Schuylkill County

Act 129 of 2014, § 354, under HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2014-2015.

Act 129 of 2014, § 354

Section 354. Schuylkill County.

Projects are as follows:

(1) (Reserved).

(2) SR 0061, Highway Reconstruction, PA 61 from Saint Clair Borough to Frackville Borough, Blythe, New Castle, Ryan and West Mahanoy Townships, Project ID 96470

Project Allocation

41,563,000

(Base Project Allocation - $33,513,000)

(Land Allocation - $2,300,000)

(Design & Contingencies - $5,750,000)

(3) SR 0061, Highway Restoration, SR 0061, from SR 2014 to Penn State University, North Manheim Township, Orwigsburg and Schuylkill Haven Boroughs, West Brunswick Township, Project ID 91112

Project Allocation

5,041,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $41,000)

(4) SR 0924, Highway Resurface, Gold Star Highway/Main Street (SR 0924) from Frackville to Ringtown Boulevard, Gilberton Borough, Mahanoy Township, Shenandoah Borough, West Mahanoy Township, Project ID 93710

Project Allocation

9,101,000

(Base Project Allocation - $9,100,000)

(Design & Contingencies - $1,000)

(5) SR 0339, Highway Portion Bridge Replacement, PA 339 over Catawissa Creek, North Union Township, Project ID 12717

Project Allocation

788,000

(Base Project Allocation - $777,000)

(Land Allocation - $4,000)

(Design & Contingencies - $7,000)

(6) SR 0209, Highway Portion Bridge Rehabilitation, US 209 over West Branch Schuylkill River, Branch Township, City of Pottsville, Project ID 92022

Project Allocation

602,000

(Base Project Allocation - $600,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(7) SR 0209, Resurface, US 209, Blythe Township, Middleport Borough, Schuylkill Township, Tamaqua Borough, Walker Township, Project ID 96446

Project Allocation

10,001,000

(Base Project Allocation - $10,000,000)

(Design & Contingencies - $1,000)

(8) SR 2003, Highway Portion Bridge Replacement, SR 2003 over Pine Creek, West Brunswick Township, Project ID 89618

Project Allocation

1,502,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(9) SR 0054, Highway Resurface, Center Street (SR 0054), Mahanoy Township, Shenandoah Borough and West Mahanoy Township, Project ID 83097

Project Allocation

2,501,000

(Base Project Allocation - $2,500,000)

(Design & Contingencies - $1,000)

(10) SR 0125, Highway Portion Bridge Rehabilitation, PA 125 over Mahantango Creek, Eldred Township, Project ID 89638

Project Allocation

1,002,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(11) SR 0061, Highway Reconstruction, Drainage, Guide Rail, Shoulders, ADA Ramps, SR 0061, Segments 0210 through 0240 from Penn State University in Schuylkill Haven to past SR 2014, North Manheim Township, Schuylkill Haven Borough, Project ID 88387

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

(12) SR 0443, Highway Resurface, Market Street (SR 0443) from PA 61 to Hope Avenue, North Manheim Township, Orwigsburg Borough, Project ID 95577

Project Allocation

2,001,000

(Base Project Allocation - $2,000,000)

(Design & Contingencies - $1,000)

(13) SR 0309, Highway Resurface, PA 309 from Ye Olde Dam Road to the Carbon County Line, Kline Township, McAdoo Borough, Rush Township, Project ID 96484

Project Allocation

4,952,000

(Base Project Allocation - $4,950,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(14) SR 0061, Highway Reconstruction, PA 61 from North of Schuylkill Haven through Saint Clair Borough, East Norwegian, New Castle, North Manheim and Norwegian Townships, Palo Alto Borough, City of Pottsville, Saint Clair Borough, Project ID 96565

Project Allocation

24,933,000

(Base Project Allocation - $24,932,000)

(Design & Contingencies - $1,000)

(15) SR 0209, Intersection Safety Improvement, SR 0209-SR 0901 Intersection, Branch Township, Project ID 97267

