Section 343. Mercer County.
Projects are as follows:
(1) (Reserved).
(2) SR 0058, Restoration, SR 0058 (Liberty Street/Jamestown Road) from Jamestown to Greenville, Greene Township, Greenville Borough, Hempfield Township, Jamestown Borough and West Salem Township, Project ID 89171
Project Allocation
2,951,000
(Base Project Allocation - $2,900,000)
(Design & Contingencies - $51,000)
(3) SR 0019, Safety Improvement, SR 0019 (Perry Highway/Franklin Street) from I-80 (Z H Confair Highway) to SR 0062, Coolspring and East Lackawannock Townships, Mercer Borough and Springfield Township, Project ID 97907
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(4) SR 0208, Restoration/Resurface, SR 0208 from SR 0258 (Mercer Grove City Road) to Gregg Street (TR 302), Grove City Borough, Pine and Springfield Townships, Project ID 98030
Project Allocation
2,550,000
(Base Project Allocation - $2,500,000)
(Design & Contingencies - $50,000)
(5) SR 3025, Restoration, Mill, Overlay and ADA Ramps, SR 3025 (Buhl Farm Drive) from SR 0418 to SR 3014, City of Hermitage, Project ID 94769
Project Allocation
169,000
(Base Project Allocation - $169,000)
(6) SR 3023, Resurface, SR 3023 (Seventh Avenue) from Hazen Road to Ridge Road, Sharpsville Borough, Project ID 32321
Project Allocation
350,000
(Base Project Allocation - $350,000)
(7) SR 0062, Highway Restoration, SR 0062 (Irvine Avenue/Connelly Boulevard) from the Ohio State Line to Stambaugh Avenue, City of Sharon, Project ID 94770
Project Allocation
307,000
(Base Project Allocation - $294,000)
(Land Allocation - $13,000)
(8) SR 0062, Restoration/Resurface, SR 0062 (Shenango Valley Expressway) from SR 0018 to State Street, City of Hermitage, Project ID 97901
Project Allocation
250,000
(Base Project Allocation - $250,000)
(9) SR 0018, Resurface, Mill and Overlay, SR 0018 (New Castle Road), SR 0358 from Main Street to Hadley Road, SR 0158 (Mercer Road), East Lackawannock Township, Greenville Borough, Hempfield, Shenango and Wilmington Townships, Project ID 96116
Project Allocation
2,186,000
(Base Project Allocation - $2,186,000)
(10) SR 0019, Replace/Upgrade Signalization and Restrict Movements on North Street, SR 0019 (Perry Highway) at the Five Legged Intersection with SR 0062, SR 0058 (Greenville Road) and North Street, Mercer Borough, Project ID 95568
Project Allocation
355,000
(Base Project Allocation - $105,000)
(Design & Contingencies - $250,000)
(11) SR 3012, Restoration, SR 3012 (Clark Street) from SR 0518 (North Sharpsville Road) to SR 0718, Cities of Hermitage and Sharon, Project ID 98025
Project Allocation
95,000
(Base Project Allocation - $45,000)
(Design & Contingencies - $50,000)
(12) SR 3017, Resurface, SR 3017 (Indiana Avenue) from SR 0418 (Mercer Avenue), City of Farrell, Project ID 32320
Project Allocation
335,000
(Base Project Allocation - $325,000)
(Design & Contingencies - $10,000)
(13) SR 0358, Restoration/Resurfacing, SR 0358 (Hadley Road) from Billy Boyd Road to SR 0062 and SR 2021 (Hendersonville Road) from Sandy Lake to SR 0965, Lake and Worth Townships, Project ID 96884
Project Allocation
2,153,000
(Base Project Allocation - $2,153,000)
(14) SR 3008, Restoration, SR 3008 and SR 0518 (State Street), City of Sharon, Project ID 96362
Project Allocation
1,391,000
(Base Project Allocation - $801,000)
(Land Allocation - $40,000)
(Design & Contingencies - $550,000)
(15) SR 0760, Restoration/Resurface, SR 0760 (Beaver Valley Expressway) from I-80 to Broadway Avenue, City of Hermitage, Shenango Township, Wheatland Borough, Project ID 98022
