Section 3. Itemization of public improvement capital projects.
Additional capital projects in the category of public improvement projects to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Department of Agriculture
(i) Farm Show Complex
(A) Renovations of the underground (Cameron Street) pedestrian/cyclist walk from Department of Agriculture to the Farm Show Complex and associated pathways
Project Allocation
3,000,000
(ii) Samuel E. Hayes Jr. Livestock Evaluation Center
(A) Renovations to the Livestock Evaluation Center
Project Allocation
2,000,000
(iii) Health Diagnostic Laboratory
(A) Renovations, additions and new construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures
Project Allocation
25,000,000
(2) Department of Conservation and Natural Resources
(i) Clear Creek Forest District
(A) New maintenance shop and equipment storage
Project Allocation
4,000,000
(ii) Cornplanter Forest District
(A) Office renovation
Project Allocation
3,000,000
(ii.1) Cowans Gap State Park
(A) Rehabilitate Cowans Gap Dam
Project Allocation
9,200,000
(iii) Delaware State Forest
(A) Lilly Pond Dam spillway repair/ replacement
Project Allocation
1,350,000
(iii.1) Hickory Run State Park
(A) Additional funding to replace pit latrines with modern comfort stations
Project Allocation
700,000
(iii.2) Kooser State Park
(A) Day-use improvements and dam rehabilitation
Project Allocation
6,250,000
(iii.3) Laurel Hill State Park
(A) Rehabilitate Penn Scenic View Dam
Project Allocation
5,000,000
(iii.4) Leonard Harrison State Park
(A) Turkey Path Trail rehabilitation and realignment
Project Allocation
3,750,000
(iii.5) McKeever Center
(A) Land acquisition, construction and infrastructure costs
Project Allocation
1,000,000
(iii.6) Memorial Lake State Park
(A) Rehabilitate dam
Project Allocation
9,800,000
(iv) Norristown Farm Park
(A) Replace multiple vehicular and pedestrian bridges
Project Allocation
6,250,000
(iv.1) Parker Dam State Park
(A) Dam repairs and lake dredging
Project Allocation
11,250,000
(v) Pinchot State Forest
(A) Remove Turtle Creek Dam
Project Allocation
1,875,000
(vi) Pinchot Forest District
(A) Remove Race Run Dam
Project Allocation
2,000,000
(B) Remove Dam 148-118 SGL 260
Project Allocation
2,000,000
(vi.1) Point State Park
(A) Portal bridge replacement and park sidewalk rehabilitation and ADA compliance
Project Allocation
3,750,000
(vi.2) Prince Gallitzin State Park
(A) Rehabilitate Sandy Run Dam
Project Allocation
12,000,000
(vi.3) Promised Land State Park
(A) Rehabilitate Promised Land Dam
Project Allocation
5,000,000
(vi.4) Pymatuning State Park
(A) Rehabilitate park and campground facilities
Project Allocation
5,000,000
(vi.5) Raccoon Creek State Park
(A) Extend toe drain at Raccoon Creek Lake Dam
Project Allocation
1,250,000
(vi.6) Shikellamy State Park
(A) Rehabilitate dam
Project Allocation
15,000,000
(vii) Tiadaghton & Tioga Forest Districts
(A) Pine Creek Rail Trail-truss bridges over Pine Creek
Project Allocation
6,700,000
(vii.1) Yellow Creek State Park
(A) Construction, infrastructure, renovations and other related costs for improvements and upgrades
Project Allocation
5,850,000
(viii) Various State Parks - Statewide
(A) Campground facility amenities - construct washhouses, including utility and site work
Project Allocation
12,500,000
(B) Rehabilitate historic structures
Project Allocation
12,500,000
(C) Statewide critical regulatory system repairs and replacements at multiple water and wastewater treatment plants
Project Allocation
12,500,000
(D) New and replacement of roofed overnight colonies and support infrastructure at five State parks
Project Allocation
6,250,000
(E) Construct solar arrays at various State park facilities
Project Allocation
15,000,000
(ix) Bureau of Forestry
(A) New Regional Air Operations facilities
Project Allocation
9,600,000
(B) New Fire Cache/Forestry warehouse - replace main building
Project Allocation
7,200,000
(C) Construct solar arrays at various forestry facilities
Project Allocation
3,750,000
(3) Department of Corrections
(i) Elizabethtown Training Facility
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
3,982,700
(ii) Quehanna Boot Camp
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
2,793,000
(iii) State Correctional Institution at Albion
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
4,362,000
(iv) State Correctional Institution at Benner
(A) Design and construction of a transportation hub, including land development and site infrastructure improvements
Project Allocation
3,000,000
(B) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
5,933,490
(v) State Correctional Institution at Cambridge Springs
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
15,354,000
(vi) State Correctional Institution at Camp Hill
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
37,425,000
(vii) State Correctional Institution at Chester
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
6,848,000
(viii) State Correctional Institution at Coal Township
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
12,567,000
(ix) State Correctional Institution at Dallas
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
1,657,000
(x) State Correctional Institution at Fayette
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
15,679,200
(xi) State Correctional Institution at Forest
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
14,394,000
(xii) State Correctional Institution at Frackville
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
6,397,900
(xiii) State Correctional Institution at Graterford
(A) Design and construction of code, permit and site/utility/infrastructure-related issues
Project Allocation
650,000
(xiv) State Correctional Institution at Greene
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
7,462,000
(xv) State Correctional Institution at Houtzdale
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
11,897,500
(xvi) State Correctional Institution at Huntingdon
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
14,292,350
(xvii) State Correctional Institution at Laurel Highlands
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
