Section 8. Itemization of public highway projects.
Additional capital projects in the category of public highway projects to be constructed by the Department of Transportation, its successors or assigns and to be financed from current revenues of the Motor License Fund are hereby itemized, together with their respective estimated financial costs, as follows:
Total
Project
Project
Allocation
(1) Adams County
(i) Various State highways
(A) Adams air quality, various locations countywide
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0030
(A) S.R.0030, Gettysburg Borough, signal improvement
1,020,000
(Base Construction Allocation - $900,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(B) S.R.0030 from Fulton County line to T.R.116, transportation study
274,000
(Design and Contingencies - $274,000)
(iii) S.R.0094
(A) S.R.0094, Berlin Road, Hamilton Township, safety improvement
560,000
(Base Construction Allocation - $400,000)
(Land Allocation - $100,000)
(Design and Contingencies - $60,000)
(2) Allegheny County
(i) Various State highways
(A) Ride share incentive, countywide transportation study
260,000
(Base Construction Allocation - $234,000)
(Design and Contingencies - $26,000)
(B) Allegheny air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0008
(A) Kittanning Street from Etna Borough to Shaler Township, widen to 60 feet
1,125,000
(Land Allocation - $375,000)
(Design and Contingencies - $750,000)
(B) S.R.0008 and Kleber Road intersection, Shaler Township, widen to 60 feet
800,000
(Base Construction Allocation - $640,000)
(Land Allocation - $80,000)
(Design and Contingencies - $80,000)
(C) S.R.0008 from Duquesne Way to Elfinwild Road, Shaler Township, widen to 60 feet
1,150,000
(Base Construction Allocation - $850,000)
(Land Allocation - $175,000)
(Design and Contingencies - $125,000)
(D) S.R.0008 from Duncan Avenue to Old Route 8, Hampton Township, widen to 60 feet
2,000,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $500,000)
(Design and Contingencies - $200,000)
(E) S.R.0008 from Wildwood Road to north of Pa. Turnpike, Hampton and Richland Townships, widen to 60 feet
4,275,000
(Base Construction Allocation - $3,155,000)
(Land Allocation - $750,000)
(Design and Contingencies - $370,000)
(iii) S.R.0022
(A) S.R.0022 from Washington County line to S.R.0030, restoration
2,502,000
(Base Construction Allocation - $2,275,000)
(Design and Contingencies - $227,000)
(B) S.R.0022 from S.R.0030 to S.R.0060, pavement restoration
2,618,000
(Base Construction Allocation - $2,380,000)
(Design and Contingencies - $238,000)
(C) S.R.0022, construct new intersection on Parkway West in Robinson Township
7,500,000
(Base Construction Allocation - $7,500,000)
(iii.1) S.R.0028
(A) S.R.0028 from Millvale Borough to 31st Street Bridge, widen
500,000
(Design and Contingencies - $500,000)
(B) S.R.0028 from 31st Street Bridge to Troy Hill, widen
1,700,000
(Design and Contingencies - $1,700,000)
(iv) S.R.0030
(A) Lincoln Highway and Ardmore Boulevard, Forest Hills Borough and North Versailles Township, signal improvement
800,000
(Base Construction Allocation - $680,000)
(Land Allocation - $40,000)
(Design and Contingencies - $80,000)
(v) S.R.0050
(A) S.R.0050 from Vanadium to Kirwin Heights, Collier Township, widen to 60 feet
200,000
(Design and Contingencies - $200,000)
(vi) S.R.0051
(A) S.R.0088 and S.R.0051 intersection, City of Pittsburgh, widen to 60 feet
13,414,000
(Base Construction Allocation - $11,403,000)
(Land Allocation - $670,000)
(Design and Contingencies - $1,341,000)
(B) S.R.0051 from Fort Pitt Tunnel to Warrington, restoration and upgrade
125,000
(Base Construction Allocation - $125,000)
(C) S.R.0051 from West Liberty Avenue to CraneAvenue, restoration
6,172,000
(Base Construction Allocation- $2,902,000)
(Design and Contingencies- $3,270,000)
(vii) S.R.0060
(A) S.R.0060 from Beaver County line to White Swan Park, restoration
5,555,000
(Base Construction Allocation - $5,050,000)
(Design and Contingencies - $505,000)
(B) S.R.0060 and S.R.3088, construct cargo interchange
7,700,000
(Base Construction Allocation - $6,500,000)
(Land Allocation - $200,000)
(Design and Contingencies - $1,000,000)
(viii) S.R.0065
(A) S.R.0065 at River Road and Beaver Road, Osborne Borough, widen to 60 feet
862,000
(Land Allocation - $600,000)
(Design and Contingencies - $262,000)
(B) S.R.0065 and Ferry Street intersection, Leetsdale Borough, widen to 60 feet
2,300,000
(Base Construction Allocation - $1,955,000)
(Land Allocation - $115,000)
(Design and Contingencies - $230,000)
(C) S.R.0065 and Elizabeth Avenue intersection, Avalon Borough, widen to 60 feet
1,205,000
(Base Construction Allocation - $700,000)
(Land Allocation - $380,000)
(Design and Contingencies - $125,000)
(D) S.R.0065 and Cross Street intersection, Leetsdale Borough, widen to 60 feet
975,000
(Base Construction Allocation - $800,000)
(Land Allocation - $85,000)
(Design and Contingencies - $90,000)
(ix) I-79
(A) I-79 from Bridgeville to Kirwan Heights, restoration
1,205,000
(Base Construction Allocation - $1,150,000)
(Design and Contingencies - $55,000)
(B) I-79 from I-279 to Butler County line, pavement rehabilitation
56,000
(Base Construction Allocation - $50,000)
(Land Allocation - $1,000)
(Design and Contingencies - $5,000)
(x) S.R.0279
(A) I-279, Fort Pitt Tunnel, restoration, including traffic management system
2,182,000
(Base Construction Allocation - $1,770,000)
(Land Allocation - $290,000)
(Design and Contingencies - $122,000)
(B) I-279, City of Pittsburgh, safety improvement
173,000
(Base Construction Allocation - $151,000)
(Design and Contingencies - $22,000)
(C) I-279 from McKnight Road to Suffold, widen highway
460,000
(Base Construction Allocation - $430,000)
(Design and Contingencies - $30,000)
(D) I-279 from Greentree to I-79, pavement rehabilitation
286,000
(Base Construction Allocation - $275,000)
(Land Allocation - $1,000)
(Design and Contingencies - $10,000)
(xi) S.R.0376
(A) I-376 from Churchill to I-79, safety improvement
4,500,000
(Base Construction Allocation - $3,825,000)
(Land Allocation - $225,000)
(Design and Contingencies - $450,000)
(xii) S.R.2040
(A) Curry Hollow Road, Pleasant Hills Borough, widen to 60 feet
3,800,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $800,000)
(Design and Contingencies - $500,000)
(B) Lebanon Church Road, safety improvements
9,000,000
(Base Construction Allocation - $7,500,000)
(Land Allocation -$1,000,000)
(Design and Contingencies - $500,000)
(xii.1) S.R.2046
(A) Baldwin Road/Streets Run Road restoration of Baldwin Road/Streets Run Road from the Glennwood Bridge south to the city line and into West Mifflin and Baldwin Boroughs
2,000,000
(Base Construction Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(xii.2) S.R.3069
(A) McArdle Roadway reconstruction of McArdle Roadway from the Liberty Bridge to Grandview Avenue
10,000,000
(Base Construction Allocation - $9,000,000)
(Design and Contingencies - $1,000,000)
(xiii) S.R.4003
(A) McKnight and Seibert Roads intersection, widen to 60 feet
4,070,000
(Base Construction Allocation - $2,100,000)
(Land Allocation - $1,800,000)
(Design and Contingencies - $170,000)
(B) McKnight Road, park and ride lot
506,000
(Base Construction Allocation - $476,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(C) McKnight Road and New Town Road, Duncan, intersection improvements
1,960,000
(Base Construction Allocation - $1,750,000)
(Design and Contingencies - $210,000)
(xiv) S.R.6060
(A) Beaver Valley Expressway connection, interchange improvement
3,180,000
(Base Construction Allocation - $2,100,000)
(Land Allocation - $180,000)
(Design and Contingencies - $900,000)
(B) McClaren Road interchange, construction of new highway linking Southern Expressway with Parkwest Regional Industrial Development Corporation
1,000,000
(xv) S.R.0400
(A) S.R.0400, Bigelow Boulevard, Service Road at Sixth and Bigelow Streets, safety improvements
445,000
(Base Construction Allocation - $400,000)
(Design and Contingencies - $45,000)
(xvi) S.R.3070
(A) S.R.3070, S.R.3073 and S.R.3107, Hookstown Grade interchange
11,000,000
(Base Construction Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(xvii) Alternative public transportation
(A) Rock Yard in Greentree, Mifflin Junction and West End Branch, acquisition of right-of-way
25,000,000
(Land Allocation - $25,000,000)
(xviii) Wabash Bridge over Monongahela River, City of Pittsburgh, new bridge construction
35,000,000
(Base Construction Allocation - $30,000,000)
(Land Allocation - $2,000,000)
(Design and Contingencies - $3,000,000)
(xix) S.R.4024
(A) S.R.4024, Duncan Avenue extension, McKnight Road to Babcock Boulevard, McCandless Township, new highway construction
3,975,000
(Base Construction Allocation - $3,375,000)
(Land Allocation - $100,000)
(Design and Contingencies - $500,000)
(xx) S.R.0286
(A) S.R.0286 from S.R.0022 to S.R.0380, Golden Mile, Plum Borough
280,000
(Design and Contingencies - $280,000)
(3) Armstrong County
(i) Various State highways
(A) Armstrong air quality, various locations countywide
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0068
(A) Kaylor Underpass, Bradys Bend Township, safety improvement
1,500,000
(Base Construction Allocation - $1,100,000)
(Land Allocation - $100,000)
(Design and Contingencies - $300,000)
(iii) S.R.0085
(A) S.R.0085 from S.R.0028 to S.R.0210, Rayburn Township, safety improvement
1,000,000
(Base Construction Allocation - $890,000)
(Land Allocation - $60,000)
(Design and Contingencies - $50,000)
(iv) S.R.0268
(A) Parker Curve, Perry Township, safety improvement
375,000
(Base Construction Allocation - $315,000)
(Land Allocation - $50,000)
(Design and Contingencies - $10,000)
(v) S.R.0422
(A) S.R.0422 and S.R.1040 intersection, Manor Township, lighting
50,000
(Base Construction Allocation - $47,000)
(Design and Contingencies - $3,000)
(B) S.R.0422 and S.R.3009 intersection, Worthington Borough, intersection improvement
550,000
(Base Construction Allocation - $545,000)
(Design and Contingencies - $5,000)
(C) S.R.0422 and S.R.3011 intersection, Worthington Borough, signal improvement
100,000
(Base Construction Allocation - $95,000)
(Design and Contingencies - $5,000)
(vi) S.R.1038
(A) Market Street signals from Water Street to Grant Street, Kittanning Borough, signal improvement
250,000
(Base Construction Allocation - $225,000)
(Design and Contingencies - $25,000)
(vii) S.R.3029, S.R.3006 and S.R.3017
(A) S.R.3029, S.R.3006 and S.R.3017 from S.R.0028 to Mechanicsville, restoration or reconstruction
1,040,000
(Base Construction Allocation - $915,000)
(Land Allocation - $75,000)
(Design and Contingencies - $50,000)
(viii) S.R.0356
(A) Construct new highway from Weinel Crossroads to Interstate 28
150,000,000
(Base Construction Allocation - $150,000,000)
(ix) S.R.6028
(A) Kittanning Bypass, four-lane relocation for 2.4 miles from Route 66 to Route 422
34,000,000
(4) Beaver County
(i) Various State highways
(A) Beaver air quality, various locations countywide
3,900,000
(Base Construction Allocation - $3,100,000)
(Land Allocation - $400,000)
(Design and Contingencies - $400,000)
(ii) S.R.0018
(A) Beaver County attenuator, off-ramp to Rochester and off-ramp to Monaca, impact attenuator
75,000
(Base Construction Allocation - $67,000)
(Design and Contingencies - $8,000)
(iii) S.R.0030
(A) S.R.0030 from Ohio line to S.R.0022, reconstruction
800,000
(Base Construction Allocation - $720,000)
(Design and Contingencies - $80,000)
(iv) S.R.0065
(A) S.R.0065 and Old Economy intersection, Ambridge Borough, add lane
2,000,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(B) Ambridge Borough, parking lot
90,000
(Base Construction Allocation - $36,000)
(Land Allocation - $50,000)
(Design and Contingencies - $4,000)
(v) S.R.0068
(A) S.R.0068 intersections with S.R.0018, Brighton Avenue and Adams Street, signal improvement
300,000
(Base Construction Allocation - $255,000)
(Land Allocation - $15,000)
(Design and Contingencies - $30,000)
(B) S.R.0068 and Deer Lane intersection, Rochester Borough, signal improvement
125,000
(Base Construction Allocation - $107,000)
(Land Allocation - $6,000)
(Design and Contingencies - $12,000)
(vi) S.R.0251
(A) 37th Street Extension to Oakville Road, Chippewa Township, reconstruct to 60 feet
499,000
(Base Construction Allocation - $357,000)
(Land Allocation - $100,000)
(Design and Contingencies - $42,000)
(5) Bedford County
(i) S.R.0026
(A) Saxton intersection, 2 miles east of Saxton, Liberty Township, intersection improvement
1,105,000
(Base Construction Allocation - $825,000)
(Land Allocation - $205,000)
(Design and Contingencies - $75,000)
(ii) S.R.0056
(A) Pleasantville signal, Pleasantville Borough, signal improvement
55,000
(Base Construction Allocation - $50,000)
(Land Allocation - $1,000)
(Design and Contingencies - $4,000)
(iii) S.R.0220
(A) S.R.0220, Bedford Springs Access, widen and add an additional lane
4,925,000
(Base Construction Allocation - $4,525,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(iv) S.R.4009
(A) Bedford signal grid, Penn, Pitt and Sunnyside Streets, Bedford Borough, signal improvement
300,000
(Base Construction Allocation - $260,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(6) Berks County
(i) Various State highways
(A) Berks air quality, various locations countywide
3,000,000
(Base Construction Allocation - $2,800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) I-78
(A) I-78 from Milepost 10 to Milepost 29, pavement restoration
1,250,000
(Base Construction Allocation - $1,170,000)
(Design and Contingencies - $80,000)
(B) I-78 from City of Lebanon to Frystown, pavement restoration
878,000
(Base Construction Allocation - $850,000)
(Land Allocation - $10,000)
(Design and Contingencies - $18,000)
(C) I-78 from S.R.0143 to Lehigh County line, pavement restoration
1,470,000
(Base Construction Allocation - $1,370,000)
(Design and Contingencies - $100,000)
(iii) S.R.0222
(A) S.R.0222 and S.R.0183 interchange, City of Reading, interchange improvement
3,150,000
(Base Construction Allocation - $800,000)
(Land Allocation - $2,200,000)
(Design and Contingencies - $150,000)
(B) S.R.0222 and S.R.0073 intersection, intersection improvements
1,000,000
(iv) S.R.0422
(A) Shelbourne Road jughandle, S.R.0422 and S.R.2033 intersection, Exeter Township, intersection improvement
2,900,000
(Base Construction Allocation - $2,100,000)
(Land Allocation - $500,000)
(Design and Contingencies - $300,000)
(v) Morgantown connector
(A) Construct 4-lane divided highway to connect Pa. Turnpike with I-176
6,780,000
