Section 304. Beaver County.
Projects are as follows:
(1) (Reserved).
(2) SR 0551, Highway Reconstruction, SR 0551 Hollow Road from Darlington Road to Enon Valley Road, Darlington Township, Project ID 91738
Project Allocation
3,500,000
(Base Project Allocation - $3,150,000)
(Design & Contingencies - $350,000)
(3) SR 0018, Highway Reconstruction, SR 0018 Frankfort Road from SR 0151 Green Garden Road, Raccoon Township, Project ID 91736
Project Allocation
3,600,000
(Base Project Allocation - $3,200,000)
(Design & Contingencies - $400,000)
(4) SR 0030, Highway Reconstruction, SR 0030, Lincoln Highway, from SR 0168 to SR 0151, Greene Township, Project ID 88258
Project Allocation
1,830,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $330,000)
(5) SR 3016, SR 3007, Highway Reconstruction, SR 3016 Mill Street, Kennedy Boulevard from Brodhead Road to Sheffield Avenue, Monaca Road and SR 3007 Brodhead Road from Sheffield Road to Admiral Street, City of Aliquippa, Project ID 91734
Project Allocation
3,400,000
(Base Project Allocation - $3,000,000)
(Design & Contingencies - $400,000)
(6) SR 0588, Highway Reconstruction, SR 0588 Stiffin Hill Road from Clayton Road to 7th Street, White Township, City of Beaver Falls, Eastvale Borough, Project ID 91740
Project Allocation
3,475,000
(Base Project Allocation - $3,175,000)
(Design & Contingencies - $300,000)
(7) SR 1002, Highway Reconstruction, SR 1002 Cherry Hill Road from SR 0351 to Brighton Road, North Sewickley Township, Project ID 91742
Project Allocation
3,420,000
(Base Project Allocation - $3,120,000)
(Design & Contingencies - $300,000)
(8) SR 0288, Highway Reconstruction, SR 0288 from SR 0065 to Shady Rest Road, Franklin Township, Project ID 88263
Project Allocation
660,000
(Base Project Allocation - $660,000)
(9) SR 0288 Highway Reconstruction, River Road to Mercer Road, Franklin Township, Project ID 88456
Project Allocation
110,000
(Base Project Allocation - $110,000)
(10) SR 1011, Highway Reconstruction, SR 1011 North Camp Run Road from Zelienople Road to Camp Run Road, Franklin Township, Project ID 91744
Project Allocation
3,480,000
(Base Project Allocation - $3,150,000)
(Design & Contingencies - $330,000)
(11) SR 3014, Highway Reconstruction, SR 3014 Golf Course Road from Dead End to Mill Street, Center and Hopewell Townships, City of Aliquippa, Project ID 91732
Project Allocation
3,535,000
(Base Project Allocation - $3,175,000)
(Design & Contingencies - $360,000)
(12) SR 3005, Highway Reconstruction, SR 3005 Chapel Road from Brodhead Road to Center Grange Road, Segments 0010 to 0060, City of Aliquippa, Hopewell and Center Townships, Project ID 91748
Project Allocation
3,470,000
(Base Project Allocation - $3,140,000)
(Design & Contingencies - $330,000)
(13) SR 0351, Highway Reconstruction, SR 0351 Crescent Drive from County Line to Centennial Avenue, Darlington Township, New Galilee Borough, Project ID 91726
Project Allocation
3,500,000
(Base Project Allocation - $3,140,000)
(Design & Contingencies - $360,000)
(14) SR 3005, Highway Reconstruction, SR 3005 Chapel Road from Center Grange Road to Old Brodhead Road, Segments 0060 to 0080, Center Township, Project ID 91750
Project Allocation
3,460,000
(Base Project Allocation - $3,100,000)
(Design & Contingencies - $360,000)
(15) SR 0588, Reconstruction, Clayton Road to Eastvale Bridge, City of Beaver Falls, Eastvale Borough, North Sewickley and White Townships, Project ID 88457
Project Allocation
680,000
(Base Project Allocation - $680,000)
(16) SR 0989, Highway Reconstruction, Longvue Circle to Mohr Lane, Economy Borough, Project ID 88458
Project Allocation
500,000
(Base Project Allocation - $500,000)
(17) SR 8029, Highway Portion Bridge Preservation, SR 8029 Ramp over 65 at SR 2002 Interchange, Freedom Borough, Project ID 95554
Project Allocation
927,000
(Base Project Allocation - $309,000)
(Design & Contingencies - $618,000)