6,738,300
(xviii) State Correctional Institution at Mahanoy
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
20,493,500
(xix) State Correctional Institution at Mercer
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
7,908,500
(xx) State Correctional Institution at Muncy
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
14,342,980
(xxi) State Correctional Institution at Pine Grove
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
8,596,000
(xxii) State Correctional Institution at Retreat
(A) Design and construction of facility upgrades, including land development and site infrastructure improvements and new construction
Project Allocation
1,500,000
(xxiii) State Correctional Institution at Rockview
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
10,131,000
(xxiv) State Correctional Institution at Smithfield
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
8,375,270
(xxv) State Correctional Institution at Somerset
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
8,403,610
(xxvi) State Correctional Institution at Waymart
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation
19,787,295
(4) Department of Education
(i) Department of Education Headquarters (Reserved)
(ii) Lincoln University
(A) Infrastructure replacement, upgrade and improvements
Project Allocation
26,000,000
(B) Renovation of Houston Hall
Project Allocation
12,000,000
(iii) The Pennsylvania State University
(A) Davey Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Davey Laboratory at the University Park campus. The project scope includes building systems renewal, including mechanical, electrical, plumbing and sprinkler systems and code upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
100,000,000
(B) Osmond Laboratory Renovation - Phase II (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Phase II of Osmond Laboratory at the University Park campus. This project will complete the renovation of Osmond Laboratory. The project will renew the remainder of facility by replacing worn systems, improving the thermal envelope, replacing windows and interior finishes. Interior space modifications will be made to meet the needs of the departments and activities currently housed there and into the future. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
40,000,000
(C) Carpenter Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Carpenter Building at the University Park campus. The Carpenter Building requires building-wide renewal to include building, life safety system and accessibility upgrades. The project includes building systems and envelope renewal/replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
40,000,000
(D) Student Support and Services Center (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Student Support and Services Center at the University Park campus. A new multistory building will be constructed to provide functional spaces for student support and engagement, admissions and administration. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
90,000,000
(E) Electrical Engineering West Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering West at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building-wide systems renewal, including mechanical, electrical, plumbing and sprinkler systems to improve efficiency and performance. The building exterior improvements include masonry repair, roof and window replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
65,000,000
(F) Electrical Engineering East Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering East at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building systems renewal, including mechanical, electrical, plumbing and fire suppression systems to improve efficiency and performance. The building exterior improvements include glazing, curtain wall and door replacement. Interior and accessibility improvements are needed. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
45,000,000
(G) Pattee Library/Paterno Library Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Pattee Library/Paterno Library at the University Park campus. This project will address aging systems, accessibility concerns, reliability issues and safety concerns. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
60,000,000
(H) Sparks Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Sparks Building at the University Park campus. The project will include building system and envelope renewal and renovation to address programmatic and system needs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
65,000,000
(I) Applied Research Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Applied Research Laboratory at the University Park campus. The ARL Building requires building-wide renewal to include building systems and envelope renewal/replacement. The project scope also includes life safety system and accessibility upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
50,000,000
(J) Capital Renewal, Phase X (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal, Phase X at the University Park campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in the other phases of renewal. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
40,000,000
(K) Chilled Water Plant (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Chilled Water Plant at the University Park campus. Scope includes new building construction along with the initial chilled water, condenser water and electrical equipment and plant infrastructure. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
80,000,000
(L) Advanced Water Treatment System (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Advanced Water Treatment System at the University Park campus. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
15,000,000
(M) Classroom-Library Building Renovation (and Nursing Addition) (Scranton Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Classroom-Library Building Renovation (and Nursing Addition) at the Scranton campus. A total renovation is needed to address a multitude of deficiencies. An addition for the expansion of the Nursing program is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
