Section 41. Lawrence County.
(a) Local Bridges
(1) Fleming Park Bridge over Ohio River Back Channel and Conrail-Neville, Bridge Replacement
472,000
(Base Construction Allocation - $460,000)
(Design and Contingencies - $12,000)
(2) Slippery Rock Township, McConnells Mill Road Bridge over Slippery Rock Creek, Bridge Rehabilitation
240,000
(Base Construction Allocation - $200,000)
(Design and Contingencies - $40,000)
(3) City of New Castle, Mill Street Bridge over Neshannock Creek, Bridge Replacement
2,650,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $150,000)
(Design and Contingencies - $500,000)
(4) Ellwood City Borough, 2nd Avenue, Bridge over Buffalo & Pittsburgh Railroad, Bridge Replacement
2,600,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(5) Ellwood City Borough, Railroad over 5th Street, Bridge Rehabilitation
2,100,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(6) Chewton, Anne Street, Bridge over Track, Bridge Replacement
1,600,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(b) State Bridges
(1) SR 0018 over Mahoning River, City of New Castle, Bridge Rehabilitation
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(2) SR 0060 Southbound over Shenango River, Neshannock Township, Bridge Rehabilitation
143,000
(Base Construction Allocation - $130,000)
(Design and Contingencies - $13,000)
(3) SR 0060 Northbound over Shenango River, Neshannock Township, Bridge Rehabilitation
143,000
(Base Construction Allocation - $130,000)
(Design and Contingencies - $13,000)
(4) SR 0168, Wettich Bridge over CSX, Taylor Township, Bridge Replacement
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(5) SR 0208 over Neshannock Creek, Volant Borough, Bridge Replacement
176,000
(Base Construction Allocation - $160,000)
(Design and Contingencies - $16,000)
(6) SR 0224, State Street over Norfolk Southern Railroad, Mahoning Township, Bridge Replacement
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(7) SR 0551, Main Street over Little Beaver Creek, Little Beaver Township, Bridge Replacement
132,000
(Base Construction Allocation - $120,000)
(Design and Contingencies - $12,000)
(8) SR 0060 over T-605, Pulaski Township, Bridge Replacement
165,000
(Base Construction Allocation - $150,000)
(Land Allocation - $15,000)
(9) SR 0168 over SR 0422, Taylor Township, Bridge Preservation
134,000
(Base Construction Allocation - $124,000)
(Design and Contingencies - $10,000)
(10) SR 0208, Pulaski Road over McClures Run, Wilmington Township, Bridge Replacement
114,000
(Base Construction Allocation - $100,000)
(Land Allocation - $4,000)
(Design and Contingencies - $10,000)
(11) SR 0488, Portersville Road over Slippery Rock Creek, Perry Township, Bridge Replacement
224,000
(Base Construction Allocation - $199,000)
(Land Allocation - $5,000)
(Design and Contingencies - $20,000)
(12) SR 0956 over Little Neshannock Creek, Wilmington Township, Bridge Replacement
101,000
(Base Construction Allocation - $77,000)
(Land Allocation - $4,000)
(Design and Contingencies - $20,000)
(13) SR 1001, High Street over Branch of Little Neshannock Creek, New Wilmington Borough, Bridge Replacement
275,000
(Base Construction Allocation - $170,000)
(Land Allocation - $15,000)
(Design and Contingencies - $90,000)
(14) SR 1005, Highland Avenue over Little Neshannock Creek, New Wilmington Borough, Bridge Replacement
121,000
(Base Construction Allocation - $91,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(15) SR 1018 over Branch of Taylor Run, Plain Grove Township, Bridge Replacement
111,000
(Base Construction Allocation - $100,000)
(Land Allocation - $1,000)
(Design and Contingencies - $10,000)
(16) SR 1018, Georgetown Road over Branch of Taylor Run, Plain Grove Township, Bridge Replacement
114,000
(Base Construction Allocation - $100,000)
(Land Allocation - $4,000)
(Design and Contingencies - $10,000)
(17) SR 2014, Lawrence Avenue over Beaver Run, Wayne Township, Bridge Replacement
114,000
(Base Construction Allocation - $100,000)
