Section 67. Washington County.
(a) Local Bridges
Local
State
(1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) SR 3021 over Middle Wheeling Creek, West Finley Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98861
Project Allocation
1,651,000
(Base Project Allocation - $1,151,000)
(Land Allocation - $150,000)
(Design & Contingencies - $350,000)
(3) SR 3011 over I-70, Buffalo and South Franklin Townships, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98675
Project Allocation
6,142,000
(Base Project Allocation - $4,610,000)
(Land Allocation - $151,000)
(Design & Contingencies - $1,381,000)
(4) SR 3004 over Dutch Fork of Buffalo Creek, Donegal Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98857
Project Allocation
519,000
(Base Project Allocation - $519,000)
(5) SR 2023 over Pigeon Creek, Carroll Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98855
Project Allocation
4,131,000
(Base Project Allocation - $3,060,000)
(Land Allocation - $150,000)
(Design & Contingencies - $921,000)
(6) SR 4057 over Brush Run, Buffalo Township, Bridge Replacement, Bridge Key 35221, Project ID 89052
Project Allocation
2,001,000
(Base Project Allocation - $2,001,000)
(7) SR 2027 over South Branch of Maple Creek, Twilight Borough, Bridge Replacement, Bridge Key 34964, Project ID 91132
Project Allocation
3,968,000
(Base Project Allocation - $3,968,000)
(8) SR 2011 over Pine Run, West Bethlehem Township, Bridge Replacement, Bridge Key 34898, Project ID 90777
Project Allocation
725,000
(Base Project Allocation - $725,000)
(9) SR 2065 over Barneys Run, Centerville Borough, Bridge Replacement, Bridge Key 35021, Project ID 90775
Project Allocation
802,000
(Base Project Allocation - $802,000)
(10) SR 2053 over Branch of Daniels Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35015, Project ID 90790
Project Allocation
675,000
(Base Project Allocation - $675,000)
(11) SR 2053 over Branch of Daniels Run, North Bethlehem Township, Bridge Replacement, Bridge Key 35014, Project ID 89081
Project Allocation
2,198,000
(Base Project Allocation - $2,198,000)
(12) SR 2053 over Branch of Daniels Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35013, Project ID 89035
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(13) SR 2047 over Sowers Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35009, Project ID 90824
Project Allocation
622,000
(Base Project Allocation - $622,000)
(14) SR 3003 over Dog Run, Donegal Township, Bridge Replacement, Bridge Key 35034, Project ID 89034
Project Allocation
1,792,000
(Base Project Allocation - $1,792,000)
(15) SR 2034 over Branch of Pike Run, West Pike Run Township, Bridge Replacement, Bridge Key 34977, Project ID 91846
Project Allocation
1,272,000
(Base Project Allocation - $1,152,000)
(Design & Contingencies - $120,000)
(16) SR 3006 over Buffalo Creek, Buffalo Township, Bridge Replacement, Bridge Key 35038, Project ID 79381
Project Allocation
1,280,000
(Base Project Allocation - $1,280,000)
(17) SR 2027 over I-70, Speers Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 34963, Project ID 98291
Project Allocation
6,070,000
(Base Project Allocation - $4,581,000)
(Land Allocation - $200,000)
(Design & Contingencies - $1,289,000)
(18) SR 2023 over Pigeon Creek, Fallowfield Township, Bridge Replacement, Bridge Key 34947, Project ID 90673
Project Allocation
1,238,000
(Base Project Allocation - $1,238,000)
(19) SR 2023 over Branch of Pigeon Creek, Fallowfield Township, Bridge Replacement, Bridge Key 34946, Project ID 89142
Project Allocation
2,401,000
(Base Project Allocation - $2,401,000)
(20) SR 2020 over North Fork of Ten Mile Creek, Amwell Township, Bridge Replacement, Bridge Key 34928, Project ID 89080
Project Allocation
4,268,000
(Base Project Allocation - $4,268,000)
(21) SR 2019 over Center Branch of Pigeon Creek, Somerset Township, Bridge Replacement, Bridge Key 34921, Project ID 90785
Project Allocation
675,000
(Base Project Allocation - $675,000)
(22) SR 2011 over Potato Run, Amwell Township, Bridge Replacement, Bridge Key 34902, Project ID 30725
Project Allocation
2,307,000
(Base Project Allocation - $1,879,000)
(Land Allocation - $137,000)
(Design & Contingencies - $291,000)
(23) SR 2036 over Pike Run, California Borough, Bridge Replacement, Bridge Key 34989, Project ID 90799
Project Allocation
1,735,000
(Base Project Allocation - $1,735,000)
(24) SR 4057 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 35220, Project ID 79391
Project Allocation
2,485,000
(Base Project Allocation - $2,485,000)
(25) SR 0018 over Ten Mile Creek, Morris Township, Bridge Replacement, Bridge Key 34307, Project ID 77853
Project Allocation
558,000
(Base Project Allocation - $467,000)
(Land Allocation - $25,000)
(Design & Contingencies - $66,000)
(26) SR 4047 over Chartiers Run, Chartiers Township, Bridge Replacement, Bridge Key 35209, Project ID 91128
Project Allocation
2,001,000
