Centre County

Act 129 of 2014, § 314, under HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2014-2015.

Act 129 of 2014, § 314

Section 314. Centre County.

Projects are as follows:

(1) (Reserved).

(2) SR 0045, SR 0192, SR 3041, Highway Reconstruction, Various Segments of SR 0045, SR 0192 and SR 3041, Benner, College, Haines, Miles and Penn Townships, Project ID 91100

Project Allocation

2,747,000

(Base Project Allocation - $2,747,000)

(3) SR 0322, Highway Reconstruction, SR 0322 from Thompson Curve to the 4 Lane Segments, Rush Township, Project ID 92736

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(4) SR 0099, Roadway Resurfacing, Mount Nittany Expressway I-99 and SR 0322, College, Harris and Patton Townships, Project ID 92740

Project Allocation

3,800,000

(Base Project Allocation - $3,800,000)

(5) SR 0099, Concrete Pavement Rehabilitation, Overlay, SR 0099 Concrete Pavement Rehabilitation, Overlay, Taylor and Worth Townships, Project ID 91586

Project Allocation

2,361,000

(Base Project Allocation - $2,361,000)

(6) I-99, Reconstruction, I-99 between Bald Eagle Valley Road and East of the Intersection with US 322, Worth Township, Project ID 91585

Project Allocation

550,000

(Base Project Allocation - $550,000)

(7) I-99, Reconstruction, I-99 between Sellers Lane and SR 8022, Patton Township, Project ID 91584

Project Allocation

660,000

(Base Project Allocation - $660,000)

(8) SR 2005, Highway Portion Bridge Replacement, SR 2005 over Sinking Creek, Segments 0020 Offset 0839 Near Spring Mills, Gregg Township, Project ID 91500

Project Allocation

1,050,000

(Base Project Allocation - $791,000)

(Land Allocation - $49,000)

(Design & Contingencies - $210,000)

(9) SR 0192, Highway Reconstruction, SR 0192 from Spring Bank to Wolfs Store, Miles Township, Project ID 91963

Project Allocation

600,000

(Base Project Allocation - $400,000)

(Design & Contingencies - $200,000)

(10) SR 0144, Safety Improvements, SR 0144 Nectarine Road, Segments 0620/1854 to 0620/2425, Snow Shoe Township, Snow Shoe Borough, Project ID 91959

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(11) SR 0322, Safety Improvements, SR 0322 near Sharer Road, Harris Township, Project ID 91958

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(12) SR 0144, Safety Improvements, SR 0144 Segments 0010/2395 to 0020/0957, Potter Township, Project ID 91955

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(13) SR 0045, Safety Improvements, SR 0045 at Kline Road Intersection, Gregg Township, Project ID 91954

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(14) SR 0477, Safety Improvements, SR 0477, Segment 0010, Miles Township, Project ID 91953

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(15) SR 0322, Safety Improvements, SR 0322 near Satellite Building, Rush Township, Project ID 91956

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(16) SR 3003, Safety and Intersection Improvements, SR 3005 Airport Intersection, Benner Township, Project ID 93263

Project Allocation

900,000

(Land Allocation - $400,000)

(Design & Contingencies - $500,000)

(17) SR 0192, Reconstruction, SR 0192, Segments 0400 through 0610 and Other Various Locations, Various Municipalities, Project ID 91072

Project Allocation

12,175,000

(Base Project Allocation - $12,175,000)

(18) SR 0192, SR 2012, Highway Reconstruction, SR 0192 and SR 2012, College, Gregg, Haines, Huston, Miles, Penn and Potter Townships, Millheim Borough, Project ID 91075

Project Allocation

9,740,000

(Base Project Allocation - $9,740,000)

(19) SR 0144, Resurface, PA 144, Bishop Street to Molasses Hill, Segments 0280/0000 to 0340/0000, Bellefonte Borough, Spring Township, Project ID 91093

Project Allocation

300,000

(Base Project Allocation - $300,000)

(20) SR 3005, SR 3029, SR 3049, Highway Reconstruction, Various Segments of SR 3005, SR 3029, SR 3049, Benner, College, Patton, Rush and Worth Townships, Port Matilda Borough, Project ID 91095

Project Allocation

520,000

(Base Project Allocation - $520,000)

(21) SR 0150, Highway Restoration, Various Segments on SR 0045, SR 0144, SR 0150, SR 0322, SR 1016 and SR 3010, Various Municipalities, Project ID 91097

