Section 6. Allegheny County.
(a) Local Bridges
Local
State
(1) West Deer Township, McIntyre Road over Deer Creek, Bridge Replacement, Bridge Key 2375, Project ID 88408
Project Allocation
464,000
(Base Project Allocation - $464,000)
(2) Plum Borough, Renton Road over Little Plum Creek, Bridge Rehabilitation, Bridge Key 2695, Project ID 93026
Project Allocation
460,000
(Base Project Allocation - $460,000)
(3) Plum Borough, Stotler Road over Plum Creek, Bridge Rehabilitation, Bridge Key 2691, Project ID 88415
Project Allocation
240,000
(Base Project Allocation - $240,000)
(4) Plum Borough, Stotler Road over Plum Creek, Bridge Rehabilitation, Bridge Key 2691, Project ID 79892
Project Allocation
1,252,000
(Base Project Allocation - $767,000)
(Land Allocation - $33,000)
(Design & Contingencies - $452,000)
(5) Rankin Borough, Kenmawr Avenue over Fleet Street, Bridge Rehabilitation, Bridge Key 2663, Project ID 93917
Project Allocation
1,400,000
(Base Project Allocation - $1,050,000)
(Design & Contingencies - $350,000)
(6) Richland Township, SR 7217 McIntyre Road over West Branch of Deer Creek, Bridge Rehabilitation, Bridge Key 2351, Project ID 75122
Project Allocation
200,000
(Base Project Allocation - $200,000)
(7) Robinson Township, Campbells Run Road over Campbells Run, Bridge Rehabilitation, Bridge Key 2192, Project ID 88401
Project Allocation
1,661,000
(Base Project Allocation - $940,000)
(Land Allocation - $94,000)
(Design & Contingencies - $627,000)
(8) Ross Township, Bellevue Road over SR 0279, Bridge Rehabilitation, Bridge Key 2203, Project ID 93412
Project Allocation
46,000
(Base Project Allocation - $30,000)
(Design & Contingencies - $16,000)
(9) Ross Township, Jacks Run Road over Jacks Run, Bridge Replacement, Bridge Key 2208, Project ID 88410
Project Allocation
1,221,000
(Base Project Allocation - $713,000)
(Land Allocation - $32,000)
(Design & Contingencies - $476,000)
(10) Shaler Township, Evergreen Road over Girtys Run, Bridge Rehabilitation, Bridge Key 2231, Project ID 93421
Project Allocation
51,000
(Base Project Allocation - $34,000)
(Design & Contingencies - $17,000)
(11) South Fayette Township, Station Street over South Branch of Robinson Run, Bridge Rehabilitation, Bridge Key 2243, Project ID 88418
Project Allocation
2,829,000
(Base Project Allocation - $2,085,000)
(Land Allocation - $63,000)
(Design & Contingencies - $681,000)
(12) South Park Township, Corrigan Drive over Catfish Run, Bridge Rehabilitation, Bridge Key 2367, Project ID 88405
Project Allocation
101,000
(Base Project Allocation - $101,000)
(13) Plum Borough, Booker Street over Pucketa Creek, Bridge Replacement, Bridge Key 2692, Project ID 88417
Project Allocation
940,000
(Base Project Allocation - $584,000)
(Land Allocation - $37,000)
(Design & Contingencies - $319,000)
(14) Upper St. Clair Township, Painters Run Road over Painters Run, Bridge Rehabilitation, Bridge Key 2248, Project ID 88414
Project Allocation
1,661,000
(Base Project Allocation - $940,000)
(Land Allocation - $94,000)
(Design & Contingencies - $627,000)
(15) Sewickley Heights Borough, Backbone Road over Little Sewickley Creek, Bridge Rehabilitation, Bridge Key 2670, Project ID 88420
Project Allocation
123,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $32,000)
(16) White Oak Borough, Congress Street over Hartmans Run, Bridge Rehabilitation, Bridge Key 2720, Project ID 93411
Project Allocation
36,000
(Base Project Allocation - $24,000)
(Design & Contingencies - $12,000)
(17) Wilkins Township, Jones Avenue over East Side of Thompson Run, Bridge Rehabilitation, Bridge Key 2705, Project ID 93422
Project Allocation
51,000
(Base Project Allocation - $34,000)
(Design & Contingencies - $17,000)
(18) Wilmerding Borough, Patton Street over Norfolk Southern Railway, Avenue U, Wall, Bridge Rehabilitation, Bridge Key 2723, Project ID 93371
Project Allocation
39,000
(Base Project Allocation - $35,000)
(Design & Contingencies - $4,000)
(19) Castle Shannon Borough, SR 7416 Grove Road over Saw Mill Run, Bridge Replacement, Bridge Key 2570, Project ID 83977
Project Allocation
150,000
(Base Project Allocation - $150,000)
(20) City of Pittsburgh, Boulevard of The Allies, Charles Anderson Bridge over CSX Railroad and Bike Trail, Bridge Rehabilitation, Bridge Key 2394, Project ID 91907
Project Allocation
3,287,000
(Base Project Allocation - $2,564,000)
(Land Allocation - $17,000)
(Design & Contingencies - $706,000)
(21) City of Pittsburgh, Carnahan Road over Little Saw Mill Run, Bridge Replacement, Bridge Key 2400, Project ID 58561
Project Allocation
1,416,000
(Base Project Allocation - $558,000)
(Land Allocation - $161,000)
(Design & Contingencies - $697,000)
(22) City of Pittsburgh, Crane Avenue over Saw Mill Run Creek, Bridge Rehabilitation, Bridge Key 2405, Project ID 26316
Project Allocation
1,081,000
(Base Project Allocation - $932,000)
(Design & Contingencies - $149,000)
(23) Rankin Borough, Talbot Avenue over Union Railroad, Bridge Rehabilitation, Bridge Key 2665, Project ID 93915
Project Allocation
2,601,000
(Base Project Allocation - $2,229,000)
(Design & Contingencies - $372,000)
(24) City of Pittsburgh, SR 7301, 9th Street Bridge over Allegheny River, Bridge Rehabilitation, Bridge Key 2383, Project ID 88719
Project Allocation
5,361,000
(Base Project Allocation - $5,001,000)
(Land Allocation - $6,000)
(Design & Contingencies - $354,000)
(25) South Park Township, Wood Street over Catfish Run, Bridge Rehabilitation, Bridge Key 0, Project ID 88403
Project Allocation
224,000
(Base Project Allocation - $152,000)
(Design & Contingencies - $72,000)
(26) South Park Township, CT 20 Catfish Bridge over Catfish Run, Bridge Restoration, Bridge Key 0, Project ID 88403
Project Allocation
224,000
(Base Project Allocation - $152,000)
(Design & Contingencies - $72,000)
(27) Findlay Township, Enlow Road over Montour Run, Bridge Replacement, Bridge Key 2288, Project ID 88413
Project Allocation
912,000
(Base Project Allocation - $912,000)
(28) Baldwin Borough, Brownsville Road over Wheeling and Lake Erie Railroad, Bridge Rehabilitation, Bridge Key 2526, Project ID 93370
Project Allocation
114,000
(Base Project Allocation - $95,000)
(Design & Contingencies - $19,000)
(29) Bellevue Borough, Jackman Avenue over West Bellevue Road, Bridge Rehabilitation, Bridge Key 2528, Project ID 93395
Project Allocation
38,000
(Base Project Allocation - $25,000)
(Design & Contingencies - $13,000)
(30) Carnegie Borough, Chestnut Street over Chartiers Creek, Bridge Rehabilitation, Bridge Key 2564, Project ID 93396
Project Allocation
41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(31) Shaler Township, Wible Run Road over Wible Run Creek, Bridge Rehabilitation, Bridge Key 2235, Project ID 88501
Project Allocation
22,000
(Base Project Allocation - $9,000)
(Land Allocation - $3,000)
(Design & Contingencies - $10,000)
(32) Elizabeth Township, Sutersville Bridge over Youghiogheny River, Bridge Rehabilitation, Bridge Key 2135, Project ID 93913
Project Allocation
1,482,000
(Base Project Allocation - $1,010,000)
(Land Allocation - $17,000)
(Design & Contingencies - $455,000)
(33) City of Pittsburgh, Windgap Avenue over Edmore and Creek Roads, Railroads and Charck, Bridge Rehabilitation, Bridge Key 2385, Project ID 93401
Project Allocation
61,000
(Base Project Allocation - $40,000)
(Design & Contingencies - $21,000)
(34) Fox Chapel Borough, Fox Chapel Road over Squaw Run, Bridge Rehabilitation, Bridge Key 2594, Project ID 88422
Project Allocation
165,000
(Base Project Allocation - $165,000)
(35) Jefferson Hills Borough, Coal Valley Road over McRoberts Run, Bridge Replacement, Bridge Key 2604, Project ID 88411
Project Allocation
592,000
(Base Project Allocation - $592,000)
(36) Jefferson Hills Borough, Cochran Mill Road over North Branch of Licks Run, Bridge Rehabilitation, Bridge Key 2364, Project ID 95754
Project Allocation
1,661,000
(Base Project Allocation - $940,000)
(Land Allocation - $94,000)
(Design & Contingencies - $627,000)
(37) McCandless Township, Kummer Road over Pine Creek, Bridge Rehabilitation, Bridge Key 2160, Project ID 93164
Project Allocation
1,721,000
(Base Project Allocation - $1,330,000)
(Land Allocation - $36,000)
(Design & Contingencies - $355,000)
(38) McCandless Township, McKinney Road over North Branch of Pine Creek, Bridge Replacement, Bridge Key 2161, Project ID 88416
Project Allocation
1,211,000
(Base Project Allocation - $598,000)
(Design & Contingencies - $613,000)
(39) Monroeville Borough, Abers Creek Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2630, Project ID 92912
Project Allocation
32,000
(Base Project Allocation - $8,000)
(Land Allocation - $15,000)
(Design & Contingencies - $9,000)
(40) Monroeville Borough, Abers Creek Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2631, Project ID 88497
Project Allocation
73,000
(Base Project Allocation - $9,000)
(Land Allocation - $14,000)
(Design & Contingencies - $50,000)
(41) Monroeville Borough, Cavitt Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2632, Project ID 88498
Project Allocation
106,000
(Base Project Allocation - $42,000)
(Land Allocation - $14,000)
(Design & Contingencies - $50,000)
(42) City of Pittsburgh, 16th Street Bridge over Smallman Street, Allegheny River, Bridge Rehabilitation, Bridge Key 2384, Project ID 95796
Project Allocation
113,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $22,000)
(43) Collier Township, Vanadium Road over Chartiers Creek, Bridge Rehabilitation, Bridge Key 2114, Project ID 93400
Project Allocation
61,000
(Base Project Allocation - $40,000)
(Design & Contingencies - $21,000)
(44) City of Pittsburgh, Oakwood Road over Pensdale Street, Oakwood Run, Bridge Rehabilitation, Bridge Key 2389, Project ID 93366
Project Allocation
35,000
(Base Project Allocation - $31,000)
(Design & Contingencies - $4,000)
(45) City of Pittsburgh, Ivory Avenue No.1 over I-279 Ramp J and Truck US 19, Bridge Rehabilitation, Bridge Key 2386, Project ID 93394
Project Allocation
41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(46) City of Pittsburgh, Glenwood Bridge over Monongahela River and Carson Street, Bridge Rehabilitation, Bridge Key 1310, Project ID 93419
Project Allocation
71,000
(Base Project Allocation - $53,000)
(Design & Contingencies - $18,000)
(47) Monroeville Borough, Stroschein Road over Branch of Dirty Camp Run, Bridge Rehabilitation, Bridge Key 2633, Project ID 93413
Project Allocation
46,000
(Base Project Allocation - $30,000)
(Design & Contingencies - $16,000)
(48) City of Pittsburgh, 7th Street Bridge over Allegheny River, Bridge Rehabilitation, Bridge Key 2382, Project ID 88541
Project Allocation
4,155,000
(Base Project Allocation - $3,869,000)
(Land Allocation - $16,000)
(Design & Contingencies - $270,000)
(49) Penn Hills Township, Lincoln Road over Shades Run, Bridge Rehabilitation, Bridge Key 2174, Project ID 93393
Project Allocation
41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(50) O'Hara Township, Old Freeport Road over Little Squaw Run, Bridge Rehabilitation, Bridge Key 2173, Project ID 88499
Project Allocation
27,000
(Base Project Allocation - $16,000)
(Design & Contingencies - $11,000)
(51) O'Hara Township, Old Freeport Road over Squaw Run, Bridge Rehabilitation, Bridge Key 2172, Project ID 88421
Project Allocation
22,000
(Base Project Allocation - $9,000)
(Land Allocation - $3,000)
(Design & Contingencies - $10,000)
(52) City of Pittsburgh, Windgap Avenue over Edmore and Creek Roads, Railroads and Charck, Bridge Rehabilitation, Bridge Key 2385, Project ID 93392
Project Allocation
46,000
(Base Project Allocation - $30,000)
(Design & Contingencies - $16,000)
(53) Neville Township, Fleming Park Bridge over Ohio River, CSX Railroad, Bridge Rehabilitation, Bridge Key 2168, Project ID 93418
Project Allocation
41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(54) Munhall Borough, Ravine Street over Homestead Run, Bridge Rehabilitation, Bridge Key 2646, Project ID 79934
Project Allocation
1,254,000
(Base Project Allocation - $644,000)
(Land Allocation - $31,000)
(Design & Contingencies - $579,000)
(55) City of Pittsburgh, Eighth Avenue, Homestead Grays over CSX and Norfolk Southern Railroads and Monongahela River, Bridge Rehabilitation, Bridge Key 2503, Project ID 56957
Project Allocation
113,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $22,000)
(56) Etna Borough, Hafner Street over Pine Creek, Bridge Rehabilitation
Project Allocation
212,000
(Base Project Allocation - $212,000)
(57) West View Borough, Marsolf Avenue over Center Avenue, Bridge Replacement
Project Allocation
250,000
(Base Project Allocation - $250,000)
(58) West Deer Township, Benjamin Street over East Deer Creek and Deer Creek Valley Road, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(59) O'Hara Township, Browns Hill Road over East Little Pine Creek, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(60) Harmar Township, Campbell Run Road over Guys Run Stream, Bridge Replacement
Project Allocation
175,000
(Base Project Allocation - $175,000)
(61) West Deer Township, Crest Street over East Deer Creek and Deer Creek Valley Road, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(62) Fawn Township, Grimm Road over Bull Creek, Bridge Rehabilitation
Project Allocation
100,000
(Base Project Allocation - $100,000)
(63) West Deer Township, Lick Road over Tributary of Deer Creek, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(64) Hampton Township, Oakhill Road Bridge over Willow Run, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(65) Fox Chapel Borough, Rockwood Drive over Squaw Run Creek, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(66) Indiana Township, Shaffer Run Road over Shaffer Run, Bridge Replacement
Project Allocation
175,000
(Base Project Allocation - $175,000)
(67) Fox Chapel Borough, Squaw Run Creek No.2 over Squaw Run Creek, Bridge Replacement
Project Allocation
500,000
(Base Project Allocation - $500,000)
(68) Findlay Township, Aten Road over Industry Drive, Bridge Replacement
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
(69) City of Pittsburgh, Intersection of Second Avenue, Irvine Street, Greenfield Avenue and Saline Street over SR 0885 Servicing CSX Railroad and Vacated Right-of-Way, Bridge Rehabilitation or Replacement
Project Allocation
15,000,000
(Base Project Allocation - $15,000,000)