(Base Project Allocation - $2,001,000)
(27) T-393 over Little Pike Run, West Pike Run Township, Bridge Replacement, Bridge Key 35356, Project ID 95823
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(28) T-844, Estep Bridge 2,000 Feet North of SR 1008 over Peters Creek, Union Township, Bridge Replacement, Bridge Key 35346, Project ID 95835
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(29) T-757, Zediker Bridge 200 Feet West of SR 0519 over Little Chartiers Creek, South Strabane Township, Bridge Replacement, Bridge Key 35343, Project ID 95834
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(30) T-821, Keys Bridge 300 Feet West of SR 4075 over Raccoon Creek, Smith Township, Bridge Replacement, Bridge Key 35333, Project ID 95821
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(31) SR 2067 over Norfolk Southern Railroad, Monongahela River and City Street, West Brownsville Borough, Bridge Rehabilitation, Bridge Key 35024, Project ID 91135
Project Allocation
18,001,000
(Base Project Allocation - $18,001,000)
(32) SR 4059 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 35222, Project ID 79394
Project Allocation
2,075,000
(Base Project Allocation - $2,075,000)
(33) SR 3009 over Buffalo Creek, East Finley Township, Bridge Replacement, Bridge Key 35046, Project ID 79382
Project Allocation
1,830,000
(Base Project Allocation - $1,830,000)
(34) SR 4029 over North Fork of Cross Creek, Cross Creek Township, Bridge Replacement, Bridge Key 35183, Project ID 88074
Project Allocation
659,000
(Land Allocation - $86,000)
(Design & Contingencies - $573,000)
(35) SR 4027 over North Fork of Cross Creek, Cross Creek Township, Bridge Replacement, Bridge Key 35178, Project ID 91846
Project Allocation
1,378,000
(Base Project Allocation - $1,248,000)
(Design & Contingencies - $130,000)
(36) SR 4015 over Bulger Run, Smith Township, Bridge Replacement, Bridge Key 35146, Project ID 90676
Project Allocation
1,355,000
(Base Project Allocation - $1,355,000)
(37) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 35140, Project ID 90774
Project Allocation
535,000
(Base Project Allocation - $535,000)
(38) SR 4002 over Bigger Run, Robinson Township, Bridge Replacement, Bridge Key 35100, Project ID 90651
Project Allocation
743,000
(Base Project Allocation - $743,000)
(39) SR 3023 over Branch of Middle Wheeling Creek, Donegal Township, Bridge Replacement, Bridge Key 35070, Project ID 89054
Project Allocation
1,642,000
(Base Project Allocation - $1,642,000)
(40) McDowell Lane Road Bridge 300 Feet West of SR 0019 over Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 35315, Project ID 95829
Project Allocation
453,000
(Base Project Allocation - $359,000)
(Land Allocation - $4,000)
(Design & Contingencies - $90,000)
(41) I-70 Westbound over SR 0019, South Strabane Township, Bridge Replacement, Bridge Key 34491, Project ID 87236
Project Allocation
381,000
(Base Project Allocation - $330,000)
(Land Allocation - $25,000)
(Design & Contingencies - $26,000)
(42) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement, Bridge Key 34312, Project ID 79365
Project Allocation
2,374,000
(Base Project Allocation - $1,729,000)
(Land Allocation - $181,000)
(Design & Contingencies - $464,000)
(43) SR 0221 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34663, Project ID 79369
Project Allocation
2,125,000
(Base Project Allocation - $2,125,000)
(44) SR 0221 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34662, Project ID 90656
Project Allocation
1,925,000
(Base Project Allocation - $1,925,000)
(45) SR 0136 over North Branch of Pigeon Run, Somerset Township, Bridge Replacement, Bridge Key 34637, Project ID 76057
Project Allocation
724,000
(Land Allocation - $121,000)
(Design & Contingencies - $603,000)
(46) SR 0136 over Branch of Little Chartiers Creek, Somerset Township, Bridge Replacement, Bridge Key 34636, Project ID 88076
Project Allocation
800,000
(Base Project Allocation - $800,000)
(47) SR 0136 over Branch of Little Chartiers Creek, South Strabane Township, Bridge Replacement, Bridge Key 34630, Project ID 76053
Project Allocation
2,151,000
(Base Project Allocation - $1,871,000)
(Land Allocation - $77,000)
(Design & Contingencies - $203,000)
(48) SR 0231 over Branch of Rocky Run, East Finley Township, Bridge Replacement, Bridge Key 34665 Project ID 90776
Project Allocation
580,000
(Base Project Allocation - $580,000)
(49) SR 0070, Belle Vernon Bridge over SR 0088, SR 0906, Railroad and Monongahela River, Speers Borough, Bridge Rehabilitation, Bridge Key 34533, Project ID 94684
Project Allocation
2,936,000
(Base Project Allocation - $2,163,000)
(Design & Contingencies - $773,000)
(50) SR 0018 over Chartiers Creek, North Franklin Township, Bridge Replacement, Bridge Key 34314, Project ID 90685
Project Allocation
2,001,000
(Base Project Allocation - $2,001,000)
