Allegheny County

Act 145 of 2004, § 6, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2004-2005 - ENACTMENT.

Act 145 of 2004, § 6

Section 6. Allegheny County.

(a) Local Bridges

(1) Dravosburg Borough, Mansfield Bridge over Monongahela River, Bridge Rehabilitation

1,628,000

(Base Construction Allocation - $1,350,000)

(Land Allocation - $15,000)

(Design and Contingencies - $263,000)

(2) Neville and Stowe Townships, Fleming Park Bridge over Ohio River Back Channel and CSXT, Bridge Replacement

472,000

(Base Construction Allocation - $460,000)

(Design and Contingencies - $12,000)

(3) Robinson Township, TR 8009 over Campbell's Run Road, Bridge Rehabilitation

236,000

(Base Construction Allocation - $218,000)

(Land Allocation - $3,000)

(Design and Contingencies - $15,000)

(4) City of Pittsburgh, TR 8037 over SR 0019 and Ramp C, Bridge Replacement

285,000

(Base Construction Allocation - $262,000)

(Land Allocation - $8,000)

(Design and Contingencies - $15,000)

(5) Hampton Township, T-760, North Bridge, South Pioneer Road, 350 Feet South of West Bardonner Road, Bridge Replacement

265,000

(Base Construction Allocation - $240,000)

(Design and Contingencies - $25,000)

(6) Ross Township, Nelson Run Bridge, Upstream of House No.245 Nelson Run Road, Bridge Replacement

75,000

(Base Construction Allocation - $60,000)

(Land Allocation - $5,000)

(Design and Contingencies - $10,000)

(7) Ross Township, Hillcrest Drive Bridge, Hillcrest Drive at Babcock, Bridge Rehabilitation

36,000

(Base Construction Allocation - $30,000)

(Design and Contingencies - $6,000)

(8) Ross Township, Evergreen Heights Road at Rochester Road, Bridge Rehabilitation

13,000

(Base Construction Allocation - $10,000)

(Design and Contingencies - $3,000)

(9) Ross Township, Bernice Street at Babcock, Bridge Rehabilitation

4,000

(Base Construction Allocation - $3,000)

(Design and Contingencies - $1,000)

(10) City of Pittsburgh, SR 7301, Fancourt Street Bridge over 10th Street Bypass, Bridge Replacement

1,060,000

(Base Construction Allocation - $500,000)

(Land Allocation - $10,000)

(Design and Contingencies - $550,000)

(11) Neville Township, Fleming Park Bridge over Ohio River BC & Conrail, Bridge Replacement

3,123,000

(Base Construction Allocation - $3,066,000)

(Design and Contingencies - $57,000)

(12) South Fayette Township, Millers Run Road, Pittsburgh & West Virginia Railway, Bridge Rehabilitation

272,000

(Base Construction Allocation - $272,000)

(13) Bridgeville, Chartiers Avenue, Bridge over Chartiers Creek, Bridge Rehabilitation

200,000

(Base Construction Allocation - $200,000)

(14) Walker's Mill, Bridge over Chartiers Creek, Bridge Rehabilitation

230,000

(Base Construction Allocation - $230,000)

(b) State Bridges

(1) SR 0837, Glenwood Bridge Ramps, City of Pittsburgh and West Homestead Borough, Bridge Rehabilitation

2,256,000

(Base Construction Allocation - $1,916,000)

(Land Allocation - $30,000)

(Design and Contingencies - $310,000)

(2) SR 0065 over Chateau Street, City of Pittsburgh, Bridge Replacement

2,757,000

(Base Construction Allocation - $2,557,000)

(Design and Contingencies - $200,000)

(3) SR 8043, Beaver Avenue over Chateau Street, City of Pittsburgh, Bridge Rehabilitation

486,000

(Base Construction Allocation - $420,000)

(Land Allocation - $10,000)

(Design and Contingencies - $56,000)

(4) SR 3013 over Piney Fork Creek, South Park Township, Bridge Replacement

20,050,000

(Base Construction Allocation - $20,000,000)

(Design and Contingencies - $50,000)

(5) SR 2082, Hulton Road over Allegheny River, Oakmont Borough and Harmar Township, Bridge Replacement

157,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $57,000)

(6) SR 0008 over Allegheny River, City of Pittsburgh, Bridge Rehabilitation

680,000

(Base Construction Allocation - $660,000)

(Design and Contingencies - $20,000)

(7) SR 0008 Northbound over SR 0028, Railroad and Local Road, Etna Borough, Bridge Rehabilitation

250,000

(Base Construction Allocation - $240,000)