(Land Allocation - $4,000)
(Design and Contingencies - $10,000)
(18) SR 3010, West Washington Street over Conrail Railroad, City of New Castle, Bridge Replacement
112,000
(Base Construction Allocation - $88,000)
(Land Allocation - $4,000)
(Design and Contingencies - $20,000)
(19) SR 3015 over McKee Run, Taylor Township, Bridge Replacement
115,000
(Base Construction Allocation - $104,000)
(Land Allocation - $1,000)
(Design and Contingencies - $10,000)
(20) SR 4001, Pulaski Road over Branch of Deer Creek, Pulaski Township, Bridge Replacement
133,000
(Base Construction Allocation - $109,000)
(Land Allocation - $4,000)
(Design and Contingencies - $20,000)
(21) Mitchell Road over SR 0060, Neshannock Township, Bridge Rehabilitation
532,000
(Base Construction Allocation - $508,000)
(Land Allocation - $4,000)
(Design and Contingencies - $20,000)
(22) SR 0065, 100 Feet South of Mt. Vernon Drive and Line Avenue, Bridge over Branch of Conoquenessing Creek, Elwood City Borough, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(23) SR 3002, Indian Run Road, New Beaver Borough, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(24) SR 3008, Darlington Road, 0.75 Miles Southwest of SR 0018, Bridge over Wampum Run, New Beaver Borough, Bridge Replacement
1,227,000
(Base Construction Allocation - $943,000)
(Land Allocation - $95,000)
(Design and Contingencies - $189,000)
(25) SR 3008, Darlington Road, 0.5 Miles Southwest of SR 0018, Bridge over Wampum Run, New Beaver Borough, Bridge Replacement
2,753,000
(Base Construction Allocation - $2,117,000)
(Land Allocation - $212,000)
(Design and Contingencies - $424,000)
(26) SR 0488, Portersville Road, Bridge over Slippery Rock Creek, Perry Township, Bridge Replacement
2,753,000
(Base Construction Allocation - $2,117,000)
(Land Allocation - $212,000)
(Design and Contingencies - $424,000)
(27) SR 0488, Portersville Road, Wayne Township Line, Bridge over Morrison Run, Perry Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(28) SR 2005, Van Gorders Mill Road, Bridge over Branch of Slippery Rock Creek, Perry Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(29) SR 2011, Camp Run Road, Bridge over Camp Run, Perry Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(30) SR 2016, River Road, Bridge over Branch of Conoquenessing Creek, Perry Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(31) SR 1018, Georgetown Road, Bridge over Branch of Taylor Run, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(32) SR 1018, Georgetown Road, Bridge over Branch of Taylor Run, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(33) SR 0019, LR 0246, US 19, Bridge over Branch of Slippery Rock Creek, Scott Township, Bridge Replacement
1,225,000
(Base Construction Allocation - $941,000)
(Land Allocation - $95,000)
(Design and Contingencies - $189,000)
(34) SR 0065, Ellwood Road, Bridge over B&O Railroad, Abandoned, Shenango Township, Bridge Replacement
400,000
(Base Construction Allocation - $250,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(35) SR 0019, Perry Highway, Bridge over Branch of Slippery Rock Creek, Shenango Township Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(36) SR 0065, Washington Road, Bridge over SR 0422 and Benjamin Franklin Highway, Shenango Township, Bridge Replacement
13,530,000
(Base Construction Allocation - $10,407,000)
(Land Allocation - $1,041,000)
(Design and Contingencies - $2,082,000)
(37) SR 0422, Benjamin Franklin Highway, 1 Mile West of SR 0065, SR 2001, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
21,696,000
(Base Construction Allocation - $16,726,000)
(Land Allocation - $1,673,000)
(Design and Contingencies - $3,297,000)
(38) SR 0422, Benjamin Franklin Highway over SR 2001 and Branch of Big Run, Shenango Township, Bridge Replacement
21,430,000
(Base Construction Allocation - $16,484,000)
(Land Allocation - $1,649,000)
(Design and Contingencies - $3,297,000)