(51) I-70 Eastbound over SR 0019, South Strabane Township, Bridge Replacement, Bridge Key 34489, Project ID 87236
Project Allocation
381,000
(Base Project Allocation - $330,000)
(Land Allocation - $25,000)
(Design & Contingencies - $26,000)
(52) I-70 Westbound over SR 1009, South Strabane Township, Bridge Rehabilitation, Bridge Key 34485, Project ID 87236
Project Allocation
47,000
(Base Project Allocation - $40,000)
(Land Allocation - $3,000)
(Design & Contingencies - $4,000)
(53) TR 505 over SR 0070, North Franklin Township, Bridge Replacement, Bridge Key 34458, Project ID 89063
Project Allocation
5,164,000
(Base Project Allocation - $5,164,000)
(54) SR 0018 over Chartiers Creek, Canton Township, Bridge Replacement, Bridge Key 34319, Project ID 90637
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(55) SR 2011 over Branch of Ten Mile Creek, West Bethlehem Township, Bridge Replacement, Bridge Key 34891, Project ID 89047
Project Allocation
1,258,000
(Base Project Allocation - $1,258,000)
(56) SR 3023 over Branch of Middle Wheeling Creek, Donegal Township, Bridge Replacement, Bridge Key 35072, Project ID 90649
Project Allocation
1,340,000
(Base Project Allocation - $1,340,000)
(57) SR 2089 over Two Mile Run, Centerville Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 34600, Project ID 98290
Project Allocation
2,371,000
(Base Project Allocation - $1,710,000)
(Land Allocation - $150,000)
(Design & Contingencies - $511,000)
(58) SR 1016 over Branch of Mingo Creek, Nottingham Township, Bridge Replacement, Bridge Key 34819, Project ID 31152
Project Allocation
1,780,000
(Base Project Allocation - $1,780,000)
(59) SR 2011 over Plum Run, Beallsville Borough, Bridge Replacement, Bridge Key 34885, Project ID 90786
Project Allocation
485,000
(Base Project Allocation - $485,000)
(60) SR 1061 over Froman Run, Union Township, Bridge Replacement, Bridge Key 34858, Project ID 90690
Project Allocation
512,000
(Base Project Allocation - $512,000)
(61) SR 1055 over Branch of Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34852, Project ID 89068
Project Allocation
768,000
(Base Project Allocation - $768,000)
(62) SR 0221 over Ten Mile Creek, Morris Township, Bridge Replacement, Bridge Key 34650, Project ID 89048
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
(63) SR 1023 over Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34829, Project ID 89044
Project Allocation
5,460,000
(Base Project Allocation - $5,460,000)
(64) SR 0231 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34672, Project ID 79370
Project Allocation
1,855,000
(Base Project Allocation - $1,855,000)
(65) SR 1008 over Peters Creek, Union Township, Bridge Replacement, Bridge Key 34790, Project ID 95801
Project Allocation
4,702,000
(Base Project Allocation - $3,482,000)
(Land Allocation - $523,000)
(Design & Contingencies - $697,000)
(66) SR 1006 over Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34776, Project ID 90657
Project Allocation
730,000
(Base Project Allocation - $730,000)
(67) SR 0331 over Branch of Brush Run, Independence Township, Bridge Replacement, Bridge Key 34681, Project ID 90691
Project Allocation
598,000
(Base Project Allocation - $598,000)
(68) SR 0844 over Branch of Chartiers Run, Canton Township, Bridge Replacement, Bridge Key 34740, Project ID 88077
Project Allocation
1,705,000
(Base Project Allocation - $1,705,000)
(69) SR 0844 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34737, Project ID 91117
Project Allocation
490,000
(Base Project Allocation - $490,000)
(70) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34687, Project ID 89060
Project Allocation
971,000
(Base Project Allocation - $971,000)
(71) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34683, Project ID 90788
Project Allocation
565,000
(Base Project Allocation - $565,000)
(72) SR 0917 over Branch of Pigeon Creek, Somerset Township, Bridge Replacement, Bridge Key 34751, Project ID 90808
Project Allocation
726,000
(Base Project Allocation - $726,000)
(73) SR 1039 over SR 0079, North Strabane Township, Bridge Replacement, Bridge Key 34834, Project ID 87954
Project Allocation
9,300,000
(Base Project Allocation - $9,300,000)
(74) SR 0231 over Brush Run, Independence Township, Bridge Replacement, Bridge Key 34673 Project ID 88078
Project Allocation
2,061,000
(Base Project Allocation - $2,061,000)
(75) SR 0022 over Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(76) SR 0022 over Little Raccoon Run, Smith Township, Bridge Replacement
Project Allocation
1,185,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $125,000)
(77) SR 0022 Over Saint Patrick Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(78) SR 0040 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(79) SR 0040 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(80) SR 0040 Over Branch Of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,125,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design & Contingencies - $150,000)