20,000,000
(N) Kelly Library Renovation and Addition (Greater Allegheny Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Kelly Library Renovation and Addition at the Greater Allegheny campus. A total renovation is needed to address a multitude of deficiencies. An addition for an auditorium is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
20,000,000
(O) Classroom/Class Lab Teaching and Learning Building (Harrisburg Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Classroom/Class Lab Teaching and Learning Building at the Harrisburg campus. A new multistory Classroom/Class Lab Teaching and Learning Building will be constructed to provide modern classrooms, instructional laboratories, faculty offices, instructional support and flexible/adaptable space to support both general and technology instructional programs, as well as campus engagement activities. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
50,000,000
(P) Teaching and Administrative Support Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Teaching and Administrative Support Building at the Hershey campus. This project will provide space for key administrative units on campus. The program will include new administrative and support spaces, offices and meeting rooms. The facility will be equipped with state-of-the-art technology. The facility will be located on the core campus adjacent to clinical, administrative, research and academic facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
80,000,000
(Q) Capital Renewal (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal at the Hershey campus. This project is part of a continuing effort to make significant comprehensive upgrades to infrastructure in the College of Medicine buildings at the Hershey campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in routine renewal programs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
30,000,000
(R) Academic and Research Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Academic and Research Building at the Hershey campus. This project will include new wet and dry research laboratories, comparative medicine spaces, support spaces, instructional spaces, seminar rooms, offices and administration space. The facility will be equipped with state-of-the-art instructional technology. The facility will be located on the core campus adjacent to academic, clinical and other research facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
160,000,000
(S) North Wing of Chambers Building (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the North Wing of Chambers Building at the University Park campus. This project involves the renovation, demolition and reconstruction of Chambers Building. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
60,000,000
(T) Demolition Program (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Demolition Program at the University Park campus. This project involves the demolition of campus facilities. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation
10,000,000
(U) Critical infrastructure improvements to athletic facilities at University Park campus
Project Allocation
150,000,000
(V) Acquisition, reclamation, infrastructure improvements and construction to land and facilities at the Pennsylvania College of Technology in the City of Williamsport
Project Allocation
10,000,000
(iv) Temple University
(A) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation
250,000,000
(B) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation
185,000,000
(C) New classroom building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a classroom building academic complex. This will involve renovating and adding to an existing building or building a stand-alone classroom building
Project Allocation
125,000,000
(C.1) New Science, Technology, Engineering and Mathematics (STEM) academic building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a STEM academic complex. This will involve renovating and adding to an existing building or building a stand-alone building
Project Allocation
125,000,000
(D) Design, infrastructure, abatement of hazardous materials, renovation and construction of expansion to Ritter Hall, including utility upgrades and extensions, site improvements, code-related upgrades, including ADA compliance-related upgrades
Project Allocation
40,000,000
(E) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, educational and exterior facilities of Temple University Hospital and affiliated physician practices
Project Allocation
60,000,000
(F) Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Health System
Project Allocation
60,000,000
(G) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, educational and exterior facilities of Temple University Health System
Project Allocation
30,000,000
(H) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital-Boyer Pavilion
Project Allocation
40,000,000
(I) Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Hospital
Project Allocation
60,000,000
(J) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital
Project Allocation
60,000,000
(K) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Episcopal Campus
Project Allocation
40,000,000
(L) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, educational and exterior facilities for Fox Chase Cancer Center
Project Allocation
60,000,000
(M) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Jeanes Campus
Project Allocation
40,000,000
(N) Construction, infrastructure, acquisition, redevelopment and other related costs to be used for academic space at Temple University Main Campus
Project Allocation
1,300,000
(v) Thaddeus Stevens College of Technology
(A) Hartzell renovations
Project Allocation
4,000,000
(B) Jones renovations
Project Allocation
5,000,000
(C) Mellor renovations
Project Allocation
20,000,000
(D) Dorm renovations
Project Allocation
7,000,000
(E) Shop addition
Project Allocation
5,000,000
(F) Student Center addition
Project Allocation
5,000,000
(G) Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements
Project Allocation
18,000,000
