Luzerne County

Act 223 of 2002, § 44, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2002-2003.

Act 223 of 2002, § 44

Section 44. Luzerne County.

(a) Local Bridges

(1) Huntington Township, T-510, Winkler Road over Marsh Wolf Creek, Bridge Replacement

400,000,

(Base Construction Allocation - $320,000)

(Land Allocation - $70,000)

(Design and Contingencies - $10,000)

(2) Huntington Township, T-510, Winkler Road, 0.1 Mile South of SR 4017 over Marsh Wolf Creek, Bridge Replacement

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $10,000)

(Design and Contingencies - $70,000)

(3) Bridge over Tributary of Bear Creek Lake, Bear Creek Village, Bridge Replacement

256,000

(Base Construction Allocation - $200,000)

(Land Allocation - $16,000)

(Design and Contingencies - $40,000)

(4) Plymouth Township and Nanticoke City, SR 3001, West Nanticoke Bridge over Susquehanna River, Bridge Replacement

17,000,000

(Base Construction Allocation - $15,000,000)

(Land Allocation - $500,000)

(Design and Contingencies - $1,500,000)

(5) West Pittston Borough and Pittston City, Water Street Bridge over Susquehanna River, Bridge Replacement

11,500,000

(Base Construction Allocation - $10,000,000)

(Land Allocation - $500,000)

(Design and Contingencies - $1,000,000)

(6) Wilkes-Barre City, Bridge over Mill Creek, Bridge Rehabilitation

33,000

(Base Construction Allocation - $30,000)

(Design and Contingencies - $3,000)

(7) Wilkes-Barre City, Scott Street Bridge, Bridge Rehabilitation

161,000

(Base Construction Allocation - $150,000)

(Design and Contingencies - $11,000)

(8) Wilkes-Barre City, Shelbourne Street Bridge, Bridge Demolition

36,000

(Base Construction Allocation - $35,000)

(Design and Contingencies - $1,000)

(9) Ashley Borough, Cemetery Street Bridge, Bridge Demolition

60,000

(Base Construction Allocation - $50,000)

(Design and Contingencies - $10,000)

(10) Ashley Borough, Ashley Street Bridge, Bridge Rehabilitation

121,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $11,000)

(11) Ashley Borough, Carey's Patch Viaduct, Bridge Demolition

31,000

(Base Construction Allocation - $30,000)

(Design and Contingencies - $1,000)

(12) Avoca Borough, York Avenue Bridge, Bridge Rehabilitation

43,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $3,000)

(13) Avoca and Duryea Boroughs, Bridge over D&H Railroad, Bridge Rehabilitation

49,000

(Base Construction Allocation - $45,000)

(Design and Contingencies - $4,000)

(14) Pittston Township, Suscon Road, Bridge Replacement

1,553,000

(Base Construction Allocation - $1,350,000)

(Design and Contingencies - $203,000)

(15) Pittston Township, Sathers Drive over Suscon Mill Creek, Bridge Rehabilitation

22,000

(Base Construction Allocation - $20,000)

(Design and Contingencies - $2,000)

(16) Avoca Borough, McAlpine Street Bridge, Bridge Rehabilitation

33,000

(Base Construction Allocation - $30,000)

(Design and Contingencies - $3,000)

(17) Avoca Borough, Langcliff at Kerr McGee, Bridge Rehabilitation

22,000

(Base Construction Allocation - $20,000)

(Design and Contingencies - $2,000)

(18) Pittston City and West Pittston Borough, West Side Connector over Susquehanna River, Bridge Rehabilitation

500,000

(Base Construction Allocation - $450,000)

(Design and Contingencies - $50,000)

(19) Wyoming Borough, Between 6th and 8th Streets, Bridge Rehabilitation

11,000

(Base Construction Allocation - $10,000)

(Design and Contingencies - $1,000)

(20) Wyoming Borough, Between 6th and 8th Streets at Perforated Metals, Bridge Rehabilitation

11,000

(Base Construction Allocation - $10,000)

(Design and Contingencies - $1,000)

(21) Exeter Borough, Stephens Road Bridge, Bridge Rehabilitation

17,000

(Base Construction Allocation - $15,000)

(Design and Contingencies - $2,000)

(22) Wilkes-Barre City, Bridge over Laurel Run Creek, Bridge Rehabilitation

4,000

(Base Construction Allocation - $3,000)

(Design and Contingencies - $1,000)

(23) Wilkes-Barre City, Thomas Street Bridge, Bridge Rehabilitation

11,000

(Base Construction Allocation - $10,000)

(Design and Contingencies - $1,000)

(24) Wilkes-Barre City, Mayock Street Bridge over Mill Creek, Bridge Rehabilitation

44,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $4,000)

(b) State Bridges

(1) Bridge 3 Miles East of SR 2039 over Red Run, Bear Creek Township, Bridge Replacement

470,000

(Base Construction Allocation - $370,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(2) Bridge Located at Junction of SR 3016 over Nescopeck Creek, Black Creek Township, Bridge Replacement

3,496,000

(Base Construction Allocation - $2,897,000)

(Land Allocation - $20,000)

(Design and Contingencies - $579,000)

(3) Bridge 3 Miles West of SR 3024 over Black Creek, Black Creek Township, Bridge Replacement

1,748,000

(Base Construction Allocation - $1,440,000)

(Land Allocation - $20,000)

(Design and Contingencies - $288,000)

(4) Bridge 0.1 Mile North of SR 1026 over Leonard's Creek, Dallas Township, Bridge Replacement

697,000

(Base Construction Allocation - $564,000)

(Land Allocation - $20,000)

(Design and Contingencies - $113,000)

(5) Bridge 5 Miles North of SR 2048 over Little Nescopeck Creek, Dennison Township, Bridge Replacement

430,000

(Base Construction Allocation - $340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(6) Bridge 3.7 Miles North of SR 2048 over Branch of Creasy Creek, Dennison Township, Bridge Replacement

360,000

(Base Construction Allocation - $280,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(7) Bridge 3.5 Miles North of SR 2048 over Branch of Creasy Creek, Dennison Township, Bridge Replacement

320,000

(Base Construction Allocation - $250,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(8) Bridge over I-81, Dorrance Township, Bridge Replacement

3,377,000

(Base Construction Allocation - $2,797,000)

(Land Allocation - $20,000)

(Design and Contingencies - $560,000)

(9) Bridge 100 Feet South of SR 3010 over a Tributary of Wapwallopen Creek, Dorrance Township, Bridge Replacement

801,000

(Base Construction Allocation - $651,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(10) Bridge 0.1 Mile South of SR 4011 over Branch of Pine Creek, Fairmont Township, Bridge Replacement

260,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(11) Bridge Located at Junction of SR 1020 over Tributary of Harveys Lake, Harveys Lake Borough, Bridge Replacement

3,330,000

(Base Construction Allocation - $2,760,000)

(Land Allocation - $20,000)

(Design and Contingencies - $550,000)

(12) Bridge Located at Junction of SR 1055 over Inlet to Harveys Lake, Harveys Lake Borough, Bridge Replacement

276,000

(Base Construction Allocation - $213,000)

(Land Allocation - $20,000)

(Design and Contingencies - $43,000)

(13) Bridge 0.5 Mile North of SR 4026 over Lewis Run, Hunlock Township, Bridge Replacement

370,000

(Base Construction Allocation - $290,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(14) Bridge Located at Junction of SR 4003 over Hunlock Creek, Hunlock Township, Bridge Replacement

1,012,000

(Base Construction Allocation - $827,000)

(Land Allocation - $20,000)

(Design and Contingencies - $165,000)

(15) Bridge Located at Junction of SR 4016 over Hunlock Creek, Hunlock Township, Bridge Replacement

1,764,000

(Base Construction Allocation - $1,453,000)

(Land Allocation - $20,000)

(Design and Contingencies - $291,000)

(16) Bridge 0.3 Mile West of SR 4001 over Hunlock Creek, Hunlock Township, Bridge Replacement

1,141,000

(Base Construction Allocation - $934,000)

(Land Allocation - $20,000)

(Design and Contingencies - $187,000)

(17) Bridge 0.6 Mile East of SR 4006 over Tributary of Huntington Creek, Huntington Township, Bridge Replacement