Project Allocation
2,752,000
(Base Project Allocation - $2,701,000)
(Design & Contingencies - $51,000)
(16) SR 0058, Intersection Improvements/Congestion Reduction, SR 0058 (Main Street/Center Street) from Elm Street to Walnut Street and SR 0173 from SR 0058 to Pine Street, Grove City Borough, Project ID 94749
Project Allocation
187,000
(Base Project Allocation - $176,000)
(Land Allocation - $11,000)
(17) SR 3008, Reconstruction, SR 3008 (Irvine Avenue/State Street), Cities of Hermitage and Sharon, Project ID 97911
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(18) SR 3006, Restoration/Resurface, SR 3006 (Roemer Boulevard) from SR 0718 (Broadway Avenue) to SR 0518, City of Farrell, Project ID 98026
Project Allocation
220,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $50,000)
(19) SR 0173, Highway Portion Bridge Replacement with Intersection Improvements, SR 0173 (Slippery Rock Road) Bridge over Swamp Run, Pine Township, Project ID 89104
Project Allocation
139,000
(Land Allocation - $52,000)
(Design & Contingencies - $87,000)
(20) SR 0080, Resurface, I-80 (Z H Confair Highway) from SR 0019 (Perry Highway) at Milepost 15 to SR 2007 (Springfield Church Road) at Milepost 21, East Lackawannock and Findley Townships, Project ID 87637
Project Allocation
1,562,000
(Base Project Allocation - $1,362,000)
(Design & Contingencies - $200,000)
(21) SR 0080, Resurface, I-80 (Z H Confair Highway) from the Ohio/Pennsylvania State Line to SR 0019 (Perry Highway), East Lackawannock, Lackawannock and Shenango Townships, Project ID 91569
Project Allocation
11,115,000
(Base Project Allocation - $11,115,000)
(22) SR 0718, Retaining Wall to Correct an Active Slide, SR 0718 (Water Avenue), City of Sharon, Project ID 97046
Project Allocation
750,000
(Base Project Allocation - $750,000)
(23) SR 0475, Highway Restoration, Restoration, SR 0058 (Main Street) from Main Street to Main Street Extension, Pine Township, Project ID 83024
Project Allocation
880,000
(Base Project Allocation - $880,000)
(24) SR 0208, Intersection Improvements, SR 0208 at the Intersection of George Junior Road, Pine Township, Project ID 97909
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(25) SR 0846, Slide Correction/Shoulder Failure, SR 0846 (Saranac Drive), South Pymatuning Township, Project ID 97667
Project Allocation
900,000
(Base Project Allocation - $900,000)
(26) SR 3016, Restoration/Resurfacing, SR 3016 (Hazen Road) from Tenth Street to Mercer Avenue, Sharpsville Borough, Project ID 98024
Project Allocation
153,000
(Base Project Allocation - $103,000)
(Design & Contingencies - $50,000)
(27) SR 0846, Safety Improvement, SR 0846 (River Road/Orangeville Road) from Water Avenue to Clarksville Street, Greenville Borough, City of Hermitage, Pymatuning, South Pymatuning and West Salem Townships, Project ID 97914
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(28) SR 0062, Highway Restoration, SR 0062 (Sharon Mercer Road), SR 0158 (Mercer Road) and SR 0258 (Butler Pike), East Lackawannock, Findley, French Creek and Jefferson Townships, Mercer Borough, Springfield Township, Project ID 97869
Project Allocation
3,781,000
(Base Project Allocation - $3,781,000)
(29) SR 3011, Restoration/Resurface, SR 3011 (Keel Ridge Road) from SR 0318 to Valley View Road, City of Hermitage, Shenango Township, Project ID 97913
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