(18) SR 0051, Bituminous Overlay, SR 0051 from SR 0251 to SR 4004, Cannelton Road, City of Aliquippa, Bridgewater Borough, Center, Chippewa and Darlington Townships, East Rochester and Fallston Boroughs, Hopewell Township, Monaca Borough, Patterson Township, Rochester Borough, South Beaver Township, Project ID 88495
Project Allocation
2,465,000
(Base Project Allocation - $2,385,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(19) SR 2012, Pavement Reconstruction, SR 2012 (Phillips Street) from State Street to Ridge Road Extension, Baden and Economy Boroughs, Project ID 91747
Project Allocation
3,500,000
(Base Project Allocation - $3,150,000)
(Design & Contingencies - $350,000)
(20) SR 3016, Concrete Pavement Rehabilitation, SR 3016 Kennedy Boulevard, from SR 3007 (Brodhead Road) to SR 3001 (Monaca Road), City of Aliquippa, Project ID 88373
Project Allocation
564,000
(Design & Contingencies - $564,000)
(21) SR 2006, Highway Reconstruction, SR 2006 Lovi Road from Freedom Crider Road to Wallace City Road, New Sewickley Township, Project ID 91710
Project Allocation
3,490,000
(Base Project Allocation - $3,130,000)
(Design & Contingencies - $360,000)
(22) SR 0989, Highway Reconstruction, SR 0989 Ridge Road Extension from Droz Avenue to Legionville Hollow, Economy Borough, Project ID 91708
Project Allocation
3,430,000
(Base Project Allocation - $3,180,000)
(Design & Contingencies - $250,000)
(23) SR 0168, Highway Reconstruction, SR 0168 from Lisbon Road to Blackhawk Road, Ohioville Borough, South Beaver Township, Project ID 91707
Project Allocation
3,625,000
(Base Project Allocation - $3,245,000)
(Design & Contingencies - $380,000)
(24) SR 0151, Highway Reconstruction, SR 0151 from Park Road to Stone Quarry Road, Independence and Hopewell Townships, Project ID 91706
Project Allocation
3,690,000
(Base Project Allocation - $3,360,000)
(Design & Contingencies - $330,000)
(25) SR 0151, Highway Reconstruction, SR 0151 Bocktown Road from SR 0018 to Park Road, Raccoon, Hanover and Independence Townships, Project ID 91701
Project Allocation
3,560,000
(Base Project Allocation - $3,180,000)
(Design & Contingencies - $380,000)
(26) SR 3011, Highway Reconstruction, SR 3011 Gringo Clinton Road from PA 151 to the County Line, Hopewell Township, Project ID 91712
Project Allocation
3,510,000
(Base Project Allocation - $3,180,000)
(Design & Contingencies - $330,000)
(27) SR 0068, Highway Reconstruction, SR 0068 from Division Street to Railroad Overpass, Vanport Township, Project ID 91699
Project Allocation
2,530,000
(Base Project Allocation - $2,300,000)
(Design & Contingencies - $230,000)
(28) SR 0068, Highway Reconstruction, SR 0051 Constitution Boulevard from SR 0065 to SR 0018, Rochester Township Bridgewater and Rochester Boroughs, Project ID 91577
Project Allocation
3,250,000
(Base Project Allocation - $3,000,000)
(Design & Contingencies - $250,000)
(29) SR 0051, Restoration, SR 0051 from SR 0251 to SR 4004, Chippewa, Darlington and South Beaver Townships, Project ID 91696
Project Allocation
352,000
(Design & Contingencies - $352,000)
(30) SR 3012, Highway Reconstruction, SR 3012 Center Grange Road from SR 3007 to SR 3001, Center Township, Project ID 91730
Project Allocation
3,510,000
(Base Project Allocation - $3,150,000)
(Design & Contingencies - $360,000)
(31) SR 0051, Highway Reconstruction, SR 0051 from Ohio State Line to McKinley Road, Chippewa Township, Project ID 91718
Project Allocation
3,130,000
(Base Project Allocation - $2,800,000)
(Design & Contingencies - $330,000)
(32) I-376, Highway Reconstruction, I-376, Hopewell Township Line to Findlay Township, Hopewell and Center Townships, Project ID 87752
Project Allocation
201,000
(Base Project Allocation - $172,000)
(Design & Contingencies - $29,000)
(33) SR 2004, Realignment and Roadway Reconstruction, Located on SR 2004 (Freedom Road) from Park Quarry Road to Wolfe Run Road, New Sewickley Township, Beaver County. This is Second Phase of 3 Construction Phase Project, New Sewickley Township, Project ID 82616
Project Allocation
3,756,000
(Base Project Allocation - $2,255,000)
(Land Allocation - $600,000)
(Design & Contingencies - $901,000)