428,000

(Base Construction Allocation - $340,000)

(Land Allocation -$20,000)

(Design and Contingencies - $68,000)

(18) Bridge Located at Junction of SR 1012, Pikes Creek, Jackson Township, Bridge Replacement

370,000

(Base Construction Allocation - $290,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(19) Bridge 0.2 Mile South of SR 0118 over Fades Creek, Lake Township, Bridge Replacement

450,000

(Base Construction Allocation - $358,000)

(Land Allocation - $20,000)

(Design and Contingencies - $72,000)

(20) Bridge 0.3 Mile South of TR 118 over Pikes Creek, Lake Township, Bridge Replacement

448,000

(Base Construction Allocation - $357,000)

(Land Allocation - $20,000)

(Design and Contingencies - $71,000)

(21) Bridge 0.1 Mile West of SR 3015 over Nescopeck Creek, Nescopeck Township, Bridge Replacement

2,755,000

(Base Construction Allocation - $2,279,000)

(Land Allocation - $20,000)

(Design and Contingencies - $456,000)

(22) Bridge Located at Junction of SR 3015 over Branch of Nescopeck Creek, Nescopeck Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(23) Bridge 0.6 Mile North of SR 2039 over Railroad, Plains Township, Bridge Replacement

2,660,000

(Base Construction Allocation - $2,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $440,000)

(24) Bridge over I-81 Northbound and Southbound, Plains Township, Bridge Replacement

3,860,000

(Base Construction Allocation - $3,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $640,000)

(25) Bridge 0.2 Mile West of SR 2026 over Gardners Creek, Plains Township, Bridge Replacement

981,000

(Base Construction Allocation - $801,000)

(Land Allocation - $20,000)

(Design and Contingencies - $160,000)

(26) Bridge 0.9 Mile North of SR 2045 over Branch of Big Wapwallopen Creek, Rice Township, Bridge Replacement

260,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(27) Bridge 0.5 Mile South of SR 2042 over Branch of Little Wapwallopen Creek, Rice Township, Bridge Replacement

801,000

(Base Construction Allocation - $651,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(28) Bridge over TR 447, Rice Township, Bridge Replacement

1,093,000

(Base Construction Allocation - $894,000)

(Land Allocation - $20,000)

(Design and Contingencies - $179,000)

(29) Bridge 1 Mile East of SR 4021 over Branch of Marsh Creek, Ross Township, Bridge Replacement

261,000

(Base Construction Allocation - $201,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(30) Bridge 0.3 Mile West of TR 11 over Mingle Inn Creek, Salem Township, Bridge Replacement

428,000

(Base Construction Allocation - $340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $68,000)

(31) Bridge 0.1 Mile East of SR 4005 over Unknown Stream, Union Township, Bridge Replacement

470,000

(Base Construction Allocation - $380,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(32) Bridge 0.2 Mile West of SR 4006 over Branch of Shickshinny Creek, Union Township, Bridge Replacement

428,000

(Base Construction Allocation - $340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $68,000)

(33) SR 0309, Little Nescopeck Creek, 0.6 Mile South of SR 3022, Butler Township, Bridge Replacement

609,000

(Base Construction Allocation - $499,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(34) SR 3040, Tributary of Nescopeck Creek, 300 Feet East of TR 93, Sugarloaf Township, Bridge Replacement

668,000

(Base Construction Allocation - $548,000)

(Land Allocation - $10,000)

(Design and Contingencies - $110,000)

(35) SR 0080, Long Run, 1.1 Miles East of SR 0081, Butler Township, Bridge Replacement

1,388,000

(Base Construction Allocation - $1,148,000)

(Land Allocation - $10,000)

(Design and Contingencies - $230,000)

(36) SR 0081, Stony Creek, 1 Mile South of TR 93, Hazle Township, Bridge Replacement

960,000

(Base Construction Allocation - $792,000)

(Land Allocation - $10,000)

(Design and Contingencies - $158,000)

(37) SR 0924, Cranberry Creek, 1.5 Miles East of I-81, Hazle Township, Bridge Replacement

1,194,000

(Base Construction Allocation - $987,000)

(Land Allocation - $10,000)

(Design and Contingencies - $197,000)

(38) SR 0309, Little Nescopeck Creek, 0.7 Mile South of SR 3022, Butler Township, Bridge Replacement

663,000

(Base Construction Allocation - $544,000)

(Land Allocation - $10,000)

(Design and Contingencies - $109,000)

(39) SR 2051, Gross Creek Canal, 0.3 Mile East of TR 940, Jeddo Borough, Bridge Replacement

620,000

(Base Construction Allocation - $508,000)

(Land Allocation - $10,000)

(Design and Contingencies - $102,000)

(40) SR 3021, Nescopeck Creek, 0.7 Mile South of SR 3034, Butler Township, Bridge Replacement

1,010,000

(Base Construction Allocation - $833,000)

(Land Allocation - $10,000)

(Design and Contingencies - $167,000)

(41) SR 3021, Nescopeck Creek, 300 Feet South of SR 3040, Butler Township, Bridge Replacement

963,000

(Base Construction Allocation - $794,000)

(Land Allocation - $10,000)

(Design and Contingencies - $159,000)

(42) SR 3034, Nescopeck Creek, 0.8 Mile East of TR 93, Conyngham Borough, Bridge Replacement

752,000

(Base Construction Allocation - $618,000)

(Land Allocation - $10,000)

(Design and Contingencies - $124,000)

(43) SR 0080, SR 0309, TR 309 over SR 0309, Butler Township, Bridge Replacement

1,827,000

(Base Construction Allocation - $1,514,000)

(Land Allocation - $10,000)

(Design and Contingencies - $303,000)

(44) SR 0080, Linesville Creek, 0.5 Mile West of TR 0940, White Haven Borough, Bridge Replacement

608,000

(Base Construction Allocation - $498,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(45) SR 0309, Big Black Creek, 0.1 Mile North of TR 940, Hazle Township, Bridge Replacement

2,136,000

(Base Construction Allocation - $1,772,000)

(Land Allocation - $10,000)

(Design and Contingencies - $354,000)

(46) SR 0309, Little Black Creek, 0.4 Mile North of TR 940, Hazle Township, Bridge Replacement

836,000

(Base Construction Allocation - $688,000)

(Land Allocation - $10,000)

(Design and Contingencies - $138,000)

(47) SR 0080, SR 0080, I-80 Eastbound and Westbound, 3.3 Miles West of TR 93, Sugarloaf Township, Bridge Replacement

2,614,000

(Base Construction Allocation - $2,170,000)

(Land Allocation - $10,000)

(Design and Contingencies - $434,000)

(48) SR 0080, SR 0093, TR 93 over TR 93, Sugarloaf Township, Bridge Replacement

2,608,000

(Base Construction Allocation - $2,165,000)

(Land Allocation - $10,000)

(Design and Contingencies - $433,000)

(49) SR 0080, SR 0093, Segment 0240, TR 93 over TR 93, Sugarloaf Township, Bridge Replacement

2,465,000

(Base Construction Allocation - $2,046,000)

(Land Allocation - $10,000)

(Design and Contingencies - $409,000)

(50) SR 0080, SR 0081 Northbound and Southbound over TR 81, Butler Township, Bridge Replacement

4,221,000

(Base Construction Allocation - $3,509,000)

(Land Allocation - $10,000)

(Design and Contingencies - $702,000)

(51) SR 0081, SR 2039 and Gardner Creek over SR 2039, Laflin Borough, Bridge Replacement

2,607,000

(Base Construction Allocation - $2,164,000)

(Land Allocation - $10,000)

(Design and Contingencies - $433,000)

(52) SR 0081, SR 2039 and Gardner Creek over SR 2039, Laflin Borough, Bridge Replacement

2,699,000

(Base Construction Allocation - $2,241,000)

(Land Allocation - $10,000)

(Design and Contingencies - $448,000)

(53) SR 0081, Conrail, 0.6 Miles South of Exit 48, Laflin Borough, Bridge Replacement

2,139,000

(Base Construction Allocation - $1,774,000)

(Land Allocation - $10,000)

(Design and Contingencies - $355,000)

(54) SR 0081, SR 0315 North and South, Exit 48, Pittston Borough, Bridge Replacement

2,396,000

(Base Construction Allocation - $1,988,000)