Project Allocation

3,750,000

(Base Project Allocation - $3,750,000)

(22) SR 0322, Safety Improvements, SR 0322 Intersection with SR 0144, Potters Mills, Potter Township, Project ID 91952

Project Allocation

300,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $100,000)

(23) SR 0045, Add Lane/Widen, SR 0045 and SR 2006, Segment/Offset 0292/0000 to 0310/0000, Segment/Offset 0010/0000, Harris Township, Project ID 93267

Project Allocation

914,000

(Base Project Allocation - $914,000)

(24) SR 3040, Reconstruction, Drainage and Shoulders, SR 3040, Segments 0280 to 0370/2238, Huston and Union Townships, Unionville Borough, Project ID 91102

Project Allocation

5,000,000

(Base Project Allocation - $5,000,000)

(25) SR 0026, Intersection Improvement, SR 0026 and SR 0150 Intersections, Segment/Offset 0640/0421 to 0640/2150, Segment/Offset 0310/2500 to 0320/1000, Howard Township, Project ID 93262

Project Allocation

759,000

(Base Project Allocation - $701,000)

(Land Allocation - $29,000)

(Design & Contingencies - $29,000)

(26) SR 0350, Left Turn Lane, SR 0350, Glass City Road, Dale Road, Sleepy Hollow Road, Rush Township, Project ID 93260

Project Allocation

530,000

(Base Project Allocation - $307,000)

(Land Allocation - $97,000)

(Design & Contingencies - $126,000)

(27) SR 0322, Highway Resurfacing, SR 0322, Philipsburg to Port Mountain, Segment/Offset 0052/0000 to 0150/0000, Rush Township, Project ID 93256

Project Allocation

4,102,000

(Base Project Allocation - $3,901,000)

(Design & Contingencies - $201,000)

(28) SR 0322, Highway Resurfacing, SR 0322, Port Matilda Mountain, Segments 0150/0000 to 0272/0000, Rush and Worth Townships, Project ID 93255

Project Allocation

989,000

(Base Project Allocation - $593,000)

(Land Allocation - $45,000)

(Design & Contingencies - $351,000)

(29) SR 0026, Highway Reconstruction, SR 0026, Segments 0510 through 0640 and Other Various Locations, Howard and Marion Townships, Howard Borough, Project ID 91099

Project Allocation

863,000

(Base Project Allocation - $863,000)

(30) SR 0045, Congestion Improvement, SR 0045, Segments/Offset 0140/0000 to 0240/0000, Ferguson and Harris Townships, Project ID 93367

Project Allocation

60,000

(Design & Contingencies - $60,000)

(31) SR 0026, Highway Restoration, Various Segments on SR 0026, SR 0045, SR 0150, SR 0192, SR 0120, SR 0477, SR 4001, Various Municipalities in Centre and Clinton Counties, Project ID 91098

Project Allocation

3,806,000

(Base Project Allocation - $3,806,000)

(32) SR 0026, Safety and Intersection Improvements, Intersection of SR 0026 and SR 0064, Spring Township, Project ID 95827

Project Allocation

1,500,000

(Base Project Allocation - $1,500,000)

(33) SR 2003, Highway Restoration, SR 0192 Stover Gap Road to Union County Line, Miles Township, Project ID 88341

Project Allocation

500,000

(Base Project Allocation - $500,000)

(34) SR 0948, Highway Restoration, SR 0322 Satellite to Top of Port Matilda Mountain, Rush Township, Project ID 88342

Project Allocation

300,000

(Base Project Allocation - $300,000)

(35) SR 3040, Highway Betterment Project, SR 3040, Alternate 220 Bottom of Sky Top Mountain to County Line, Segments 0190/2084 to 0370/2238, Huston and Union Townships, Unionville Borough, Worth Township, Project ID 88343

Project Allocation

1,800,000

(Base Project Allocation - $1,800,000)

(36) SR 3014, Highway Portion Bridge Replacement, SR 3014 over SR 0322, Patton Township, Project ID 88353

Project Allocation

201,000

(Base Project Allocation - $201,000)

(37) SR 3014, Safety Improvements, SR 3014, North Atherton Street, Southbound, Segments 0030 to 0180, State College Borough, Patton, Ferguson, College and Harris Townships, Project ID 95832