(Base Construction Allocation - $5,250,000)
(Land Allocation - $1,155,000)
(Design and Contingencies - $375,000)
(vi) Kutztown University Relief Route
(A) Construction of a new highway from the intersection of Lytle Lane and College Boulevard to Marion Street to connect with S.R.0222 (Business), new construction
1,000,000
(vii) S.R.2033
(A) S.R.2033, Shelbourne Road, reconstruction
1,500,000
(viii) S.R.3055
(A) S.R.3055 from S.R.3021 to S.R.3023, reconstruction
1,000,000
(7) Blair County
(i) Various State highways
(A) Bald Eagle and Martinsburg, Snyder Township and Martinsburg Borough, signal improvement
136,000
(Base Construction Allocation - $115,000)
(Land Allocation - $6,000)
(Design and Contingencies - $15,000)
(B) Blair air quality, various locations countywide
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0022
(A) S.R.0022 from Hollidaysburg to Blair-Huntingdon County line, construct safety improvements and truck climbing lanes
1,160,000
(Base Construction Allocation - $960,000)
(Land Allocation - $200,000)
(B) S.R.0022, Hollidaysburg Bypass from S.R.0220 to Canoe Creek, relocation
13,020,000
(Base Construction Allocation - $9,760,000)
(Land Allocation - $1,960,000)
(Design and Contingencies - $1,300,000)
(iii) S.R.0036
(A) S.R.0036 from top of Buckhorn to S.R.4039, Logan Township, intersection improvement
940,000
(Base Construction Allocation - $850,000)
(Land Allocation - $30,000)
(Design and Contingencies - $60,000)
(B) S.R.0036, Logan Boulevard and Araryd Boulevard intersection, City of Altoona, intersection improvement
75,000
(Base Construction Allocation - $41,000)
(Land Allocation - $19,000)
(Design and Contingencies - $15,000)
(iv) S.R.0220
(A) S.R.0220 from Bald Eagle to Blair County line, 4-lane divided relocation
10,000,000
(Base Construction Allocation - $9,400,000)
(Land Allocation - $200,000)
(Design and Contingencies - $400,000)
(v) S.R.1001
(A) Meadows RADII improvement, Allegheny Township, intersection improvement
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $60,000)
(Design and Contingencies - $40,000)
(B) Pleasant Valley Boulevard, City of Altoona, signal improvement
300,000
(Base Construction Allocation - $270,000)
(Design and Contingencies - $30,000)
(vi) S.R.1009
(A) Frankstown intersections on Frankstown Road, Frankstown Township, intersection improvement
1,110,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design and Contingencies - $50,000)
(vii) S.R.4010
(A) 17th Street signals, City of Altoona, signal improvement
100,000
(Base Construction Allocation - $93,000)
(Design and Contingencies - $7,000)
(viii) S.R.4013
(A) Chestnut Avenue, widen and reconstruct
1,794,000
(Base Construction Allocation - $1,406,000)
(Land Allocation - $300,000)
(Design and Contingencies - $88,000)
(ix) S.R.4019
(A) 6th Avenue intersections with 8th Street and Greenwood Road, Logan Township, intersection improvement
950,000
(Base Construction Allocation - $750,000)
(Land Allocation - $125,000)
(Design and Contingencies - $75,000)
(x) Blair County Airport Access Road
(A) Reconstruction or relocation and construction of an access road to the Blair County Airport
43,000,000
(Base Construction Allocation - $35,000,000)
(Land Allocation - $4,000,000)
(Design and Contingencies - $4,000,000)
(8) Bradford County
(i) S.R.0006
(A) S.R.0006 and S.R.0187 signal at Wysox, signal improvement
100,000
(Base Construction Allocation - $80,000)
(Land Allocation - $5,000)
(Design and Contingencies - $15,000)
(B) S.R.0006, Towanda Bypass, relocation
2,600,000
(Base Construction Allocation - $2,150,000)
(Land Allocation - $200,000)
(Design and Contingencies - $250,000)
(ii) S.R.0220
(A) S.R.0220 in area known as Crystal Springs, North Towanda Township, intersection improvement
1,075,000
(Base Construction Allocation - $825,000)
(Land Allocation - $175,000)
(Design and Contingencies - $75,000)
(9) Bucks County
(i) Various State highways
(A) Bucks air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0013
(A) S.R.0013 at Levittown Parkway, Tullytown Borough, safety improvement
4,400,000
(Base Construction Allocation - $3,850,000)
(Land Allocation - $150,000)
(Design and Contingencies - $400,000)
(iii) I-95
(A) Woodbourne park and ride, fringe parking expansion
123,000
(Base Construction Allocation - $102,000)
(Design and Contingencies - $21,000)
(B) Trevose park and ride, fringe parking expansion
110,000
(Base Construction Allocation - $89,000)
(Design and Contingencies - $21,000)
(C) Neshaminy park and ride, fringe parking expansion
167,000
(Base Construction Allocation - $146,000)
(Design and Contingencies - $21,000)
(D) Yardley park and ride, fringe parking expansion
127,000
(Base Construction Allocation - $106,000)
(Design and Contingencies - $21,000)
(iv) S.R.0132
(A) Street Road, State Road to S.R.0001, Bensalem Township, signal improvement
3,500,000
(Base Construction Allocation - $2,750,000)
(Land Allocation - $500,000)
(Design and Contingencies - $250,000)
(B) Street Road and S.R.0001, Upper Southampton, Lower Southampton and Bensalem Townships, signal improvement
2,420,000
(Base Construction Allocation - $1,570,000)
(Land Allocation - $600,000)
(Design and Contingencies - $250,000)
(C) Street Road and Old York and S.R.0611, Warrington and Warminster Townships, signal improvement
1,711,000
(Base Construction Allocation - $961,000)
(Land Allocation - $500,000)
(Design and Contingencies - $250,000)
(v) S.R.0202
(A) S.R.0202 and bypass to S.R.0313, Doylestown Borough and Doylestown and Buckingham Townships, widen
1,126,000
(Base Construction Allocation - $849,000)
(Land Allocation - $150,000)
(Design and Contingencies - $127,000)
(vi) S.R.0263
(A) S.R.0263 and Almshouse intersection, Warwick Township, intersection improvement
1,565,000
(Base Construction Allocation - $1,274,000)
(Land Allocation - $100,000)
(Design and Contingencies - $191,000)
(vii) S.R.0309
(A) S.R.0309 at S.R.0313 and S.R.0663, Quakertown Borough, intersection improvement
1,520,000
(Base Construction Allocation - $800,000)
(Land Allocation - $600,000)
(Design and Contingencies - $120,000)
(viii) S.R.0313
(A) S.R.0313 and S.R.0263 intersection, Doylestown Township, signal improvement
25,000
(Base Construction Allocation - $22,000)
(Design and Contingencies - $3,000)
(B) S.R.0313, Main Street at Maple Avenue and Elephant Road, intersection improvements
500,000
(Base Construction Allocation - $375,000)
(Land Allocation - $75,000)
(Design and Contingencies - $50,000)
(C) S.R.0313, Swamp Road at S.R.0202, intersection improvements
100,000
(Base Construction Allocation - $75,000)
(Land Allocation - $15,000)
(Design and Contingencies - $10,000)
(D) S.R.0313 from Curley Hill Road to Stump Road, add truck passing lane
2,580,000
(Base Construction Allocation - $1,935,000)
(Land Allocation - $387,000)
(Design and Contingencies - $258,000)
(ix) S.R.0332
(A) S.R.0332 at Street Road, Warminster Township, widen to 60 feet
1,190,000
(Base Construction Allocation - $600,000)
(Land Allocation - $500,000)
(Design and Contingencies - $90,000)
(B) S.R.0332 at I-95, construct interchange
2,296,000
(Base Construction Allocation - $1,721,000)
(Land Allocation - $345,000)
(Design and Contingencies - $230,000)
(x) S.R.0413
(A) S.R.0413 and Old Link and Bath, Middletown Township and Bristol Borough, widen to 56 feet
4,150,000
(Base Construction Allocation - $3,480,000)
(Land Allocation - $150,000)
(Design and Contingencies - $520,000)
(B) S.R.0413 at Stoopville Road, Wrightstown Township, shoulder improvement
153,000
(Base Construction Allocation - $99,000)
(Land Allocation - $39,000)
(Design and Contingencies - $15,000)
(C) Townshipwide signals, Newtown Township, signal improvement
855,000
(Base Construction Allocation - $775,000)
(Design and Contingencies - $80,000)
(D) S.R.0413, Newtown Pike at Winchester Avenue, intersection improvements
500,000
(Base Construction Allocation - $350,000)
(Land Allocation - $100,000)
(Design and Contingencies - $50,000)
(E) S.R.0413, Newtown Bypass at Richboro Road, intersection improvements
698,000
(Base Construction Allocation - $488,000)
(Land Allocation - $140,000)
(Design and Contingencies - $70,000)
(F) S.R.0413, Newtown Bypass at Buck Road and Sycamore Street, intersection improvements
444,000
(Base Construction Allocation - $310,000)
(Land Allocation - $89,000)
(Design and Contingencies - $45,000)
(G) S.R.0413 and Worthington Mill Road, signalization
150,000
(Base Construction Allocation - $120,000)
(Land Allocation - $15,000)
(Design and Contingencies - $15,000)
(xi) S.R.0513
(A) S.R.0513 and Hulmeville Road, Bensalem Township, widen to 44 feet
2,715,000
(Base Construction Allocation - $2,275,000)
(Land Allocation - $100,000)
(Design and Contingencies - $340,000)
(xii) S.R.2029
(A) S.R.2029, Oxford Valley Road at U.S.1 ramps, safety improvements
4,148,000
(Base Construction Allocation - $3,111,000)
(Land Allocation - $622,000)
(Design and Contingencies - $415,000)
(xiii) S.R.0232
(A) S.R.0232, Second Street Pike at S.R.0332, widen
1,000,000
(Base Construction Allocation - $750,000)
(Land Allocation - $150,000)
(Design and Contingencies - $100,000)
(xiv) S.R.0532
(A) S.R.0532, Sycamore Street at Jefferson Avenue, intersection improvements
270,000
(Base Construction Allocation - $202,500)
(Land Allocation - $40,500)
(Design and Contingencies - $27,000)
(B) S.R.0532, Buck Road at Mill Pond and Diamond Roads, intersection improvements
156,000
(Base Construction Allocation - $117,000)
(Land Allocation - $23,400)
(Design and Contingencies - $15,600)
(xv) S.R.0611
(A) S.R.0611 at Edison Furlong Road, intersection improvement
972,000
(Base Construction Allocation - $728,000)
(Land Allocation - $146,000)
(Design and Contingencies - $98,000)
(10) Butler County
(i) Various State highways
(A) Butler air quality, various locations countywide
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0008
(A) Butler County Transit Study, various locations, transportation study
35,000
(Design and Contingencies - $35,000)
(iii) S.R.0068
(A) S.R.0068 from S.R.0422 to North Oakland, Butler and Oakland Townships, shoulder improvement
1,000,000
(Base Construction Allocation - $930,000)
(Land Allocation - $50,000)
(Design and Contingencies - $20,000)
(iv) I-80
(A) I-80 from Milepost 42 to Armstrong County line, restoration
860,000
(Base Construction Allocation - $852,000)
(Design and Contingencies - $8,000)
(v) S.R.0108
(A) S.R.0108 and S.R.0173 intersection, Slippery Rock Borough, signal improvement
600,000
(Base Construction Allocation - $225,000)
(Land Allocation - $300,000)
(Design and Contingencies - $75,000)
(vi) S.R.0228
(A) S.R.0228 and S.R.3015 intersection, Adams Township, intersection improvement
750,000
(Base Construction Allocation - $730,000)
(Land Allocation - $10,000)
(Design and Contingencies - $10,000)
(B) S.R.0228 and I-79, interchange restoration
20,450,000
(Base Construction Allocation - $17,900,000)
(Design and Contingencies - $2,550,000)
(C) S.R.0228 from Criders Corners east to S.R.3015, construct additional lanes
12,000,000
(Base Construction Allocation - $9,600,000)
(Design and Contingencies - $2,400,000)
(D) S.R.0228 and Franklin Road, intersection improvements
116,000
(Base Construction Allocation - $76,000)
(Design and Contingencies - $40,000)
(vii) S.R.0422
(A) S.R.0422 and I-79 interchange, Muddycreek Township, intersection improvement
750,000
(Base Construction Allocation - $740,000)
(Design and Contingencies - $10,000)
(B) Butler Bypass from Mt. Chestnut to S.R.0008, restoration
1,000,000
(Base Construction Allocation - $970,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(C) Butler Bypass from S.R.0008 to S.R.2006, restoration
1,598,000
(Base Construction Allocation - $1,580,000)
(Design and Contingencies - $18,000)
(viii) S.R.0528
(A) S.R.0528 and I-79 interchange, Jackson Township, parking lot
185,000
(Base Construction Allocation - $150,000)
(Land Allocation - $20,000)
(Design and Contingencies - $15,000)
(ix) S.R.3020
(A) S.R.3020, Cranberry Township, park and ride lot
11,000
(Base Construction Allocation - $10,000)
(Design and Contingencies - $1,000)
(B) S.R.3020 from Cranberry Township line to S.R.0019, widen and resurface
5,550,000
(Base Construction Allocation - $5,000,000)
(Design and Contingencies - $550,000)
(C) S.R.3020, Freedom Road and Powell Road, intersection improvements
286,000
(Base Construction Allocation - $226,000)
(Design and Contingencies - $60,000)
(D) S.R.3020, Freedom Road and Haine School Road, intersection improvements
390,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $90,000)
(x) S.R.3024
(A) S.R.3024 from Glen Eden Road east to S.R.0019, widen, relocate and resurface
3,600,000
(Base Construction Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(xi) S.R.0019
(A) S.R.0019 and Dutilh Road, intersection improvement
290,000
(Base Construction Allocation - $200,000)
(Design and Contingencies - $90,000)
(B) S.R.0019 and Rowan Road, intersection improvement
116,000
(Base Construction Allocation - $76,000)
(Design and Contingencies - $40,000)
(11) Cambria County
(i) Various State highways
(A) Cambria signals, Carrolltown, Southmont and Ferndale Boroughs and City of Johnstown, signal improvement
200,000
(Base Construction Allocation - $180,000)
(Land Allocation - $5,000)
(Design and Contingencies - $15,000)
(B) Cambria air quality, various locations countywide
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0022
(A) S.R.0022 and S.R.3045 intersection, Chickory and Jackson Townships, intersection improvement
1,675,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $75,000)
(Design and Contingencies - $100,000)
(B) Mundys Corner to Blairsville, upgrade existing highway or build 4-lane divided relocation
6,780,000
(Base Construction Allocation - $5,250,000)
(Land Allocation - $1,155,000)
(Design and Contingencies - $375,000)
(iii) S.R.0056
(A) Fairfield Avenue to Scalp Avenue, pavement and bridge rehabilitation
4,000,000
(Base Construction Allocation - $3,800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $180,000)
(B) S.R.0056, Haws Pike from Seward to Johnstown, reconstruction
3,500,000
(Base Construction Allocation - $3,250,000)
(Land Allocation - $150,000)
(Design and Contingencies - $100,000)
(C) S.R.0056 from S.R.0022 to Johnstown, west end traffic study
150,000
(Design and Contingencies - $150,000)
(iv) S.R.0219
(A) S.R.0219 and S.R.4013 intersection, East Carroll Township, intersection improvement
420,000
(Base Construction Allocation - $300,000)
(Land Allocation - $40,000)
(Design and Contingencies - $80,000)