(70) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement
Project Allocation
754,000
(Base Project Allocation - $754,000)
(71) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement
Project Allocation
156,000
(Base Project Allocation - $156,000)
(72) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement
Project Allocation
1,012,000
(Base Project Allocation - $1,012,000)
(73) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement
Project Allocation
806,000
(Base Project Allocation - $806,000)
(74) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement
Project Allocation
720,000
(Base Project Allocation - $720,000)
(75) Penn Hills Township, Universal Road over Bessemer and Lake Erie Railroad, Bridge Preservation
Project Allocation
166,000
(Base Project Allocation - $166,000)
(76) West Mifflin Borough, Homestead-Duquesne Road over Bull Run, Bridge Replacement
Project Allocation
2,534,000
(Base Project Allocation - $2,534,000)
(77) West Mifflin Borough, Homestead-Duquesne Road over Bull Run, Bridge Replacement
Project Allocation
864,000
(Base Project Allocation - $864,000)
(78) Frazer Township, Creighton-Russellton Road over Bailey's Run, Bridge Replacement
Project Allocation
288,000
(Base Project Allocation - $288,000)
(79) Crafton Borough, Steuben Street over Chartiers Creek, Bridge Rehabilitation
Project Allocation
234,000
(Base Project Allocation - $234,000)
(80) Carnegie Borough, Hammond Street over Chartiers Creek, Bridge Preservation
Project Allocation
284,000
(Base Project Allocation - $284,000)
(81) Collier Township, Thoms Run and Oakdale Roads over Chartiers Creek, Bridge Replacement
Project Allocation
768,000
(Base Project Allocation - $768,000)
(82) Penn Hills Township, Laketon Road over Chalfont Run, Bridge Replacement
Project Allocation
376,000
(Base Project Allocation - $376,000)
(83) North Versailles Township, Crooked Run Road over Crooked Run, Bridge Rehabilitation
Project Allocation
743,000
(Base Project Allocation - $743,000)
(84) Robinson Township, Campbells Run Road over South Side of Campbells Run, Bridge Replacement
Project Allocation
621,000
(Base Project Allocation - $621,000)
(85) South Park Township, Maple Springs Drive over Catfish Run, Bridge Rehabilitation
Project Allocation
480,000
(Base Project Allocation - $480,000)
(86) South Park Township, South Park Fairgrounds over Catfish Run, Bridge Replacement
Project Allocation
691,000
(Base Project Allocation - $691,000)
(87) South Park Township, South Park Skating Rink over Catfish Run, Bridge Rehabilitation
Project Allocation
408,000
(Base Project Allocation - $408,000)
(88) Harmar Township, Rich Hill Road over Deer Creek, Bridge Preservation
Project Allocation
1,019,000
(Base Project Allocation - $1,019,000)
(89) West Deer Township, Glendening Road over Deer Creek, Bridge Preservation
Project Allocation
499,000
(Base Project Allocation - $499,000)
(90) Indiana Township, Jacoby Road over Little Deer Creek, Bridge Replacement
Project Allocation
858,000
(Base Project Allocation - $858,000)
(91) Franklin Park Borough, Brandt School Road over Fish Run, Bridge Preservation
Project Allocation
432,000
(Base Project Allocation - $432,000)
(92) City of Duquesne, Duquesne Flyover over CSX Railroad, Bridge Rehabilitation
Project Allocation
263,000
(Base Project Allocation - $263,000)
(93) City of McKeesport, McKeesport Flyover over CSX Railroad, Bridge Preservation
Project Allocation
250,000
(Base Project Allocation - $250,000)
(94) Hampton Township, Old Butler Plank Road over Gourdhead Run, Bridge Replacement
Project Allocation
882,000
(Base Project Allocation - $882,000)
(95) Ross Township, Evergreen Road Extension over Girtys Run, Bridge Replacement
Project Allocation
626,000
(Base Project Allocation - $626,000)
(96) Ross Township, Cemetery Lane over Girtys Run, Bridge Preservation
Project Allocation
705,000
(Base Project Allocation - $705,000)
(97) Bethel Park Borough, Graeser's Run Road over Graeser's Run, Bridge Replacement
Project Allocation
826,000
(Base Project Allocation - $826,000)
(98) Liberty Borough, Liberty Way over Heath's Run, Bridge Rehabilitation
Project Allocation
1,332,000
(Base Project Allocation - $1,332,000)
(99) Munhall Borough, Homeville Road over Homeville Creek, Bridge Preservation
Project Allocation
994,000
(Base Project Allocation - $994,000)
(100) McCandless Township, Pearce Mill Road over Irwin Run, Bridge Preservation
Project Allocation
634,000
(Base Project Allocation - $634,000)
(101) City of Pittsburgh, Lincoln Avenue over Jacks Run, Bridge Preservation
Project Allocation
2,013,000
(Base Project Allocation - $2,013,000)
(102) Bellevue Borough, Bascom Avenue over Jacks Run, Bridge Preservation
Project Allocation
2,436,000
(Base Project Allocation - $2,436,000)
(103) Ross Township, Jacks Run Road over Jacks Run, Bridge Replacement
Project Allocation
2,142,000
(Base Project Allocation - $2,142,000)
(104) Sewickley Hills Borough, Glenfield Road over Kilbuck Run, Bridge Preservation
Project Allocation
864,000
(Base Project Allocation - $864,000)
(105) Sewickley Heights Borough, Glenfield Road over Kilbuck Run, Bridge Preservation
Project Allocation
562,000
(Base Project Allocation - $562,000)
(106) Sewickley Heights Borough, Glenfield Road over Kilbuck Run, Bridge Preservation
Project Allocation
459,000
(Base Project Allocation - $459,000)
(107) Jefferson Hills Borough, Wallace Road over Lick's Run, Bridge Replacement
Project Allocation
507,000
(Base Project Allocation - $507,000)
(108) Jefferson Hills Borough, Cochran Mill Road over Lick's Run, Bridge Replacement
Project Allocation
672,000
(Base Project Allocation - $672,000)
(109) South Park Township, Old Brownsville Road over Lick's Run, Bridge Replacement
Project Allocation
116,000
(Base Project Allocation - $116,000)
(110) White Oak Borough, Coultersville Road over Long Run, Bridge Replacement
Project Allocation
403,000
(Base Project Allocation - $403,000)
(111) Findlay Township, Imperial and Burgettstown Road over North Fork of Montour Run, Bridge Replacement
Project Allocation
501,000
(Base Project Allocation - $501,000)
(112) Jefferson Hills Borough, Coal Valley Road over McRobert's Run, Bridge Replacement
Project Allocation
90,000
(Base Project Allocation - $90,000)
(113) Findlay Township, Clinton Road over North Branch of Montour Run, Bridge Rehabilitation
Project Allocation
384,000
(Base Project Allocation - $384,000)
(114) Coraopolis Borough, Neville Road over Back Channel of Ohio River, Bridge Preservation
Project Allocation
2,858,000
(Base Project Allocation - $2,858,000)
(115) Upper St. Clair Township, Painter's Run Road over Painter's Run, Bridge Replacement
Project Allocation
818,000
(Base Project Allocation - $818,000)
(116) Ross Township, Jacks Run Road over I-279, Bridge Rehabilitation
Project Allocation
415,000
(Base Project Allocation - $415,000)
(117) South Park Township, Triphammer Road over Piney Fork, Bridge Rehabilitation
Project Allocation
799,000
(Base Project Allocation - $799,000)
(118) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Replacement
Project Allocation
826,000
(Base Project Allocation - $826,000)
(119) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Rehabilitation
Project Allocation
360,000
(Base Project Allocation - $360,000)
(120) Shaler Township, Old Butler Plank Road over Pine Creek, Bridge Preservation
Project Allocation
2,168,000
(Base Project Allocation - $2,168,000)
(121) Shaler Township, Old Butler Plank Road over Pine Creek, Bridge Rehabilitation
Project Allocation
951,000
(Base Project Allocation - $951,000)
(122) Hampton Township, Wildwood Road over Pine Creek, Bridge Preservation
Project Allocation
1,134,000
(Base Project Allocation - $1,134,000)
(123) Plum Borough, Renton Road over Plum Creek, Bridge Rehabilitation
Project Allocation
825,000
(Base Project Allocation - $825,000)
(124) Pine Township, Brown Road over North Branch of Pine Creek, Bridge Rehabilitation
Project Allocation
612,000
(Base Project Allocation - $612,000)
(125) McCandless Township, North Pine Creek Bridge No.3 over North Branch of Pine Creek, Bridge Rehabilitation
Project Allocation
1,123,000
(Base Project Allocation - $1,123,000)
(126) Ross Township, Thompson Run Road over South Branch of Pine Creek, Bridge Preservation
Project Allocation
873,000
(Base Project Allocation - $873,000)
(127) Shaler Township, McElheny Road over South Branch of Pine Creek, Bridge Rehabilitation
Project Allocation
441,000
(Base Project Allocation - $441,000)
(128) Bethel Park Borough, Fort Couch Road over Port Authority Transit, Bridge Rehabilitation
Project Allocation
2,928,000
(Base Project Allocation - $2,928,000)
(129) Plum Borough, Pierson Run Road over Upper Branch of Plum Creek, Bridge Preservation
Project Allocation
134,000
(Base Project Allocation - $134,000)
(130) North Fayette Township, Mill Street over South Branch of Robinson Run, Bridge Replacement
Project Allocation
240,000
(Base Project Allocation - $240,000)
(131) Penn Hills Township, Lincoln Road over Ryan's Run, Bridge Replacement
Project Allocation
100,000
(Base Project Allocation - $100,000)
(132) Bell Acres Borough, Merriman Road over Big Sewickley Creek, Bridge Preservation
Project Allocation
8,139,000
(Base Project Allocation - $8,139,000)
(133) Franklin Park Borough, Brown Road over East Branch of Big Sewickley Creek, Bridge Rehabilitation
Project Allocation
374,000
(Base Project Allocation - $374,000)
(134) Sewickley Heights Borough, Fern Hollow Road over Little Sewickley Creek, Bridge Preservation
Project Allocation
96,000
(Base Project Allocation - $96,000)
(135) Sewickley Heights Borough, Fern Hollow Road over South Branch of Little Sewickley Creek, Bridge Replacement
Project Allocation
521,000
(Base Project Allocation - $521,000)
(136) Fox Chapel Borough, Fox Chapel Road over Squaw Run, Bridge Preservation
Project Allocation
521,000
(Base Project Allocation - $521,000)
(137) City of Pittsburgh, Ramp Street over Street's Run, Bridge Rehabilitation
Project Allocation
537,000
(Base Project Allocation - $537,000)
(138) Collier Township, Thoms Run and Oakdale Roads over Thoms Run, Bridge Replacement
Project Allocation
295,000
(Base Project Allocation - $295,000)
(139) Collier Township, Thoms Run and Oakdale Roads over Thoms Run, Bridge Replacement
Project Allocation
109,000
(Base Project Allocation - $109,000)
(140) Monroeville Borough, Saunders Station Road over Turtle Creek, Bridge Preservation
Project Allocation
1,732,000
(Base Project Allocation - $1,732,000)
(141) Ross Township, Thompson Run Road over North Side of Thompson Run, Bridge Preservation
Project Allocation
192,000
(Base Project Allocation - $192,000)
(142) City of Pittsburgh, Mifflin Road over South Side of Thompson Run, Bridge Preservation
Project Allocation
480,000
(Base Project Allocation - $480,000)
(143) Braddock Hills Borough, Braddock Ardmore Boulevard Connector Road over Tassy Hollow Run, Bridge Preservation
Project Allocation
465,000
(Base Project Allocation - $465,000)
(144) Homestead Borough, West Ramp at Homestead Grays Bridge over Parking Lot Parallel to CSX Railroad, Bridge Preservation
Project Allocation
3,314,000
(Base Project Allocation - $3,314,000)
(145) White Oak Borough, McClintock Road over Tributary of Jacks Run, Bridge Replacement
Project Allocation
396,000
(Base Project Allocation - $396,000)
(146) White Oak Borough, Muse Lane over Tributary of Youghiogheny River, Bridge Replacement
Project Allocation
202,000
(Base Project Allocation - $202,000)
(147) Ben Avon Borough, Cornell Avenue over Spruce Run, Bridge Preservation
Project Allocation
1,722,000
(Base Project Allocation - $1,722,000)
(148) Various Municipalities, Various Routes over Various Spans, Bridge Preservation
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) Guys Run Road 0.5 Mile North of SR 0028 over Guys Run, Harmar Township, Bridge Rehabilitation, Bridge Key 1400, Project ID 89115
Project Allocation
1,200,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $200,000)
(3) Little Deer Creek Road North, Rural Ridge over Branch of Little Deer Creek, Indiana Township, Bridge Replacement, Bridge Key 1424, Project ID 99687
Project Allocation
1,000
(Base Project Allocation - $1,000)
(4) Hite Road 0.7 Mile Northeast of Pennsylvania Turnpike over Allegheny Valley Expressway, Harmar Township, Bridge Rehabilitation, Bridge Key 1417, Project ID 100644
Project Allocation
500,000
(Base Project Allocation - $500,000)
(5) Little Deer Creek Road North, Rural Ridge over Branch of Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1424, Project ID 100645
Project Allocation
600,000
(Base Project Allocation - $600,000)
(6) Little Deer Creek Road 1.0 Mile North of SR 1016 over Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1426, Project ID 100646
Project Allocation
720,000
(Base Project Allocation - $720,000)
(7) Little Deer Creek Road 1.0 Mile North of SR 1016 over Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1426, Project ID 63346
Project Allocation
443,000
(Base Project Allocation - $366,000)
(Design & Contingencies - $77,000)
(8) Little Deer Creek Valley Road West at Orange Belt X over Little Deer Creek, West Deer Township, Bridge Rehabilitation, Bridge Key 1429, Project ID 100647
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(9) Days Run Road 1.0 Mile from Bailey Run Road over Days Run, Frazer Township, Bridge Rehabilitation, Bridge Key 1438, Project ID 100649
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(10) Bakerstown Road over Lardintown Run, Fawn Township, Bridge Replacement, Bridge Key 1455, Project ID 63356
Project Allocation
1,028,000
(Base Project Allocation - $385,000)
(Land Allocation - $97,000)
(Design & Contingencies - $546,000)
(11) Gibsonia Road 250 Feet South of SR 1020 over Deer Creek, West Deer Township, Bridge Rehabilitation, Bridge Key 1339, Project ID 100634
Project Allocation
640,000
(Base Project Allocation - $640,000)
(12) Pleasantville Road 0.25 Mile Southwest of SR 1032 over Little Bull Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 1448, Project ID 100650
Project Allocation
1,160,000
(Base Project Allocation - $1,160,000)
(13) Guys Run Road 1,028 Feet North of Freeport Road over Guys Run, Harmar Township, Bridge Replacement, Bridge Key 1397, Project ID 89100
Project Allocation
1,401,000
(Base Project Allocation - $350,000)
