Act 145 of 2004, § 29, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2004-2005 - ENACTMENT.

Act 145 of 2004, § 29

Section 29. Erie County.

(a) Local Bridge

(1) Conneaut Township, T-301, Boyce Road over Stone Run, Bridge Replacement

293,000

(Base Construction Allocation - $269,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(2) Washington Township, T-580, Perry Lane over Conneauttee Creek, Bridge Replacement

40,000

(Base Construction Allocation - $38,000)

(Land Allocation - $2,000)

(3) City of Corry, Shady Avenue over Hare Creek, Bridge Replacement

131,000

(Base Construction Allocation - $115,000)

(Land Allocation - $16,000)

(4) Conneaut Township, T-883, Akerley Road over Astabula Creek, Bridge Replacement

175,000

(Base Construction Allocation - $168,000)

(Land Allocation - $7,000)

(5) Concord Township, T-387, Mitchell Road over Lilley Run, Bridge Replacement

113,000

(Base Construction Allocation - $108,000)

(Land Allocation - $5,000)

(6) Washington Township, T-518, Benson Road over Conneauttee Creek, Bridge Replacement

218,000

(Base Construction Allocation - $213,000)

(Land Allocation - $5,000)

(7) City of Erie, State Street over Conrail Railroad, Bridge Replacement

20,000

(Base Construction Allocation - $18,000)

(Land Allocation - $2,000)

(8) North East Township, Bort Road over Conrail Railroad, Bridge Replacement

0

(Base Construction Allocation - $0)

(9) Washington Township, T-307, Conneauttee Road, 2.5 Miles West of US 19, Bridge Replacement

445,000

(Base Construction Allocation - $400,000)

(Design and Contingencies - $45,000)

(10) Conneaut Township, Boyce Road, Bridge T-301 over Stone Run, Bridge Rehabilitation

368,000

(Base Construction Allocation - $337,000)

(Land Allocation - $6,000)

(Design and Contingencies - $25,000)

(11) Girard Township, Beckman over I-90 over SR 0090, Eastbound and Westbound, Bridge Rehabilitation

255,000

(Base Construction Allocation - $200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $50,000)

(12) McKean Township, Various Bridges over Elk Creek, French Creek, Lamson Run, I-79 and I-90, Bridge Rehabilitation

156,000

(Base Construction Allocation - $156,000)

(13) Waterford Borough, South Hazel Street, Bridge over LeBoeuf Creek, Bridge Removal or Bridge Replacement

128,000

(Base Construction Allocation - $75,000)

(Land Allocation - $23,000)

(Design and Contingencies - $30,000)

(b) State Bridges

(1) SR 0018 over East Branch of Tributary of Conneaut Creek, Albion Borough, Bridge Replacement

130,000

(Base Construction Allocation - $80,000)

(Land Allocation - $20,000)

(Design and Contingencies - $30,000)

(2) SR 0006 over French Creek, Le Boeuf Township, Bridge Replacement

81,000

(Base Construction Allocation - $24,000)

(Land Allocation - $4,000)

(Design and Contingencies - $53,000)

(3) SR 3002 over Conneaut Creek, Conneaut Township, Bridge Replacement

228,000

(Base Construction Allocation - $108,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(4) SR 0090 over Elk Creek and Railroad, Girard Township, Bridge Replacement

876,000

(Base Construction Allocation - $56,000)

(Land Allocation - $20,000)

(Design and Contingencies - $800,000)

(5) Railroad over SR 2010, Ox Bow Road, Concord Township, Bridge Removal

500,000

(Base Construction Allocation - $500,0000)

(6) Conrail Railroad over SR 2018, Lovell Road, Concord Township, Bridge Rehabilitation

401,000

(Base Construction Allocation - $400,000)

(Land Allocation - $1,000)

(7) SR 0006 over French Creek Branch No.3, Mill Village Borough, Bridge Replacement

120,000

(Base Construction Allocation - $90,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(8) SR 0005, East Lake Road Bridge, Harbor Creek Township, Bridge Rehabilitation

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(9) SR 0090 over Davis Run, North East Township, Bridge Rehabilitation

190,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(10) SR 0006 over Baskins Run, Wayne Township, Bridge Rehabilitation

140,000

(Base Construction Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(11) SR 1004 over Townley Run, Greenfield Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(12) SR 0017 Ramp to I-90, Greenfield Township, Bridge Replacement

1,140,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $120,000)

(13) SR 0005 over Orchard Run, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(14) SR 0006 over Colt Run, Le Boeuf Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(15) SR 0006 over French Creek Branch No.2, Wayne Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(16) SR 0008 over East Branch of French Creek, Amity Township, Bridge Replacement

270,000

(Base Construction Allocation - $200,000)

(Land Allocation - $10,000)

(Design and Contingencies - $60,000)

(17) SR 0086 over Twelve Mile Creek Tributary, Greenfield Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(18) SR 0086 over Twelve Mile Creek No.1, Greenfield Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(19) SR 0086 over Twelve Mile Creek No.2, Greenfield Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(20) SR 0020 over Six Mile Creek, Harbor Creek Township, Bridge Replacement

250,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $30,000)

(21) SR 0020 over Tributary of Eight Mile Creek, Harbor Creek Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(22) SR 0020 over Eight Mile Creek No.1, Harbor Creek Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(23) SR 0020 over Eight Mile Creek No.2, Harbor Creek Township, Bridge Replacement

150,000

(Base Construction Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(24) SR 0020 over Twelve Mile Creek, Harbor Creek Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(25) SR 0020, Sixteen Mile Creek Tributary, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(26) SR 0020 over Twenty Mile Creek, North East Township, Bridge Replacement

