Act 129 of 2014, § 307, under HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2014-2015.

Act 129 of 2014, § 307

Section 307. Blair County.

Projects are as follows:

(1) (Reserved).

(2) SR 3013, Resurface, William Penn Road (SR 3013) from Polecat Run to PA 164, Freedom and Greenfield Townships, Project ID 96469

Project Allocation

725,000

(Base Project Allocation - $725,000)

(3) SR 4027, Resurface, 10th Street (SR 4027) from Washington Avenue to Herald Street, Tyrone Borough, Project ID 96479

Project Allocation

125,000

(Base Project Allocation - $125,000)

(4) SR 0026, Safety Improvement, US 22 from Cambria County Line East to the PA 764 Interchange, Allegheny Township, Project ID 88200

Project Allocation

200,000

(Base Project Allocation - $200,000)

(5) SR 3005, Resurface, Cottontown Road (SR 3005) from Quarry Road (SR 3006) to Ski Gap Road (SR 3002), Greenfield Township, Project ID 96459

Project Allocation

1,400,000

(Base Project Allocation - $1,400,000)

(6) SR 3006, Resurface, Quarry Road (SR 3006) from Bedford County Line to Dunnings Highway (SR 3013), Greenfield Township, Project ID 96460

Project Allocation

380,000

(Base Project Allocation - $380,000)

(7) SR 3007, Resurface, Schellsburg Road (SR 3007) from Bedford County Line to Cottontown Road (SR 3005), Greenfield Township, Project ID 96461

Project Allocation

200,000

(Base Project Allocation - $200,000)

(8) SR 3008, Resurface, Polecat Hollow Road (SR 3008) from PA 164 to Bedford Street, Freedom and Greenfield Townships, Project ID 96462

Project Allocation

1,500,000

(Base Project Allocation - $1,500,000)

(9) SR 3009, Resurface, Valley Forge Road (SR 3009) from Poplar Run Road (SR 3010) to Old Route 22 (SR 3012), Juniata Township, Project ID 96463

Project Allocation

925,000

(Base Project Allocation - $925,000)

(10) SR 0164, Resurface, PA 164 from SR 3013 to PA 36, Freedom Township, Project ID 96467

Project Allocation

1,250,000

(Base Project Allocation - $1,250,000)

(11) SR 4002, Resurface, Sugar Run Road (SR 4002) from Tunnel Hill Street (SR 4001) to PA 764, Allegheny Township, Project ID 96472

Project Allocation

2,300,000

(Base Project Allocation - $2,300,000)

(12) SR 3013, Concrete Restoration, William Penn Road (SR 3013) from Bedford County Line to Mill Road (T-405), Greenfield Township, Project ID 96468

Project Allocation

1,600,000

(Base Project Allocation - $1,600,000)

(13) SR 2008, Resurface, Plum Creek Road (SR 2008) from PA 36 to PA 164, Taylor Township, Project ID 96411

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

(14) SR 4024, Resurface, Broad Avenue (SR 4024) from Logan Boulevard (SR 4003) to PA 36, City of Altoona, Project ID 96477

Project Allocation

275,000

(Base Project Allocation - $275,000)

(15) SR 4023, Resurface, Tipton Road (SR 4023) from Bell Tip Road (SR 4021) to Grazierville Road (SR 4025), Antis Township, Project ID 96476

Project Allocation

1,500,000

(Base Project Allocation - $1,500,000)

(16) SR 4005, Resurface, 31st Street (SR 4005) from Beale Avenue to Pine Avenue, City of Altoona, Project ID 96473

Project Allocation

400,000

(Base Project Allocation - $400,000)

(17) SR 4020, Resurface, Reightown Road (SR 4020) from Grandview Road (SR 4015) to North First Street, Antis Township, Bellwood Borough, Project ID 96474

Project Allocation

525,000

(Base Project Allocation - $525,000)

(18) SR 4021, Resurface, Bell Tip Road (SR 4021) from PA 865 to Tipton Road (SR 4023), Antis Township, Project ID 96475

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(19) SR 2014, Resurface, Plank Road (SR 2014) from Smith Street to Reservoir Road (SR 2007), Blair and Frankstown Townships, Hollidaysburg Borough, Project ID 96412

Project Allocation

600,000

(Base Project Allocation - $600,000)