(Land Allocation - $132,000)
(Design & Contingencies - $919,000)
(14) Harts Run Road at Intersection with SR 1006 over Little Pine Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1396, Project ID 100643
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(15) Highland Park Bridge over Freeport Road, Old Route 28, O'Hara Township, Bridge Rehabilitation, Bridge Key 1384, Project ID 100641
Project Allocation
600,000
(Base Project Allocation - $600,000)
(16) North Canal Street over Seitz Run, O'Hara Township, Bridge Rehabilitation, Bridge Key 1378, Project ID 100640
Project Allocation
600,000
(Base Project Allocation - $600,000)
(17) Seventh Avenue at Approach to Tarentum Bridge over Bull Creek, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1374, Project ID 100639
Project Allocation
400,000
(Base Project Allocation - $400,000)
(18) Freeport Road over Barge Basin, Harmar Township, Bridge Restoration, Bridge Key 1366, Project ID 100948
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(19) Street over Pine Creek, Etna Borough, Bridge Restoration, Bridge Key 1355, Project ID 100947
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(20) Clinton Road 200 Feet West of SR 3063 over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1351, Project ID 100637
Project Allocation
740,000
(Base Project Allocation - $740,000)
(21) Bull Creek Road 4,200 Feet Southeast of SR 1033 over Bull Creek, Fawn Township, Bridge Rehabilitation, Bridge Key 1471, Project ID 63513
Project Allocation
418,000
(Base Project Allocation - $219,000)
(Land Allocation - $41,000)
(Design & Contingencies - $158,000)
(22) Gibsonia Road at Interchange with SR 1036 over Rawlins Run, Indiana Township, Bridge Rehabilitation, Bridge Key 1342, Project ID 100635
Project Allocation
640,000
(Base Project Allocation - $640,000)
(23) Verona Road 0.75 Mile Northeast of SR 0400 over Sandy Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1588, Project ID 89077
Project Allocation
3,001,000
(Base Project Allocation - $2,001,000)
(Design & Contingencies - $1,000,000)
(24) Miller's Run Road 100 Feet West of SR 3026 over Dolphin Run, South Fayette Township, Bridge Rehabilitation, Bridge Key 1347, Project ID 100636
Project Allocation
800,000
(Base Project Allocation - $800,000)
(25) New Texas Road at Intersection with SR 0286 over Abers Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1618, Project ID 80508
Project Allocation
185,000
(Base Project Allocation - $113,000)
(Land Allocation - $30,000)
(Design & Contingencies - $42,000)
(26) SR 3014 over Catfish Run, South Park Township, Bridge Restoration, Bridge Key 1714, Project ID 100682
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(27) SR 3012 over Sleepy Hollow Road, South Park Township, Bridge Restoration, Bridge Key 1711, Project ID 100681
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(28) SR 3007, Walton Road Bridge over Branch of Lobbs Run, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1703, Project ID 100698
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(29) SR 2208 over SR 2270, City of Pittsburgh, Bridge Restoration, Bridge Key 1687, Project ID 100680
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(30) SR 2124 Fortieth Street Bridge over Norfolk Allegheny Valley, City of Pittsburgh, Bridge Replacement, Bridge Key 1674, Project ID 88375
Project Allocation
352,000
(Base Project Allocation - $352,000)
(31) Center Street over Long Run, White Oak Borough, Bridge Restoration, Bridge Key 1671, Project ID 100679
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(32) McKeesport-Duquesne Bridge over 736 Extension, Three Railroads, Monongahela River, City of Duquesne, Bridge Rehabilitation, Bridge Key 1668, Project ID 63583
Project Allocation
1,720,000
(Base Project Allocation - $1,497,000)
(Design & Contingencies - $223,000)
(33) SR 2086, Leechburg Road over Plum Creek, Plum Borough, Bridge Replacement, Bridge Key 1646, Project ID 89093
Project Allocation
1,600,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $600,000)
(34) Plum Avenue over Plum Creek, Oakmont Borough, Bridge Restoration, Bridge Key 1631, Project ID 100949
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(35) Old Leechburg Road at Intersection with SR 2075 over Branch of Little Plum Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1628, Project ID 63554
Project Allocation
79,000
(Base Project Allocation - $60,000)
(Land Allocation - $10,000)
(Design & Contingencies - $9,000)
(36) SR 2052 over Thompson Run, West Mifflin Borough, Bridge Restoration, Bridge Key 1582, Project ID 100669
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(37) New Texas Road over Branch of Little Plum Creek, Plum Borough, Bridge Replacement, Bridge Key 1620, Project ID 89124
Project Allocation
70,000
(Base Project Allocation - $50,000)
(Design & Contingencies - $20,000)
(38) Sunfish Road 0.75 Mile North of SR 0136 over Sunfish Run, Forward Township, Bridge Rehabilitation, Bridge Key 1497, Project ID 63520
Project Allocation
122,000
(Base Project Allocation - $60,000)
(Land Allocation - $15,000)
(Design & Contingencies - $47,000)
(39) Crosstown Boulevard Southbound over 7th Avenue Ramp D, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1240, Project ID 93009
Project Allocation
380,000
(Base Project Allocation - $380,000)
(40) SR 2053 over Duffs Run Road, Churchill Borough, Bridge Restoration, Bridge Key 1584, Project ID 100670
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(41) Gibsonia Road 1.0 Mile East of Route 8 Interchange over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation, Bridge Key 1334, Project ID 63321
Project Allocation
556,000
(Base Project Allocation - $456,000)
(Land Allocation - $31,000)
(Design & Contingencies - $69,000)
(42) Ramp R Northbound over Braddock Avenue, East Pittsburgh Borough, Bridge Restoration, Bridge Key 1547, Project ID 100952
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(43) Lincoln Way 237 Feet East of Interchange with SR 0048 over Long Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 1535, Project ID 89129
Project Allocation
452,000
(Base Project Allocation - $395,000)
(Design & Contingencies - $57,000)
(44) Lincoln Way at Interchange with SR 2022 over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1533, Project ID 89095
Project Allocation
901,000
(Base Project Allocation - $353,000)
(Land Allocation - $18,000)
(Design & Contingencies - $530,000)
(45) Stewartsville Hollow Road 2,644 Feet Northeast of LR 02310 over Branch of Long Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 1527, Project ID 91779
Project Allocation
8,367,000
(Base Project Allocation - $7,666,000)
(Land Allocation - $34,000)
(Design & Contingencies - $667,000)
(46) Stewartsville Hollow Road 2,644 Feet Northeast of LR 02310 over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1527, Project ID 99670
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(47) SR 2017, Buena Vista Road over Wildcat Run, Elizabeth Township, Bridge Rehabilitation, Bridge Key 1521, Project ID 89119
Project Allocation
1,200,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $200,000)
(48) Buena Vista Road at Rock Run Road over Wildcat Run, Elizabeth Township, Bridge Replacement, Bridge Key 1520, Project ID 99665
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(49) SR 2013, Ella Hollow Road 564 Feet North of SR 0136 over Branch of Beckets Run, Forward Township, Bridge Rehabilitation, Bridge Key 1507, Project ID 82292
Project Allocation
614,000
(Base Project Allocation - $614,000)
(50) SR 2075 over Little Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1624, Project ID 100676
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(51) I-376, Parkway East 247 Feet West of Old William Penn Highway over Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1210, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(52) SR 0030, Ardmore Boulevard (Bridge 663) over LR 395, Rodi Road, Churchill Borough, Bridge Rehabilitation, Bridge Key 1198, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(53) I-376, Parkway East over Sunset Drive, Old William Penn Highway and Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1200, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(54) I-376, Parkway East over Sunset Drive, Old William Penn Highway and Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1200, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(55) I-376, Parkway East 1,000 Feet West of Thompson Run Bridge over Branch of Thompson Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1203, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(56) I-376, Parkway East 1,000 Feet West of Thompson Run Bridge over Branch of Thompson Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1203, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(57) I-376, Parkway East 2.5 Miles West of Pennsylvania Turnpike over LR 744, Union Railroad, Thompson, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1204, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(58) I-81 Northbound (Bridge 13672) over LR 744, Union Railroad, Thompson, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1204, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(59) I-376, Parkway East, Second Avenue to Forbes Avenue over Old William Penn Highway and Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1206, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(60) I-376, Parkway East, Second Avenue to Forbes Avenue over Old William Penn Highway and Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1206, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(61) Veterans Bridge over Allegheny River, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1244, Project ID 93009
Project Allocation
1,140,000
(Base Project Allocation - $1,140,000)
(62) SR 3017 over Peters Creek, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1723, Project ID 100683
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(63) I-376, Parkway East over LR 187 Ramp A Westbound, Churchill Borough, Bridge Rehabilitation, Bridge Key 1197, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(64) SR 4012, Union Avenue over Spruce Run, Ross Township, Bridge Restoration, Bridge Key 1942, Project ID 100711
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(65) I-81 Southbound (Bridge 13676) over Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1210, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(66) I-376, Parkway East 247 Feet West of Old William Penn Highway over Haymaker Road, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1212, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(67) SR 1005, Chapel Drive (Bridge 3646) over Haymaker Road, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1212, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(68) I-376, Parkway East Eastbound over LR 187, Business Route 22, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1214, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(69) I-81 Northbound (Bridge 13671) over LR 187, Business Route 22, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1214, Project ID 87778
Project Allocation
261,000
(Base Project Allocation - $219,000)
(Design & Contingencies - $42,000)
(70) Ramp G Road, 228 Eastbound over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1219, Project ID 100626
Project Allocation
800,000
(Base Project Allocation - $800,000)
(71) Baum Boulevard 1.0 Mile South of Bloomfield over CSX Railroad Past East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1229, Project ID 100627
Project Allocation
600,000
(Base Project Allocation - $600,000)
(72) Saltsburg Road 50 Feet East of Pierson Run Road over Plum Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1232, Project ID 100625
Project Allocation
540,000
(Base Project Allocation - $540,000)
(73) Crosstown Boulevard Northbound over Fifth Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1234, Project ID 93009
Project Allocation
456,000
(Base Project Allocation - $456,000)
(74) I-376, Parkway East over Old William Penn Highway, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1208, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(75) Webster Avenue over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1236, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(76) Boulevard of the Allies, Brady Street Interchange over Forbes Ramps E and F, Local, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1320, Project ID 100632
Project Allocation
380,000
(Base Project Allocation - $380,000)
(77) Mifflin Road, Glenwood Interchange over SR 8059 Ramp A, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1309, Project ID 100631
Project Allocation
660,000
(Base Project Allocation - $660,000)
(78) Lebanon Road Bridge over Baldwin Road, City of Pittsburgh, Bridge Restoration, Bridge Key 1302, Project ID 100951
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(79) Eighth Avenue Southbound, West Homestead to City Line over Ramps C and D, Ramp Carson, Local, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1286, Project ID 100630
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
(80) Eighth Avenue Northbound, West Homestead to City Line over Baldwin Road, West Homestead Borough, Bridge Rehabilitation, Bridge Key 1283, Project ID 100628
Project Allocation
3,010,000
(Base Project Allocation - $3,010,000)
(81) Kennywood Boulevard, Kennywood Park Bridge over Abandoned Union Railroad Yard, West Mifflin Borough, Bridge Rehabilitation, Bridge Key 1278, Project ID 94648
Project Allocation
231,000
(Design & Contingencies - $231,000)
(82) Kennywood Boulevard, Kennywood Park Bridge over Abandoned Union Railroad Yard, West Mifflin Borough, Bridge Rehabilitation, Bridge Key 1278, Project ID 100629
Project Allocation
480,000
(Base Project Allocation - $480,000)
(83) I-579, North End of Veterans Bridge over 279, 28, HOV, Railroad, East Ohio Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1254, Project ID 93009
Project Allocation
380,000
(Base Project Allocation - $380,000)
(84) Raymond E. Wilt Highway North of Veterans Bridge over 1040, 1026, East Ohio Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1248, Project ID 93009
Project Allocation
3,800,000
(Base Project Allocation - $3,800,000)