(H) Branch Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements
Project Allocation
8,000,000
(I) Roof - Renovations, alterations, infrastructure upgrades and associated design and construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings
Project Allocation
3,500,000
(J) Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses
Project Allocation
5,000,000
(K) ALMS House - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses
Project Allocation
25,000,000
(L) Orange Street Campus - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses
Project Allocation
3,500,000
(M) Main Campus - Sidewalks/road repair
Project Allocation
1,500,000
(vi) University of Pittsburgh
(A) New Integrated Health Sciences Building, Oakland Campus
Project Allocation
200,000,000
(B) New Academic Student Support Center Building, Oakland Campus
Project Allocation
80,000,000
(C) New One Bigelow Academic Teaching and Research Complex, Oakland Campus
Project Allocation
300,000,000
(D) Posvar Hall addition and renovation, Oakland Campus
Project Allocation
100,000,000
(E) Posvar Hall Chiller Plant expansion and upgrade, Oakland Campus
Project Allocation
50,000,000
(F) Programmatic and infrastructure upgrades to buildings, Oakland Campus
Project Allocation
50,000,000
(G) Crabtree Hall renovations, Oakland Campus
Project Allocation
110,000,000
(vii) Butler County Community College
(A) Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space
Project Allocation
1,750,000
(5) Pennsylvania Emergency Management Agency (Reserved)
(6) Department of Environmental Protection
(i) Carbon County
(A) Quakake Treatment Facility - Additional funds for construction of acid mine treatment facility
Project Allocation
6,000,000
(ii) Clarion County
(A) Mill Creek Treatment Facility - Construction of treatment facility
Project Allocation
14,000,000
(iii) Clearfield County
(A) Additional funds for additional culvert alignment under borough streets at Stinky Run
Project Allocation
1,000,000
(iv) Fayette County
(A) Phillips Discharge Treatment Facility - Construction of treatment facility
Project Allocation
12,000,000
(v) Jefferson County
(A) Weisner Hollow - Additional funds to decertify high-hazard dam and construct permanent drainage channel. Regrade and revegetate site
Project Allocation
6,500,000
(vi) Lycoming County
(A) Grafius Run and Freedom Road Tributary - Improve existing culverts in the City of Williamsport
Project Allocation
3,500,000
(vii) Westmoreland County
(A) West Newton Coal Logistics Slope - Embankment stabilization and coal refuse slurry impoundment capping
Project Allocation
23,000,000
(7) Department of General Services
(i) Berks County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Reading area
Project Allocation
15,000,000
(ii) Dauphin County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Harrisburg area
Project Allocation
200,000,000
(B) Upgrade and expansion of IT infrastructure and automation system redundancy
Project Allocation
100,000,000
(C) Renovations and alterations for upgrades and infrastructure improvements to the Finance Building
Project Allocation
100,000,000
(iii) Lackawanna County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Scranton
Project Allocation
15,000,000
(iv) Statewide
(A) Professional services for the development of agency facility strategic master plans and capital planning
Project Allocation
15,000,000
(B) Renovations, alterations, new construction, site improvements and infrastructure upgrades for Commonwealth child-care centers
Project Allocation
7,000,000
(7.1) Department of Health
(i) Bureau of Laboratories
(A) Construct new laboratory, including site and infrastructure improvements
Project Allocation
60,000,000
(8) Department of Human Services
(i) Clarks Summit State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(ii) Danville State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(iii) Ebensburg Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(iv) Loysville Youth Development Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(v) Norristown State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(B) Additional funds for the design and construction of a psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution
Project Allocation
190,000,000
(vi) North Central Secure Treatment Unit
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
7,000,000
(vii) Selinsgrove Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(viii) South Mountain Secure Treatment Unit
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
5,000,000
(ix) South Mountain Restoration Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(x) Torrance State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(xi) Warren State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(xii) Wernersville State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(xiii) Youth Forestry Camp No.2
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
9,000,000
(xiv) Youth Forestry Camp No.3
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation
5,000,000
(xv) Northeast Juvenile Justice Facility
(A) New construction, renovation, rehabilitation, acquisition of land and facility and associated costs in northeastern Pennsylvania
Project Allocation
25,000,000
(9) Pennsylvania Historical and Museum Commission
(i) State Museum
(A) Exhibit upgrades
Project Allocation
20,000,000
(ii) Brandywine Battlefield Park
(A) Building, site and infrastructure improvements
Project Allocation
5,000,000
(iii) Daniel Boone Homestead
(A) Building, site and infrastructure improvements
Project Allocation
5,000,000
(iv) Drake Well
(A) Building, site and infrastructure improvements
Project Allocation
3,000,000
(v) Erie Maritime Museum
(A) Building, site and infrastructure improvements
Project Allocation
2,000,000
(vi) Graeme Park
(A) Building, site and infrastructure improvements
Project Allocation
3,500,000
(B) Exhibit upgrades
Project Allocation
1,000,000
(vii) Railroad Museum of Pennsylvania
(A) Building, site and infrastructure improvements
Project Allocation
13,000,000
(10) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Construct new adult day health care and 48-bed nursing care addition with additional parking area