Project Allocation

2,000,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $200,000)

(Design & Contingencies - $300,000)

(38) SR 3014, Reconstruction and Drainage Work, SR 3014, North and South Atherton Street, Segments 0030/0000 to 0180/1500 and 0031/0000 to 0181/1550, College, Ferguson, Harris and Patton Townships, State College Borough, Project ID 89019

Project Allocation

7,347,000

(Base Project Allocation - $6,155,000)

(Land Allocation - $791,000)

(Design & Contingencies - $401,000)

(39) SR 0026, Safety Improvements, SR 0026, Buckhout to Struble Road, State College Borough, College Township, Project ID 95828

Project Allocation

1,950,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $150,000)

(Design & Contingencies - $300,000)

(40) SR 0006, Highway Restoration, SR 0045, Segments 0060/0000 to 0690/0000, Millheim Borough, Penn Township, Project ID 88268

Project Allocation

300,000

(Base Project Allocation - $300,000)

(41) I-80, Highway Reconstruction, I-80, Segments 1520 through 1590, Boggs Township, Project ID 88577

Project Allocation

300,000

(Base Project Allocation - $300,000)

(42) I-99, Highway Reconstruction, I-99, Segments 0694 through 0740, College and Patton Townships, Project ID 88578

Project Allocation

2,500,000

(Base Project Allocation - $2,500,000)

(43) I-99, Concrete Pavement Rehabilitation and Guide Rail Improvements, I-99, Segments 0740 through 0820, Benner, College and Spring Townships, Project ID 88581

Project Allocation

2,500,000

(Base Project Allocation - $2,500,000)

(44) I-99, Concrete Pavement Rehabilitation and Guide Rail Improvements, I-99, Segments 0680 through 0650, Huston, Patton and Worth Townships, Project ID 88582

Project Allocation

1,400,000

(Base Project Allocation - $1,400,000)

(45) I-99, Reconstruction, I-99, Segments 0694 through 0680, Patton Township, Project ID 88583

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(46) SR 0026, Installation of Truck Escape Ramp, SR 0026, Pine Grove Mountain II, Segments 0040/1150 to 0040/2650, Ferguson Township, Project ID 88629

Project Allocation

516,000

(Base Project Allocation - $200,000)

(Land Allocation - $41,000)

(Design & Contingencies - $275,000)

(47) SR 0045, Highway Portion Bridge Preservation Activities, PA 45 over Elk Creek and PA 144 over Irish Hollow, Millheim Borough, Spring Township, Project ID 94957

Project Allocation

600,000

(Base Project Allocation - $600,000)

(48) SR 3014, Safety Improvements, SR 3014, North Atherton Street, Northbound, Segments 0023 to 0105, State College Borough, Patton and Ferguson Townships, Project ID 95831

Project Allocation

2,000,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $200,000)

(Design & Contingencies - $300,000)

(49) SR 4005, Highway Portion Bridge Replacement, SR 4005 over SR 0080, I-80, Segment 0010 Offset 0240, Snow Shoe Township, Project ID 88217

Project Allocation

358,000

(Base Project Allocation - $281,000)

(Land Allocation - $43,000)

(Design & Contingencies - $34,000)

(50) SR 0322, New Alignment and Relocation of 4 Lane Roadway, SR 0322, Segments 0570 to 0770, Harris and Potter Townships, Project ID 96820

Project Allocation

307,000,000

(Base Project Allocation - $250,000,000)

(Land Allocation - $32,000,000)

(Design & Contingencies - $25,000,000)

(51) SR 0144, Highway Portion Bridge Rehabilitation, SR 0144 over Bald Eagle Creek, BMS 14-0144-0370-0654, Boggs Township, Milesburg Borough, Project ID 69434

Project Allocation

205,000

(Base Project Allocation - $177,000)

(Land Allocation - $28,000)

(52) SR 0026, Roadway Restoration/Resurfacing, SR 0026, Jacksonville Road, Segments 0470/0169 to 0510/0609, Marion Township, Project ID 85965

Project Allocation

2,051,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $1,000,000)

(Design & Contingencies - $51,000)

(53) Build Park and Ride Lot, Philipsburg Area, Philipsburg Borough, Project ID 87155

Project Allocation

1,800,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $500,000)

(Design & Contingencies - $300,000)

