Allegheny County

Act 128 of 2008, § 302, under HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2008-2009 - ENACTMENT.

Act 128 of 2008, § 302

Section 302. Allegheny County.

Projects are as follows:

(1) I-279, ITS Expansion, Corridor Safety Improvement, I-279 from Camp Horne Road to I-79, Franklin Park Borough and Ross Township

763,000

(Base Project Allocation - $763,000)

(2) SR 1001, Concrete Pavement Reconstruction, Rehabilitation, SR 1001, Freeport Road No.2 from Ross Street to Burtner Road, Brackenridge and Tarentum Boroughs and Harrison Township

4,778,000

(Base Project Allocation - $4,328,000)

(Design and Contingencies - $450,000)

(3) SR 1001, Concrete Pavement Reconstruction, Rehabilitation, SR 1001, Freeport Road No.3 from Burtner Road to Brackenridge Borough Line, Brackenridge Borough and Harrison Township

3,875,000

(Base Project Allocation - $3,520,000)

(Design and Contingencies - $355,000)

(4) SR 1001, Concrete Pavement Reconstruction, Rehabilitation, SR 1001, Freeport Road No.1 from Baileys Run to North of Larusse Boulevard, East Deer and Tarentum Townships

1,162,000

(Base Project Allocation - $1,056,000)

(Design and Contingencies - $106,000)

(5) SR 1001, Concrete Pavement Reconstruction, Rehabilitation, SR 1001, Etna Bypass, Etna Borough

696,000

(Base Project Allocation - $632,000)

(Design and Contingencies - $64,000)

(6) SR 1013, Concrete Pavement Reconstruction, Rehabilitation, SR 1013, Saxonburg Boulevard, Indiana and West Deer Townships

3,054,000

(Base Project Allocation - $2,774,000)

(Design and Contingencies - $280,000)

(7) SR 130, Safety Improvement, Allegheny River Boulevard from Penn Hills to Verona, Penn Hills Township and City of Pittsburgh

588,000

(Base Project Allocation - $553,000)

(Design and Contingencies - $35,000)

(8) SR 148, Concrete Pavement Reconstruction, Rehabilitation, SR 148 from Eden Park Boulevard to Lincoln Highway, City of McKeesport and North Versailles Township

3,080,000

(Base Project Allocation - $2,800,000)

(Design and Contingencies - $280,000)

(9) SR 19, Concrete Pavement Reconstruction, Rehabilitation, Perry Highway, Westbound from Pine Creek Road to South Church Road, McCandless and Pine Townships

2,221,000

(Base Project Allocation - $2,016,000)

(Design and Contingencies - $205,000)

(10) SR 19, Concrete Pavement Reconstruction, Rehabilitation, Perry Highway, Eastbound from Pine Creek Road to South Church Road, McCandless and Pine Townships

2,221,000

(Base Project Allocation - $2,016,000)

(Design and Contingencies - $205,000)

(11) SR 19, Concrete Pavement Reconstruction, Rehabilitation, Washington Road, Eastbound from Gilkeson Road to Cochran Road, Mt. Lebanon Township

1,206,000

(Base Project Allocation - $1,096,000)

(Design and Contingencies - $110,000)

(12) SR 19, Concrete Pavement Reconstruction, Rehabilitation, Washington Road, Westbound from Gilkeson Road to Cochran Road, Mt. Lebanon Township

898,000

(Base Project Allocation - $816,000)

(Design and Contingencies - $82,000)

(13) SR 19, Upgrade and Rebuild Ten Signals, Safety Improvement, Perry Highway from Ivory to Sewickley Oakmont Road, West View Borough, Pine and Ross Townships and City of Pittsburgh

50,000

(Design and Contingencies - $50,000)

(14) SR 19, Concrete Pavement Reconstruction, Rehabilitation, SR 19, Boyce Road, Upper St. Clair Township

1,098,000

(Base Project Allocation - $998,000)

(Design and Contingencies - $100,000)

