Section 11. Itemization of public highway projects.
Additional capital projects in the category of public highway projects to be constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt or from current revenues of the Motor License Fund are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total
Project
Allocation
(1) Adams County
(i) S.R.0034
(A) Main Street intersection with PA 234, York Street, Biglerville Borough
105,000
(Base Project Allocation - $30,000)
(Land Allocation - $10,000)
(Design and Contingencies - $65,000)
(ii) S.R.0094
(A) Main Street intersection with Idaville Road, York Springs Borough and Huntington Township
250,000
(Base Project Allocation - $50,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(iii) S.R.0097
(A) Queen Street intersection with PA 194, King Street, Littlestown Borough
87,000
(Base Project Allocation - $12,000)
(Land Allocation - $10,000)
(Design and Contingencies - $65,000)
(iv) S.R.0015
(A) Pavement restoration, bridge rehabilitation and safety improvements, Maryland State line to York County line
6,100,000
(Base Project Allocation - $6,000,000)
(Design and Contingencies - $100,000)
(v) Eisenhower Drive
(A) Rehabilitation and improvement of Eisenhower Drive from High Street to Oxford Avenue
900,000
(B) Rehabilitation and improvement of Eisenhower Drive from Oxford Avenue to PA 116
1,270,000
(vi) PA 94
(A) Safety improvements to Bollinger and Mehring Road Interchange
200,000
(vii) U.S.30
(A) U.S.30/U.S.15 Interchange, interchange improvement
1,850,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $150,000)
(2) Allegheny County
(i) S.R.0019
(A) U.S.19 Abbeyville Road Extension, Upper Saint Clair Township
935,000
(B) Add intersection and connector on west side of S.R.0019 at Abbeyville Road
900,000
(C) U.S.19 and Highland Avenue intersection, turning lanes and signals
589,000
(Base Project Allocation - $194,000)
(Land Allocation - $275,000)
(Design and Contingencies - $120,000)
(D) U.S.19 from S.R.0051 junction to S.R.0065 split, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(E) U.S.19 Truck Route from S.R.4070 north to U.S.19, pavement and restoration, bridge rehabilitation and safety improvements
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(F) U.S.19 Truck Route from I-279 to S.R.8079, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(G) U.S.19 Pine Creek Hill to Wallace Road, Pine and McCandless Townships, restoration
867,000
(Base Project Allocation - $867,000)
(H) U.S.19 West End Bypass to West End Bridge, City of Pittsburgh, new roadway
4,000,000
(Base Project Allocation - $4,000,000)
(I) U.S.19 Gateshead/Hidden Valley Intersection, Peters Township, construction costs, new traffic signals
400,000
(J) Boyce Road connector to Upper St. Clair providing access from S.R.0019 to I-79 and/or Southern Beltway
25,000,000
(K) Abbeyville Road Connector with Route 19
1,125,000
(ii) S.R.0060
(A) Improvements to Robinson Town Centre Boulevard and Montour Church Road and their intersection with S.R.60 and U.S.22/30, Robinson Township and North Fayette Township
5,224,000
(Base Project Allocation - $3,174,000)
(Land Allocation - $1,600,000)
(Design and Contingencies - $450,000)
(B) S.R.0060 from U.S.22 to Beaver County line, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(C) Construction of Enlow Interchange and access road, Findlay Township
23,500,000
(Base Project Allocation - $19,000,000)
(Design and Contingencies - $4,500,000)
(D) S.R.0060 Business Route, from S.R.0060/S.R.6060 junction to S.R.6060/S.R.0060 junction, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(E) PA 60, Intersection of PA 60 and Churchill, Robinson Township, safety improvement
25,000
(Base Project Allocation - $25,000)
(F) PA 60 Flaugherty Run Interchange to Beaver County Line, Findlay and Moon Townships, reconstruction
2,256,000
(Base Project Allocation - $2,256,000)
(G) Widen northbound S.R.0060 from Enlow Road Overpass to Flaugherty Run Exit ramp
6,600,000
(Base Project Allocation - $6,000,000)
(Design and Contingencies - $600,000)
(H) Moon Clinton Road/S.R.0060 Interchange, add ramps and relocate existing ramp to improve access to S.R.0060 and Pittsburgh International Airport
8,500,000
(Base Project Allocation - $7,000,000)
(Design and Contingencies - $1,500,000)
(I) Widen Moon Clinton Road and exit ramp terminals 0.5 miles west of S.R.0060 to 500 feet east of S.R.0060 business
17,500,000
(Base Project Allocation - $15,000,000)
(Design and Contingencies - $2,500,000)
(iii) S.R.0065
(A) West End Bridge, north approach to S.R.0065
1,325,000
(Base Project Allocation - $1,325,000)
(B) S.R.0065 from U.S.19 to S.R.3104, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(iv) S.R.0079
(A) I-79 reconstruction from Rest Area to Kirwan Heights, South Fayette Township and Bridgeville Borough
1,510,000
(Base Project Allocation - $1,510,000)
(B) I-79 from Washington County line to Butler County line, pavement restoration, bridge rehabilitation and safety improvements
2,850,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $50,000)
(C) Interchange at I-79/Parkway and Penn Center West Interchange at Campbell's Run Road, Collier and Robinson Townships
50,000,000
(Base Project Allocation - $32,000,000)
(Land Allocation - $12,000,000)
(Design and Contingencies - $6,000,000)
(D) I-79, Ramp E, South Fayette Township/Bridgeville Interchange, reconstruction
1,008,000
(Base Project Allocation - $1,008,000)
(E) I-79, Parkway West, construction of missing ramps from I-79 southbound to Parkway West S.R.0060 and Parkway West eastbound to I-79 north
70,000,000
(F) I-79 Warrendale Interchange/Warrendale/Bayne Road, develop partnership for highway improvements to enable site development for TECH 21 technology park
15,000,000
(G) I-79 and S.R.0019, TECH 21 Technology Park Highway Improvement Project, improvements to I-79 and S.R.0019, including widening of existing roadways, construction of turning lanes and completion of the Warrendale Interchange on I-79 through construction of a northbound on-ramp and southbound off-ramp, making it a full interchange
15,000,000
(v) S.R.0279
(A) I-279, Penn Center West Interchange with Campbells Run Road, Collier Township and Robinson Township
29,000,000
(Base Project Allocation - $19,500,000)
(Land Allocation - $7,000,000)
(Design and Contingencies - $2,500,000)
(B) I-279 from I-79 (Penn Lincoln Parkway) to I-79 in northern Allegheny County, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(C) I-279, sound barriers from Venture Street Exit North to the Pittsburgh city line, City of Pittsburgh
2,000,000
(D) I-279, Fort Pitt Bridge to Camp Horn Road, City of Pittsburgh and Ross Township, safety improvement/freeway surveillance
60,000
(Design and Contingencies - $60,000)
(E) I-279/Anner Street Slide, City of Pittsburgh, slope improvement
59,000
(Base Project Allocation - $35,000)
(Land Allocation - $2,000)
(Design and Contingencies - $22,000)
(F) I-279, retaining wall number 4, City of Pittsburgh, slope stabilization
161,000
(Base Project Allocation - $120,000)
(Land Allocation - $15,000)
(Design and Contingencies - $26,000)
(G) I-279, Anner Street Slide, City of Pittsburgh, reconstruction
100,000
(Base Project Allocation - $100,000)
(H) I-279, retaining wall number 4, City of Pittsburgh, reconstruction
180,000
(Base Project Allocation - $180,000)
(I) I-279, Ft. Pitt Bridge to Camp Horn Road, City of Pittsburgh and Ross Township, safety improvement
330,000
(Base Project Allocation - $330,000)
(vi) S.R.0837
(A) Waterfront improvements to S.R.0837 from 8th Avenue to East Drive, West Homestead Borough, Homestead Borough and Munhall Borough
587,000
(B) S.R.0837 from Duquesne to Munhall, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(C) PA 837, 8th Avenue to East Drive, West Homestead, Homestead and Munhall Boroughs, safety improvement
117,000
(Base Project Allocation - $117,000)
(D) PA 837, Parry Street to Witaker Way, West Homestead, Homestead and Munhall Boroughs, safety improvement
146,000
(Base Project Allocation - $146,000)
(E) Widen S.R.0837 from Ravine St. area in Munhall to East Flyover Bridge and continuing to the Whitaker/Rankin Bridge
6,000,000
(vii) S.R.3004
(A) Intersection improvements with S.R.3034 and Lesnett Road
2,500,000
(viii) S.R.3004 and S.R.3009
(A) Widen McMurray Road to 3 lanes from South Park Road and Clifton Road and widen approaches at South Park Road and Clifton Road
2,800,000
(ix) S.R.3006
(A) Improvements to Boyce Road from S.R.0019 to S.R.3005
2,800,000
(x) S.R.3009 and S.R.2040
(A) Intersection and approach improvements
2,000,000
(xi) S.R.3036
(A) Intersection improvements with S.R.3034
850,000
(xii) S.R.3103
(A) Widen and intersection improvements for McKee Road, North Fayette Township
900,000
(xiii) S.R.3160
(A) Grade-separated interchange at Beers School Road and S.R.60, Moon Township
5,000,000
(Land Allocation - $1,000,000)
(Design and Contingencies - $4,000,000)
(B) Directional interchange at Flaugherty Run Road, Moon Township
18,000,000
(Base Project Allocation - $15,000,000)
(Design and Contingencies - $3,000,000)
(xiv) Local road connector
(A) Construct new road from intersection of S.R.3005 and S.R.3006 to interchange of the Southern Beltway and I-79
30,000,000
(xv) S.R.0028
(A) Development of a connector road from S.R.0028 to Rock Airport, Tarentum Borough, East Deer Township, Indiana Township and West Deer Township
3,000,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(B) S.R.0028 from Etna to Butler County line, pavement restoration, bridge rehabilitation and safety improvements
2,350,000
(Base Project Allocation - $2,300,000)
(Design and Contingencies - $50,000)
(C) East Ohio relocation, Millvale Borough wall along Route 28 at Millvale Interchange
1,805,000
(Base Project Allocation - $1,020,000)
(Design and Contingencies - $785,000)
(D) PA 28 southbound from Highland Park Bridge to Ravine Street, restoration
400,000
(Base Project Allocation - $400,000)
(E) PA 28 northbound from Ravine Street to Highland Park, Sharpsburg Borough, restoration
400,000
(Base Project Allocation - $400,000)
(F) PA 28 Highland Park Bridge to Delafield, Aspinwall Borough, reconstruction
120,000
(Base Project Allocation - $120,000)
(xvi) S.R.0022
(A) U.S.22 from Carnegie to Ohio State line, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(xvii) S.R.0376
(A) I-376 from I-279 to the Pennsylvania Turnpike, pavement restoration, bridge rehabilitation and safety improvements
1,550,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $50,000)
(B) I-376, Grant Street to Greensburg Pike, City of Pittsburgh and Edgewood and Braddock Hills Boroughs, reconstruction
2,512,000
(Base Project Allocation - $2,512,000)
(xviii) S.R.0579
(A) I-579 from I-279 to the Pennsylvania Turnpike, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(xix) S.R.3070
(A) Extension of Industry Drive between McClaren Road and Enlow Road, Findlay Township
8,125,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $1,125,000)
(B) Widen, safety improvements, upgrade McClaren Road (S.R.3070) from McClaren Interchange (S.R.0060) to Village of Enlow with improvements to the five-point intersection at Enlow
8,000,000
(xx) S.R.2082
(A) Oakmont and Plum Boroughs, widening and restoration of Hulton Road from the Hulton Bridge to S.R.2058
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(xxi) Intelligent Transportation Systems
(A) Installation of Intelligent Transportation Systems at various areas within the Pittsburgh Regional Area
500,000
(xxii) PA 65
(A) PA 65 from Grant to Riverview, Bellevue Borough, widen roadway
722,000
(Base Project Allocation - $580,000)
(Land Allocation - $95,000)
(Design and Contingencies - $47,000)
(xxiii) New Mon River Bridge
(A) From Wabash Tunnel to Stanwix, City of Pittsburgh, new bridge
32,400,000
(Base Project Allocation - $24,000,000)
(Land Allocation - $2,000,000)
(Design and Contingencies - $6,400,000)
(xxiv) South Millvale Street Bridge
(A) Over East Busway/Conrail, City of Pittsburgh, bridge rehabilitation
1,000,000
(Base Project Allocation - $1,000,000)
(xxv) Banksville Connection
(A) From Wabash Tunnel to Banksville, City of Pittsburgh, new roadway
11,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(xxvi) S.R.9900
(A) North Fayette Township, new roadway and reconstruction of Pittsburgh Technology Institute Access Road
900,000
(xxvii) Summit Park Drive
(A) Summit Park Drive/Robinson Town Center Boulevard Interchange, North Fayette Township, safety improvement/add turn lane
288,000
(Base Project Allocation - $288,000)
(xxviii) PA 885
(A) Liberty Bridge to Parkway West, City of Pittsburgh, restoration
1,222,000
(Base Project Allocation - $1,222,000)
(B) Lebanon Church Road (S.R.2040) to Mifflin Road (S.R.2045) to accommodate Adtranz, waterfront and other development
5,000,000
(C) S.R.0885 reconstruction, improvement upgrades to S.R.0885 between Lebanon Church Road (S.R.2040) and junction of Mifflin Road (S.R.2045) and S.R.0885 to accommodate Adtranz, waterfront and other significant development and expansion in the Mon Valley
3,000,000
(xxix) S.R.1019
(A) Access road from S.R.1019 (Butler Logan Airport Road) to Rock Airport, West Deer Township
500,000
(Base Project Allocation - $470,000)
(Design and Contingencies - $30,000)
(xxx) PA 910
(A) I-79 Interchange with PA 910, Marshall Township, reconstruction
301,000
(Base Project Allocation - $301,000)
(xxxi) S.R.3056
(A) Chestnut Street, Carnegie Borough, safety improvement
70,000
(Base Project Allocation - $70,000)
(xxxii) S.R.0060/S.R.0022/S.R.0030
(A) S.R.0060/S.R.0022/S.R.0030, feasibility study to provide interstate highway designation to Pittsburgh International Airport from regional highways
1,000,000
(xxxiii) Kirwan Heights Interchange
(A) Kirwan Heights Interchange, improvements, connection to Thomas Run Road, improvements to S.R.0050 intersection
9,000,000
(xxxiv) Rock Airport Industrial Park
(A) Rock Airport Industrial Park, access road, from Little Deer Creek Road, S.R.1015 to Russelton Airport Road
6,000,000
(xxxv) Baptist Road/Broughton Road/Horning Corridor
(A) Baptist Road/Broughton Road/Route 88/ Horning Road, Baptist Road and Broughton Road, construction of turning lanes and increase of storage length, Baptist and Horning Road and Route 88 and Broughton Road, optimizing traffic signal timings, Route 88 and Horning Road, protected turn phases and optimize traffic signal timings
1,200,000
(xxxvi) Lebanon Church Road
(A) Intersections of Lebanon Church Road and Clove Drive, Lebanon Church Road and Richaller Drive, Pleasant Hills Borough, construct left-hand turn lane, adding traffic signs and signals
4,000,000
(xxxvii) Cochran Road
(A) Intersections of Cochran Road and Beverly Road, Mount Lebanon Township, reline to create left-hand turn lane, replace traffic signal, install fiberoptic interconnecting signal systems
120,000
(xxxviii) Moon-Clinton Road
(A) S.R.0060 to S.R.0030 upgrade, widen and straighten
5,000,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $2,000,000)
(xxxix) Cherrington Parkway
(A) Extend Cherrington Business Park internal access road through Pittsburgh International Airport property to Ewing Road and new interchange at S.R.0060 (Business)
3,000,000
(xl) S.R.3107
(A) Widen, signalization and safety improvements to Ewing Road (S.R.3107) at new interchange with S.R.0060 (Business)
2,000,000
(xli) McClaren Road Area
(A) Internal access road from RIDC Park terminus of Industry Drive to McClaren Road (S.R.3070) and McClaren Interchange on S.R.0060
5,000,000
(xlii) McKees Rocks Access Road
(A) New access road from Route 51 at West Carson Street intersection to Stowe Township to open sites for redevelopment
6,250,000
(xliii) Airport Multimodal Transportation Corridor
(A) Multiuse toll facility feasibility study to relieve Parkway West. Project from S.R.0060/Montour Interchange to Pittsburgh central business district via Robinson-Kennedy-Stowe-McKees Rocks-Brunot Island and S.R.0065 on the North Shore
1,000,000
(xliv) S.R.4003
(A) Duncan Avenue/McKnight Road Improvement Project, widening of S.R.4003, McKnight Road, and intersection construction and improvements at Duncan Avenue
3,010,000
(xlv) S.R.0088
(A) Improvement of Route 88 corridor in Bethel Park north and south of intersection with Clifton Road
4,000,000
(xlvi) Baptist and Broughton Roads
(A) Improvement of intersection of Baptist and Broughton Roads in Bethel Park
3,000,000
(3) Armstrong County
(i) S.R.3017
