Allegheny County

Act 147 of 1994, § 6, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1993-1994.

Act 147 of 1994, § 6

Section 6. Allegheny County.

(a) Local Bridges

(1) Munhall and West Mifflin Boroughs, Homestead-Duquesne Road Bridge over Homeville Creek, Bridge Replacement

185,000

(Base Construction Allocation - $144,000)

(Design and Contingencies - $41,000)

(2) Shaler Township, Anderson Road Bridge over Wible Run, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Design and Contingencies - $100,000)

(3) Wilkes Township, Russell Lane Bridge over Brown Run, Bridge Replacement

525,000

(Base Construction Allocation - $475,000)

(Design and Contingencies - $50,000)

(4) Green Tree Borough, Trumbull Drive Bridge over W&LR Railroad, Bridge Rehabilitation

253,000

(Base Construction Allocation - $230,000)

(Design and Contingencies - $23,000)

(5) Scott Township, Scrubgrass Road Bridge over Scrubgrass Run, Bridge Replacement

110,000

(6) South Fayette Township, Main Street Bridge over Robinson Run, Bridge Rehabilitation

56,000

(Base Construction Allocation - $28,000)

(Design and Contingencies - $28,000)

(7) Carnegie Borough, West Mall Drive Bridge over Chartiers Creek, Bridge Replacement

875,000

(Base Construction Allocation - $700,000)

(Design and Contingencies - $175,000)

(8) South Park Township, Hough Road Bridge over Lick Run, Bridge Rehabilitation

100,000

(Base Construction Allocation - $90,000)

(Design and Contingencies - $10,000)

(9) South Park Township, McElheny Road Bridge, Bridge Rehabilitation

85,000

(Base Construction Allocation - $75,000)

(Design and Contingencies - $10,000)

(10) SR 0051, Coraopolis-Neville Island Bridge, 12-inch emergency water line for Neville Island and neighboring systems

100,000

(Base Construction Allocation - $100,000)

(11) Monroeville Borough, Northern Pike over Pennsylvania Turnpike, Bridge Replacement

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(12) 31st Street Bridge, Bridge Rehabilitation and Widening

35,000,000

(Base Construction Allocation - $31,500,000)

(Design and Contingencies - $3,500,000)

(13) West Mifflin, Pleasant Hills and Jefferson Boroughs, Reconstruction and Reconfiguration of Tunnel and Bridge for Flow of Water for Lewis Run Watershed along Route 51

10,000,000

(Base Construction Allocation - $10,000,000)

(14) Upper St. Clair Township, Painters Run Bridge No.4 over Painter's Run, Bridge Replacement

132,000

(Base Construction Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $30,000)

(15) Scott Township, TR 8033, Ade Way Bridge over Whiskey Run, Bridge Replacement

129,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $29,000)

(16) Scott Township, County Road 1, Lindsay Road Bridge over Georges Run, Bridge Replacement

111,000

(Base Construction Allocation - $84,000)

(Design and Contingencies - $27,000)

(b) State Bridges

(1) SR 0019, Ramp over Chateau Street, City of Pittsburgh, Bridge Rehabilitation

4,120,000

(Base Construction Allocation - $3,700,000)

(Land Allocation - $50,000)

(Design and Contingencies - $370,000)

(2) SR 0028, Bridge over Powers Run and Road, O'Hara Township, Bridge Rehabilitation

510,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(3) SR 0028, Ramp Interchange at Blawnox, O'Hara Township, Bridge Rehabilitation

1,050,000

(Base Construction Allocation - $900,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(4) SR 0030, Greensburg Pike Bridge over SR 0030, North Versailles Township, Bridge Rehabilitation

726,000

(Base Construction Allocation - $600,000)

(Land Allocation - $25,000)

(Design and Contingencies - $101,000)

(5) SR 0048, Bridge over Branch of Wylie Run, Elizabeth Township, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(6) SR 0048, Bridge over Service Road, Monroeville Borough, Bridge Rehabilitation

630,000

(Base Construction Allocation - $500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(7) SR 0048, Bridge over Wylie Run, Versailles Borough, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(8) SR 0051, West Carson Viaduct, City of Pittsburgh, Bridge Replacement

1,550,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(9) SR 0051, Bridge over Saw Mill Run, City of Pittsburgh, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(10) SR 0060, South Main Street Bridge over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation - Painting

135,000

(Base Construction Allocation - $130,000)

(Design and Contingencies - $5,000)

(11) SR 0060, Bridge over Montour Railroad and Cliff Mine, Moon and North Fayette Townships, Bridge Rehabilitation

2,025,000

(Base Construction Allocation - $1,800,000)

(Land Allocation - $25,000)

(Design and Contingencies - $200,000)

(12) SR 0065, Bridge over Birmingham Avenue, Avalon Borough, Bridge Rehabilitation

440,000

(Base Construction Allocation - $350,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(13) SR 0065, Fort Duquesne Bridge Southbound over Allegheny River, City of Pittsburgh, Bridge Rehabilitation - Painting

1,946,000

(Base Construction Allocation - $1,946,000)