(54) SR 0144, Highway Portion Bridge Replacement, SR 0144 over South Fork Beech Creek, BMS 14-0144-0560-1203, Boggs and Snow Shoe Townships, Project ID 88170

Project Allocation

728,000

(Base Project Allocation - $728,000)

(55) SR 3011, Highway Portion Bridge Replacement, SR 3011 over Slab Cabin Run, BMS 14-3011-0040-0000, College Township, State College Borough, Project ID 88189

Project Allocation

387,000

(Base Project Allocation - $295,000)

(Land Allocation - $92,000)

(56) SR 0045, Highway Portion Bridge Replacement, SR 0045 over Elk Creek, Millheim Borough, Project ID 88193

Project Allocation

238,000

(Base Project Allocation - $106,000)

(Land Allocation - $85,000)

(Design & Contingencies - $47,000)

(57) SR 0219, Highway Restoration, SR 0192 Elk Creek to Stover Gap Road, Miles Township, Project ID 88340

Project Allocation

(Base Project Allocation - $650,000)

650,000

(58) SR 3040, Highway Portion Bridge Replacement, SR 3040 over Laurel Run, BMS 14-3040-0280-1591, Huston Township, Project ID 88206

Project Allocation

984,000

(Base Project Allocation - $675,000)

(Land Allocation - $58,000)

(Design & Contingencies - $251,000)

(59) SR 0120, Highway Restoration, SR 0192, SR 0445, Elk Creek, Miles Township, Project ID 88339

Project Allocation

600,000

(Base Project Allocation - $600,000)

(60) SR 0322, Highway Reconstruction, SR 0322, Segments 0770/0000 to 0820, Potters Mills to Sand Mountain Road, Potter Township, Project ID 96370

Project Allocation

1,000,000

(Design & Contingencies - $1,000,000)

(61) SR 3014, Highway Portion Bridge Replacement, SR 3014 over Slab Cabin Run, Segments 0140 Offset 1699, State College Borough, Project ID 88235

Project Allocation

3,980,000

(Base Project Allocation - $3,287,000)

(Land Allocation - $130,000)

(Design & Contingencies - $563,000)

(62) SR 3014, Safety Improvements, SR 0026, Jacksonville Road to SR 0150, Segments 0510/0000 to 0640/2150, Howard Borough, Howard and Marion Townships, Project ID 88259

Project Allocation

400,000

(Base Project Allocation - $100,000)

(Land Allocation - $100,000)

(Design & Contingencies - $200,000)

(63) SR 0153, Safety Improvements, SR 0150, Segments 0030/0000 to 0150/0200, College, Benner and Spring Townships, Bellefonte Borough, Rush Township, Project ID 88261

Project Allocation

400,000

(Base Project Allocation - $100,000)

(Land Allocation - $100,000)

(Design & Contingencies - $200,000)

(64) SR 0219, Safety Improvements, SR 3014, Atherton Street, Patton and Ferguson Townships, State College Borough, College and Harris Townships, Project ID 88262

Project Allocation

400,000

(Base Project Allocation - $100,000)

(Land Allocation - $100,000)

(Design & Contingencies - $200,000)

(65) SR 0066, Highway Restoration, SR 3014, South Atherton, Segment 0104/0000 to 0190/0000, State College Borough, College and Harris Townships, Project ID 88267

Project Allocation

700,000

(Base Project Allocation - $700,000)

(66) SR 0044, Safety Improvements, SR 0144 to Bumbarger Lane, Spring Township, Bellefonte Borough, Boggs and Burnside Townships, Project ID 88260

Project Allocation

400,000

(Base Project Allocation - $100,000)

(Land Allocation - $100,000)

(Design & Contingencies - $200,000)

(67) SR 0045, Highway Portion Bridge Replacement, SR 0045 over Pine Creek, BMS 14-0045-0790-2031, Haines Township, Project ID 88201

Project Allocation

1,931,000

(Base Project Allocation - $1,357,000)

(Land Allocation - $108,000)

(Design & Contingencies - $466,000)

(68) SR 0099, Embankment Removal and Guide Rail Updates, I-99, Benner, College, Huston, Patton, Spring, Taylor and Worth Townships, Project ID 89251

Project Allocation

100,000

(Base Project Allocation - $100,000)

(69) SR 0080, Signing, Mile Marker Sign, Segments 0080/1380 through 0080/1700, Various, Project ID 89243

Project Allocation

250,000

(Base Project Allocation - $250,000)