(34) SR 0018, Safety Improvement, SR 0018 from SR 0065 to SR 0351, Hanover Township, Project ID 82562
Project Allocation
788,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $38,000)
(35) SR 2005, Safety Improvement Slide Repair, SR 2005/0050 near the Intersection of Blank Drive, Economy Borough, Project ID 92934
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
(36) SR 0018, Full Reconstruction, Located on SR 0018, Fourth Avenue, from near the Intersection with 32nd Street to near the Intersection with Wallace Run Road, (SR 0551), City of Beaver Falls, Project ID 91582
Project Allocation
792,000
(Land Allocation - $711,000)
(Design & Contingencies - $81,000)
(37) SR 0018, Highway Reconstruction, SR 0018 Big Beaver Boulevard, from SR 0351 to Lawrence County Line, Big Beaver Borough, Project ID 91595
Project Allocation
4,100,000
(Base Project Allocation - $3,750,000)
(Design & Contingencies - $350,000)
(38) SR 0168, Highway Reconstruction, SR 0168 Salem Church Road from SR 0051 to Madison Road, Big Beaver and New Galilee Boroughs, Project ID 91721
Project Allocation
3,530,000
(Base Project Allocation - $3,170,000)
(Design & Contingencies - $360,000)
(39) SR 0151, Highway Reconstruction, Thompson Hill Road to SR 0060, Independence and Hopewell Townships, Project ID 88269
Project Allocation
363,000
(Base Project Allocation - $363,000)
(40) SR 1005, Highway Reconstruction, SR 1005 Chapel Road from Mercer Road to Shady Rest Road, North Sewickley and Franklin Townships, Project ID 91727
Project Allocation
3,520,000
(Base Project Allocation - $3,190,000)
(Design & Contingencies - $330,000)
(41) SR 4030, Highway Reconstruction, SR 4030 Leopard Lane from Sharon Road to SR 0051, Bridgewater Borough, Project ID 91716
Project Allocation
3,565,000
(Base Project Allocation - $3,165,000)
(Design & Contingencies - $400,000)
(42) SR 0068, Highway Reconstruction, SR 0068 H Street and 3rd Street, Vanport Township, Beaver Borough, Project ID 88455
Project Allocation
300,000
(Base Project Allocation - $300,000)
(43) SR 0018, Highway Reconstruction, SR 0018 Frankfort Road from Traverse Creek Bridge to SR 0151, Hanover and Raccoon Townships, Project ID 91697
Project Allocation
3,560,000
(Base Project Allocation - $3,180,000)
(Design & Contingencies - $380,000)
(44) SR 0065, Patch and Overlay, Located on SR 0065, from SR 0288 to Lawrence County Line also SR 0288, Zelienople Road from SR 0065 to Shady Rest Road, Elwood City Borough, Franklin Township, Project ID 75773
Project Allocation
352,000
(Design & Contingencies - $352,000)
(45) SR 1021, Highway Portion Bridge Replacement, SR 1021, Allegheny County, Marion Township, Project ID 93770
Project Allocation
801,000
(Base Project Allocation - $801,000)
(46) SR 3002, Bituminous Overlay, SR 3002, Old Brodhead Road from Frankfort Road to Brodhead Road, Center Township, Project ID 96713
Project Allocation
418,000
(Base Project Allocation - $418,000)
(47) SR 0065, Highway Reconstruction, SR 0065 from SR 0288 to Lawrence County Line, Ellwood City Borough, Franklin Township, Project ID 75673
Project Allocation
3,425,000
(Base Project Allocation - $3,170,000)
(Design & Contingencies - $255,000)
(48) SR 0168, Highway Reconstruction, SR 0168 from SR 0030 to SR 0068, Greene Township, Hookstown, Industry and Shippingport Boroughs, Project ID 78294
Project Allocation
4,530,000
(Base Project Allocation - $4,000,000)
(Design & Contingencies - $530,000)
(49) SR 0376, Restoration, SR 0376 from SR 0060 Vanport to Center Township, Center, Potter and Vanport Townships, Project ID 81976
Project Allocation
1,731,000
(Base Project Allocation - $1,422,000)
(Land Allocation - $74,000)
(Design & Contingencies - $235,000)
(50) SR 4012, Highway Portion Bridge Rehabilitation, SR 4012 (Brady Run Road) over Branch of South Branch of Brady Run, Chippewa Township, Project ID 89150
Project Allocation
785,000
(Base Project Allocation - $738,000)
(Design & Contingencies - $47,000)
(51) SR 3016, Repair a Slide, 351 Feet West of Shannon Road and Extends for Approximately 169 Feet, Raccoon Township, Project ID 28996