(81) SR 0050 Over Wheeling & Lake Erie Railway, Independence Township, Bridge Replacement
Project Allocation
1,125,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design & Contingencies - $150,000)
(82) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(83) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(84) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(85) SR 1001 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(86) SR 1003 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(87) SR 1007 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(88) SR 1009 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(89) SR 1009 over Tributary of Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(90) SR 1009 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(91) SR 1009 over Branch of Chartiers Creek, Cecil Township, Bridge Replacement
Project Allocation
1,125,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design & Contingencies - $150,000)
(92) SR 1009 over McPherson Creek, Cecil Township, Bridge Replacement
Project Allocation
3,750,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $600,000)
(93) SR 1010 over Chartiers Creek, Peters Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(94) SR 1011 over Branch of Chartiers Creek, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(95) SR 1034 over SR 0079, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(96) SR 1041 over Branch of Chartiers Creek, South Strabane Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(97) SR 1045 over Chartiers Creek, South Strabane Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(98) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(99) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement
Project Allocation
1,285,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $225,000)
(100) SR 0018 over Branch of Chartiers Creek, South Franklin Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(101) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement
Project Allocation
3,390,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $125,000)
(Design & Contingencies - $265,000)
(102) SR 0018 over Branch of Chartiers Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(103) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,185,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $125,000)
(104) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(105) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,185,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $125,000)
(106) SR 0018 over Open Sewer, Smith Township, Bridge Replacement
Project Allocation
3,475,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $275,000)
(107) SR 0018 over Burgetts Fork of Raccoon Creek, Burgettstown Borough, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(108) SR 0018 over Anta Clara Fork of Kings Creek, Hanover Township, Bridge Replacement
Project Allocation
1,185,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $125,000)
(109) SR 0022 over Branch of Raccoon Creek, Hanover Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(110) SR 0221 over Branch of Ten Mile Creek, South Franklin Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(111) SR 0221 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(112) SR 0221 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(113) SR 3006 over Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design & Contingencies - $350,000)
(114) SR 3009 over Branch of Chartiers Creek, South Franklin Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(115) SR 3009 over Ten Mile Creek, South Franklin Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(116) SR 3009 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(117) SR 3009 over Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(118) SR 3011 over SR 0070, Buffalo Township, Bridge Replacement
Project Allocation
3,000,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $1,000,000)
(Design & Contingencies - $1,000,000)
(119) SR 3029 over Ten Mile Creek, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(120) SR 3036 over SR 0070, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(121) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(122) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
0
(123) SR 0331 over Branch of Brush Run, Independence Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(124) SR 0331 over Dunkle Run, Hopewell Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(125) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(126) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design & Contingencies - $350,000)