Project Allocation

300,000

(Design & Contingencies - $300,000)

(16) SR 0309, Roadway Rehabilitation, SR 0309 from T-779 (School Drive) in West Penn Township to T-503 (Owl Creek Drive), Tamaqua Borough, West Penn Township, Project ID 96441

Project Allocation

17,002,000

(Base Project Allocation - $17,001,000)

(Design & Contingencies - $1,000)

(17) SR 0309, Highway Portion Bridge Replacement, SR 0309 over Backfilled Channel, Kline Township, Project ID 85743

Project Allocation

1,002,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(18) SR 4016, Highway Portion Bridge Replacement, SR 4016 over Little Mahantango Creek, Upper Mahantongo Township, Project ID 85724

Project Allocation

1,002,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(19) SR 4026, Highway Portion Bridge Rehabilitation, SR 4026 over Mahanoy Creek, Butler Township, Project ID 85718

Project Allocation

802,000

(Base Project Allocation - $800,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(20) SR 0309, Highway Resurface, PA 309 from Lehigh County Line to School Drive, West Penn Township, Project ID 96471

Project Allocation

6,001,000

(Base Project Allocation - $6,000,000)

(Design & Contingencies - $1,000)

(21) SR 0209, Resurface, US 209 from Coal Street to Lehigh Street in Middleport Borough, Schuylkill, Walker, and Blythe Townships, Middleport Borough, Schuylkill Township, Tamaqua Borough, Walker Township, Project ID 101626

Project Allocation

2,051,000

(Base Project Allocation - $2,001,000)

(Design & Contingencies - $50,000)

(22) SR 0443, Resurface, SR 2006, Lincoln Avenue to Route 895, New Ringgold and Orwigsburg Boroughs, Walker, West Brunswick, West Penn and East Brunswick Townships, Project ID 101613

Project Allocation

2,050,000

(Base Project Allocation - $2,000,000)

(Design & Contingencies - $50,000)

(23) I-81, Reconstruction, I-81 from the Lebanon County Line to the Luzerne County Line, Various Municipalities, Project ID 0

Project Allocation

171,600,000

(Base Project Allocation - $171,600,000)

(24) SR 0061, Mill, Overlay and Slope Stabilization, from the Berks/Schuylkill County Line to SR 0895

Project Allocation

3,657,000

(Base Project Allocation - $3,657,000)

(25) SR 0025, Resurface PA 25 from Grove Drive to US 209 in Hegins, Frailey and Reilly Townships

Project Allocation

2,360,000

(Base Project Allocation - $2,360,000)

(26) SR 0054, Resurface from Columbia County Line to Front Street, Ashland Borough and Butler Township

Project Allocation

540,000

(Base Project Allocation - $540,000)

(27) SR 0054, Resurface PA 54 from I-81 to SR 1021 (Lincoln Drive) in Mahanoy, Ryan and Rush Townships

Project Allocation

1,725,000

(Base Project Allocation - $1,725,000)

(28) SR 0061, Deer Lake North, Safety Improvements and Construction, New Southbound Road from SR 2014 to 0895

Project Allocation

11,040,000

(Base Project Allocation - $11,040,000)

(29) SR 0061, Resurface PA 61 from SR 1008 (Oak Street) to the Columbia County Line in Frackville and Ashland Boroughs, Butler Township

Project Allocation

1,610,000

(Base Project Allocation - $1,610,000)

(30) SR 0061, Scale Rock, Install Shoulder around Inside Curve, Upgrade Gabion Face to Soil Nail Wall on SR 0061 in New Castle Township

Project Allocation

2,500,000

(Base Project Allocation - $2,500,000)

(31) SR 0061, Install Median Barrier and Minor Widening on SR 0061 from Saint Clair Bypass to Bifurcation in Roadway in New Castle Township

Project Allocation

2,000,000

(Base Project Allocation - $2,000,000)

(32) SR 0125, Resurface PA 125 from PA 25 to the Northumberland County Line in Hegins and Eldred Townships

Project Allocation

1,677,000

(Base Project Allocation - $1,677,000)