(Design and Contingencies - $10,000)

(8) SR 0008 over Southbound SR 0028, SR 1001 and Railroad, Etna Borough, Bridge Rehabilitation

210,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $10,000)

(9) SR 0019, Perrysville Avenue over I-279, Ross Township, Bridge Replacement

70,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $10,000)

(10) SR 0065 over Fremont Street, Bellevue Borough, Bridge Rehabilitation

360,000

(Base Construction Allocation - $330,000)

(Design and Contingencies - $30,000)

(11) SR 0065 over Dilworth Run, Bellevue Borough, Bridge Rehabilitation

275,000

(Base Construction Allocation - $250,000)

(Design and Contingencies - $25,000)

(12) SR 0065 over Spruce Run, Ben Avon Borough, Bridge Rehabilitation

770,000

(Base Construction Allocation - $700,000)

(Design and Contingencies - $70,000)

(13) SR 0079 Northbound over SR 0019, Marshall Township, Bridge Rehabilitation

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(14) SR 0079 Southbound over SR 0019, Marshall Township, Bridge Replacement

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(15) SR 2038, Clairton/Glassport Bridge over Monongahela River, City of Clairton, Bridge Rehabilitation

740,000

(Base Construction Allocation - $720,000)

(Design and Contingencies - $20,000)

(16) SR 2082, Hulton Bridge over Allegheny River, Oakmont Borough, Bridge Replacement

2,140,000

(Base Construction Allocation - $2,000,000)

(Design and Contingencies - $140,000)

(17) SR 2082, Birmingham Bridge over Monongahela River, City of Pittsburgh, Bridge Replacement

2,200,000

(Base Construction Allocation - $2,000,000)

(Design and Contingencies - $200,000)

(18) SR 2124, 40th Street Bridge over Allegheny River, City of Pittsburgh, Bridge Rehabilitation

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(19) SR 3039, Nike Site Bridge, Collier Township, Bridge Rehabilitation

330,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $30,000)

(20) SR 3089, Flaugherty Run Bridge over SR 0060, Findlay Township, Bridge Rehabilitation

220,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $20,000)

(21) SR 4025, Sewickley Bridge over Ohio River, Sewickley Borough, Bridge Rehabilitation

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(22) SR 8007, Ramp D over Robinson, Collier Township, Bridge Rehabilitation

330,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $30,000)

(23) SR 8043, California Avenue over SR 0065, City of Pittsburgh, Bridge Rehabilitation

154,000

(Base Construction Allocation - $140,000)

(Design and Contingencies - $14,000)

(24) SR 8049, Ramp A to Marshall Avenue, City of Pittsburgh, Bridge Rehabilitation

616,000

(Base Construction Allocation - $560,000)

(Design and Contingencies - $56,000)

(25) SR 8049, Ramp E from Chateau Street to SR 0065 Northbound, City of Pittsburgh, Bridge Rehabilitation

209,000

(Base Construction Allocation - $190,000)

(Design and Contingencies - $19,000)

(26) SR 8049 over Norfolk Southern Railroad, Chateau Street and California Avenue, City of Pittsburgh, Bridge Rehabilitation

594,000

(Base Construction Allocation - $540,000)

(Design and Contingencies - $54,000)

(27) SR 8049, Marshall Avenue and SR 0019 to SR 0065 Southbound, City of Pittsburgh, Bridge Rehabilitation

990,000

(Base Construction Allocation - $900,000)

(Design and Contingencies - $90,000)

(28) SR 0048, Boston Bridge over Youghiogheny River, Elizabeth and Versailles Townships, Bridge Replacement

1,540,000

(Base Construction Allocation - $1,400,000)

(Design and Contingencies - $140,000)

(29) SR 0376, Rodi Road Bridge, Churchill Borough, Bridge Rehabilitation

660,000

(Base Construction Allocation - $600,000)

(Design and Contingencies - $60,000)

(30) SR 0079, Forrest Grove Road over I-79, Kennedy Township, Bridge Rehabilitation

396,000

(Base Construction Allocation - $360,000)

(Design and Contingencies - $36,000)

(31) SR 0022 over Parkway West SR 0060, Robinson Township, Bridge Rehabilitation

356,000

(Base Construction Allocation - $332,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(32) SR 0028 over Scout Reservation Road, Sharpsburg Borough, Bridge Replacement

200,000

(Base Construction Allocation - $170,000)

(Design and Contingencies - $30,000)

(33) SR 0028 over SR 1028, Kennedy Township, Bridge Replacement

284,000

(Base Construction Allocation - $264,000)