Project Allocation
676,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $76,000)
(52) Pennsylvania Avenue, Resurface, Pennsylvania Avenue from PA 51 to PA 18 (Ninth Street), Monaca Borough, Project ID 101229
Project Allocation
605,000
(Base Project Allocation - $605,000)
(53) SR 4023, Resurface, Braden School Road from Braun Road to Constitution Boulevard, Chippewa Township, Project ID 101225
Project Allocation
338,000
(Base Project Allocation - $338,000)
(54) SR 4029, Resurface, SR 4029 from Tuscarawas Road to Blackhawk Road, Ohioville Borough, South Beaver Township, Project ID 101226
Project Allocation
724,000
(Base Project Allocation - $724,000)
(55) SR 4042, Resurface, SR 4042 from SR 8039 to Madison Street, Bridgewater and Rochester Boroughs, Project ID 101227
Project Allocation
300,000
(Base Project Allocation - $300,000)
(56) Kelley Road, Resurface, Kelley Road from Wolf Run Road to Engle Road, Industry Borough, Project ID 101228
Project Allocation
215,000
(Base Project Allocation - $215,000)
(57) SR 4018, Resurface, SR 4018 from Brady's Run Road to Third Street, Beaver Borough, Brighton Township, Project ID 101224
Project Allocation
560,000
(Base Project Allocation - $560,000)
(58) Smiths Ferry Road, Resurface, Smiths Ferry Road from Liberty Road to Tuscarawas Road, Ohioville Borough, Project ID 101230
Project Allocation
383,000
(Base Project Allocation - $383,000)
(59) SR 6018, Resurface, SR 6018 from Monaca Rochester Bridge to SR 8041 (Ramps A and B), Rochester Borough, Project ID 101231
Project Allocation
800,000
(Base Project Allocation - $800,000)
(60) Constitution Boulevard, Reconstruction, Constitution Boulevard from McKinley Road to the Ohio State Line, Chippewa, Darlington and South Beaver Townships, Project ID 101232
Project Allocation
3,100,000
(Base Project Allocation - $3,100,000)
(61) Zelienople Road, Concrete Rehabilitation, Zelienople Road from PA 65 to Shady Rest Road, Franklin Township, Project ID 101233
Project Allocation
900,000
(Base Project Allocation - $900,000)
(62) SR 0376, Interchange Improvements, I-376 (Beaver Valley Expressway) at the SR 0018 (Frankfort Road) Interchange, Center, Potter and Vanport Townships, Project ID 101828
Project Allocation
40,000,000
(Base Project Allocation - $40,000,000)
(63) SR 4019, Highway Portion Bridge Replacement, SR 4019, Park Road over North Branch of Bradys Run, Chippewa Township, Project ID 99794
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(64) SR 3020, Resurface, on Service Creek Road from Clearview Road to Green Garden Road, Hopewell and Independence Townships, Project ID 101221
Project Allocation
2,050,000
(Base Project Allocation - $2,050,000)
(65) I-376, Highway Reconstruction, I-376 from the Allegheny County Line to the Lawrence County Line, Various Municipalities, Project ID 0
Project Allocation
71,600,000
(Base Project Allocation - $71,600,000)
(66) SR 1019, Highway Portion Bridge Replacement, SR 1018, Brush Creek Road over Branch Brush Creek, New Sewickley Township, Project ID 99795
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(67) SR 0551, Resurface, from PA 551 from 37th Street to Echo Valley, Big Beaver and Darlington Boroughs, Darlington and South Beaver Townships, Project ID 101211
Project Allocation
339,000
(Base Project Allocation - $339,000)
(68) SR 0018, Resurface, on Frankfort Road from Lincoln Highway to Green Garden Road, Hanover and Raccoon Townships, Project ID 101205
Project Allocation
725,000
(Base Project Allocation - $725,000)
(69) SR 0065, Resurface, SR 0065 from Allegheny County Line to SR 0051, Ambridge and Rochester Boroughs, Project ID 101206
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
(70) PA 151, Resurface, PA 151 from Park Road to Stone Quarry Road, Independence Township, Project ID 101207
Project Allocation
852,000
(Base Project Allocation - $852,000)
(71) SR 0168, Resurface, on Salem Church Road from Tuscarawas Road to Beaver Run, Ohioville Borough, Project ID 101208
Project Allocation
335,000
(Base Project Allocation - $335,000)