(A) Intersection of S.R.3017 and PA 28, South Buffalo Township, safety improvement/add lane
567,000
(Base Project Allocation - $500,000)
(Land Allocation - $10,000)
(Design and Contingencies - $57,000)
(ii) PA 156
(A) Intersection of PA 156 and PA 210, South Bend Township, safety improvement
160,000
(Base Project Allocation - $120,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(iii) PA 268
(A) Pine Street to Cedar Drive, East Franklin Township, safety improvement
346,000
(Base Project Allocation - $240,000)
(Land Allocation - $50,000)
(Design and Contingencies - $56,000)
(B) Intersection of PA 268 and mall entrance, East Franklin Township, safety improvement
176,000
(Base Project Allocation - $140,000)
(Land Allocation - $5,000)
(Design and Contingencies - $31,000)
(iv) Wetland Banking
(A) Countywide, reconstruction of wetland banking
84,000
(Base Project Allocation - $40,000)
(Land Allocation - $20,000)
(Design and Contingencies - $24,000)
(4) Beaver County
(i) S.R.0051/S.R.0065
(A) S.R.0051/S.R.0065 from Freedom Borough to Bridgewater Borough, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(ii) S.R.0060
(A) S.R.0060 from Allegheny County line to Lawrence County line, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(B) PA 60, Beaver and Allegheny County line to PA 151 Interchange, Hopewell Township, reconstruction
2,059,000
(Base Project Allocation - $2,059,000)
(C) PA 60, PA 151 Interchange to Green Garden Interchange, Hopewell Township, reconstruction
2,765,000
(Base Project Allocation - $2,765,000)
(D) PA 60, Green Garden Road to Center Exit, Hopewell and Center Townships, reconstruction
7,450,000
(Base Project Allocation - $7,450,000)
(iii) S.R.9900
(A) Construction of Woodlawn Avenue extension in City of Aliquippa
300,000
(Base Project Allocation - $280,000)
(Design and Contingencies - $20,000)
(iv) Logan Lane
(A) Widen roadway between S.R.2001 and S.R.0065, Harmony Township
1,500,000
(v) S.R.0168
(A) Reconstruction and improvements between S.R.0018 and S.R.0030, Hanover and Greene Townships
10,000,000
(vi) S.R.0288
(A) Widening and improvements, including the removal of dangerous turns
200,000,000
(vii) S.R.0588
(A) Resurfacing and improvements to highway
50,000,000
(viii) Pennsylvania Turnpike
(A) Construction of an exit ramp on Concord Church Road (S.R.0588), North Sewickley Township
35,000,000
(ix) PA 151
(A) PA 151 from Kane Road at Gringo Road, Hopewell Township, relocation
300,000
(Base Project Allocation - $260,000)
(Land Allocation - $40,000)
(x) PA 51
(A) Rochester-Monaca Bridge to Aliquippa-Ambridge Bridge, City of Aliquippa, reconstruction
3,000,000
(Base Project Allocation - $3,000,000)
(B) Extension of Woodlawn Road Extension, PA 51, from Franklin Avenue, City of Aliquippa
3,000,000
(Base Project Allocation - $3,000,000)
(xi) PA 65
(A) State Street to PA 51, Harmony Township and Baden and Conway Boroughs, reconstruction
2,400,000
(Base Project Allocation - $2,400,000)
(xii) Woodlawn Avenue
(A) Woodlawn Avenue Extension, new roadway
400,000
(Base Project Allocation - $400,000)
(xiii) Sproat Street
(A) Baden and Economy Boroughs, new connector road from Sproat Street to Quigley High School, 1 mile long
1,000,000
(Base Project Allocation - $1,000,000)
(xiv) Wolfe Lane
(A) Wolfe Lane connector, Bridgewater Borough, enhancement
16,000
(Base Project Allocation - $16,000)
(xv) PA 68
(A) Vanport Township, safety improvement
400,000
(Base Project Allocation - $400,000)
(B) PA 68 corridor, Beaver Borough, traffic signal improvement
90,000
(Base Project Allocation - $90,000)
(xvi) S.R.3009
(A) Kane Road at Gringo Road, Hopewell Township, safety improvement
260,000
(Base Project Allocation - $260,000)
(5) Beaver and Lawrence Counties
(i) River Road
(A) Widening and reconstruction between the Borough of Ellwood City through Wayne Township and North Sewickley Township
70,000,000
(6) Bedford County
(i) S.R.0056
(A) Improvements from U.S.220 to Somerset County line, East St. Clair and West St. Clair Townships
2,002,000
(Base Project Allocation - $1,712,000)
(Land Allocation - $100,000)
(Design and Contingencies - $190,000)
(B) Improvements from Chestnut Ridge through Dunnings Creek Fish Hatchery, Lower Pleasantville Mountain areas
2,000,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(ii) S.R.0030
(A) U.S.30 from Cliffs to Wolfsburg, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(B) U.S.30, intersection of I-70 and S.R.1013 with U.S.30 East Providence Township, safety improvement
26,000
(Base Project Allocation - $23,000)
(Land Allocation - $1,000)
(Design and Contingencies - $2,000)
(C) U.S.30, intersection of U.S.30 and PA 56, Bedford Township, safety improvement
510,000
(Base Project Allocation - $360,000)
(Land Allocation - $60,000)
(Design and Contingencies - $90,000)
(iii) S.R.0070
(A) I-70 from Pennsylvania Turnpike to Fulton County line, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(iv) S.R.0099
(A) I-99 from Pennsylvania Turnpike to Blair County line, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(v) S.R.0220
(A) U.S.220 from Pennsylvania Turnpike south to end of expressway, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(vi) S.R.4009
(A) Improvements to S.R.4009 in the Bedford Springs area, Bedford Township
200,000
(Base Project Allocation - $180,000)
(Land Allocation - $5,000)
(Design and Contingencies - $15,000)
(vii) PA 915
(A) PA 26/PA 915 Hopewell Interchange, Hopewell Borough, intersection improvement
265,000
(Base Project Allocation - $200,000)
(Land Allocation - $15,000)
(Design and Contingencies - $50,000)
(viii) PA 26
(A) Everett Borough signal upgrade, Everett Borough, safety improvement
40,000
(Base Project Allocation - $40,000)
(7) Berks County
(i) S.R.0061
(A) Safety improvements from S.R.3055 to S.R.4017, Leesport area
2,000,000
(Base Project Allocation - $1,800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) S.R.0012 to S.R.0222, widen highway and replace existing railroad overpass in Muhlenberg Township
32,375,000
(Base Project Allocation - $21,125,000)
(Land Allocation - $7,500,000)
(Design and Contingencies - $3,750,000)
(C) S.R.0061 from Hamburg to Schuylkill County line, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(ii) S.R.0183
(A) Interchange with S.R.3055, installation of signals
100,000
(Base Project Allocation - $70,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(B) Interchange with S.R.0012, widen bridge and reconstruct interchange in City of Reading
20,000,000
(Base Project Allocation - $11,000,000)
(Land Allocation - $6,000,000)
(Design and Contingencies - $3,000,000)
(C) Interchange with S.R.0222, widen Bridge and reconstruct interchange in Bern Township
20,000,000
(Base Project Allocation - $13,000,000)
(Land Allocation - $4,000,000)
(Design and Contingencies - $3,000,000)
(iii) S.R.3021
(A) Widen to 5 lanes and signal improvements between Broadcasting Road and Van Reed Road, Spring Township
3,100,000
(Base Project Allocation - $2,900,000)
(Design and Contingencies - $200,000)
(iv) S.R.3040
(A) Park Road interchanges with Van Reed Road and Broadcasting Road
4,850,000
(Base Project Allocation - $3,500,000)
(Land Allocation - $600,000)
(Design and Contingencies - $750,000)
(B) Construction of new northbound on-ramp and off-ramp system from S.R.3040 to Broadcasting Road, Spring Township
2,900,000
(Base Project Allocation - $2,200,000)
(Land Allocation - $250,000)
(Design and Contingencies - $450,000)
(v) S.R.0012
(A) S.R.0012 from S.R.0185 to Hyde Villa Business Route 222, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(vi) S.R.0078
(A) I-78 from Lebanon County line to Lehigh County line, pavement restoration, bridge rehabilitation and safety improvements
3,550,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $50,000)
(B) I-78, Exit 11 to Milepost 33, Windsor and Greenwich Townships, patching, grinding, rumble strips
207,000
(Base Project Allocation - $207,000)
(vii) S.R.0100
(A) S.R.0100 from Montgomery County line to Swamp Creek Road, pavement restoration, bridge rehabilitation and safety improvements
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(viii) S.R.0176
(A) I-176 from Pennsylvania Turnpike to U.S.422, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(B) I-76/PA 724 interchange improvement
650,000
(ix) S.R.0222
(A) U.S.222 from junction U.S.422 to North of Temple, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(B) U.S.222 from Kempville to S.R.8015, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(x) S.R.0422
(A) S.R.0422 from S.R.8048 to Wyomissing, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(B) S.R.0422 from Montgomery County line to Douglassville, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(8) Blair County
(i) S.R.0036
(A) Construction of turn lanes at intersections of Logan Boulevard with Plank Road and 6th Avenue, City of Altoona
260,000
(Base Project Allocation - $160,000)
(Land Allocation - $40,000)
(Design and Contingencies - $60,000)
(ii) S.R.0866
(A) Widening and improvements between U.S.22 and Martinsburg
2,960,000
(Base Project Allocation - $2,400,000)
(Land Allocation - $500,000)
(Design and Contingencies - $60,000)
(B) PA 866 from Curryville to Royer, Huston and North Woodbury Townships, restoration
550,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $300,000)
(iii) S.R.4004
(A) Widen, reconstruction and intersection improvements from Plank Road to Ruskin Street
612,000
(Base Project Allocation - $334,000)
(Land Allocation - $233,000)
(Design and Contingencies - $45,000)
(B) Logan Valley Mall to 58th Street, Allegheny Township and City of Altoona, reconstruction
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $80,000)
(Design and Contingencies - $90,000)
(iv) S.R.4004 and S.R.4006
(A) Widen, reconstruction and intersection improvements, Goods Lane to PA 764
601,000
(Base Project Allocation - $353,000)
(Land Allocation - $200,000)
(Design and Contingencies - $48,000)
(v) S.R.4013
(A) North Altoona access, Second Street to Pinecroft, Logan Township and Antis Township
25,300,000
(Base Project Allocation - $20,000,000)
(Land Allocation - $2,000,000)
(Design and Contingencies - $3,300,000)
(vi) S.R.4029
(A) Improvements from S.R.4027 to along S.R.4029, Tyrone Borough
650,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(vii) Ninth Avenue
(A) Extension of Ninth Avenue as four-lane roadway between Seventh Street and Twelfth Street
12,000,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $6,000,000)
(viii) S.R.0099
(A) I-99 from Bedford County line to U.S.220, pavement restoration, bridge rehabilitation and safety improvements
3,750,000
(Base Project Allocation - $3,700,000)
(Design and Contingencies - $50,000)
(ix) S.R.0022
(A) U.S.22 from I-99 junction to Cambria County line, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(x) S.R.9900
(A) Construction of Park Avenue extension from 17th Street to Frankstown Road
900,000
(Base Project Allocation - $700,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) S.R.9900, Park Avenue/Sixth Street Extension, new roadway
800,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(xi) S.R.4010
(A) 17th Street Exit of I-99 to PA 36, Logan Township, new roadway
760,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $160,000)
(xii) S.R.0764
(A) Preliminary engineering on relocation of S.R.0764, alignment, widening, safety improvements along the Ninth Avenue corridor in the City of Altoona, Logan Township and Antis Township
3,800,000
(9) Bradford County
(i) S.R.0220
(A) U.S.220 from Dunn Road to Hemlock Run Road, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(B) U.S.220 from Hill Road to New York State line, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(C) Albany Township, Sullivan/Bradford County line to Village of South Branch
6,300,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $300,000)
(Design and Contingencies - $1,000,000)
(ii) S.R.0706
(A) Wyalusing Borough and Wyalusing Township, junction U.S.6 to S.R.1004
15,000,000
(Base Project Allocation - $12,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $2,000,000)
(B) Wyalusing Borough to Susquehanna County Line, Wyalusing and Stevens Townships, restoration and widening
1,500,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $180,000)
(iii) S.R.0014
(A) Borough of Troy, Fallbrook Road, S.R.3032 to Main Street S.R.0006
390,000
(Base Project Allocation - $240,000)
(Land Allocation - $30,000)
(Design and Contingencies - $120,000)
(iv) S.R.0006
(A) Standing Stone Township, T-610 River Road to T-580 Tracy Road
7,150,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $150,000)
(Design and Contingencies - $1,000,000)
(B) U.S.6 from Wysox Narrows to Rummerfield, reconstruction and widening
381,000
(Base Project Allocation - $194,000)
(Land Allocation - $30,000)
(Design and Contingencies - $157,000)
(C) U.S. 6 from the Tioga/Bedford County line east to Sylvania, reconstruction and widening
591,000
(Base Project Allocation - $411,000)
(Land Allocation - $20,000)
(Design and Contingencies - $160,000)
(10) Bucks County
(i) S.R.0001
(A) U.S.1 from New Jersey State line to Philadelphia County line, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(ii) S.R.0013
(A) U.S.13 from Tullytown to junction U.S.1, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(iii) S.R.0095
(A) I-95 from Philadelphia County line to New Jersey, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(iv) S.R.0202
(A) U.S.202 from S.R.3002 to PA 611, Doylestown, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(v) S.R.0309
(A) S.R.0309 from Montgomery County line to Rich Hill, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(vi) S.R.0611
(A) S.R.0611 from Bridgepoint to Dyerstown, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(vii) S.R.2038
(A) County Line Road extension from Bustleton to Philmont Avenue, Lower Southampton Township
2,080,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(viii) PA 132
(A) Street Road (PA 132) and I-95 Interchange, Bensalem Township, interchange improvements
4,800,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $400,000)
(Design and Contingencies - $400,000)
(ix) S.R.2006
(A) Intersection of New Falls Road (S.R.2006) and Wistar Road, intersection improvements
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(x) S.R.2022
(A) S.R.2022 from PA 413 to Street Road (PA 132) intersection, intersection improvements
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(xi) S.R.2025
(A) S.R.2025 from Hulmeville Road to Old Lincoln Highway, Bensalem Township, intersection improvements
1,251,000
(Base Project Allocation - $450,000)
(Land Allocation - $250,000)
(Design and Contingencies - $551,000)
(xii) S.R.2029
(A) S.R.2029, intersection of Oxford Valley Road and Levittown Parkway, Falls and Middletown Townships, intersection improvements
1,060,000
(Base Project Allocation - $760,000)
(Land Allocation - $300,000)
(B) S.R.2029, Oxford Valley Road at U.S.1 Interchange, Lower Makefield Township, interchange improvements
375,000
(Base Project Allocation - $375,000)
(xiii) S.R.2069
(A) S.R.2069 from Heacock to Oxford Valley Road, Lower Makefield Township, realignment
500,000
(Base Project Allocation - $500,000)
(xiv) S.R.2002
(A) Storm water Drainage Project/Reconstruction on State Road from Elm Avenue to the Neshaminy Creek, Croydon, Bristol Township
2,000,000
(Base Project Allocation - $1,750,000)
(Design and Contingencies - $250,000)
(11) Butler County
(i) S.R.0079
(A) I-79 from Allegheny County line to Lawrence County line, pavement restoration, bridge rehabilitation and safety improvements
2,750,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $50,000)
(B) I-79 from Allegheny County line to Lawrence County line, countywide roadway and safety improvements
4,040,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $40,000)
(ii) S.R.0080
(A) I-80 from Clarion County line to Venango County line, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(iii) S.R.0422
(A) U.S.422 from Old 422 East to I-79 Interchange, pavement restoration, bridge rehabilitation and safety improvements
1,350,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $50,000)
(iv) S.R.0019 and S.R.0528
(A) Widen S.R.0019 and S.R.0528 and install new signalization at intersection of S.R.0019 and S.R.0528, Jackson Township
1,783,000
(Base Project Allocation - $1,550,000)
(Design and Contingencies - $233,000)
(v) PA 228