(Design and Contingencies - $20,000)

(34) SR 0030 over Branch of Falls Run, Forest Hill Borough, Bridge Replacement

107,000

(Base Construction Allocation - $93,000)

(Design and Contingencies - $14,000)

(35) SR 0051 over Weyman Run, City of Pittsburgh, Bridge Replacement

139,000

(Base Construction Allocation - $115,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(36) SR 0051 over TR 142 and Montour Run, Robinson Township, Bridge Replacement

398,000

(Base Construction Allocation - $374,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(37) SR 0060 over Branch of Chartiers Creek, Robinson Township, Bridge Replacement

130,000

(Base Construction Allocation - $114,000)

(Design and Contingencies - $16,000)

(38) SR 0065 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation

654,000

(Base Construction Allocation - $630,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(39) SR 0065 over Spruce Run Creek, Ben Avon Borough, Bridge Rehabilitation

885,000

(Base Construction Allocation - $825,000)

(Design and Contingencies - $60,000)

(40) SR 0079 over Chartiers Creek, Collier Township, Bridge Rehabilitation

442,000

(Base Construction Allocation - $400,000)

(Design and Contingencies - $42,000)

(41) SR 0079 over Chartiers Creek, Collier Township, Bridge Rehabilitation

416,000

(Base Construction Allocation - $392,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(42) SR 0079 over I-79, Collier Township, Bridge Replacement

317,000

(Base Construction Allocation - $293,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(43) SR 0079 over Thoms Run Road/Flood Channel, Collier Township, Bridge Rehabilitation

537,000

(Base Construction Allocation - $513,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(44) SR 0079 over Robinson Run and Conrail Railroad, Collier Township, Bridge Rehabilitation

946,000

(Base Construction Allocation - $922,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(45) SR 0079 over Robinson Run, Collier Township, Bridge Rehabilitation

777,000

(Base Construction Allocation - $753,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(46) SR 0079 over Glenfield Road, Aleppo Township, Bridge Replacement

147,000

(Base Construction Allocation - $133,000)

(Design and Contingencies - $14,000)

(47) SR 0079 over Red Mud Creek, Sewickley Hills Borough, Bridge Rehabilitation

350,000

(Base Construction Allocation - $310,000)

(Design and Contingencies - $40,000)

(48) SR 0079 over Warrendale-Bayne Road, Marshall Township, Bridge Rehabilitation

589,000

(Base Construction Allocation - $565,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(49) SR 0088 over Small Stream 3100 feet North of Washington County Line, South Park Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(50) SR 0136 over Mon River Tributary, Forward Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(51) SR 0136 over SR 0051, Forward Township, Bridge Replacement

195,000

(Base Construction Allocation - $171,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(52) SR 0136 over Branch of Gillespie Run, Elizabeth Township, Bridge Replacement

145,000

(Base Construction Allocation - $100,000)

(Land Allocation - $35,000)

(Design and Contingencies - $10,000)

(53) SR 0148 over Crooked Run, White Oak Borough, Bridge Replacement

230,000

(Base Construction Allocation - $200,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(54) SR 0279 over SR 0050, Scott Township, Bridge Replacement

1,044,000

(Base Construction Allocation - $948,000)

(Land Allocation - $1,000)

(Design and Contingencies - $95,000)

(55) SR 0376 over Branch of Thompson Run, Municipality of Penn Hills, Bridge Replacement

683,000

(Base Construction Allocation - $629,000)

(Land Allocation - $4,000)

(Design and Contingencies - $50,000)

(56) SR 0885 over Branch of Streets Run Road, West Mifflin Borough, Bridge Replacement

77,000

(Base Construction Allocation - $67,000)

(Design and Contingencies - $10,000)

(57) SR 0885 over SR 8059, City of Pittsburgh, Bridge Replacement

94,000

(Base Construction Allocation - $70,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(58) SR 0906 over Beckets Run, Forward Township, Bridge Replacement

124,000

(Base Construction Allocation - $112,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(59) SR 0910 over Pine Creek, Marshall Township, Bridge Replacement

111,000

(Base Construction Allocation - $101,000)

(Design and Contingencies - $10,000)

(60) SR 1001 over Barge Basin, Harmar Township, Bridge Replacement

135,000

(Base Construction Allocation - $111,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(61) SR 1012 over McCaslin Run, Hampton Township, Bridge Replacement

134,000

(Base Construction Allocation - $110,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(62) SR 1012 over Shafer's Run, Indiana Township, Bridge Replacement

119,000

(Base Construction Allocation - $109,000)