(Land Allocation - $10,000)

(Design and Contingencies - $398,000)

(55) SR 0081, SR 0081, I-81 Northbound and Southbound, Wyoming Avenue, Dupont Borough, Bridge Replacement

1,437,000

(Base Construction Allocation - $1,189,000)

(Land Allocation - $10,000)

(Design and Contingencies - $238,000)

(56) SR 0115, Shades Creek, 1.2 Miles South of SR 2038, Bear Creek Township, Bridge Replacement

573,000

(Base Construction Allocation - $469,000)

(Land Allocation - $10,000)

(Design and Contingencies - $94,000)

(57) SR 0309, SR 2022, Railroads and North Washington over SR 2022, Wilkes-Barre City, Bridge Replacement

15,317,000

(Base Construction Allocation - $12,756,000)

(Land Allocation - $10,000)

(Design and Contingencies - $2,551,000)

(58) SR 0309, SR 1015 and Mercer Avenue over SR 1015, Kingston Borough, Bridge Replacement

10,715,000

(Base Construction Allocation - $8,921,000)

(Land Allocation - $10,000)

(Design and Contingencies - $1,784,000)

(59) SR 0315, Mill Creek, 0.2 Mile North of SR 2020, Plains Township, Bridge Replacement

1,054,000

(Base Construction Allocation - $870,000)

(Land Allocation - $10,000)

(Design and Contingencies - $174,000)

(60) SR 0502, Spring Brook 300 Feet East of County Line, Pittston Township, Bridge Replacement

1,901,000

(Base Construction Allocation - $1,576,000)

(Land Allocation - $10,000)

(Design and Contingencies - $315,000)

(61) SR 1021, Susquehanna River, Junction of SR 2004, Jenkins Township, Bridge Replacement

10,732,000

(Base Construction Allocation - $8,935,000)

(Land Allocation - $10,000)

(Design and Contingencies - $1,787,000)

(62) SR 2020, Branch of Mill Creek, 1.4 Miles East TR 315, Plains Township, Bridge Replacement

398,000

(Base Construction Allocation - $323,000)

(Land Allocation - $10,000)

(Design and Contingencies - $65,000)

(63) SR 2035, Meadow Run, 346 Feet North of SR 2038, Bear Creek Township, Bridge Replacement

485,000

(Base Construction Allocation - $396,000)

(Land Allocation - $10,000)

(Design and Contingencies - $79,000)

(64) SR 2035, Branch of Bear Creek, 1.1 Miles North of SR 2036, Jenkins Township, Bridge Replacement

663,000

(Base Construction Allocation - $544,000)

(Land Allocation - $10,000)

(Design and Contingencies - $109,000)

(65) SR 2039, Gardners Creek, 0.3 Mile South of TR 315, Jenkins Township, Bridge Replacement

660,000

(Base Construction Allocation - $530,000)

(Land Allocation - $20,000)

(Design and Contingencies - $110,000)

(66) SR 0081, Mill Creek, 0.3 Mile North of SR 2020, Plains Township, Bridge Replacement

1,120,000

(Base Construction Allocation - $925,000)

(Land Allocation - $10,000)

(Design and Contingencies - $185,000)

(67) SR 0081, SR 0081 Northbound and Southbound I-81 over I-81, Avoca Borough, Bridge Replacement

1,179,000

(Base Construction Allocation - $974,000)

(Land Allocation - $10,000)

(Design and Contingencies - $195,000)

(68) SR 0115, Geneceda Creek, 1.7 Miles East of SR 2007, Bear Creek Township, Bridge Replacement

465,000

(Base Construction Allocation - $379,000)

(Land Allocation - $10,000)

(Design and Contingencies - $76,000)

(69) SR 2059, Leidys Creek, 239 Feet North of TR 315, Dupont Borough, Bridge Replacement

701,000

(Base Construction Allocation - $576,000)

(Land Allocation - $10,000)

(Design and Contingencies - $115,000)

(70) SR 0029, Harveys Creek, 165 Feet South of SR 1059, Jackson Township, Bridge Replacement

1,071,000

(Base Construction Allocation - $884,000)

(Land Allocation - $10,000)

(Design and Contingencies - $177,000)

(71) SR 0029, Ceasetown Dam Outlet, 0.3 Mile North of SR 1059, Plymouth Township, Bridge Replacement

528,000

(Base Construction Allocation - $432,000)

(Land Allocation - $10,000)

(Design and Contingencies - $86,000)

(72) SR 0029, Sluiceway Water Company, 0.2 Miles South of SR 4001, Plymouth Township, Bridge Replacement

578,000

(Base Construction Allocation - $473,000)

(Land Allocation - $10,000)

(Design and Contingencies - $95,000)

(73) SR 0029, Pike Creek, 1.1 Miles North of SR 1032, Lake Township, Bridge Replacement

534,000

(Base Construction Allocation - $437,000)

(Land Allocation - $10,000)

(Design and Contingencies - $87,000)

(74) SR 1001, Browns Creek, 0.4 Mile North of SR 1002, Larksville Borough, Bridge Replacement

426,000

(Base Construction Allocation - $347,000)

(Land Allocation - $10,000)

(Design and Contingencies - $69,000)

(75) SR 1054, Toby Creek, Evans Street, Luzerne Borough, Bridge Replacement

922,000

(Base Construction Allocation - $760,000)

(Land Allocation - $10,000)

(Design and Contingencies - $152,000)

(76) SR 2008, Espy Run, 0.1 Mile East of SR 2010, Nanticoke City, Bridge Replacement

423,000

(Base Construction Allocation - $344,000)

(Land Allocation - $10,000)

(Design and Contingencies - $69,000)

(77) SR 3004, Forge Reservoir Creek, 0.8 Mile East of SR 3002, Newport Township, Bridge Replacement

1,274,000

(Base Construction Allocation - $1,053,000)

(Land Allocation - $10,000)

(Design and Contingencies - $211,000)

(78) SR 3006, Branch of Little Wapwallopen Creek, 0.7 Mile East of SR 3005, Slocum Township, Bridge Replacement

406,000

(Base Construction Allocation - $330,000)

(Land Allocation - $10,000)

(Design and Contingencies - $66,000)

(79) SR 3006, Branch of Pond Creek, 304 Feet East of SR 3007, Slocum Township, Bridge Replacement

450,000

(Base Construction Allocation - $367,000)

(Land Allocation - $10,000)

(Design and Contingencies - $73,000)

(80) SR 4001, Branch of Hunlock Creek, 2.6 Miles North of SR 4016, Plymouth Township, Bridge Replacement

574,000

(Base Construction Allocation - $470,000)

(Land Allocation - $10,000)

(Design and Contingencies - $94,000)

(81) SR 0029, Sugar Notch Run, 0.1 Mile North of I-81, Hanover Township, Bridge Replacement

1,629,000

(Base Construction Allocation - $1,349,000)

(Land Allocation - $10,000)

(Design and Contingencies - $270,000)

(82) SR 0029, Branch of Warrior Creek, 0.4 Mile North of SR 2010, Hanover Township, Bridge Replacement

1,209,000

(Base Construction Allocation - $749,000)

(Land Allocation - $10,000)

(Design and Contingencies - $450,000)

(83) SR 0029, Warrior Creek, 0.4 Mile North of SR 2008, Hanover Township, Bridge Replacement

852,000

(Base Construction Allocation - $702,000)

(Land Allocation - $10,000)

(Design and Contingencies - $140,000)

(84) SR 0029, Nanticoke Creek, 0.2 Mile South of SR 2002, Hanover Township, Bridge Replacement

1,436,000

(Base Construction Allocation - $1,188,000)

(Land Allocation - $10,000)

(Design and Contingencies - $238,000)

(85) SR 0309, Toby Creek, 1.1 Miles North of SR 1002, Courtdale Borough, Bridge Replacement

1,500,000

(Base Construction Allocation - $1,242,000)

(Land Allocation - $10,000)

(Design and Contingencies - $248,000)

(86) SR 2002, Warrior Creek, 1 Mile East of TR 29, Hanover Township, Bridge Replacement

981,000

(Base Construction Allocation - $809,000)

(Land Allocation - $10,000)

(Design and Contingencies - $162,000)