(85) Veterans Bridge Approach Southbound, I-579 over Norfolk Southern Railway, Port Authority of Allegheny County LRT and East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1245, Project ID 93009
Project Allocation
760,000
(Base Project Allocation - $760,000)
(86) I-376, Penn Lincoln Parkway over LR 395/Rodi Road, Churchill Borough, Bridge Rehabilitation, Bridge Key 1198, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(87) Crosstown Boulevard Southbound over Fifth Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1237, Project ID 93009
Project Allocation
380,000
(Base Project Allocation - $380,000)
(88) I-79, Raymond P. Shafer Highway Southbound (Bridge 857) over LR 187, Ramp A Westbound, Churchill Borough, Bridge Rehabilitation, Bridge Key 1197, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(89) Center Avenue over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1235, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(90) I-376 over Ardmore Boulevard, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1182, Project ID 87767
Project Allocation
174,000
(Base Project Allocation - $150,000)
(Design & Contingencies - $24,000)
(91) I-376 over SR 8012 Ramp A, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1183, Project ID 87767
Project Allocation
86,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $11,000)
(92) I-376 over LR 763 Ramp G, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1185, Project ID 87767
Project Allocation
86,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $11,000)
(93) I-376 over Beulah Road, Churchill Borough, Bridge Restoration, Bridge Key 1189, Project ID 87767
Project Allocation
86,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $11,000)
(94) I-376 Westbound over SR 2110 SH, Churchill Borough, Bridge Restoration, Bridge Key 1192, Project ID 87767
Project Allocation
86,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $11,000)
(95) I-376, Parkway East 1,000 Feet West of TR 791 over Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1194, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(96) I-79, Raymond P. Shafer Highway Northbound (Bridge 854) over Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1194, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(97) I-79, Raymond P. Shafer Highway (Bridge 852) over Branch of Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1195, Project ID 87778
Project Allocation
140,000
(Base Project Allocation - $117,000)
(Design & Contingencies - $23,000)
(98) Gibsonia Road 1.0 Mile East of Route 8 Interchange over West Branch of Deer Creek, Richland Township, Bridge Replacement, Bridge Key 1334, Project ID 100633
Project Allocation
800,000
(Base Project Allocation - $800,000)
(99) Veterans Bridge Approach Northbound over Norfolk Southern Railway, Port Authority of Allegheny County LRT and East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1241, Project ID 93009
Project Allocation
190,000
(Base Project Allocation - $190,000)
(100) Blazier Drive 108003 over Pine Creek, McCandless Township, Bridge Replacement, Bridge Key 2153, Project ID 86359
Project Allocation
2,901,000
(Base Project Allocation - $2,048,000)
(Design & Contingencies - $853,000)
(101) Ramp B I-376 Westbound to I-79 Southbound over Parkway and Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 2759, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(102) Ramp A to 279 Northbound Ramp A-1 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 2756, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(103) I-79, Ramp D (Bridge 2750) over Ohio Central Railroad, Robinson Run, Collier Township, Bridge Repair and Restoration, Bridge Key 2750, Project ID 87751
Project Allocation
99,000
(Base Project Allocation - $79,000)
(Design & Contingencies - $20,000)
(104) I-79, LR 1016 Ramp AB (Bridge 2747) over LR 1016 Northbound and Southbound Exit Ramp, Collier Township, Bridge Repair and Restoration, Bridge Key 2747, Project ID 87751
Project Allocation
198,000
(Base Project Allocation - $158,000)
(Design & Contingencies - $40,000)
(105) Ramp T Road to Parkway Eastbound over I-376, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2742, Project ID 99019
Project Allocation
7,000
(Base Project Allocation - $7,000)
(106) SR 8004 over I-376, City of Pittsburgh, Bridge Restoration, Bridge Key 2742, Project ID 100728
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(107) Ramp V Road, Oakland Exit to Forbes over Ramps to I-376 Eastbound and Westbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2741, Project ID 99019
Project Allocation
8,000
(Base Project Allocation - $8,000)
(108) Crosstown Boulevard over Forbes, Diamond and Ramps J and G, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2733, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(109) Ramp G Road to Liberty over Liberty Bridge Approach Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2731, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(110) SR 4009, Peoples Road Bridge over Branch of Girtys Run, Ross Township, Bridge Restoration, Bridge Key 1930, Project ID 100707
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(111) Duncan Avenue Gourdhead No. 3 over Gourdhead Run, Hampton Township, Bridge Replacement, Bridge Key 2312, Project ID 95663
Project Allocation
1,174,000
(Base Project Allocation - $1,174,000)
(112) 79 Northbound Ramp to 65 over 652 Ramp A1, LR 02123, Glenfield Borough, Bridge Rehabilitation, Bridge Key 2788, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(113) LR 1026 HOV St 25 and 45, North Side of Veterans Bridge over Norfolk Southern Railway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2044, Project ID 99019
Project Allocation
15,000
(Base Project Allocation - $15,000)
(114) Crosstown Boulevard over State Roads, Railroad and City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2043, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(115) SR 279, LR 1021 HOV over LR 805 Ramp J and LR 02302, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2032, Project ID 99019
Project Allocation
7,000
(Base Project Allocation - $7,000)
(116) 1021 HOV 22 and 52 from Stadium over Four City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2030, Project ID 87772
Project Allocation
44,000
(Base Project Allocation - $37,000)
(Design & Contingencies - $7,000)
(117) 1021 HOV 22 and 52 from Stadium over Four City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2030, Project ID 99019
Project Allocation
12,000
(Base Project Allocation - $12,000)
(118) Wildwood Road Bridge over CSX Railroad, Hampton Township, Bridge Restoration, Bridge Key 2018, Project ID 100727
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(119) Peebles Road Bridge over Little Pine Creek, McCandless Township, Bridge Restoration, Bridge Key 2009, Project ID 100726
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(120) SR 4058, Leet Street Bridge over Ohio River Boulevard, Leetsdale Borough, Bridge Restoration, Bridge Key 2004, Project ID 100725
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(121) Wexford Run Road over Raymond P. Shafer Highway, Marshall Township, Bridge Rehabilitation, Bridge Key 2002, Project ID 91596
Project Allocation
10,376,000
(Base Project Allocation - $9,652,000)
(Design & Contingencies - $724,000)
(122) Wexford Run Road over Raymond P. Shafer Highway, Marshall Township, Bridge Restoration, Bridge Key 2002, Project ID 100724
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(123) Ramp H Road over Forbes, Diamond and 6th Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2730, Project ID 87780
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(124) SR 8095 Ramp B at Interchange with Smithfield Street over SR 8041 Ramp F, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2907, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(125) Ramp Fr-A Road 0.125 Mile from Moon Clinton Road over SR 0060 SH, Findlay Township, Bridge Rehabilitation, Bridge Key 2943, Project ID 87764
Project Allocation
70,000
(Base Project Allocation - $70,000)
(126) Ramp Mt-C Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 2942, Project ID 87764
Project Allocation
110,000
(Base Project Allocation - $110,000)
(127) Ramp Mt-B Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 2940, Project ID 87764
Project Allocation
30,000
(Base Project Allocation - $30,000)
(128) Ramp Ws-C Road at White Swan Interchange over SR 0060 and Business Route 60, Moon Township, Bridge Rehabilitation, Bridge Key 2937, Project ID 87775
Project Allocation
36,000
(Base Project Allocation - $36,000)
(129) Ramp J Road Near Heinz Plant over LR 1040 Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2934, Project ID 96561
Project Allocation
3,000
(Design & Contingencies - $3,000)
(130) Ramp J Road Near Heinz Plant over LR 1040 Eastbound and Westbound Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2934, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(131) Ramp A Road over Anderson Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2930, Project ID 96561
Project Allocation
3,000
(Design & Contingencies - $3,000)
(132) Ramp H Road Northbound, I-579 to TR 28 Northbound over Northbound and Southbound 1040 Ramp N, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2929, Project ID 99019
Project Allocation
6,000
(Base Project Allocation - $6,000)
(133) Ramp South Road, LR 1021 HOV over LR 805, LR 02302 and McKnight Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2919, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(134) Ramp J Road 1021 Southbound over SR 4003, Evergreen Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2918, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(135) I-79, Ramp F Road (Bridge 2760) over Baldwin Road (6014-02), Robinson Township, Bridge Repair and Restoration, Bridge Key 2760, Project ID 87751
Project Allocation
99,000
(Base Project Allocation - $79,000)
(Design & Contingencies - $20,000)
(136) Ramp F Road to Parkway East over Ramps C and D, Fort Pitt Boulevard, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2910, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(137) Local Ramp Road to SR 0065 Northbound, Glenfield Borough, Bridge Rehabilitation, Bridge Key 2783, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(138) Ramp Bu Road, Stanwix Street to Fort Pitt Westbound over Mon Wharf, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2906, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(139) Ramp H Road 160 Feet West of McKeesport-Duquesne Bridge over Cliff Street, City of McKeesport, Bridge Rehabilitation, Bridge Key 2898, Project ID 63583
Project Allocation
861,000
(Base Project Allocation - $749,000)
(Design & Contingencies - $112,000)
(140) Ramp F Road 300 Feet South of McKeesport-Duquesne Bridge over 1066, 392 and Local Streets, City of McKeesport, Bridge Rehabilitation, Bridge Key 2897, Project ID 63583
Project Allocation
861,000
(Base Project Allocation - $749,000)
(Design & Contingencies - $112,000)
(141) Birmingham Ramp E, Bridge over I-376 Ramp V and 2nd Avenue, City of Pittsburgh, Bridge Restoration, Bridge Key 2878, Project ID 100732
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(142) Birmingham Ramp F over I-376 Ramp V and 2nd Avenue, City of Pittsburgh, Bridge Restoration, Bridge Key 2877, Project ID 100731
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(143) SR 3144, Robinson Town Center Boulevard over I-376 Airport Parkway, North Fayette Township, Bridge Restoration, Bridge Key 2836, Project ID 87765
Project Allocation
145,000
(Base Project Allocation - $125,000)
(Design & Contingencies - $20,000)
(144) SR 8041 Ramp J over Ramp C, City of Pittsburgh, Bridge Restoration, Bridge Key 2819, Project ID 100730
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(145) SR 8031 Ramp A over Parkway West, Rosslyn Farms Borough, Bridge Restoration, Bridge Key 2799, Project ID 100729
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(146) Ramp W over I-79 Southbound, Marshall Township, Bridge Rehabilitation, Bridge Key 2796, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(147) Sample Road over Pine Creek, Hampton Township, Bridge Restoration, Bridge Key 1967, Project ID 100719
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(148) Ramp I, LR 1021 over LR 805, Evergreen Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2916, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(149) SR 3051, Half Crown Road Bridge over Half Crown Run, North Fayette Township, Bridge Restoration, Bridge Key 1787, Project ID 100692
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(150) Reichold Road over Wexford Run, McCandless Township, Bridge Restoration, Bridge Key 2000, Project ID 100723
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(151) SR 3072, Beaver Grade Road Bridge over Montour Run and Montour Trailway, Moon Township, Bridge Restoration, Bridge Key 1837, Project ID 100697
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(152) SR 3071, Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge Restoration, Bridge Key 1834, Project ID 100696
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(153) McClaren Road at PennDOT Shed over SR 0060 Ramp Ad, Findlay Township, Bridge Rehabilitation, Bridge Key 1828, Project ID 87775
Project Allocation
321,000
(Base Project Allocation - $321,000)
(154) SR 3070, McClaren and Main Street Bridge over Branch of Montour Run, Findlay Township, Bridge Restoration, Bridge Key 1826, Project ID 100694
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(155) McClaren Road 150 Feet Northeast of Steubenville Pike, Enlow Road over Branch of Montour Run, Findlay Township, Bridge Rehabilitation, Bridge Key 1825, Project ID 89087
Project Allocation
2,501,000
(Base Project Allocation - $1,667,000)
(Design & Contingencies - $834,000)
(156) SR 3070, McClaren Road Bridge over Branch of Montour Run, Findlay Township, Bridge Restoration, Bridge Key 1825, Project ID 100695
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(157) Collier Road 0.25 Mile West of SR 0050 over Branch of Chartiers Creek, Collier Township, Bridge Rehabilitation, Bridge Key 1797, Project ID 93788
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
(158) I-79, Ewing Road (Bridge 1796) over LR 1016, I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1796, Project ID 87751
Project Allocation
247,000