(33) SR 0125, Resurface PA 125 from SR 4011 (Main Street) to PA 25 in Hegins and Porter Townships

Project Allocation

617,000

(Base Project Allocation - $617,000)

(34) SR 0125, Resurface PA 125 from US 209 to SR 4011 (Main Street) in Tremont Borough, Porter and Frailey Townships

Project Allocation

2,070,000

(Base Project Allocation - $2,070,000)

(35) SR 0183, Resurface PA 183 from Berks County Line to PA 443 in Wayne Township

Project Allocation

1,620,000

(Base Project Allocation - $1,620,000)

(36) SR 0209, Resurface SR 1008 (Morea Road) from PA 924 to PA 54 in Frackville Borough, West Mahanoy and Mahanoy Townships

Project Allocation

1,780,000

(Base Project Allocation - $1,780,000)

(37) SR 0209, Resurface US 209 from PA 901 to 300 Feet past PA 901 in City of Pottsville, Branch Township

Project Allocation

256,000

(Base Project Allocation - $256,000)

(38) SR 0209, Resurface US 209 from Broad Street to the Carbon County Line, Tamaqua and Coaldale Boroughs

Project Allocation

1,160,000

(Base Project Allocation - $1,160,000)

(39) SR 0209, Resurface US 209 from the Dauphin County Line to Keystone Street, Tower City Borough, Porter Township

Project Allocation

840,000

(Base Project Allocation - $840,000)

(40) SR 0339, Resurface PA 339 from PA 924 to the Columbia County Line, North Union and East Union Townships

Project Allocation

1,550,000

(Base Project Allocation - $1,550,000)

(41) SR 0443, Resurface PA 443 from the Lebanon County Line to Gerry Wolfe Road (SR 0645), Pine Grove Township

Project Allocation

1,370,000

(Base Project Allocation - $1,370,000)

(42) SR 0443, Resurface PA 443 from Gerry Wolfe Road (SR 0645) to Hallton Hill Road, Pine Grove Township, Pine Grove Borough

Project Allocation

634,000

(Base Project Allocation - $634,000)

(43) SR 0443, Resurface PA 443 from Parkway Avenue to PA 309, Schuylkill Haven and Orwigsburg Boroughs, North Manheim, West Brunswick, East Brunswick and West Penn Townships

Project Allocation

5,385,000

(Base Project Allocation - $5,385,000)

(44) SR 0443, Resurface PA 443 from PA 309 to the Carbon County Line, West Penn Township

Project Allocation

1,335,000

(Base Project Allocation - $1,335,000)

(45) SR 0501, Resurface PA 501 from the Berks County Line to PA 895, Pine Grove Township

Project Allocation

740,000

(Base Project Allocation - $740,000)

(46) SR 0895, Resurface PA 895 from PA 443 to PA 309, New Ringgold Borough, East Brunswick and West Penn Townships

Project Allocation

1,982,000

(Base Project Allocation - $1,982,000)

(47) SR 0895, Resurface PA 895 from PA 443 to PA 183, Pine Grove Borough and Pine Grove, Washington and Wayne Townships

Project Allocation

2,295,000

(Base Project Allocation - $2,295,000)

(48) SR 0895, Resurface PA 895 from PA 183 to PA 61, Wayne, South Manheim and West Brunswick Townships, Deer Lake and Auburn Boroughs

Project Allocation

2,255,000

(Base Project Allocation - $2,255,000)

(49) SR 0895, Resurface PA 895 from PA 309 to the Carbon County Line, West Penn Township

Project Allocation

1,050,000

(Base Project Allocation - $1,050,000)

(50) SR 0901, Resurface PA 901 from the Northumberland County Line to 1500 Feet Past Keystone Boulevard, Butler, Barry and Foster Townships

Project Allocation

1,625,000

(Base Project Allocation - $1,625,000)

(51) SR 0901, Resurface PA 901 from I-81 to Sunbury Street, Cass and Foster Townships