(87) SR 3007, Branch of Little Wapwallopen Creek, 0.3 Mile South of SR 3008, Slocum Township, Bridge Replacement

485,000

(Base Construction Allocation - $396,000)

(Land Allocation - $10,000)

(Design and Contingencies - $79,000)

(88) SR 0081, SR 6309, Segment 0550, 0551 over SR 6309, Ashley Borough, Bridge Replacement

3,741,000

(Base Construction Allocation - $3,109,000)

(Land Allocation - $10,000)

(Design and Contingencies - $622,000)

(89) SR 0081, Pocono Northeast Railroad, 0.5 Mile North of Exit 45, Ashley Borough, Bridge Replacement

2,460,000

(Base Construction Allocation - $2,042,000)

(Land Allocation - $10,000)

(Design and Contingencies - $408,000)

(90) SR 0081, Johnson Street and Branch of Solomon Creek, 0.2 Mile North of Exit 45, Wilkes-Barre Township, Bridge Replacement

2,380,000

(Base Construction Allocation - $1,975,000)

(Land Allocation - $10,000)

(Design and Contingencies - $395,000)

(91) SR 0081, Johnson Street and Branch of Solomon Creek, 0.2 Mile North of Exit 45, Wilkes-Barre Township, Bridge Replacement

2,358,000

(Base Construction Allocation - $1,957,000)

(Land Allocation - $10,000)

(Design and Contingencies - $391,000)

(92) SR 0309, Wilkes-Barre Boulevard over Wilkes-Barre Boulevard, Wilkes-Barre City, Bridge Replacement

6,111,000

(Base Construction Allocation - $5,084,000)

(Land Allocation - $10,000)

(Design and Contingencies - $1,017,000)

(93) SR 2005, Pocono Northeast Railroad, 0.6 Mile West of SR 2010, Wilkes-Barre Borough, Bridge Replacement

1,386,000

(Base Construction Allocation - $1,147,000)

(Land Allocation - $10,000)

(Design and Contingencies - $229,000)

(94) SR 2020, Laurel Run, 0.7 Mile North of TR 309 Business, Wilkes-Barre City, Bridge Replacement

770,000

(Base Construction Allocation - $633,000)

(Land Allocation - $10,000)

(Design and Contingencies - $127,000)

(95) SR 2034, Tributary of Pine Creek, 1 Mile East of SR 0309, Hanover Township, Bridge Replacement

420,000

(Base Construction Allocation - $342,000)

(Land Allocation - $10,000)

(Design and Contingencies - $68,000)

(96) SR 6309, Branch of Solomon Creek, 0.2 Mile North of SR 2007, Wilkes-Barre Township, Bridge Replacement

951,000

(Base Construction Allocation - $784,000)

(Land Allocation - $10,000)

(Design and Contingencies - $157,000)

(97) SR 0081, Solomon Creek, 0.4 Mile North of Exit 44, Ashley Borough, Bridge Replacement

1,601,000

(Base Construction Allocation - $1,326,000)

(Land Allocation - $10,000)

(Design and Contingencies - $265,000)

(98) SR 0309, Pine Run, Junction of SR 2034, Hanover Township, Bridge Replacement

1,311,000

(Base Construction Allocation - $1,084,000)

(Land Allocation - $10,000)

(Design and Contingencies - $217,000)

(99) SR 0309, Coalbrook, 0.3 Mile North of SR 2020, Wilkes-Barre City, Bridge Replacement

1,136,000

(Base Construction Allocation - $938,000)

(Land Allocation - $10,000)

(Design and Contingencies - $188,000)

(100) SR 8047, Laurel Run, Ramp K Spur and Westbound Boulevard, Wilkes-Barre City, Bridge Replacement

689,000

(Base Construction Allocation - $566,000)

(Land Allocation - $10,000)

(Design and Contingencies - $113,000)

(101) SR 0940, Linesville Creek, 200 Feet South of I-81, White Haven Borough, Bridge Replacement

1,005,000

(Base Construction Allocation - $829,000)

(Land Allocation - $10,000)

(Design and Contingencies - $166,000)

(102) SR 2039, Seg.0120, Offset 0000, 0.4 Mile South of TR 315, Bridge over Gardners Creek, Jenkins Township, Bridge Replacement

640,000

(Base Construction Allocation - $520,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(103) SR 0502, Seg.0010, Offset 0609, 600 Feet East of County Line, Bridge over Spring Brook, Pittston Township, Bridge Replacement

3,430,000

(Base Construction Allocation - $2,840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $570,000)

(104) SR 2033, Seg.0010, Offset 0400, 400 Feet North of SR 2006, Bridge over Lackawanna River, Duryea Borough, Bridge Replacement

2,212,000

(Base Construction Allocation - $1,827,000)

(Land Allocation - $20,000)

(Design and Contingencies - $365,000)

(105) SR 2035, Seg.0220, Offset 1694, Junction of TR 315, Bridge over Mill Creek, Dupont Borough, Bridge Replacement

388,000

(Base Construction Allocation - $307,000)

(Land Allocation - $20,000)

(Design and Contingencies - $61,000)

(106) SR 0081, Seg.1774, Offset 2085, Exit 177 Bridge over Airport Road, Avoca Borough, Bridge Replacement

2,420,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(107) SR 0081, Seg.1775, Offset 1908, Exit 177 Bridge over Airport Road, Avoca Borough, Bridge Replacement

2,510,000

(Base Construction Allocation - $2,080,000)

(Land Allocation - $20,000)

(Design and Contingencies - $410,000)

(108) SR 0081, Seg.1784, Offset 0653, 0.2 Mile South of Lackawanna County Line, Bridge over Plane Street, Avoca Borough, Bridge Replacement

1,060,000

(Base Construction Allocation - $870,000)

(Land Allocation - $20,000)

(Design and Contingencies - $170,000)

(109) SR 0081, Seg.1785, Offset 0686, 0.2 Mile South of Lackawanna County Line, Bridge over Plane Street, Avoca Borough, Bridge Replacement

1,060,000

(Base Construction Allocation - $870,000)

(Land Allocation - $20,000)

(Design and Contingencies - $170,000)

(110) SR 0081, Seg.1764, Offset 0779, 0.1 Mile North of SR 2035, Bridge over Collins Creek, Dupont Borough, Bridge Replacement

1,100,000

(Base Construction Allocation - $900,000)

(Land Allocation - $20,000)

(Design and Contingencies - $180,000)

(111) SR 0081, Seg.1770, Offset 0957, 0.5 Mile South of Exit 177, Bridge over Liddy Creek, Dupont Borough, Bridge Replacement

1,840,000

(Base Construction Allocation - $1,520,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(112) SR 0011, Seg.0790, Offset 1610, Junction 0315 Bridge over Railroad and Mill Creek, Dupont Borough, Bridge Replacement

6,022,000

(Base Construction Allocation - $5,002,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,000,000)

(113) SR 0081, Seg.1771, Offset 2009, Bridge over Liddys Road, Dupont Borough, Bridge Replacement

2,662,000

(Base Construction Allocation - $2,202,000)

(Land Allocation - $20,000)

(Design and Contingencies - $440,000)

(114) SR 2103, Seg.0010, Offset 0000, Wyoming Avenue Bridge over SR 0081 Northbound and Southbound, Dupont Borough, Bridge Replacement

2,426,000

(Base Construction Allocation - $2,005,000)

(Land Allocation - $20,000)

(Design and Contingencies - $401,000)

(115) SR 2033, Seg.0010, Offset 0400, 400 Feet North of SR 2006, Bridge over Lackawanna River, Duryea Borough, Bridge Rehabilitation

935,000

(Base Construction Allocation - $850,000)

(Design and Contingencies - $85,000)

(116) SR 0309, Seg.0520, Offset 0295, Junction of SR 2034, Bridge over Pine Run, Hanover Township, Bridge Replacement

1,900,000

(Base Construction Allocation - $1,570,000)

(Land Allocation - $20,000)

(Design and Contingencies - $310,000)

(117) SR 2034, Seg.0030, Offset 0000, 1.0 Mile East of SR 0309, Bridge over Tributary of Pine Creek, Hanover Township, Bridge Replacement

244,000

(Base Construction Allocation - $187,000)

(Land Allocation - $20,000)