(127) SR 4002 over Bigger Run, Robinson Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(128) SR 4004 over Little Raccoon Creek, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(129) SR 4005 over Saint Patrick Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(130) SR 4006 over Ward Run, Hanover Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(131) SR 4006 over Harmon Creek, Hanover Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(132) SR 4006 over Branch of Harmon Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(133) SR 4007 over Branch of Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(134) SR 4007 over Branch of Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(135) SR 4007 over Branch of Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(136) SR 4008 over Burgetts Fork, Burgettstown Borough, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(137) SR 4009 over Branch of Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(138) SR 4009 over Raccoon Creek, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(139) SR 4009 over SR 0022, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(140) SR 4010 over Branch of Saint Patrick Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(141) SR 4011 over Branch of Robinson Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(142) SR 4011 over Branch of Robinson Run, Robinson Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(143) SR 4012 over Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(144) SR 4012 over Branch of Robinson Run, North Franklin Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(145) SR 4013 over Robb Run, McDonald Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(146) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(147) SR 4015 over Cherry Run, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(148) SR 4015 over Branch of Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(149) SR 4015 over Branch of Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(150) SR 4015 over Burgetts Run, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(151) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(152) SR 4015 over Raccoon Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(153) SR 4015 over Bulger Run, Smith Township, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design & Contingencies - $350,000)
(154) SR 4018 over Cross Creek, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(155) SR 4018 over Cross Creek, Jefferson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(156) SR 4018 over Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(157) SR 4019 over Branch of Raccoon Creek, Smith Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(158) SR 4020 over Chartiers Creek, Canton Township, Bridge Replacement
Project Allocation
2,600,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $600,000)
(Design & Contingencies - $1,000,000)
(159) SR 4022 over Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(160) SR 4023 over Branch of North Fork of Cross Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(161) SR 4023 over Branch of North Fork of Cross Creek, Jefferson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(162) SR 4024 over Branch of Georges Run, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(163) SR 4025 over Branch of Cross Creek, Jefferson Township, Bridge Replacement
Project Allocation
22,250,000
(Base Project Allocation - $21,000,000)
(Land Allocation - $250,000)
(Design & Contingencies - $1,000,000)
(164) SR 4026 over SR 0022, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(165) SR 4027 over Branch of North Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(166) SR 4029 over Middle Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(167) SR 4029 over Branch of Burgetts Fork, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(168) SR 4029 over Branch of Burgetts Fork, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(169) SR 4029 over Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
2,400,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design & Contingencies - $600,000)
(170) SR 4029 over Burgetts Fork, Smith Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(171) SR 4031 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(172) SR 4035 over Branch of Georges Run, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(173) SR 4035 over Branch of Georges Run, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(174) SR 4035 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(175) SR 4035 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(176) SR 4035 over South Fork of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(177) SR 4036 over Branch of Buffalo Creek, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(178) SR 4036 over Branch of Brush Run, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(179) SR 4039 over Millers Run, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(180) SR 4039 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(181) SR 4045 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(182) SR 4045 over Branch of Cross Creek, Hopewell Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(183) SR 4047 over Branch of Chartiers Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design & Contingencies - $350,000)