(B) S.R.0219 from Carrolltown to DuBois, relocation
1,000,000
(Design and Contingencies - $1,000,000)
(C) S.R.0219 from Scalp Avenue to Davidsville, pavement restoration
4,400,000
(Base Construction Allocation - $3,960,000)
(Land Allocation - $40,000)
(Design and Contingencies - $400,000)
(D) S.R.0219 from S.R.0869 to S.R.0022, pavement restoration
2,300,000
(Base Construction Allocation - $2,060,000)
(Land Allocation - $40,000)
(Design and Contingencies - $200,000)
(v) S.R.0756
(A) S.R.0756 and Belmont Street intersection, Geistown Borough and Richland Township, intersection improvement
400,000
(Base Construction Allocation - $310,000)
(Land Allocation - $40,000)
(Design and Contingencies - $50,000)
(B) S.R.0756 from Luther Road to Donald Lane, reconstruction
526,000
(Base Construction Allocation - $360,000)
(Land Allocation - $80,000)
(Design and Contingencies - $86,000)
(vi) S.R.3007
(A) Goucher Street, Westmont Borough and Lower Yoder Township, intersection improvement
610,000
(Base Construction Allocation - $500,000)
(Land Allocation - $35,000)
(Design and Contingencies - $75,000)
(vii) S.R.4003
(A) S.R.4003 from S.R.0422 to S.R.4002, restore and realign
500,000
(Base Construction Allocation - $400,000)
(Design and Contingencies - $100,000)
(viii) S.R.4002
(A) S.R.4002 from S.R.4003 to Cambria Township line, restore and realign
500,000
(Base Construction Allocation - $400,000)
(Design and Contingencies - $100,000)
(ix) S.R.3007
(A) Willett Drive to Westgate Drive, add 3rd lane
1,300,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $100,000)
(12) Cameron County (Reserved)
(13) Carbon County
(i) Various State highways
(A) Carbon air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0248
(A) S.R.0248, Lower Towamensing and Franklin Townships, resurface
1,020,000
(Base Construction Allocation - $970,000)
(Design and Contingencies - $50,000)
(iii) S.R.0903
(A) Front Street to borough line, Jim Thorpe Borough, safety improvement
350,000
(Base Construction Allocation - $250,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(iv) S.R.2006
(A) S.R.2006 and S.R.2002 intersection, Lower Towamensing Township, safety improvement
1,150,000
(Base Construction Allocation - $850,000)
(Land Allocation - $150,000)
(Design and Contingencies - $150,000)
(14) Centre County
(i) Various State highways
(A) Park and ride facility, State College area, parking lot
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(B) Centre air quality, various locations countywide
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0026
(A) S.R.0026, S.R.3007 and S.R.3014, State College Borough, signal improvement
1,160,000
(Base Construction Allocation - $1,060,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(B) S.R.0026 and Rockview Curve near Rockview Prison, Benner Township, safety improvement
570,000
(Base Construction Allocation - $470,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(C) I-80 to S.R.0064, widen to 4 lanes
5,900,000
(Base Construction Allocation - $5,600,000)
(Design and Contingencies - $300,000)
(D) I-80 to Pleasant Gap, pavement restoration
570,000
(Base Construction Allocation - $550,000)
(Design and Contingencies - $20,000)
(iii) S.R.0045
(A) S.R.0045 and S.R.2012 intersection, Gregg Township, safety improvement
665,000
(Base Construction Allocation - $625,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(B) Old Fort, intersection signals, left turn lanes and intersection improvement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(iv) I-80
(A) I-80, Snow Shoe rest areas, sewage system rehabilitation
700,000
(Base Construction Allocation - $600,000)
(Design and Contingencies - $100,000)
(B) I-80, S.R.0220, Bald Eagle interchange, relocation
59,400,000
(Base Construction Allocation - $55,100,000)
(Land Allocation - $1,620,000)
(Design and Contingencies - $2,680,000)
(v) S.R.0144
(A) S.R.0144, S.R.0055 and S.R.1008, Bellefonte Borough, signal improvement
325,000
(Base Construction Allocation - $285,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(vi) S.R.0350
(A) Sandy Ridge climbing lane, Rush Township, add lane
1,825,000
(Base Construction Allocation - $1,625,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(vii) S.R.3018
(A) Whitehall Road intersection, Ferguson Township, safety improvement
200,000
(Base Construction Allocation - $70,000)
(Land Allocation - $100,000)
(Design and Contingencies - $30,000)
(viii) Center Street Extension
(A) Center Street in Philipsburg to S.R.0322, new 2-lane roadway
525,000
(Base Construction Allocation - $375,000)
(Land Allocation - $125,000)
(Design and Contingencies - $25,000)
(ix) Ninth Street connection
(A) S.R.3029 in Philipsburg to S.R.0322, new 2-lane roadway
500,000
(Base Construction Allocation - $375,000)
(Land Allocation - $100,000)
(Design and Contingencies - $25,000)
(x) S.R.0220
(A) S.R.0220 from State College to I-80, 4-lane relocation
12,675,000
(Base Construction Allocation - $10,475,000)
(Land Allocation - $620,000)
(Design and Contingencies - $1,580,000)
(15) Chester County
(i) Various State highways
(A) Chester air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0001
(A) S.R.0001 from Pennock Road to Brandywine Creek, safety improvements
342,000
(Base Construction Allocation - $300,000)
(Land Allocation - $2,000)
(Design and Contingencies - $40,000)
(B) S.R.0001 from S.R.0462 to Maryland line, pavement restoration
13,500,000
(Base Construction Allocation - $13,500,000)
(iii) S.R.0003
(A) S.R.0003 safety corridor, various municipalities, Chester and Delaware Counties, intersection improvement
2,500,000
(Base Construction Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(B) S.R.0003, West Chester Borough and West Goshen Township, widen to 36 feet
900,000
(Base Construction Allocation - $660,000)
(Land Allocation - $140,000)
(Design and Contingencies - $100,000)
(iv) S.R.0030
(A) S.R.0030 and S.R. 0252, Easttown and Tredyffrin Townships, signal improvement
1,450,000
(Base Construction Allocation - $1,200,000)
(Land Allocation - $100,000)
(Design and Contingencies - $150,000)
(B) S.R.0030 and S.R.0113 interchange, Caln and East Caln Townships and Downingtown Borough, interchange improvement
4,000,000
(Base Construction Allocation - $3,300,000)
(Land Allocation - $300,000)
(Design and Contingencies - $400,000)
(v) S.R.0041
(A) S.R.0041 at State and 1st, Avondale Borough, signal improvement
100,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $10,000)
(B) S.R.0041 at S.R.0010, West Fallowfield Township, intersection improvement
516,000
(Base Construction Allocation - $396,000)
(Land Allocation - $40,000)
(Design and Contingencies - $80,000)
(C) Limestone Road to Sheehan Road and Sharp Road, New Garden Township, interchange improvement
250,000
(Base Construction Allocation - $135,000)
(Land Allocation - $90,000)
(Design and Contingencies - $25,000)
(D) S.R.0041 and Highland Road intersection, West Fallowfield Township, intersection improvement
640,000
(Base Construction Allocation - $500,000)
(Land Allocation - $60,000)
(Design and Contingencies - $80,000)
(E) S.R.0041 and Newark Road intersection, New Garden Township, intersection improvement
840,000
(Base Construction Allocation - $680,000)
(Land Allocation - $60,000)
(Design and Contingencies - $100,000)
(F) S.R.0041 and Penn Green intersection, Avondale Borough and New Garden Township, intersection improvement
1,050,000
(Base Construction Allocation - $650,000)
(Land Allocation - $300,000)
(Design and Contingencies - $100,000)
(G) S.R.0041 and S.R.0926 intersection, Londonderry Township, intersection improvement
250,000
(Base Construction Allocation - $185,000)
(Land Allocation - $40,000)
(Design and Contingencies - $25,000)
(H) S.R.0041 and S.R.0001 ramps, London Grove Township, interchange improvement
100,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $10,000)
(I) S.R.0041 and Baltimore, Avondale Borough, intersection improvement
550,000
(Base Construction Allocation - $405,000)
(Land Allocation - $90,000)
(Design and Contingencies - $55,000)
(J) S.R.0041 and Baltimore, London Grove Township, intersection improvement
450,000
(Base Construction Allocation - $270,000)
(Land Allocation - $135,000)
(Design and Contingencies - $45,000)
(vi) S.R.0100
(A) S.R.0100 and S.R.0724 interchange, North Coventry Township, interchange improvement
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) S.R.0100, North Coventry Township, widen to 42 feet
575,000
(Base Construction Allocation - $375,000)
(Land Allocation - $150,000)
(Design and Contingencies - $50,000)
(C) S.R.0100, Hoffecker to Pa. Turnpike, North Coventry and Uwchlan Townships, relocation for safety improvement
650,000
(Base Construction Allocation - $135,000)
(Land Allocation - $450,000)
(Design and Contingencies - $65,000)
(D) S.R.0100 and S.R.0023, South Coventry Township, signal improvement
26,000
(Base Construction Allocation - $23,000)
(Design and Contingencies - $3,000)
(E) S.R.0100 and Conestoga, West Vincent Township, intersection improvement
275,000
(Base Construction Allocation - $203,000)
(Land Allocation - $45,000)
(Design and Contingencies - $27,000)
(F) S.R.0100 and Font Road, Upper Uwchlan Township, intersection improvement
650,000
(Base Construction Allocation - $495,000)
(Land Allocation - $90,000)
(Design and Contingencies - $65,000)
(G) S.R.0100 at Park, Upper Uwchlan Township, intersection improvement
700,000
(Base Construction Allocation - $540,000)
(Land Allocation - $90,000)
(Design and Contingencies - $70,000)
(H) S.R.0100 and Ship Road, Uwchlan Township, intersection improvement
76,000
(Base Construction Allocation - $68,000)
(Design and Contingencies - $8,000)
(I) S.R.0100 from S.R.0030 to Swedesford Road, West Whiteland Township, median barrier
150,000
(Base Construction Allocation - $135,000)
(Design and Contingencies - $15,000)
(J) S.R.0100, construct pedestrian crossing at intersection of South High Street and Rosedale Avenue, West Chester University Campus Handicapped Safety Initiative
3,000,000
(Base Construction Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(vii) S.R.0926
(A) S.R.0926 curve, Pennsbury Township, safety improvement
500,000
(Base Construction Allocation - $300,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(viii) Chester Valley rail relocation
(A) Acquire right-of-way and construct rail connection with National Rolling Mill
994,000
(Base Construction Allocation - $830,000)
(Land Allocation - $159,000)
(Design and Contingencies - $5,000)
(ix) S.R.3069
(A) Whitford Road near Chester Valley Railroad, West Whiteland Township, culvert replacement
230,000
(Base Construction Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(x) T-560 Pedestrian walkways
(A) Construction of a pedestrian walkway over railroad right-of-way along T-560, Cassatt Avenue, Berwyn and Tredyffrin Township
250,000
(Base Construction Allocation - $230,000)
(Design and Contingencies - $20,000)
(16) Clarion County
(i) S.R.0036
(A) S.R.0036 and S.R.0066 intersection, Farmington Township, signal improvement
117,000
(Base Construction Allocation - $100,000)
(Land Allocation - $2,000)
(Design and Contingencies - $15,000)
(ii) S.R.0066
(A) S.R.0066, New Bethlehem Borough, signal improvement
450,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $30,000)
(iii) S.R.0068
(A) I-80 to Clarion Borough, Monroe Township, signal improvement
250,000
(Base Construction Allocation - $225,000)
(Design and Contingencies - $25,000)
(17) Clearfield County
(i) S.R.0053
(A) S.R.0053 and S.R.0255 interchange, Cooper and Sandy Townships, safety improvement
200,000
(Base Construction Allocation - $150,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(ii) I-80
(A) I-80 at Milepost 119, Milepost 120 and Milepost 138, bridge rehabilitations
1,084,000
(Base Construction Allocation - $1,044,000)
(Design and Contingencies - $40,000)
(iii) S.R.0153
(A) Brisbin Curve near cemetery, safety improvement
700,000
(Base Construction Allocation - $550,000)
(Land Allocation - $100,000)
(Design and Contingencies - $50,000)
(iv) S.R.0219
(A) S.R.0219 and S.R.4019, Lawrence Township, add lane
940,000
(Base Construction Allocation - $690,000)
(Land Allocation - $150,000)
(Design and Contingencies - $100,000)
(B) S.R.0219, DuBois Bypass, 4-lane divided relocation, preliminary engineering only
250,000
(Design and Contingencies - $250,000)
(v) S.R.0322
(A) S.R.0322 and S.R.0970 intersection, Bradford Township, intersection improvement
1,110,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $30,000)
(Design and Contingencies - $80,000)
(B) S.R.0322 from Clearfield Borough to S.R.0153, pavement restoration
2,460,000
(Base Construction Allocation - $2,440,000)
(Design and Contingencies - $20,000)
(vi) S.R.0879
(A) Bell Road intersection, Curwensville Borough, safety improvement
305,000
(Base Construction Allocation - $205,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(vii) S.R.4014
(A) S.R.4014 and Maple Avenue intersection, Sandy Township, intersection improvement
1,400,000
(Base Construction Allocation - $1,200,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(18) Clinton County
(i) S.R.0064
(A) I-80, Exit 25, Lamar interchange, Porter Township, add lane
750,000
(Base Construction Allocation - $650,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0150
(A) S.R.0150 and S.R.1024 intersection, City of Lock Haven, signal improvement
125,000
(Base Construction Allocation - $65,000)
(Land Allocation - $30,000)
(Design and Contingencies - $30,000)
(B) Hogan Boulevard, City of Lock Haven, add lane
450,000
(Base Construction Allocation - $430,000)
(Land Allocation - $10,000)
(Design and Contingencies - $10,000)
(19) Columbia County
(i) S.R.0011
(A) S.R.0011 from Park Street to Central Road, Town of Bloomsburg, widen to 52 feet
3,470,000
(Base Construction Allocation - $3,020,000)
(Land Allocation - $200,000)
(Design and Contingencies - $250,000)
(B) S.R.0011, Town of Bloomsburg, signal improvement
165,000
(Base Construction Allocation - $140,000)
(Land Allocation - $10,000)
(Design and Contingencies - $15,000)
(ii) I-80
(A) I-80, bridge over Susquehanna River, restoration of eastbound bridge
1,200,000
(Base Construction Allocation - $1,150,000)
(Design and Contingencies - $50,000)
(B) I-80 from Milepost 228 to Milepost 235, pavement restoration
1,858,000
(Base Construction Allocation - $1,680,000)
(Land Allocation - $10,000)
(Design and Contingencies - $168,000)
(20) Crawford County
(i) Various State highways
(A) Various locations throughout district, shoulder improvement
1,000,000