(Base Project Allocation - $197,000)
(Design & Contingencies - $50,000)
(159) SR 3052, Greentree Road over Chartiers Creek, Scott Township, Bridge Restoration, Bridge Key 1792, Project ID 100693
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(160) SR 3089, Washington Road over Potato Garden Road, Findlay Township, Bridge Rehabilitation, Bridge Key 1849, Project ID 89064
Project Allocation
2,600,000
(Base Project Allocation - $1,625,000)
(Design & Contingencies - $975,000)
(161) Kelso Road, SR 3051 over SR 0022, North Fayette Township, Bridge Rehabilitation, Bridge Key 1788, Project ID 91781
Project Allocation
1,086,000
(Base Project Allocation - $814,000)
(Design & Contingencies - $272,000)
(162) Moon Clinton Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 1850, Project ID 87764
Project Allocation
130,000
(Base Project Allocation - $130,000)
(163) SR 3048, Noblestown Road over Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1782, Project ID 100690
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(164) SR 3048, Noblestown Road over Branch of Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1778, Project ID 100691
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(165) Noblestown Road over Branch of Robinson Run, North Fayette Township, Bridge Replacement, Bridge Key 1771, Project ID 74330
Project Allocation
1,468,000
(Base Project Allocation - $734,000)
(Design & Contingencies - $734,000)
(166) SR 3037, Castle Shannon Boulevard over Saw Mill Run, Castle Shannon Borough, Bridge Restoration, Bridge Key 1762, Project ID 100689
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(167) SR 3035, Weyman Road over Saw Mill Run, Whitehall Borough, Bridge Restoration, Bridge Key 1760, Project ID 100688
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(168) SR 3034, McMillan Road over Branch of McLaughlin Run, Upper St. Clair Township, Bridge Restoration, Bridge Key 1759, Project ID 100687
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(169) I-79, Presley Road (Bridge 1748) over I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1748, Project ID 87751
Project Allocation
395,000
(Base Project Allocation - $315,000)
(Design & Contingencies - $80,000)
(170) SR 3018, Grant Street over Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1747, Project ID 100686
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(171) Smithfield Street Bridge over Monongahela River and CSX Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1742, Project ID 28525
Project Allocation
3,610,000
(Base Project Allocation - $1,814,000)
(Land Allocation - $164,000)
(Design & Contingencies - $1,632,000)
(172) SR 3026 over Millers Run, South Fayette Township, Bridge Restoration, Bridge Key 1738, Project ID 100685
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(173) I-79, Hill Top Road (Bridge 1791) over I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1791, Project ID 87751
Project Allocation
198,000
(Base Project Allocation - $158,000)
(Design & Contingencies - $40,000)
(174) SR 4009, Evergreen Road Intersection with North Avenue over Girtys Run, Millvale Borough, Bridge Replacement, Bridge Key 1923, Project ID 89118
Project Allocation
1,200,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $200,000)
(175) SR 3018 over Lobbs Run, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1726, Project ID 100684
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(176) SR 4023, New Brighton Road Bridge over Spruce Run, Avalon Borough, Bridge Restoration, Bridge Key 1965, Project ID 100718
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(177) SR 4021, Lowries Run Bridge over Lowries Run, Ross Township, Bridge Restoration, Bridge Key 1961, Project ID 100717
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(178) Mt. Royal Boulevard over Pine Creek, Hampton Township, Bridge Restoration, Bridge Key 1957, Project ID 100715
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(179) Pine Creek Road No.2 over Little Pine Creek, Shaler Township, Bridge Restoration, Bridge Key 1948, Project ID 100714
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(180) Union Avenue over I-279 Northbound and Southbound, Ross Township, Bridge Rehabilitation, Bridge Key 1943, Project ID 99019
Project Allocation
7,000
(Base Project Allocation - $7,000)
(181) SR 4012, Union Avenue over I-279, Ross Township, Bridge Restoration, Bridge Key 1943, Project ID 100712
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(182) Butler Logan Road 50 Feet North of SR 1014 over Allegheny Valley Expressway, Frazer Township, Bridge Rehabilitation, Bridge Key 1436, Project ID 100648
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(183) SR 4012, Union Avenue over Spruce Run, Ross Township, Bridge Restoration, Bridge Key 1941, Project ID 100713
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(184) Edgewood Avenue over Parkway East, Edgewood Borough, Bridge Replacement, Bridge Key 1176, Project ID 88398
Project Allocation
200,000
(Base Project Allocation - $200,000)
(185) Spring Run Road 1.0 Mile South of Beaver County Line over LR 1023, TR 60, Findlay Township, Bridge Rehabilitation, Bridge Key 1846, Project ID 87764
Project Allocation
440,000
(Base Project Allocation - $440,000)
(186) SR 4009, Babcock Boulevard over Girtys Run, Shaler Township, Bridge Restoration, Bridge Key 1924, Project ID 100710
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(187) Big Sewickley Creek Road 0.3 Mile Southwest of SR 2005 over Big Sewickley Creek, Bell Acres Borough, Bridge Replacement, Bridge Key 1981, Project ID 89117
Project Allocation
1,696,000
(Base Project Allocation - $714,000)
(Design & Contingencies - $982,000)
(188) SR 4009, Evergreen Road over Girtys Run, Millvale Borough, Bridge Restoration, Bridge Key 1923, Project ID 100706
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(189) SR 0019 McKnight Road over Babcock Boulevard and Girtys Run, Ross Township, Bridge Replacement, Bridge Key 1904, Project ID 89046
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $300,000)
(190) E Road Ramp at Intersection 3160 over SR 0060 SH, Findlay Township, Bridge Rehabilitation, Bridge Key 1899, Project ID 87764
Project Allocation
170,000
(Base Project Allocation - $170,000)
(191) Business Route 60 Southbound, South End of Airport Expressway over SR 0060, Moon Township, Bridge Rehabilitation, Bridge Key 1891, Project ID 87775
Project Allocation
72,000
(Base Project Allocation - $72,000)
(192) Shaler Street 0.25 Mile Northwest of SR 0279 over TR 19 and TR 51, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1885, Project ID 96562
Project Allocation
62,000
(Design & Contingencies - $62,000)
(193) North Branch Road 200 Feet Southwest of SR 3049 over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1881, Project ID 89079
Project Allocation
2,901,000
(Base Project Allocation - $2,048,000)
(Design & Contingencies - $853,000)
(194) SR 3104, McKees Rocks Bridge over Norfolk Southern Railway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1876, Project ID 28344
Project Allocation
1,955,000
(Base Project Allocation - $1,505,000)
(Design & Contingencies - $450,000)
(195) SR 3104, McKees Rocks No.2 over Ohio River and Norfolk Southern Railway, City of Pittsburgh, Bridge Restoration, Bridge Key 1876, Project ID 100701
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(196) McKees Rocks Bridge Road over CSX Railroad, McKees Rocks Borough, Bridge Rehabilitation, Bridge Key 1868, Project ID 28344
Project Allocation
1,955,000
(Base Project Allocation - $1,505,000)
(Design & Contingencies - $450,000)
(197) SR 3014, McKees Rocks Bridge over CSX Railroad, McKees Rocks Borough, Bridge Restoration, Bridge Key 1868, Project ID 100700
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(198) SR 4009, Babcock Boulevard over Girtys Run, Shaler Township, Bridge Restoration, Bridge Key 1925, Project ID 100709
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(199) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 94888
Project Allocation
455,000
(Base Project Allocation - $280,000)
(Land Allocation - $7,000)
(Design & Contingencies - $168,000)
(200) I-79, Raymond P. Shafer Highway Southbound (Bridge 857) over TR 50, South Fayette Township, Bridge Rehabilitation, Bridge Key 857, Project ID 91566
Project Allocation
228,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $28,000)
(201) SR 0079 North of TR 50 over Wheeling and Lake Erie Railroad, Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 855, Project ID 93010
Project Allocation
190,000
(Base Project Allocation - $190,000)
(202) I-79, Raymond P. Shafer Highway Northbound (Bridge 854) over TR 50, South Fayette Township, Bridge Rehabilitation, Bridge Key 854, Project ID 91566
Project Allocation
228,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $28,000)
(203) I-79, Raymond P. Shafer Highway (Bridge 852) over Coal Run Creek, South Fayette Township, Bridge Rehabilitation, Bridge Key 852, Project ID 91566
Project Allocation
228,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $28,000)
(204) Ohio River Boulevard 2.0 Miles Southeast of I-79 over Forest Avenue, Ben Avon Borough, Bridge Rehabilitation, Bridge Key 837, Project ID 88443
Project Allocation
6,000
(Design & Contingencies - $6,000)
(205) Ohio River Boulevard over Jacks Run, Farragut Road, Bellevue Borough, Bridge Rehabilitation, Bridge Key 832, Project ID 88443
Project Allocation
12,000
(Design & Contingencies - $12,000)
(206) Ohio River Boulevard at McKees Rocks Bridge over Verner Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 831, Project ID 88443
Project Allocation
7,000
(Design & Contingencies - $7,000)
(207) Ohio River Boulevard, TR 19-65 Southbound over Tunnel and Beaver Avenue Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 824, Project ID 89122
Project Allocation
165,000
(Base Project Allocation - $156,000)
(Design & Contingencies - $9,000)
(208) I-376 Airport Parkway over Cliff Mine Road and Montour Run, Moon Township, Bridge Restoration, Bridge Key 776, Project ID 87765
Project Allocation
145,000
(Base Project Allocation - $125,000)
(Design & Contingencies - $20,000)
(209) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 89122
Project Allocation
2,465,000
(Base Project Allocation - $2,339,000)
(Design & Contingencies - $126,000)
(210) I-79, Raymond P. Shafer Highway (Bridge 861) over Chartiers Creek, Collier Township, Bridge Repair and Restoration, Bridge Key 861, Project ID 87751
Project Allocation
395,000
(Base Project Allocation - $315,000)
(Design & Contingencies - $80,000)
(211) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 99019
Project Allocation
6,000
(Base Project Allocation - $6,000)
(212) SR 0065, 1039 Southbound over Allegheny Avenue and Ramp B Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 813, Project ID 94888
Project Allocation
342,000
(Base Project Allocation - $210,000)
(Land Allocation - $6,000)
(Design & Contingencies - $126,000)
(213) SR 0065 Northbound over Allegheny Avenue Ramp B Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 806, Project ID 94888
Project Allocation
144,000
(Base Project Allocation - $88,000)
(Land Allocation - $3,000)
(Design & Contingencies - $53,000)
(214) Hookstown Grade Road 0.5 Mile from Interchange 3160 over SR 0376 Eastbound and Westbound, Findlay Township, Bridge Rehabilitation, Bridge Key 798, Project ID 87764
Project Allocation
70,000
(Base Project Allocation - $70,000)
(215) Airport Extension Near McClaren Run Road Interchange over Service Road and McClaren Run, Findlay Township, Bridge Rehabilitation, Bridge Key 787, Project ID 87775
Project Allocation
267,000
(Base Project Allocation - $267,000)
(216) Airport Road near McClaren Run Road Interchange over Service Road and McClaren Run, Findlay Township, Bridge Rehabilitation, Bridge Key 786, Project ID 87775
Project Allocation
267,000
(Base Project Allocation - $267,000)
(217) I-376 and Ramps, White Swan Interchange over McClaren Run, Moon Township, Bridge Rehabilitation, Bridge Key 780, Project ID 87775
Project Allocation
36,000
(Base Project Allocation - $36,000)
(218) Raymond P. Shafer Highway, Neville Island, Tied Arch over CSX Railroad, Norfolk Southern Railway and Ohio River, Neville Township, Bridge Rehabilitation, Bridge Key 897, Project ID 99019
Project Allocation
89,000
(Base Project Allocation - $89,000)
(219) Ohio River Boulevard, TR 19-65 Southbound over Tunnel, Beaver Avenue Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 824, Project ID 94888
Project Allocation
285,000
(Base Project Allocation - $175,000)
(Land Allocation - $5,000)
(Design & Contingencies - $105,000)
(220) I-79, Raymond P. Shafer Highway (Bridge 876) over LR 1016 Ramp B, Robinson Township, Bridge Repair and Restoration, Bridge Key 876, Project ID 87751
Project Allocation
395,000
(Base Project Allocation - $315,000)
(Design & Contingencies - $80,000)
(221) Raymond P. Shafer Highway, Groveton I-79 Southbound over LR 76, TR 51, Robinson Township, Bridge Rehabilitation, Bridge Key 896, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(222) I-79 North of PA 51 over Moon Run, Robinson Township, Bridge Restoration, Bridge Key 895, Project ID 91565
Project Allocation
85,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $10,000)
(223) Raymond P. Shafer Highway, Groveton I-79 Northbound over LR 76, TR 51, Robinson Township, Bridge Rehabilitation, Bridge Key 894, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(224) I-79 South of PA 51 over Moon Run, Robinson Township, Bridge Restoration, Bridge Key 892, Project ID 91565
Project Allocation
74,000
(Base Project Allocation - $65,000)
(Design & Contingencies - $9,000)
(225) I-79 Southbound over Moon Run, Kennedy Township, Bridge Restoration, Bridge Key 891, Project ID 91565
Project Allocation
85,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $10,000)
(226) I-79 Southbound over Clever Road, Kennedy Township, Bridge Restoration, Bridge Key 890, Project ID 91565
Project Allocation
37,000
(Base Project Allocation - $32,000)
(Design & Contingencies - $5,000)
(227) I-79 Northbound over Clever Road, Kennedy Township, Bridge Restoration, Bridge Key 889, Project ID 91565
Project Allocation
85,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $10,000)