Project Allocation

1,100,000

(Base Project Allocation - $1,100,000)

(52) SR 0901, Resurface PA 901 from Sunbury Street to US 209, City of Pottsville, Minersville Borough, Branch Township

Project Allocation

490,000

(Base Project Allocation - $490,000)

(53) SR 0924, Resurface PA 924 from SR 4033 to PA 339 in West Mahanoy, Union and East Union Townships

Project Allocation

520,000

(Base Project Allocation - $520,000)

(54) SR 1001, Resurface SR 1001 (Market Street) from US 209 to SR 1027 (Russell Street), Port Clinton and Saint Clair Boroughs, East Norwegian Township

Project Allocation

40,000

(Base Project Allocation - $40,000)

(55) SR 1002, Resurface SR 1002 (Pottsville Street) from East Norwegian Street to Chestnut Street, Mechanicsville Borough

Project Allocation

235,000

(Base Project Allocation - $235,000)

(56) SR 1006, Resurface SR 1006 (Burma Road) from Peach Mountain Road to SR 1008 (Morea Road), Saint Clair Borough, Norwegian, East Norwegian, Mahanoy, Blythe and Ryan Townships

Project Allocation

2,440,000

(Base Project Allocation - $2,440,000)

(57) SR 1020, Resurface SR 1020 from PA 54 to the Carbon County Line, Rush Township

Project Allocation

1,625,000

(Base Project Allocation - $1,625,000)

(58) SR 1023, Resurface SR 1023 (Pine Street) from US 209 to PA 309, Tamaqua Borough

Project Allocation

22,000

(Base Project Allocation - $22,000)

(59) SR 1027, Resurface SR 1027 (Second Street) from PA 61 to PA 61, Saint Clair Borough

Project Allocation

200,000

(Base Project Allocation - $200,000)

(60) SR 2004, Resurface SR 2004 (Tumbling Run Road) from PA 61 to SR 2003 (New Philadelphia Street), North Manheim and Blythe Townships

Project Allocation

1,705,000

(Base Project Allocation - $1,705,000)

(61) SR 2008, Resurface SR 2008 (Main Street) from PA 443 to PA 61, Schuylkill Haven Borough, North Manheim Township

Project Allocation

270,000

(Base Project Allocation - $270,000)

(62) SR 2010, Resurface SR 2010 (Adamsdale Road) from Liberty Street to PA 61, North Manheim Township

Project Allocation

805,000

(Base Project Allocation - $805,000)

(63) SR 3004, Resurface SR 3004 from Front Street to PA 183, Cressona Borough, Wayne and North Manheim Townships

Project Allocation

985,000

(Base Project Allocation - $985,000)

(64) SR 3005, Resurface SR 3005 (Beckville Road) from SR 3004 (Panther Valley Road) to PA 901 in Cressona Borough, North Manheim Township

Project Allocation

120,000

(Base Project Allocation - $120,000)

(65) SR 4004, Resurface SR 4004 (Biddle Street) from Airport Road to SR 4007 (Gordon Mountain Road), Gordon Borough

Project Allocation

115,000

(Base Project Allocation - $115,000)

(66) SR 4005, Resurface SR 4005 (Minersville Highway) from US 209 to PA 901, Minersville Borough, Branch Township

Project Allocation

380,000

(Base Project Allocation - $380,000)

(67) SR 4006, Resurface SR 4006 (Biddle Street) from SR 4007 (McKnight Street) to Turnpike Road, Gordon Borough, Butler Township

Project Allocation

190,000

(Base Project Allocation - $190,000)

(68) SR 4007, Resurface SR 4007 (High Ridge Road) from SR 4002 (Heckscherville Road) to Charles Street, Butler and Cass Townships

Project Allocation

1,075,000

(Base Project Allocation - $1,075,000)

(69) SR 4011, Resurface SR 4011 from US 209 to PA 25, Porter and Hegins Townships

Project Allocation

1,932,000

(Base Project Allocation - $1,932,000)