Project Allocation
20,000,000
(B) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(ii) Gino J. Merli Veterans Center
(A) Construct new adult day health care addition with parking area, including demolition as required
Project Allocation
13,500,000
(B) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(iii) Hollidaysburg Veterans Home
(A) Construct new adult day health care addition with additional parking area
Project Allocation
8,040,000
(B) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(iv) Pennsylvania Soldiers' & Sailors' Home, Erie
(A) Construct new adult day health care addition with additional parking area
Project Allocation
10,720,000
(B) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(v) Southeastern Veterans' Center, Spring City
(A) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(vi) Southwestern Veterans' Center, Pittsburgh
(A) Construct new adult day health care addition with additional parking area
Project Allocation
14,740,000
(B) Rehabilitate Veterans' Home
Project Allocation
10,000,000
(vii) Statewide Veterans' Homes
(A) Provide safety measures and physical security upgrades, including new construction, renovations, electronic security systems and equipment, and site work
Project Allocation
30,000,000
(B) Provide additional funding to rehabilitate PA Veterans' Homes, including to remedy life safety and regulatory deficiencies
Project Allocation
30,000,000
(viii) Allentown Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(ix) Beaver Falls Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(x) Berks County Readiness Centers
(A) Renovate DMVA facilities in Berks County, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
20,000,000
(xi) Cambridge Springs Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
12,500,000
(xii) Cumberland County Readiness Centers
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades for all DMVA facilities in Cumberland County
Project Allocation
27,500,000
(xiii) Chambersburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xiv) Coatesville Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xv) Easton Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xvi) Everett Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xvii) Fort Indiantown Gap DMVA facilities and infrastructure
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
37,500,000
(xviii) Greensburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xviii.1) Hiller Army Reserve Center, Fayette County
(A) Rehabilitate various buildings, including an unheated storage facility and parking
Project Allocation
2,500,000
(xix) Huntingdon Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xx) Lebanon Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
12,500,000
(xxi) Lewisburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
12,500,000
(xxii) Lewistown Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
12,500,000
(xxiii) Luzerne County Readiness Centers
(A) Renovate DMVA facilities in Luzerne County, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades
Project Allocation
25,000,000
(xxiv) Philadelphia/Delaware Counties Readiness Center
(A) Renovate the facility, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades for Readiness Center
Project Allocation
20,000,000
(xxv) Punxsutawney Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
7,500,000
(xxvi) South Mountain Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
7,500,000
(xxvii) Tamaqua Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
15,000,000
(xxviii) Wellsboro Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation
10,000,000
(xxix) New Readiness Center
(A) Land and/or building acquisition for new readiness center to relocate existing center in Dauphin and/or Lebanon counties
Project Allocation
20,000,000
(B) Acquisition of land and or facilities to build or renovate buildings for a new readiness center in southeastern Pennsylvania
Project Allocation
33,000,000
(xxx) Horsham Air Guard Station
(A) Acquisition, construction and other related costs for a capital improvement project
Project Allocation
15,000,000
(11) Office of Administration
(i) Commonwealth Technology Center (Reserved)
(12) Pennsylvania State Police
(i) Statewide
(A) Capital renewal of existing facilities, including site and building envelop improvements, interior renovations, building system upgrades and code-required improvements
Project Allocation
25,000,000
(B) Land acquisition or purchase of existing facility to replace existing troop headquarter buildings or provide new facilities
Project Allocation
29,000,000
(ii) Regional Forensic Laboratory
(A) Renovate and construct new laboratory in central Pennsylvania, including site and infrastructure improvements
Project Allocation
30,000,000
(iii) Pennsylvania State Police Academy and BESO Complex
(A) Additional funding for construction and other related costs for the Pennsylvania State Police Academy and BESO Complex in Derry Township, Dauphin County
Project Allocation
8,000,000
(iv) Erie Headquarters
(A) Additional funding for construction and other related costs for new headquarters in Erie County
Project Allocation
5,500,000
(v) DNA Laboratory
(A) Additional funding for design and construction of a new DNA laboratory in the City of Greensburg, Westmoreland County
Project Allocation
5,500,000
(13) State System of Higher Education
(i) Bloomsburg University
(A) Acquisition or construction of student housing
Project Allocation
98,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
25,000,000
(C) Additional funding for Waller Administration Building renovations
Project Allocation
11,000,000
(ii) California University
(A) Acquisition or construction of student housing, additional funds
Project Allocation
33,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(C) Renovations and rehabilitation of athletic facilities
Project Allocation
2,000,000
(iii) Cheyney University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(iv) Clarion University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(v) East Stroudsburg University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(vi) Edinboro University