(228) Raymond P. Shafer Highway, I-79 Southbound over SR 0376, Robinson Township, Bridge Rehabilitation, Bridge Key 881, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(229) SR 0079 500 Feet North of TR 50 over Wheeling and Lake Erie Railroad and Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 858, Project ID 93010
Project Allocation
190,000
(Base Project Allocation - $190,000)
(230) Raymond P. Shafer Highway, I-79 Northbound over SR 0022, Robinson Township, Bridge Rehabilitation, Bridge Key 877, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(231) I-79, Raymond P. Shafer Highway (Bridge 860) over Chartiers Creek, Collier Township, Bridge Repair and Restoration, Bridge Key 860, Project ID 87751
Project Allocation
346,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $70,000)
(232) I-79, Raymond P. Shafer Highway (Bridge 875) over 1016 Ramp B, Robinson Township, Bridge Repair and Restoration, Bridge Key 875, Project ID 87751
Project Allocation
346,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $70,000)
(233) I-79, Raymond P. Shafer Highway (Bridge 870) over Branch of Robinson Run, Collier Township, Bridge Rehabilitation, Bridge Key 870, Project ID 87751
Project Allocation
157,000
(Base Project Allocation - $135,000)
(Design & Contingencies - $22,000)
(234) I-79, Raymond P. Shafer Highway (Bridge 869) over Pittsburgh Industrial Railroad, Robinson Run, Collier Township, Bridge Repair and Restoration, Bridge Key 869, Project ID 87751
Project Allocation
198,000
(Base Project Allocation - $158,000)
(Design & Contingencies - $40,000)
(235) I-79, Raymond P. Shafer Highway (Bridge 868) over LR 02246, Noblestown Road, Collier Township, Bridge Repair and Restoration, Bridge Key 868, Project ID 87751
Project Allocation
247,000
(Base Project Allocation - $197,000)
(Design & Contingencies - $50,000)
(236) I-79, Raymond P. Shafer Highway (Bridge 867) over CSX Railway, Collier Township, Bridge Repair and Restoration, Bridge Key 867, Project ID 87751
Project Allocation
296,000
(Base Project Allocation - $236,000)
(Design & Contingencies - $60,000)
(237) I-79, Raymond P. Shafer Highway (Bridge 866) over SR 3048, Noblestown Road, Collier Township, Bridge Repair and Restoration, Bridge Key 866, Project ID 87751
Project Allocation
247,000
(Base Project Allocation - $197,000)
(Design & Contingencies - $50,000)
(238) I-79, Raymond P. Shafer Highway (Bridge 864) over Thomas Run Road and Flood Channel, Collier Township, Bridge Repair and Restoration, Bridge Key 864, Project ID 87751
Project Allocation
296,000
(Base Project Allocation - $236,000)
(Design & Contingencies - $60,000)
(239) I-79, Raymond P. Shafer Highway (Bridge 863) over Thomas Run Road and Flood Channel, Collier Township, Bridge Repair and Restoration, Bridge Key 863, Project ID 87751
Project Allocation
296,000
(Base Project Allocation - $236,000)
(Design & Contingencies - $60,000)
(240) Steubenville Pike and East Windhaven Road over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation, Bridge Key 769, Project ID 100613
Project Allocation
600,000
(Base Project Allocation - $600,000)
(241) Banksville Road over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 523, Project ID 97028
Project Allocation
51,000
(Base Project Allocation - $50,000)
(Land Allocation - $1,000)
(242) I-19 Sign Structure (Bridge 537) over Main Span of West End Bridge, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 537, Project ID 62528
Project Allocation
1,550,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $50,000)
(243) West End Bridge over Ohio River and CSX Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 535, Project ID 62528
Project Allocation
4,939,000
(Base Project Allocation - $3,899,000)
(Design & Contingencies - $1,040,000)
(244) SR 0019 North Approach to West End Bridge over 65 Northbound and Southbound Ramps C and H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 533, Project ID 62528
Project Allocation
988,000
(Base Project Allocation - $780,000)
(Design & Contingencies - $208,000)
(245) I-19, CSX Railroad (Bridge 532) over West End Circle, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 532, Project ID 62528
Project Allocation
1,550,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $50,000)
(246) Saw Mill Run Boulevard 19 and 51 Southbound at West End Circle over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 531, Project ID 62528
Project Allocation
494,000
(Base Project Allocation - $390,000)
(Design & Contingencies - $104,000)
(247) SR 0051 Southbound 400 Feet West of Fort Pitt Tunnel over I-279 Parkway West, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 526, Project ID 96562
Project Allocation
13,000
(Design & Contingencies - $13,000)
(248) SR 0051 Southbound 400 Feet West of Fort Pitt Tunnel over I-279 Parkway West, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 526, Project ID 100602
Project Allocation
600,000
(Base Project Allocation - $600,000)
(249) SR 0019 Northbound 350 Feet West of Fort Pitt Tunnel over LR 766, I-279, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 524, Project ID 96562
Project Allocation
13,000
(Design & Contingencies - $13,000)
(250) Airport Extension at White Swan Interchange over Branch of McClaren Run, Moon Township, Bridge Rehabilitation, Bridge Key 779, Project ID 87775
Project Allocation
36,000
(Base Project Allocation - $36,000)
(251) Banksville Road over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 523, Project ID 96562
Project Allocation
13,000
(Design & Contingencies - $13,000)
(252) Chestnut Street 301131 Near Heinz Plant over PA 28 Eastbound and Westbound, Ramp H Eastbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 570, Project ID 96561
Project Allocation
12,000
(Design & Contingencies - $12,000)
(253) Banksville Road Near Runaway Truck Ramp over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 521, Project ID 97028
Project Allocation
51,000
(Base Project Allocation - $50,000)
(Land Allocation - $1,000)
(254) William Flynn Highway at Intersection with SR 0910 over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation, Bridge Key 505, Project ID 100600
Project Allocation
1,160,000
(Base Project Allocation - $1,160,000)
(255) 62nd Street Bridge over Norfolk Southern Railway, South Main Street and River, City of Pittsburgh, Bridge Restoration, Bridge Key 488, Project ID 100958
Project Allocation
9,050,000
(Base Project Allocation - $8,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $1,000,000)
(256) Penn Avenue over Storm Sewer, Wilkinsburg Borough, Bridge Rehabilitation, Bridge Key 482, Project ID 100601
Project Allocation
600,000
(Base Project Allocation - $600,000)
(257) Pleasantville Road 0.75 Mile Southeast of SR 1032 over Little Bull Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 1447, Project ID 89097
Project Allocation
443,000
(Base Project Allocation - $366,000)
(Design & Contingencies - $77,000)
(258) I-376 over Braddock Avenue, Edgewood Borough, Bridge Restoration, Bridge Key 1171, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(259) SR 1038 over Allegheny River, East Deer Township, Bridge Rehabilitation, Bridge Key 0, Project ID 63515
Project Allocation
2,500,000
(Base Project Allocation - $2,000,000)
(Design & Contingencies - $500,000)
(260) SR 0019 Northbound 350 Feet West of Fort Pitt Tunnel over LR 766, I-279, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 524, Project ID 100603
Project Allocation
200,000
(Base Project Allocation - $200,000)
(261) Jacks Run Road at Intersection with SR 2035 over Branch of Jacks Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 686, Project ID 100606
Project Allocation
380,000
(Base Project Allocation - $380,000)
(262) Stoops Ferry Road at SR 3089 Interchange over Flaugherty Run, Moon Township, Bridge Rehabilitation, Bridge Key 762, Project ID 100612
Project Allocation
600,000
(Base Project Allocation - $600,000)
(263) Coraopolis Boulevard over TR 142 and Montour Run, Robinson Township, Bridge Rehabilitation, Bridge Key 755, Project ID 100609
Project Allocation
480,000
(Base Project Allocation - $480,000)
(264) Saw Mill Run Boulevard at Whited Street over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 738, Project ID 100611
Project Allocation
380,000
(Base Project Allocation - $380,000)
(265) Saw Mill Run Boulevard Near Pittsburgh Boundary over Weyman Run, Whitehall Borough, Bridge Rehabilitation, Bridge Key 734, Project ID 100610
Project Allocation
400,000
(Base Project Allocation - $400,000)
(266) SR 0051 Southbound over LR 736 Extension, SR 0837, West Elizabeth Borough, Bridge Rehabilitation, Bridge Key 718, Project ID 91714
Project Allocation
149,000
(Base Project Allocation - $149,000)
(267) Elizabeth Bridge, SR 0051 over SR 0837, 2001, CSX and Norfolk Southern Railroads, Monongahela River, Elizabeth Borough, Bridge Rehabilitation, Bridge Key 712, Project ID 88335
Project Allocation
7,924,000
(Base Project Allocation - $5,632,000)
(Land Allocation - $151,000)
(Design & Contingencies - $2,141,000)
(268) SR 0051 at Interchange with Weigel Hill Road over Fallen Timber Run, Elizabeth Township, Bridge Replacement, Bridge Key 709, Project ID 91923
Project Allocation
10,501,000
(Base Project Allocation - $9,546,000)
(Design & Contingencies - $955,000)
(269) Washington Avenue, Scott Township Line over Chartiers Creek, Heidelberg Borough, Bridge Rehabilitation, Bridge Key 701, Project ID 100608
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(270) SR 0022 761 Feet East of Washington County Line over Potato Garden Road, North Fayette Township, Bridge Rehabilitation, Bridge Key 547, Project ID 88393
Project Allocation
836,000
(Base Project Allocation - $358,000)
(Land Allocation - $60,000)
(Design & Contingencies - $418,000)
(271) Washington Avenue South End Bridge over Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 691, Project ID 100607
Project Allocation
400,000
(Base Project Allocation - $400,000)
(272) SR 0022 Robinson/Collier Line over SR 3041, McMichael Road, Robinson Township, Bridge Rehabilitation, Bridge Key 557, Project ID 93011
Project Allocation
190,000
(Base Project Allocation - $190,000)
(273) Boston Hollow Road at Interchange with SR 2025 over Wylie Run, Elizabeth Township, Bridge Rehabilitation, Bridge Key 679, Project ID 93784
Project Allocation
400,000
(Base Project Allocation - $400,000)
(274) Scenery Drive 0.25 Mile South of Round Hill Road over Douglas Run, Forward Township, Bridge Replacement, Bridge Key 678, Project ID 100605
Project Allocation
600,000
(Base Project Allocation - $600,000)
(275) Ardmore Boulevard, 75 Feet Northwest of Marion Avenue over Branch of Falls Run, Forest Hills Borough, Bridge Rehabilitation, Bridge Key 666, Project ID 100604
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(276) SR 0028 Northbound, Harmarville Interchange over SR 9109 Northbound and Southbound, Pine and Allriv, Harmar Township, Bridge Restoration, Bridge Key 634, Project ID 100959
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(277) SR 0028 Southbound over Scout Reservation Road, Sharpsburg Borough, Bridge Restoration, Bridge Key 612, Project ID 93012
Project Allocation
190,000
(Base Project Allocation - $190,000)
(278) SR 0028 Near Highland Park Interchange over Guyasuta Run, O'Hara Township, Bridge Rehabilitation, Bridge Key 611, Project ID 93012
Project Allocation
114,000
(Base Project Allocation - $114,000)
(279) SR 0028 Southbound over Kittanning Pike and Seitz Run, Sharpsburg Borough, Bridge Rehabilitation, Bridge Key 607, Project ID 93012
Project Allocation
114,000
(Base Project Allocation - $114,000)
(280) SR 0028 Near SR 0008 Interchange over SR 1007, Ravine Street, Sharpsburg Borough, Bridge Rehabilitation, Bridge Key 603, Project ID 93012
Project Allocation
190,000
(Base Project Allocation - $190,000)
(281) I-79, Raymond P. Shafer Highway (Bridge 882) over Campbells Run Road, Robinson Township, Bridge Repair and Restoration, Bridge Key 882, Project ID 87751
Project Allocation
148,000
(Base Project Allocation - $118,000)
(Design & Contingencies - $30,000)
(282) Washington Avenue 300 Feet South of Thoms Run Road over Chartiers Creek Flood Channel, Collier Township, Bridge Rehabilitation, Bridge Key 698, Project ID 92936
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(283) I-279 Northbound over I-279 Southbound Ramp D and SR 8041, City of Pittsburgh, Bridge Restoration, Bridge Key 1022, Project ID 87773
Project Allocation
58,000
(Base Project Allocation - $50,000)
(Design & Contingencies - $8,000)
(284) I-279 Northbound 700 Feet South of Evergreen Road over LR 805, Ramp J, LR 02302 and HOV, City of Pittsburgh, Bridge Removal, Bridge Key 1068, Project ID 87758
Project Allocation
838,000
(Base Project Allocation - $695,000)
(Design & Contingencies - $143,000)
(285) SR 0279, SH 1021 Northbound over LR 805, Ramp J, LR 02302 and HOV, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1068, Project ID 99019
Project Allocation
12,000
(Base Project Allocation - $12,000)
(286) I-279 East Street Valley Exit over Suffolk Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1056, Project ID 99019
Project Allocation
5,000
(Base Project Allocation - $5,000)
(287) I-279 East Street over Storm Sewer, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1053, Project ID 87758
Project Allocation
335,000
(Base Project Allocation - $278,000)
(Design & Contingencies - $57,000)
(288) I-279 Northbound 500 Feet Southeast of I-579 over Box Culvert Sewer, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1040, Project ID 87758
Project Allocation
335,000
(Base Project Allocation - $278,000)
(Design & Contingencies - $57,000)
(289) SR 0279 Near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1032, Project ID 91860
Project Allocation
4,126,000
(Base Project Allocation - $3,883,000)
(Design & Contingencies - $243,000)
(290) SR 0279 Near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1030, Project ID 91860
Project Allocation
4,126,000
(Base Project Allocation - $3,883,000)
(Design & Contingencies - $243,000)
(291) I-279 Northbound Ramp from Fort Duquesne Bridge over I-279 Southbound, City of Pittsburgh, Bridge Restoration, Bridge Key 1028, Project ID 87773
Project Allocation
8,558,000
(Base Project Allocation - $8,050,000)
(Design & Contingencies - $508,000)
(292) Penn Lincoln Parkway over Whiskey Run, Greentree Borough, Bridge Rehabilitation, Bridge Key 984, Project ID 91564