(70) SR 4016, Resurface SR 4016 (Ridge Road) from the Northumberland County Line to PA 125, Upper Mahantongo and Eldred Townships

Project Allocation

2,190,000

(Base Project Allocation - $2,190,000)

(71) SR 4025, Resurface SR 4025 (Steins Road) from Steins Road to SR 901

Project Allocation

140,000

(Base Project Allocation - $140,000)

(72) SR 4026, Resurface SR 4026 (Dutchtown Road) from SR 0061 to SR 4007 (Gordon Road)

Project Allocation

715,000

(Base Project Allocation - $715,000)

(73) SR 4027, Resurface SR 4027 (Lavelle Road) from SR 4026 (Dutchtown Road) to PA 54, Butler Township

Project Allocation

448,000

(Base Project Allocation - $448,000)

(74) SR 4029, Resurface SR 4029 (Big Mine Run Road) from PA 54 to Columbia County Line, Butler Township

Project Allocation

220,000

(Base Project Allocation - $220,000)

(75) SR 4031, Resurface SR 4031 from PA 54 to SR 4032 (Raven Run Road) in West Mahanoy Township

Project Allocation

350,000

(Base Project Allocation - $350,000)

(76) SR 4033, Resurface SR 4033 (Ringtown Road) from PA 924 to SR 1005 (Mahanoy Street), Ringtown Borough, West Mahanoy, Union and North Union Townships

Project Allocation

2,915,000

(Base Project Allocation - $2,915,000)

(77) SR 4034, Resurface SR 4034 (Aristes Road) from the Columbia County Line to SR 4036 (Little Mountain Road), Union Township

Project Allocation

645,000

(Base Project Allocation - $645,000)

(78) SR 4036, Resurface SR 4036 (Little Mountain Road) from the Columbia County Line to SR 4033 (Ringtown Boulevard), Union Township

Project Allocation

620,000

(Base Project Allocation - $620,000)

(79) SR 4037, Resurface SR 4037 (Patterson Road) from SR 4033 (Ringtown Road) to SR 4033 (Center Street), Union Township

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

(80) SR 0054, Resurface PA 54 from Near Beech Street to Vine Street, Girardville and Shenandoah Boroughs, Butler and West Mahanoy Townships

Project Allocation

1,265,000

(Base Project Allocation - $1,265,000)

(81) SR 4026 (Dutchtown Road), Resurface from SR 0061 to SR 4007 (Gordon Road)

Project Allocation

715,000

(Base Project Allocation - $715,000)

(82) PA 54, Resurface from Columbia County Line to Front Street (Ashland), Butler Township

Project Allocation

540,000

(Base Project Allocation - $540,000)

(83) PA 901, Resurface from I-81 to Sunbury Street, Cass and Foster Townships

Project Allocation

1,100,000

(Base Project Allocation - $1,100,000)

(84) PA 61, Resurface from SR 1008 (Oak Street) to Columbia County Line, Frackville and Ashland Boroughs, Butler Township

Project Allocation

1,610,000

(Base Project Allocation - $1,288,000)

(Design & Contingencies - $322,000)

(85) SR 1006 (Burma Road), Resurface from Peach Mountain Road to SR 1008 (Morea Road), Saint Clair Borough, Norwegian, East Norwegian, Mahanoy, Blythe and Ryan Townships

Project Allocation

2,440,000

(Base Project Allocation - $1,952,000)

(Design & Contingencies - $488,000)

(86) SR 4031, Resurface from SR 0054 to SR 4032 (Raven Run Road), West Mahanoy Township

Project Allocation

350,000

(Base Project Allocation - $350,000)

(87) PA 924, Resurface from Southern Boundary of Shenandoah Borough Northward to SR 4033, West Mahanoy Township

Project Allocation

1,273,000

(Base Project Allocation - $1,173,000)

(Design & Contingencies - $100,000)

(88) Second Street (Old State Route 61), Resurface from SR 0061 to Industrial Park Road, Saint Clair Borough

Project Allocation

744,000

(Base Project Allocation - $620,000)

(Design & Contingencies - $124,000)