(14) SR 19, Concrete Pavement Reconstruction, Rehabilitation, SR 19, Boyce Road, Upper St. Clair Township

1,098,000

(15) SR 19, Concrete Pavement Reconstruction, Rehabilitation, Perrysville Avenue from Bellevue Road to Harden Drive, West View Borough

1,259,000

(Base Project Allocation - $1,144,000)

(Design and Contingencies - $115,000)

(16) SR 2048, Restoration, Rehabilitation, Safety Improvements, Business Route 22 from Rodi Road, SR 791 to Mosside Boulevard, SR 48, Churchill and Monroeville Boroughs and Wilkins Township

1,998,000

(Base Project Allocation - $1,974,000)

(Design and Contingencies - $24,000)

(17) SR 2057, Concrete Pavement Reconstruction, Rehabilitation, SR 2057, Haymaker Road, Monroeville Borough

407,000

(Base Project Allocation - $370,000)

(Design and Contingencies - $37,000)

(18) SR 2058, Pavement Reconstruction, Rehabilitation, SR 2058, Leechburg Road, Penn Hills Township

966,000

(Base Project Allocation - $878,000)

(Design and Contingencies - $88,000)

(19) SR 2073, Concrete Pavement Reconstruction, Rehabilitation, Allegheny River Boulevard from Sandy Creek to College, Verona and Oakmont Boroughs and Penn Hills Township

805,000

(Base Project Allocation - $731,000)

(Design and Contingencies - $74,000)

(20) SR 2073, Concrete Pavement Reconstruction, Rehabilitation, SR 2073 from South Avenue to Plum Street, Verona Borough

330,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $30,000)

(21) SR 2104, Concrete Pavement Reconstruction, Rehabilitation, SR 2104, Churchill Road, Churchill Borough

410,000

(Base Project Allocation - $372,000)

(Design and Contingencies - $38,000)

(22) SR 2108, Concrete Pavement Reconstruction, Rehabilitation, SR 2108, Wilkins Avenue, City of Pittsburgh

363,000

(Base Project Allocation - $330,000)

(Design and Contingencies - $33,000)

(23) SR 2116, Concrete Pavement Reconstruction, Rehabilitation, SR 2116, Bettis Road, Dravosburg and West Mifflin Boroughs

429,000

(Base Project Allocation - $390,000)

(Design and Contingencies - $39,000)

(24) SR 2128, Concrete Pavement Reconstruction, Rehabilitation, Tenth Street Bypass Phase II, SR 8041 to Fort Duquesne Boulevard, City of Pittsburgh

616,000

(Base Project Allocation - $560,000)

(Design and Contingencies - $56,000)

(25) SR 2128, Concrete Pavement Reconstruction, Rehabilitation, SR 3004, McMurray Road, City of Pittsburgh

623,000

(Base Project Allocation - $566,000)

(Design and Contingencies - $57,000)

(26) SR 2128, Concrete Pavement Reconstruction, Rehabilitation, Tenth Street Bypass Phase I, SR 8041 to Fort Duquesne Boulevard, City of Pittsburgh

616,000

(Base Project Allocation - $560,000)

(Design and Contingencies - $56,000)

(27) SR 279, Concrete Pavement Reconstruction, Rehabilitation, SR 279, Robinson Township to Fort Pitt Tunnel, Carnegie, Green Tree and Rosslyn Farms Boroughs, Collier, Scott and Robinson Townships and City of Pittsburgh

2,860,000

(Base Project Allocation - $2,600,000)

(Design and Contingencies - $260,000)

(28) SR 28, Concrete Pavement Reconstruction, Rehabilitation, SR 28, Northbound from Baily's Run to County Line, East Deer and Harrison Townships

13,750,000

(Base Project Allocation - $12,500,000)

(Design and Contingencies - $1,250,000)

(29) SR 28, Concrete Pavement Reconstruction, Rehabilitation, SR 28 Southbound from Baily's Run to County Line, East Deer and Harrison Townships

13,750,000

(Base Project Allocation - $12,500,000)

(Design and Contingencies - $1,250,000)