(A) Intersection of PA 228/S.R.2007/T-840, Clinton Township, intersection improvements
340,000
(Base Project allocation - $140,000)
(Land Allocation - $50,000)
(Design and Contingencies - $150,000)
(B) PA 228, intersections at S.R.2007 and T-840, Clinton Township, safety improvement
187,000
(Base Project Allocation - $140,000)
(Land Allocation - $10,000)
(Design and Contingencies - $37,000)
(vi) Wetland Banking
(A) Countywide reconstruction of wetland banking
80,000
(Base Project Allocation - $40,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(vii) U.S.19
(A) Zelienople Borough and Jackson Township, traffic study
695,000
(Base Project Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $75,000)
(viii) PA 68
(A) Evans City Borough, traffic signal improvement
82,000
(Base Project Allocation - $60,000)
(Land Allocation - $1,000)
(Design and Contingencies - $21,000)
(ix) PA 356
(A) PA 356, Buffalo Township, intersection of PA 356 and S.R.2018 (Sarver Road), reconstruction
151,000
(Base Project Allocation - $90,000)
(Land Allocation - $25,000)
(Design and Contingencies - $36,000)
(x) PA 288
(A) Zelienople Borough, intersection of PA 288 and PA 588, safety improvements
151,000
(Base Project Allocation - $100,000)
(Land Allocation - $15,000)
(Design and Contingencies - $36,000)
(xi) S.R.8002
(A) Muddy Creek Township, intersection of S.R.8002 and U.S.422, new interchange
304,000
(Base Project Allocation - $240,000)
(Land Allocation - $4,000)
(Design and Contingencies - $60,000)
(12) Cambria County
(i) S.R.0022
(A) Concrete rehabilitation from Ebensburg to Blair County line, Cresson, Munster and Cambria Townships
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(B) U.S.22 from PA 271 Mundys Corner to 1 mile west, pavement restoration, bridge rehabilitation and safety improvements
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(C) U.S.22 Ebensburg area, Cambria Township, safety improvements
2,150,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $400,000)
(Design and Contingencies - $150,000)
(D) U.S.22 from intersection with U.S.219 to Blair County line, restoration
2,220,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(ii) S.R.0056
(A) S.R.0056 from U.S.219 to Johnstown, pavement restoration, bridge rehabilitation and safety improvements
750,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $50,000)
(B) PA 56 from Broad Avenue to U.S.22,City of Johnstown, relocation
1,000,000
(Design and Contingencies - $1,000,000)
(C) PA 56, Widman Rockfall Fence, Stonycreek Township, safety improvement
205,000
(Base Project Allocation - $180,000)
(Land Allocation - $5,000)
(Design and Contingencies - $20,000)
(D) PA 56, U.S.219 to Widman Street, Richland Township, restoration
460,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(iii) S.R.0219
(A) U.S.219 from Somerset County line to S.R.4031 interchange, pavement restoration, bridge rehabilitation and safety improvements
2,650,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $50,000)
(B) U.S.219 from U.S.22 to U.S.422, Cambria Township, restoration
560,000
(Base Project Allocation - $560,000)
(iv) S.R.0271
(A) Pergrim Hill Twin Lane with Shoemaker Street, Jackson Township
680,000
(Base Project Allocation - $480,000)
(Land Allocation - $140,000)
(Design and Contingencies - $60,000)
(B) PA 271, Shoemaker Street, Jackson Township, widening and add turn lane
3,599,000
(Base Project Allocation - $2,400,000)
(Land Allocation - $799,000)
(Design and Contingencies - $400,000)
(C) PA 271, Maple and Clinton Streets, City of Johnstown, safety improvement
363,000
(Base Project Allocation - $300,000)
(Land Allocation - $23,000)
(Design and Contingencies - $40,000)
(v) S.R.4021
(A) S.R.4021 from U.S.219 to Hastings Access Road, Susquehanna Township, reconstruction and realignment
827,000
(Base Project Allocation - $672,000)
(Land Allocation - $90,000)
(Design and Contingencies - $65,000)
(vi) PA 756
(A) U.S.219 to Scalp Avenue, Geistown and Richland Township, restoration
710,000
(Base Project Allocation - $400,000)
(Land Allocation - $190,000)
(Design and Contingencies - $120,000)
(vii) PA 53
(A) Intersection with PA 36, Ashville Borough, intersection improvement
280,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design and Contingencies - $40,000)
(viii) U.S.422
(A) Cambria and Blacklick Townships, reconstruction
920,000
(Base Project Allocation - $700,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(13) Carbon County
(i) S.R.0080
(A) I-80 from Monroe County line to Luzerne County line, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(ii) S.R.0248
(A) S.R.0248 from Northampton County line to Lehighton, pavement restoration, bridge rehabilitation and safety improvements
750,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $50,000)
(iii) S.R.0054
(A) S curves, safety improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(14) Centre County
(i) S.R.0080
(A) I-80 from Clinton County line to Clearfield County line, pavement restoration, bridge rehabilitation and safety improvements
3,350,000
(Base Project Allocation - $3,300,000)
(Design and Contingencies - $50,000)
(ii) S.R.0322
(A) Boalsburg to Bear Meadows Road, Harris Township
150,000
(Base Project Allocation - $90,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(B) Improvements to S.R.0322 at Waddle Road, widening of Waddle Road from S.R.0322 to Clearview Road, Patton Township
5,000,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $300,000)
(Design and Contingencies - $700,000)
(C) Widen to 5 lanes between Park Forest Drive and Douglas Drive, Patton Township
3,000,000
(Base Project Allocation - $2,500,000)
(Land Allocation - $200,000)
(Design and Contingencies - $300,000)
(D) U.S.322 from Boalsburg to Scotia Road, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(E) U.S.322 from Jack's Mill Drive to Bear Road, Harris Township, left turn lanes
290,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $70,000)
(iii) S.R.0026
(A) Widen West College Avenue, S.R.0026
7,260,000
(Base Project Allocation - $6,180,000)
(Land Allocation - $180,000)
(Design and Contingencies - $900,000)
(iv) T-355
(A) Extension of Old Gatesburg Road
1,770,000
(Base Project Allocation - $1,290,000)
(Land Allocation - $350,000)
(Design and Contingencies - $130,000)
(v) Intersection of S.R.0550 and S.R.3008
(A) Improvement to the intersection of Routes 550 and 3008 to enhance sight distance and remove accident problem area, Safety and Mobility Initiative (SAMI), Benner Township
213,000
(Base Project Allocation - $103,000)
(Land Allocation - $10,000)
(Design and Contingencies - $100,000)
(vi) S.R.0099
(A) Utility relocation from S.C.I. Rockview, Benner Township
550,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(vii) Waddle Road
(A) From Atherton Street through U.S.322 interchange, Patton Township, reconstruction, widening and safety improvements
500,000
(Base Project Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(15) Chester County
(i) S.R.0001
(A) U.S.1 from Maryland State line to Kennett Square, pavement restoration, bridge rehabilitation and safety improvements
2,150,000
(Base Project Allocation - $2,100,000)
(Design and Contingencies - $50,000)
(ii) S.R.0030
(A) U.S.30 from junction U.S.202 to junction Business U.S.30, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(iii) S.R.0202
(A) U.S.202 from Montgomery County line to West Chester, pavement restoration, bridge rehabilitation and safety improvements
1,750,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $50,000)
(iv) S.R.0422
(A) U.S.422 from U.S.202 to Montgomery County line, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(B) U.S.422, Berks County line to Schuylkill River, reconstruction
3,160,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $60,000)
(Design and Contingencies - $100,000)
(v) S.R.0100/S.R.2023
(A) S.R.0100/S.R.2023 from S.R.2022 to U.S.202, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(B) PA 100/PA 113, interchange and access improvements
5,000,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(vi) S.R.9900
(A) Reconstruction of Kings Row Road in New London Township
100,000
(Base Project Allocation - $100,000)
(vii) S.R.0252
(A) S.R.0252 at the intersection of Route 30, widen rail underpass
17,000,000
(viii) S.R.0029
(A) Intersection improvements on S.R.0029 in Phoenixville, Charlestown Township
1,750,000
(ix) S.R.0023 and S.R.0029
(A) Design and construction of French Creek Drive connector between S.R.0023 and S.R.0029, Borough of Phoenixville
7,360,000
(Base Project Allocation - $6,400,000)
(Design and Contingencies - $960,000)
(x) S.R.0113
(A) Relocation of S.R.0113 in the Borough of Phoenixville
5,864,000
(Base Project Allocation - $4,026,000)
(Land Allocation - $1,234,000)
(Design and Contingencies - $604,000)
(xi) PA 252
(A) Reconstruction under SEPTA rail tracks
17,000,000
(Base Project Allocation - $14,450,000)
(Design and Contingencies - $2,550,000)
(xii) Wagontown Road
(A) Wagontown Road flood repair, reconstruction and retaining wall
800,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(xiii) PA 926
(A) PA 26 and New Street Intersection, Westtown Township, intersection improvements
83,000
(Base Project Allocation - $72,000)
(Design and Contingencies - $11,000)
(xiv) French Creek Parkway
(A) French Creek Parkway, new roadway
3,260,000
(Base Project Allocation - $2,420,000)
(Land Allocation - $440,000)
(Design and Contingencies - $400,000)
(xv) S.R. 0100
(A) Roadway, safety and access improvements, Uwchlan Township, in the vicinity of PA 100 and PA 113
3,000,000
(Base Project Allocation - $2,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(16) Clarion County
(i) S.R.0080
(A) I-80 westbound rehabilitation between S.R.2007 and Williamsburg, Beaver, Paint and Monroe Townships
464,000
(Base Project Allocation - $464,000)
(B) I-80 from Butler County line to Jefferson County line, pavement restoration, bridge rehabilitation and safety improvements
2,850,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $50,000)
(C) Pavement and safety improvements to Clarion rest areas, weight stations and crossovers
392,000
(Base Project Allocation - $92,000)
(Design and Contingencies - $300,000)
(D) I-80, Butler County line east to Jefferson County line, Countywide ITS safety improvement
315,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $15,000)
(ii) PA 68
(A) PA 68/U.S.322 intersection, Clarion Borough, intersection improvement
360,000
(Base Project Allocation - $160,000)
(Land Allocation - $20,000)
(Design and Contingencies - $180,000)
(B) PA 68, from Exit 9 to Main Street, Monroe and Clarion Townships, reconstruction
1,800,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(C) Intersection of PA 68 and S.R.3012, Toby Township, safety improvement
287,000
(Base Project Allocation - $190,000)
(Land Allocation - $40,000)
(Design and Contingencies - $57,000)
(D) Intersection of PA 68 and U.S.322, Clarion Borough, safety improvement
121,000
(Base Project Allocation - $80,000)
(Land Allocation - $4,000)
(Design and Contingencies - $37,000)
(iii) Wetland Banking
(A) Countywide, reconstruction of wetland banking
70,000
(Base Project Allocation - $40,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(iv) U.S.322
(A) Intersection of U.S.322 and PA 208, Shippenville Borough, safety improvement
241,000
(Base Project Allocation - $160,000)
(Land Allocation - $40,000)
(Design and Contingencies - $41,000)
(B) Venango County Line to T-890, Ashland and Elk Townships, safety improvement
1,391,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $40,000)
(Design and Contingencies - $51,000)
(17) Clearfield County
(i) S.R.0080
(A) I-80 from Centre County line to Jefferson County line, pavement restoration, bridge rehabilitation and safety improvements
4,250,000
(Base Project Allocation - $4,200,000)
(Design and Contingencies - $50,000)
(ii) S.R.0879
(A) Safety improvements, reconstruction and new connector road, S.R.0879 and Ridge Avenue, S.R.3013, Curwensville Borough and Pike Township
4,000,000
(Base Project Allocation - $3,500,000)
(Land Allocation - $150,000)
(Design and Contingencies - $350,000)
(18) Clinton County
(i) S.R.1001
(A) Improvements from S.R.0664 to Queens Run, Village of Lockport
1,230,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $90,000)
(Design and Contingencies - $40,000)
(ii) S.R.0080
(A) I-80 from Union County line to Centre County line, pavement restoration, bridge rehabilitation and safety improvements
2,450,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $50,000)
(iii) S.R.0220
(A) U.S.220 from Lycoming County line to Salona, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(iv) New Road Construction
(A) New road construction from Route 220 into Avis Industrial Park, Pine Creek Township
5,350,000
(Base Project Allocation - $4,500,000)
(Land Allocation - $200,000)
(Design and Contingencies - $650,000)
(v) S.R.2028
(A) S.R.2028, Industrial Park Access Road, new roadway
870,000
(Base Project Allocation - $730,000)
(Land Allocation - $40,000)
(Design and Contingencies - $100,000)
(19) Columbia County
(i) S.R.0080
(A) I-80 from Montour County line to Luzerne County line, pavement restoration, bridge rehabilitation and safety improvements
1,950,000
(Base Project Allocation - $1,900,000)
(Design and Contingencies - $50,000)
(ii) S.R.0054 and S.R.0061
(A) Conyngham Township, reconstruction and/or relocation of S.R.0054 approximately 0.7 miles north of the Columbia/Schuylkill County line
7,000,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $900,000)
(iii) S.R.0044
(A) Hemlock Township, reconstruction and/or relocation of S.R.0044 at the intersection with Peppermill Road S.R.4012 from the intersection of Lover Drive, TR-487 north to the Hemlock/Madison Township line
4,000,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(iv) S.R.0011
(A) Briar Creek and Berwick Borough, improvements from Briar Creek to Columbia/Luzerne County line
78,000,000
(Base Project Allocation - $66,000,000)
(Land Allocation - $6,000,000)
(Design and Contingencies - $6,000,000)
(B) U.S.11/PA 487 Interchange to Park Street, City of Bloomsburg, reconstruct intersection
250,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $100,000)
(C) Interchange of U.S.11 and PA 42, City of Bloomsburg, signing
11,000
(Design and Contingencies - $11,000)
(v) PA 42 and PA 44
(A) PA 42, I-80 to School House Road, PA 44, Hemlock Township, patching, grinding and overlay
405,000
(Base Project Allocation - $220,000)
(Design and Contingencies - $185,000)
(vi) S.R.0487
(A) Catawissa Borough and Franklin Township, relocation and new construction of S.R.0487 near Rider Road, T-344 and McIntyre Road, T-393
6,500,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $500,000)
(20) Crawford County
(i) S.R.0027
(A) Improvements from Little Sugar Creek Bridge to Township line at Frenchtown, safety improvement
271,000
(Base Project Allocation - $126,000)
(Land Allocation - $50,000)
(Design and Contingencies - $95,000)
(ii) S.R.0077
(A) PA 77 and PA 408 intersection, widen and add turn lane at Lower Crest
135,000
(Base Project Allocation - $120,000)
(Land Allocation - $6,000)
(Design and Contingencies - $9,000)
(iii) S.R.0079
(A) I-79 from Mercer County line to Erie County line, pavement restoration, bridge rehabilitation and safety improvements
11,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(iv) PA 408
(A) PA 408 Strawbridge Road to PA 428 and Steadman Road to Shiner Road, widen and straighten roadway
325,000
(Base Project Allocation - $265,000)
(Land Allocation - $40,000)
(Design and Contingencies - $20,000)
(21) Cumberland County
(i) S.R.0011
(A) Realign Lamb's Gap Road with Silver Spring Road at their intersection with U.S.11, Silver Spring Township
4,875,000
(Base Project Allocation - $4,250,000)
(Land Allocation - $250,000)
(Design and Contingencies - $375,000)
(B) Construct turning lanes at intersection of S.R.0011 and Cavalry Road, Middlesex Township
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(C) Construct turning lanes at intersection of S.R.0011 and Harmony Hall/Wolf's Bridge Road, Middlesex Township
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(ii) S.R.0034
(A) Holly Pike intersection with S.R.0174, South Middleton Township
195,000
(Base Project Allocation - $40,000)
(Land Allocation - $30,000)
(Design and Contingencies - $125,000)
(iii) S.R.0081
(A) I-81 Carlisle West, preventive maintenance, Stonehouse Road to Petersburg Road