(Design and Contingencies - $10,000)

(63) SR 1013 over Branch of Little Pine Creek, Indiana Township, Bridge Replacement

124,000

(Base Construction Allocation - $114,000)

(Design and Contingencies - $10,000)

(64) SR 1013 over Branch of Blue Run, Indiana Township, Bridge Replacement

117,000

(Base Construction Allocation - $107,000)

(Design and Contingencies - $10,000)

(65) SR 2001 over Unnamed Creek, Forward Township, Bridge Replacement

105,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $5,000)

(66) SR 2001 over Perry Mill Run, Forward Township, Bridge Replacement

114,000

(Base Construction Allocation - $102,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(67) SR 2001 over Fallen Timber Run, Elizabeth Township, Bridge Replacement

124,000

(Base Construction Allocation - $112,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(68) SR 2005 over Kelly Run, Forward Township, Bridge Replacement

104,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $4,000)

(69) SR 2005 over Kelly Run, Forward Township, Bridge Replacement

16,000

(Base Construction Allocation - $14,000)

(Design and Contingencies - $2,000)

(70) SR 2006 over Branch of Wylie Run, Elizabeth Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(71) SR 2010 over Branch of Wylie Run, Elizabeth Township, Bridge Replacement

114,000

(Base Construction Allocation - $100,000)

(Land Allocation - $4,000)

(Design and Contingencies - $10,000)

(72) SR 2013 over Beckets Run, Forward Township, Bridge Replacement

101,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $1,000)

(73) SR 2017 over Gillespie Run, Elizabeth Township, Bridge Replacement

90,000

(Base Construction Allocation - $60,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(74) SR 2017 over Boyd's Run, Elizabeth Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(75) SR 2017 over Wildcat Run, Elizabeth Township, Bridge Replacement

116,000

(Base Construction Allocation - $104,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(76) SR 2024 over Small Swamp, White Oak Borough, Bridge Replacement

102,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $2,000)

(77) SR 2045 over Union Railroad, Dravosburg Borough, Bridge Replacement

225,000

(Base Construction Allocation - $201,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(78) SR 2075 over Branch of Little Pine Creek, Plum Borough, Bridge Replacement

108,000

(Base Construction Allocation - $104,000)

(Design and Contingencies - $4,000)

(79) SR 2107 over SR 1066, Ramp G and E, Cliff Street, City of McKeesport, Bridge Replacement

120,000

(Base Construction Allocation - $112,000)

(Land Allocation - $8,000)

(80) SR 2118 over Log Run, White Oak Borough, Bridge Replacement

128,000

(Base Construction Allocation - $104,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(81) SR 2152 over Chalfant Road, Wilkins Township, Bridge Replacement

126,000

(Base Construction Allocation - $102,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(82) SR 3003 over Coal Run, South Fayette Township, Bridge Replacement

124,000

(Base Construction Allocation - $100,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(83) SR 3014 over Catfish Run, South Park Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(84) SR 3014 over Piney Fork Creek, South Park Township, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(85) SR 3021 over Lobbs Run, Jefferson Hills Borough, Bridge Replacement

112,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $10,000)

(86) SR 3031 over I-79, Collier Township, Bridge Rehabilitation

271,000

(Base Construction Allocation - $247,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(87) SR 3034 over Branch of McLaughlin Run, Upper St. Clair Township, Bridge Replacement

114,000

(Base Construction Allocation - $100,000)

(Land Allocation - $4,000)

(Design and Contingencies - $10,000)

(88) SR 3035, Weyman Road Bridge over Saw Mill Run, Whitehall Borough, Bridge Replacement

114,000

(Base Construction Allocation - $100,000)

(Land Allocation - $4,000)

(Design and Contingencies - $10,000)

(89) SR 3071, Potato Garden Road over Potato Garden Run, Findlay Township, Bridge Replacement

114,000

(Base Construction Allocation - $100,000)

(Land Allocation - $4,000)

(Design and Contingencies - $10,000)

(90) SR 3088, Hookstown Grade Road over SR 0060, Findlay Township, Bridge Rehabilitation

366,000

(Base Construction Allocation - $342,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(91) SR 4017, Pine Creek Road over Little Pine Creek, Shaler Township, Bridge Replacement

139,000

(Base Construction Allocation - $115,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(92) SR 4017, Wetzel Road over Little Pine Creek, Shaler Township, Bridge Replacement

130,000

(Base Construction Allocation - $106,000)

(Land Allocation - $4,000)

(Design and Contingencies - $20,000)

(93) SR 0060, Thornburg Bridge, Robinson Township and City of Pittsburgh, Bridge Preservation

