Section 65. Venango County.
(a) Local Bridges
Local
State
(1) Sugarcreek Borough, T-685, Sugar Creek Drive over Tributary of Sugar Creek, Bridge Replacement, Bridge Key 33946, Project ID 98296
Project Allocation
2,020,000
(Base Project Allocation - $2,020,000)
(2) Richland Township, Geiring Road over Mill Creek, Bridge Replacement
Project Allocation
1,235,000
(Base Project Allocation - $885,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(3) Mineral Township, T-300, Henderson Station Road over South Sandy Creek, Bridge Replacement
Project Allocation
860,000
(Base Project Allocation - $510,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(4) Mineral Township, T-330, Slatertown Road over South Sandy Creek, Bridge Replacement
Project Allocation
1,075,000
(Base Project Allocation - $725,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(5) Richland Township, T-357, Porterfield Road over Mill Creek, Bridge Replacement
Project Allocation
800,000
(Base Project Allocation - $450,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(6) Richland Township, T-381, Starr Road over Pine Run, Bridge Replacement
Project Allocation
690,000
(Base Project Allocation - $340,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(7) Cranberry Township, T-391, Van Road over Tarklin Creek, Bridge Replacement
Project Allocation
785,000
(Base Project Allocation - $435,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(8) Sugarcreek Borough, T-460, Shaffer Run Road over Brannon Run, Bridge Replacement
Project Allocation
835,000
(Base Project Allocation - $485,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(9) Cranberry Township, T-484, Aires Hill Road over Lower Two Mile Run, Bridge Replacement
Project Allocation
970,000
(Base Project Allocation - $620,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(10) Rockland Township, T-512, Mays Mill Road over Allegheny Valley Bike Trail, Bridge Replacement
Project Allocation
2,590,000
(Base Project Allocation - $2,240,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(11) Cranberry Township, T-560, Oil Route 322 over Halls Run, Bridge Replacement
Project Allocation
1,225,000
(Base Project Allocation - $875,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(12) Richland Township, T-590, Whiting Road over Pine Run, Bridge Replacement
Project Allocation
690,000
(Base Project Allocation - $340,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(13) Richland Township, T-592, Center Road over Branch of Pine Run, Bridge Replacement
Project Allocation
705,000
(Base Project Allocation - $355,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(14) Jackson Township, T-595, Creek Road over Sugar Creek, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $1,875,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(15) Oil Creek Township, T-604, Old Warren Pike over West Pithole Creek, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $910,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(16) Allegheny Township, T-632, Pleasant Valley Drive over Tributary of Pithole Creek, Bridge Replacement
Project Allocation
720,000
(Base Project Allocation - $370,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(17) Sugarcreek Borough, T-685, Sugarcreek Drive over Lick Run, Bridge Replacement
Project Allocation
860,000
(Base Project Allocation - $510,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(18) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) SR 0427 over Sugar Creek, Plum Township, Bridge Rehabilitation, Bridge Key 33763, Project ID 97402
Project Allocation
1,552,000
(Base Project Allocation - $1,277,000)
(Land Allocation - $19,000)
(Design & Contingencies - $256,000)
(3) SR 1009 over Benninghoff Run, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33780, Project ID 92508
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(4) SR 3007 over North Fork of Scrubgrass Creek, Scrubgrass Township, Bridge Replacement, Bridge Key 33799, Project ID 97360
Project Allocation
426,000
(Base Project Allocation - $232,000)
(Land Allocation - $16,000)
(Design & Contingencies - $178,000)
(5) SR 3007 over SR 0080 Eastbound and Westbound, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33798, Project ID 97395
Project Allocation
1,351,000
(Base Project Allocation - $1,080,000)
(Land Allocation - $91,000)
(Design & Contingencies - $180,000)
(6) SR 3003 over SR 0080 Westbound, Irwin Township, Bridge Rehabilitation, Bridge Key 33794, Project ID 98177
Project Allocation
661,000
(Base Project Allocation - $550,000)
(Land Allocation - $19,000)
(Design & Contingencies - $92,000)