1,210,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design and Contingencies - $200,000)
(B) Intersection improvements at I-81 northbound ramp and S.R.0074, Middlesex Township
50,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $10,000)
(C) Intersection improvements at I-81 southbound ramp and S.R.0074, Middlesex Township
50,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $10,000)
(D) Intersection improvements at I-81 southbound ramp and S.R.0641, Middlesex Township
50,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $10,000)
(E) I-81 from Dauphin County line to Franklin County line, pavement restoration, bridge rehabilitation and safety improvements
3,950,000
(Base Project Allocation - $3,900,000)
(Design and Contingencies - $50,000)
(F) S.R.0081, rebuilding of Exit 12 ramp
13,400,000
(Design and Contingencies - $1,200,000)
(Land Allocation - $2,200,000)
(Design and Contingencies - $10,000,000)
(G) S.R.0081, rebuilding of Exits 15 and 16 ramps
3,000,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $800,000)
(Design and Contingencies - $200,000)
(iv) S.R.0083
(A) I-83 from York County line to Dauphin County line, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(v) S.R.0015
(A) U.S.15 from York County line to PA 581, pavement restoration, bridge rehabilitation and safety improvements
750,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $50,000)
(vi) S.R.0581
(A) S.R.0581 from I-83 to I-81, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(B) S.R.0581, additional exit ramps
12,500,000
(Base Project Allocation - $8,500,000)
(Land Allocation - $1,500,000)
(Design and Contingencies - $2,500,000)
(vii) S.R.1013
(A) Widening of S.R.1013 and realignment with Silver Creek Road, Hampden Township
1,500,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(viii) S.R.0074
(A) Intersection improvements at S.R.0074 and Forge Road, Middlesex Township
50,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $10,000)
(B) Construct turning lanes and intersection improvements at S.R.0074 and Fairview Drive, Middlesex Township
160,000
(Base Project Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(ix) S.R.0641
(A) Construct turning lanes at S.R.0641 and Fairview Lane, Middlesex Township
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(x) Fairview Drive
(A) Intersection improvements at Fairview Drive and Claremont Road, Middlesex Township
50,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $10,000)
(xi) S.R.0696
(A) Construction of an interconnection of PA 696 south with PA 696 north to facilitate traffic flow into and exiting from the Borough of Shippensburg, Shippensburg Township and Southampton Township
10,000,000
(xii) S.R.0944
(A) S.R.0944, widening of Wertzville Road throughout Cumberland County from Route 15 to Perry County line
7,200,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $1,500,000)
(Design and Contingencies - $700,000)
(xiii) St. John's Road
(A) Realign intersection of St. John's Church Road and Main Street, Hampden Township
150,000
(Base Project Allocation - $150,000)
(22) Dauphin County
(i) S.R.0422
(A) Signalization and realignment of intersections with U.S.422, U.S.322, S.R.0743 and S.R.2016, Derry Township
8,000,000
(Base Project Allocation - $8,000,000)
(B) Intersection improvements and upgrading of Chocolate Avenue, Derry Township
3,700,000
(Base Project Allocation - $2,440,000)
(Land Allocation - $600,000)
(Design and Contingencies - $660,000)
(C) Access improvements, Chocolate Avenue; develop intermodal transportation center, Derry Township
11,250,000
(Base Project Allocation - $8,750,000)
(Land Allocation - $900,000)
(Design and Contingencies - $1,600,000)
(ii) Hershey Park Drive extension
(A) Relocation of Hershey Park Drive from S.R.0743 and Lingle Avenue, Derry Township
1,400,000
(Base Project Allocation - $900,000)
(Land Allocation - $100,000)
(Design and Contingencies - $400,000)
(iii) S.R.0022
(A) U.S.22 from Elmerton Avenue to Perry County line, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(iv) S.R.0081
(A) I-81 from Lebanon County line to Cumberland County line, pavement restoration, bridge rehabilitation and safety improvements
1,750,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $50,000)
(v) S.R.0083
(A) I-83 from Cumberland County line to I-81, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(vi) S.R.0743
(A) Relocation of Park Avenue, Derry Township
3,965,000
(Base Project Allocation - $2,215,000)
(Land Allocation - $900,000)
(Design and Contingencies - $850,000)
(vii) S.R.0283
(A) I-283 from Pennsylvania Turnpike to I-83, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(B) S.R.0283 from Lancaster County line to I-283 junction, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(C) Airport extension from airport to PA 283 east/west junction, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(viii) S.R.0322
(A) U.S.322 from Hershey to I-83 junction, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(ix) S.R.2019
(A) Widen and intersection improvements on Nyes Road
7,500,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,000,000)
(x) S.R.0022
(A) Improvements to intersection of S.R.0022 and Manor Road, West Hanover Township
1,140,000
(Base Project Allocation - $900,000)
(Land Allocation - $90,000)
(Design and Contingencies - $150,000)
(xi) Market Street
(A) Restore and upgrade Market Street bridge structure, including lighting and amenities, City of Harrisburg
688,000
(xii) S.R.2036
(A) PA 743/S.R.2012 Intersection to Lingle Avenue, Derry Township, new roadway
8,394,000
(Base Project Allocation - $6,394,000)
(Land Allocation - $1,600,000)
(Design and Contingencies - $400,000)
(xiii) S.R.0209
(A) Borough of Millersburg, Union Street from the Millersburg Square to Walnut Street, pavement restoration and drainage
30,000
(23) Dauphin and Cumberland Counties
(i) Capital Beltway
(A) I-81/I-83 Incident Management/ITS
3,015,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $15,000)
(24) Delaware County
(i) S.R.0003
(A) Improvements from North Lawrence Road to U.S.1, Haverford Township
800,000
(Base Project Allocation - $776,000)
(Land Allocation - $16,000)
(Design and Contingencies - $8,000)
(ii) S.R.2006
(A) Improvements to Mcdade Boulevard from I-476 to Fairview Road, Ridley Township
126,000
(Base Project Allocation - $100,000)
(Land Allocation - $2,000)
(Design and Contingencies - $24,000)
(iii) S.R.0001
(A) U.S.1 from PA 320 to PA 352, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(B) U.S.1/U.S.322, interchange and access improvements
5,000,000
(Base Project Allocation - $3,750,000)
(Land Allocation - $625,000)
(Design and Contingencies - $625,000)
(C) U.S.1/Pennsylvania Turnpike/Street Road, interchange and access improvements
10,000,000
(Base Project Allocation - $8,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $1,000,000)
(iv) S.R.0095
(A) I-95 from Philadelphia County line to Delaware State line, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(v) S.R.0322
(A) U.S.322 from C. Barry Bridge to S.R.3016, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(vi) S.R.0476
(A) I-476 from I-95 to Montgomery County line, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(25) Erie County
(i) S.R.0079
(A) I-79 from Crawford County line to Bay Front, pavement restoration, bridge rehabilitation and safety improvements
2,050,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $50,000)
(ii) S.R.0090
(A) I-90 from New York State line to Ohio State line, pavement restoration, bridge rehabilitation and safety improvements
18,000,000
(Base Project Allocation - $16,000,000)
(Design and Contingencies - $2,000,000)
(B) I-79, from Bayfront to Mercer County line, pavement and safety improvements
8,800,000
(Base Project Allocation - $8,000,000)
(Design and Contingencies - $800,000)
(iii) U.S.19
(A) U.S.19 from Robinson Road (S.R.4024) to Oliver Road (S.R.4008), widen roadway
700,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) Intersection of U.S.19 and I-90, intersection improvement
4,935,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $400,000)
(Design and Contingencies - $535,000)
(C) U.S.19 from I-90 to Robinson Road, reconstruction
620,000
(Base Project Allocation - $400,000)
(Land Allocation - $120,000)
(Design and Contingencies - $100,000)
(iv) U.S.20
(A) U.S.20 from Water Street to Nagle Road, Wesleyville Borough and Haborcreek Township, resurface
123,000
(Base Project Allocation - $108,000)
(Design and Contingencies - $15,000)
(B) Intersection of U.S.20 and PA 98, add left turn lane
200,000
(Base Project Allocation - $160,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(C) Intersection of U.S.20 and PA 98, Fairview Township, safety improvement
320,000
(Base Project Allocation - $200,000)
(Land Allocation - $80,000)
(Design and Contingencies - $40,000)
(v) PA 531
(A) PA 531 from I-90 to U.S.20, Harborcreek Township, widen roadway
1,000,000
(Base Project Allocation - $900,000)
(Land Allocation - $75,000)
(Design and Contingencies - $25,000)
(vi) S.R.4024
(A) S.R.4024 from TR-99 to Robison Road, relocation
960,000
(Base Project Allocation - $480,000)
(Land Allocation - $400,000)
(Design and Contingencies - $80,000)
(vii) S.R.4026
(A) S.R.4026 from U.S.19 (Peach Street) to PA 505 (Perry Highway), Millcreek and Summit Townships, reconstruction
200,000
(Base Project Allocation - $180,000)
(Land Allocation - $10,000)
(Design and Contingencies - $10,000)
(viii) Ore Dock Access Road
(A) From the Bayfront Highway 0.44 miles north, relocation
1,280,000
(Base Project Allocation - $1,120,000)
(Land Allocation - $40,000)
(Design and Contingencies - $120,000)
(26) Fayette County
(i) S.R.0040
(A) Widen S.R.0040 and redesign and construct interchange of S.R.0040 and S.R.0119, South Union Township, North Union Township and City of Uniontown
9,750,000
(Base Project Allocation - $8,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,250,000)
(B) Widen S.R.0040 from S.R.0119 to Duck Hollow Road, South Union Township and North Union Township
4,350,000
(Base Project Allocation - $3,500,000)
(Land Allocation - $250,000)
(Design and Contingencies - $600,000)
(C) Extend Matthew Drive from S.R.0040 to Duck Hollow Road, South Union Township
3,350,000
(Base Project Allocation - $1,250,000)
(Land Allocation - $1,900,000)
(Design and Contingencies - $200,000)
(D) U.S.40, from PA 166 to Morgan Street, safety improvement/center turn lane
126,000
(Base Project Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $16,000)
(ii) S.R.4006
(A) Widen S.R.4006 from S.R.0040 to Matthew Drive, South Union Township
1,450,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $200,000)
(iii) S.R.4003 and S.R.4020
(A) Improvements, upgrades and extensions, Luzerne Township
6,500,000
(iv) S.R.4020
(A) S.R.4020 from prison entrance to PA 166, Luzerne Township, restoration
1,000,000
(Base Project Allocation - $840,000)
(Land Allocation - $100,000)
(Design and Contingencies - $60,000)
(B) Prison entrance to PA 166, Luzerne Township, restoration
1,000,000
(Base Project Allocation - $840,000)
(Land Allocation - $100,000)
(Design and Contingencies - $60,000)
(v) U.S.119
(A) Morgantown Interchange, South Union Township, reconstruction
630,000
(Base Project Allocation - $500,000)
(Land Allocation - $60,000)
(Design and Contingencies - $70,000)
(vi) S.R.2027
(A) Intersection of S.R.2027 and S.R.1020, safety improvement
19,000
(Base Project Allocation - $16,000)
(Land Allocation - $1,000)
(Design and Contingencies - $2,000)
(vii) S.R.3019
(A) Intersection of S.R.3019 and Walnut Hill Road, safety improvement/add turn lanes
160,000
(Base Project Allocation - $120,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(viii) S.R.6040
(A) Uniontown Central Business District, City of Uniontown, safety improvement/signal improvement
110,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(ix) Signal Improvements
(A) Countywide signal improvements
91,000
(Base Project Allocation - $80,000)
(Land Allocation - $1,000)
(Design and Contingencies - $10,000)
(27) Forest County
(i) S.R.0666
(A) Widen and rehabilitate S.R.0666 from Village of Lynch to the Village of Whig Hill, Howe and Kingsley Townships
16,500,000
(Base Project Allocation - $14,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $1,500,000)
(ii) S.R.0948
(A) Widen and resurface S.R.0948 from Warren County line to Brookston
1,390,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $90,000)
(iii) S.R.0899
(A) Widen and resurface S.R.0899 from S.R.0066 to Clarion County line
6,000,000
(Base Project Allocation - $5,250,000)
(Design and Contingencies - $750,000)
(28) Franklin County
(i) S.R.0081
(A) I-81, recondition level 4 from north of Scotland to Cumberland County line
2,154,000
(Base Project Allocation - $2,032,000)
(Land Allocation - $1,000)
(Design and Contingencies - $121,000)
(B) I-81 from Cumberland County line to Maryland State line, pavement restoration, bridge rehabilitation and safety improvements
2,650,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $50,000)
(C) I-81 at Exit 2, interchange improvements, Antrim Township
1,865,000
(Base Project Allocation - $1,700,000)
(Land Allocation - $15,000)
(Design and Contingencies - $150,000)
(29) Fulton County
(i) S.R.0030
(A) U.S.30 from near S.R.1006 to S.R.1004/Oliver Drive, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(ii) S.R.0070
(A) I-70 from Maryland State line to Bedford County line, pavement restoration, bridge rehabilitation and safety improvements
2,050,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $50,000)
(30) Greene County
(i) S.R.0021
(A) Improvements to Route 21 at Kiwi Road, reconstruction and extension of Kiwi Road and signalization upgrade of I-79 ramp intersections
1,729,000
(Base Project Allocation - $1,504,000)
(Design and Contingencies - $225,000)
(B) Development of a connector road from S.R.0021 to Nemacolin, Cumberland Township and Monongahela Township
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(ii) TR-624
(A) Areford Boulevard, extend 2-lane blacktop with cul-de-sac 1/4 mile, Carmichaels Borough
300,000
(iii) S.R.0209 (R.D.1)
(A) Extend access road to Industrial Park 1/2 mile, Mount Morris, Perry Township
650,000
(iv) S.R.0079
(A) I-79 from West Virginia State line to Washington County line, pavement restoration, bridge rehabilitation and safety improvements
2,250,000
(Base Project Allocation - $2,200,000)
(Design and Contingencies - $50,000)
(v) U.S.19
(A) U.S.19/PA 221 Intersection, safety improvement
50,000
(Base Project Allocation - $20,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(B) U.S.19/PA 221 Intersection, construct Park and Ride Lot
120,000
(Base Project Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $10,000)
(vi) PA 88
(A) Intersections at S.R.1006 and S.R.1021, Carmichaels Borough, safety improvements
38,000
(Base Project Allocation - $34,000)
(Design and Contingencies - $4,000)
(31) Huntingdon County
(i) S.R.3047
(A) Turn lane and signalization of South 4th Street, Huntingdon Borough
90,000
(Base Project Allocation - $70,000)
(Land Allocation - $5,000)
(Design and Contingencies - $15,000)
(ii) U.S.22
(A) Intersection of U.S.22 and PA 655 (Valley Street), Mill Creek Borough, safety improvement
9,000
(Base Project Allocation - $7,000)
(Land Allocation - $1,000)
(Design and Contingencies - $1,000)
(32) Indiana County
(i) S.R.0119
(A) U.S.119 from Two Lick to S.R.1010, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(B) U.S.119 from PA 56 to Snyder Lane, Burrell and Center Townships, add lanes
9,600,000
(Base Project Allocation - $8,000,000)
(Land Allocation - $800,000)
(Design and Contingencies - $800,000)
(ii) S.R.0422
(A) U.S.422 from Pikes Peak to U.S.119, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(iii) Rose Street Extension
(A) PA 286 north to S.R.4032, White Township, relocation
671,000
(Base Project Allocation - $228,000)
(Land Allocation - $293,000)
(Design and Contingencies - $150,000)
(iv) U.S.22
(A) U.S.22 north to Snyder Lane, Burrell Township, interchange improvement and add lanes
5,745,000
(Base Project Allocation - $4,400,000)
(Design and Contingencies - $1,345,000)
(B) U.S.22 from PA 289 east to four-lane section, East and West Wheatfield Townships, add lanes
5,200,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $800,000)
(Design and Contingencies - $400,000)
(v) Wetland Bank
(A) Wetland bank, Countywide reconstruction of wetland bank
71,000