101,000

(Base Construction Allocation - $60,000)

(Land Allocation - $2,000)

(Design and Contingencies - $39,000)

(94) SR 0837 and Kennywood Park Entrance, Kennywood Pedestrian Bridge, New Bridge Construction

4,250,000

(Base Construction Allocation - $4,000,000)

(Design and Contingencies - $250,000)

(95) SR 7301, Fancourt Bridge over 10th Street Bypass, Pittsburgh, Bridge Replacement

650,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $150,000)

(96) SR 0008, PA 8, Allegheny River over N&S Railroad, South Main Street, Pittsburgh, Bridge Rehabilitation

333,000

(Base Construction Allocation - $333,000)

(97) SR 0028, Kittanning Street Bridge over Kittanning Pike, Seitz Run, Sharpsburg Borough, Bridge Replacement

2,984,000

(Base Construction Allocation - $2,464,000)

(Land Allocation - $20,000)

(Design and Contingencies - $500,000)

(98) SR 0028, PA 28 Northbound and Southbound Bridges over Turnpike, Harmar Township, Bridge Replacement

899,000

(Base Construction Allocation - $828,000)

(Design and Contingencies - $71,000)

(99) SR 0030, Ardmore Boulevard Bridge No.1 over Falls Run, Forest Hills Borough, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $50,000)

(100) SR 0030, Ardmore Boulevard Bridge No.2 over Falls Run, Forest Hills Borough, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $50,000)

(101) SR 0030, Ardmore Westbound Electric over LR 639, Electric Avenue, Chalfant Borough, Bridge Rehabilitation

3,100,000

(Base Construction Allocation - $3,000,000)

(Design and Contingencies - $100,000)

(102) SR 0030, US 30 Falls Run Bridge over Falls Run, Forest Hills Borough, Bridge Rehabilitation

532,000

(Base Construction Allocation - $462,000)

(Design and Contingencies - $70,000)

(103) SR 0048, Boston Hollow Road Bridge over Small Stream, Elizabeth Borough, Bridge Rehabilitation

340,000

(Base Construction Allocation - $200,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(104) SR 0050, Washington Avenue Bridge over Chartiers Creek Flood Channel, Bridgeville Borough, Bridge Replacement

119,000

(Base Construction Allocation - $109,000)

(Design and Contingencies - $10,000)

(105) SR 0051, Clairton Boulevard Bridge over Lewis Run, Pleasant Hills Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(106) SR 0051, Elizabeth Bridge over SR 0837, Elizabeth Borough, West Elizabeth Borough, Bridge Rehabilitation

550,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $50,000)

(107) SR 0060, Steubenville Pike over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation

650,000

(Base Construction Allocation $570,000)

(Design and Contingencies - $80,000)

(108) SR 0065, PA 65 Ohio River Boulevard over Forest Avenue, Ben Avon Borough, Bridge Rehabilitation

396,000

(Base Construction Allocation - $360,000)

(Design and Contingencies - $36,000)

(109) SR 0065, PA 65 Bridge over Railroad, Chateau Street, Pittsburgh, Bridge Replacement

13,784,000

(Base Construction Allocation - $12,784,000)

(Design and Contingencies - $1,000,000)

(110) SR 0065 over Spruce Run Creek, Ben Avon Borough, Bridge Rehabilitation

4,422,000

(Base Construction Allocation - $4,122,000)

(Design and Contingencies - $300,000)

(111) SR 0065, Fort Duquesne Bridge over SR 0065, Reedsdale Street, Pittsburgh, Bridge Replacement

6,400,000

(Base Construction Allocation - $5,200,000)

(Design and Contingencies - $1,200,000)

(112) SR 0088, Library Road Bridge No.1 over Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(113) SR 0088, Library Road Bridge No.2 over Bridge, Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(114) SR 0121, PA 21 Greentree Road over I-279, Parkway West, Green Tree Borough, Bridge Rehabilitation

192,000

(Base Construction Allocation - $165,000)

(Land Allocation - $10,000)

(Design and Contingencies - $17,000)

(115) SR 0136, West Newton Road Bridge over Branch of Gillespie Run, Elizabeth Borough, Bridge Rehabilitation

200,000

(Land Allocation - $173,000)

(Design and Contingencies - $27,000)

(116) SR 0148, PA 148, Bridge over Crooked Run, White Oak Borough, Bridge Rehabilitation

1,150,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(117) SR 0279, I-279, PA 50 Bridge over SR 0050, Scott Township, Bridge Replacement

