Section 340. Luzerne County.
Projects are as follows:
(1) (Reserved).
(2) SR 3007, Construct New Park and Ride Lot, SR 3007 at Exit 155 off I-81, Dorrance Township, Project ID 50703
Project Allocation
370,000
(Base Project Allocation - $370,000)
(3) SR 4020, Highway Portion Bridge Replacement, SR 4020 (Volanski Road) over Pine Creek, Huntington Township, Project ID 93019
Project Allocation
2,669,000
(Base Project Allocation - $1,930,000)
(Design & Contingencies - $739,000)
(4) SR 3010, Highway Portion Bridge Rehabilitation, SR 3010 (Alberdeen Road) over Branch of Wapwallopen Creek, Dorrance Township, Project ID 93036
Project Allocation
3,539,000
(Base Project Allocation - $2,816,000)
(Design & Contingencies - $723,000)
(5) SR 2036, Highway Portion Bridge Replacement, SR 2036 (Bald Mountain Road) over Mill Creek, Bear Creek Township, Project ID 93033
Project Allocation
3,764,000
(Base Project Allocation - $3,036,000)
(Design & Contingencies - $728,000)
(6) SR 0118, Safety and Intersection Improvements, Segments 0118/0320 through 0118/0330, Lehman Township, Project ID 92444
Project Allocation
1,125,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $125,000)
(7) SR 0309, Union Street, Park and Ride, Intersection of SR 0309 and Union Street, Pringle and Luzerne Boroughs, Project ID 93038
Project Allocation
2,145,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $45,000)
(Design & Contingencies - $500,000)
(8) SR 1012, Slope Repair, SR 1012 (Chase Road), Jackson Township, Project ID
96931
Project Allocation
665,000
(Base Project Allocation - $475,000)
(Design & Contingencies - $190,000)
(9) SR 0081, Safety Improvement, Ramp Improvements, I-81 Ramp Improvements, Hanover and Wilkes-Barre Townships, Project ID 83451
Project Allocation
777,000
(Base Project Allocation - $500,000)
(Land Allocation - $177,000)
(Design & Contingencies - $100,000)
(10) SR 2015, Highway Portion Bridge Replacement, SR 2015 (Market Street) over Gardner Creek, Laflin Borough, Project ID 93022
Project Allocation
886,000
(Base Project Allocation - $668,000)
(Design & Contingencies - $218,000)
(11) SR 3021, Highway Portion Bridge Rehabilitation, SR 3021 (Old Turnpike Road) over Nescopeck Creek, Butler Township, Project ID 93039
Project Allocation
11,604,000
(Base Project Allocation - $10,825,000)
(Design & Contingencies - $779,000)
(12) SR 3006, Highway Restoration, SR 3006 (Lily Lake Road) over Pond Creek, Conyngham Township, Project ID 93035
Project Allocation
2,867,000
(Base Project Allocation - $2,161,000)
(Design & Contingencies - $706,000)
(13) SR 0118, Intersection Improvements, SR 0118 at Idetown Road, Lehman Township, Project ID 84565
Project Allocation
309,000
(Base Project Allocation - $192,000)
(Land Allocation - $25,000)
(Design & Contingencies - $92,000)
(14) SR 3034, Highway Portion Bridge Replacement, SR 3034 (Sugarloaf Avenue), Conyngham Borough, Project ID 93040
Project Allocation
4,560,000
(Base Project Allocation - $3,271,000)
(Land Allocation - $111,000)
(Design & Contingencies - $1,178,000)
(15) SR 4026, Highway Portion Bridge Replacement, SR 4026 over Lewis Run, Hunlock Township, Project ID 89703
Project Allocation
863,000
(Base Project Allocation - $863,000)
(16) SR 2017, Highway Portion Bridge Replacement, SR 2017 (Yatesville Road) over SR 2021 (James A. Musto Bypass), Jenkins Township, Project ID 93025
Project Allocation
1,664,000