(Base Project Allocation - $40,000)
(Land Allocation - $10,000)
(Design and Contingencies - $21,000)
(vi) S.R.3043
(A) From intersection of S.R.3043 and PA 286 to S.R.4032, White Township, relocation/new roadway
940,000
(Base Project Allocation - $550,000)
(Land Allocation - $210,000)
(Design and Contingencies - $180,000)
(vii) PA 286
(A) From T-813 west to U.S.422, White Township, safety improvement
1,190,000
(Base Project Allocation - $900,000)
(Land Allocation - $150,000)
(Design and Contingencies - $140,000)
(viii) S.R.3013
(A) Intersection of S.R.3013 and S.R.3008, Black Lick Township, safety improvement
146,000
(Base Project Allocation - $100,000)
(Land Allocation - $15,000)
(Design and Contingencies - $31,000)
(ix) PA 403
(A) PA 403 just east of the intersection with PA 286, Clymer Borough, safety improvement/restoration
146,000
(Base Project Allocation - $80,000)
(Land Allocation - $35,000)
(Design and Contingencies - $31,000)
(33) Jefferson County
(i) S.R.0080
(A) I-80 from Clearfield County line to Clarion County line, pavement restoration, bridge rehabilitation and safety improvements
2,450,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $50,000)
(B) I-80, Clarion County to Clearfield County, countywide ITS, safety improvement
270,000
(Base Project Allocation - $260,000)
(Design and Contingencies - $10,000)
(ii) Wetland Banking
(A) Countywide, reconstruction of wetland banking
70,000
(Base Project Allocation - $40,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(iii) PA 36
(A) Intersection of PA 36 and PA 949, Village of Sigel, Eldred Township, safety improvements
206,000
(Base Project Allocation - $130,000)
(Land Allocation - $40,000)
(Design and Contingencies - $36,000)
(iv) U.S.119
(A) Intersection of U.S.119 and PA 410, Henderson Township, restoration
330,000
(Base Project Allocation - $200,000)
(Land Allocation - $60,000)
(Design and Contingencies - $70,000)
(v) PA 28
(A) Intersection of PA 28 and S.R.1011, Snyder Township, safety improvement
310,000
(Base Project Allocation - $180,000)
(Land Allocation - $60,000)
(Design and Contingencies - $70,000)
(B) From T-434 (Milliron Road) to Pine Creek/Warsaw Township Line, Pine Creek Township, safety improvement
275,000
(Base Project Allocation - $180,000)
(Land Allocation - $20,000)
(Design and Contingencies - $75,000)
(vi) PA 536
(A) Intersection of PA 536 and S.R.3001, Ringgold Township, safety improvement
250,000
(Base Project Allocation - $160,000)
(Land Allocation - $40,000)
(Design and Contingencies - $50,000)
(vii) U.S.119
(A) U.S.119 and T-841 Intersection (Punxsutawney Airport), Bell Township, safety improvement and add left turn lane
255,000
(Base Project Allocation - $150,000)
(Land Allocation - $30,000)
(Design and Contingencies - $75,000)
(viii) PA 830
(A) From PA 830/S.R.1006 Intersection to S.R.1006/T-548 Intersection, Washington Township, reconstruction and relocation
940,000
(Base Project Allocation - $800,000)
(Land Allocation - $80,000)
(Design and Contingencies - $60,000)
(34) Juniata County
(i) S.R.0022
(A) U.S.22 from Perry County line to Macedonia, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(35) Lackawanna County
(i) S.R.0247
(A) Moosic Mountain Business Park
1,655,000
(Base Project Allocation - $1,525,000)
(Land Allocation - $10,000)
(Design and Contingencies - $120,000)
(ii) S.R.0011
(A) U.S.11 from Wyoming Avenue to I-81, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(iii) S.R.0006
(A) U.S.6, Lackawanna Valley Industrial Highway from I-81/I-84/I-380 junction to Carbondale, pavement restoration, bridge rehabilitation and safety improvements
1,550,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $50,000)
(B) Officemax to Timber Falls, Dickson City and Blakely Borough, restoration and widening
542,000
(Base Project Allocation - $482,000)
(Land Allocation - $40,000)
(Design and Contingencies - $20,000)
(iv) S.R.0081
(A) I-81 from Luzerne County line to Susquehanna County line, pavement restoration, bridge rehabilitation and safety improvements
2,750,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $50,000)
(v) S.R.0084
(A) I-84 from Wayne County line to I-81, pavement restoration, bridge rehabilitation and safety improvements
1,350,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $50,000)
(vi) S.R.0307
(A) S.R.0307 from I-81 to U.S.11, pavement restoration, bridge rehabilitation and safety improvements
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(vii) S.R.0380
(A) I-380 from Monroe County line to I-81, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(viii) S.R.3011
(A) Keyser Avenue from Taylor-Old Forge line to Taylor-Scranton line, storm water management system and road reconstruction, Borough of Taylor
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(B) Keyser Avenue from Scranton-Taylor line to West Market Street, storm water management system and road reconstruction, City of Scranton
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(C) Keyser Avenue, storm water management project from Loop Street to Philo Street, including, but not limited to, construction of storm sewers and piping along Keyser Avenue, Loop Street and North-South Road and construction of water retention pond of unnamed tributary of Keyser Creek traveling underneath Keyser Avenue, S.R.3011, City of Scranton
1,600,000
(Design and Contingencies - $300,000)
(Base Project Allocation - $1,300,000)
(ix) S.R.3003
(A) Jackson Street from Keyser Avenue to Newton Road, construction of storm water management system, City of Scranton
840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(B) Newton Road from Jackson Street to Scranton-Newton Township line, construction of storm water management system, City of Scranton
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(x) S.R.3010
(A) Union Street from Main Street to Keyser Avenue, road reconstruction and construction of storm water management system, including, but not limited to, storm sewers, storm water piping, curbing, sidewalks, pumping stations and acquisition of property, Borough of Taylor
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(xi) S.R.3012
(A) Oak Street from Main Street to Keyser Avenue, construction of storm water management system, Borough of Taylor
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(xii) S.R.3013
(A) Main Street from Taylor-Old Forge line to Taylor-Scranton line, road reconstruction and storm water management system, Borough of Taylor
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) Main Avenue from Scranton-Taylor line to West Market Street, road reconstruction and storm water management system, City of Scranton
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(xiii) S.R.3014
(A) Luzerne Street from Main Avenue to Keyser Avenue, road reconstruction and storm water management system, including curbing, City of Scranton
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(xiv) S.R.3029
(A) Providence Road from Olive Street to North Main Avenue, construction of storm water management system, City of Scranton
1,900,000
(Base Project Allocation - $1,600,000)
(Design and Contingencies - $300,000)
(xv) S.R.3033
(A) Oak Street from Keyser Avenue to North Scranton Expressway, road reconstruction and storm water management system, City of Scranton
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(xvi) S.R.0347
(A) Cypress Street from Throop-Olyphant line to Throop-Dunmore line, road reconstruction and construction of storm water management system, Borough of Throop
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) Dunmore Street from Throop-Olyphant line to Throop-Dunmore line, road reconstruction and construction of storm water management system, Borough of Throop
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(C) Blakely Street from Drinker Street to Dunmore-Throop line, road reconstruction and construction of storm water management system, Borough of Dunmore
1,400,000
(Base Project Allocation - $1,150,000)
(Design and Contingencies - $250,000)
(xvii) S.R.6011
(A) Blakely Street from Green Ridge Street to Dunmore-Scranton line, road reconstruction and construction of storm water management system, borough of Dunmore
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) Green Ridge Street from Main Avenue to Scranton-Dunmore line, construction of storm water management system, City of Scranton
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(C) Green Ridge Street from Dunmore-Scranton line to Blakely Street, construction of storm water management system, Borough of Dunmore
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(xviii) S.R.2020
(A) Drinker Street from Blakely Street to I-380, construction of storm water management system, Borough of Dunmore
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(xix) S.R.0307
(A) Morgan Highway from Keyser Avenue to Abington Township, Scranton line, road reconstruction and construction of storm water management system, City of Scranton
2,000,000
(Base Project Allocation - $1,650,000)
(Design and Contingencies - $350,000)
(xx) Safety improvements and signals on the following State highways: S.R.2020, S.R.6011, S.R.0347, S.R.3013, S.R.3010, S.R.3012, S.R.3011, S.R.3033, S.R.3014, S.R.3029, S.R.3003 and S.R.0307 in the City of Scranton and the Boroughs of Taylor, Throop and Dunmore
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(xxi) Acquisition and installation of warning devices and safety improvements of highway-rail grade crossings, 20% of the cost of each such acquisition and installation shall be paid by the company, party, person or persons that own the tract upon which the improvements are being installed, City of Scranton, Boroughs of Taylor, Throop and Dunmore
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(xxii) East Mountain Road
(A) Safety and drainage improvement on highway, including shoulders from Mountain Lake Road to Intersection I-81, City of Scranton
6,000,000
(xxiii) S.R.3022
(A) S.R.3022, Roaring Brook and Central City Expressway, repair retaining wall
150,000
(Base Project Allocation - $130,000)
(Design and Contingencies - $20,000)
(xxiv) PA 247 and S.R.6247
(A) Moosic Mountain/Valley View Business Park, Archbald and Jessup Boroughs, Jefferson Township, widening and safety improvements
10,400,000
(Base Project Allocation - $8,400,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,500,000)
(B) Salem Road widening, safety improvements and access road
1,430,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $130,000)
(C) Valleyview Business Park, Archbald and Jessup Boroughs, new construction
1,760,000
(Base Project Allocation - $1,400,000)
(Land Allocation - $40,000)
(Design and Contingencies - $320,000)
(xxv) I-81, I-84 and I-380
(A) Traffic control center, data system and safety improvements, various townships traffic safety improvements
100,000
(Base Project Allocation - $100,000)
(36) Lancaster County
(i) S.R.0072 and S.R.0501
(A) Improvements to various sections of Doe Run Road and Collector
640,000
(Base Project Allocation - $640,000)
(ii) S.R.0222
(A) Signalization of intersection of S.R.0222 and Pennsylvania Turnpike, East Cocalico Township
127,000
(Base Project Allocation - $27,000)
(Design and Contingencies - $100,000)
(B) U.S.222 from Berks County line to U.S.30 in Lancaster, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(iii) S.R.0441 and S.R.0462
(A) Signalization of 6 locations, Columbia Borough
270,000
(Base Project Allocation - $40,000)
(Land Allocation - $50,000)
(Design and Contingencies - $180,000)
(iv) S.R.0030
(A) U.S.30 from Greenland to York County line, pavement restoration, bridge rehabilitation and safety improvements
1,750,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $50,000)
(B) U.S.30 from York County line to Mountville Borough, resurface
1,609,000
(Base Project Allocation - $1,309,000)
(Design and Contingencies - $300,000)
(C) U.S.30 from Mountville Borough to PA 741, resurface
1,688,000
(Base Project Allocation - $1,388,000)
(Design and Contingencies - $300,000)
(v) S.R.0283
(A) S.R.0283 from U.S.30 in Lancaster to Dauphin County line, pavement restoration, bridge rehabilitation and safety improvements
1,750,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $50,000)
(B) PA 283 from Elizabethtown to PA 230, resurface
2,581,000
(Base Project Allocation - $2,281,000)
(Design and Contingencies - $300,000)
(vi) PA 272
(A) PA 272/PA 372, Buck Intersection, East Drumore Township, intersection improvement
360,000
(Base Project Allocation - $160,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(vii) PA 896
(A) PA 896 from Strasburg Borough to Route 340, road widening, shoulder widenings and safety improvements
4,000,000
(B) Road relocation of PA 896 from Bishop Road, Strasburg Township, to Clover Avenue, Strasburg Borough
2,500,000
(viii) Newcomer Road
(A) Rapho and Mount Joy Townships, safety improvements
18,000
(Base Project Allocation - $11,000)
(Land Allocation - $2,000)
(Design and Contingencies - $5,000)
(ix) Irishtown Road
(A) Connector to Harvest Road and North Cherry Lane, Leacock Township, relocation
1,420,000
(Base Project Allocation - $1,070,000)
(Land Allocation - $250,000)
(Design and Contingencies - $100,000)
(x) Eby Chiques and Newcomer Road
(A) Rapho Township, realignment
1,232,000
(Base Project Allocation - $882,000)
(Land Allocation - $250,000)
(Design and Contingencies - $100,000)
(37) Lawrence County
(i) S.R.0060
(A) S.R.0060 from Beaver County line to Mercer County line, pavement restoration, bridge rehabilitation and safety improvements
1,250,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $50,000)
(ii) S.R.0079
(A) I-79 from Butler County line to Mercer County line, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(iii) S.R.0422
(A) U.S.422 from U.S.422/S.R.2004 Interchange to PA 60, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(iv) S.R.0018
(A) Restoration and widen S.R.0018, Wilmington and Neshannock Townships
800,000
(Base Project Allocation - $740,000)
(Design and Contingencies - $60,000)
(B) PA 18, Wallace Avenue to Maitland Lane, restoration
600,000
(Base Project Allocation - $600,000)
(v) S.R.0065
(A) Widening and construction to include a third lane, Wayne Township
38,000,000
(vi) S.R.1005
(A) Intersection of S.R.1005/Maitland Lane to Mercer County line, reconstruction
600,000
(Base Project Allocation - $600,000)
(B) Maitland Lane to Mercer County line, Neshannok and Wilmington Townships, widening and realignment
720,000
(Base Project Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(vii) S.R.4014
(A) Union Township and New Castle Borough, restoration
700,000
(Base Project Allocation - $700,000)
(38) Lebanon County
(i) S.R.0022
(A) U.S.22 from Berks County line to Dauphin County line, pavement restoration, bridge rehabilitation and safety improvements
1,550,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $50,000)
(ii) S.R.0078
(A) I-78 from Berks County line to Dauphin County line, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(iii) S.R.0081
(A) I-81 from Dauphin County line to Schuylkill County line, pavement restoration, bridge rehabilitation and safety improvements
1,550,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $50,000)
(iv) S.R.2001
(A) Reconstruction and improvements at S.R.2001 and PA 501 intersection
401,000
(Base Project Allocation - $401,000)
(39) Lehigh County
(i) S.R.0309
(A) Intersection improvements with S.R.4010
400,000
(Base Project Allocation - $240,000)
(Land Allocation - $80,000)
(Design and Contingencies - $80,000)
(B) S.R.0309 from Bucks County line to I-78/I-78 to U.S.22, pavement restoration, bridge rehabilitation and safety improvements
750,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $50,000)
(ii) S.R.1003
(A) Widen, reconstruction and intersection improvements on Airport Road from U.S.22 to Congress Street
3,000,000
(Base Project Allocation - $2,400,000)
(Land Allocation - $300,000)
(Design and Contingencies - $300,000)
(iii) S.R.1007
(A) Reconstruction of Dauphin Street from Irving Street to Union Boulevard
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $25,000)
(Design and Contingencies - $75,000)
(B) Reconstruction, intersection improvements and new roadway on Dauphin Street from Irving Street to Union Boulevard, and Lloyd Street Connector from Airport Road to existing Lloyd Street
3,900,000
(Base Project Allocation - $2,800,000)
(Land Allocation - $525,000)