(Design and Contingencies - $37,000)

(118) SR 0029, Seg.0230, Offset 0000, 0.3 Mile North of SR 1059, Bridge over Ceasetown Dam Outlet, Plymouth Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(119) SR 0029, Seg.0230, Offset 2212, 0.2 Mile South of SR 4001, Bridge over Sluiceway Water Company, Plymouth Township, Bridge Replacement

530,000

(Base Construction Allocation - $430,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(120) SR 1002, Seg.0010, Offset 2390, 200 Feet South of SR 1003, Bridge over Wadham Creek, Plymouth Borough, Bridge Replacement

430,000

(Base Construction Allocation - $340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(121) SR 2036, Seg.0070, Offset 0000, 3 Miles East of SR 2039, Bridge over Red Run, Bear Creek Township, Bridge Replacement

470,000

(Base Construction Allocation - $370,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(122) SR 3005, Seg.0030, Offset 0000, 0.7 Mile South SR 3006, Bridge over Black Brook, Slocum Township, Bridge Replacement

429,000

(Base Construction Allocation - $344,000)

(Land Allocation - $20,000)

(Design and Contingencies - $65,000)

(123) SR 3006, Seg.0090, Offset 0000, 0.9 Mile East SR 3005, Bridge over Tributary of Lilly Lake, Slocum Township, Bridge Replacement

580,000

(Base Construction Allocation - $470,000)

(Land Allocation - $20,000)

(Design and Contingencies - $90,000)

(124) SR 3006, Seg.0150, Offset 0304, 304 Feet East SR 3007, Bridge over Outlet Lake Independence, Slocum Township, Bridge Replacement

458,000

(Base Construction Allocation - $365,000)

(Land Allocation - $20,000)

(Design and Contingencies - $73,000)

(125) SR 3007, Seg.0150, Offset 1138, 0.3 Mile South of SR 3008, Bridge over Branch Little Wapwallopen Creek, Slocum Township, Bridge Replacement

510,000

(Base Construction Allocation - $410,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(126) SR 0309, Seg.0440, Offset 0000, 0.7 Mile South of SR 2045, Bridge over Bow Creek, Wright Township, Bridge Replacement

840,000

(Base Construction Allocation - $680,000)

(Land Allocation - $20,000)

(Design and Contingencies - $140,000)

(127) SR 0309, Seg.0460, Offset 0000, 0.5 Mile North of SR 2045, Bridge over Wapwallopen Creek, Fairview Township, Bridge Replacement

630,000

(Base Construction Allocation - $510,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(128) SR 2035, Seg.0040, Offset 0346, 346 Feet North of SR 2038, Bridge over Meadow Run, Bear Creek Township, Bridge Replacement

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(129) SR 0081, Seg.1710, Offset 1950, 0.3 Mile North of SR 2020 over Mill Creek, Plains Township, Bridge Replacement

1,550,000

(Base Construction Allocation - $1,270,000)

(Land Allocation - $20,000)

(Design and Contingencies - $260,000)

(130) SR 0115, Seg.0180, Offset 0000, 1.7 Miles East of SR 2007, Bridge over Geneceda Creek, Bear Creek Township, Bridge Replacement

480,000

(Base Construction Allocation - $380,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(131) SR 0081, Seg.1561, Offset 2036, 100 Feet South of SR 3010, Bridge over Tributary of Wapwallopen Creek, Dorrance Township, Bridge Replacement

801,000

(Base Construction Allocation - $651,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(132) SR 0081, Seg.1564, Offset 1355, 0.2 Mile North of SR 3010, Bridge over Big Wapwallopen Creek, Dorrance Township, Bridge Replacement

3,099,000

(Base Construction Allocation - $2,566,000)

(Land Allocation - $20,000)

(Design and Contingencies - $513,000)

(133) SR 0081, Seg.1545, Offset 0881, Bridge over SR 3007, Dorrance Township, Bridge Replacement

3,468,000

(Base Construction Allocation - $2,873,000)

(Land Allocation - $20,000)

(Design and Contingencies - $575,000)

(134) SR 0081, Seg.1565, Offset 0000, Bridge over SR 3010, Dorrance Township, Bridge Replacement

2,534,000

(Base Construction Allocation - $2,095,000)

(Land Allocation - $20,000)

(Design and Contingencies - $419,000)

(135) SR 3020, Seg.0110, Offset 0000, 3 Miles West of SR 3024, Bridge over Black Creek, Black Creek Township, Bridge Replacement

1,748,000

(Base Construction Allocation - $1,440,000)

(Land Allocation - $20,000)

(Design and Contingencies - $288,000)

(136) SR 3038, Seg.0014, Offset 0000, SR 3016 Junction, Bridge over Nescopeck Creek, Black Creek Township, Bridge Replacement

3,496,000

(Base Construction Allocation - $2,897,000)

(Land Allocation - $20,000)

(Design and Contingencies - $579,000)

(137) SR 2011, Seg.0030, Offset 0913, 0.2 Mile West of SR 2026, Bridge over Gardners Creek, Plains Township, Bridge Replacement

981,000

(Base Construction Allocation - $801,000)

(Land Allocation - $20,000)

(Design and Contingencies - $160,000)

(138) SR 3005, Seg.0040, Offset 1912, 0.4 Mile North of SR 4006, Bridge over Outlet of Lilly Lake, Conyngham Township, Bridge Replacement

229,000

(Base Construction Allocation - $174,000)

(Land Allocation - $20,000)

(Design and Contingencies - $35,000)

(139) SR 3006, Seg.0060, Offset 0000, 300 Feet East of SR 3005, Bridge over Pond Creek, Conyngham Township, Bridge Replacement

309,000

(Base Construction Allocation - $241,000)

(Land Allocation - $20,000)

(Design and Contingencies - $48,000)

(140) SR 3018, Seg.0040, Offset 1923, 600 Feet East of SR 3020, Bridge over Black Creek, Black Creek Township, Bridge Replacement

1,562,000

(Base Construction Allocation - $1,285,000)

(Land Allocation - $20,000)

(Design and Contingencies - $257,000)

(141) SR 2042, Seg.0060, Offset 1682, Bridge over I-81, Dorrance Township, Bridge Replacement

3,377,000

(Base Construction Allocation - $2,797,000)

(Land Allocation - $20,000)

(Design and Contingencies - $560,000)

(142) SR 2047, Seg.0020, Offset 1336, 0.9 Mile North of SR 2045, Bridge over Branch of Big Wapwallopen Creek, Rice Township, Bridge Replacement

260,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(143) SR 2047, Seg.0030, Offset 1368, Bridge over TR 447, Rice Township, Bridge Replacement

1,093,000

(Base Construction Allocation - $894,000)

(Land Allocation - $20,000)

(Design and Contingencies - $179,000)

(144) SR 2045, Seg.0150, Offset 0000, 0.1 Mile South of SR 2042, Bridge over Bow Creek, Wright Township, Bridge Replacement

430,000

(Base Construction Allocation - $340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(145) SR 3004, Seg.0010, Offset 0665, 665 Feet East of TR 239, Bridge over Turtle Run, Conyngham Township, Bridge Replacement

450,000

(Base Construction Allocation - $360,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(146) SR 2041, Seg.0050, Offset 0000, 2 Miles North of TR 940, Bridge over Wright Creek, Dennison Township, Bridge Replacement

805,000

(Base Construction Allocation - $654,000)

(Land Allocation - $20,000)

(Design and Contingencies - $131,000)

(147) SR 0437, Seg.0080, Offset 0000, 3.5 Miles North of SR 2048, Bridge over Branch of Creasy Creek, Dennison Township, Bridge Replacement

320,000

(Base Construction Allocation - $250,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(148) SR 0437, Seg.0080, Offset 0812, 3.7 Miles North of SR 2048, Bridge over Branch of Creasy Creek, Dennison Township, Bridge Replacement

360,000

(Base Construction Allocation - $280,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(149) SR 2036, Seg.0070, Offset 0000, 3 Miles East of SR 2039, Bridge over Red Run, Bear Creek Township, Bridge Replacement

470,000

(Base Construction Allocation - $370,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(150) SR 0080, Seg.2554, Offset 2405, Bridge over TR 93, Sugarloaf Township, Bridge Replacement