(Base Project Allocation - $1,484,000)
(Design & Contingencies - $180,000)
(17) SR 2019, Highway Portion Bridge Replacement, SR 2019 (Oak Street), Pittston Township, Project ID 69001
Project Allocation
2,469,000
(Base Project Allocation - $2,337,000)
(Land Allocation - $9,000)
(Design & Contingencies - $123,000)
(18) SR 2035, Highway Portion Bridge Replacement, SR 2035 (Bear Creek Road) over Mud Run Creek, Jenkins Township, Project ID 93032
Project Allocation
3,764,000
(Base Project Allocation - $3,036,000)
(Design & Contingencies - $728,000)
(19) SR 1040, Slope Repair, SR 1040 (Apple Tree Road), Exeter Township, Project ID 96794
Project Allocation
1,070,000
(Base Project Allocation - $662,000)
(Design & Contingencies - $408,000)
(20) SR 1025, Slope Repair, SR 1025 (Schooley Avenue), Exeter Borough, Project ID 96795
Project Allocation
894,000
(Base Project Allocation - $596,000)
(Design & Contingencies - $298,000)
(21) SR 1021, Slope Repair, SR 1021 (Eighth Street), Kingston Township, West Wyoming Borough, Project ID 96799
Project Allocation
357,000
(Base Project Allocation - $265,000)
(Design & Contingencies - $92,000)
(22) SR 2035, Highway Portion Bridge Rehabilitation, SR 2035 (Bear Creek Road), Bear Creek Township, Project ID 93027
Project Allocation
3,357,000
(Base Project Allocation - $2,572,000)
(Design & Contingencies - $785,000)
(23) SR 0029, Highway Portion Bridge Preservation, PA 29 (South Cross Valley Expressway) over New Commerce Boulevard, Hanover Township, Project ID 69228
Project Allocation
2,914,000
(Base Project Allocation - $2,173,000)
(Land Allocation - $50,000)
(Design & Contingencies - $691,000)
(24) SR 1001, Slide Repair, SR 1001 (Washington Street), Larksville Borough, Project ID 96800
Project Allocation
357,000
(Base Project Allocation - $265,000)
(Design & Contingencies - $92,000)
(25) SR 1021, Highway Portion Bridge Replacement, SR 1021 (Eighth Street) over Sutton Creek, Franklin Township, Project ID 93020
Project Allocation
4,211,000
(Base Project Allocation - $3,476,000)
(Design & Contingencies - $735,000)
(26) SR 0309 and SR 0093, Corridor Safety Improvement, SR 0309 and SR 0093 Connector, Hazle Township, Project ID 74756
Project Allocation
325,000
(Base Project Allocation - $325,000)
(27) SR 0309, Congestion Improvement - Park and Ride, SR 0309 Corridor, Butler Township, Project ID 64481
Project Allocation
3,200,000
(Base Project Allocation - $3,000,000)
(Design & Contingencies - $200,000)
(28) Coal Street, Highway Reconstruction, Wilkes-Barre Boulevard to Union Street, City of Wilkes-Barre, Project ID 80028
Project Allocation
4,001,000
(Base Project Allocation - $3,352,000)
(Land Allocation - $300,000)
(Design & Contingencies - $349,000)
(29) SR 0080, Restoration, SR 0080 Eastbound and Westbound, Black Creek, Butler, Nescopeck and Sugarloaf Townships, Project ID 91598
Project Allocation
1,641,000
(Base Project Allocation - $1,541,000)
(Design & Contingencies - $100,000)
(30) SR 0092, Highway Surface Treatment, SR 0092 from SR 0292 to SR 0011, Conyngham Township, Exeter Borough, Exeter and Huntington Townships, Shickshinny Borough, Union Township, West Pittston Borough, Project ID 91214
Project Allocation
7,213,000
(Base Project Allocation - $7,212,000)
(Design & Contingencies - $1,000)
(31) SR 0029, Install ITS Devices, I-81, SR 0115 and SR 0029, Hanover, Jenkins and Plains Townships, Project ID 85456
Project Allocation