(Base Construction Allocation - $900,000)
(Design and Contingencies - $100,000)
(B) Various locations throughout district, guide rail improvement at bridges
600,000
(Base Construction Allocation - $540,000)
(Design and Contingencies - $60,000)
(ii) S.R.0006
(A) S.R.0006 at various locations, City of Meadville, signal improvement
960,000
(Base Construction Allocation - $840,000)
(Design and Contingencies - $120,000)
(B) S.R.0006 from top of Gable to Smock Bridge, Vernon Township, add lane
820,000
(Base Construction Allocation - $820,000)
(iii) S.R.0018
(A) S.R.0018 curve, Spring Township, safety improvement
450,000
(Base Construction Allocation - $370,000)
(Land Allocation - $30,000)
(Design and Contingencies - $50,000)
(iv) S.R.0027
(A) S.R.0027 curve from T-993 to Enterprise Road, Oil Creek Township, safety improvement
500,000
(Base Construction Allocation - $380,000)
(Land Allocation - $70,000)
(Design and Contingencies - $50,000)
(B) S.R.0027 from Meadville to Titusville, East Mead Township
400,000
(Base Construction Allocation - $360,000)
(Design and Contingencies - $40,000)
(v) S.R.0285
(A) S.R.0285, Espyville Causeway, resurface roadway, shoulders, causeway slopes and improve drainage
450,000
(Base Construction Allocation - $400,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(21) Cumberland County
(i) Various State highways
(A) Cumberland air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0011
(A) Camp Hill Bypass from S.R.0581 to 21st Street, Camp Hill Borough, signal improvement
700,000
(Base Construction Allocation - $600,000)
(Land Allocation - $10,000)
(Design and Contingencies - $90,000)
(iii) S.R.0074
(A) S.R.0074 and S.R.0174 intersection, Monroe Township, signal improvement
170,000
(Base Construction Allocation - $125,000)
(Land Allocation - $5,000)
(Design and Contingencies - $40,000)
(iv) I-81
(A) I-81 from Petersburg Road to S.R.0011, rehabilitation of 4 bridge decks
1,097,000
(Base Construction Allocation - $1,080,000)
(Land Allocation - $2,000)
(Design and Contingencies - $15,000)
(B) I-81 from Petersburg Road to S.R.0011, pavement restoration
1,877,000
(Base Construction Allocation - $1,776,000)
(Land Allocation - $1,000)
(Design and Contingencies - $100,000)
(v) S.R.0114
(A) S.R.0114 and I-81 interchange, Silver Spring Township, signal improvement
380,000
(Base Construction Allocation - $300,000)
(Land Allocation - $5,000)
(Design and Contingencies - $75,000)
(vi) S.R.0174
(A) S.R.0174 and S.R.0641 interchange, Silver Spring and Monroe Townships, signal improvement
255,000
(Base Construction Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $45,000)
(vii) S.R.0581
(A) S.R.0581 from Carlisle Pike to I-83, rehabilitation and pavement
220,000
(Base Construction Allocation - $200,000)
(Design and Contingencies - $20,000)
(viii) S.R.0641
(A) S.R.0641 and Simpson Ferry Road intersection, Mechanicsburg Borough, intersection improvement
310,000
(Base Construction Allocation - $240,000)
(Land Allocation - $20,000)
(Design and Contingencies - $50,000)
(22) Dauphin County
(i) Various State highways
(A) Dauphin air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0022
(A) S.R.0022 safety corridor, Lower Paxton, East Hanover and West Hanover Townships, median barrier
5,850,000
(Base Construction Allocation - $5,000,000)
(Land Allocation - $350,000)
(Design and Contingencies - $500,000)
(B) S.R.0022, park and ride near Clarks Ferry Bridge, Reed Township, parking lot
155,000
(Base Construction Allocation - $100,000)
(Land Allocation - $30,000)
(Design and Contingencies - $25,000)
(C) S.R.022/S.R.0322 from Clarks Ferry Bridge to Speeceville, rehabilitation and pavement
1,320,000
(Base Construction Allocation - $1,200,000)
(Design and Contingencies - $120,000)
(D) S.R.0022/S.R.0322 from Dauphin Narrows to Amity Hall, pavement rehabilitation
1,801,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $6,000)
(Design and Contingencies - $95,000)
(iii) S.R.0039
(A) Linglestown Road from Oakhurst to Blue Mountain Parkway, Lower Paxton Township, widen to 36 feet
4,300,000
(Base Construction Allocation - $4,100,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) S.R.0039, S.R.0322 and Industrial Road, Susquehanna Township, signal improvement
235,000
(Base Construction Allocation - $200,000)
(Land Allocation - $5,000)
(Design and Contingencies - $30,000)
(iv) I-81
(A) I-81 from Cumberland County line to Lebanon County line, restoration
3,751,000
(Base Construction Allocation - $3,650,000)
(Land Allocation - $1,000)
(Design and Contingencies - $100,000)
(v) I-83
(A) I-83 from Derry Street to Union Deposit Road, widen
1,130,000
(Base Construction Allocation - $800,000)
(Land Allocation - $150,000)
(Design and Contingencies - $180,000)
(vi) S.R.0230
(A) S.R.0230 from Vine Street to Wilson Street, Middletown Borough, signal improvement
490,000
(Base Construction Allocation - $420,000)
(Land Allocation - $10,000)
(Design and Contingencies - $60,000)
(vii) S.R.0283
(A) I-283 from S.R.0441 to Eisenhower interchange, Lower Paxton and Swatara Townships, add lane
3,270,000
(Base Construction Allocation - $3,000,000)
(Land Allocation - $20,000)
(Design and Contingencies - $250,000)
(viii) S.R.0322
(A) S.R.0322, interchange ramps from Middletown Road to Quarry Road, Derry Township, signal improvement
300,000
(Base Construction Allocation - $250,000)
(Land Allocation - $5,000)
(Design and Contingencies - $45,000)
(B) S.R.0322, safety corridor from S.R.0422 to Lebanon County line, Derry Township, signal improvement
310,000
(Base Construction Allocation - $250,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(ix) S.R.0325
(A) S.R.0325, Middle Paxton and Rush Townships, guide rail improvement
590,000
(Base Construction Allocation - $550,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(x) S.R.0422
(A) S.R.0422, safety corridor from S.R.0322 to Lebanon County line, Derry Township, signal improvement
1,110,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design and Contingencies - $100,000)
(xi) S.R.3006
(A) Chambers Hill Road and Eisenhower Boulevard intersection, Swatara Township, signal improvement
280,000
(Base Construction Allocation - $200,000)
(Land Allocation - $5,000)
(Design and Contingencies - $75,000)
(xii) Cameron Street
(A) Cameron Street from McClay Street to Elmerton Avenue, add center turning lane
218,000
(Base Construction Allocation - $204,000)
(Land Allocation - $2,000)
(Design and Contingencies - $12,000)
(23) Delaware County
(i) Various State highways
(A) Delaware air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0001
(A) S.R.0001 from S.R.3007 (Concord Road) to S.R.0452, safety improvements
391,000
(Base Construction Allocation - $320,000)
(Land Allocation - $21,000)
(Design and Contingencies - $50,000)
(B) S.R.0001 from Brandywine Creek to Concord Road, safety improvements
391,000
(Base Construction Allocation - $330,000)
(Land Allocation - $11,000)
(Design and Contingencies - $50,000)
(iii) S.R.0003
(A) S.R.0003, West Chester Pike, Upper Darby, Haverford, Marple, and Newtown Townships, signal improvement
4,700,000
(Base Construction Allocation - $4,130,000)
(Land Allocation - $100,000)
(Design and Contingencies - $470,000)
(B) S.R.0003 safety corridor from S.R.0001 to Chester County line, Edgemont and Newtown Townships, intersection improvement
770,000
(Base Construction Allocation - $700,000)
(Design and Contingencies - $70,000)
(C) S.R.0003, West Chester Pike between Township Line Road and 69th Street in Upper Darby Township, resurface and add third lane in each direction
5,500,000
(Base Construction Allocation - $5,000,000)
(Design and Contingencies - $500,000)
(iv) I-95
(A) I-95 interchange, Tinicum Township, interchange improvement
550,000
(Base Construction Allocation - $500,000)
(Design and Contingencies - $50,000)
(v) S.R.0252
(A) S.R.0252 and S.R.0001 ramps, Upper Providence Township, interchange improvement
1,311,000
(Base Construction Allocation - $711,000)
(Land Allocation - $500,000)
(Design and Contingencies - $100,000)
(vi) S.R.0320
(A) S.R.0320, Sproul Road, Springfield and Marple Townships, signal improvement
550,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(vii) I-476
(A) I-476, Baltimore Pike interchange, construction of fringe parking facility
1,535,000
(Base Construction Allocation - $1,500,000)
(Design and Contingencies - $35,000)
(B) I-476, West Chester Pike interchange, construction of fringe parking facility
715,000
(Base Construction Allocation - $700,000)
(Design and Contingencies - $15,000)
(C) I-476/S.R.0030 interchange, Radnor Township, drainage improvements
144,000
(Base Construction Allocation - $115,000)
(Design and Contingencies - $29,000)
(viii) S.R.1034
(A) Goshen near Darby and Radnor Townships, safety improvement
704,000
(Base Construction Allocation - $546,000)
(Land Allocation - $76,000)
(Design and Contingencies - $82,000)
(24) Elk County
(i) S.R.0219
(A) S.R.0219 in vicinity of Johnsonburg, 2-lane relocation
4,575,000
(Base Construction Allocation - $3,800,000)
(Land Allocation - $125,000)
(Design and Contingencies - $650,000)
(ii) S.R.0255
(A) S.R.0255, intersection at St. Mary's Hospital, safety improvement
1,000,000
(Base Construction Allocation - $920,000)
(Land Allocation - $40,000)
(Design and Contingencies - $40,000)
(iii) S.R.0555
(A) S.R.0555 and S.R.2004 intersection, Benezette Township, intersection improvement
1,010,000
(Base Construction Allocation - $860,000)
(Land Allocation - $100,000)
(Design and Contingencies - $50,000)
(iv) James City Hill Project
(A) James City Hill Project
3,300,000
(Base Construction Allocation - $3,000,000)
(Land Allocation - $150,000)
(Design and Contingencies - $150,000)
(v) S.R.0948
(A) S.R.0948, reconstruction of storm sewers and curbing in Kersey
2,800,000
(Base Construction Allocation - $2,500,000)
(Design and Contingencies - $300,000)
(25) Erie County
(i) Various State highways
(A) Erie air quality, various locations countywide
2,300,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design and Contingencies - $240,000)
(ii) S.R.0019
(A) Peach Street from Kuntz Road to 26th Street, reconstruction
1,069,000
(Base Construction Allocation - $658,000)
(Land Allocation - $358,000)
(Design and Contingencies - $53,000)
(iii) S.R.0020
(A) S.R.0020 from Knoll Road to Clark Road, Harborcreek Township, add lane
2,220,000
(Base Construction Allocation - $2,140,000)
(Land Allocation - $30,000)
(Design and Contingencies - $50,000)
(B) S.R.0020 and 26th Street and Green Garden, City of Erie, intersection improvement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(C) S.R.0020 Corridor Phase I from I-79 to Knoll Avenue, City of Erie, Wesleyville Borough and Harborcreek Township, signal improvement
800,000
(Base Construction Allocation - $680,000)
(Land Allocation - $60,000)
(Design and Contingencies - $60,000)
(iv) I-90
(A) I-90 from Milepost 18 to Milepost 30, Exit 5 to Exit 9, restoration
2,630,000
(Base Construction Allocation - $2,600,000)
(Design and Contingencies - $30,000)
(B) I-90 from Milepost 18 toNew York State line, pavement rehabilitation
330,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $30,000)
(C) I-90 from Milepost 35 to New York State line, pavement rehabilitation
220,000
(Base Construction Allocation - $200,000)
(Design and Contingencies - $20,000)
(v) S.R.0097
(A) S.R.0097 and S.R.4028 intersection, Millcreek Township, intersection improvement
350,000
(Base Construction Allocation - $290,000)
(Land Allocation - $30,000)
(Design and Contingencies - $30,000)
(vi) S.R.0430
(A) S.R.0430 and T-608 and Behrend, Harborcreek Township, add lane
250,000
(Base Construction Allocation - $200,000)
(Land Allocation - $25,000)
(Design and Contingencies - $25,000)
(vii) S.R.0832
(A) S.R.0832, Peninsula Drive from 12th Street to 25th Street, widen to 5 lanes
375,000
(Base Construction Allocation - $375,000)
(viii) S.R.4030
(A) S.R.4030 and Cooper Road interchange, Harborcreek Township, add lane
375,000
(Base Construction Allocation - $300,000)
(Land Allocation - $25,000)
(Design and Contingencies - $50,000)
(ix) S.R.4034
(A) East side access road, engineering study
1,500,000
(Design and Contingencies - $1,500,000)
(26) Fayette County
(i) Various State highways
(A) Fayette air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0021
(A) S.R.0021 and S.R.0166 intersection, German Township, signal improvement
80,000
(Base Construction Allocation - $70,000)
(Land Allocation - $1,000)
(Design and Contingencies - $9,000)
(iii) S.R.0031
(A) S.R.0031 and S.R.0982 intersection, Bullskin Township, add lane
1,420,000
(Base Construction Allocation - $1,218,000)
(Land Allocation - $100,000)
(Design and Contingencies - $102,000)
(iv) S.R.0051
(A) S.R.0051 and S.R.4036 and T-699, Perry Township, add lane
600,000
(Base Construction Allocation - $522,000)
(Land Allocation - $30,000)
(Design and Contingencies - $48,000)
(v) S.R.0711
(A) Crawford Avenue and Pittsburgh Street, Connellsville Borough, signal improvement
350,000
(Base Construction Allocation - $304,000)
(Land Allocation - $18,000)
(Design and Contingencies - $28,000)
(vi) S.R.3019
(A) Morgantown Street, City of Uniontown, signal improvement
250,000
(Base Construction Allocation - $217,000)
(Land Allocation - $13,000)
(Design and Contingencies - $20,000)
(vii) S.R.0040
(A) S.R.0040, Brownsville interchange, Redstone Township, interchange completion
420,000
(Base Construction Allocation - $320,000)
(Land Allocation - $40,000)
(Design and Contingencies - $60,000)
(27) Forest County (Reserved)
(28) Franklin County
(i) S.R.0016
(A) S.R.0016, North Grant and Welty Roads, Waynesboro Borough, signal improvement
920,000
(Base Construction Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(ii) S.R.0316
(A) S.R.0316, Wayne Avenue from I-81 to Orchard Drive, widen and add median
460,000
(Base Construction Allocation - $420,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(iii) S.R.4015
(A) S.R.4015 and S.R.4010 intersection, Hamilton Township, intersection improvement
540,000
(Base Construction Allocation - $365,000)
(Land Allocation - $100,000)
(Design and Contingencies - $75,000)
(29) Fulton County
(i) S.R.0030
(A) S.R.0030 from S.R.0915 to S.R.4003, Licking Creek Township, safety improvement
3,420,000
(Base Construction Allocation - $3,000,000)
(Land Allocation - $320,000)
(Design and Contingencies - $100,000)
(ii) I-70
(A) I-70, eastbound and westbound rest areas, sewage system rehabilitation
538,000
(Base Construction Allocation - $305,000)
(Land Allocation - $145,000)