(39) SR 0422, Benjamin Franklin Highway over SR 2001 and Branch of Big Run, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(40) SR 0422, Benjamin Franklin Highway, New Castle Interchange, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(41) SR 0422, Benjamin Franklin Highway, Business Route 422, Bridge over SR 2004, Shenango Township, Bridge Replacement
12,633,000
(Base Construction Allocation - $9,717,000)
(Land Allocation - $972,000)
(Design and Contingencies - $1,944,000)
(42) SR 1012, Frew Mill Road, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
1,059,000
(Base Construction Allocation - $814,000)
(Land Allocation - $82,000)
(Design and Contingencies - $163,000)
(43) SR 2001, Savannah Road, McKee Run near T-427, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(44) SR 2001, Pennsylvania Avenue and Alborn Road, Bridge over Big Run, Shenango Township, Bridge Replacement
3,959,000
(Base Construction Allocation - $3,045,000)
(Land Allocation - $305,000)
(Design and Contingencies - $609,000)
(45) SR 2003, Old Pittsburgh Road and Shenango Road, Bridge over McKee Run, Shenango Township, Bridge Replacement
1,973,000
(Base Construction Allocation - $1,517,000)
(Land Allocation - $152,000)
(Design and Contingencies - $304,000)
(46) SR 2003, Wurtemburg Road, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
1,650,000
(Base Construction Allocation - $1,269,000)
(Land Allocation - $127,000)
(Design and Contingencies - $254,000)
(47) SR 2004, Benjamin Franklin Highway, Bridge over Willow Brook, Shenango Township, Bridge Replacement
1,898,000
(Base Construction Allocation - $1,460,000)
(Land Allocation - $146,000)
(Design and Contingencies - $292,000)
(48) SR 2008, Savannah Road, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(49) SR 2010, Gardner Center Road, Bridge over Branch of Big Run, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(50) SR 2012, Union Valley Road, West of TR-434, Bridge over Branch of McKee Run, Shenango Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(51) SR 2012, Union Valley Road, Bridge over Branch of McKee Run, Shenango Township, Bridge Replacement
1,979,000
(Base Construction Allocation - $1,521,000)
(Land Allocation - $153,000)
(Design and Contingencies - $305,000)
(52) SR 2030, Mountville Road, Bridge over Slippery Rock Creek, Slippery Rock Township, Bridge Replacement
190,000
(Base Construction Allocation - $175,000)
(Land Allocation - $5,000)
(Design and Contingencies - $10,000)
(53) SR 0422, Benjamin Franklin Highway, Bridge over Slippery Rock Creek, Slippery Rock Township, Bridge Replacement
2,575,000
(Base Construction Allocation - $2,550,000)
(Design and Contingencies - $25,000)
(54) SR 0422, Benjamin Franklin Highway, near Church Road, Bridge over Branch of Big Run, Slippery Rock Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(55) SR 0422, Benjamin Franklin Highway, Near Fox Road, Bridge over Branch of Slippery Rock Creek, Slippery Rock Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(56) SR 1012, Frew Mill Road, Bridge over Big Run, Slippery Rock Township, Bridge Replacement
1,673,000
(Base Construction Allocation - $1,286,000)
(Land Allocation - $129,000)
(Design and Contingencies - $258,000)
(57) SR 1012, Frew Mill Road, Bridge over Brush Run, Slippery Rock Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(58) SR 2013, McConnell Mill Road, Bridge over Branch of Slippery Rock Creek, Slippery Rock Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(59) SR 0168, Pittsburgh and Lake Erie Railroad and CSX Railroad, Wettich Bridge, Taylor Township, Bridge Replacement
600,000
(Base Construction Allocation - $550,000)
(Design and Contingencies - $50,000)
(60) SR 3015, Moravia Street, Bridge over McKee Run, Taylor Township, Bridge Replacement
1,063,000
(Base Construction Allocation - $817,000)
(Land Allocation - $82,000)
(Design and Contingencies - $164,000)
(61) SR 2022, Heinz Camp Road on Wayne and Perry Township Line, Bridge over Slippery Rock Creek, Wayne Township, Bridge Replacement
115,000
(Base Construction Allocation - $105,000)