399,000
(Base Project Allocation - $160,000)
(Design & Contingencies - $239,000)
(32) SR 2002, Surface Treatment, SR 2002, Hanover Township, Project ID 93945
Project Allocation
5,501,000
(Base Project Allocation - $5,500,000)
(Design & Contingencies - $1,000)
(33) I-80, Restoration, Overlay Existing Concrete, I-80 Eastbound and Westbound, Approximately 2 Miles East of I-81, Butler, Dennison and Foster Townships, White Haven Borough, Project ID 94465
Project Allocation
11,900,000
(Base Project Allocation - $11,000,000)
(Design & Contingencies - $900,000)
(34) SR 0081, Lengthening of I-81 Southbound Off Ramp Exit 165, 0.2 Mile North Exit 165, Wilkes-Barre Township, Project ID 85008
Project Allocation
656,000
(Base Project Allocation - $651,000)
(Land Allocation - $5,000)
(35) SR 0309, Bridge Preservation Activities, SR 0309 over SR 1013, Luzerne Borough, Project ID 92884
Project Allocation
3,809,000
(Base Project Allocation - $3,808,000)
(Design & Contingencies - $1,000)
(36) SR 0309, Highway Portion Bridge Preservation, SR 0309 (North Cross Valley) over SR 2004 (River Street), L&S Railroad and the Susquehanna River, Forty Fort Borough, City of Wilkes-Barre, Project ID 89012
Project Allocation
564,000
(Base Project Allocation - $564,000)
(37) SR 0118, Horizontal and Vertical Intersections Improvements, SR 0118 Intersection at Segments 0210, 0220, 0320 and 0330, Lake, Lehman and Ross Townships, Project ID 85466
Project Allocation
266,000
(Base Project Allocation - $184,000)
(Land Allocation - $24,000)
(Design & Contingencies - $58,000)
(38) SR 0940, Congestion Improvement - Park and Ride, SR 0940 Corridor, White Haven Borough, Project ID 70235
Project Allocation
2,200,000
(Base Project Allocation - $2,000,000)
(Design & Contingencies - $200,000)
(39) SR 4016, Highway Portion Bridge Replacement, SR 4016 (Hunlock-Harveyville Road) over Branch of Shickshinny Creek, Union Township, Project ID 93041
Project Allocation
2,688,000
(Base Project Allocation - $1,921,000)
(Design & Contingencies - $767,000)
(40) SR 8005, Highway Portion Bridge Replacement, Route 8005 (Ramp E) over I-80, Butler Township, Project ID 97506
Project Allocation
296,000
(Base Project Allocation - $141,000)
(Design & Contingencies - $155,000)
(41) SR 1006, Highway Portion Bridge Preservation, SR 1006 over SR 0309, Forty Fort Borough, Project ID 92882
Project Allocation
1,886,000
(Base Project Allocation - $1,723,000)
(Land Allocation - $1,000)
(Design & Contingencies - $162,000)
(42) SR 4024, Highway Portion Bridge Rehabilitation, SR 4024 (Talcott Hill Road) over Huntington Creek, Fairmount Township, Project ID 93043
Project Allocation
1,078,000
(Base Project Allocation - $390,000)
(Design & Contingencies - $688,000)
(43) SR 4026, Highway Portion Bridge Replacement, SR 4026 (Prichards Road) over Lewis Run, Hunlock Township, Project ID 93044
Project Allocation
2,696,000
(Base Project Allocation - $1,917,000)
(Design & Contingencies - $779,000)
(44) SR 0081, Interchange Improvements, I-81 and SR 0924 Interchange, Hazle Township, Project ID 86733
Project Allocation
3,043,000
(Base Project Allocation - $2,640,000)
(Design & Contingencies - $403,000)
(45) SR 0309, Surface Treatment, Various Segments of SR 0309 and SR 0415, Various Municipalities, Project ID 99523
Project Allocation
5,144,000
(Base Project Allocation - $5,143,000)
(Design & Contingencies - $1,000)