Project Allocation
3,274,000
(Base Project Allocation - $3,274,000)
(293) I-79, Raymond P. Shafer Highway (Bridge 879) over Campbells Run Road, Robinson Township, Bridge Repair and Restoration, Bridge Key 879, Project ID 87751
Project Allocation
148,000
(Base Project Allocation - $118,000)
(Design & Contingencies - $30,000)
(294) Raymond E. Wilt Highway over SR 4014, Gass Road, Ross Township, Bridge Rehabilitation, Bridge Key 1086, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(295) Raymond P. Shafer Highway, Neville Island, Tiered Arch over CSX and Norfolk Southern Railroads and Ohio River, Neville Township, Bridge Rehabilitation, Bridge Key 897, Project ID 87756
Project Allocation
12,941,000
(Base Project Allocation - $11,187,000)
(Design & Contingencies - $1,754,000)
(296) Parkway West over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1006, Project ID 91564
Project Allocation
3,274,000
(Base Project Allocation - $3,274,000)
(297) Parkway West Near Fort Pitt Garage over Branch of Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1004, Project ID 97028
Project Allocation
163,000
(Base Project Allocation - $159,000)
(Land Allocation - $4,000)
(298) Penn Lincoln Parkway over Banksville Road Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 999, Project ID 93014
Project Allocation
4,000
(Base Project Allocation - $3,000)
(Design & Contingencies - $1,000)
(299) Penn Lincoln Parkway over Banksville Road Southbound, City of Pittsburgh, Bridge Replacement, Bridge Key 999, Project ID 97028
Project Allocation
405,000
(Base Project Allocation - $397,000)
(Land Allocation - $8,000)
(300) Penn Lincoln Parkway Greentree Interchange over Poplar Avenue, Greentree Borough, Bridge Rehabilitation, Bridge Key 988, Project ID 93014
Project Allocation
36,000
(Base Project Allocation - $35,000)
(Design & Contingencies - $1,000)
(301) Penn Lincoln Parkway Greentree Interchange over Poplar Avenue, Greentree Borough, Bridge Rehabilitation, Bridge Key 988, Project ID 97029
Project Allocation
103,000
(Base Project Allocation - $99,000)
(Land Allocation - $4,000)
(302) Parkway West over Branch of Whiskey Run, Greentree Borough, Bridge Rehabilitation, Bridge Key 985, Project ID 91564
Project Allocation
3,274,000
(Base Project Allocation - $3,274,000)
(303) I-279 Southbound Ramp from Fort Duquesne Bridge over Portal Point State Park and Lower Approach to Fort Duquesne Bridge, City of Pittsburgh, Bridge Restoration, Bridge Key 1027, Project ID 87773
Project Allocation
58,000
(Base Project Allocation - $50,000)
(Design & Contingencies - $8,000)
(304) I-376 over Second Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1137, Project ID 87754
Project Allocation
86,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $11,000)
(305) I-376, Second Avenue to Forbes Avenue over LR 763 Ramp B, City of Pittsburgh, Bridge Restoration, Bridge Key 1170, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(306) I-376 over Commercial Street and Nine Mile Run, City of Pittsburgh, Bridge Restoration, Bridge Key 1167, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(307) I-376 over Forward Avenue, Ramp H, City of Pittsburgh, Bridge Restoration, Bridge Key 1163, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(308) I-376 over Saline Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1159, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(309) I-376 over CSX Railroad and Swineburn and Frazier Streets, City of Pittsburgh, Bridge Restoration, Bridge Key 1157, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(310) I-376 over LR 763 Ramp B and Bates Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1153, Project ID 87755
Project Allocation
88,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $13,000)
(311) I-376 over Bates Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1152, Project ID 87754
Project Allocation
173,000
(Base Project Allocation - $150,000)
(Design & Contingencies - $23,000)
(312) I-376, Second Avenue to Forbes Avenue Bridge over Pedestrian Underpass, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1148, Project ID 87754
Project Allocation
145,000
(Base Project Allocation - $125,000)
(Design & Contingencies - $20,000)
(313) I-279 Southbound over SR 4003, SR 4009 and Ramp J, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1069, Project ID 99019
Project Allocation
10,000
(Base Project Allocation - $10,000)
(314) I-376 Eastbound over Brady Street and Pedestrian Trail, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1143, Project ID 87754
Project Allocation
542,000
(Base Project Allocation - $475,000)
(Design & Contingencies - $67,000)
(315) Raymond E. Wilt Highway over I-279 HOV Lane at Park and Ride, Ross Township, Bridge Rehabilitation, Bridge Key 1078, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(316) I-376 Westbound over Abandoned Railroad, 2nd Avenue and 10th Street, City of Pittsburgh, Bridge Removal, Bridge Key 1133, Project ID 87754
Project Allocation
568,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $68,000)
(317) I-376 Eastbound over Monongahela River, Wharf and I-376 Westbound, City of Pittsburgh, Bridge Restoration, Bridge Key 1116, Project ID 91567
Project Allocation
508,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $8,000)
(318) Tarentum Bridge Ramp A over 4th Avenue, Ramp D and Norfolk Southern Railway, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1111, Project ID 63306
Project Allocation
439,000
(Base Project Allocation - $368,000)
(Land Allocation - $15,000)
(Design & Contingencies - $56,000)
(319) Tarentum Bridge over Norfolk Southern Railway, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1108, Project ID 100624
Project Allocation
4,077,000
(Base Project Allocation - $3,106,000)
(Design & Contingencies - $971,000)
(320) Golden Mile Highway 85 Feet North of Interchange with SR 2075 over Abers Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1103, Project ID 100623
Project Allocation
600,000
(Base Project Allocation - $600,000)
(321) Raymond E. Wilt Highway, I-279 Southbound over Camp Horne Road, SR 4021, Ohio Township, Bridge Rehabilitation, Bridge Key 1090, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(322) Raymond E. Wilt Highway, I-279 Northbound over Camp Horne Road, SR 4021, Ohio Township, Bridge Rehabilitation, Bridge Key 1089, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(323) Raymond E. Wilt Highway over SR 4014, Gass Road, Ross Township, Bridge Rehabilitation, Bridge Key 1088, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(324) I-376 Fort Pitt Bridge Northbound over Monongahela River, Norfolk Southern Railway and PA 837, City of Pittsburgh, Bridge Restoration, Bridge Key 1011, Project ID 91567
Project Allocation
508,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $8,000)
(325) I-376 Westbound over Brady Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1145, Project ID 87754
Project Allocation
145,000
(Base Project Allocation - $125,000)
(Design & Contingencies - $20,000)
(326) I-279 Northbound, Fort Duquesne Bridge over Allegheny River, City of Pittsburgh, Bridge Restoration, Bridge Key 1023, Project ID 87773
Project Allocation
58,000
(Base Project Allocation - $50,000)
(Design & Contingencies - $8,000)
(327) I-79 over Warrendale Bayne Road, SR 4052 (Red Belt), Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 87746
Project Allocation
431,000
(Base Project Allocation - $374,000)
(Design & Contingencies - $57,000)
(328) I-79 over Warrendale Bayne Road, SR 4052 (Red Belt), Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 88718
Project Allocation
29,000
(Land Allocation - $2,000)
(Design & Contingencies - $27,000)
(329) I-79 over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 99019
Project Allocation
5,000
(Base Project Allocation - $5,000)
(330) I-79 Northbound over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 87746
Project Allocation
431,000
(Base Project Allocation - $374,000)
(Design & Contingencies - $57,000)
(331) I-79 Northbound over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 88718
Project Allocation
29,000
(Land Allocation - $2,000)
(Design & Contingencies - $27,000)
(332) I-79 over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 99019
Project Allocation
6,000
(Base Project Allocation - $6,000)
(333) I-79 over Brush Creek, Marshall Township, Bridge Rehabilitation, Bridge Key 917, Project ID 87746
Project Allocation
44,000
(Base Project Allocation - $38,000)
(Design & Contingencies - $6,000)
(334) I-79 Northbound over LR 246, TR 19, Marshall Township, Bridge Rehabilitation, Bridge Key 920, Project ID 87746
Project Allocation
44,000
(Base Project Allocation - $38,000)
(Design & Contingencies - $6,000)
(335) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 88718
Project Allocation
7,000
(Land Allocation - $1,000)
(Design & Contingencies - $6,000)
(336) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 87746
Project Allocation
431,000
(Base Project Allocation - $374,000)
(Design & Contingencies - $57,000)
(337) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Replacement, Bridge Key 913, Project ID 87746
Project Allocation
216,000
(Base Project Allocation - $187,000)
(Design & Contingencies - $29,000)
(338) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 913, Project ID 88718
Project Allocation
7,000
(Land Allocation - $1,000)
(Design & Contingencies - $6,000)
(339) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 913, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(340) I-79 over East Branch of Big Sewickley Creek, Marshall Township, Bridge Rehabilitation, Bridge Key 912, Project ID 87746
Project Allocation
44,000
(Base Project Allocation - $38,000)
(Design & Contingencies - $6,000)
(341) Raymond P. Shafer Highway 1.0 Mile North of SR 4022 over Red Mud Hollow Road, Sewickley Hills Borough, Bridge Rehabilitation, Bridge Key 907, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(342) Raymond P. Shafer Highway, 1.0 Mile North of SR 4022 over Red Mud Hollow Road, Sewickley Hills Borough, Bridge Rehabilitation, Bridge Key 905, Project ID 99019
Project Allocation
2,000
(Base Project Allocation - $2,000)
(343) Raymond P. Shafer Highway, 1016 Southbound over Glenfield Road and Kilbuck Run, Aleppo Township, Bridge Rehabilitation, Bridge Key 903, Project ID 99019
Project Allocation
5,000
(Base Project Allocation - $5,000)
(344) Raymond P. Shafer Highway, 1016 Northbound over Glenfield Road and Kilbuck Run, Aleppo Township, Bridge Rehabilitation, Bridge Key 902, Project ID 99019
Project Allocation
5,000
(Base Project Allocation - $5,000)
(345) Penn Lincoln Parkway Below Norfolk and Western Railway Trestle over Whiskey Run and Bell Road, Scott Township, Bridge Rehabilitation, Bridge Key 980, Project ID 93014
Project Allocation
269,000
(Base Project Allocation - $268,000)
(Design & Contingencies - $1,000)
(346) Monongahela City Bridge over SR 0837, CSX and Norfolk and Southern Railroads, Monongahela River, Forward Township, Bridge Rehabilitation, Bridge Key 952, Project ID 97948
Project Allocation
2,201,000
(Base Project Allocation - $1,834,000)
(Design & Contingencies - $367,000)
(347) I-79 Northbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 922, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(348) Lysle Boulevard 500 Feet South of North Interchange with SR 2037 over Crooked Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 966, Project ID 100622
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(349) West Newton Road, TR 136 over TR 51, Forward Township, Bridge Rehabilitation, Bridge Key 960, Project ID 100619
Project Allocation
1,120,000
(Base Project Allocation - $1,120,000)
(350) I-376 over Campbells Run, Robinson Township, Bridge Restoration, Bridge Key 970, Project ID 91563
Project Allocation
6,000
(Base Project Allocation - $5,000)
(Design & Contingencies - $1,000)
(351) Parkway West 1,000 Feet East of SR 0079 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 971, Project ID 93014
Project Allocation
97,000
(Base Project Allocation - $96,000)
(Design & Contingencies - $1,000)
(352) Monongahela Road at Intersection with SR 2013 over Beckets Run, Forward Township, Bridge Rehabilitation, Bridge Key 959, Project ID 100618
Project Allocation
400,000
(Base Project Allocation - $400,000)
(353) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(354) Monongahela Road 2.0 Miles East of Monongahela City Bridge over Perry Mill Run, Forward Township, Bridge Rehabilitation, Bridge Key 953, Project ID 100620
Project Allocation
600,000
(Base Project Allocation - $600,000)
(355) Monongahela Road at Intersection with SR 2013 over Beckets Run, Forward Township, Bridge Replacement, Bridge Key 959, Project ID 97949
Project Allocation
450,000
(Base Project Allocation - $360,000)
(Design & Contingencies - $90,000)
(356) Beulah Road at Interchange with SR 2059 over Chalfont Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 946, Project ID 100615
Project Allocation
400,000
(Base Project Allocation - $400,000)
(357) Brown Avenue 0.75 Mile North of SR 2112 over Saw Mill Run, Wilkins Township, Bridge Rehabilitation, Bridge Key 942, Project ID 100617
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(358) Parkway West over Busway, Arch Street, Bell Street and Wheeling and Lake Erie Railroad, Carnegie Borough, Bridge Rehabilitation, Bridge Key 975, Project ID 93014
Project Allocation
18,000
(Base Project Allocation - $17,000)
(Design & Contingencies - $1,000)
(359) Watkins Avenue over Patton Street, Wilmerding Borough, Bridge Rehabilitation, Bridge Key 937, Project ID 100616
Project Allocation
660,000
(Base Project Allocation - $660,000)
(360) Parkway West over SR 0050, Wheeling and Lake Erie Railroad and Chartiers Creek, Scott Township, Bridge Rehabilitation, Bridge Key 977, Project ID 93014
Project Allocation
269,000
(Base Project Allocation - $268,000)
(Design & Contingencies - $1,000)
(361) I-79 Southbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 924, Project ID 87746
Project Allocation
216,000
(Base Project Allocation - $187,000)
(Design & Contingencies - $29,000)
(362) I-79 Southbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 924, Project ID 99019
Project Allocation
3,000
(Base Project Allocation - $3,000)
(363) I-79 Southbound over SR 0019, Marshall Township, Bridge Rehabilitation, Bridge Key 923, Project ID 87746