5,219,000

(Base Construction Allocation - $4,740,000)

(Land Allocation - $5,000)

(Design and Contingencies - $474,000)

(118) SR 0376, I-376 Westbound over Haymaker Road, Monroeville Borough, Bridge Replacement

155,000

(Base Construction Allocation - $145,000)

(Design and Contingencies - $10,000)

(119) SR 0885, PA 885, Mifflin Road Bridge over Bridge Streets Run, Pittsburgh, Bridge Rehabilitation

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(120) SR 0885, Lebanon Road Bridge over Bridge Streets Run, West Mifflin Borough, Bridge Rehabilitation

383,000

(Base Construction Allocation - $333,000)

(Design and Contingencies - $50,000)

(121) SR 0910, Bayne Wexford Road Bridge over Pine Creek, Marshall Township, Bridge Rehabilitation

112,000

(Base Construction Allocation - $102,000)

(Design and Contingencies - $10,000)

(122) SR 0978, Millers Run Road Bridge over Dolphin Run, South Fayette Township, Bridge Rehabilitation

196,000

(Base Construction Allocation - $186,000)

(Design and Contingencies - $10,000)

(123) SR 0978, Millers Run Road Bridge over Small Stream, South Fayette Township, Bridge Rehabilitation

240,000

(Base Construction Allocation - $220,000)

(Design and Contingencies - $20,000)

(124) SR 1011, Guys Run Road Bridge over Guys Run, Harmar Township, Bridge Rehabilitation

380,000

(Base Construction Allocation - $280,000)

(Land Allocation - $50,000)

(Design and Contingencies - $50,000)

(125) SR 1012, Church Lane Bridge over Shafers Run, Indiana Township, Bridge Rehabilitation

242,000

(Base Construction Allocation - $242,000)

(126) SR 1013, Bridge over Branch of Little Pine Creek, Indiana Township, Bridge Rehabilitation

266,000

(Base Construction Allocation - $266,000)

(127) SR 1013, Bridge over Branch of Blue Run, Indiana Township, Bridge Rehabilitation

533,000

(Base Construction Allocation - $533,000)

(128) SR 1015, Little Deer Creek Road Bridge over Small Creek, West Deer Township, Bridge Rehabilitation

391,000

(Base Construction Allocation - $391,000)

(129) SR 1027, Pleasantville Road Bridge over Little Bull Creek, Harrison Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $100,000)

(130) SR 1032, Burtner Road Bridge over Little Bull Creek, Harrison Township, Bridge Rehabilitation

198,000

(Base Construction Allocation - $180,000)

(Design and Contingencies - $18,000)

(131) SR 1040, Bakerstown Road Bridge over TR 28, Tarentum Borough, Bridge Rehabilitation

225,000

(Base Construction Allocation - $175,000)

(Design and Contingencies - $50,000)

(132) SR 2001, Glassport-Elizabeth Road Bridge over Burns Run, Lincoln Borough, Bridge Rehabilitation

590,000

(Base Construction Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $40,000)

(133) SR 2001, Monongahela Road Bridge over Unnamed Creek, Forward Township, Bridge Rehabilitation

61,000

(Base Construction Allocation - $55,000)

(Design and Contingencies - $6,000)

(134) SR 2005, Kelly Run Road Bridge No.1 over Kelly Run, Forward Township, Bridge Rehabilitation

17,000

(Base Construction Allocation - $15,000)

(Design and Contingencies - $2,000)

(135) SR 2005, Kelly Run Road Bridge No.2 over Kelly Run, Forward Township, Bridge Rehabilitation

73,000

(Base Construction Allocation - $66,000)

(Design and Contingencies - $7,000)

(136) SR 2008, Lovedale Road Bridge over Wylie Run, Elizabeth Borough, Bridge Rehabilitation

430,000

(Base Construction Allocation - $300,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(137) SR 2013, Elizabeth Road Bridge No.1 over Branch of Beckets Run, Forward Township, Bridge Rehabilitation

17,000

(Base Construction Allocation - $15,000)

(Design and Contingencies - $2,000)

(138) SR 2017, Pineview Drive Bridge No.1 over Gillespie Run, Elizabeth Borough, Bridge Rehabilitation

255,000

(Base Construction Allocation - $135,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(139) SR 2017, Pineview Drive Bridge No.2 over Gillespie Run, Elizabeth Borough, Bridge Rehabilitation

243,000

(Base Construction Allocation - $123,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(140) SR 2018, West Smithfield Road Bridge over Unnamed Creek, Elizabeth Borough, Bridge Rehabilitation

218,000

(Base Construction Allocation - $118,000)