(46) SR 2006, Resurface, Wyoming Avenue to Lackawanna County Line, Duryea Borough, Cities of Pittston and Wilkes-Barre, Butler, Dorrance and Wright Townships, Project ID 102354
Project Allocation
951,000
(Base Project Allocation - $951,000)
(47) SR 0118, Restoration, Surface Treatment, SR 0118 from Ricketts Glen Entrance Road to SR 0415 (Memorial Highway), Dallas, Fairmount, Lake, Lehman and Ross Townships, Project ID 102113
Project Allocation
7,097,000
(Base Project Allocation - $7,096,000)
(Design & Contingencies - $1,000)
(48) SR 1032, Restoration, Surface Treatment, SR 1032, SR 3022, SR 1057, SR 0309, SR 2415, in the Corresponding Municipalities, Bear Creek and Butler Townships, Dallas Borough, Dallas Township, Harveys Lake Borough, Lake and Lehman Townships, Project ID 101988
Project Allocation
6,200,000
(Base Project Allocation - $6,199,000)
(Design & Contingencies - $1,000)
(49) SR 0115, Edgeline Rumble Strips, PA 115 and PA 239, Bear Creek Township, Bear Creek Village Borough, Buck and Huntington Townships, Shickshinny Borough, Union Township, Project ID 102002
Project Allocation
5,320,000
(Base Project Allocation - $4,917,000)
(Design & Contingencies - $403,000)
(50) I-81, Reconstruction, I-81 from South of Interchange with SR 0029 to the Lackawanna County Line, Ashley, Avoca, Dupont and Duryea Boroughs, Hanover, Hazle and Jenkins Townships, Laflin Borough, Newport, Pittston, Plains and Wilkes-Barre Townships, Project ID 98248
Project Allocation
367,350,000
(Base Project Allocation - $360,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $7,200,000)
(51) I-81, Resurface, I-81 from Schuylkill County to Exit 145, and from Exit 164 to Exit 175, Hanover, Newport, Plains, Wilkes-Barre, Hazle and Jenkins Townships, Ashley, Dupont, Laflin, Pittston and West Hazleton Boroughs, Project ID 98247
Project Allocation
13,000,000
(Base Project Allocation - $13,000,000)
(52) SR 0115, Various, Restoration, Surface Treatment, SR 0115, SR 1031, SR 3004, SR 2048 in the Corresponding Municipalities, Bear Creek, Conyngham, Exeter, Foster, Kingston, Newport and Plains Townships, White Haven Borough, Project ID 102068
Project Allocation
6,661,000
(Base Project Allocation - $6,660,000)
(Design & Contingencies - $1,000)
(53) SR 4035, Highway Portion of Bridge Rehabilitation, Huntington Creek, SR 4035, Huntington Township, Project ID 101925
Project Allocation
1,209,000
(Base Project Allocation - $518,000)
(Design & Contingencies - $691,000)
(54) SR 0115, Pipe Replacement, PA 115 (Bear Creek Boulevard), Bear Creek Township, Project ID 101479
Project Allocation
2,651,000
(Base Project Allocation - $1,961,000)
(Design & Contingencies - $690,000)
(55) SR 0011, Resurface, SR 2006 to Main Street, Duryea Borough, Pittston and City of Wilkes-Barre, Butler, Dorrance and Wright Townships, Project ID 102354
Project Allocation
450,000
(Base Project Allocation - $450,000)
(56) SR 2002, Reconstruction, Restoration, SR 2002 from Loomis Street to SR 2005, Hanover Township, City of Nanticoke, Project ID 102030
Project Allocation
27,030,000
(Base Project Allocation - $26,290,000)
(Land Allocation - $50,000)
(Design & Contingencies - $690,000)
(57) SR 0309, Park and Ride Lot, SR 0309 Park and Ride, Luzerne Borough, Project ID 102217
Project Allocation
5,501,000
(Base Project Allocation - $5,500,000)
(Design & Contingencies - $1,000)