(Design and Contingencies - $575,000)
(iv) S.R.9900
(A) Lloyd Street Connector from Airport Road to existing Lloyd Street, new roadway
3,600,000
(Base Project Allocation - $2,600,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(v) American Parkway
(A) Four-lane relocation of American Parkway between American Boulevard and S.R.0987
12,540,000
(Base Project Allocation - $11,280,000)
(Land Allocation - $450,000)
(Design and Contingencies - $810,000)
(B) American Boulevard northeast to S.R.0987, City of Allentown
12,540,000
(Base Project Allocation - $11,280,000)
(Land Allocation - $450,000)
(Design and Contingencies - $810,000)
(vi) S.R.0022
(A) U.S.22 from Northampton County line to I-78 junction, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(vii) S.R.0078
(A) I-78 from Northampton County line to Berks County line, pavement restoration, bridge rehabilitation and safety improvements
1,950,000
(Base Project Allocation - $1,900,000)
(Design and Contingencies - $50,000)
(viii) S.R.0378
(A) S.R.0378 from Northampton County line to U.S.22, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(40) Luzerne County
(i) S.R.0093
(A) Improvements to Broad Street, City of Hazleton
1,682,000
(Base Project Allocation - $1,346,000)
(Design and Contingencies - $336,000)
(ii) S.R.0011
(A) U.S.11 from I-81 Airport to S.R.2021, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(iii) S.R.0029
(A) S.R.0029 from I-81 Ashley to U.S.11 West Nanticoke, pavement restoration, bridge rehabilitation and safety improvements
2,000,000
(Base Project Allocation - $1,940,000)
(Design and Contingencies - $60,000)
(iv) S.R.0080
(A) I-80 from Monroe County line to Columbia County line, pavement restoration, bridge rehabilitation and safety improvements
2,650,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $50,000)
(B) I-80, eastbound/westbound lanes, pavement restoration
400,000
(Base Project Allocation - $380,000)
(Design and Contingencies - $20,000)
(v) S.R.0081
(A) I-81 from Schuylkill County line to Lackawanna County line, pavement restoration, bridge rehabilitation and safety improvements
3,950,000
(Base Project Allocation - $3,900,000)
(Design and Contingencies - $50,000)
(B) I-81, reconstruct Exit 49, Avoca Borough, interchange improvement
2,000,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(vi) S.R.0309
(A) S.R.0309 from I-81 Wilkes-Barre to Trucksville, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(B) Construction of 3,500 linear feet of sound barrier on the north side of S.R.0309 between Exit 1 and Exit 2, City of Wilkes-Barre
3,000,000
(C) PA 309, Exit 4 to Exit 5, restoration
450,000
(Base Project Allocation - $420,000)
(Design and Contingencies - $30,000)
(D) PA 309 and Airport Road, Hazle Township, improve intersection
260,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(vii) S.R.2021
(A) S.R.2021 from U.S.11 Cork Lane to Sebastopol, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(viii) PA 239
(A) Mocanaqua rock removal, Mocanaqua Borough, rock embankment removal
240,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(ix) PA 115
(A) PA 115 and Meadow Run, Bear Creek Township, intersection improvement
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(x) S.R.3026
(A) Airport Beltway, Hazleton Borough, widening
860,000
(Base Project Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(xi) I-81 and I-80
(A) Portable message boards, data system and safety improvement, various townships, traffic safety improvements
110,000
(Base Project Allocation - $110,000)
(xii) Coal Street realignment
(A) Wilkes-Barre City, restoration, new construction
1,610,000
(Base Project Allocation - $1,400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $160,000)
(41) Lycoming County
(i) S.R.0180
(A) I-180 restoration and improvements from Halls Station Interchange to South Muncy Interchange and U.S.220/S.R.2036 Interchange
956,000
(Base Project Allocation - $899,000)
(Design and Contingencies - $57,000)
(B) I-180 from Northumberland County line to U.S.15, pavement restoration, bridge rehabilitation and safety improvements
2,050,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $50,000)
(ii) S.R.0015
(A) U.S.15 from Williamsport to Tioga County line, pavement restoration, bridge rehabilitation and safety improvements
2,050,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $50,000)
(B) South Williamsport to Lycoming/Union County line, roadway reconstruction, safety improvements
3,150,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $100,000)
(iii) S.R.0220
(A) U.S.220 from Williamsport to Nisbit/Larrys Corner to Clinton County, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(B) U.S.220 from intersection with PA 287 to Williamsport Beltway, Woodward Township, four-lane divided relocation/reconstruction and safety improvement
3,778,000
(Base Project Allocation - $3,251,000)
(Land Allocation - $294,000)
(Design and Contingencies - $233,000)
(C) U.S.220, 4th Street Ramp, Jersey Shore Borough, safety improvement
70,000
(Design and Contingencies - $70,000)
(D) City of Williamsport and Woodward Township, junction of U.S.220 and S.R.2014
2,500,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $300,000)
(E) City of Williamsport to Jersey Shore, upgrade to divided limited-access
20,000,000
(Base Project Allocation - $16,300,000)
(Land Allocation - $1,500,000)
(Design and Contingencies - $2,200,000)
(iv) S.R.0414
(A) Brown Township, Cedar Run Narrows, roadway reconstruction, retaining wall
3,700,000
(Base Project Allocation - $2,400,000)
(Land Allocation - $300,000)
(Design and Contingencies - $1,000,000)
(v) Trenton Avenue connector
(A) Trenton Avenue connector, City of Williamsport Industrial Park access road
4,500,000
(42) McKean County
(i) S.R.0219
(A) Upgrade of Bradford Bypass north and south of Bradford
8,320,000
(Base Project Allocation - $7,600,000)
(Design and Contingencies - $720,000)
(B) U.S.219 from south Bradford to New York State line, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(ii) S.R.0060
(A) S.R.0060 from Lawrence County line to PA 18 Intersection, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(iii) S.R.0079
(A) I-79 from Lawrence County line to Crawford County line, pavement restoration, bridge rehabilitation and safety improvements
2,650,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $50,000)
(iv) S.R.0080
(A) I-80 from Venango County line to Ohio State line, pavement restoration, bridge rehabilitation and safety improvements
2,850,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $50,000)
(v) PA 59
(A) PA 59, intersection of PA 59 and PA 770, Lafayette Township, intersection improvement
190,000
(Base Project Allocation - $160,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(43) Mercer County
(i) I-79
(A) I-79, Lawrence County line to City of Erie, pavement and safety improvements
11,660,000
(Base Project Allocation - $10,600,000)
(Design and Contingencies - $1,060,000)
(ii) S.R.3014
(A) S.R.3014, PA 18 to Buhl Boulevard, add turn lane
860,000
(Base Project Allocation - $520,000)
(Land Allocation - $320,000)
(Design and Contingencies - $20,000)
(iii) S.R.0018
(A) Intersection improvements and upgrading of Main Street, Borough of Greenville
1,191,000
(Base Project Allocation - $979,000)
(Design and Contingencies - $212,000)
(44) Mifflin County
(i) S.R.0322
(A) U.S.322 from 322/22 Split of Centre County line, pavement restoration, bridge rehabilitation and safety improvements
1,650,000
(Base Project Allocation - $1,600,000)
(Design and Contingencies - $50,000)
(45) Monroe County
(i) S.R.0033
(A) S.R.0033 from Northampton County line to I-80, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(ii) S.R.0080
(A) I-80 from New Jersey State line to Carbon County line, pavement restoration, bridge rehabilitation and safety improvements
2,850,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $50,000)
(B) I-80 Exit 51/Forge Road/Prospect Street/East Brown Street Interchange reconfiguration, East Stroudsburg
4,500,000
(Base Project Allocation - $3,700,000)
(Land Allocation - $500,000)
(Design and Contingencies - $300,000)
(C) I-80 Exit 52 Interchange improvements
12,000,000
(Base Project Allocation - $10,000,000)
(Land Allocation - $1,000,000)
(Design and Contingencies - $1,000,000)
(D) I-80 and Stony Hollow Road, new interchange
11,500,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,500,000)
(E) Delaware Water Gap Welcome Center I-80
10,000,000
(Base Project Allocation - $7,600,000)
(Land Allocation - $400,000)
(Design and Contingencies - $2,000,000)
(iii) S.R.0209
(A) U.S.209 from PA 33 Split to I-80, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(B) I-80 to Marshalls Creek reconstruction and widening
3,400,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(C) Preliminary engineering on congestion management, safety improvements including, but not limited to, intersection improvements, signaling improvements, turning lanes, speed management and routing
750,000
(iv) S.R.0611
(A) Enhance mobility and improve safety, 1,000 feet south of S.R.2106 to 1,200 feet north of S.R.0033 in Stroud Township
24,900,000
(Base Project Allocation - $14,000,000)
(Land Allocation - $7,400,000)
(Design and Contingencies - $3,500,000)
(v) S.R.0380
(A) I-380 from I-80 to Lackawanna County line, pavement restoration, bridge rehabilitation and safety improvements
1,450,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $50,000)
(46) Montgomery County
(i) S.R.0030
(A) Improvements to Closed Loop, City Avenue to County Line Road, Lower Merion Township
112,000
(Base Project Allocation - $100,000)
(Land Allocation - $12,000)
(ii) S.R.0073
(A) Intersection improvement at Willow Grove, Cheltenham Township
290,000
(Base Project Allocation - $270,000)
(Land Allocation - $20,000)
(iii) S.R.0663
(A) Improvements of Swamp Park intersection with Layfield, New Hanover Township
1,133,000
(Base Project Allocation - $950,000)
(Land Allocation - $75,000)
(Design and Contingencies - $108,000)
(iv) S.R.0076
(A) I-76 from Philadelphia County line to Chester County line, pavement restoration, bridge rehabilitation and safety improvements
1,350,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $50,000)
(v) S.R.0309
(A) S.R.0309 from Cedarbrook to S.R.2018, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(vi) S.R.0422
(A) U.S.422 from Chester County line to Berks County line, pavement restoration, bridge rehabilitation and safety improvements
3,160,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $60,000)
(Design and Contingencies - $100,000)
(vii) S.R.0476
(A) I-476 from Delaware County line to Bucks County line, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(viii) Upper Perkiomen Industrial Access Highway
(A) Construction of a new industrial access highway in Upper Hanover Township
8,000,000
(Base Project Allocation - $6,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,500,000)
(ix) S.R.0363
(A) PA 363, Sumneytown Pike at PA 363 intersection, Towamencin and Upper Gwynedd Townships, intersection improvement
1,344,000
(Base Project Allocation - $1,344,000)
(x) S.R.9900
(A) PA 9900, Fort Washington improvements, Upper Dublin Township, various reconstruction and safety improvements
196,000
(Base Project Allocation - $175,000)
(Land Allocation - $4,000)
(Design and Contingencies - $17,000)
(B) PA 9900, Butler Pike at Flourtown Road, Plymouth and Whitemarsh Townships, intersection improvement
220,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(47) Montour County
(i) S.R.0080
(A) I-80 from Columbia County line to Northumberland County line, pavement restoration, bridge rehabilitation and safety improvements
1,250,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $50,000)
(ii) U.S.11
(A) U.S.11, Walnut Street and Montour Boulevard, restoration
650,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $300,000)
(48) Northampton County
(i) S.R.0022
(A) U.S.22 from New Jersey State line to Lehigh County line, pavement restoration, bridge rehabilitation and safety improvements
1,250,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $50,000)
(ii) S.R.0033
(A) S.R.0033 from U.S.22 to Monroe County line, pavement restoration, bridge rehabilitation and safety improvements
1,350,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $50,000)
(iii) S.R.0078
(A) I-78 from New Jersey State line to Lehigh County line, pavement restoration, bridge rehabilitation and safety improvements
1,250,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $50,000)
(49) Northumberland County
(i) S.R.0061
(A) PA 61/PA 225 intersection, Shamokin and Coal Townships, intersection improvement and new bridge
2,360,000
(Base Project Allocation - $1,800,000)
(Land Allocation - $200,000)
(Design and Contingencies - $360,000)
(B) Mill and resurface S.R.0061 from S.R.4006 to S.R.0890
300,000
(C) Hamilton Underpass, City of Sunbury and Upper Augusta Township, reconstruction and/or relocation of S.R.0061 from Market Street in Sunbury to S.R.0890 in Upper Augusta Township
6,000,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(ii) S.R.0080
(A) I-80 from Montour County line to Union County line, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(iii) S.R.0180
(A) I-180 from I-80 to Lycoming County line, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(B) Resurface, shoulder pavement and guide rail upgrade on section 049
4,400,000
(C) I-180, from Lycoming County line to PA 54 Interchange, restoration
518,000
(Base Project Allocation - $480,000)
(Design and Contingencies - $38,000)
(iv) S.R.0147
(A) Mill and resurface S.R.0147, section 63M
780,000
(v) S.R.0405
(A) Mill and resurface S.R.0405 from Cameron Avenue Intersection to Segment 0231/1537
900,000
(vi) S.R.0487
(A) Mill and resurface, shoulder pavement and guide rail upgrade on S.R.0487 from Timber Creek Restaurant to S.R.0054 in Elysburg
430,000
(B) PA 61/PA 487 to 700 feet east of PA 487/S.R.4012, Shamokin Township, restoration
404,000
(Base Project Allocation - $224,000)
(Land Allocation - $30,000)
(Design and Contingencies - $150,000)
(vii) S.R.0054
(A) Riverside Borough and Rush Township, widen from the Riverside Borough/Rush Township line to the intersection of S.R.2002 and S.R.2003 with S.R.0054
3,200,000
(Base Project Allocation - $2,600,000)
(Land Allocation - $100,000)
(Design and Contingencies - $500,000)
(viii) Belford Boulevard
(A) Belford Boulevard, Milton Borough and West Chillisquaque Township, new 2-lane access road lying east and west of S.R.1031, Housel Run Road
1,000,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $400,000)
(B) East and West of Housel Run Road, construct a new 2-lane roadway
269,000
(Base Project Allocation - $269,000)
(50) Perry County
(i) S.R.0011
(A) U.S.11 from Spur Lane to Amity Hall, pavement restoration, bridge rehabilitation and safety improvements
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(B) S.R.0011, resurface roadway between S.R.0081 and Perdix
1,880,000
(Base Project Allocation - $1,850,000)
(Design and Contingencies - $30,000)
(ii) S.R.0022
(A) U.S.22, South of Newport to Dauphin County line, restoration
2,001,000
(Base Project Allocation - $1,701,000)
(Design and Contingencies - $300,000)
(iii) Duncannon Borough
(A) Duncannon Borough, rebuild subway to correct drainage problem
2,750,000
(Base Project Allocation - $2,000,000)
(Land allocation - $400,000)
(Design and Contingencies - $350,000)
(51) Philadelphia County
(i) S.R.0076
(A) Incident Management on I-76 West between I-676 West and City Avenue Interchange, City of Philadelphia
800,000
(Base Project Allocation - $710,000)
(Land Allocation - $10,000)
(Design and Contingencies - $80,000)
(B) I-76 from Walt Whitman Bridge to Montgomery County line, pavement restoration, bridge rehabilitation and safety improvements
850,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $50,000)
(ii) S.R.0001
(A) U.S.1 from Hunting Park to I-76, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(B) U.S.1, Twin Bridge to Ninth Street, City of Philadelphia, restoration
5,400,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $40,000)
(Design and Contingencies - $360,000)
(iii) S.R.0095
(A) I-95 from Delaware State line to New Jersey State line, pavement restoration, bridge rehabilitation and safety improvements
2,250,000
(Base Project Allocation - $2,200,000)
(Design and Contingencies - $50,000)
(iv) S.R.0676
(A) I-676 from I-95 to I-76, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(v) S.R.0063