(70) SR 0026, SR 0064, SR 0322, Guide Rail Improvements, Various Segments of SR 0026, SR 0064, SR 0322, Various Municipalities, Project ID 89246

Project Allocation

500,000

(Base Project Allocation - $500,000)

(71) SR 0144, Roadway Resurfacing, Milesburg Interchange, Segments 0144/0150, Boggs Township, Milesburg Borough, Project ID 89247

Project Allocation

820,000

(Base Project Allocation - $820,000)

(72) SR 4002, Betterment, Restoration, SR 4000 Quad Routes, Boggs and Rush Townships, Snow Shoe Borough, Snow Shoe and Union Townships, Project ID 101995

Project Allocation

8,905,000

(Base Project Allocation - $8,755,000)

(Design & Contingencies - $150,000)

(73) SR 3040, Resurface, SR 3040, Silverdale Road to PA 504, Segments 0270/0000 to 0370/2238, Huston and Union Townships, Unionville Borough, Project ID 100563

Project Allocation

2,100,000

(Base Project Allocation - $2,100,000)

(74) SR 0504, Resurface, PA 504, Black Bear Run to SR 3032, Segments 0080/0000 to 0170/2195, Rush Township, Project ID 100538

Project Allocation

900,000

(Base Project Allocation - $900,000)

(75) SR 3010, Resurface, SR 3010, Oak Hall Interchange, Segments 0060/0000 to 0070/1945, College and Harris Townships, Project ID 101035

Project Allocation

772,000

(Base Project Allocation - $772,000)

(76) SR 0879, Resurface, SR 0879, Karthaus to the Crossroads, Segments 0010/0000 to 0170/1859, Burnside and Snow Shoe Townships, Project ID 101031

Project Allocation

3,200,000

(Base Project Allocation - $3,200,000)

(77) SR 3041, Resurface, SR 3041, Shiloh Road, Segments 0010/0000 to 0020/4370, Benner and College Townships, Project ID 101042

Project Allocation

626,000

(Base Project Allocation - $626,000)

(78) SR 3042, Resurface, SR 3042, Laurel Run Road to Port Matilda, Segments 0274/0000 to 0302/0000, Port Matilda Borough, Worth Township, Project ID 101045

Project Allocation

500,000

(Base Project Allocation - $500,000)

(79) SR 0150, Resurface, SR 0150, PA 26 to County Line, Segments 0320/1279 to 0430/1820, Howard and Liberty Townships, Project ID 100546

Project Allocation

1,060,000

(Base Project Allocation - $1,060,000)

(80) SR 0045, Resurface, SR 0045, Old Fort to Spring Mills, Segments 0430/000 to 0530/0000, Gregg Township, Potter Township, Project ID 100551

Project Allocation

1,002,000

(Base Project Allocation - $1,002,000)

(81) SR 3020, Resurface, SR 3020, University Drive, Whitehall Road to Atherton Street, Segments 0010/0000 to 0020/1513, College Township, State College Borough, Project ID 100545

Project Allocation

200,000

(Base Project Allocation - $200,000)

(82) SR 0550, Resurface, SR 0550, Blair County Line to Eagle Spring Road, Segments 0010/0000 to 0160/2505, Half Moon and Patton Townships, Project ID 101056

Project Allocation

7,300,000

(Base Project Allocation - $7,300,000)

(83) SR 0192, Resurface, Livonia to County Line, Miles Township, Project ID 100528

Project Allocation

1,223,000

(Base Project Allocation - $1,223,000)

(84) SR 0045, Resurface, SR 0045, Cedar Run Road to Old Fort, Segments 0320/000 to 0410/1950, Harris and Potter Townships, Project ID 10126

Project Allocation

3,345,000

(Base Project Allocation - $3,345,000)

(85) SR 1010, Resurface, SR 1010, PA 64 to Jacksonville Road, Segments 0014/0000 to 0150/2284, Marion and Walker Townships, Project ID 100562

Project Allocation

1,500,000

(Base Project Allocation - $1,500,000)

(86) SR 2012, Resurface, SR 2012, Greenbriar Road to Coburn Road, Segments 0230/0000 to 0270/3149, Penn Township, Project ID 100534

Project Allocation

434,000

(Base Project Allocation - $434,000)

(87) SR 3001, Betterment, Restoration, SR 3000 Quad Routes, Various, Project ID 101993