(Design and Contingencies - $10,000)
(62) SR 2003, Wurtemburg Road and Intersection with TR-65, Bridge over Branch of Duck Run, Wayne Township, Bridge Replacement
135,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $15,000)
(63) SR 2014, Lawrence Avenue, Bridge over Beaver Run, Wayne Township, Bridge Replacement
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(64) SR 0060, PA 60 Southbound over SR 4004, Neshannock Township, Bridge Replacement
350,000
(Base Construction Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(65) SR 0060, PA 60 Northbound and Southbound over River Road, Neshannock Township, Bridge Rehabilitation
777,000
(Base Construction Allocation - $616,000)
(Design and Contingencies - $161,000)
(66) SR 0065, Ellwood Road Bridge over B&O Railroad (Abandoned), Shenango Township, Bridge Replacement
400,000
(Base Construction Allocation - $250,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(67) SR 0168, PA 168 over US 422 Eastbound and Westbound, Taylor Township, Bridge Rehabilitation
761,000
(Base Construction Allocation - $662,000)
(Design and Contingencies - $99,000)
(68) SR 0224, PA 224 Bridge over Norfolk Southern, Mahoning Township, Bridge Rehabilitation
2,000,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(69) SR 0422, US 422 Eastbound and Westbound over Shenango River, Railroad, Bolt Street, Taylor Township, Bridge Rehabilitation
13,754,000
(Base Construction Allocation - $13,604,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(70) SR 0551, PA 551, Main Street Bridge over Little Beaver Creek, Little Beaver Township, Bridge Rehabilitation
624,000
(Base Construction Allocation - $524,000)
(Design and Contingencies - $100,000)
(71) SR 2003, Wurtemburg Road Bridge over Branch of Duck Run, Wayne Township, Bridge Rehabilitation
135,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $15,000)
(72) SR 2020, Pleasant Road Bridge over Camp Run, Perry Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $100,000)
(73) SR 3001, South Main Street Bridge over Bessemer Haul Road, Bessemer Borough, Bridge Replacement
926,000
(Base Construction Allocation - $776,000)
(Design and Contingencies - $150,000)
(74) SR 3004, Wallace Road Bridge over Branch of Honey Creek, North Beaver Township, Bridge Replacement
275,000
(Base Construction Allocation - $250,000)
(Design and Contingencies - $25,000)
(75) SR 4004, Harbor, Edinburg Bridge over Shenango River, Neshannock Township, Bridge Rehabilitation
1,975,000
(Base Construction Allocation - $1,690,000)
(Land Allocation - $125,000)
(Design and Contingencies - $160,000)
(76) SR 4006, Coffee Run Bridge over Coffee Run, Mahoning Township, Bridge Rehabilitation
335,000
(Base Construction Allocation - $270,000)
(Land Allocation - $15,000)
(Design and Contingencies - $50,000)
(77) SR 0018 over Mahoning River, New Castle, Bridge Rehabilitation
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(78) SR 0060 Southbound over Shenango River, Neshannock Township, Bridge Rehabilitation
143,000
(Base Construction Allocation - $130,000)
(Design and Contingencies - $13,000)
(79) SR 0060 Northbound over Shenango River, Neshannock Township, Bridge Rehabilitation
143,000
(Base Construction Allocation - $130,000)
(Design and Contingencies - $13,000)
(80) SR 0168, Wettich Bridge over CSX Railroad, Taylor Township, Bridge Replacement
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(81) SR 0208 Bridge, Volant Borough, Bridge Replacement
176,000
(Base Construction Allocation - $160,000)
(Design and Contingencies - $16,000)
(82) SR 0224, State Street over NS Railroad, Mahoning Township, Bridge Replacement
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(83) SR 0551, Main Street over Little Beaver Creek, Little Beaver Township, Bridge Replacement
132,000
(Base Construction Allocation - $120,000)
(Design and Contingencies - $12,000)
(84) SR 0060 over TR 605, Pulaski Township, Bridge Replacement
165,000
(Base Construction Allocation - $150,000)
(Design and Contingencies - $15,000)