(72) SR 0168, Resurface, on PA 168 from Moore Road to Second Street, Darlington Borough, Darlington and South Beaver Townships, Project ID 101209
Project Allocation
857,000
(Base Project Allocation - $857,000)
(73) SR 0168, Resurface, on PA 168 from Second Street to Eastbrook Road, Big Beaver and Darlington Boroughs, Darlington Township, New Galilee Borough, Project ID 101210
Project Allocation
458,000
(Base Project Allocation - $458,000)
(74) SR 4012, Resurface, on State Route 4012 from Old Blackhawk Road to Grange Road, Brighton, Chippewa and South Beaver Townships, Project ID 101223
Project Allocation
2,580,000
(Base Project Allocation - $2,580,000)
(75) Georgetown Road, Highway Portion Bridge Rehabilitation, Georgetown Road over PA 51, South Beaver Township, Project ID 101202
Project Allocation
360,000
(Base Project Allocation - $360,000)
(76) SR 0051 and Various, Congestion and Safety Improvements, Various State Routes around Aliquippa Tin Mill Redevelopment, City of Aliquippa, Project ID 0
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(77) SR 0989, Resurface, PA 989 (Ridge Road Extension) from Solar Drive to Conway Walrose Road, Ambridge and Economy Boroughs, Harmony Township, Project ID 101212
Project Allocation
751,000
(Base Project Allocation - $751,000)
(78) SR 1006, Resurface, from Mercer Road from PA 65 (Mercer Road) to Zelienople Road, Franklin Township, Project ID 101213
Project Allocation
665,000
(Base Project Allocation - $665,000)
(79) SR 1016, Resurface, on State Route 1016 from Harmony Avenue to Brush Creek Road, Daugherty Township, New Brighton Borough, New Sewickley and Pulaski Townships, Project ID 101214
Project Allocation
760,000
(Base Project Allocation - $760,000)
(80) SR 1019, Resurface from Brush Creek Road from Mecklem Road to PA 588, Marion Township, Project ID 101215
Project Allocation
550,000
(Base Project Allocation - $550,000)
(81) SR 1032, Resurface, on SR 1032, Rochester-Freedom Road from Brighton Avenue to Ashland Oil Company Road, East Rochester and Rochester Boroughs, Project ID 101216
Project Allocation
600,000
(Base Project Allocation - $600,000)
(82) SR 2006, Resurface, on SR 2006 from Freedom Crider Road to Sunset Drive, Economy Borough, New Sewickley Township, Project ID 101217
Project Allocation
839,000
(Base Project Allocation - $839,000)
(83) SR 2008, Resurface, on SR 2008 from Ohio River Boulevard to PA 989, Conway and Economy Boroughs, Project ID 101218
Project Allocation
371,000
(Base Project Allocation - $371,000)
(84) SR 3005, Resurface, on Chapel Road from Brodhead Road to Old Brodhead Road, City of Aliquippa, Center and Hopewell Townships, Project ID 101219
Project Allocation
798,000
(Base Project Allocation - $798,000)
(85) SR 3008, Resurface, on Montgomery Dam Road from Montgomery Dam to Frankfort Road, Potter Township, Project ID 101220
Project Allocation
196,000
(Base Project Allocation - $196,000)
(86) SR 2004, Resurface, PA 989 to Butler County Line, New Sewickley Township, Project ID 0
Project Allocation
3,025,000
(Base Project Allocation - $3,000,000)
(Design & Contingencies - $25,000)
(87) SR 3023, Resurface, on SR 3023 from Lincoln Highway to Clearview Road, Independence Township, Project ID 101222
Project Allocation
733,000
(Base Project Allocation - $733,000)
(88) SR 0051 and SR 0068, Exit Lane and Off Ramp on SR 0051 to SR 0068, Beaver and Bridgewater Boroughs
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(89) SR 0989 and SR 0065, Economy Way Extensions, MPMS #102058 Study Phase has been added to the Tip with Local Funds only at this Time. SPC requested a Map for Air Quality Testing. Economy Way was Improved with a Turning Lane at SR 0065 and the Road through the Shopping Center is now a Public Road to the Walmart Plaza. A 6500 Feet Extension to Route 989 is Proposed
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(90) Various Routes, Replace Guide Rail, Various Locations Beaver County, Various, Project ID 85968
Project Allocation
98,000
(Base Project Allocation - $98,000)