(58) SR 2004, Resurface, SR 2004, Horton Street to River Street, Duryea Borough, Cities of Pittston and Wilkes-Barre, Butler, Dorrance and Wright Townships, Project ID 102354
Project Allocation
291,000
(Base Project Allocation - $291,000)
(59) SR 8035, Various, Restoration, Surface Treatment, SR 1001, SR 8035, SR 8045, SR 8047, SR 8039, SR 1002, SR 8013, SR 8019, SR 8037, SR 1027, SR 1037, SR 1026, SR 1038, SR 2057 in the Corresponding Municipalities, Ashley and Avoca Boroughs, Dallas Township, Dupont and Exeter Boroughs, Exeter, Foster, Franklin and Hanover Townships, Larksville and Luzerne Boroughs, Pittston and Plains Townships, Plymouth and Pringle Boroughs, Project ID 102013
Project Allocation
6,119,000
(Base Project Allocation - $6,118,000)
(Design & Contingencies - $1,000)
(60) SR 2006, Various, Restoration, Surface Treatment, SR 2006, SR 4025, SR 4027, SR 4035, SR 4009, SR 1028, SR 0309, in the Corresponding Municipalities, Ashley and Duryea Boroughs, Fairview and Hanover Townships, Harveys Lake Borough, Hunlock, Huntington and Lake Townships, City of Pittston, Ross and Union Townships, Project ID 102062
Project Allocation
6,192,000
(Base Project Allocation - $6,191,000)
(Design & Contingencies - $1,000)
(61) I-80, Reconstruction, I-80 from the Columbia County Line to the Carbon County Line, Various Municipalities, Project ID 0
Project Allocation
102,000,000
(Base Project Allocation - $102,000,000)
(62) SR 0011, Restoration, Surface Treatment, SR 0011 from SR 1019 (Dennison Street) to the Lackawanna County Line, Avoca, Dupont, Duryea, Exeter, Forty Fort and Hughestown Boroughs, City of Pittston, Pittston Township, West Pittston and Wyoming Boroughs, Project ID 102095
Project Allocation
4,976,000
(Base Project Allocation - $4,975,000)
(Design & Contingencies - $1,000)
(63) SR 0118, SR 0029, Restoration, Surface Treatment, SR 0118 from SR 4028 (Mooretown Road) to Bridge over Fades Creek, SR 0029 from SR 0011 to TR 497 (Pavlick Road), Jackson, Lake, Plymouth and Ross Townships, Project ID 102088
Project Allocation
3,776,000
(Base Project Allocation - $3,775,000)
(Design & Contingencies - $1,000)
(64) SR 0093, Restoration, Surface Treatment, SR 0093 Corridor Main Street, Broad Street, Susquehanna Avenue, Berwick-Hazleton Highway, Third Street, Hazle Township, City of Hazleton, Hollenback Township, Nescopeck Borough, Nescopeck and Sugarloaf Townships, West Hazleton Borough, Project ID 102091
Project Allocation
9,757,000
(Base Project Allocation - $9,756,000)
(Design & Contingencies - $1,000)
(65) SR 2015, Intersection Improvements, SR 2015 (Saylor Avenue) and SR 2004 (River Road), Plains Township, Project ID 102007
Project Allocation
2,423,000
(Base Project Allocation - $1,681,000)
(Land Allocation - $51,000)
(Design & Contingencies - $691,000)
(66) SR 0011, Restoration, Surface Treatment, SR 0011, from the Columbia County Line to On Ramp for SR 0029, Hunlock, Plymouth and Salem Townships, Shickshinny Borough, Union Township, Project ID 102093
Project Allocation
11,278,000
(Base Project Allocation - $11,277,000)
(Design & Contingencies - $1,000)
(67) SR 0487, Various, Restoration, Surface Treatment, SR 0487, SR 4011, SR 1034, SR 1055, SR 1063, SR 1041, in Corresponding Municipalities, Dallas and Fairmount Townships, Harveys Lake Borough, Huntington and Lake Townships, Project ID 102005
Project Allocation
6,096,000
(Base Project Allocation - $6,095,000)
(Design & Contingencies - $1,000)