4,804,000

(Base Construction Allocation - $3,987,000)

(Land Allocation - $20,000)

(Design and Contingencies - $797,000)

(151) SR 0080, Seg.2555, Offset 2456, Bridge over TR 93, Sugarloaf Township, Bridge Replacement

4,508,000

(Base Construction Allocation - $3,740,000)

(Land Allocation - $20,000)

(Design and Contingencies - $748,000)

(152) SR 0080, Seg.2594, Offset 0543, Bridge over I-81, Butler Township, Bridge Replacement

8,488,000

(Base Construction Allocation - $7,057,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,411,000)

(153) SR 0080, Seg.2604, Offset 1120, 1.1 Miles East of I-81 over Long Run Creek, Butler Township, Bridge Replacement

2,050,000

(Base Construction Allocation - $1,690,000)

(Land Allocation - $20,000)

(Design and Contingencies - $340,000)

(154) SR 0080, Seg.2625, Offset 0381, Bridge over TR 309, Butler Township, Bridge Replacement

3,286,000

(Base Construction Allocation - $2,722,000)

(Land Allocation - $20,000)

(Design and Contingencies - $544,000)

(155) SR 0080, Seg.2714, Offset 0974, 0.5 Mile West of TR 940, Bridge over Linesville Creek, White Haven Borough, Bridge Replacement

668,000

(Base Construction Allocation - $540,000)

(Land Allocation - $20,000)

(Design and Contingencies - $108,000)

(156) SR 0940, Seg.0270, Offset 0496, 200 Feet South of I-80, Bridge over Linesville Creek, White Haven Borough, Bridge Replacement

1,340,000

(Base Construction Allocation - $1,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $220,000)

(157) SR 0081, Seg.1404, Offset 1273, 1 Mile South of TR 424, Bridge over Branch of Catawissa Creek, Hazle Township, Bridge Replacement

1,990,000

(Base Construction Allocation - $1,640,000)

(Land Allocation - $20,000)

(Design and Contingencies - $330,000)

(158) SR 0093, Seg.0160, Offset 0000, Bridge over I-81, Exit 41, Sugarloaf Township, Bridge Replacement

6,885,000

(Base Construction Allocation - $5,721,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,144,000)

(159) SR 0309, Seg.0150, Offset 0000, 0.1 Mile North of TR 940, Bridge over Big Black Creek, Hazle Township, Bridge Replacement

925,000

(Base Construction Allocation - $754,000)

(Land Allocation - $20,000)

(Design and Contingencies - $151,000)

(160) SR 0309, Seg.0150, Offset 1689, 0.4 Mile North of TR 940, Bridge over Little Black Creek, Hazle Township, Bridge Replacement

762,000

(Base Construction Allocation - $618,000)

(Land Allocation - $20,000)

(Design and Contingencies - $124,000)

(161) SR 0309, Seg.0210, Offset 2215, 0.7 Mile South of SR 3022, Bridge over Little Nescopeck Creek, Butler Township, Bridge Replacement

700,000

(Base Construction Allocation - $570,000)

(Land Allocation - $20,000)

(Design and Contingencies - $110,000)

(162) SR 0309, Seg.0210, Offset 2417, 0.6 Mile South of SR 3022, Bridge over Little Nescopeck Creek, Butler Township, Bridge Replacement

610,000

(Base Construction Allocation - $490,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(163) SR 0924, Seg.0110, Offset 2382, 1.5 Miles East of I-81, Bridge over Cranberry Creek, Hazle Township, Bridge Replacement

1,690,000

(Base Construction Allocation - $1,390,000)

(Land Allocation - $20,000)

(Design and Contingencies - $280,000)

(164) SR 0924, Seg.0120, Offset 0000, 1.7 Miles East of I-81, Bridge over Conrail Railroad, Hazle Township, Bridge Replacement

6,820,000

(Base Construction Allocation - $5,670,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,130,000)

(165) SR 2048, Seg.0010, Offset 1407, 0.3 Mile North of TR 940, Bridge over Pond Creek, Foster Township, Bridge Replacement

73,000

(Base Construction Allocation - $57,000)

(Land Allocation - $4,000)

(Design and Contingencies - $12,000)

(166) SR 0081, Seg.1440, Offset 1913, 1 Mile South of TR 93, Bridge over Stony Creek, Hazle Township, Bridge Replacement

1,250,000

(Base Construction Allocation - $1,030,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(167) SR 2048, Seg.0060, Offset 0562, SR 2057 Junction, Bridge over Branch of Linesville Creek, Foster Township, Bridge Replacement

250,000

(Base Construction Allocation - $190,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(168) SR 2051, Seg.0110, Offset 0385, 0.3 Mile East of TR 940, Bridge over Gross Creek Canal, Jeddo Borough, Bridge Replacement

90,000

(Base Construction Allocation - $72,000)

(Land Allocation - $4,000)

(Design and Contingencies - $14,000)

(169) SR 3040, Seg.0010, Offset 0000, 300 Feet East of TR 93, Bridge over Tributary of Nescopeck Creek, Sugarloaf Township, Bridge Replacement

850,000

(Base Construction Allocation - $690,000)

(Land Allocation - $20,000)

(Design and Contingencies - $140,000)

(170) SR 3040, Seg.0030, Offset 0000, 2.4 Miles East of TR 93, Bridge over Tributary of Nescopeck Creek, Butler Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(171) SR 3021, Seg.0030, Offset 2871, 0.7 Mile South of SR 3034, Bridge over Nescopeck Creek, Butler Township, Bridge Replacement

110,000

(Base Construction Allocation - $88,000)

(Land Allocation - $4,000)

(Design and Contingencies - $18,000)

(172) SR 3021, Seg.0060, Offset 2210, 300 Feet South of SR 3040, Bridge over Nescopeck Creek, Butler Township, Bridge Replacement

853,000

(Base Construction Allocation - $694,000)

(Land Allocation - $20,000)

(Design and Contingencies - $139,000)

(173) SR 3034, Seg.0020, Offset 1556, 0.8 Mile East of TR 93, Bridge over Nescopeck Creek, Conyngham Borough, Bridge Replacement

138,000

(Base Construction Allocation - $112,000)

(Land Allocation - $4,000)

(Design and Contingencies - $22,000)

(174) SR 3100, Seg.0010, Offset 0000, 3.3 Miles West of TR 93, Bridge over I-80, Eastbound and Westbound, Sugarloaf Township, Bridge Replacement

4,899,000

(Base Construction Allocation - $4,066,000)

(Land Allocation - $20,000)

(Design and Contingencies - $813,000)

(175) SR 0081, Seg.1495, Offset 0675, Bridge over SR 3040, Butler Township, Bridge Replacement

789,000

(Base Construction Allocation - $641,000)

(Land Allocation - $20,000)

(Design and Contingencies - $128,000)

(176) SR 0081, Seg.1494, Offset 0514, Bridge over SR 3040, Butler Township, Bridge Replacement

789,000

(Base Construction Allocation - $641,000)

(Land Allocation - $20,000)

(Design and Contingencies - $128,000)

(177) SR 0081, Seg.1510, Offset 0000, Bridge over I-80 Westbound, Butler Township, Bridge Replacement

2,125,000

(Base Construction Allocation - $1,754,000)

(Land Allocation - $20,000)

(Design and Contingencies - $351,000)

(178) SR 0081, Seg.1511, Offset 0000, Bridge over I-80 Westbound, Butler Township, Bridge Replacement

2,418,000

(Base Construction Allocation - $1,998,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(179) SR 0081, Seg.1445, Offset 1276, 0.7 Mile South of TR 93, Bridge over Black Creek and Conrail Railroad, West Hazleton Borough, Bridge Replacement

8,323,000

(Base Construction Allocation - $6,919,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,384,000)

(180) SR 1021, Seg.0060, Offset 0000, 0.5 Mile North of SR 1010, Bridge over Abrahams Creek, West Wyoming Borough, Bridge Replacement

740,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $120,000)

(181) SR 1021, Seg.0080, Offset 0000, 0.1 Mile South of SR 1036, Bridge over Abrahams Creek, Kingston Township, Bridge Replacement

76,000

(Base Construction Allocation - $60,000)

(Land Allocation - $4,000)

(Design and Contingencies - $12,000)