(A) S.R.0063 from New Jersey State line to U.S.1 Junction, pavement restoration, bridge rehabilitation and safety improvements
350,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $50,000)
(vi) Intelligent Transportation Systems
(A) Construct Intelligent Transportation Systems throughout the Philadelphia area
500,000
(Base Project Allocation - $500,000)
(vii) S.R.3007
(A) S.R.3007, Art Museum to Gustine Lake, City of Philadelphia, lighting and safety improvements
265,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $25,000)
(viii) S.R.4007
(A) S.R.4007, Allens Lane to Cresheim Valley Drive, City of Philadelphia, reconstruction
880,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $80,000)
(52) Pike County
(i) S.R.0084
(A) I-84 from New Jersey State line to Wayne County line, pavement restoration, bridge rehabilitation and safety improvements
3,550,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $50,000)
(B) Wayne County to Delaware River, overhead sign structures
34,000
(Base Project Allocation - $34,000)
(ii) S.R.1001
(A) Well Road relocation, Blooming Grove Township, relocation
395,000
(Base Project Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $75,000)
(iii) PA 590
(A) Palmyra Township, safety improvement
100,000
(Base Project Allocation - $80,000)
(Design and Contingencies - $20,000)
(iv) PA 739
(A) Delaware Township, roadway improvements
130,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $30,000)
(v) U.S.6
(A) Milford and Matamoras Boroughs, Milford and Westfall Townships, roadway improvements
450,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(53) Potter County
(i) PA 449
(A) PA 449 from U.S.6 to New York State line, Allegany, Genesee and Ulysses Townships, restoration
830,000
(Base Project Allocation - $750,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(54) Schuylkill County
(i) S.R.0061
(A) Widen and safety improvements on S.R.0061 from Deer Lake south
4,786,000
(Base Project Allocation - $2,800,000)
(Land Allocation - $1,500,000)
(Design and Contingencies - $486,000)
(B) Berks County line to Columbia County line, various municipalities, restoration, widening and safety improvements
70,938,000
(Base Project Allocation - $56,402,000)
(Land Allocation - $4,848,000)
(Design and Contingencies - $9,688,000)
(ii) S.R.0081
(A) I-81 from Lebanon County line to Luzerne County line, pavement restoration, bridge rehabilitation and safety improvements
4,350,000
(Base Project Allocation - $4,300,000)
(Design and Contingencies - $50,000)
(B) From Exit 32 to Exit 34, Tremont and Frailey Townships, construct northbound climbing lane
810,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $10,000)
(iii) U.S.209
(A) From PA 901 to PA 61, Pine Grove, Washington, Wayne and North Manheim Townships, safety and congestion improvements
700,000
(Base Project Allocation - $400,000)
(Land Allocation - $200,000)
(Design and Contingencies - $100,000)
(B) From PA 61 to Middleport Borough line, Pottsville City, Port Carbon and Palo Alto Boroughs, new roadway
2,500,000
(Base Project Allocation - $1,800,000)
(Land Allocation - $300,000)
(Design and Contingencies - $400,000)
(C) Intersection with S.R.0309, Tamaqua Borough, intersection improvements
1,460,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $160,000)
(Design and Contingencies - $100,000)
(D) S.R.0081 to S.R.0125, Tremont Borough and Tremont Township, widen, drainage and resurface
920,000
(Base Project Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(iv) PA 443
(A) From PA 125 to PA 183, Pine Grove, Washington and Wayne Townships, restoration and widening
128,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $8,000)
(B) Intersection with PA 183, Wayne Township, intersection improvements
164,000
(Base Project Allocation - $160,000)
(Design and Contingencies - $4,000)
(v) PA 54
(A) From U.S.309 to PA 61, Rush Township, restoration and widening
1,430,000
(Base Project Allocation - $1,120,000)
(Land Allocation - $10,000)
(Design and Contingencies - $300,000)
(B) T-873 to T-853, Mahanoy City Borough, mill and resurface
96,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $6,000)
(vi) S.R.3002
(A) From PA 183 to PA 125, Pine Grove, Washington, Wayne and North Manheim Townships, restoration and widening
310,000
(Base Project Allocation - $240,000)
(Land Allocation - $10,000)
(Design and Contingencies - $60,000)
(vii) S.R.1008
(A) S.R.0061 to Exit 37 of I-81, Frackville Borough, West Mahanoy and Mahanoy Townships, widen to 4 lanes, drainage improvements, resurface
1,820,000
(Base Project Allocation - $1,600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $20,000)
(viii) S.R.0025
(A) Intersection with S.R.0125, Hegins Township, intersection improvement
140,000
(Base Project Allocation - $70,000)
(Land Allocation - $40,000)
(Design and Contingencies - $30,000)
(ix) S.R.4002
(A) S.R.0901 to T-861, Foster and Cass Townships, storm drainage improvements
174,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $24,000)
(x) S.R.4013
(A) S.R.0025 to S.R.4011, Hegins and Hubley Townships, realign, widen and resurface
296,000
(Base Project Allocation - $240,000)
(Land Allocation - $16,000)
(Design and Contingencies - $40,000)
(xi) S.R.0025
(A) S.R.4013 to S.R.0081, Hegins and Hubley Townships, widen and resurface
1,400,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $80,000)
(Design and Contingencies - $120,000)
(xii) S.R.4011
(A) S.R.4013 to S.R.0209, Hegins and Tremont Townships, realign, widen and resurface
920,000
(Base Project Allocation - $800,000)
(Land Allocation - $40,000)
(Design and Contingencies - $80,000)
(xiii) S.R.0924
(A) Gilberton Borough, elimination of rock fall
890,000
(Base Project Allocation - $800,000)
(Land Allocation - $40,000)
(Design and Contingencies - $50,000)
(xiv) S.R.4007
(A) S.R.4002 to S.R.4006, Cass and Butler Townships, Gordon Borough, widen, drainage, resurface
796,000
(Base Project Allocation - $720,000)
(Land Allocation - $6,000)
(Design and Contingencies - $70,000)
(xv) S.R.1006
(A) St. Clair Borough to S.R.1008, Ryan, Blythe and East Norwegian Townships, widening, shoulder improvements and resurfacing
460,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(xvi) S.R.0901
(A) S.R.0081 to S.R.4002, Foster and Cass Townships and Minersville Borough, widen, construct climbing lane, drainage and resurface
1,020,000
(Base Project Allocation - $800,000)
(Land Allocation - $60,000)
(Design and Contingencies - $160,000)
(xvii) S.R.0000
(A) From Pine Creek to Orchard Road, Rush Township, stabilize stream embankment
408,000
(Base Project Allocation - $8,000)
(Design and Contingencies - $400,000)
(xviii) S.R.0000
(A) From Berks County line to I-81 various municipalities, new roadway
92,000,000
(Base Project Allocation - $80,000,000)
(Land Allocation - $10,000,000)
(Design and Contingencies - $2,000,000)
(55) Somerset County
(i) S.R.0219
(A) Resurface S.R.0219 from S.R.0281 Interchange to end of expressway, Somerset Township
5,480,000
(Base Project Allocation - $5,280,000)
(Design and Contingencies - $200,000)
(B) U.S.219 from Somerset to Cambria County line, pavement restoration, bridge rehabilitation and safety improvements
2,450,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $50,000)
(ii) PA 601
(A) North Center Avenue, Somerset Township, traffic signals, safety improvement/turn lane
90,000
(Base Project Allocation - $83,000)
(Land Allocation - $1,000)
(Design and Contingencies - $6,000)
(iii) PA 31
(A) Intersection of PA 31 and Pleasant Hill Road (T-546), Somerset Township, safety improvement
79,000
(Base Project Allocation - $50,000)
(Land Allocation - $15,000)
(Design and Contingencies - $14,000)
(iv) PA 281
(A) Intersection of PA 281 and Sechler Road, Somerset Borough, safety improvement
79,000
(Base Project Allocation - $50,000)
(Land Allocation - $15,000)
(Design and Contingencies - $14,000)
(B) Intersection of PA 281 and Sechler Road, Somerset Borough, safety improvement
24,000
(Base Project Allocation - $20,000)
(Land Allocation - $1,000)
(Design and Contingencies - $3,000)
(v) S.R.3041
(A) Intersection of S.R.3041 and Industrial Park Road (T-522), Somerset Township, safety improvement
105,000
(Base Project Allocation - $70,000)
(Land Allocation - $20,000)
(Design and Contingencies - $15,000)
(vi) PA 160
(A) Wellersburg, Southampton Township, construct truck ramp
780,000
(Base Project Allocation - $400,000)
(Land Allocation - $80,000)
(Design and Contingencies - $300,000)
(56) Sullivan County
(i) U.S.220
(A) U.S.220 from Christian Street to Railroad Street, resurface
174,000
(Base Project Allocation - $94,000)
(Land Allocation - $10,000)
(Design and Contingencies - $70,000)
(ii) PA 87
(A) PA 87 over Stoney Run, Hillsgrove Township, bridge replacement
86,000
(Base Project Allocation - $60,000)
(Land Allocation - $6,000)
(Design and Contingencies - $20,000)
(57) Susquehanna County
(i) S.R.0081
(A) I-81 from Lenox to Harford Townships, resurface
2,150,000
(Base Project Allocation - $2,100,000)
(Design and Contingencies - $50,000)
(B) I-81 from Harford Township to New Milford Borough, resurface
300,000
(Base Project Allocation - $290,000)
(Design and Contingencies - $10,000)
(C) I-81, Lackawanna County to New York State line, overhead sign structures
35,000
(Base Project Allocation - $35,000)
(ii) S.R.0706
(A) Bradford to U.S.11, study and reconstruction
3,200,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $1,000,000)
(58) Tioga County
(i) S.R.0015
(A) U.S.15 from Lycoming County line to S.R.2005, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(B) U.S.15 from Canoe Camp to PA 287, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(ii) PA 49
(A) PA 49 from T-763 to Lawrenceville Borough, restoration
426,000
(Base Project Allocation - $406,000)
(Design and Contingencies - $20,000)
(59) Union County
(i) S.R.0080
(A) I-80 from Northumberland County line to Clinton County line, pavement restoration, bridge rehabilitation and safety improvements
1,650,000
(Base Project Allocation - $1,600,000)
(Design and Contingencies - $50,000)
(ii) S.R.0015
(A) U.S.15 from Linntown to Allenwood, pavement restoration, bridge rehabilitation and safety improvements
1,050,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $50,000)
(B) Lycoming/Union County line to PA 44, Allenwood, reconstruction, safety improvements
6,000,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)
(C) East Buffalo/Union Township line to south of the Village of Winfield, Sandel Road T-333
2,700,000
(Base Project Allocation - $2,500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(iii) S.R.0045
(A) Lewisburg S.R.0015 to Mifflinburg, S.R.3007 corridor study, safety improvements
5,300,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(60) Venango County
(i) S.R.0322
(A) U.S.322 from Horse Creek Road to Mapleshade, Cranberry Township, reconstruction
463,000
(Base Project Allocation - $403,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(B) Improvements at intersection of U.S.322, PA 357 and S.R.2013
261,000
(Base Project Allocation - $201,000)
(Design and Contingencies - $60,000)
(ii) S.R.0008
(A) S.R.0008 from Wesley S.R.3003 to S.R.3013, pavement restoration, bridge rehabilitation and safety improvements
1,150,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $50,000)
(iii) S.R.0080
(A) I-80 from Clarion County line to Mercer County line, pavement restoration, bridge rehabilitation and safety improvements
1,550,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $50,000)
(iv) PA 38
(A) PA 38, top of Emlenton Hill, Scrubgrass Township, truck pull-off lane
1,000,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(v) PA 417
(A) Intersection of Sugarcreek Borough Road and Old Warren Road, Sugarcreek Borough, safety improvement
250,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(61) Warren County
(i) S.R.6006
(A) Improvement to intersection at T.R.6B and S.R.1013
100,000
(Base Project Allocation - $70,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(ii) S.R.0006
(A) U.S.6 from South Warren S.R.2003 to U.S.6 Business, pavement restoration, bridge rehabilitation and safety improvements
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(iii) S.R.0069
(A) Widen and resurface S.R.0069 from S.R.0062 to New York State line
6,000,000
(Base Project Allocation - $5,250,000)
(Design and Contingencies - $750,000)
(iv) Pennsylvania Avenue
(A) Intersection of Pennsylvania Avenue and Park Avenue, intersection improvement
100,000
(Base Project Allocation - $70,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(62) Washington County
(i) S.R.0019
(A) Improve interchange with S.R.1010, Valley Brook Road
500,000
(B) Improve intersection and approaches to S.R.1002
1,500,000
(C) U.S.19 at Meadowbrook Drive, North Strabane Township, safety improvement/turning lane
181,000
(Base Project Allocation - $147,000)
(Land Allocation - $12,000)
(Design and Contingencies - $22,000)
(D) U.S.19, Gateshead to Hidden Valley Road, restoration
102,000
(Base Project Allocation - $68,000)
(Land Allocation - $24,000)
(Design and Contingencies - $10,000)
(E) New Interchange for S.R.0019 and Valley Brook Road in Peters Township
8,000,000
(ii) S.R.0070
(A) Improve interchange ramps on western side of S.R.2037, Fallowfield Township
1,000,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(B) Improve Airport Interchange from Buffalo Township to S.R.0040
2,600,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $300,000)
(Design and Contingencies - $300,000)
(C) I-70 from Westmoreland County line to West Virginia State line, pavement restoration, bridge rehabilitation and safety improvements
4,150,000
(Base Project Allocation - $4,100,000)
(Design and Contingencies - $50,000)
(D) I-70/PA 88 Intersection, Charleroi Borough, safety improvement
540,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design and Contingencies - $40,000)
(E) I-70, Exit 3 to Exit 4, restoration
800,000
(Base Project Allocation - $760,000)
(Design and Contingencies - $40,000)
(F) I-70, lower interchange ramps, west side of S.R.2037, Fallowfield Township, reconstruction
600,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(iii) S.R.0079
(A) I-79 from Greene County line to Allegheny County line, pavement restoration, bridge rehabilitation and safety improvements
2,450,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $50,000)
(iv) S.R.0088
(A) Improve turning radius at intersection with S.R.1006, Finleyville
360,000
(Base Project Allocation - $60,000)
(Land Allocation - $200,000)
(Design and Contingencies - $100,000)
(B) Intersection of PA 88 and PA 837, New Eagle Borough, safety improvement
120,000
(Base Project Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $10,000)
(C) PA 88 from PA 481 to PA 136, City of Monongahela, safety improvements
56,000
(Base Project Allocation - $40,000)
(Land Allocation - $6,000)
(Design and Contingencies - $10,000)
(v) S.R.4049, S.R.1083 and S.R.0018
(A) Main Street from Walnut Street to railroad tracks and Maiden Street from Franklin Street to College Street, reconstruction
760,000
(Base Project Allocation - $760,000)
(vi) PA 18
(A) PA 18/Market Street Intersection, Burgettstown, intersection improvement
140,000
(Base Project Allocation - $30,000)
(Land Allocation - $50,000)
(Design and Contingencies - $60,000)
(B) Intersection of PA 18 and S.R.4008, Burgettstown Borough, safety improvement
140,000
(Base Project Allocation - $60,000)
(Land Allocation - $50,000)
(Design and Contingencies - $30,000)
(C) Construction of new intersection at Route 22 and 18, Hanover Township, to accommodate proposed industrial park
2,600,000
(vii) PA 519
(A) Intersections with PA 980 and U.S.19 Southbound ramps, North Strabane Township, signal improvements
80,000
(Base Project Allocation - $40,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(viii) S.R.1006
(A) Intersection of S.R.1006 and S.R.1053, safety improvement
100,000
(Base Project Allocation - $70,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(ix) S.R.1010
(A) Bebout Road Intersection, Peters Township, safety improvement/turning lane
98,000
(Base Project Allocation - $88,000)
(Design and Contingencies - $10,000)
(x) S.R.4049
(A) Intersection to Humbert Lane/Colonial Drive, safety improvement
170,000
(Base Project Allocation - $120,000)
(Land Allocation - $30,000)
(Design and Contingencies - $20,000)
(xi) Countywide
(A) Countywide, traffic signal improvements