(30) SR 28, Concrete Pavement Reconstruction, Rehabilitation, SR 28 from Millvale to Etna, Etna Borough and Shaler Township

3,850,000

(Base Project Allocation - $3,500,000)

(Design and Contingencies - $350,000)

(31) SR 30, Concrete Pavement Reconstruction, Rehabilitation, SR 30 from County Line to Clinton Road, Findlay Township

1,650,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $150,000)

(32) SR 3005, Concrete Pavement Reconstruction, Rehabilitation, SR 3005, Station Street to Bank Street, Bridgeville Borough

421,000

(Base Project Allocation - $381,000)

(Design and Contingencies - $40,000)

(33) SR 3009, Concrete Pavement Reconstruction, Rehabilitation, SR 3009, Baptist Road, Bethel Park and Whitehall Boroughs

1,130,000

(Base Project Allocation - $1,027,000)

(Design and Contingencies - $103,000)

(34) SR 3009, Concrete Pavement Reconstruction, Rehabilitation, SR 3009, South Park Road, Bethel Park Borough

469,000

(Base Project Allocation - $426,000)

(Design and Contingencies - $43,000)

(35) SR 3028, Slide Correction, Concrete Pavement Reconstruction, Rehabilitation, SR 3028, at Presto and Sygan Roads, South Fayette Township

1,100,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(36) SR 3038, Safety Improvement, Conner Road from Washington Road to Library Road, Bethel Park Borough and Mt. Lebanon Township

354,000

(Base Project Allocation - $304,000)

(Design and Contingencies - $50,000)

(37) SR 3044, Concrete Pavement Reconstruction, Rehabilitation, Castle Shannon Boulevard from Washington Road to Scott Road, Mt. Lebanon Township

1,100,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(38) SR 3054, Slide Correction, Concrete Pavement Reconstruction, Rehabilitation, SR 3054, Segment 0020 and Segment 0030, Collier Township

1,100,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(39) SR 3065, New Two-Lane Roadway, Banksville Connection to Wabash Tunnel to Banksville Road in City of Pittsburgh, Green Tree Borough

14,620,000

(Base Project Allocation - $10,000,000)

(Land Allocation - $2,000,000)

(Design and Contingencies - $2,620,000)

(40) SR 3069, Concrete Pavement Reconstruction, Rehabilitation, SR 3069 from Liberty Bridge to 6th Avenue, City of Pittsburgh

1,650,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $150,000)

(41) SR 3069, Concrete Pavement Reconstruction, Rehabilitation, West Liberty Avenue from McFarland to Saw Mill Run, Dormont Borough and City of Pittsburgh

2,139,000

(Base Project Allocation - $1,944,000)

(Design and Contingencies - $195,000)

(42) SR 3085, Concrete Pavement Reconstruction, Rehabilitation, SR 3085, Forest Grove Road, Robinson Township

590,000

(Base Project Allocation - $536,000)

(Design and Contingencies - $54,000)

(43) SR 3087, Concrete Pavement Reconstruction, Rehabilitation, SR 3087, Thorn Run Road, Moon Township

752,000

(Base Project Allocation - $683,000)

(Design and Contingencies - $69,000)

(44) SR 3092, Concrete Pavement Reconstruction, Rehabilitation, SR 3092, Broadway Street, Stowe Township

398,000

(Base Project Allocation - $361,000)

(Design and Contingencies - $37,000)

(45) SR 366, Signal Improvements at 4 Intersections, SR 8 and SR 366, 2 Intersections Each, Tarentum Borough and Shaler Township

50,000

(Base Project Allocation - $50,000)

(46) SR 376, Installation of ITS Equipment to Include Variable Traffic System, I-376 from South Braddock Avenue to SR 2048, Business Route 22, Braddock Hills, Churchill, Edgewood, Wilkinsburg Boroughs and City of Pittsburgh

35,000

(Base Project Allocation - $35,000)

(47) SR 376, Pavement Reconstruction, Rehabilitation, Squirrel Hill Tunnel Rehabilitation No.2, City of Pittsburgh