Project Allocation
44,000
(Base Project Allocation - $38,000)
(Design & Contingencies - $6,000)
(364) I-79 Northbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 922, Project ID 87746
Project Allocation
216,000
(Base Project Allocation - $187,000)
(Design & Contingencies - $29,000)
(365) Monongahela Road near SR 2011 over Sunfish Run, Forward Township, Bridge Rehabilitation, Bridge Key 955, Project ID 100621
Project Allocation
600,000
(Base Project Allocation - $600,000)
(366) Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge Restoration, Bridge Key 1509, Project ID 100662
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(367) Mifflin Road over SR 3098, Glass Run Road, City of Pittsburgh, Bridge Restoration, Bridge Key 1304, Project ID 100946
Project Allocation
2,225,000
(Base Project Allocation - $1,875,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(368) Bakerstown Road over Branch of Deer Creek, Richland Township, Bridge Restoration, Bridge Key 1449, Project ID 100652
Project Allocation
1,350,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(369) Bakerstown Road over Bessemer and Lake Erie Railroad, West Deer Township, Bridge Restoration, Bridge Key 1453, Project ID 100651
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(370) Lardington Road over Bull Creek, Fawn Township, Bridge Restoration, Bridge Key 1462, Project ID 100653
Project Allocation
1,250,000
(Base Project Allocation - $900,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(371) New Kensington Bridge over State Route, East Deer Township, Bridge Restoration, Bridge Key 1475, Project ID 100655
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(372) Allegheny River Boulevard 1.5 Miles East of PA 8 over Abandoned Railroad, Penn Hills Township, Bridge Rehabilitation, Bridge Key 41065, Project ID 100614
Project Allocation
720,000
(Base Project Allocation - $720,000)
(373) Mill Hill Road over Wylie Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1496, Project ID 100658
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(374) Old Frankstown Road over Thompson Run, Monroeville Borough, Bridge Replacement, Bridge Key 1607, Project ID 100673
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(375) Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge Restoration, Bridge Key 1507, Project ID 100661
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(376) Library Road 200 Feet North of SR 3004 over Branch of Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 928, Project ID 100972
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $250,000)
(377) Boyds Hollow Road over Boyds Hollow Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1511, Project ID 100663
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(378) Buena Vista Road over Wildcat Run, Elizabeth Borough, Bridge Replacement, Bridge Key 1520, Project ID 100665
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(379) Buena Vista Road over Wildcat Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1521, Project ID 100664
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(380) Stewartsville Hollow Road over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1527, Project ID 100666
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(381) McKeesport B1 over Maple Avenue, Dravosburg Borough, Bridge Restoration, Bridge Key 1558, Project ID 100667
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(382) Hulton Road over Branch of Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1594, Project ID 100671
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(383) Lime Hollow Road over Lime Hollow Run, Penn Hills Township, Bridge Restoration, Bridge Key 1597, Project ID 100672
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(384) Sunfish Road over Sunfish Run, Forward Township, Bridge Restoration, Bridge Key 1497, Project ID 100659
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(385) SR 8009 Ramp G, I-79 at Parkway West over I-79, I-376 and Campbells Run Road, Collier Township, Bridge Rehabilitation, Bridge Key 45197, Project ID 99019
Project Allocation
12,000
(Base Project Allocation - $12,000)
(386) SR 0279 Southbound near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 42749, Project ID 91867
Project Allocation
6,601,000
(Base Project Allocation - $5,500,000)
(Design & Contingencies - $1,101,000)
(387) I-79, Steen Road (Bridge 43100) over Raymond P. Shafer Highway, Collier Township, Bridge Repair and Restoration, Bridge Key 43100, Project ID 87751
Project Allocation
50,000
(Base Project Allocation - $40,000)
(Design & Contingencies - $10,000)
(388) I-279 Northbound and Southbound, Fort Duquesne Bridge over Allegheny River, City of Pittsburgh, Bridge Restoration, Bridge Key 43172, Project ID 87773
Project Allocation
82,000
(Base Project Allocation - $70,000)
(Design & Contingencies - $12,000)
(389) SR 0019 over SR 0837, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 41961, Project ID 62528
Project Allocation
494,000
(Base Project Allocation - $390,000)
(Design & Contingencies - $104,000)
(390) SR 0978, Bateman Road over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 41833, Project ID 100638
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(391) Rochester Road near I-79, I-279 Junction over SR 0079 and SR 0279, Franklin Park Borough, Bridge Rehabilitation, Bridge Key 44257, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(392) SR 4003 Plank Road (Bridge 44957) over Branch of Brokenstraw Creek, Columbus Township, Bridge Replacement, Bridge Key 44957, Project ID 84958
Project Allocation
11,000
(Base Project Allocation - $11,000)
(393) Webster Avenue over I-579, City of Pittsburgh, Bridge Restoration, Bridge Key 1236, Project ID 100953
Project Allocation
1,450,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(394) Plank Road (Bridge 34199) over Branch of Brokenstraw Creek, Columbus Township, Bridge Replacement, Bridge Key 34199, Project ID 84958
Project Allocation
80,000
(Base Project Allocation - $80,000)
(395) Golden Mile Highway over Humms Run, Plum Borough, Bridge Replacement, Bridge Key 1105, Project ID 100806
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(396) SR 8009 Ramp H, I-79 at SR 0022 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 45198, Project ID 99019
Project Allocation
5,000
(Base Project Allocation - $5,000)
(397) SR 1005, Highland Park Bridge over Route 8, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45260, Project ID 100642
Project Allocation
960,000
(Base Project Allocation - $960,000)
(398) Boulevard of the Allies Ramp to Liberty Bridge over 1st Avenue, 2nd Avenue and Local Roads, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45326, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(399) Liberty Ramp over 1st Avenue and Local Roads, City of Pittsburgh, Bridge Restoration, Bridge Key 45327, Project ID 100733
Project Allocation
2,350,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(400) Liberty Bridge Ramp, Liberty Bridge to Boulevard of the Allies over 1st Avenue, 2nd Avenue and Local Roads, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45327, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(401) West Drive Ramp, 5th Street Parallel to CSX Railroad, Homestead Borough, Bridge Rehabilitation, Bridge Key 40413, Project ID 95797
Project Allocation
26,000
(Base Project Allocation - $17,000)
(Design & Contingencies - $9,000)
(402) Center Avenue over Fallen Timber Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1483, Project ID 100656
Project Allocation
1,350,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(403) SR 0028, I-279 Connector North Side over SR 0279 and Madison Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45110, Project ID 99019
Project Allocation
4,000
(Base Project Allocation - $4,000)
(404) Library Road 50 Feet South of SR 3004, Clifton Road over Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 927, Project ID 100972
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $250,000)
(405) Howes Run Road over McDowell Run, Fawn Township, Bridge Restoration, Bridge Key 1466, Project ID 100654
Project Allocation
1,200,000
(Base Project Allocation - $850,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(406) Audubon Road over Little Sewickley Creek, Sewickley Heights Borough, Bridge Restoration, Bridge Key 43233, Project ID 100720
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(407) Lovedale Road over Branch of Wylie Run, Lincoln Borough, Bridge Replacement, Bridge Key 46046, Project ID 100660
Project Allocation
26,600,000
(Base Project Allocation - $26,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(408) Streets Run Road over Streets Run, Baldwin Borough, Bridge Replacement, Bridge Key 46286, Project ID 100668
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(409) Streets Run Road over Streets Run, West Mifflin Borough, Bridge Replacement, Bridge Key 46286, Project ID 100668
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(410) SR 0019 SH over SR 0065 and Ramps H and C, City of Pittsburgh, Bridge Restoration, Bridge Key 533, Project ID 100956
Project Allocation
12,350,000
(Base Project Allocation - $12,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(411) West End Bridge over Ohio River and CSX Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 535, Project ID 100956
Project Allocation
12,350,000
(Base Project Allocation - $12,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(412) Walnut Street, Boston Bridge over Youghiogheny River, CSX Railroad and Local Streets, Elizabeth Borough, Bridge Restoration, Bridge Key 684, Project ID 100950
Project Allocation
4,850,000
(Base Project Allocation - $4,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(413) Walnut Street, Boston Bridge over Local Streets, Versailles Borough, Bridge Restoration, Bridge Key 684, Project ID 100950
Project Allocation
4,850,000
(Base Project Allocation - $4,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(414) SR 0065 SH over Allegheny Avenue Ramp B Southbound, City of Pittsburgh, Bridge Restoration, Bridge Key 806, Project ID 100960
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(415) Robinson Town C Bridge over Airport Parkway, Robinson Township, Bridge Restoration, Bridge Key 2836, Project ID 100938
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(416) Local Ramp Road over Local Ramp to SR 0065 Northbound, Glenfield Borough, Bridge Restoration, Bridge Key 2783, Project ID 100939
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(417) Allegheny River Bridge over Plum Creek, Verona Borough, Bridge Restoration, Bridge Key 1615, Project ID 100674
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(418) Ohio River Bridge over Fremont Street, Bellevue Borough, Bridge Restoration, Bridge Key 833, Project ID 100935
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(419) Murdocksville Road over Branch of Raccoon Creek, Findlay Township, Bridge Replacement, Bridge Key 1845, Project ID 100699
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(420) New Texas Road over Abers Creek, Plum Borough, Bridge Restoration, Bridge Key 1618, Project ID 100675
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(421) Logan Ferry Road over Allegheny Valley Railroad, Plum Borough, Bridge Replacement, Bridge Key 1626, Project ID 100961
Project Allocation
4,600,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(422) Leechburg Road over Plum Creek, Penn Hills Township, Bridge Restoration, Bridge Key 1646, Project ID 100677
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(423) Leechburg Road over Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1646, Project ID 100677
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(424) Jerome Street Bridge over 2027, CSX Railroad, Local Roads and Youghiogheny River, City of McKeesport, Bridge Restoration, Bridge Key 1651, Project ID 100678
Project Allocation
1,950,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(425) McKeesport-Duquesne Bridge over 736 Extension, Three Railroads and Monongahela River, City of Duquesne, Bridge Restoration, Bridge Key 1668, Project ID 100955
Project Allocation
18,350,000
(Base Project Allocation - $18,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(426) Ramp J Road over 79 Southbound to Neville Island, Neville Township, Bridge Replacement, Bridge Key 2780, Project ID 100941
Project Allocation
3,100,000
(Base Project Allocation - $2,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(427) Walton Road over Lobbs Run, Jefferson Hills Borough, Bridge Replacement, Bridge Key 1733, Project ID 100962
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(428) Spring Run Road over LR 1023, TR 60, Findlay Township, Bridge Replacement, Bridge Key 1846, Project ID 100940
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(429) McKnight Road over Babcock Boulevard, Girtys Run, Ross Township, Bridge Restoration, Bridge Key 1904, Project ID 100703
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(430) McKnight Road over Ingomar Road, SR 4070, McCandless Township, Bridge Restoration, Bridge Key 1914, Project ID 100705
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(431) McKnight Road over Pine Creek, McCandless Township, Bridge Restoration, Bridge Key 1915, Project ID 100704
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(432) Green Tree Road over I-279, Parkway West, Green Tree Borough, Bridge Restoration, Bridge Key 933, Project ID 100945
Project Allocation
1,850,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(433) SR 1016, Butler Logan Road over Route 28, Frazer Township, Bridge Restoration
Project Allocation
500,000
(Base Project Allocation - $500,000)
(434) (Reserved).
(435) Squaw Run Creek No.1 through No.7 over Squaw Run Creek, O'Hara Township, Bridge Replacement
Project Allocation
500,000
(Base Project Allocation - $500,000)
(436) SR 4070, Wildwood Road over Pine Creek, Hampton and McCandless Townships, Bridge Rehabilitation
Project Allocation
500,000
(Base Project Allocation - $500,000)
(437) Various Routes over Various Spans, Various Municipalities, Bridge Preservation and Cleaning, Bridge Key 0, Project ID 99021
Project Allocation
200,000
(Base Project Allocation - $200,000)
(438) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)