320,000
(Base Project Allocation - $260,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(63) Wayne County
(i) S.R.0084
(A) I-84 from Pike County line to Lackawanna County line, pavement restoration, bridge rehabilitation and safety improvements
650,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $50,000)
(ii) S.R.0380
(A) I-380 from New Jersey State line to Lackawanna County line, pavement restoration, bridge rehabilitation and safety improvements
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(iii) PA 296
(A) Prison access, Waymart, roadway improvements
440,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(64) Westmoreland County
(i) S.R.0056
(A) Improvements from S.R.4048 to intersection with T-792
130,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(ii) S.R.0119
(A) Intermodal interchange access, East Huntington Township
2,400,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(B) U.S.119, Turnpike Bridge to Youngwood, restoration
520,000
(Base Project Allocation - $400,000)
(Land Allocation - $40,000)
(Design and Contingencies - $80,000)
(iii) S.R.0130
(A) Intersection improvements from S.R.4002 to Toll 66, Hempfield Township
260,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(B) Intersection of PA 130 and S.R.2013, Slate Run Road, Hempfield Township, safety improvement
20,000
(Base Project Allocation - $16,000)
(Land Allocation - $2,000)
(Design and Contingencies - $2,000)
(C) Intersection of PA 130 and Pleasant Valley Road, Penn Township, safety improvement and add lane
122,000
(Base Project Allocation - $57,000)
(Land Allocation - $25,000)
(Design and Contingencies - $40,000)
(iv) S.R.0819
(A) Improvements from T-744 to T-395, East Huntingdon Township
3,900,000
(v) S.R.3020
(A) Relocation of S.R.3020, improvements to S.R.30 and a new intersection with S.R.3020 and S.R.30, North Huntingdon Township
9,400,000
(vi) S.R.0070
(A) I-70 from I-76 to Washington County line, pavement restoration, bridge rehabilitation and safety improvements
1,750,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $50,000)
(B) I-70 near Washington County line, restoration
420,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $20,000)
(C) I-70, New Stanton Interchange, New Stanton Borough, reconstruction
3,300,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $100,000)
(vii) S.R.0422
(A) U.S.422, Greensburg Bypass, pavement restoration, bridge rehabilitation and safety improvements
450,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $50,000)
(viii) S.R.0030
(A) Widen S.R.0030 from Colony Lane to Thompson Lane, improve intersection with S.R.3020 and relocate S.R.3020, North Huntingdon Township
13,700,000
(Base Project Allocation - $9,800,000)
(Land Allocation - $2,000,000)
(Design and Contingencies - $1,900,000)
(B) U.S.30 from S.R.4019 to Malts Lane, safety improvement and add lane
650,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $50,000)
(C) U.S.30, Allegheny County line to S.R.4019, safety improvement and add lane
560,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design and Contingencies - $60,000)
(D) U.S.30, intersection of U.S.30 and PA 981, Unity Township, reconstruction and intersection improvement
960,000
(Base Project Allocation - $600,000)
(Land Allocation - $200,000)
(Design and Contingencies - $160,000)
(E) U.S.30, Irwin Bridge to Hamilton Buick, safety improvement and add lane
390,000
(Base Project Allocation - $300,000)
(Land Allocation - $60,000)
(Design and Contingencies - $30,000)
(ix) PA 31
(A) Intersection of PA 31 at PA 981 and Braddock Avenue, Mt. Pleasant Borough, signal improvements and add lane
440,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(B) Intersection of PA 31 and Pennsylvania Turnpike Exit 9 Donegal, Donegal Township, signal improvements and turning lanes
107,000
(Base Project Allocation - $57,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(x) PA 66
(A) Intersection of PA 66 and Beaver Run Road, Washington Township, safety improvement and add lane
230,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(xi) PA 136
(A) Intersection of PA 136 and U.S.30, Greensburg, safety improvement
130,000
(Base Project Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $20,000)
(B) Safety improvements and intersection upgrades from S.R.0030 to S.R.3071, Hempfield Township
5,000,000
(xii) PA 981
(A) Intersection of PA 981 and Monastery Drive, signal improvements and add lane
136,000
(Base Project Allocation - $120,000)
(Land Allocation - $2,000)
(Design and Contingencies - $14,000)
(xiii) S.R.1045
(A) St. Vincent College, relocation
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(xiv) Countywide
(A) Countywide, traffic signal improvement
530,000
(Base Project Allocation - $480,000)
(Land Allocation - $20,000)
(Design and Contingencies - $30,000)
(xv) Brewery Street, City of Greensburg
(A) Replacement of the Brewery Street Bridge
925,000
(Base Project Allocation - $650,000)
(Land Allocation - $25,000)
(Design and Contingencies - $250,000)
(xvi) Laird Street, City of Greensburg
(A) Replacement of the Laird Street Bridge
725,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design and Contingencies - $200,000)
(xvii) St. Vincent Grove Road, Unity Township
(A) Replacement of the St. Vincent Grove Road Bridge
1,590,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $40,000)
(Design and Contingencies - $350,000)
(xviii) T.R.0937, Derry Township
(A) Replacement of the T.R.0937 Bridge between S.R.1025 and S.R.1027
725,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design and Contingencies - $200,000)
(xix) T.R.0941, Derry Township
(A) Replacement of the T.R.0941 Bridge between T.R.0968 and S.R.1027
725,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design and Contingencies - $200,000)
(65) Wyoming County
(i) U.S.6
(A) Rehabilitation and safety improvements from PA 87 to T-455
1,150,000
(B) Rehabilitation and safety improvements from T-455 to Tunkhannock Bypass
2,200,000
(C) From PA 92 to existing concrete section, Tunkhannock Township, resurfacing
8,000
(Base Project Allocation - $8,000)
(ii) U.S.11
(A) Rehabilitation and safety improvements from the Susquehanna County line to U.S.6
2,500,000
(iii) S.R.1003
(A) From S.R.1005 to PA 29, Lemon and Tunkhannock Townships, resurfacing
8,000
(Base Project Allocation - $8,000)
(iv) S.R.1005
(A) From C.P. Mason Road to S.R.1003, Lemon Township, resurfacing
16,000
(Base Project Allocation - $16,000)
(v) S.R.1007
(A) From S.R.1005 to PA 29, Lemon Township, resurfacing
4,000
(Base Project Allocation - $4,000)
(vi) PA 92
(A) From the Falls Bridge to Village of Osterhout, Falls Township, resurfacing
70,000
(Base Project Allocation - $70,000)
(B) From S.R.1009 to S.R.1011, Lemon Township, resurfacing
28,000
(Base Project Allocation - $28,000)
(C) From Osterhout to Department of Agriculture Building, Tunkhannock Township, resurfacing
38,000
(Base Project Allocation - $38,000)
(vii) PA 87
(A) From Procter and Gamble Drive to U.S.6, Washington Township, resurfacing
28,000
(Base Project Allocation - $28,000)
(viii) PA 309
(A) From Luzerne County to T-352, roadway improvements
290,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design and Contingencies - $50,000)
(B) S.R.2007 to River Bridge, Eaton Township, restoration
510,000
(Base Project Allocation - $400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $60,000)
(66) York County
(i) S.R.0030
(A) Preventive maintenance on S.R.0030 between S.R.0024 and Hallam Interchange
610,000
(Base Project Allocation - $500,000)
(Land Allocation - $10,000)
(Design and Contingencies - $100,000)
(B) U.S.30 from Lancaster County line to PA 462 junction, pavement restoration, bridge rehabilitation and safety improvements
1,850,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $50,000)
(ii) S.R.0074
(A) Reconstruction and highway safety improvements
3,000,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $1,500,000)
(B) Intersection improvements with Park Street, Pleasant Street and Walnut Street, Dallastown Borough
205,000
(Base Project Allocation - $30,000)
(Land Allocation - $25,000)
(Design and Contingencies - $150,000)
(iii) S.R.0083
(A) Reconstruction of S.R.0083 from Exit 4 to Exit 5
10,017,000
(Base Project Allocation - $7,600,000)
(Land Allocation - $600,000)
(Design and Contingencies - $1,817,000)
(B) Improvements to S.R.0083 from Exit 6 to Exit 8
1,220,000
(Base Project Allocation - $1,120,000)
(Design and Contingencies - $100,000)
(C) Safety improvements of Exits 1, 2 and 3 by lengthening the ramps
910,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design and Contingencies - $100,000)
(D) Improvements to Exit 13
160,000
(Base Project Allocation - $60,000)
(Land Allocation - $25,000)
(Design and Contingencies - $75,000)
(E) I-83 from Maryland State line to Cumberland County line, pavement restoration, bridge rehabilitation and safety improvements
4,050,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $50,000)
(iv) S.R.0181
(A) Improvement of intersection with S.R.0921, Manchester Borough
120,000
(Base Project Allocation - $15,000)
(Land Allocation - $30,000)
(Design and Contingencies - $75,000)
(v) S.R.0194
(A) Improvement of intersection with S.R.4012, Washington Township
450,000
(Base Project Allocation - $150,000)
(Land Allocation - $100,000)
(Design and Contingencies - $200,000)
(vi) S.R.0462
(A) Reconstruction of intersection with Hokes Mill
70,000
(Base Project Allocation - $20,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(B) Widen from S.R.0024 to Locust Grove Road, Springettsbury Township
340,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(vii) S.R.1033
(A) Intersection improvements with S.R.1012 and S.R.0024, Springettsbury Township
260,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(viii) S.R.3072
(A) Realign Moulstown Road from S.R.0194 to Penn Township line, Hanover Borough
400,000
(Base Project Allocation - $320,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(ix) S.R.0094
(A) Widen S.R.0094 from Hanover Road to Kuhn Drive
10,306,000
(Base Project Allocation - $8,420,000)
(Land Allocation - $206,000)
(Design and Contingencies - $1,680,000)
(B) Widen and spot resurface S.R.0094 from Granger Avenue and South
1,361,000
(Base Project Allocation - $1,130,000)
(Land Allocation - $6,000)
(Design and Contingencies - $225,000)
(x) S.R.3068
(A) Widen, reconstruction and signalization of intersection with S.R.3070 and Breezewood Drive, Penn Township
510,000
(Base Project Allocation - $410,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(xi) Center Street
(A) Widen and reconstruction of Center Street from S.R.0116 to Ridge Avenue, Hanover Borough and Penn Township
1,500,000
(Base Project Allocation - $1,240,000)
(Land Allocation - $10,000)
(Design and Contingencies - $250,000)
(xii) S.R.0024
(A) Widen S.R.0024 from Carol Road to Windsor Road
5,200,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $700,000)
(Design and Contingencies - $2,500,000)
(xiii) S.R.0124
(A) Realign S.R.0124 by removal of S curve near Christensen Road
2,700,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $200,000)
(Design and Contingencies - $1,400,000)
(xiv) S.R.2005
(A) Camp Betty Washington Road, engineering and environmental study
250,000
(Design and Contingencies - $250,000)
(xv) S.R.0015
(A) U.S.15 from Adams County line to Cumberland County line, pavement restoration, bridge rehabilitation and safety improvements
950,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $50,000)
(67) Railroad Crossing Projects
(i) Allegheny County
(A) Purchase Rook Yard and right-of-way south to Bridgeville from Wheeling and Lake Erie Railroad for use as new transportation corridor
16,500,000
(ii) Bedford County
(A) Intermodal and rail and highway analysis for business development in Bedford and Blair Counties
300,000
(iii) Berks County
(A) Borough of Topton, repair of Conrail crossing gates
100,000
(iv) Luzerne County
(A) Biscontini Distribution Centers, relocate and rehabilitate rail siding to Biscontini Distribution Center to handle larger, special purpose rail cars and to handle increase in volume, including two rail spurs, an additional rail switch, preparation of rail infrastructure and reconstruction of intermodal yard including access and temporary storage
866,000
(v) Philadelphia County
(A) Clearance project to CSX line beginning at Park Junction in North Philadelphia and continuing north to the Pennsylvania/New Jersey State line
10,000,000
(B) Rehabilitation of track, including rail, ties, switches and any other track-related repair work and the purchase of required loading and unloading equipment for use at the rail facility at Girard Point
900,000
(vi) Monroe County
(A) Monroe Rail Authority, improvement and upgrade of 10 railroad crossings
1,500,000
(vii) Allegheny and Eastern Railroad, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
462,000
(viii) Allegheny Valley Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
207,000
(ix) Bradford Industrial Railroad, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
45,000
(x) Buffalo and Pittsburgh Railroad, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
508,000
(xi) Delaware and Hudson Railway Co.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
172,000
(B) Replacement of signal facilities with solid state interlockings and associated cabling, track side signals and electronics
660,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $60,000)
(C) Rehabilitate crossing at S.R.0339 with new state-of-the-art automatic highway warning devices and new crossing surface, including track and rail interface materials
259,000
(Base Project Allocation - $235,000)
(Design and Contingencies - $24,000)
(xii) Delaware and Lackawanna Railroad Company
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
630,000
(xiii) Emons Transportation Group, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, automatic or manual protection and any other related work
(I) Maryland and Pennsylvania Railroad
570,000
(II) Penn Eastern Rail Lines, Inc., Lancaster Line
789,000
(III) Perkiomen Line
405,000
(IV) Yorkrail, Inc.
640,000
(xiv) Everett Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, automatic or manual protection and any other related work
270,000
(xv) Gettysburg Railroad Company, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
460,000
(xvi) Hollidaysburg and Roaring Spring Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
400,000
(xvii) Juniata Valley Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
133,000
(xviii) Lycoming Valley Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
116,000
(xix) Middletown and Hummelstown Railroad Co.
(A) Repair and rehabilitation of grade crossing at Route 230, including tracks, ties, surfaces, subsurfaces and any other related work to ensure continued regulatory compliance and enhance public safety
30,000
(xx) Morrison's Cove Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
120,000
(xxi) Nittany Bald Eagle Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
287,000
(xxii) North Shore Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
62,000
(xxiii) Pittsburgh & Shawmut Railroad, Inc.
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
343,000
(xxiv) Reading, Blue Mountain and Northern Railroad Company
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
850,000
(xxv) SEDA-COG Joint Rail Authority
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
(I) Juniata Valley Railroad
50,000
(II) Lycoming Valley Railroad
167,000
(III) Nittany & Bald Eagle
260,000
(IV) North Shore Railroad
200,000
(V) Shamokin Valley Railroad
127,000
(xxvi) Shamokin Valley Railroad
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
672,000
(xxvii) Wellsboro and Corning Rail Line
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
86,000
(xxviii) Wheeling and Lake Erie Railway Company
(A) Repair and/or rehabilitation of grade crossings, including tracks, ties, surfaces, subsurfaces, signals, automatic or manual protection and any other related work
645,000
(xxix) Statewide
(A) Acquisition and installation of constant warning time devices to upgrade and improve safety of highway-rail grade crossings on any road including local roads. Twenty percent of the cost of each such acquisition and installation shall be paid by the railroad that owns the track upon which the improvements are being installed
10,000,000
(11 added June 22, 2000, P.L.136, No.27)