4,950,000

(Base Project Allocation - $4,500,000)

(Design and Contingencies - $450,000)

(48) SR 400, Concrete Pavement Reconstruction, Rehabilitation, Bigelow Boulevard, Northbound Craig to Bloomfield Bridge, City of Pittsburgh

550,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $50,000)

(49) SR 400, Concrete Pavement Reconstruction, Rehabilitation, Bigelow Boulevard, Southbound Craig to Bloomfield Bridge, City of Pittsburgh

550,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $50,000)

(50) SR 4003, Concrete Pavement Reconstruction, Rehabilitation, SR 4003, McKnight Road Phase II, Ross and McCandless Townships

6,592,000

(Base Project Allocation - $5,992,000)

(Design and Contingencies - $600,000)

(51) SR 4003, Concrete Pavement Reconstruction, Rehabilitation, SR 4003, McKnight Road Phase I, Ross and McCandless Townships

6,458,000

(Base Project Allocation - $5,858,000)

(Design and Contingencies - $600,000)

(52) SR 4024, Concrete Pavement Reconstruction, Rehabilitation, SR 4024, Duncan Avenue, McCandless Township

836,000

(Base Project Allocation - $760,000)

(Design and Contingencies - $76,000)

(53) SR 4036, Concrete Pavement Reconstruction, Rehabilitation, Big Sewickley Creek Road from Sunset Drive to Hitzell Hill Road, Bell Acres and Economy Boroughs

1,870,000

(Base Project Allocation - $1,700,000)

(Design and Contingencies - $170,000)

(54) SR 4052, Intersection Improvement, Widen, Warrendale-Bayne Road, Improvements, Phase II, Marshall Township

99,000

(Base Project Allocation - $99,000)

(55) SR 4084, Concrete Pavement Reconstruction, Rehabilitation, SR 4084, Western Avenue and Ridge from Chateau Street to Brighton Road, City of Pittsburgh

784,000

(Base Project Allocation - $712,000)

(Design and Contingencies - $72,000)

(56) SR 48, Concrete Pavement Reconstruction, Rehabilitation, SR 48, Scenery Drive, Forward and Elizabeth Townships

715,000

(Base Project Allocation - $650,000)

(Design and Contingencies - $65,000)

(57) SR 48, Concrete Pavement Reconstruction, Rehabilitation, SR 48, T-130 to Macbeth Drive, Monroeville Borough

2,120,000

(Base Project Allocation - $1,920,000)

(Design and Contingencies - $200,000)

(58) SR 50, Upgrade and Coordinate 8 Signals, Safety Improvement, PA 50, Collier Street to Noblestown and Poplar, Carnegie, Green Tree and Heidelberg Boroughs, Scott Township and City of Pittsburgh

18,000

(Design and Contingencies - $18,000)

(59) SR 51, Traffic Signal Upgrade, 9 Intersections, Existing Signal Improvement, Saw Mill Run Boulevard from Edgebrooke Avenue to Stewart Avenue, Brentwood and Whitehall Boroughs and City of Pittsburgh

232,000

(Base Project Allocation - $232,000)

(60) SR 51, Concrete Pavement Reconstruction, Rehabilitation, Clairton Boulevard from Lewis Run to Cloverleaf, Pleasant Hills Borough

7,260,000

(Base Project Allocation - $6,600,000)

(Design and Contingencies - $660,000)

(61) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60 from Business Route 60 to South Expressway, Findlay and Moon Townships

10,474,000

(Base Project Allocation - $9,522,000)

(Design and Contingencies - $952,000)

(62) SR 60, New Interchange, Dick's Sporting Goods Headquarters, Between SR 60 and Business Route 60, Clinton Road and Flaugherty Run Interchange, Findlay Township

1,868,000

(Base Project Allocation - $1,868,000)

(63) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60, South Expressway No.2, Segment 0353 to Segment 0392 from Airport to Flaugherty Run, Findlay and Moon Townships