(Design and Contingencies - $88,000)
(iii) S.R.0522
(A) S.R.0522, Lincoln Way at 2nd and 3rd Streets, McConnellsburg Borough, signal improvement
125,000
(Base Construction Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $15,000)
(30) Greene County
(i) S.R.0019
(A) S.R.0019, various intersections, Waynesburg Borough, signal improvement
610,000
(Base Construction Allocation - $530,000)
(Land Allocation - $31,000)
(Design and Contingencies - $49,000)
(B) S.R.0019 from S.R.0019/S.R.0021 intersection to High Street, Waynesburg Corridor, Franklin Township
1,960,000
(Base Construction Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $160,000)
(ii) S.R.0021
(A) S.R.0021 and Elm Street intersection, Franklin Township, add lane
600,000
(Base Construction Allocation - $522,000)
(Land Allocation - $30,000)
(Design and Contingencies - $48,000)
(iii) I-79
(A) I-79 from Milepost 7 to Milepost 11, pavement rehabilitation
204,000
(Base Construction Allocation - $200,000)
(Design and Contingencies - $4,000)
(31) Huntingdon County
(i) S.R.0022
(A) S.R.0022 and T-614 intersection, Porter Township, intersection improvement
295,000
(Base Construction Allocation - $250,000)
(Land Allocation - $10,000)
(Design and Contingencies - $35,000)
(B) S.R.0022 and S.R.3039 intersection, Porter Township, intersection improvement
535,000
(Base Construction Allocation - $450,000)
(Land Allocation - $25,000)
(Design and Contingencies - $60,000)
(C) S.R.0022 from Blair-Huntingdon County line to S.R.0453, construct safety improvements and truck climbing lanes
440,000
(Base Construction Allocation - $360,000)
(Land Allocation - $80,000)
(D) S.R.0022, Water Street Bypass, relocation
2,000,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $300,000)
(Design and Contingencies - $200,000)
(ii) S.R.0026
(A) S.R.0026 intersections with 2nd and 8th Streets, Huntingdon Borough, signal improvement
385,000
(Base Construction Allocation - $355,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(32) Indiana County
(i) S.R.0022
(A) S.R.0022 and Armagh 4-lane interchange, interchange improvement
1,550,000
(Base Construction Allocation - $1,500,000)
(ii) S.R.0119
(A) S.R.0119 near Grove Chapel, construct climbing lanes
1,085,000
(Base Construction Allocation - $1,000,000)
(Design and Contingencies - $85,000)
(iii) S.R.0286
(A) S.R.0286 and S.R.1026 to S.R.1032, Montgomery Township, safety improvement
1,000,000
(Base Construction Allocation - $950,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(B) S.R.0286 and S.R.3031 intersection, Young Township, intersection improvement
900,000
(Base Construction Allocation - $840,000)
(Land Allocation - $50,000)
(Design and Contingencies - $10,000)
(iv) S.R.3043
(A) Rose Street Extension, relocation
149,000
(Land Allocation - $9,000)
(Design and Contingencies - $140,000)
(v) S.R.4005
(A) Wayne and Maple Streets intersection, Indiana Borough, intersection improvement
1,200,000
(Base Construction Allocation - $880,000)
(Land Allocation - $200,000)
(Design and Contingencies - $120,000)
(33) Jefferson County
(i) S.R.0036
(A) S.R.0036 from S.R.0322 to I-80, Brookville Borough and Rose Township, add lane
280,000
(Base Construction Allocation - $248,000)
(Design and Contingencies - $32,000)
(ii) I-80
(A) I-80 from S.R.0036 to Millcreek, pavement restoration
770,000
(Base Construction Allocation - $450,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(iii) S.R.0119
(A) S.R.0119 and Jenks Street intersection, Young Township and Punxsutawney Borough, intersection improvement
880,000
(Base Construction Allocation - $650,000)
(Land Allocation - $150,000)
(Design and Contingencies - $80,000)
(B) S.R.0119 from T-539 to T-508, reconstruction
1,020,000
(Base Construction Allocation - $955,000)
(Land Allocation - $23,000)
(Design and Contingencies - $42,000)
(C) S.R.0119, Punxsutawney South, construct climbing lane
1,005,000
(Base Construction Allocation - $917,000)
(Land Allocation - $53,000)
(Design and Contingencies - $35,000)
(iv) S.R.0830
(A) S.R.0830, Airport Road, realignment
880,000
(Base Construction Allocation - $800,000)
(Land Allocation - $50,000)
(Design and Contingencies - $30,000)
(v) S.R.0028,
(A) S.R.0028 and S.R.0322 intersection, safety improvement
80,000
(Base Construction Allocation - $60,000)
(Land Allocation - $13,000)
(Design and Contingencies - $7,000)
(34) Juniata County (Reserved)
(35) Lackawanna County
(i) Various State highways
(A) Lackawanna air quality, various locations countywide
2,000,000
(Base Construction Allocation - $1,800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) Exposed bridge ends, various locations districtwide, improvement
275,000
(Base Construction Allocation - $247,000)
(Design and Contingencies - $28,000)
(C) Guide rail, various locations districtwide, guide rail improvement
2,154,000
(Base Construction Allocation - $1,870,000)
(Design and Contingencies - $284,000)
(D) Shoulder drop-off, various locations districtwide, shoulder improvement
1,823,000
(Base Construction Allocation - $1,613,000)
(Design and Contingencies - $210,000)
(E) Daylight intersections, various locations districtwide, intersection improvement
357,000
(Base Construction Allocation - $273,000)
(Land Allocation - $50,000)
(Design and Contingencies - $34,000)
(ii) S.R.0006
(A) S.R.0006 and State and Grove Streets intersection, Clarks Summit Borough, intersection improvement
254,000
(Base Construction Allocation - $186,000)
(Land Allocation - $50,000)
(Design and Contingencies - $18,000)
(B) S.R.0006 and 5th Lane, South Abington Township, add lane
1,043,000
(Base Construction Allocation - $893,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(iii) S.R.0081
(A) I-81, Exit 51, interchange improvement
1,760,000
(Base Construction Allocation - $1,600,000)
(Design and Contingencies - $160,000)
(B) I-81, Exit 59 to Exit 63, Rehabilitation
522,000
(Base Construction Allocation - $522,000)
(iv) S.R.0084
(A) I-84, Exit 4, Mt. Cobb park and ride, Jefferson Township, parking lot
165,000
(Base Construction Allocation - $150,000)
(Design and Contingencies - $15,000)
(B) I-84 from I-380 to S.R.0247, pavement restoration
880,000
(Base Construction Allocation - $800,000)
(Design and Contingencies - $80,000)
(v) S.R.0307
(A) S.R.0307 and Moosic, Meadow and River Streets, City of Scranton, signal improvement
200,000
(Base Construction Allocation - $182,000)
(Design and Contingencies - $18,000)
(B) S.R.0307 and S.R.4036, Newton Township, intersection improvement
235,000
(Base Construction Allocation - $215,000)
(Land Allocation - $5,000)
(Design and Contingencies - $15,000)
(vi) S.R.0632
(A) S.R.0632 and Green Grove Road, Scott Township, intersection improvement
169,000
(Base Construction Allocation - $148,000)
(Land Allocation - $6,000)
(Design and Contingencies - $15,000)
(B) Lily Lake Road, Dalton Borough, road improvements, retaining wall and drainage construction
100,000
(Base Construction Allocation - $92,000)
(Design and Contingencies - $8,000)
(C) S.R.0632, Waverly and Abington Townships, road and drainage improvements
100,000
(Base Construction Allocation - $92,000)
(Design and Contingencies - $8,000)
(vii) S.R.1014
(A) Jessup Curve, Jessup Borough, safety improvement
250,000
(Base Construction Allocation - $175,000)
(Land Allocation - $50,000)
(Design and Contingencies - $25,000)
(viii) S.R.3011
(A) Keyser Avenue, Taylor Borough and City of Scranton, safety improvement
1,000,000
(Base Construction Allocation - $880,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(B) Keyser Avenue, Old Forge Borough to Taylor Borough, reconstruction and improvements
800,000
(Base Construction Allocation - $720,000)
(Design and Contingencies - $80,000)
(C) Keyser Avenue, Old Forge Borough to City of Scranton, reconstruction to 4-lane highway
12,000,000
(Base Construction Allocation - $10,500,000)
(Land Allocation - $300,000)
(Design and Contingencies - $1,200,000)
(ix) S.R.3019
(A) Lonesome Road, Old Forge Borough to Moosic Borough, reconstruction and improvements
2,000,000
(Base Construction Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(x) S.R.3027
(A) Mulberry Street corridor, City of Scranton, safety improvement
500,000
(Base Construction Allocation - $250,000)
(Land Allocation - $200,000)
(Design and Contingencies - $50,000)
(B) Mulberry Street from Main Avenue to Mulberry Street Bridge, reconstruction
3,141,000
(Base Construction Allocation - $2,962,000)
(Land Allocation - $60,000)
(Design and Contingencies - $119,000)
(xi) S.R.3031
(A) Rocky Glen Road, Moosic Borough, reconstruction and drainage improvements
800,000
(Base Construction Allocation - $720,000)
(Design and Contingencies - $80,000)
(xii) S.R.0611
(A) Northern Boulevard, Chinchilla Borough, construction of new retaining wall from existing wall to Pennsylvania Gas and Water Company property and road construction
3,000,000
(Base Construction Allocation - $2,700,000)
(Design and Contingencies - $300,000)
(B) S.R.0611, Clarks Summit Borough through Dalton Borough, road improvements, turning lanes, safety improvements and signalization
5,000,000
(Base Construction Allocation - $4,250,000)
(Land Allocation - $250,000)
(Design and Contingencies - $500,000)
(xiii) S.R.6011
(A) S.R.6011 and Sanderson Avenue, City of Scranton, signal improvement
211,000
(Base Construction Allocation - $190,000)
(Design and Contingencies - $21,000)
(xiv) S.R.4032
(A) Shady Lane Road, Chinchilla Borough, reconstruction, safety and drainage improvements
1,500,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $150,000)
(xv) Fords Pond Road
(A) Fords Pond Road, Newton Township, reconstruction and drainage improvements
100,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $10,000)
(36) Lancaster County
(i) Various State highways
(A) Lancaster air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0023
(A) S.R.0023 and Centerville Road, East Hempfield Township, intersection improvement
360,000
(Base Construction Allocation - $250,000)
(Land Allocation - $50,000)
(Design and Contingencies - $60,000)
(iii) S.R.0030
(A) S.R.0030, East Lampeter Township, pedestrian safety and signal improvement
190,000
(Base Construction Allocation - $150,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(iv) S.R.0041
(A) S.R.0041 corridor, Sadsbury Township, add lane
2,500,000
(Base Construction Allocation - $2,200,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(v) S.R.0222
(A) Conrail bridge over S.R.0222, Providence Township, bridge removal
295,000
(Base Construction Allocation - $225,000)
(Land Allocation - $30,000)
(Design and Contingencies - $40,000)
(B) S.R.0222 and S.R.2029 intersection, Strasburg Township, intersection improvement
435,000
(Base Construction Allocation - $350,000)
(Land Allocation - $10,000)
(Design and Contingencies - $75,000)
(vi) S.R.0230
(A) S.R.0230 from Barbara Street to Angle Street, Mt. Joy Borough, signal improvement
475,000
(Base Construction Allocation - $400,000)
(Land Allocation - $15,000)
(Design and Contingencies - $60,000)
(B) S.R.0230 and Espenshade Road, Rapho Township, signal improvement
305,000
(Base Construction Allocation - $250,000)
(Land Allocation - $5,000)
(Design and Contingencies - $50,000)
(vii) S.R.0272
(A) S.R.0272 and S.R.0897 intersection, East Cocalico Township, signal improvement
440,000
(Base Construction Allocation - $370,000)
(Land Allocation - $10,000)
(Design and Contingencies - $60,000)
(viii) S.R.0300
(A) I-283 from S.R.0230 to S.R.0300, reconstruction
6,176,000
(Base Construction Allocation - $5,875,000)
(Land Allocation - $7,000)
(Design and Contingencies - $294,000)
(ix) S.R.0741
(A) S.R.0741 corridor, various townships, Millersville and Strasburg Boroughs, signal improvement
2,370,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $120,000)
(Design and Contingencies - $250,000)
(B) S.R.0741, traffic relief route from S.R.0741 to Duke Street, Millersville Borough
2,200,000
(Base Construction Allocation - $2,000,000)
(Design and Contingencies - $200,000)
(x) S.R.0772
(A) S.R.0772 and Horseshoe Road intersection, Upper Leacock Township, intersection improvement
950,000
(Base Construction Allocation - $800,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(37) Lawrence County
(i) Various State highways
(A) Various locations, New Castle Area Transportation Authority bus shelters, pedestrian facilities
65,000
(Base Construction Allocation - $55,000)
(Land Allocation - $3,000)
(Design and Contingencies - $7,000)
(B) Various locations, pedestrian safety and transportation study
60,000
(Design and Contingencies - $60,000)
(ii) S.R.0018
(A) City of New Castle, New Castle Area Transportation Authority, bus stop signs at various locations
75,000
(Base Construction Allocation - $68,000)
(Design and Contingencies - $7,000)
(iii) S.R.0065
(A) 2nd Street Bridge attenuator, City of New Castle, impact attenuator
65,000
(Base Construction Allocation - $59,000)
(Design and Contingencies - $6,000)
(B) S.R.0065, Shenango Township, widen to 5 lanes
1,250,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $125,000)
(Design and Contingencies - $125,000)
(iv) I-79
(A) I-79, northbound and southbound rest areas, sewage system rehabilitation
550,000
(Base Construction Allocation - $500,000)
(Design and Contingencies - $50,000)
(38) Lebanon County
(i) Various State highways
(A) Lebanon air quality, various locations countywide
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0022
(A) S.R.0022 safety corridor, East Hanover, Swatara and Bethel Townships, median barrier
4,200,000
(Base Construction Allocation - $3,500,000)
(Land Allocation - $150,000)
(Design and Contingencies - $550,000)
(iii) S.R.0081
(A) I-81 from Dauphin County line to I-78, reconstruction
2,261,000
(Base Construction Allocation - $2,160,000)
(Land Allocation - $1,000)
(Design and Contingencies - $100,000)
(iv) S.R.0322
(A) S.R.0322 safety corridor, Cornwall Borough and various townships, median barrier
2,775,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $150,000)
(Design and Contingencies - $125,000)
(v) S.R.0422
(A) S.R.0422 safety corridor, various municipalities, signal improvement
260,000
(Base Construction Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(39) Lehigh County
(i) Various State highways
(A) Lehigh air quality, various locations countywide
1,500,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0022
(A) S.R.0022 from Fullerton Avenue to Northampton County line, restoration
4,300,000
(Base Construction Allocation - $4,125,000)
(Land Allocation - $50,000)
(Design and Contingencies - $125,000)
(iii) I-78