(20) SR 1016, Resurface, Turkey Valley Road (SR 1016) from US 22 to Quarry Road (SR 1011), Frankstown Township, Project ID 96409

Project Allocation

975,000

(Base Project Allocation - $975,000)

(21) SR 1001, Resurface, Plank Road (SR 1001) from US 22 to Sheraton Drive, Allegheny, Blair and Logan Townships, Project ID 96403

Project Allocation

2,500,000

(Base Project Allocation - $2,500,000)

(22) SR 0866, Resurface, PA 866 from Sportmans Road (T-357) to Locke Mountain Road (SR 2020), Huston and Woodbury Townships, Project ID 96401

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(23) SR 0453, Rockfall Stabilization, PA 453 from Beginning of 4 Lane to New Enterprise Stone and Lime Company Tyrone Quarry Entrance, Snyder Township, Project ID 96400

Project Allocation

1,350,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $25,000)

(Design & Contingencies - $325,000)

(24) SR 0164, Resurface, on PA 164 from Cambria County Line to Knob Run Road (SR 3003), Juniata Township, Project ID 96399

Project Allocation

149,000

(Base Project Allocation - $149,000)

(25) SR 0022, Resurface, on US 22 from SR 3012 to Turkey Valley Road (SR 1016), Allegheny and Blair Townships, Duncansville Borough and Frankstown Township, Hollidaysburg Borough, Project ID 96398

Project Allocation

745,000

(Base Project Allocation - $745,000)

(26) SR 1011, Resurface, Quarry Road (SR 1011) from Canoe Creek to US 22, Frankstown Township, Project ID 96404

Project Allocation

2,700,000

(Base Project Allocation - $2,700,000)

(27) SR 0022, Intersection Improvements, from a Point 150 Feet West of the Intersection of US 22 with SR 2007 (Reservoir Road) East through the Intersection of US 22 with SR 1009 (Frankstown Road to the Village of Geeseytown, Approximately 150 Feet beyond the Geeseytown Cemetery, Frankstown Township, Project ID 92537

Project Allocation

2,043,000

(Base Project Allocation - $1,982,000)

(Land Allocation - $20,000)

(Design & Contingencies - $41,000)

(28) SR 1013, Resurface, SR 1013 - Pleasant Valley Boulevard to Golf Course Road, City of Altoona, Tyrone and Logan Townships, Project ID 96405

Project Allocation

2,600,000

(Base Project Allocation - $2,600,000)

(29) SR 1013, Resurface, on Kettle Road (SR 1013) from Golf Course Road (SR 1015) to PA 453, Tyrone Township, Project ID 96406

Project Allocation

1,800,000

(Base Project Allocation - $1,800,000)

(30) SR 4019, Highway Reconstruction, SR 4019 from SR 4022 Stadium Drive to Main Street, Antis Township, Bellwood Borough, Project ID 92743

Project Allocation

150,000

(Base Project Allocation - $150,000)

(31) SR 3003, Resurface, Knob Run Road (SR 3003) from PA 164 to Dick Street (T-611), Blair, Freedom and Juniata Townships, Project ID 96456

Project Allocation

2,321,000

(Base Project Allocation - $2,321,000)

(32) SR 4027, Resurface, SR 4027 from the Tyrone Borough Line to PA 350, Snyder Township, Project ID 96480

Project Allocation

1,400,000

(Base Project Allocation - $1,400,000)

(33) SR 3004, Resurface, Buttermilk Hollow Road (SR 3004) from Locust Hollow Road (SR 3005) to Ski Gap Road (SR 3002), Greenfield Township, Project ID 96457

Project Allocation

825,000

(Base Project Allocation - $825,000)

(34) SR 4008, Resurface, SR 4008 from Cambria County Line to West Chestnut Avenue, City of Altoona, Logan Township, Project ID 92595

Project Allocation

600,000

(Base Project Allocation - $600,000)

(35) SR 2016, Resurface, Chimney Rocks Road (SR 2016) from PA 36 to West Loop Road (SR 2014), Blair Township, Project ID 96450

Project Allocation

500,000

(Base Project Allocation - $500,000)

(36) SR 2017, Resurface, Fox Run Road (SR 2017) from Yellow Springs Drive (SR 2015) to US 22, Catharine and Morris Townships, Project ID 96451