(7) SR 3003 over SR 0080 Eastbound, Irwin Township, Bridge Rehabilitation, Bridge Key 33792, Project ID 97364
Project Allocation
661,000
(Base Project Allocation - $550,000)
(Land Allocation - $19,000)
(Design & Contingencies - $92,000)
(8) SR 1009 over Benninghoff Run Township Road, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33781, Project ID 97345
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(9) SR 3007 over Scrubgrass Creek, Clinton Township, Bridge Rehabilitation, Bridge Key 33802, Project ID 97346
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(10) SR 1006, Pithole Road over Tributary of Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 33778, Project ID 97371
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(11) SR 1004 over Muskrat Run, President Township, Bridge Rehabilitation, Bridge Key 33773, Project ID 97344
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(12) SR 1004 over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 33771, Project ID 97343
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(13) SR 0428 over Sugar Creek, Oakland Township, Bridge Rehabilitation, Bridge Key 33766, Project ID 97342
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(14) SR 0427 over Sugar Creek, Plum Township, Bridge Rehabilitation, Bridge Key 33764, Project ID 97370
Project Allocation
191,000
(Base Project Allocation - $88,000)
(Land Allocation - $88,000)
(Design & Contingencies - $15,000)
(15) SR 3013, Old Route 8 over Scrubgrass Creek, Irwin Township, Bridge Rehabilitation, Bridge Key 33813, Project ID 97350
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(16) PA 427 over Branch of Sugar Creek, Plum Township, Bridge Replacement, Bridge Key 33762, Project ID 97339
Project Allocation
761,000
(Base Project Allocation - $496,000)
(Land Allocation - $17,000)
(Design & Contingencies - $248,000)
(17) SR 3013, Pecan Hill Bridge over T-380 and Sandy Creek, Victory Township, Bridge Rehabilitation, Bridge Key 44276, Project ID 97383
Project Allocation
411,000
(Base Project Allocation - $391,000)
(Design & Contingencies - $20,000)
(18) SR 0427 over Tributary of Sugar Creek, Plum Township, Bridge Replacement, Bridge Key 33765, Project ID 93160
Project Allocation
1,800,000
(Base Project Allocation - $1,440,000)
(Land Allocation - $90,000)
(Design & Contingencies - $270,000)
(19) SR 3018 over SR 0008 Southbound, Victory Township, Bridge Rehabilitation, Bridge Key 33827, Project ID 97385
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(20) SR 4022, Buxton Road over Prather Creek, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33862, Project ID 97359
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(21) SR 4016, Beatty Road over Beatty Run, Jackson Township, Bridge Rehabilitation, Bridge Key 33854, Project ID 97358
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(22) SR 4011, Gresham Road over Prather Creek, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33852, Project ID 97356
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(23) SR 4003, Patchel Road over Wolf Run, Jackson Township, Bridge Rehabilitation, Bridge Key 33842, Project ID 97405
Project Allocation
251,000
(Base Project Allocation - $167,000)
(Design & Contingencies - $84,000)
(24) SR 4003, Patchel Road over Patchel Run, Sugarcreek Borough, Bridge Rehabilitation, Bridge Key 33841, Project ID 97355
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(25) SR 3025 over Lower Two Mile Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33834, Project ID 88490
Project Allocation
321,000
(Base Project Allocation - $146,000)
(Land Allocation - $15,000)
(Design & Contingencies - $160,000)
(26) SR 3024, Savannah Road over Little Sandy Creek, Polk Borough, Bridge Rehabilitation, Bridge Key 33831, Project ID 88489
Project Allocation
130,000
(Base Project Allocation - $100,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(27) SR 3010 over Left Branch of Scrubgrass Creek, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33810, Project ID 97348
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(28) SR 3018 over SR 0008 Northbound, Victory Township, Bridge Rehabilitation, Bridge Key 33828, Project ID 97387
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(29) SR 3008 over Bullion Run, Clinton Township, Bridge Rehabilitation, Bridge Key 33804, Project ID 97347
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(30) SR 3017, Utica Road over Mill Creek, French Creek Township, Bridge Rehabilitation, Bridge Key 33823, Project ID 97352
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(31) SR 3017 over Little Sandy Creek, French Creek Township, Bridge Rehabilitation, Bridge Key 33820, Project ID 97379