Project Allocation

36,236,000

(Base Project Allocation - $36,085,000)

(Design & Contingencies - $151,000)

(88) SR 0026, Resurface, SR 0026, Ferguson Township to College Avenue Southbound, Segments 0143/0000 to 0181/0000, Ferguson Township, State College Borough, Project ID 101008

Project Allocation

600,000

(Base Project Allocation - $600,000)

(89) SR 0026, Resurface, SR 0026, Ferguson Township to College Avenue Northbound, Segments 0142/0000 to 0180/0000, Ferguson Township, State College Borough, Project ID 101003

Project Allocation

600,000

(Base Project Allocation - $600,000)

(90) SR 3017, Resurface, SR 3017, PA 550 to SR 3042, Segments 0010/0000 to 0050/0802, Half Moon Township, Port Matilda Borough, Worth Township, Project ID 100554

Project Allocation

550,000

(Base Project Allocation - $550,000)

(91) SR 3005, Resurface, SR 3005, SR 3007 to Fox Hill Road, Segments 0010/0000 to 0070/2676, Benner Township, College and Patton Townships, Project ID 100557

Project Allocation

720,000

(Base Project Allocation - $720,000)

(92) SR 0350, Resurface, SR 0350, Linnwood Development to Presqueisle Street, Segments 0200/0000 to 0260/0357, Philipsburg Borough, Rush Township, Project ID 100559

Project Allocation

800,000

(Base Project Allocation - $800,000)

(93) SR 0504, Resurface, SR 0504, Black Moshannon to Wallace Run, Segments 0180/0000 to 0340/1389, Rush and Union Townships, Project ID 100560

Project Allocation

2,000,000

(Base Project Allocation - $2,000,000)

(94) SR 0144, Resurface, SR 0144, Centre Hall, Segments 0090/0000 to 0130/0000, Centre Hall Borough, Potter Township, Project ID 101028

Project Allocation

1,132,000

(Base Project Allocation - $1,132,000)

(95) SR 0045, Betterment, Restoration, PA 45, Ferguson, Harris and Potter Townships, Project ID 101509

Project Allocation

4,461,000

(Base Project Allocation - $4,310,000)

(Design & Contingencies - $151,000)

(96) SR 0322, Resurface, SR 0322, Clearfield County Line to Cold Stream, Segments 0012/0000 to 0052/0000, Philipsburg Borough, Rush Township, Project ID 100594

Project Allocation

500,000

(Base Project Allocation - $500,000)

(97) SR 0192, Betterment, Restoration, PA 192, Centre Hall Borough, Gregg and Potter Townships, Project ID 101514

Project Allocation

3,875,000

(Base Project Allocation - $3,725,000)

(Design & Contingencies - $150,000)

(98) SR 0322, Betterment, Restoration, US 322, Harris, Potter, Rush and Worth Townships, Project ID 101539

Project Allocation

4,371,000

(Base Project Allocation - $4,221,000)

(Design & Contingencies - $150,000)

(99) SR 3010, Rehabilitation, Resurface, SR 3010, Oak Hall Intersection, College and Harris Townships, Project ID 99528

Project Allocation

2,039,000

(Base Project Allocation - $2,039,000)

(100) SR 0150, Betterment, Restoration, PA 150, Boggs, College and Howard Townships, Project ID 101513

Project Allocation

4,285,000

(Base Project Allocation - $4,135,000)

(Design & Contingencies - $150,000)

(101) I-80, Reconstruction, I-80 from the Clearfield County Line to the Clinton County Line, Various Municipalities, Project ID 0

Project Allocation

131,000,000

(Base Project Allocation - $131,000,000)

(102) SR 0053, Betterment, Restoration, PA 53, Snow Shoe Township, Project ID 101506

Project Allocation

1,617,000

(Base Project Allocation - $1,466,000)

(Design & Contingencies - $151,000)

(103) SR 0322, Resurface, SR 0322, Bypass to Boalsburg Westbound, Segments 0541/0000 to 0585/1074, College and Harris Townships, Project ID 100586

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(104) SR 0026, Betterment, Restoration, PA 26, Ferguson Township, Howard Borough, Howard and Spring Townships, Project ID 101511

Project Allocation

2,531,000

(Base Project Allocation - $2,381,000)

(Design & Contingencies - $150,000)