(A) I-78, construction of safety rest area
470,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $20,000)
(iv) S.R.0145
(A) S.R.0145 from 6th Street to S.R.0022, City of Allentown and Whitehall Township, widen to 64 feet
4,300,000
(Base Construction Allocation - $3,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $300,000)
(v) S.R.0309
(A) S.R.0309 from Fairmount to Station, Upper Saucon Township, add lane
1,521,000
(Base Construction Allocation - $950,000)
(Land Allocation - $315,000)
(Design and Contingencies - $256,000)
(B) S.R.0309 and S.R.0873 intersection, North Whitehall Township, intersection improvement
625,000
(Base Construction Allocation - $400,000)
(Land Allocation - $150,000)
(Design and Contingencies - $75,000)
(vi) S.R.1002
(A) S.R.1002 and S.R.4001 intersection, Upper Macungie Township, intersection improvement
550,000
(Base Construction Allocation - $450,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(vii) S.R.1014
(A) S.R.1014 crossing Ironton Railroad over Lehigh Street Bridge, removal of bridge and fill of cut
250,000
(Base Construction Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(viii) S.R.2006
(A) Ott and Hamilton Streets, City of Allentown, signing
35,000
(Base Construction Allocation - $30,000)
(Design and Contingencies - $5,000)
(B) S.R.2006 at intersection with S.R.1019, South Whitehall Township, intersection improvement
1,400,000
(Base Construction Allocation - $1,100,000)
(Land Allocation - $50,000)
(Design and Contingencies - $250,000)
(40) Luzerne County
(i) Various State highways
(A) Luzerne air quality, various locations countywide
2,000,000
(Base Construction Allocation - $1,800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0011
(A) S.R.0011 and S.R.0239 intersection, Shickshinny Borough, signal improvement
112,000
(Base Construction Allocation - $102,000)
(Design and Contingencies - $10,000)
(B) S.R.0011, Wyoming Avenue and Market Street, Kingston Borough, signal improvement
175,000
(Base Construction Allocation - $157,000)
(Design and Contingencies - $18,000)
(C) S.R.0011, Wyoming Avenue and Carle Street, Kingston Borough, signal improvement
130,000
(Base Construction Allocation - $116,000)
(Design and Contingencies - $14,000)
(D) S.R.0011 and S.R.4016 intersection, Hunlock Township, safety improvement
100,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $10,000)
(iii) S.R.0081
(A) I-81, Exit 45, Blackman park and ride, City of Wilkes-Barre, parking lot
165,000
(Base Construction Allocation - $150,000)
(Design and Contingencies - $15,000)
(iv) I-81
(A) I-81 from Schuylkill County line north of I-80 interchange, rehabilitation
2,000,000
(Base Construction Allocation - $1,900,000)
(Design and Contingencies - $100,000)
(B) I-81, Exit 43, interchange improvement
4,175,000
(Base Construction Allocation - $3,750,000)
(Land Allocation - $250,000)
(Design and Contingencies - $175,000)
(C) I-81 from I-80 to Lenox, rock slide mitigation
1,150,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(v) S.R.0093
(A) Broad and Diamond Avenues, City of Hazleton and West Hazleton Borough, intersection improvement
299,000
(Base Construction Allocation - $254,000)
(Land Allocation - $5,000)
(Design and Contingencies - $40,000)
(B) S.R.0093 and Rock Glen Road, Sugarloaf Township, safety improvement
294,000
(Base Construction Allocation - $265,000)
(Design and Contingencies - $29,000)
(vi) S.R.0118
(A) S.R.0118 and S.R.0415, Lehman Township, intersection improvement
288,000
(Base Construction Allocation - $253,000)
(Land Allocation - $10,000)
(Design and Contingencies - $25,000)
(vii) S.R.0309
(A) S.R.0309 and Church and Carverton intersection, Kingston Borough, signal improvement
112,000
(Base Construction Allocation - $102,000)
(Design and Contingencies - $10,000)
(B) S.R.0309 and Buttonwood interchange, City of Hazleton, intersection improvement
211,000
(Base Construction Allocation - $169,000)
(Land Allocation - $25,000)
(Design and Contingencies - $17,000)
(C) S.R.0309 corridor west, S.R.0309 and Susquehanna River to S.R.0415 in Dallas Township, safety improvement
1,000,000
(Base Construction Allocation - $900,000)
(Design and Contingencies - $100,000)
(D) S.R.0309, Dallas park and ride, Kingston Township, parking lot
204,000
(Base Construction Allocation - $150,000)
(Land Allocation - $35,000)
(Design and Contingencies - $19,000)
(E) S.R.0309, North Cross Valley Expressway, Forty Fort and Kingston Boroughs, noise abatement project
4,400,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(viii) S.R.0315
(A) S.R.0315, Suscon Road and Main Street intersection, Dupont Borough, intersection improvement
99,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $9,000)
(B) S.R.0315 and I-81 interchange, Pittston park and ride, Pittston Township, parking lot
165,000
(Base Construction Allocation - $150,000)
(Design and Contingencies - $15,000)
(C) S.R.0315 corridor, Plains and Jenkins Townships, Laflin Borough and City of Pittston, safety improvement
2,000,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(ix) S.R.1006
(A) S.R.1006, off-ramp and Rutter Avenue, Forty Fort Borough, safety improvement
250,000
(Base Construction Allocation - $225,000)
(Design and Contingencies - $25,000)
(x) S.R.2002
(A) Sans Souci Highway, Hanover Township, safety improvement
965,000
(Base Construction Allocation - $845,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(B) S.R.2002 and Dundee Road, City of Nanticoke, intersection improvement
306,000
(Base Construction Allocation - $278,000)
(Design and Contingencies - $28,000)
(xi) S.R.2005
(A) Horton and Franklin Streets, City of Wilkes-Barre, signal improvement
128,000
(Base Construction Allocation - $113,000)
(Design and Contingencies - $15,000)
(xii) S.R.2035
(A) S.R.2035 and S.R.0315 and Bear Creek Road intersection, Dupont Borough, signal improvement
99,000
(Base Construction Allocation - $90,000)
(Design and Contingencies - $9,000)
(xiii) S.R.6309
(A) S.R.6309 corridor, City of Wilkes-Barre and Wilkes-Barre Township, safety improvement
481,000
(Base Construction Allocation - $432,000)
(Land Allocation - $6,000)
(Design and Contingencies - $43,000)
(B) S.R.6309 corridor east, City of Wilkes-Barre, Kingston Township and Dallas Borough, safety improvement
1,000,000
(Base Construction Allocation - $900,000)
(Design and Contingencies - $100,000)
(xiv) S.R.0115
(A) S.R.0115, Bear Creek Boulevard, Plains Township, construct fly over ramp to I-81
7,200,000
(Base Construction Allocation - $6,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $700,000)
(xv) S.R.0924
(A) S.R.0924, Can Do Freeway interchange, Hazle Township, modification
7,100,000
(Base Construction Allocation - $5,000,000)
(Land Allocation - $1,300,000)
(Design and Contingencies - $800,000)
(41) Lycoming County
(i) Various State highways
(A) Lycoming air quality, various locations countywide
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0015
(A) S.R.0015 from Hepburnville to Cogan Station, Hepburn Township, widen to 40 feet
1,735,000
(Base Construction Allocation - $1,350,000)
(Land Allocation - $250,000)
(Design and Contingencies - $135,000)
(iii) S.R.0180
(A) I-180 from Hepburn Street to Maynard Street, City of Williamsport, add lane
4,000,000
(Base Construction Allocation - $3,500,000)
(Land Allocation - $450,000)
(Design and Contingencies - $50,000)
(iv) S.R.2014
(A) S.R.2014 from Northway Road to Westminister Drive, Loyalsock Township, signal improvement
200,000
(Base Construction Allocation - $135,000)
(Land Allocation - $50,000)
(Design and Contingencies - $15,000)
(B) Williamsport Bus Transfer Station, 3rd Street and Pine to Court Street, 3rd and Market Streets, City of Williamsport, miscellaneous
1,100,000
(Base Construction Allocation - $1,050,000)
(Design and Contingencies - $50,000)
(v) S.R.2023
(A) Market Street and Little League Boulevard, City of Williamsport, signal improvement
125,000
(Base Construction Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $15,000)
(vi) S.R.2036
(A) S.R.2036 from Halls Station to I-180, Muncy Township, widen to 40 feet
1,400,000
(Base Construction Allocation - $1,100,000)
(Land Allocation - $200,000)
(Design and Contingencies - $100,000)
(42) McKean County
(i) S.R.0219
(A) S.R.0219 from I-80 to New York State line, add climbing lanes and safety improvements
6,500,000
(Base Construction Allocation - $6,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(ii) S.R.0346
(A) S.R.0346 and S.R.4005 and S.R.0219 ramp and intersection, Foster Township, add lane
660,000
(Base Construction Allocation - $610,000)
(Land Allocation - $20,000)
(Design and Contingencies - $30,000)
(43) Mercer County
(i) Various State highways
(A) Mercer air quality, various locations countywide
2,300,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $60,000)
(Design and Contingencies - $240,000)
(ii) S.R.0018
(A) S.R.0018 and S.R.0062 intersection, City of Hermitage, signal improvement
100,000
(Base Construction Allocation - $80,000)
(Design and Contingencies - $20,000)
(iii) S.R.0062
(A) S.R.0062 and Freeway and Sunset and S.R.0062 business interchange, City of Hermitage, intersection improvement
650,000
(Base Construction Allocation - $578,000)
(Land Allocation - $12,000)
(Design and Contingencies - $60,000)
(B) S.R.0062 from Sharpsville to State, City of Sharon and City of Hermitage, add lane
2,000,000
(Base Construction Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(iv) I-80
(A) I-80 from Milepost 2 to Milepost 15, Ohio line to S.R.0015, restoration
3,800,000
(Base Construction Allocation - $3,720,000)
(Design and Contingencies - $80,000)
(v) S.R.0060
(A) S.R.0060 from Lawrence County line to Wheatland Borough, rehabilitation and pavement
1,320,000
(Base Construction Allocation - $1,200,000)
(Design and Contingencies - $120,000)
(vi) S.R.0358
(A) S.R.0358 from 6th Avenue to Quartermile, Hempfield Township, widen to 36 feet
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(vii) S.R.0418
(A) S.R.0418 and S.R.0062, freeway, Morefield and Maple intersections, City of Hermitage, signal improvement
180,000
(Base Construction Allocation - $170,000)
(Design and Contingencies - $10,000)
(viii) S.R.0518
(A) S.R.0518 and Mercer Avenue and Lamor Road, Sharpsville Borough, signal improvement
100,000
(Base Construction Allocation - $80,000)
(Design and Contingencies - $20,000)
(ix) S.R.3008
(A) S.R.3008 from S.R.0018 to Keel Road, City of Hermitage, add lane
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(x) S.R.3025
(A) S.R.3025 from freeway to S.R.0062, City of Hermitage, signal improvement
100,000
(Base Construction Allocation - $80,000)
(Design and Contingencies - $20,000)
(44) Mifflin County
(i) S.R.0022
(A) S.R.0022 from S.R.0322 to Mifflin-Huntingdon County line, construct safety improvements
460,000
(Base Construction Allocation - $320,000)
(Land Allocation - $80,000)
(Design and Contingencies - $60,000)
(B) S.R.0022/S.R.0322 Narrows from Lewistown Bypass to Mifflintown
2,615,000
(Base Construction Allocation - $1,540)
(Land Allocation - $675,000)
(Design and Contingencies - $400,000)
(C) S.R.0022, Lewistown Bypass, 4-lane divided relocation
14,550,000
(Base Construction Allocation - $13,050,000)
(Land Allocation - $900,000)
(Design and Contingencies - $600,000)
(45) Monroe County
(i) Various State highways
(A) Monroe air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) S.R.0115, I-80 and S.R.4002 transportation study, preliminary engineering only
125,000
(Design and Contingencies - $125,000)
(ii) S.R.0080
(A) I-80, Exit 53, welcome center and park and ride, Delaware Water Gap, parking lot
300,000
(Base Construction Allocation - $250,000)
(Design and Contingencies - $50,000)
(iii) I-80
(A) I-80, eastbound rest area, sewage system rehabilitation
315,000
(Base Construction Allocation - $250,000)
(Design and Contingencies - $65,000)
(iv) S.R.0209
(A) S.R.0209 from S.R.0715 to S.R.3005, Chestnut Hill Township, widen to 48 feet
750,000
(Base Construction Allocation - $460,000)
(Land Allocation - $200,000)
(Design and Contingencies - $90,000)
(v) S.R.0380
(A) I-380 from S.R.0940 to Lackawanna County line, restoration
1,840,000
(Base Construction Allocation - $1,830,000)
(Design and Contingencies - $10,000)
(vi) S.R.0611
(A) S.R.0611 from S.R.2016 to S.R.2011, Stroud Township, widen to 64 feet
900,000
(Base Construction Allocation - $525,000)
(Land Allocation - $300,000)
(Design and Contingencies - $75,000)
(B) S.R.0611 from T-535 to T-537, Pocono Township, widen to 64 feet
2,400,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $400,000)
(C) S.R.0611 from T-535 to T-628, restoration and safety improvements
2,500,000
(Base Construction Allocation - $2,250,000)
(Land Allocation - $175,000)
(Design and Contingencies - $75,000)
(D) S.R.0611 and I-80 interchange, feasibility study
50,000
(Design and Contingencies - $50,000)
(vii) S.R.0196
(A) S.R.0196, construct safety improvements
1,200,000
(46) Montgomery County
(i) Various State highways
(A) Montgomery air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0029
(A) S.R.0029 to S.R.0422, construction of eastbound on-ramp and intersection
390,000
(Base Construction Allocation - $375,000)
(Design and Contingencies - $15,000)
(iii) I-95
(A) Philmont park and ride, fringe parking expansion
132,000
(Base Construction Allocation - $111,000)
(Design and Contingencies - $21,000)
(B) Meadowbrook park and ride, fringe parking expansion
72,000
(Base Construction Allocation - $52,000)
(Design and Contingencies - $20,000)
(iv) S.R.0100
(A) S.R.0100, corridor from Shoemaker Road to Rick Road, Pottstown Borough and Upper Pottsgrove Township, safety improvement
150,000
(Base Construction Allocation - $135,000)
(Design and Contingencies - $15,000)
(v) S.R.0113
(A) S.R.0113, Lederach Bypass, 2-lane relocation, preliminary engineering only
125,000
(Design and Contingencies - $125,000)
(vi) S.R.0202
(A) S.R.0202 from S.R.0073 to Township Line Road, widen
300,000
(Base Construction Allocation - $300,000)
(vii) S.R.0309
(A) S.R.0309 from North Wales Road to Five Points, Montgomery Township, add lane
844,000
(Base Construction Allocation - $380,000)
(Land Allocation - $380,000)
(Design and Contingencies - $84,000)
(B) S.R.0309 from Five Points to Sellersville Bypass, Montgomery and Hilltown Townships, add lane
5,060,000
(Base Construction Allocation - $4,100,000)
(Land Allocation - $500,000)
(Design and Contingencies - $460,000)
(C) S.R.0309 from Greenwood Avenue to Commerce Road, restoration
10,200,000
(Base Construction Allocation - $9,700,000)