(Design and Contingencies - $100,000)

(141) SR 2024, McClintock Road Bridge No.1 over Small Swamp, White Oak Borough, Bridge Rehabilitation

109,000

(Base Construction Allocation - $99,000)

(Design and Contingencies - $10,000)

(142) SR 2031, Lincoln Way Bridge over Long Run, White Oak Borough, Bridge Rehabilitation

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(143) SR 2051, Brinton Road Bridge over Parkway East, Edgewood Borough, Bridge Rehabilitation

996,000

(Base Construction Allocation - $846,000)

(Design and Contingencies - $150,000)

(144) SR 2074, Hulton Road Bridge over Caldwell Run, Penn Hills Township, Bridge Rehabilitation

184,000

(Base Construction Allocation - $145,000)

(Land Allocation - $20,000)

(Design and Contingencies - $19,000)

(145) SR 2075, New Texas Road Bridge over Branch of Little Plum Creek, Plum Borough, Bridge Rehabilitation

72,000

(Base Construction Allocation - $65,000)

(Design and Contingencies - $7,000)

(146) SR 2080, Plum Avenue Bridge over Plum Creek, Oakmont Borough, Bridge Replacement

341,000

(Base Construction Allocation - $301,000)

(Design and Contingencies - $40,000)

(147) SR 2084, Milltown Road Bridge over Plum Creek, Penn Hills Township, Bridge Rehabilitation

31,000

(Base Construction Allocation - $26,000)

(Design and Contingencies - $5,000)

(148) SR 2114, Bowman Avenue Bridge over 1066 Ramp, Cliff Street, McKeesport, Bridge Replacement

300,000

(Base Construction Allocation - $260,000)

(Design and Contingencies - $40,000)

(149) SR 3004, McLaughlin Road Bridge over McLaughlin Run, Bridgeville Borough, Bridge Rehabilitation

227,000

(Base Construction Allocation, - $127,000)

(Design and Contingencies - $100,000)

(150) SR 3005, Mayview Road Bridge over Branch of Chartiers Creek, South Fayette Township, Bridge Rehabilitation

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(151) SR 3007, Walton Road Bridge over Branch of Lobbs Run, Jefferson Hills Borough, Bridge Rehabilitation

93,000

(Base Construction Allocation - $63,000)

(Land Allocation - $20,000)

(Design and Contingencies - $10,000)

(152) SR 3066, Steubenville Pike Bridge over Route 22, North Fayette Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $25,000)

(Design and Contingencies - $75,000)

(153) SR 3069, Liberty Bridge over Monongahela River, I-376, Pittsburgh, Bridge Rehabilitation

2,860,000

(Base Construction Allocation - $2,600,000)

(Design and Contingencies - $260,000)

(154) SR 3078, Burgetstown Road Bridge over Potato Garden Run, Findlay Township, Bridge Rehabilitation

148,000

(Base Construction Allocation - $120,000)

(Land Allocation - $10,000)

(Design and Contingencies - $18,000)

(155) SR 4003, McKnight Road Bridge over Branch of Pine Creek, McCandless Township, Bridge Rehabilitation

978,000

(Base Construction Allocation - $850,000)

(Design and Contingencies - $128,000)

(156) SR 4019, Mt. Royal Boulevard Bridge over Pine Creek, Hampton Township, Bridge Replacement

94,000

(Base Construction Allocation - $89,000)

(Design and Contingencies - $5,000)

(157) SR 4036, Big Sewickley Creek Road Bridge over Big Sewickley Creek, Bell Acres Borough, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $25,000)

(Design and Contingencies - $75,000)

(158) SR 4043, Big Sewickley Road Bridge over Big Sewickley Creek, Franklin Park Borough, Bridge Rehabilitation

84,000

(Base Construction Allocation - $76,000)

(Design and Contingencies - $8,000)

(159) Forrest Grove Road over I-79, Kennedy Township, Bridge Rehabilitation

836,000

(Base Construction Allocation - $76,000)

(Design and Contingencies - $760,000)

(160) SR 8043, SR 0065, Ramp C, Southbound to Beaver Avenue over Chateau, Pittsburgh, Bridge Rehabilitation

486,000

(Base Construction Allocation - $420,000)

(Land Allocation - $10,000)

(Design and Contingencies - $56,000)

(161) SR 0065, PA 65, Northbound and Southbound over Chateau Street, Pittsburgh, Bridge Replacement

2,757,000

(Base Construction Allocation - $2,557,000)

(Design and Contingencies - $200,000)