(30) SR 0018, Restoration, Mill, Overlay and ADA Ramps, SR 0018 (Main Street) from SR 0358 (West Main Street) Hill to the West Side of Greenville and SR 0358 (Main Street) from SR 4004 to SR 0018, Greenville Borough, West Salem Township, Project ID 94768
Project Allocation
173,000
(Base Project Allocation - $173,000)
(31) SR 0019, Retaining Wall to Correct a Slide, SR 0019 (Perry Highway), Perry Township, Project ID 97047
Project Allocation
500,000
(Base Project Allocation - $500,000)
(32) SR 0062, Restoration/Resurface, SR 0062 (Shenango Valley Expressway/State Street) from SR 3008 (State Street) to SR 3011, City of Hermitage, Project ID 97902
Project Allocation
150,000
(Base Project Allocation - $150,000)
(33) SR 0376, Resurface, I-376 (Beaver Valley Expressway) from the I-80 Interchange to the Mercer/Lawrence County Line, Shenango Township, Project ID 94793
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(34) SR 0173, Resurface/Restoration, SR 0173 (Sandy Lake Road) from SR 0965 to SR 1004, Sandy Lake and Worth Townships, Project ID 98397
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(35) SR 1002, Resurface/Restoration, SR 1002 (Mill Street/Fredonia Road) from SR 4025 to SR 0019, Fairview Township, Fredonia Borough, Project ID 98511
Project Allocation
424,000
(Base Project Allocation - $424,000)
(36) SR 0760, Widen/Reconstruction, SR 0760 (Broadway Avenue) from SR 0018 to Council Avenue, City of Hermitage, Shenango Township, Wheatland Borough, Project ID 98512
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
(37) SR 0058, Resurface/Restoration, SR 0058 (Kinsman Road/Gibson Street) from the Ohio State Line to SR 0322, Greene Township, Jamestown Borough, Project ID 98440
Project Allocation
1,191,000
(Base Project Allocation - $1,191,000)
(38) SR 0019, Resurface/Restoration, SR 0019 (Perry Highway) from the Sandy Creek Township Line to SR 1014, Sandy Creek Township, Sheakleyville Borough, Project ID 98431
Project Allocation
812,000
(Base Project Allocation - $812,000)
(39) SR 0062, Resurface/Restoration, SR 0062 (Franklin Road) from SR 0019 to Airport Road, Coolspring Township, Project ID 98414
Project Allocation
556,000
(Base Project Allocation - $556,000)
(40) SR 0358, Resurface/Restoration, SR 0358 (Hadley Road) from SR 0019 to Carpenter Road, New Vernon and Perry Townships, Project ID 98405
Project Allocation
1,150,000
(Base Project Allocation - $1,150,000)
(41) SR 0018, Rehabilitation/Restoration and Corridor Safety Improvements, SR 0018 (Hermitage Road) from Wynnwood Drive to Edgewood Drive, Clark Borough, City of Hermitage, Pymatuning and South Pymatuning Townships, Project ID 98384
Project Allocation
6,000,000
(Base Project Allocation - $6,000,000)
(42) SR 2005, Resurface/Restoration, SR 2005 (Irishtown Road) from SR 0208 to SR 2007, Pine Township, Project ID 98399
Project Allocation
1,439,000
(Base Project Allocation - $1,439,000)
(43) SR 0080, Adding Parking for I-80 Closures, I-80 (Z H Confair Highway) Welcome Center, Shenango Township, Project ID 98385
Project Allocation
6,000,000
(Base Project Allocation - $6,000,000)
(44) SR 0173, Resurface/Restoration, SR 0173 (Slippery Rock Road/Liberty Street) from the Butler County Line to Liberty Street, Liberty and Pine Townships, Project ID 98393
Project Allocation
597,000
(Base Project Allocation - $597,000)
(45) SR 3026, Resurface/Restoration, SR 3026 (Bestwick Road) from SR 0318 to SR 0062 (Sharon Road), East Lackawannock Township, Project ID 98391
Project Allocation
737,000
(Base Project Allocation - $737,000)