1,140,000

(Base Construction Allocation - $920,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(27) SR 0077 over South Branch of French Creek, Concord Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(28) SR 0077 over French Creek Branch No.1, Concord Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(29) SR 0077 over French Creek Branch No.2, Concord Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(30) SR 0089 over Lilley Run, Concord Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(31) SR 0089 over Hubble Run, Amity Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(32) SR 0089 over French Creek Branch No.1, Venango Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(33) SR 0089 over French Creek Branch No.2, Venango Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(34) SR 0089 over French Creek Branch No.3, Greenfield Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(35) SR 0089 over French Creek Branch No.4, Greenfield Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(36) Lake Street Bridge, North East Township, Bridge Replacement

150,000

(Base Construction Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(37) SR 0090 over Spence Run No.1, Greene Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(38) SR 0090 over Tributary of Four Mile Creek, Harbor Creek Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(39) SR 0090 over Tributary No.1 of Lake Erie, Harbor Creek Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(40) SR 0090 over Tributary No.2 of Lake Erie, Harbor Creek Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(41) SR 0090 over Seven Mile Creek No.1, Harbor Creek Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(42) SR 0090 over Seven Mile Creek No.2, Harbor Creek Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(43) SR 0090 over Seven Mile Creek No.3, Greenfield Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(44) SR 0090 over Seven Mile Creek No.5, North East Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(45) SR 0090 over Seven Mile Creek No.6, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(46) SR 0090 over Tributary No.1 of Seven Mile Creek, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(47) SR 0090 over Tributary No.2 of Seven Mile Creek, North East Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(48) SR 0090 over Branch of Sixteen Mile Creek, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(49) SR 0090 over Tributary No.3 of Lake Erie, North East Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(50) SR 0090 over Tributary No.4 of Lake Erie, North East Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(51) SR 0090 Westbound over Norfolk and Western Railroad, North East Township, Bridge Replacement

340,000

(Base Construction Allocation - $260,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(52) SR 0090 over Tributary No.5 of Lake Erie, North East Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(53) SR 0090 Eastbound over Norfolk and Western Railroad, North East Township, Bridge Replacement

340,000

(Base Construction Allocation - $260,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(54) SR 0097 over Tributary of French Creek, Union Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(55) SR 0426 over Hare Creek No.1, Wayne Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(56) SR 0426 over Hare Creek No.2, Wayne Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(57) SR 0430 over West Branch of French Creek, Greenfield Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(58) SR 0430 over Branch of French Creek, Greenfield Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(59) SR 0474 over Spafford Run, Venango Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(60) Iroquois Avenue Bridge No.1, Harbor Creek Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(61) SR 1001 over Owens Creek, Venango Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(62) SR 1008 over Twelve Mile Creek, North East Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(63) SR 1009 over Branch of Six Mile Creek, Greene Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(64) SR 1014 over Blum Run, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(65) SR 1014 over Averill Run, North East Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(66) SR 2002 over Spring Creek, Mill Village Borough, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(67) SR 2010 over Tributary of French Creek, Union Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(68) SR 2010 over Hungry Run, Union Township, Bridge Replacement

130,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(69) SR 2012 over Tributary of Hungry Run, Union Township, Bridge Replacement

110,000

(Base Construction Allocation - $70,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(70) SR 2018 over Pine Run, Union Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(71) SR 2018 over East Branch of Pine Run, Union Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(72) SR 2018 over Slaughters Run, Concord Township, Bridge Replacement

120,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(73) SR 2018 over South Branch of French Creek, Concord Township, Bridge Replacement

130,000

(Base Construction Allocation - $80,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(74) SR 2020 over South Branch of French Creek, Concord Township, Bridge Replacement

140,000

(Base Construction Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(75) SR 2024 over Bear Creek, Wayne Township, Bridge Replacement

70,000

(Base Construction Allocation - $40,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(76) Sciota Road Bridge No.1, Corry Township, Bridge Replacement

180,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(77) SR 2034 over Alder Run, Amity Township, Bridge Replacement

100,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(78) Ramp over Lake Erie Tributary, Harbor Creek Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(79) SR 8170 Ramp over T-666, Rohl Road, Greenfield Township, Bridge Replacement

400,000

(Base Construction Allocation - $340,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(80) SR 8170 Ramp over Branch of Eight Mile Creek, Greenfield Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(81) SR 0005, 12th Street (PA 5), CCI over Cascade Creek, over SR 0801, Ramp G, over SR 0079, Northbound and Southbound, Millcreek Township and City of Erie, Bridge Rehabilitation

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(82) SR 0006, TR 6, Gar Street Bridge over Tributary of French Creek, Wayne Township, Bridge Rehabilitation

260,000

(Base Construction Allocation - $260,000)

(83) SR 0018, Bridge over SR 0090, Eastbound and Westbound, Girard Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $440,000)

(Design and Contingencies - $60,000)

(84) SR 0019, TR 19 over Leboeuf Creek, Summit Township, Bridge Rehabilitation

259,000

(Base Construction Allocation - $219,000)

(Land Allocation - $20,000)

(Design and Contingencies - $20,000)

(85) SR 0090, I-90 Bridge over SR 0020, Eastbound and Westbound, East Main and North East Townships, Bridge Replacement

1,175,000

(Base Construction Allocation - $925,000)

(Design and Contingencies - $250,000)

(86) SR 0090, I-90 Westbound over Elk Creek and Railroad over T-384, Cole Springs Railroad, Girard Township, Bridge Rehabilitation

6,300,000

(Base Construction Allocation - $6,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $280,000)

(87) SR 0090, I-90 Bridge over T-390, South Creek Road, Eastbound and Westbound over T-390, South Creek Road, Girard Township, Bridge Replacement

4,127,000

(Base Construction Allocation - $3,537,000)

(Land Allocation - $40,000)

(Design and Contingencies - $550,000)