(68) SR 2028, Restoration, Surface Treatment, SR 2028, SR 3017, SR 1011, SR 2015, SR 0029, SR 0118, in the Corresponding Municipalities, Hanover Township, City of Hazleton, Jenkins Township, Kingston and Laflin Boroughs, Lehman, Pittston, Plains, and Plymouth Townships, Sugar Notch Borough, City of Wilkes-Barre, Yatesville Borough, Project ID 102073
Project Allocation
6,529,000
(Base Project Allocation - $6,528,000)
(Design & Contingencies - $1,000)
(69) SR 2005, Reconstruction, Restoration, SR 2005 (Blackman Street) in the Corresponding Municipalities, Hanover Township, City of Wilkes-Barre, Wilkes-Barre Township, Project ID 102116
Project Allocation
7,003,000
(Base Project Allocation - $6,600,000)
(Design & Contingencies - $403,000)
(70) I-81, Cable Median Barrier, Along I-81, Various Municipalities, Project ID 102001
Project Allocation
1,740,000
(Base Project Allocation - $1,337,000)
(Design & Contingencies - $403,000)
(71) I-81, Reconstruction, I-81 from Schuylkill County Line to Lackawanna County Line, Various Municipalities, Project ID 0
Project Allocation
156,400,000
(Base Project Allocation - $156,400,000)
(72) SR 2017, Intersection Improvement, SR 0315 (Dupont Highway) and SR 2017 (Yatesville Road), Jenkins Township, Project ID 102011
Project Allocation
4,100,000
(Base Project Allocation - $3,360,000)
(Land Allocation - $50,000)
(Design & Contingencies - $690,000)
(73) SR 0309, Resurface, Woodmere Drive to Sunset Drive, Duryea Borough, City of Pittston, City of Wilkes-Barre, Butler, Dorrance and Wright Townships, Project ID 102354
Project Allocation
2,957,000
(Base Project Allocation - $2,957,000)
(74) SR 1010 (Main Street), Repave Main Street, Swoyersville Borough
Project Allocation
125,000
(Base Project Allocation - $100,000)
(Design & Contingencies - $25,000)
(75) SR 1019 (Dennison Street), Repave Dennison Street, Swoyersville Borough
Project Allocation
150,000
(Base Project Allocation - $100,000)
(Design & Contingencies - $50,000)
(76) Various, Restoration, Surface Treatment, SR 0940 from Power House Road to I-81, SR 3001 from Blue Ridge Road to the West Nanticoke Bridge, SR 3034 from T-419 to Butler Avenue, SR 2001 from SR 2010 to SR 2002, SR 0029 from SR 0118 to the Wyoming County Line, SR 2004 from SR 1011 to Swallow Street, SR 2006 from SR 3028 to SR 2003, Ashley, Conyngham and Duryea Boroughs, Hanover and Lake Townships, City of Nanticoke, Newport Township, City of Pittston, Slocum Township, White Haven Borough, City of Wilkes-Barre, Project ID 91213
Project Allocation
7,128,000
(Base Project Allocation - $7,128,000)
(77) Various, Rehabilitation, Resurface, SR 0011, SR 3010, SR 3012, SR 3015, SR 3017, SR 3019, SR 3024 Corridors, Avoca, Duryea, Hughestown and Laflin Boroughs, City of Pittston, Pittston Township, Project ID 97220
Project Allocation
500,000
(Base Project Allocation - $500,000)
(78) Various, Restoration, Surface Treatment, SR 2019, SR 1006, SR 2004, SR 0239, SR 2026, SR 8001, SR 8002, SR 8003, SR 8005, SR 2037 and SR 1010, in the Corresponding Municipalities, Butler Township, Exeter and Forty Fort Boroughs, Hazle Township, Kingston and Laflin Boroughs, Nescopeck Township, City of Pittston, Pittston, Plains and Sugarloaf Townships, West Hazleton Borough, City of Wilkes-Barre, Project ID 101928
Project Allocation
6,283,000
(Base Project Allocation - $6,282,000)
(Design & Contingencies - $1,000)