(46) SR 3003, Resurface/Restoration, SR 3003 (Bedford Road/Wheatland Road) from SR 4009 to Sieg Hill Road, Shenango Township, West Middlesex Borough, Project ID 98390
Project Allocation
1,447,000
(Base Project Allocation - $1,447,000)
(47) SR 0080, Resurface/Restoration, Interstate 80 (Z H Confair Highway) from Milepost 15 to Milepost 21.5, East Lackawannock, Findley and Pine Townships, Project ID 98389
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
(48) SR 3020, Reconstruction, SR 3020 (Lamor Road) from the Joy Cone Facility to North Keel Ridge Road, City of Hermitage, Project ID 98388
Project Allocation
1,750,000
(Base Project Allocation - $1,750,000)
(49) SR 0208, Reconstruction and Intersection Improvements, SR 0208 (Center Street/North Street) at the Intersection with SR 0173, Grove City Borough, Project ID 98387
Project Allocation
500,000
(Base Project Allocation - $500,000)
(50) SR 0018, Resurface/Restoration, SR 0018 (College Avenue/Conneaut Lake Road) from College Avenue to Packard Avenue, Greenville Borough, Hempfield Township, Project ID 98401
Project Allocation
300,000
(Base Project Allocation - $300,000)
(51) SR 2021, Resurface, SR 2021 (Hendersonville Road) from Sandy Lake to SR 0965, Sandy Lake Borough, Sandy Lake and Worth Townships, Project ID 99871
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(52) SR 2001, Resurface, SR 2001 (New Castle-Mercer Road) from Highland Avenue to SR 0019, East Lackawannock, Springfield and Wilmington Townships, Project ID 99970
Project Allocation
1,334,000
(Base Project Allocation - $1,334,000)
(53) SR 0173, Resurface, SR 0173 (Main Street/Mercer Street) from Lake Street to Gordon Road, Mill Creek Township, New Lebanon and Sandy Lake Boroughs, Sandy Lake Township, Project ID 100019
Project Allocation
1,447,000
(Base Project Allocation - $1,447,000)
(54) I-376, Reconstruction, I-376 from the Lawrence County Line to its Northern Terminus at I-80, Various Municipalities, Project ID 0
Project Allocation
17,200,000
(Base Project Allocation - $17,200,000)
(55) SR 0258, Resurface, SR 0258 (Butler Pike/Pitt Street) from the Mercer County Line to SR 0208, East Lackawannock and Findley Townships, Mercer Borough, Springfield Township, Project ID 99916
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(56) SR 3018, Resurface, SR 3018 (Walnut Street) from Buckeye Drive to Walnut Street with Coordination with Consolidated Rail Corporation (DOT #545037w), South Pymatuning Township, Project ID 99918
Project Allocation
300,000
(Base Project Allocation - $300,000)
(57) SR 3008, Intersection Improvement/Pedestrian Facilities, SR 3008 (State Street) at the Intersection of Kerrwood Drive and Ellis Avenue, City of Hermitage, Project ID 102554
Project Allocation
280,000
(Base Project Allocation - $180,000)
(Land Allocation - $20,000)
(Design & Contingencies - $80,000)
(58) SR 0058, Resurface, SR 0058 (Mercer Street/Greenville Road) from SR 4024 to SR 0019 with Coordination with Bessemer and Lake Erie Railroad (DOT #051967m), Coolspring, Delaware, Hempfield and Jefferson Townships, Mercer Borough, Project ID 99869
Project Allocation
3,700,000
(Base Project Allocation - $3,700,000)
(59) SR 0358, Resurface, SR 0358 (Hadley Road) from Irish Ridge Road to Billy Boyd Road, New Vernon Township, Project ID 99924
Project Allocation
500,000
(Base Project Allocation - $500,000)
(60) SR 0018, Resurface, SR 0018 (Hermitage Road) from Wilson Road to the Shenango Valley Freeway, City of Hermitage, Shenango Township, Project ID 99883