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(32) SR 3015, Wansack Road over Tributary of Sandy Creek, Mineral Township, Bridge Rehabilitation, Bridge Key 33817, Project ID 97373
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(33) SR 3013, Old Route 8 over Scrubgrass Creek, Irwin Township, Bridge Rehabilitation, Bridge Key 33814, Project ID 97351
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(34) SR 0157, Fryburg Road over Branch of Horse Creek, Cranberry Township, Bridge Rehabilitation, Bridge Key 33721, Project ID 97389
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(35) SR 3010 over Scrubgrass Creek, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33811, Project ID 97349
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(36) SR 0427 over Sugar Creek, Sugarcreek Borough, Bridge Rehabilitation, Bridge Key 33758, Project ID 97403
Project Allocation
2,452,000
(Base Project Allocation - $2,168,000)
(Land Allocation - $95,000)
(Design & Contingencies - $189,000)
(37) SR 3009 over SR 0080 Eastbound and Westbound, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33808, Project ID 97398
Project Allocation
1,101,000
(Base Project Allocation - $917,000)
(Land Allocation - $19,000)
(Design & Contingencies - $165,000)
(38) SR 3024, Savannah Road over Tributary of Little Sandy Creek, Frenchcreek Township, Bridge Rehabilitation, Bridge Key 33830, Project ID 97354
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(39) SR 0062, Main Street over Little Sandy Creek, Polk Borough, Bridge Replacement, Bridge Key 33685, Project ID 84946
Project Allocation
1,761,000
(Base Project Allocation - $1,467,000)
(Land Allocation - $19,000)
(Design & Contingencies - $275,000)
(40) SR 0036 over Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 42374, Project ID 97366
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(41) SR 0062 over Conrail and French Creek, City of Franklin, Bridge Rehabilitation, Bridge Key 33686, Project ID 87387
Project Allocation
740,000
(Base Project Allocation - $179,000)
(Land Allocation - $30,000)
(Design & Contingencies - $531,000)
(42) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33693, Project ID 97363
Project Allocation
321,000
(Base Project Allocation - $283,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(43) SR 0208 over SR 0080 Eastbound and Westbound, Clinton Township, Bridge Rehabilitation, Bridge Key 33726, Project ID 97401
Project Allocation
3,152,000
(Base Project Allocation - $2,864,000)
(Land Allocation - $20,000)
(Design & Contingencies - $268,000)
(44) SR 3017, Utica Bridge over French Creek, Utica Borough, Bridge Rehabilitation, Bridge Key 41261, Project ID 97384
Project Allocation
411,000
(Base Project Allocation - $391,000)
(Design & Contingencies - $20,000)
(45) SR 3008 Kennerdell over Allegheny River, Clinton Township, Bridge Rehabilitation, Bridge Key 40929, Project ID 97372
Project Allocation
611,000
(Base Project Allocation - $591,000)
(Design & Contingencies - $20,000)
(46) SR 4009 over East Branch of Sugar Creek, Oakland Township, Bridge Rehabilitation, Bridge Key 42415, Project ID 97388
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(47) SR 1011, Drake Well on Drake Well Park Road over Oil Creek, Oil Creek Township, Bridge Rehabilitation, Bridge Key 40417, Project ID 97382
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(48) SR 0062, Petroleum Street over Conrail and Allegheny River, Oil City, Bridge Rehabilitation, Bridge Key 33690, Project ID 88509
Project Allocation
1,242,000
(Base Project Allocation - $1,126,000)
(Land Allocation - $20,000)
(Design & Contingencies - $96,000)
(49) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33696, Project ID 97400
Project Allocation
321,000
(Base Project Allocation - $283,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(50) SR 0008, Rynd Farm over Oil Creek, Cornplanter Township, Bridge Rehabilitation, Bridge Key 40240, Project ID 97365
Project Allocation
311,000
(Base Project Allocation - $291,000)
(Design & Contingencies - $20,000)
(51) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33697, Project ID 97391
Project Allocation
321,000
(Base Project Allocation - $283,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(52) SR 0227, Cherry Run over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 39600, Project ID 97369
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(53) SR 0227, Cherry Run over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 39599, Project ID 97341