18,500,000

(Base Project Allocation - $18,500,000)

(64) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60, South Expressway No.1, Segment 0352 to Segment 0392 from Airport to Flaugherty Run, Findlay and Moon Townships

18,500,000

(Base Project Allocation - $18,500,000)

(65) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60, South Expressway No.4, Segment 0293 to Segment 0353 from Business Route 60 to Airport, Moon Township

20,000,000

(Base Project Allocation - $20,000,000)

(66) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60, South Expressway No.3, Segment 0292 to Segment 0352 from Business Route 60 to Airport, Moon Township

20,000,000

(Base Project Allocation - $20,000,000)

(67) SR 60, Concrete Pavement Reconstruction, Rehabilitation, Steubenville Pike from Parkway West to I-79, Robinson Township

2,750,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $250,000)

(68) SR 60, Concrete Pavement Reconstruction, Rehabilitation, SR 60 from SR 22 to Business Route 60, Moon, North Fayette and Robinson Townships

1,162,000

(Base Project Allocation - $1,056,000)

(Design and Contingencies - $106,000)

(69) SR 65, Upgrade and Coordinate 17 Signals, Safety Improvement, SR 65 from West End Bridge to Cross Street, Various Municipalities

200,000

(Base Project Allocation - $160,000)

(Design and Contingencies - $40,000)

(70) SR 79, Concrete Patching Restoration, Interstate Maintenance, SR 79 from Washington County Line to Bridgeville, Segment 496 to Segment 525, Bridgeville Borough and South Fayette Township

1,055,000

(Base Project Allocation - $927,000)

(Design and Contingencies - $128,000)

(71) SR 79, Concrete Pavement Reconstruction, Rehabilitation, SR 79 from SR 279 to SR 910, including SR 910 Overhead Deck Replacement, Franklin Park Borough and Marshall Township

2,228,000

(Base Project Allocation - $2,025,000)

(Design and Contingencies - $203,000)

(72) SR 79, Concrete Patching Restoration, Interstate Maintenance, SR 79 from Campbells Run to Moon Run, Segment 586 to Segment 605, Kennedy and Robinson Townships

885,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $85,000)

(73) SR 79, Concrete Patching Restoration, Interstate Maintenance, SR 79 from Campbells Run to Moon Run, Various Municipalities

97,000

(Base Project Allocation - $97,000)

(74) SR 791, Concrete Pavement Reconstruction, Rehabilitation, SR 791, Rodi Road Phase I, US 22 to Maple Lane, Churchill Borough

385,000

(Base Project Allocation - $350,000)

(Design and Contingencies - $35,000)

(75) SR 791, Concrete Pavement Reconstruction, Rehabilitation, SR 791, Rodi Road Phase II, Segment 0021/0000 to Segment 0021/1656, Churchill Borough

330,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $30,000)

(76) SR 8, Concrete Pavement Reconstruction, Rehabilitation, Allegheny River Boulevard, Southbound from Washington Boulevard to Highland Park Bridge, City of Pittsburgh

330,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $30,000)

(77) SR 8, Concrete Pavement Reconstruction, Rehabilitation, Allegheny River Boulevard, Northbound from Washington Boulevard to Highland Park Bridge, City of Pittsburgh

330,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $30,000)

(78) SR 8, Corridor Safety Improvements, Congestion Reduction, Penn Avenue and Ardmore Boulevard from I-376 to Braddock Avenue, Hampton, Richland and Shaler Townships

175,000

(Base Project Allocation - $125,000)

(Design and Contingencies - $50,000)

(79) SR 8, Concrete Pavement Reconstruction, Rehabilitation, Penn Avenue from South Avenue to Braddock Avenue, Wilkinsburg Borough

447,000

(Base Project Allocation - $406,000)

(Design and Contingencies - $41,000)

(80) SR 837, Slide Correction, Concrete Rehabilitation, SR 837, Segment 190, Dravosburg and West Mifflin Boroughs

2,200,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $200,000)