Project Allocation

1,800,000

(Base Project Allocation - $1,800,000)

(37) SR 2007, Resurface, Reservoir Road (SR 2007) from West Loop Road (SR 2014) to US 22, Frankstown Township, Project ID 96410

Project Allocation

700,000

(Base Project Allocation - $700,000)

(38) SR 2020, Resurface, Locke Mountain Road (SR 2020) from Reservoir Road (SR 2007) to Evans Road (T-380), Frankstown, Huston and Woodbury Townships, Project ID 96452

Project Allocation

2,500,000

(Base Project Allocation - $2,500,000)

(39) SR 2022, Resurface, Juniata Valley Road (SR 2002) from US 22 to US 22, Frankstown Township, Project ID 96453

Project Allocation

1,750,000

(Base Project Allocation - $1,750,000)

(40) SR 3001, Resurface, Knob Road (SR 3001) from Blue Knob Road (SR 4035) to PA 164, Greenfield and Juniata Townships, Project ID 96454

Project Allocation

1,516,000

(Base Project Allocation - $1,516,000)

(41) SR 0866, Resurface, PA 866 from Locke Mountain Road (SR 2020) to Union Street, Williamsburg Borough, Woodbury Township, Project ID 96402

Project Allocation

1,700,000

(Base Project Allocation - $1,700,000)

(42) SR 3003, Resurface, Knob Road (SR 3003) from Diamond Lane (SR 3001) to PA 164, Greenfield and Juniata Townships, Project ID 96455

Project Allocation

800,000

(Base Project Allocation - $800,000)

(43) SR 2024, SR 3003, Highway Reconstruction, SR 2024 Sproul Mountain Road from Sproul Mountain to Sproul Interchange and SR 3013 William Penn Road from Sproul Interchange to T-405 Mill Road, Greenfield Township, Project ID 92598

Project Allocation

456,000

(Base Project Allocation - $456,000)

(44) SR 1015, Resurface, on Golf Course Road (SR 1015) from Kettle Road (SR 1013) to Hileman Road (SR 1008), Tyrone Township, Project ID 96407

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

(45) SR 0036, Resurface, with Drainage and Guide Rail as Required, on PA 36 from the Bedford County Line to I-99, Blair and Freedom Townships, Roaring Spring Borough, Taylor Township, Project ID 89339

Project Allocation

2,064,000

(Base Project Allocation - $1,994,000)

(Design & Contingencies - $70,000)

(46) SR 0022, Resurface, on US 22 from SR 3012 to US 22 Interchange and on PA 764 from US 22 Interchange to Veeder Root Driveway, Allegheny Township, Project ID 91614

Project Allocation

407,000

(Base Project Allocation - $407,000)

(47) SR 2017, Highway Portion Bridge Replacement, SR 2017 (Fox Run Road) over Fox Run near the Intersection of Goodman Road (T-482), Catharine and Morris Townships, Project ID 94442

Project Allocation

122,000

(Base Project Allocation - $119,000)

(Land Allocation - $3,000)

(48) SR 1013, Pipe Replacements, SR 1013 (Kettle Road) over Sinking Run, Tyrone Township, Project ID 93762

Project Allocation

847,000

(Base Project Allocation - $760,000)

(Land Allocation - $66,000)

(Design & Contingencies - $21,000)

(49) SR 1013, Pipe Replacements, SR 1013 (Kettle Road) over Sinking Run, Tyrone Township, Project ID 93766

Project Allocation

587,000

(Base Project Allocation - $501,000)

(Land Allocation - $65,000)

(Design & Contingencies - $21,000)

(50) SR 1009, Mill and Overlay and Intersection Upgrade, On Frankstown Road (SR 1009) from Scotch Valley Road (T-424) to Park Avenue (SR 1021), Frankstown and Logan Townships, Project ID 88543

Project Allocation

1,928,000

(Base Project Allocation - $1,770,000)

(Land Allocation - $115,000)

(Design & Contingencies - $43,000)

(51) SR 4010, Safety Improvement, 17th Street from 12th Avenue to the I-99 Interchange, 6th/7th Avenue, 5th Avenue and 8th Avenue from 31st Street to Kettle Street, 12th Avenue from 17th Street to 18th Street and 18th Street from 12th Avenue to 13th Avenue, City of Altoona, Logan Township, Project ID 94670