(105) SR 0064, Betterment, Restoration, PA 64, Spring and Walker Townships, Project ID 101512

Project Allocation

6,526,000

(Base Project Allocation - $6,376,000)

(Design & Contingencies - $150,000)

(106) SR 0350, Resurface, SR 0350, Blair County to Sandy Ridge, Segments 0010/0000 to 0130/0000, Rush and Taylor Townships, Project ID 100590

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

(107) SR 0144, Betterment, Restoration, PA 144, Boggs, Burnside and Potter Townships, Snow Shoe Borough, Snow Shoe and Spring Townships, Project ID 101501

Project Allocation

17,221,000

(Base Project Allocation - $17,071,000)

(Design & Contingencies - $150,000)

(108) SR 0080, Betterment, Restoration, I-80, Boggs, Marion and Rush Townships, Snow Shoe Borough, Snow Shoe and Spring Townships, Project ID 101609

Project Allocation

19,412,000

(Base Project Allocation - $19,261,000)

(Design & Contingencies - $151,000)

(109) I-99, Reconstruction, I-99 from the Blair County Line to its Northern Terminus at I-80, Various Municipalities, Project ID 0

Project Allocation

119,400,000

(Base Project Allocation - $119,400,000)

(110) SR 0026, Resurface, SR 0026, High Street to SR 9012 Southbound, Segments 0181/0000 to 0247/0670, College Township, State College Borough, Project ID 100571

Project Allocation

1,250,000

(Base Project Allocation - $1,250,000)

(111) SR 2001, Betterment, Restoration, SR 2000 Quad Routes, Various, Project ID 101989

Project Allocation

19,402,000

(Base Project Allocation - $19,251,000)

(Design & Contingencies - $151,000)

(112) SR 1001, Betterment, Restoration, SR 1000 Quad Routes, Various, Project ID 101987

Project Allocation

15,120,000

(Base Project Allocation - $14,970,000)

(Design & Contingencies - $150,000)

(113) SR 3027, Resurface, SR 3049 to Stone Street, Rush Township, Project ID 100564

Project Allocation

250,000

(Base Project Allocation - $250,000)

(114) SR 0026, Resurface, SR 0026, County Line to SR 3018, Segments 0010/0000 to 0090/1853, Ferguson Township, Project ID 100565

Project Allocation

1,632,000

(Base Project Allocation - $1,632,000)

(115) SR 0322, Resurface, SR 0322, Bypass to Boalsburg Interchange Eastbound, Segments 0540/0000 to 0590/0000, College and Harris Townships, Project ID 100583

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(116) SR 0045, Resurface, SR 0045, Millheim to County Line, Segments 0670/2711 to 0880/1958, Haines Township, Millheim Borough, Penn Township, Project ID 100549

Project Allocation

3,240,000

(Base Project Allocation - $3,240,000)

(117) SR 0550, Resurface, SR 0550, SR 3042 to Park Avenue, Segments 0190/0000 to 0390/0000, Benner, Patton and Spring Townships, Project ID 100580

Project Allocation

3,876,000

(Base Project Allocation - $3,876,000)

(118) SR 0026, Highway Portion Bridge Replacement, SR 0026 over Lick Run, Segment 0590/1750, Marion Township, Project ID 99872

Project Allocation

448,000

(Base Project Allocation - $199,000)

(Land Allocation - $50,000)

(Design & Contingencies - $199,000)

(119) SR 3040, Betterment, Restoration, SR 3040, Huston Township, Port Matilda Borough, Taylor and Worth Townships, Project ID 101633

Project Allocation

6,397,000

(Base Project Allocation - $6,246,000)

(Design & Contingencies - $151,000)

(120) SR 0144 and SR 4005, Intersection Improvements

Project Allocation

250,000

(Base Project Allocation - $250,000)

(121) I-80, Clearfield to Clinton, Resurface and Restoration

Project Allocation

131,300,000

(Base Project Allocation - $131,000,000)

(Land Allocation - $50,000)

(Design & Contingencies - $250,000)

(122) Various, Highway Portion Bridge Preservation Activities, Various State Routes, Various Municipalities, Project ID 94960

Project Allocation

744,000

(Base Project Allocation - $744,000)

(123) Various, Tree Trimming Safety Improvements, Various Highways and Segments throughout Centre County, Various Municipalities, Project ID 88350

Project Allocation

500,000

(Base Project Allocation - $500,000)