(A) Hamilton Hall renovation
Project Allocation
25,000,000
(B) Demolition of underutilized and obsolete buildings
Project Allocation
15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(D) Renovation and rehabilitation of athletic facilities
Project Allocation
2,000,000
(vii) Indiana University
(A) Upgrade of campus utilities infrastructure
Project Allocation
40,000,000
(B) Demolition of underutilized and obsolete buildings, additional funds
Project Allocation
15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
35,000,000
(viii) Kutztown University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(B) Beeky Education Building renovation
Project Allocation
19,000,000
(ix) Lock Haven University
(A) Acquisition or construction of student housing, additional funds
Project Allocation
20,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(x) Mansfield University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(B) Renovation, replacement or upgrade of campus utilities infrastructure, additional funds
Project Allocation
5,000,000
(xi) Millersville University
(A) Renovation, replacement or upgrade of campus utilities infrastructure, additional funds
Project Allocation
21,000,000
(B) Stadium renovation
Project Allocation
15,000,000
(xii) Shippensburg University
(A) Heiges Field House renovation and addition
Project Allocation
40,000,000
(B) Old Main renovation
Project Allocation
15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
20,000,000
(xiii) Slippery Rock University
(A) Additional funds for McKay Building renovation/addition
Project Allocation
15,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
29,000,000
(xiv) West Chester University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation
32,000,000
(14) Department of Transportation
(i) Adams County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(ii) Allegheny County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 11-0
Project Allocation
10,000,000
(B) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the western training facility
Project Allocation
5,000,000
(C) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(D) Provide for the construction or renovation of maintenance facility at Fort Pitt Tunnel, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(E) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 11
Project Allocation
5,000,000
(F) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 12
Project Allocation
5,000,000
(G) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(iii) Armstrong County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(iv) Beaver County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(v) Bedford County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(vi) Berks County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(vii) Blair County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 9-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(viii) Bradford County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(ix) Bucks County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site P
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(x) Butler County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xi) Cambria County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xii) Cameron County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xiii) Carbon County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xiv) Centre County
(A) Provide for the construction or renovation of Bellefonte Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Provide for the construction or renovation of Phillipsburg Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 29
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 30
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xv) Chester County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xvi) Clarion County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xvii) Clearfield County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 2-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xviii) Clinton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 33
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 34
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xix) Columbia County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 37
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 38
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xx) Crawford County
(A) Provide for the construction or renovation of Centerville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Provide for the construction or renovation of Meadville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 19
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 20
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxi) Cumberland County
(A) Provide for the construction or renovation of Carlisle maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Provide for the construction or renovation of Lemoyne maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 45
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 46
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxii) Dauphin County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 8-0
Project Allocation
10,000,000
(B) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the material testing lab
Project Allocation
8,000,000
(C) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the fleet management facility
Project Allocation
5,000,000
(D) Construction or renovation of sign shop facility. May include site acquisition and development, design and construction of buildings and utility work
Project Allocation
5,000,000
(E) Provide for the construction or renovation of Harrisburg maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(F) Provide for the construction or renovation of Elizabethville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(G) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 47
Project Allocation
5,000,000
(H) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 48
Project Allocation