(14) SR 0065, Fort Duquesne Bridge Northbound over Ohio River, City of Pittsburgh, Bridge Rehabilitation - Painting

2,134,000

(Base Construction Allocation - $2,134,000)

(15) SR 0079, I-79 Bridge Northbound over Clever Road, Kennedy Township, Bridge Rehabilitation

1,260,000

(Base Construction Allocation - $1,100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(16) SR 0079, I-79 Bridge Southbound over Clever Road, Kennedy Township, Bridge Rehabilitation

1,260,000

(Base Construction Allocation - $1,100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(17) SR 0079, Forest Grove Bridge over I-79, Robinson and Kennedy Townships, Bridge Replacement

7,300,000

(Base Construction Allocation - $6,500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $700,000)

(18) SR 0246, Bridge Ramps from SR 0065 Northbound to SR 0019, City of Pittsburgh, Bridge Rehabilitation

2,850,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(19) SR 0279, Ramps from Carson Street to Fort Pitt Bridge, City of Pittsburgh, Bridge Rehabilitation

4,000,000

(Base Construction Allocation - $3,600,000)

(Design and Contingencies - $400,000)

(20) SR 0279, Fort Pitt Piers, Fort Pitt Tunnel to Liberty Avenue, City of Pittsburgh, Bridge Rehabilitation

268,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $68,000)

(21) SR 0279, I-279 Bridge over Banksville Road Southbound, City of Pittsburgh, Bridge Rehabilitation - Painting

374,000

(Base Construction Allocation - $369,000)

(Design and Contingencies - $5,000)

(22) SR 0885, Bridge over Streets Run, City of Pittsburgh, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(23) SR 0910, Bridge over Cedar Run, Indiana Township, Bridge Rehabilitation

210,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(24) SR 0910, Perry Highway Bridge at Intersection of SR 0910 and Church Road, Pine Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $25,000)

(25) SR 0910, Bridge over Willow Run Creek, Richland Township, Bridge Replacement

700,000

(Base Construction Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(26) SR 1001, Freeport Road Bridge over Bailey's Run, East Deer Township, Bridge Replacement

650,000

(Base Construction Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(27) SR 1016, Rich Hill Road Bridge over Little Deer Creek, Indiana Township, Bridge Replacement

500,000

(Base Construction Allocation - $350,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(28) SR 1024, Starr Road Bridge over Branch of Deer Creek, West Deer Township, Bridge Replacement

350,000

(Base Construction Allocation - $200,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(29) SR 1026, Webster Avenue Bridge over I-579, City of Pittsburgh, Bridge Rehabilitation

2,450,000

(Base Construction Allocation - $2,150,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(30) SR 1028, Bakerstown Road Railroad Bridge over Bessemer and Lake Erie Railroad, West Deer Township, Bridge Rehabilitation

1,800,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(31) SR 2010, Lovedale Bridge over Wylie Run, Elizabeth Township, Bridge Replacement

515,000

(Base Construction Allocation - $400,000)

(Land Allocation - $15,000)

(Design and Contingencies - $100,000)

(32) SR 2013, Monessen-Elizabeth Road Bridge over Becketts Run, Forward Township, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(33) SR 2017, Pine View Road Bridge over Gillespie Run, Elizabeth Township, Bridge Rehabilitation

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(34) SR 2017, Industry Road Bridge over Creek, Elizabeth Township, Bridge Replacement

500,000

(Base Construction Allocation - $300,000)

(Land Allocation - $100,000)

(Design and Contingencies - $100,000)

(35) SR 2018, West Smithfield Bridge over Creek, Elizabeth Township, Bridge Replacement

440,000

(Base Construction Allocation - $300,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(36) SR 2037, McKeesport Boulevard Bridge over Braddock Avenue, East Pittsburgh Borough, Bridge Rehabilitation - Painting

1,076,000

(Base Construction Allocation - $1,076,000)

(37) SR 2037, Bridge Northbound over Turtle Creek, East Pittsburgh Borough, Bridge Rehabilitation

2,260,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(38) SR 2037, Bridge Southbound over Turtle Creek, East Pittsburgh Borough, Bridge Rehabilitation

2,260,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(39) SR 2040, Broughton Bridge over Lick Run, South Park Township, Bridge Replacement

650,000

(Base Construction Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(40) SR 2065, Bridge over Thompson Run, Monroeville Borough, Bridge Replacement

950,000

(Base Construction Allocation - $750,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(41) SR 2083, Bridge over Railroad and Tri-Boro Avenue, East Pittsburgh Borough, Bridge Rehabilitation

5,650,000

(Base Construction Allocation - $5,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $600,000)

(42) SR 2108, Westbound Ramp, Forbes Avenue to Boulevard of the Allies over Maurice Way, City of Pittsburgh, Bridge Replacement

928,000

(Base Construction Allocation - $776,000)

(Land Allocation - $50,000)

(Design and Contingencies - $102,000)

(43) SR 2108, Eastbound Ramp, Boulevard of the Allies to Forbes Avenue, City of Pittsburgh, Bridge Replacement