Project Allocation

652,000

(Base Project Allocation - $601,000)

(Land Allocation - $51,000)

(52) SR 1013, Pipe Replacements, SR 1013 (Kettle Road) over Sinking Run, Tyrone Township, Project ID 93767

Project Allocation

587,000

(Base Project Allocation - $501,000)

(Land Allocation - $65,000)

(Design & Contingencies - $21,000)

(53) SR 0022, Intersection Improvement, on US 22 at the Intersection of 7th Street, Duncansville Borough, Project ID 88539

Project Allocation

276,000

(Base Project Allocation - $276,000)

(54) SR 1001, Resurface, on Plank Road (SR 1001) from Sellers Drive (T-584) to Goods Lane (SR 4004), Allegheny and Logan Townships, Project ID 91616

Project Allocation

195,000

(Base Project Allocation - $195,000)

(55) SR 4029, Reconstruction, Clay Avenue (SR 4029) from Engelman Drive to PA 453, Snyder Township, Tyrone Borough, Project ID 97858

Project Allocation

152,000

(Base Project Allocation - $81,000)

(Land Allocation - $71,000)

(56) SR 0764, Resurface, PA 764 from SR 1001 (Pleasant Valley Boulevard) to SR 4018 (Sabbath Rest Road), Antis and Logan Townships, Project ID 94438

Project Allocation

600,000

(Base Project Allocation - $600,000)

(57) SR 0764, Intersection Improvement, PA 764 (6th Avenue) with SR 4013 (7th Street) and the Intersection of SR 4013 (7th Street) and SR 4013 (Chestnut Avenue), City of Altoona, Project ID 94439

Project Allocation

791,000

(Base Project Allocation - $600,000)

(Land Allocation - $71,000)

(Design & Contingencies - $120,000)

(58) SR 3006, Highway Portion Bridge Replacement, SR 3006 (Quarry Road) over Boiling Spring Run near the Intersection of SR 3005 (Cottontown Road), Greenfield Township, Project ID 94443

Project Allocation

222,000

(Base Project Allocation - $201,000)

(Land Allocation - $21,000)

(59) SR 1003, Highway Portion Bridge Replacement, SR 1003 (Sylvan Drive) over Brush Run near the Intersection of Brush Mountain Drive (T-423), Frankstown Township, Hollidaysburg Borough, Project ID 94440

Project Allocation

167,000

(Base Project Allocation - $156,000)

(Land Allocation - $11,000)

(60) SR 2017, Highway Portion Bridge Replacement, SR 2017 (Fox Run Road) over Yellow Springs Run near the Intersection of Pole Cat Hollow Road (T-461), Catharine Township, Project ID 94441

Project Allocation

125,000

(Base Project Allocation - $116,000)

(Land Allocation - $9,000)

(61) SR 0022, Intersection Improvements, SR 0022 from the Village of Canoe Creek to Weller Road (T-446), Frankstown Township, Project ID 63586

Project Allocation

1,875,000

(Base Project Allocation - $1,875,000)

(62) SR 4023, Resurface, SR 4023 (Tipton Road) from SR 1001 (Pleasant Valley Boulevard) to the Railroad Crossing, Antis Township, Project ID 96336

Project Allocation

115,000

(Base Project Allocation - $115,000)

(63) SR 4023, Resurface, SR 4023 (Tipton Road) from SR 4025 (Grazierville Road) to the Clearfield County Line, Antis and Snyder Townships, Project ID 96337

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(64) SR 0764, Resurface, on PA 764 from Sugar Run Road (SR 4002) to Pleasant Valley Boulevard (SR 1001) and on SR 4010 (17th Street) from 12th Avenue to SR 1021 (Osgood Drive), Allegheny Township, City of Altoona, Logan Township, Project ID 91625

Project Allocation

816,000

(Base Project Allocation - $780,000)

(Design & Contingencies - $36,000)

(65) SR 0036, Highway Reconstruction, PA 36 from Bedford County Line to T-374 Old PA 36 Road, Blair and Freedom Townships, Project ID 88548

Project Allocation

200,000

(Base Project Allocation - $200,000)

(66) SR 3010, Resurface, SR 3010 (Poplar Run Road) from Sleigh Hollow Road to SR 3003 (Puzzletown Road), Freedom and Juniata Townships, Project ID 96348