5,000,000
(I) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxiii) Delaware County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site N
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxiv) Elk County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxv) Erie County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site L
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site M
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxvi) Fayette County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 12-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxvii) Forrest County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxviii) Franklin County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site G
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxix) Fulton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site B
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 3
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxx) Greene County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site D
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxi) Huntingdon County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxii) Indiana County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 10-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxiii) Jefferson County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 25
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 26
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxiv) Juniata County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxv) Lackawanna County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 4-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 55
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxvi) Lancaster County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxvii) Lawrence County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 15
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 16
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxviii) Lebanon County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the eastern training facility
Project Allocation
5,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xxxix) Lehigh County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 5-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xl) Luzerne County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 39
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 53
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 54
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xli) Lycoming County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 3-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlii) McKean County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xliii) Mercer County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site E
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 17
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 18
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xliv) Mifflin County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlv) Monroe County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site F
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 41
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlvi) Montgomery County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 6-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlvii) Montour County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 35
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 36
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlviii) Northampton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(xlix) Northumberland County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(l) Perry County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(li) Philadelphia County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lii) Pike County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site K
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot, and sewage plant upgrades, at roadside rest area - Site 61
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 62
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(liii) Potter County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(liv) Schuylkill County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lv) Snyder County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lvi) Somerset County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lvii) Sullivan County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lviii) Susquehanna County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site H
Project Allocation
5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 56
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition, or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lix) Tioga County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site T
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lx) Union County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxi) Venango County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 1-0
Project Allocation
10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 21
Project Allocation
5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 22
Project Allocation
5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxii) Warren County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxiii) Washington County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Provide for the construction or renovation of West Brownsville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site A
Project Allocation
5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxiv) Wayne County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxv) Westmoreland County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxvi) Wyoming County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000
(lxvii) York County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation
7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site J
Project Allocation
5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation
5,000,000