(182) SR 1038, Seg.0030, Offset 0190, 1.2 Miles West of TR 92, Bridge over Obendorfers Creek, Exeter Township, Bridge Replacement

700,000

(Base Construction Allocation - $570,000)

(Land Allocation - $20,000)

(Design and Contingencies - $110,000)

(183) SR 0092, Seg.0130, Offset 0153, 153 Feet North of SR 1040, Bridge over Lewis Creek, Exeter Township, Bridge Replacement

490,000

(Base Construction Allocation - $390,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(184) SR 1010, Seg.0090, Offset 2230, 0.2 Mile West of SR 1025, Bridge over Hicks Creek, Exeter Borough, Bridge Replacement

280,000

(Base Construction Allocation - $220,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(185) SR 0081, Seg.1681, Offset 1592, Bridge over SR 8051, Exit 168, Wilkes-Barre Township, Bridge Replacement

4,910,000

(Base Construction Allocation - $4,080,000)

(Land Allocation - $20,000)

(Design and Contingencies - $810,000)

(186) SR 0309, Seg.0626, Offset 2489, 0.3 Mile North of SR 2020, Bridge over Coal Brook, City of Wilkes-Barre, Bridge Replacement

1,580,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $260,000)

(187) SR 8047, Seg.0021, Offset 0000, Ramp to Wilkes-Barre Boulevard over Laurel Run, City of Wilkes-Barre, Bridge Replacement

1,030,000

(Base Construction Allocation - $840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $170,000)

(188) SR 0081, Seg.1644, Offset 1112, 0.4 Mile North of Exit 164 over Solomons Creek, Ashley Borough, Bridge Replacement

2,440,000

(Base Construction Allocation - $2,020,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(189) SR 0309, Seg.0626, Offset 2777, 0.3 Mile North of SR 2020, Bridge over Coal Brook, Wilkes-Barre City, Bridge Replacement

12,493,000

(Base Construction Allocation - $10,394,000)

(Land Allocation - $20,000)

(Design and Contingencies - $2,079,000)

(190) SR 2001, Seg.0010, Offset 1495, 0.3 Mile North of SR 2010, Bridge over Tributary of Solomons Creek, Ashley Borough, Bridge Replacement

333,000

(Base Construction Allocation - $261,000)

(Land Allocation - $20,000)

(Design and Contingencies - $52,000)

(191) SR 2005, Seg.0030, Offset 0755, 0.6 Mile West of SR 2010, Bridge over Pocono Northeast Railroad, Wilkes-Barre City, Bridge Replacement

2,340,000

(Base Construction Allocation - $1,933,000)

(Land Allocation - $20,000)

(Design and Contingencies - $387,000)

(192) SR 2007, Seg.0150, Offset 0210, SR 2012 Junction, Bridge over Railroad and Local Street, Wilkes-Barre City, Bridge Replacement

35,177,000

(Base Construction Allocation - $29,297,000)

(Land Allocation - $20,000)

(Design and Contingencies - $5,860,000)

(193) SR 2020, Seg.0020, Offset 1575, 0.7 Mile North of TR 309 Business, Bridge over Laurel Run, Wilkes-Barre City, Bridge Replacement

1,029,000

(Base Construction Allocation - $841,000)

(Land Allocation - $20,000)

(Design and Contingencies - $168,000)

(194) SR 6309, Seg.0580, Offset 2647, 0.2 Mile North of SR 2007, Bridge over Branch of Solomons Creek, Wilkes-Barre Township, Bridge Replacement

632,000

(Base Construction Allocation - $510,000)

(Land Allocation - $20,000)

(Design and Contingencies - $102,000)

(195) SR 0081, Seg.1680, Offset 1723, Bridge over SR 8051, Exit 168, Wilkes-Barre Township, Bridge Replacement

5,740,000

(Base Construction Allocation - $4,770,000)

(Land Allocation - $20,000)

(Design and Contingencies - $950,000)

(196) SR 0081, Seg.1651, Offset 0279, Bridge over SR 2003, Hazleton Street, Ashley Borough, Bridge Replacement

1,200,000

(Base Construction Allocation - $980,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(197) SR 0011, Seg.0554, Offset 0000, 1 Mile East of SR 1004, Bridge over Abandoned Railroad, Larksville Borough, Bridge Replacement

4,940,000

(Base Construction Allocation - $4,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $820,000)

(198) SR 0029, Seg.0010, Offset 1336, 0.1 Mile North of I-81, Bridge over Sugar Notch Run, Hanover Township, Bridge Replacement

2,532,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $412,000)

(199) SR 0029, Seg.0030, Offset 1120, 0.4 Mile North of SR 2010, Bridge over Branch Warrior Creek, Hanover Township, Bridge Replacement

1,143,000

(Base Construction Allocation - $936,000)

(Land Allocation - $20,000)

(Design and Contingencies - $187,000)

(200) SR 0029, Seg.0060, Offset 0000, 0.4 Mile North of SR 2008, Bridge over Warrior Creek, Hanover Township, Bridge Replacement

1,056,000

(Base Construction Allocation - $863,000)

(Land Allocation - $20,000)

(Design and Contingencies - $173,000)

(201) SR 0029, Seg.0080, Offset 1580, 0.2 Mile South of SR 2002, Bridge over Nanticoke Creek, Hanover Township, Bridge Replacement

2,024,000

(Base Construction Allocation - $1,670,000)

(Land Allocation - $20,000)

(Design and Contingencies - $334,000)

(202) SR 0309, Seg.0644, Offset 0000, Bridge over Vaughn Street, Luzerne Borough, Bridge Replacement

10,720,000

(Base Construction Allocation - $8,900,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,800,000)

(203) SR 1001, Seg.0010, Offset 2100, Bridge on Carver Street over Brown's Creek, Plymouth Borough, Bridge Replacement

561,000

(Base Construction Allocation - $450,000)

(Land Allocation - $20,000)

(Design and Contingencies - $91,000)

(204) SR 1001, Seg.0030, Offset 2003, 0.4 Mile North of SR 1002, Bridge over Brown's Creek, Larksville Borough, Bridge Replacement

268,000

(Base Construction Allocation - $207,000)

(Land Allocation - $20,000)

(Design and Contingencies - $41,000)

(205) SR 1002, Seg.0070, Offset 0774, 1 Mile North of SR 1001, Bridge over Tributary of Susquehanna River, Larksville Borough, Bridge Replacement

290,000

(Base Construction Allocation - $225,000)

(Land Allocation - $20,000)

(Design and Contingencies - $45,000)

(206) SR 2002, Seg.0050, Offset 0317, 1 Mile East of TR 29, Bridge over Warrior Creek, Hanover Township, Bridge Replacement

1,190,000

(Base Construction Allocation - $1,060,000)

(Land Allocation - $20,000)

(Design and Contingencies - $110,000)

(207) SR 2008, Seg.0040, Offset 0498, 1 Mile East of SR 2010, Bridge over Espy Run, Nanticoke City, Bridge Replacement

355,000

(Base Construction Allocation - $280,000)

(Land Allocation - $20,000)

(Design and Contingencies - $55,000)

(208) SR 3004, Seg.0160, Offset 0782, 0.8 Miles East of SR 3002, Bridge over Forge River Creek, Newport Township, Bridge Replacement

384,000

(Base Construction Allocation - $303,000)

(Land Allocation - $20,000)

(Design and Contingencies - $61,000)

(209) SR 3004, Seg.0170, Offset 0919, SR 3003 Junction, Bridge over Espy Run, Newport Township, Bridge Replacement

450,000

(Base Construction Allocation - $360,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(210) SR 3005, Seg.0030, Offset 0000, 0.7 Mile South of SR 3006, Bridge over Black Brook, Slocum Township, Bridge Replacement

429,000

(Base Construction Allocation - $344,000)

(Land Allocation - $20,000)

(Design and Contingencies - $65,000)

(211) SR 3006, Seg.0090, Offset 0000, 0.9 Mile East of SR 3005, Bridge over Tributary of Lilly Lake, Slocum Township, Bridge Replacement

580,000

(Base Construction Allocation - $470,000)

(Land Allocation - $20,000)

(Design and Contingencies - $90,000)

(212) SR 3006, Seg.0150, Offset 0304, 304 Feet East of SR 3007, Bridge over Outlet Lake Independence, Slocum Township, Bridge Replacement