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(54) SR 0227, Cherry Run over Cherry Run, Rouseville Borough, Bridge Rehabilitation, Bridge Key 39598, Project ID 97381
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(55) SR 0062, Oil City Road over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33699, Project ID 97397
Project Allocation
321,000
(Base Project Allocation - $283,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(56) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33695, Project ID 97399
Project Allocation
321,000
(Base Project Allocation - $283,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(57) SR 0038 over Tributary of Mill Creek, Richland Township, Bridge Rehabilitation, Bridge Key 33681, Project ID 97338
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(58) SR 0208, Emlenton Road over McKees Run, Clintonville Borough, Bridge Replacement, Bridge Key 33728, Project ID 93161
Project Allocation
1,752,000
(Base Project Allocation - $1,167,000)
(Land Allocation - $84,000)
(Design & Contingencies - $501,000)
(59) SR 0157, Fryburg Road over Tributary of Wolf Creek, Cranberry Township, Bridge Replacement, Bridge Key 33722, Project ID 89112
Project Allocation
1,951,000
(Base Project Allocation - $1,357,000)
(Land Allocation - $85,000)
(Design & Contingencies - $509,000)
(60) SR 0062, Oil City Road over Hemlock Creek, President Township, Bridge Rehabilitation, Bridge Key 39536, Project ID 97368
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(61) SR 0080 Westbound over T-388, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33713, Project ID 97378
Project Allocation
992,000
(Base Project Allocation - $792,000)
(Land Allocation - $19,000)
(Design & Contingencies - $181,000)
(62) SR 0080 Eastbound over T-388, Clinton Township, Bridge Rehabilitation, Bridge Key 33712, Project ID 97377
Project Allocation
1,192,000
(Base Project Allocation - $989,000)
(Land Allocation - $19,000)
(Design & Contingencies - $184,000)
(63) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33694, Project ID 97396
Project Allocation
422,000
(Base Project Allocation - $382,000)
(Land Allocation - $20,000)
(Design & Contingencies - $20,000)
(64) SR 0038 over Bear Run, Richland Township, Bridge Rehabilitation, Bridge Key 33682, Project ID 97362
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(65) SR 0008 over Tributary of Wolf Creek, Irwin Township, Bridge Replacement, Bridge Key 33641, Project ID 97374
Project Allocation
962,000
(Base Project Allocation - $686,000)
(Land Allocation - $18,000)
(Design & Contingencies - $258,000)
(66) SR 0038 over Richey Run, Richland Township, Bridge Replacement, Bridge Key 33678, Project ID 90028
Project Allocation
1,752,000
(Base Project Allocation - $1,167,000)
(Land Allocation - $84,000)
(Design & Contingencies - $501,000)
(67) SR 0038 over Richey Run, Richland Township, Bridge Rehabilitation, Bridge Key 33676, Project ID 97361
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(68) SR 0038, Emlenton Street over Allegheny River, Emlenton Borough, Bridge Rehabilitation, Bridge Key 33674, Project ID 97367
Project Allocation
611,000
(Base Project Allocation - $591,000)
(Design & Contingencies - $20,000)
(69) SR 0036, Colonel Drake Highway over Branch of Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 33672, Project ID 97336
Project Allocation
712,000
(Base Project Allocation - $520,000)
(Land Allocation - $18,000)
(Design & Contingencies - $174,000)
(70) SR 0027 over Tributary of Pine Creek, Oil Creek Township, Bridge Replacement, Bridge Key 33668, Project ID 97410
Project Allocation
761,000
(Base Project Allocation - $496,000)
(Land Allocation - $17,000)
(Design & Contingencies - $248,000)
(71) SR 0008, Main Street over Cherry Run, Rouseville Borough, Bridge Rehabilitation, Bridge Key 33658, Project ID 88510
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(72) SR 0008 over PA 308, Irwin Township, Bridge Rehabilitation, Bridge Key 33648, Project ID 97375
Project Allocation
1,061,000
(Base Project Allocation - $947,000)
(Land Allocation - $19,000)
(Design & Contingencies - $95,000)
(73) SR 3102, Blair Road over SR 0008, Irwin Township, Bridge Rehabilitation, Bridge Key 33646, Project ID 97380
Project Allocation
1,312,000
(Base Project Allocation - $1,108,000)
(Land Allocation - $19,000)
(Design & Contingencies - $185,000)
(74) SR 3101, Porter Road over SR 0080 Eastbound and Westbound, Clintonville Borough, Bridge Rehabilitation, Bridge Key 33711, Project ID 97340
Project Allocation
1,312,000
(Base Project Allocation - $1,108,000)
(Land Allocation - $19,000)
(Design & Contingencies - $185,000)
(75) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)