(Design and Contingencies - $500,000)
(D) S.R.0309 from Commerce Road to Welsh Road, pavement restoration
8,640,000
(Base Construction Allocation - $8,440,000)
(Design and Contingencies - $200,000)
(viii) S.R.0611
(A) S.R.0611 from Pa. Turnpike to Blair Mill Road, Upper Moreland Township, signal improvement
550,000
(Base Construction Allocation - $500,000)
(Design and Contingencies - $50,000)
(ix) S.R.3001
(A) Six Points intersection, reconstruction
571,000
(Base Construction Allocation - $532,000)
(Design and Contingencies - $39,000)
(x) S.R.3007
(A) Plymouth and Johnson Highway, Plymouth Township, signal improvement
300,000
(Base Construction Allocation - $270,000)
(Design and Contingencies - $30,000)
(xi) S.R.3014
(A) Bethlehem Pike from Pennsylvania Avenue to Morris Road, intersection improvements and relocation of Lafayette Road
499,000
(Base Construction Allocation - $412,000)
(Land Allocation - $50,000)
(Design and Contingencies - $37,000)
(xii) S.R.3035
(A) King of Prussia Road from Red Oak Terrace to Linsay Drive, Upper Merion Township, safety improvement
367,000
(Base Construction Allocation - $285,000)
(Land Allocation - $39,000)
(Design and Contingencies - $43,000)
(xiii) S.R.3053
(A) Germantown Pike, Plymouth Township, signal improvement
900,000
(Base Construction Allocation - $580,000)
(Land Allocation - $200,000)
(Design and Contingencies - $120,000)
(xiv) S.R.0422
(A) S.R.0422 from S.R.0023 to S.R.0363, S.R.0422 and Betzwood Bridge
2,090,000
(Base Construction Allocation - $2,000,000)
(Design and Contingencies - $90,000)
(xv) S.R.1011
(A) Green Street and Walnut Street from Main Street in Souderton Borough to Summit Street in Franconia Township, roadway reconstruction
850,000
(Base Construction Allocation - $760,000)
(Design and Contingencies - $90,000)
(47) Montour County
(i) S.R.0080
(A) I-80 from Milepost 220 to Milepost 232, pavement restoration
2,750,000
(Base Construction Allocation - $2,500,000)
(Design and Contingencies - $250,000)
(B) I-80 from Milepost 218 to Milepost 222, pavement restoration
434,000
(Base Construction Allocation - $414,000)
(Design and Contingencies - $20,000)
(ii) S.R.0054
(A) S.R.0054, Danville Borough, reconstruction
16,000,000
(Base Construction Allocation - $14,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,500,000)
(iii) S.R.0054
(A) S.R.0054, Danville river bridge approach, Danville Borough
800,000
(Base Construction Allocation - $680,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(48) Northampton County
(i) Various State highways
(A) Northampton air quality, various locations countywide
1,500,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0022
(A) S.R.0022 from Lehigh County line to S.R.0440, restoration
4,419,000
(Base Construction Allocation - $4,250,000)
(Land Allocation - $100,000)
(Design and Contingencies - $69,000)
(iii) S.R.0033
(A) S.R.0033 from S.R.0512 to Monroe County line, pavement rehabilitation
3,304,000
(Base Construction Allocation - $3,200,000)
(Design and Contingencies - $104,000)
(B) S.R.0033 and S.R.0512 interchange, rehabilitation
360,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(C) S.R.0033 from S.R.0022 north to Lehigh River Bridge, construct new highway
32,100,000
(D) S.R.0033 from Lehigh River Bridge north to I-78, construct new highway
54,900,000
(E) S.R.0033 interchanges with William Penn Highway and Freemansburg Avenue, preliminary impact study
500,000
(Design and Contingencies - $500,000)
(iv) S.R.0078
(A) S.R.0078 and S.R.0412 interchange, Hellertown park and ride, Bethlehem Township, parking lot
350,000
(Base Construction Allocation - $250,000)
(Design and Contingencies - $100,000)
(v) S.R.0191
(A) S.R.0191 corridor from S.R.0022 to S.R.0248, Lower Nazareth Township, intersection improvement
2,620,000
(Base Construction Allocation - $2,220,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(vi) S.R.0329
(A) S.R.0329 and S.R.0987 intersection, East Allen Township, intersection improvement
625,000
(Base Construction Allocation - $450,000)
(Land Allocation - $100,000)
(Design and Contingencies - $75,000)
(vii) S.R.2020
(A) S.R.2020 and S.R.3007 and Butztwin Road intersection, Bethlehem Township, safety improvement
1,000,000
(Base Construction Allocation - $600,000)
(Land Allocation - $250,000)
(Design and Contingencies - $150,000)
(viii) S.R.0611
(A) S.R.0611 from 3rd Street Bridge to Williams Township line, restoration
455,000
(49) Northumberland County
(i) S.R.0061
(A) S.R.0061 and S.R.0487 at Paxinos, Shamokin Township, signal improvement
970,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $70,000)
(ii) I-80
(A) I-80 from Milepost 214 to Milepost 217, pavement restoration
715,000
(Base Construction Allocation - $650,000)
(Design and Contingencies - $65,000)
(iii) I-180
(A) I-180 from S.R.0054 to S.R.1007, pavement rehabilitation
160,000
(Base Construction Allocation - $160,000)
(50) Perry County
(i) Various State highways
(A) Perry air quality, various locations countywide
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0011
(A) S.R.0011/S.R.0015 from Duncannon Borough to Clarks Ferry Bridge, pavement rehabilitation
2,200,000
(Base Construction Allocation - $2,100,000)
(Design and Contingencies - $100,000)
(iii) S.R.0022
(A) S.R.0022 and S.R.0034 interchange, Perry County park and ride, Howe Township, parking lot
275,000
(Base Construction Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $25,000)
(iv) S.R.0274
(A) S.R.0274 and S.R.0850 intersection, Northeast Madison Township, intersection improvement
540,000
(Base Construction Allocation - $450,000)
(Land Allocation - $30,000)
(Design and Contingencies - $60,000)
(v) S.R.0849
(A) S.R.0849 and S.R.1021 intersection, Penn Township, intersection improvement
370,000
(Base Construction Allocation - $300,000)
(Land Allocation - $30,000)
(Design and Contingencies - $40,000)
(51) Philadelphia County
(i) Various State highways
(A) Philadelphia air quality, various locations countywide
5,000,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0001
(A) S.R.0001 from 9th Street to Pa. Turnpike, City of Philadelphia, safety improvement
1,670,000
(Base Construction Allocation - $1,450,000)
(Design and Contingencies - $220,000)
(iii) S.R.0013
(A) S.R.0013 from Bridge Street to Bucks County line, City of Philadelphia, signal improvement
800,000
(Base Construction Allocation - $720,000)
(Design and Contingencies - $80,000)
(iv) S.R.0095
(A) Somerton park and ride, fringe parking expansion
321,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $21,000)
(B) I-95, Philadelphia, Delaware and Bucks Counties, restoration and preconstruction improvements
54,000,000
(Base Construction Allocation - $48,200,000)
(Land Allocation - $2,200,000)
(Design and Contingencies - $3,600,000)
(C) I-95, public information and community relations activities, restoration
400,000
(Base Construction Allocation - $400,000)
(D) I-95, west side between Somerset and Norris Streets, sound barrier construction
3,000,000
(E) I-95, west side between Norris and Laurel Streets, sound barrier construction
4,000,000
(F) I-95, west side between Spring Garden and Poplar Streets, sound barrier construction
2,000,000
(G) I-95, west side between Snyder and Jackson Streets, sound barrier construction
500,000
(H) I-95, west side between Jackson and Wolf Streets, sound barrier construction
400,000
(I) I-95, west side between Wolf and Ritner Streets, sound barrier construction
500,000
(J) I-95, west side between Ritner and Porter Streets, sound barrier construction
500,000
(K) I-95, west side between Porter and Shunk Streets, sound barrier construction
500,000
(v) S.R.0291
(A) S.R.0291 CBD System Stage II from South Street to Spring Garden Street, City of Philadelphia, signal improvement
8,280,000
(Base Construction Allocation - $7,200,000)
(Design and Contingencies - $1,080,000)
(vi) S.R.0611
(A) S.R.0611 from Spring Garden Street to Montgomery County line, City of Philadelphia, safety improvement
1,630,000
(Base Construction Allocation - $1,500,000)
(Design and Contingencies - $130,000)
(vii) S.R.1007
(A) State Road, City of Philadelphia, signal improvement
550,000
(Base Construction Allocation - $500,000)
(Design and Contingencies - $50,000)
(viii) S.R.1013
(A) S.R.1013 from Academy Road to Grant Avenue, City of Philadelphia, widen to 80 feet
1,455,000
(Base Construction Allocation - $1,125,000)
(Land Allocation - $130,000)
(Design and Contingencies - $200,000)
(B) Academy Road, City of Philadelphia, add lane
1,100,000
(Base Construction Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(ix) S.R.2009
(A) Harbison Avenue and Aramingo Avenue intersection, City of Philadelphia, intersection improvement
1,320,000
(Base Construction Allocation - $1,200,000)
(Design and Contingencies - $120,000)
(x) S.R.2016
(A) Allegheny Avenue, City of Philadelphia, safety improvement
1,375,000
(Base Construction Allocation - $1,250,000)
(Design and Contingencies - $125,000)
(xi) S.R.3001
(A) Stadium Complex, I-76 and Broad Street interchange, City of Philadelphia, interchange improvement
1,940,000
(Base Construction Allocation - $1,600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $240,000)
(xii) S.R.3007
(A) S.R.3007 at Sedgley Avenue and Aquarium Drive, City of Philadelphia, safety improvement
350,000
(Base Construction Allocation - $315,000)
(Design and Contingencies - $35,000)
(xiii) S.R.3010
(A) Market Street, City of Philadelphia, safety improvement
683,000
(Base Construction Allocation - $620,000)
(Design and Contingencies - $63,000)
(xiv) Old Delaware Avenue
(A) Old Delaware Avenue service road, restoration
800,000
(Base Construction Allocation - $675,000)
(Land Allocation - $75,000)
(Design and Contingencies - $50,000)
(xv) Advanced Driver Information Systems
(A) Planning
500,000
(Design and Contingencies - $500,000)
(xvi) I-76
(A) I-76 at Broad Street, Packer Avenue and Pollock Street, ramp reconstruction
1,850,000
(Base Construction Allocation - $1,600,000)
(Design and Contingencies - $250,000)
(B) I-76 at Broad Street, widen eastbound off-ramp
650,000
(Base Construction Allocation - $600,000)
(Design and Contingencies - $50,000)
(C) I-76 off-ramp between Darien Street and 10th Street, feasibility study
65,000
(Design and Contingencies - $65,000)
(52) Pike County
(i) S.R.0006
(A) S.R.0006 curve cluster, Palmyra Township, safety improvement
390,000
(Base Construction Allocation - $351,000)
(Design and Contingencies - $39,000)
(B) S.R.0006, Westfall park and ride, Westfall Township, parking lot
165,000
(Base Construction Allocation - $150,000)
(Design and Contingencies - $15,000)
(ii) S.R.0507
(A) S.R.0507 and S.R.0390 intersection, Palmyra Township, safety improvement
166,000
(Base Construction Allocation - $149,000)
(Design and Contingencies - $17,000)
(B) S.R.0507 curve cluster, Greene and Palmyra Townships, safety improvement
768,000
(Base Construction Allocation - $691,000)
(Design and Contingencies - $77,000)
(iii) S.R.4001
(A) S.R.4001 curve cluster, Greene Township, safety improvement
132,000
(Base Construction Allocation - $119,000)
(Design and Contingencies - $13,000)
(iv) S.R.2001
(A) S.R.2001 from S.R.2009 to S.R.0006, Dingman and Milford Townships, Milford-Bushkill restoration
3,088,000
(Base Construction Allocation - $2,588,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(53) Potter County
(i) S.R.0006
(A) S.R.0006 and S.R.3017, Coudersport Borough, signal improvement
100,000
(Base Construction Allocation - $60,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(54) Schuylkill County
(i) S.R.0061
(A) S.R.0061 from S.R.0183 to S.R.2015, North Manheim Township, median barrier
2,250,000
(Base Construction Allocation - $1,750,000)
(Land Allocation - $350,000)
(Design and Contingencies - $150,000)
(B) S.R.0061 from S.R.2014 to S.R.0895, Deer Lake Borough, safety improvement
6,000,000
(Base Construction Allocation - $5,400,000)
(Land Allocation - $350,000)
(Design and Contingencies - $250,000)
(C) S.R.0061, Port Clinton Borough, widen to 86 feet
1,050,000
(Base Construction Allocation - $870,000)
(Land Allocation - $100,000)
(Design and Contingencies - $80,000)
(D) S.R.0061 from I-78 to I-81, preliminary engineering and corridor study
250,000
(Design and Contingencies - $250,000)
(ii) S.R.0081
(A) I-81 northbound, Foster Township, rest area construction
280,000
(Base Construction Allocation - $248,000)
(Design and Contingencies - $32,000)
(iii) S.R.0924
(A) S.R.0924, Intersection of Shenandoah Heights and Route 924, intersection improvements, including signalization and realignment
1,687,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $88,000)
(Design and Contingencies - $299,000)
(55) Snyder County
(i) S.R.0011
(A) S.R.0011/S.R.0015 and 11th Avenue intersection, Shamokin Dam Borough and Monroe Township, signal improvement
75,000
(Base Construction Allocation - $60,000)
(Design and Contingencies - $15,000)
(ii) S.R.0522
(A) S.R.0522, 5 bridges and S.R.0044, 1 bridge guide rail improvement
130,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(56) Somerset County
(i) S.R.0031
(A) S.R.0031 and S.R.0281 and S.R.0601 intersections, Somerset Borough, grid update and signal improvement
500,000
(Base Construction Allocation - $450,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(ii) S.R.0030
(A) S.R.0030 and S.R.0403, Jennerstown Borough and Conemaugh Township, signal improvement
105,000
(Base Construction Allocation - $95,000)
(Land Allocation - $3,000)
(Design and Contingencies - $7,000)
(iii) Various State highways
(A) Somerset air quality, various locations countywide
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(iv) S.R.1033
(A) Somerset Avenue intersections, Windber Borough, intersection improvement
1,000,000
(Base Construction Allocation - $825,000)
(Land Allocation - $50,000)
(Design and Contingencies - $125,000)
(v) S.R.0601
(A) S.R.0601, North Center Avenue from Lake Road to Somerset Mall, widen and reconstruction
950,000
(Base Construction Allocation - $812,000)
(Land Allocation - $125,000)
(Design and Contingencies - $13,000)
(B) S.R.0601 from Somerset Mall to S.R.0219, widen and reconstruction
712,000
(Base Construction Allocation - $650,000)
(Land Allocation - $50,000)
(Design and Contingencies - $12,000)
(vi) S.R.6219
(A) Meyersdale Bypass from Shaw Mines to Pony Farm, design 4-lane divided relocation
125,000
(Design and Contingencies - $125,000)
(vii) S.R.0056
(A) S.R.0056, Windber Bypass from Windber Borough to Scalp Level, reconstruction
3,009,000
(Base Construction Allocation - $2,783,000)
(Land Allocation - $63,000)