950,000

(Base Construction Allocation - $750,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(44) SR 2108, Boulevard of Allies Ramp to Liberty Bridge, City of Pittsburgh, Bridge Rehabilitation - Painting

1,989,000

(Base Construction Allocation - $1,984,000)

(Design and Contingencies - $5,000)

(45) SR 2143, Church Street Bridge over Thompson Run, Turtle Creek Borough, Bridge Replacement

550,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(46) SR 3048, Mansfield Boulevard Bridge over Chartiers Creek, Carnegie Borough, Bridge Rehabilitation

1,560,000

(Base Construction Allocation - $1,400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(47) SR 3048, Noblestown Road Bridge over Robinson Run and Railroad, Collier Township, Bridge Rehabilitation

3,450,000

(Base Construction Allocation - $3,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $400,000)

(48) SR 3048, Noblestown Road Bridge No.3 over Branch of Robinson Run, Collier Township, Bridge Replacement

400,000

(Base Construction Allocation - $250,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(49) SR 3048, Noblestown Road Bridge No.1 over Branch of Robinson Run, North Fayette Township, Bridge Replacement

300,000

(Base Construction Allocation - $150,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(50) SR 3051, Half Crown Road Bridge over North Branch of Robinson Run, North Fayette Township, Bridge Replacement

550,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(51) SR 3051, Half Crown Road Bridge over SR 0022, North Fayette Township, Bridge Rehabilitation

1,250,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(52) SR 3089, Moon Clinton Road Bridge over SR 0060, Findlay Township, Bridge Rehabilitation

1,060,000

(Base Construction Allocation - $900,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(53) SR 3110, Shaler Street Bridge over SR 0019, City of Pittsburgh, Bridge Rehabilitation

1,350,000

(Base Construction Allocation - $1,100,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(54) SR 3919, Bridge and Ramp from Chateau Street to SR 0019, City of Pittsburgh, Bridge Rehabilitation

2,350,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(55) SR 4009, Evergreen Road Bridge over Girty's Run, Shaler Township, Bridge Replacement

550,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(56) SR 4009, Babcock Boulevard Bridge over Girty's Run, Shaler Township, Bridge Replacement

1,150,000

(Base Construction Allocation - $850,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(57) SR 8002, Ramp G, Crosstown Boulevard over Forbes Northbound, City of Pittsburgh, Bridge Rehabilitation - Painting

555,000

(Base Construction Allocation - $555,000)

(58) SR 8002, I-579, Crosstown Boulevard over Forbes Southbound, City of Pittsburgh, Bridge Rehabilitation - Painting

240,000

(Base Construction Allocation - $240,000)

(59) SR 8002, Ramp H, Crosstown Boulevard over Forbes Southbound, City of Pittsburgh, Bridge Rehabilitation - Painting

893,000

(Base Construction Allocation - $893,000)

(60) SR 8033, Ramp at Exit 3 to SR 0279, Bridge over Whiskey Run Creek, Scott Township, Bridge Replacement

147,000

(Base Construction Allocation - $118,000)

(Design and Contingencies - $29,000)

(61) SR 3034, Chartiers Street Bridge over Conrail, Bridgeville Borough, Bridge Replacement

1,100,000

(Base Construction Allocation - $1,000,000)

(Design and Contingencies - $100,000)

(62) SR 3004, Bridge over McLaughlin Run, Upper St. Clair Township, Bridge Replacement

700,000

(Base Construction Allocation - $500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $100,000)

(63) SR 0376, Parkway East Ramp over Monongahela River and Mon Wharf, City of Pittsburgh, Bridge Replacement

17,200,000

(Base Construction Allocation - $14,200,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $2,000,000)

(64) SR 0028 at 31st Street Bridge and Rialto Street, Construct Elevated Roadway over Existing Intersection, City of Pittsburgh, Bridge Construction

15,000,000

(Base Construction Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $3,000,000)

(65) SR 2108, Boulevard of Allies, Bridge No.2 over Cliff at Stevenson Street, City of Pittsburgh, Bridge Rehabilitation

460,000

(Base Construction Allocation - $429,000)

(Design and Contingencies - $31,000)

(66) SR 2108, Boulevard of Allies, Bridge No.3 over Cliff, City of Pittsburgh, Bridge Deck Replacement and Cantilever Replacement

2,006,000

(Base Construction Allocation - $1,870,000)

(Design and Contingencies - $136,000)

(67) SR 2108, Boulevard of Allies, Bridge No.4 over Ramps E and F and Local Street, Brady Street Interchange at I-376, City of Pittsburgh, Bridge Rehabilitation

45,000

(Base Construction Allocation - $42,000)

(Design and Contingencies - $3,000)

(68) SR 2208, Boulevard of Allies, Bridge No.1 over Pat Trolley and Local Street, Ramp to Liberty Bridge, City of Pittsburgh, Bridge Rehabilitation

65,000

(Base Construction Allocation - $61,000)

(Design and Contingencies - $4,000)

(69) SR 0079, Steen Road Bridge over I-79, Collier Township, Bridge Rehabilitation

125,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $25,000)