(162) SR 0008 over Allegheny River, City of Pittsburgh, Bridge Rehabilitation

680,000

(Base Construction Allocation - $660,000)

(Design and Contingencies - $20,000)

(163) SR 0008 over SR 0028, Railroad and Local Road, Etna Borough, Bridge Rehabilitation

250,000

(Base Construction Allocation - $240,000)

(Design and Contingencies - $10,000)

(164) SR 0008 over SR 0028, SR 1001 and Railroad, Etna Borough, Bridge Rehabilitation

210,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $10,000)

(165) SR 0019, Perrysville Avenue over I-279, Ross Township, Bridge Replacement

70,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $10,000)

(166) SR 0065 over Fremont Street, Bellevue Borough, Bridge Rehabilitation

360,000

(Base Construction Allocation - $330,000)

(Design and Contingencies - $30,000)

(167) SR 0065 over Dilworth Run, Bellevue Borough, Bridge Rehabilitation

275,000

(Base Construction Allocation - $250,000)

(Design and Contingencies - $25,000)

(168) SR 0065 over Spruce Run, Ben Avon Borough, Bridge Rehabilitation

770,000

(Base Construction Allocation - $700,000)

(Design and Contingencies - $70,000)

(169) SR 0079 Northbound over SR 0019, Marshall Township, Bridge Rehabilitation

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(170) SR 0079 Southbound over SR 0019, Marshall Township, Bridge Replacement

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(171) SR 2038, Clairton-Glassport Bridge over Monongahela River, Clairton, Bridge Rehabilitation

740,000

(Base Construction Allocation - $720,000)

(Design and Contingencies - $20,000)

(172) SR 2082, Hulton Bridge over Allegheny River, Oakmont Borough, Bridge Replacement

2,140,000

(Base Construction Allocation - $2,000,000)

(Design and Contingencies - $140,000)

(173) SR 2082, Birmingham Bridge over Monongahela River, Pittsburgh, Bridge Replacement

2,200,000

(Base Construction Allocation - $2,000,000)

(Design and Contingencies - $200,000)

(174) SR 2124, 40th Street Bridge over Allegheny River, Pittsburgh, Bridge Rehabilitation

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(175) SR 3039, Nike Site Bridge, Collier Township, Bridge Rehabilitation

330,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $30,000)

(176) SR 3089, Flaugherty Run over Business 60, Findlay Township, Bridge Rehabilitation

220,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $20,000)

(177) SR 4025, Sewickley Bridge over Ohio River, Sewickley Borough, Bridge Rehabilitation

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(178) SR 8007, Ramp D over Robinson, Collier Township, Bridge Rehabilitation

330,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $30,000)

(179) SR 8043, California Avenue over SR 0065, City of Pittsburgh, Bridge Rehabilitation

154,000

(Base Construction Allocation - $140,000)

(Design and Contingencies - $14,000)

(180) SR 8049, Ramp A to Marshall Avenue, City of Pittsburgh, Bridge Rehabilitation

616,000

(Base Construction Allocation - $560,000)

(Design and Contingencies - $56,000)

(181) SR 8049, Ramp E, Chateau Street to SR 0065 Northbound, Pittsburgh, Bridge Rehabilitation

209,000

(Base Construction Allocation - $190,000)

(Design and Contingencies - $19,000)

(182) SR 8049 over N&S Railroad, Chateau Street, California Avenue, Pittsburgh, Bridge Rehabilitation

594,000

(Base Construction Allocation - $540,000)

(Design and Contingencies - $54,000)

(183) SR 8049, Marshall Avenue, SR 0019 to SR 0065 Southbound, Pittsburgh, Bridge Rehabilitation

990,000

(Base Construction Allocation - $900,000)

(Design and Contingencies - $90,000)

(184) SR 0048, Boston Bridge over Youghiogheny River, Elizabeth and Versailles Townships, Bridge Replacement

1,540,000

(Base Construction Allocation - $1,400,000)

(Design and Contingencies - $140,000)

(185) SR 0376, Rodi Road Bridge, Churchill Borough, Bridge Rehabilitation

660,000

(Base Construction Allocation - $600,000)

(Design and Contingencies - $60,000)

(186) SR 0079, Forrest Grove Road over I-79, Kennedy Township, Bridge Rehabilitation

396,000

(Base Construction Allocation - $360,000)

(Design and Contingencies - $36,000)

(187) SR 1042 over Allegheny River, Springdale Borough and City of New Kensington, New Bridge and Connector Roadway

36,937,000

(Base Project Allocation - $3,937,000)

(Design and Contingencies - $33,000,000)