(184) SR 4047 over Branch of Chartiers Run, Mount Pleasant Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(185) SR 4049 over Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(186) SR 4049 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(187) SR 4049 over Arden Mines Run, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(188) SR 4051 over Chartiers Creek, Canton Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(189) SR 4069 over SR 0022, Hanover Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(190) SR 0050 over Branch of Cross Creek, Cross Creek Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(191) SR 0050 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(192) SR 0050 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
2,470,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $320,000)
(193) SR 0050 over Reissing Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(194) SR 0050 over Reissing Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(195) SR 0050 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(196) SR 0050 over Branch of Cross Creek, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(197) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement
Project Allocation
1,125,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design & Contingencies - $150,000)
(198) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(199) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(200) SR 0519 over Branch of Westland Run, Chartiers Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(201) SR 0519 over Westland Run, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(202) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(203) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(204) SR 0519 over Branch of Westland Run, Mount Pleasant Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(205) SR 0070 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(206) SR 0070 over SR 0221, Buffalo Township, Bridge Replacement
Project Allocation
1,185,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $125,000)
(207) SR 0070 over SR 0221, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(208) SR 0070 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(209) SR 0070 over Chartiers Creek, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(210) SR 00790 over Private Service Road No.4, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(211) SR 0070 over Catfish Creek, Canton Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(212) SR 0070 over TR 957, Ohio Avenue, Canton Township, Bridge Replacement
Project Allocation
2,260,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(213) SR 0070 over SR 0018 and City Streets, City of Washington, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(214) SR 0079 over SR 1010 and Bike Trail, Cecil Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(215) SR 0079 over SR 1010 and Bike Trail, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(216) SR 0844 over Branch of Indian Camp Run, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(217) SR 0844 over Indian Camp Run, Independence Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(218) SR 0844 over Branch of Brush Run, Hopewell Township, Bridge Replacement
Project Allocation
1,125,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design & Contingencies - $150,000)
(219) SR 0980 over Branch of Brush Run, Cecil Township, Bridge Replacement
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $175,000)
(220) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(221) SR 0980 over Branch of Robinson Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(222) SR 0980 over Branch of Raccoon Creek, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(223) SR 0980 over Branch of Raccoon Creek, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(224) SR 0980 over Branch of Brush Run, Cecil Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(225) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $150,000)
(226) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(227) SR 3047 over SR 0070, Buffalo Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(228) SR 4001 over Saint Patrick Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(229) SR 4001 over Branch of Saint Patrick Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(230) SR 4001 over Bigger Run, Robinson Township, Bridge Replacement
Project Allocation
1,260,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $200,000)
(231) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacement, Bridge Key 0, Project ID 102036
Project Allocation
500,000
(Base Project Allocation - $500,000)
(232) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)