458,000

(Base Construction Allocation - $365,000)

(Land Allocation - $20,000)

(Design and Contingencies - $73,000)

(213) SR 3007, Seg.0150, Offset 1138, 0.3 Mile South of SR 3008, Bridge over Branch of Little Wapwallopen Creek, Slocum Township, Bridge Replacement

510,000

(Base Construction Allocation - $410,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(214) SR 0081, Seg.1670, Offset 0237, Bridge over SR 2007, Northampton Street, Wilkes-Barre Township, Bridge Replacement

2,230,000

(Base Construction Allocation - $1,840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $370,000)

(215) SR 0115, Seg.0270, Offset 1694, 0.6 Mile North of SR 2039, Bridge over Railroad, Plains Township, Bridge Replacement

930,000

(Base Construction Allocation - $760,000)

(Land Allocation - $20,000)

(Design and Contingencies - $150,000)

(216) SR 0115, Seg.0290, Offset 0613, 0.7 Mile North of SR 2039, Bridge over Tributary of Laurel Run, Plains Township, Bridge Replacement

1,730,000

(Base Construction Allocation - $1,430,000)

(Land Allocation - $20,000)

(Design and Contingencies - $280,000)

(217) SR 0315, Seg.0500, Offset 0000, 1 Mile East of TR 309, Bridge over Laurel Run Creek, Plains Township, Bridge Replacement

100,000

(Base Construction Allocation - $80,000)

(Land Allocation - $4,000)

(Design and Contingencies - $16,000)

(218) SR 0115, Seg.0290, Offset 0000, 0.6 Mile North of SR 2039, Bridge over Railroad, Plains Township, Bridge Replacement

2,660,000

(Base Construction Allocation - $2,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $440,000)

(219) SR 0115, Seg.0320, Offset 2119, Bridge over I-81, Northbound and Southbound, Plains Township, Bridge Replacement

3,860,000

(Base Construction Allocation - $3,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $640,000)

(220) SR 0115, Seg.0321, Offset 2048, Bridge over I-81, Northbound and Southbound, Plains Township, Bridge Replacement

4,820,000

(Base Construction Allocation - $4,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $800,000)

(221) SR 2011, Seg.0030, Offset 0913, 0.2 Mile West of SR 2026, Bridge over Gardners Creek, Plains Township, Bridge Replacement

981,000

(Base Construction Allocation - $801,000)

(Land Allocation - $20,000)

(Design and Contingencies - $160,000)

(222) SR 0081, Seg.1710, Offset 1950, 0.3 Mile North of SR 2020, Bridge over Mill Creek, Plains Township, Bridge Replacement

1,550,000

(Base Construction Allocation - $1,270,000)

(Land Allocation - $20,000)

(Design and Contingencies - $260,000)

(223) SR 2020, Seg.0100, Offset 0000, 1.4 Miles East of TR 315, Bridge over Branch of Mill Creek, Plains Township, Bridge Replacement

240,000

(Base Construction Allocation - $180,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(224) SR 0309, Seg.0628, Offset 0000, Bridge over SR 2022, Wilkes-Barre City, Bridge Replacement

32,230,000

(Base Construction Allocation - $26,840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $5,370,000)

(225) SR 0309, Seg.0632, Offset 0000, Bridge over Susquehanna River, Plains Township, Bridge Replacement

95,520,000

(Base Construction Allocation - $79,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $16,000,000)

(226) SR 0115, Seg.0120, Offset 0000, 1.2 Miles South of SR 2038, Bridge over Shades Creek, Bear Creek Township, Bridge Replacement

600,000

(Base Construction Allocation - $480,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(227) SR 0309, Seg.0628, Offset 0000, Bridge over SR 2022, Wilkes-Barre City, Bridge Replacement

32,230,000

(Base Construction Allocation - $26,840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $5,370,000)

(228) SR 0309, Seg.0632, Offset 0000, Bridge over Susquehanna River, Plains Township, Bridge Replacement

95,520,000

(Base Construction Allocation - $79,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $16,000,000)

(229) SR 0315, Seg.0070, Offset 1209, 0.2 Mile North of SR 2020, Bridge over Mill Creek, Plains Township, Bridge Replacement

1,460,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $240,000)

(230) SR 0081, Seg.1724, Offset 1003, 2.2 Miles North of TR 115, Bridge over TR 351, Sunset Drive, Plains Township, Bridge Replacement

2,830,000

(Base Construction Allocation - $2,340,000)

(Land Allocation - $20,000)

(Design and Contingencies - $470,000)

(231) SR 0315, Seg.0130, Offset 0000, SR 2017 Junction, Bridge over Conrail Railroad, Laflin Borough, Bridge Rehabilitation

330,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $30,000)

(232) SR 0309, Seg.0629, Offset 0000, Bridge over SR 2022, Wilkes-Barre City, Bridge Rehabilitation

1,430,000

(Base Construction Allocation - $1,300,000)

(Design and Contingencies - $130,000)

(233) SR 0081, Seg.1640, Offset 1751, Bridge over TR 29 Ramp, Hanover Township, Bridge Replacement

3,740,000

(Base Construction Allocation - $3,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $620,000)

(234) SR 3004, Seg.0130, Offset 0330, Bridge over Unknown Stream, Newport Township, Bridge Replacement

720,000

(Base Construction Allocation - $580,000)

(Land Allocation - $20,000)

(Design and Contingencies - $120,000)

(235) SR 0081, Seg.1584, Offset 0850, 0.5 Mile South of SR 2042, Bridge over Branch of Little Wapwallopen Creek, Rice Township, Bridge Replacement

801,000

(Base Construction Allocation - $651,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(236) SR 0081, Seg.1734, Offset 0000, Bridge over SR 2039, Laflin Borough, Bridge Replacement

4,940,000

(Base Construction Allocation - $4,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $820,000)

(237) SR 0081, Seg.1734, Offset 2048, 0.5 Mile South of Exit 175, Bridge over Conrail Railroad, Laflin Borough, Bridge Replacement

3,910,000

(Base Construction Allocation - $3,240,000)

(Land Allocation - $20,000)

(Design and Contingencies - $650,000)

(238) SR 0081, Seg.1735, Offset 0000, Bridge over SR 2039, Laflin Borough, Bridge Replacement

5,120,000

(Base Construction Allocation - $4,250,000)

(Land Allocation - $20,000)

(Design and Contingencies - $850,000)

(239) SR 0081, Seg. 1735, Offset 2185, 0.6 Mile South of Exit 175, Bridge over Conrail Railroad, Laflin Borough, Bridge Replacement

3,910,000

(Base Construction Allocation - $3,240,000)

(Land Allocation - $20,000)

(Design and Contingencies - $650,000)

(240) SR 0081, Seg.1740, Offset 0686, Bridge over SR 2017, Laflin Borough, Bridge Replacement

2,540,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $420,000)

(241) SR 0081, Seg.1744, Offset 1494, Bridge over TR 315, Jenkins Township, Bridge Replacement

5,420,000

(Base Construction Allocation - $4,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $900,000)

(242) SR 0081, Seg.1760, Offset 0856, 0.2 Mile South of SR 2035, Bridge over Mill Creek, Pittston Township, Bridge Replacement

860,000

(Base Construction Allocation - $700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $140,000)

(243) SR 0081, Seg.1741, Offset 0693, Bridge over SR 2017, Laflin Borough, Bridge Replacement

2,400,000

(Base Construction Allocation - $1,980,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(244) SR 0081, Seg.1754, Offset 0534, Bridge over TR 315, Pittston Township, Bridge Replacement

4,460,000

(Base Construction Allocation - $3,700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $740,000)

(245) SR 0081, Seg.1755, Offset 0722, Bridge over TR 315, Pittston Township, Bridge Replacement

6,850,000

(Base Construction Allocation - $5,690,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,140,000)

(246) SR 0115, Seg.0100, Offset 1983, 2 Miles South of SR 2038, Bridge over Branch of Shades Creek, Buck Township, Bridge Replacement

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(247) SR 0081, Seg.1745, Offset 1448, Bridge over TR 315, Jenkins Township, Bridge Replacement

7,530,000

(Base Construction Allocation - $6,260,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,250,000)