(81) SR 88, Concrete Pavement Reconstruction, Rehabilitation, Library Road from Castle Shannon Boulevard to South Park Road, Bethel Park and Castle Shannon Boroughs

2,500,000

(Base Project Allocation - $2,272,000)

(Design and Contingencies - $228,000)

(82) SR 88, Concrete Pavement Reconstruction, Rehabilitation, Library Road from Brownsville and County Line to South Park Road, Bethel Park Borough and South Park Township

3,215,000

(Base Project Allocation - $2,920,000)

(Design and Contingencies - $295,000)

(83) SR 885, Concrete Pavement Reconstruction, Rehabilitation, SR 885 from State Street to Beechway, City of Clairton

330,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $30,000)

(84) SR 885, Concrete Pavement Reconstruction, Rehabilitation, SR 885 from Clairton Road to Payne Hill Road, Jefferson Hills Borough

517,000

(Base Project Allocation - $470,000)

(Design and Contingencies - $47,000)

(85) SR 910, Construct Left Turn Lanes and Adjust Traffic Signals, Intersection Improvement, Wexford Run Road, Left Turn, Intersection of SR 910 Wexford-Bayne Road and SR 4053 Wexford Run Road, Marshall Township

70,000

(Base Project Allocation - $64,000)

(Design and Contingencies - $6,000)

(86) SR 910, Concrete Pavement Reconstruction, Rehabilitation, SR 910, Wexford-Bayne Road from South Church Road to Babcock Boulevard, Pine Township

2,669,000

(Base Project Allocation - $2,424,000)

(Design and Contingencies - $245,000)

(87) SR 910, Pavement Reconstruction, Rehabilitation, SR 910, Wexford-Bayne Road from Mingo Road to North Church Road, Pine Township

1,736,000

(Base Project Allocation - $1,576,000)

(Design and Contingencies - $160,000)

(88) SR 978, Pavement Reconstruction, Rehabilitation, Union Avenue from Battle Ridge Road to Noblestown Road, Oakdale Borough and South Fayette Township

339,000

(Base Project Allocation - $308,000)

(Design and Contingencies - $31,000)

(89) Various Routes, Installation of Center Line Rumble Strips, Rumble Strips 2008, Various Municipalities

200,000

(Base Project Allocation - $200,000)

(90) I-279, Interstate Restoration and Reconstruction

19,000,000

(Base Project Allocation - $19,000,000)

(91) I-376, Interstate Restoration and Reconstruction

14,000,000

(Base Project Allocation - $14,000,000)

(92) I-576, Interstate Restoration and Reconstruction

1,200,000

(Base Project Allocation - $1,200,000)

(93) I-79, Interstate Restoration and Reconstruction

27,000,000

(Base Project Allocation - $27,000,000)

(94) SR 3009, Safety and Intersection Improvements - Signals Updates, Widening, Turning Lanes

775,000

(Base Project Allocation - $775,000)

(95) SR 28, Prep Work, Safety Improvement, Divided Relocation, Median Barrier, Planning, Widen, Alternative Route Improvements and ITS Systems

832,000

(Base Project Allocation - $832,000)

(96) SR 4003, Corridor Safety Improvement Upgrade and Coordinate Traffic Signals at Four Locations

3,000

(Design and Contingencies - $3,000)

(97) SR 60, Reconstruction, Redesign Interchange Realignment, Safety Improvement and Signing

2,000,000

(Base Project Allocation - $2,000,000)

(98) SR 8, Widen the Existing Pavement to Provide Turning Lanes

156,000

(Base Project Allocation - $156,000)

(99) SR 48, Extension of Marsh Drive to Intersect SR 48

910,000

(Base Project Allocation - $800,000)

(Land Allocation - $100,000)

(Design and Contingencies - $10,000)

(100) SR 8, Improvements at Intersection with Duncan Avenue, Including Widening, Construction of Turning Lanes, Realignment, Roadway Drainage and Right-of-Way Acquisition

5,501,000

(Base Project Allocation - $4,394,000)

(Land Allocation - $1,107,000)