Project Allocation

600,000

(Base Project Allocation - $600,000)

(67) SR 3012, Resurface, on SR 3012 (Old US 22) from Mule Shoe Tunnel to PA 764, Allegheny and Juniata Townships, Project ID 91621

Project Allocation

300,000

(Base Project Allocation - $300,000)

(68) SR 4010, Resurface, SR 4010 from 5th Avenue to Pleasant Valley Boulevard, City of Altoona, Project ID 91620

Project Allocation

76,000

(Base Project Allocation - $76,000)

(69) SR 4015, Highway Portion Bridge Replacement, SR 4015 (Bellwood Road) over Riggles Gap Run near the Intersection of SR 4018 (Lower Riggles Gap Road), Antis Township, Project ID 94446

Project Allocation

264,000

(Base Project Allocation - $258,000)

(Land Allocation - $6,000)

(70) SR 0865, Highway Reconstruction, PA 865 from North 2nd Street to Cambria County Line, Antis Township and Bellwood Borough, Project ID 91618

Project Allocation

400,000

(Base Project Allocation - $400,000)

(71) SR 4010, Highway Restoration, SR 4010 (17th Street) from SR 1001 (Pleasant Valley Boulevard) to SR 1021 (Osgood Drive), Logan Township, Project ID 94445

Project Allocation

690,000

(Base Project Allocation - $690,000)

(72) SR 4010, Highway Reconstruction, 17th Street to PA 36, between 5th and Pleasant Valley Boulevard, City of Altoona, Logan Township, Project ID 92759

Project Allocation

1,500,000

(Base Project Allocation - $1,500,000)

(73) SR 0036, Resurface, PA 36 (Broad Avenue) from PA 36 (Union Avenue) to 24th Street, City of Altoona, Project ID 96333

Project Allocation

135,000

(Base Project Allocation - $135,000)

(74) SR 4027, Resurface, SR 4027 from PA 350 to Centre County Line, Snyder Township, Project ID 92744

Project Allocation

330,000

(Base Project Allocation - $330,000)

(75) SR 4010, Highway Reconstruction, SR 4010 from Pleasant Valley Boulevard to I-99 Ramps at 17th Street Interchange, Logan Township, City of Altoona, Project ID 92745

Project Allocation

450,000

(Base Project Allocation - $450,000)

(76) SR 2015, Resurface, SR 2015 from PA 866 to Fox Run Road (SR 2017), Catharine Township and Williamsburg Borough, Project ID 92746

Project Allocation

80,000

(Base Project Allocation - $80,000)

(77) SR 0453, Stabilize Rockfall Area, along PA 453 from Schock Hollow Road (T-510) continuing for 3.0 Miles West, Snyder Township, Project ID 95291

Project Allocation

1,366,000

(Base Project Allocation - $1,201,000)

(Land Allocation - $40,000)

(Design & Contingencies - $125,000)

(78) SR 0219, Safety Improvement, Intersections of 6th and 7th Avenues with Union Avenue, 22nd Street, 12th Street, 8th Street and 7th Street, City of Altoona, Project ID 88198

Project Allocation

150,000

(Base Project Allocation - $150,000)

(79) SR 0022, Intersection Improvement, US 22 at the Juniata Street and Allegheny Street Intersection, Hollidaysburg Borough, Project ID 98785

Project Allocation

7,751,000

(Base Project Allocation - $6,501,000)

(Land Allocation - $250,000)

(Design & Contingencies - $1,000,000)

(80) SR 0022, Intersection Improvement, US 22 at the PA 36 Intersection, Hollidaysburg Borough, Project ID 98783

Project Allocation

1,352,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $201,000)

(Design & Contingencies - $151,000)

(81) I-99, Reconstruction, I-99 from the Bedford County Line to the Centre County Line, Various Municipalities, Project ID 0

Project Allocation

166,180,000

(Base Project Allocation - $166,180,000)

(82) SR 0022, Reconstruction and Safety Improvements, US 22 from Allegheny Township Line East to the Wye Switches, Allegheny and Blair Townships and Duncansville Borough, Project ID 98782

Project Allocation

250,000

(Base Project Allocation - $150,000)

(Design & Contingencies - $100,000)