(Design and Contingencies - $163,000)
(B) S.R.0056 interchange with S.R.0601, Windber ramps reconstruction
450,000
(Base Construction Allocation - $346,000)
(Land Allocation - $20,000)
(Design and Contingencies - $84,000)
(viii) S.R.0219
(A) S.R.0219, Meyersdale Bypass, relocation
12,380,000
(Base Construction Allocation - $11,750,000)
(Land Allocation - $250,000)
(Design and Contingencies - $380,000)
(B) S.R.0219 from Davidsville to S.R.0030, pavement restoration
3,000,000
(Base Construction Allocation - $2,680,000)
(Land Allocation - $40,000)
(Design and Contingencies - $280,000)
(57) Sullivan County (Reserved)
(58) Susquehanna County
(i) I-81
(A) I-81 from Milepost 230 to Milepost 232, bridge rehabilitation
110,000
(Base Construction Allocation - $100,000)
(Design and contingencies - $10,000)
(B) I-81, southbound rest area, sewage system rehabilitation
334,000
(Base Construction Allocation - $300,000)
(Design and Contingencies - $34,000)
(C) I-81, Exit 63 to New York State line, Rehabilitation
1,452,000
(Base Construction Allocation - $1,452,000)
(59) Tioga County
(i) S.R.0015
(A) S.R.0015 from S.R.0660 to Mansfield Bypass, Richmond Township, widen to 40 feet
1,940,000
(Base Construction Allocation - $1,320,000)
(Land Allocation - $500,000)
(Design and Contingencies - $120,000)
(60) Union County
(i) S.R.0015
(A) S.R.0015 from S.R.0045 to S.R.0192, Lewisburg Borough, widen to 60 feet
1,880,000
(Base Construction Allocation - $800,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $80,000)
(ii) S.R.0080
(A) I-80 from Milepost 194 to Milepost 207, pavement rehabilitation
2,750,000
(Base Construction Allocation - $2,500,000)
(Design and Contingencies - $250,000)
(61) Venango County
(i) S.R.0062
(A) S.R.0062 and S.R.0008 intersection, City of Franklin and Sandycreek Township, intersection improvement
452,000
(Base Construction Allocation - $373,000)
(Land Allocation - $32,000)
(Design and Contingencies - $47,000)
(B) S.R.0062 and Washington Crossing and Elk Street, City of Franklin, signal improvement
280,000
(Base Construction Allocation - $210,000)
(Land Allocation - $50,000)
(Design and Contingencies - $20,000)
(ii) S.R.0080
(A) I-80 and S.R.0008 interchange, Barkeyville Borough, lighting
500,000
(Base Construction Allocation - $450,000)
(Design and Contingencies - $50,000)
(B) I-80 eastbound and westbound rest areas, sewage system rehabilitation
625,000
(Base Construction Allocation - $569,000)
(Design and Contingencies - $56,000)
(iii) S.R.0322
(A) S.R.0322 from S.R.0038 to Clarion County line, Rockland Township, widen to 24 feet
1,200,000
(Base Construction Allocation - $1,025,000)
(Land Allocation - $75,000)
(Design and Contingencies - $100,000)
(62) Warren County
(i) S.R.0006
(A) S.R.0006 and Railroad Street and S.R.2006 intersection, Clarendon Borough, signal improvement
85,000
(Base Construction Allocation - $70,000)
(Design and Contingencies - $15,000)
(B) S.R.0006 from S.R.3016 to Starbrick, reconstruction
2,100,000
(Base Construction Allocation - $2,050,000)
(Design and Contingencies - $50,000)
(ii) S.R.1017
(A) Market Street corridor from Pennsylvania Avenue to 5th Street, City of Warren, signal improvement
600,000
(Base Construction Allocation - $540,000)
(Design and Contingencies - $60,000)
(63) Washington County
(i) Various State highways
(A) Washington air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0019
(A) S.R.0019 safety corridor, North Avenue to mall, add lane
2,400,000
(Base Construction Allocation - $2,088,000)
(Land Allocation - $120,000)
(Design and Contingencies - $192,000)
(B) S.R.0019 and S.R.1023 intersection, McCelland Road, North Strabane Township, add lane
900,000
(Base Construction Allocation - $783,000)
(Land Allocation - $45,000)
(Design and Contingencies - $72,000)
(C) S.R.0019 and S.R.1025, Weavertown Road, North Strabane Township, add lane
750,000
(Base Construction Allocation - $652,000)
(Land Allocation - $38,000)
(Design and Contingencies - $60,000)
(D) S.R.0019 and S.R.1047 and T-572, South Strabane Township, add lane
700,000
(Base Construction Allocation - $609,000)
(Land Allocation - $35,000)
(Design and Contingencies - $56,000)
(E) S.R.0019 and I-70 interchange, park and ride, South Strabane Township, parking lot
200,000
(Base Construction Allocation - $75,000)
(Land Allocation - $100,000)
(Design and Contingencies - $25,000)
(F) S.R.0019 and Gee Bee Shopping Center, dual park and ride, South Strabane Township, parking lot
30,000
(Design and Contingencies - $30,000)
(iii) S.R.0040
(A) S.R.0040 safety corridor from I-70 east to S.R.0018, City of Washington, add lane
3,180,000
(Base Construction Allocation - $2,830,000)
(Land Allocation - $200,000)
(Design and Contingencies - $150,000)
(iv) S.R.0070
(A) I-70 east of Jefferson interchange to I-70 and I-79 interchange, restoration
1,085,000
(Base Construction Allocation - $1,070,000)
(Land Allocation - $5,000)
(Design and Contingencies - $10,000)
(B) I-70 from Claysville to S.R.0040, pavement rehabilitation
704,000
(Base Construction Allocation - $700,000)
(Design and Contingencies - $4,000)
(v) S.R.0079
(A) I-79 from Milepost 47 to Milepost 48, Western Center interchange, restoration
3,060,000
(Base Construction Allocation - $2,900,000)
(Design and Contingencies - $160,000)
(B) I-79 from Milepost 48 to Milepost 50, pavement restoration
500,000
(Base Construction Allocation - $450,000)
(Design and Contingencies - $50,000)
(vi) S.R.0088
(A) Mobility initiative in and around California Borough and California University, parking lot
250,000
(Design and Contingencies - $250,000)
(B) S.R.0088, Mingo Creek Bridge realignment, 2-lane relocation
305,000
(Base Construction Allocation - $160,000)
(Land Allocation - $125,000)
(Design and Contingencies - $20,000)
(vii) S.R.0136
(A) S.R.0136 safety corridor from Grayson to I-70, East Washington Borough, safety improvement
1,071,000
(Base Construction Allocation - $896,000)
(Land Allocation - $100,000)
(Design and Contingencies - $75,000)
(B) S.R.0136 safety corridor, S.R.0136 and Beau and Wade Streets, East Washington Borough, signal improvement
70,000
(Base Construction Allocation - $62,000)
(Land Allocation - $2,000)
(Design and Contingencies - $6,000)
(viii) S.R.0519
(A) S.R.0519, bridge and roadway, North Strabane Township, reconstruction
1,000,000
(Base Construction Allocation - $900,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(B) S.R.0519 from S.R.0040 to intersection with I-79, realignment
2,000,000
(C) S.R.0519 from I-70 through Somerset and North Strabane Townships, rehabilitation
4,000,000
(ix) S.R.0837
(A) S.R.0837 Donora CBD, Donora Borough, signalized intersections, signal improvement
720,000
(Base Construction Allocation - $626,000)
(Land Allocation - $36,000)
(Design and Contingencies - $58,000)
(x) Donora Industrial Park
(A) S.R.0837 to 14th Street, 2-lane relocation of access road
1,327,000
(Base Construction Allocation - $1,008,000)
(Land Allocation - $227,000)
(Design and Contingencies - $92,000)
(xi) South Beltway
(A) Southern Expressway to vicinity of Mon-Fay Expressway, preliminary engineering and environmental study
1,250,000
(Design and Contingencies - $1,250,000)
(xii) S.R.2010
(A) S.R.2010, rehabilitation
2,000,000
(xiii) S.R.2041
(A) S.R.2041 from Beallsville Borough to Bentleyville Borough, realignment
1,500,000
(xiv) S.R.0980
(A) S.R.0980 from Canonsburg Borough to McDonald Borough intersection, road update
4,000,000
(B) S.R.0980 at intersection with S.R.0050, intersection improvements
1,000,000
(xv) S.R.0917
(A) S.R.0917 from S.R.0040 to S.R.0241, road update
2,000,000
(64) Wayne County
(i) S.R.0006
(A) S.R.0006 and S.R.0590 and Spruce interchange, Hawley Borough, safety improvement
170,000
(Base Construction Allocation - $170,000)
(B) S.R.0006 corridor, Palmyra, Texas and Canaan Townships, Honesdale and Prompton Boroughs, safety improvement
500,000
(Base Construction Allocation - $450,000)
(Design and Contingencies - $50,000)
(ii) S.R.0590
(A) S.R.0590 corridor, Salem Township, safety improvement
625,000
(Base Construction Allocation - $563,000)
(Design and Contingencies - $62,000)
(iii) S.R.0084
(A) I-84 from Lackawanna County line through Wayne County to Delaware River, rehabilitation
1,858,000
(Base Construction Allocation - $1,680,000)
(Land Allocation - $10,000)
(Design and Contingencies - $168,000)
(65) Westmoreland County
(i) Various State highways
(A) Westmoreland air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0022
(A) S.R.0022 near Greensburg Bypass, park and ride, Salem Township, parking lot
200,000
(Base Construction Allocation - $115,000)
(Land Allocation - $70,000)
(Design and Contingencies - $15,000)
(B) S.R.0022 and S.R.0066 interchange, interchange improvements
1,250,000
(Base Construction Allocation - $875,000)
(Land Allocation - $312,000)
(Design and Contingencies - $63,000)
(iii) S.R.0030
(A) S.R.0030 and Buttermilk Hollow Road, intersection improvement
435,000
(Base Construction Allocation - $310,000)
(Land Allocation - $100,000)
(Design and Contingencies - $25,000)
(B) S.R.0030 from Greensburg Bypass to mall, Hempfield Township, median barrier
2,164,000
(Base Construction Allocation - $1,914,000)
(Land Allocation - $150,000)
(Design and Contingencies - $100,000)
(C) S.R.0030 and White School Road, Unity Township, signal improvement
20,000
(Base Construction Allocation - $18,000)
(Design and Contingencies - $2,000)
(D) S.R.0030 from City of Jeannette to bypass, Hempfield Township, add lane
5,150,000
(Base Construction Allocation - $4,500,000)
(Land Allocation - $500,000)
(Design and Contingencies - $150,000)
(E) S.R.0030 from Circleville to Malts Lane, North Huntingdon Township, add lane
2,201,000
(Base Construction Allocation - $1,914,000)
(Land Allocation - $110,000)
(Design and Contingencies - $177,000)
(F) S.R.0030, park and ride near City of Jeannette, Hempfield Township, parking lot
250,000
(Base Construction Allocation - $100,000)
(Land Allocation - $125,000)
(Design and Contingencies - $25,000)
(G) S.R.0030, dual park and ride, S.R.0030 and Norwin Shopping Center, North Huntingdon Township, parking lot
30,000
(Design and Contingencies - $30,000)
(iv) S.R.0070
(A) I-70, bridge over Sewickley Creek, rehabilitation
66,000
(Base Construction Allocation - $60,000)
(Design and Contingencies - $6,000)
(v) S.R.0119
(A) S.R.0119 from Youngwood to Willow Crossing, Hempfield Township, median barrier
900,000
(Base Construction Allocation - $800,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(B) S.R.0119 and Burton Avenue, Hempfield Township, signal improvement
70,000
(Base Construction Allocation - $62,000)
(Land Allocation - $1,000)
(Design and Contingencies - $7,000)
(C) S.R.0119, Willow Crossing to City of Greensburg, add lane
2,880,000
(Base Construction Allocation - $2,600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $180,000)
(vi) S.R.0136
(A) S.R.0136 from Greengate to Swede Hill, Hempfield Township, add lane
1,050,000
(Base Construction Allocation - $870,000)
(Land Allocation - $100,000)
(Design and Contingencies - $80,000)
(B) S.R.0136 from S.R.3099 to S.R.3016, Hempfield Township, add lane
3,080,000
(Base Construction Allocation - $2,600,000)
(Land Allocation - $350,000)
(Design and Contingencies - $130,000)
(vii) S.R.0366
(A) S.R.0366 and S.R.4085, City of New Kensington, add lane
1,250,000
(Base Construction Allocation - $1,087,000)
(Land Allocation - $63,000)
(Design and Contingencies - $100,000)
(viii) S.R.0981
(A) S.R.0981 at Josephine Drive, Unity Township, add lane
600,000
(Base Construction Allocation - $522,000)
(Land Allocation - $30,000)
(Design and Contingencies - $48,000)
(ix) S.R.4083
(A) S.R.4083 from S.R.0056 to S.R.4044, City of New Kensington, signal improvement
250,000
(Base Construction Allocation - $217,000)
(Land Allocation - $13,000)
(Design and Contingencies - $20,000)
(x) Laurel Valley Expressway
(A) New Stanton to Blairsville, preliminary engineering study
625,000
(Design and Contingencies - $625,000)
(66) Wyoming County
(i) Various State highways
(A) Wyoming air quality, various locations countywide
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(ii) S.R.0006
(A) S.R.0006, Shadowbrook reconstruction, Tunkhannock Township, safety improvement
495,000
(Base Construction Allocation - $396,000)
(Design and Contingencies - $99,000)
(B) S.R.0006 and T-521 and Jenkins Road intersection, Washington Township, intersection improvement
380,000
(Base Construction Allocation - $350,000)
(Design and Contingencies - $30,000)
(67) York County
(i) Various State highways
(A) York air quality, various locations countywide
1,000,000
(Base Construction Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(ii) S.R.0030
(A) S.R.0030, York Bypass from S.R.0116 to North Hills Road, widen and improve signalization
2,530,000
(Base Construction Allocation - $2,030,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(iii) S.R.0074
(A) S.R.0074 from I-83 to S.R.0372, various townships, intersection improvement
2,275,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $225,000)
(B) S.R.0074 corridor, West Manchester, Dover and York Townships and Dover Borough, signal improvement
2,200,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(iv) S.R.0094
(A) S.R.0094, S.R.0116 and S.R.0194 intersection, Hanover Borough, signal improvement
1,680,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $30,000)
(Design and Contingencies - $150,000)
(v) S.R.0177
(A) S.R.0177 and S.R.0392 intersection, Fairview and Newberry Townships, intersection improvement
280,000
(Base Construction Allocation - $200,000)
(Land Allocation - $40,000)
(Design and Contingencies - $40,000)
(vi) S.R.0462
(A) S.R.0462 from I-83 to Mount Zion Road, Springettsbury Township, signal improvement
355,000
(Base Construction Allocation - $300,000)
(Land Allocation - $5,000)
(Design and Contingencies - $50,000)
(vii) S.R.0851
(A) S.R.0851 from I-83 to Susquehanna Trail, Shrewsbury Borough and Township, signal improvement
1,175,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $125,000)
(viii) S.R.2009
(A) S.R.2009, Red Lion Borough and Windsor Township, safety improvement
320,000
(Base Construction Allocation - $250,000)
(Land Allocation - $30,000)
(Design and Contingencies - $40,000)
(68) Department of Transportation
(i) Interstate highway emergency call box system
(A) Installation of emergency call boxes to be placed every 0.5 mile on both sides of all interstate highways. The emergency call box system shall be compatible with the existing Pennsylvania Turnpike system
4,000,000