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
(61) SR 0718, Resurface, SR 0718 (Water Avenue/Ivanhoe Road) from Russell Street to Hartford Road, Cities of Hermitage and Sharon, South Pymatuning Township, Project ID 99936
Project Allocation
1,444,000
(Base Project Allocation - $1,444,000)
(62) I-80, Reconstruction, I-80 from the Ohio State Line to the Venango County Line, Various Municipalities, Project ID 0
Project Allocation
111,000,000
(Base Project Allocation - $111,000,000)
(63) SR 3021, Resurface, SR 3021 (Forker Boulevard/10th Street) from Highland Avenue to SR 0518, Cities of Hermitage and Sharon, Sharpsville Borough, Project ID 99943
Project Allocation
394,000
(Base Project Allocation - $394,000)
(64) SR 0551, Resurface, SR 0551 (Pulaski Road) from Pulaski Road to New Castle Road, Shenango Township, Project ID 99966
Project Allocation
759,000
(Base Project Allocation - $759,000)
(65) SR 0418, Resurface, SR 0418 (Mercer Avenue) from Buhl Farm Drive to Maple Drive, City of Hermitage, Project ID 99961
Project Allocation
300,000
(Base Project Allocation - $300,000)
(66) SR 3035, Resurface, SR 3035 (Maple Drive) from SR 0418 to SR 3008 (State Street), City of Hermitage, Project ID 99951
Project Allocation
500,000
(Base Project Allocation - $500,000)
(67) SR 0518, Resurface, SR 0518 (Main Street/Walnut Street) from Main Street to Pierce Bluff Drive, City of Hermitage, Sharpsville Borough, Project ID 99927
Project Allocation
500,000
(Base Project Allocation - $500,000)
(68) SR 4006, Resurface, SR 4006 (Williamson Road) from Williamson Road to SR 0018 with Railroad Coordination with Norfolk and Southern Railroads (DOT #262733s) and Bessemer and Lake Erie Railroads (DOT #051958n), Hempfield Township, Project ID 99954
Project Allocation
300,000
(Base Project Allocation - $300,000)
(69) SR 3024, Resurface, SR 3024 (Delaware Road/Main Street) from Mercer Road to Constitution Road with Coordination with Bessemer and Lake Erie Railroads (DOT #051806s), Delaware and Fairview Townships, Fredonia Borough, Project ID 99921
Project Allocation
750,000
(Base Project Allocation - $750,000)
(70) SR 0358, Resurface, SR 0358 (Hadley Road) from Methodist Road to Bean Road, Hempfield, Otter Creek and Perry Townships, Project ID 99873
Project Allocation
1,300,000
(Base Project Allocation - $1,300,000)
(71) SR 0058, Resurface, SR 0058 (Main Street Extension/Main Street) from Wal-Mart Drive to Campbell Drive, Grove City Borough, Pine Township, Project ID 100030
Project Allocation
671,000
(Base Project Allocation - $671,000)
(72) I-79, Reconstruction, I-79 from the Lawrence County Line to the Crawford County Line, Various Municipalities, Project ID 0
Project Allocation
104,400,000
(Base Project Allocation - $104,400,000)
(73) SR 0018, Resurface, SR 0018 (New Castle Road/Hermitage Road) from Roman Road to Wilson Road, City of Hermitage, Shenango Township, West Middlesex Borough, Project ID 99878
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(74) Various State Routes, Safety Improvement - Roadway Departure Implementation Plan (RDIP), Various State Routes in Various Municipalities, Various Municipalities, Project ID 102100
Project Allocation
30,000
(Base Project Allocation - $30,000)
(75) Various State Routes, Safety Improvement - Intersection Safety Implementation Plan (ISIP), Various State Routes, Various Municipalities, Project ID 102083
Project Allocation
30,000
(Base Project Allocation - $30,000)