Section 6. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Adams County
(i) County projects
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other associated costs for the development of WellSpan Health health care facilities
Project Allocation
5,000,000
(ii) Adams County Industrial Development Authority
(A) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction
Project Allocation
10,000,000
(B) Acquisition, site preparation, remediation, renovation, construction, redevelopment, infrastructure and other associated costs for a community and economic development project
Project Allocation
5,000,000
(C) Site preparation, acquisition, infrastructure, rehabilitation, renovation, construction and other related costs for the construction, expansion and adaptive reuse of Bermudian Springs buildings in Huntingdon Township
Project Allocation
2,000,000
(D) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the redevelopment of the Berlin Junction Manufacturing Center site in Oxford Township
Project Allocation
5,000,000
(E) Site preparation, remediation, acquisition, renovation, construction, redevelopment, infrastructure and other associated costs for the redevelopment of former foundry site
Project Allocation
3,500,000
(iii) Butler Township
(A) Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs associated with the construction of a municipal and emergency services facility
Project Allocation
2,500,000
(iv) Reading Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, flood mitigation, renovation and other related costs for the complete replacement of an existing spillway at Lake Meade Dam with a three-stage labyrinth spillway, including the installment of a system to control the release capacity of the spillway to accommodate Department of Environmental Protection requirements
Project Allocation
5,000,000
(2) Allegheny County
(i) County projects
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation
30,000,000
(B) Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the field of automation, transportation and technology
Project Allocation
600,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
30,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
30,000,000
(E) Acquisition, construction, redevelopment, rehabilitation, infrastructure and other costs related to an elementary school building project in the Steel Valley School District
Project Allocation
2,000,000
(F) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for SteelBridge Land Management, LLC, and its affiliates
Project Allocation
25,000,000
(G) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities
Project Allocation
35,000,000
(i.1) City of Pittsburgh Urban Redevelopment Authority
(A) Construction, renovation, infrastructure and other costs related to HVAC, boilers, lighting improvements and other building system upgrades at the Squirrel Hill facility of the JCC of Greater Pittsburgh
Project Allocation
750,000
(B) Construction, infrastructure and other costs related to a new medical center and office building complex for Primary Care Health Services in Homewood
Project Allocation
7,500,000
(ii) Moon Transportation Authority
(A) Construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for development projects along Stevenson Mill and Rouser Road Connectors and adjacent areas in Moon Township
Project Allocation
5,000,000
(iii) Allegheny County Airport Authority
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for the development of industrial and commercial sites at or surrounding Pittsburgh International Airport
Project Allocation
50,000,000
(iv) Pittsburgh Gateways Corporation
(A) Construction, infrastructure, redevelopment, rehabilitation and other related costs for the Energy Innovation Center and related projects in accordance with Pittsburgh Gateway's mission
Project Allocation
6,000,000
(B) Economic development projects in southwest Pennsylvania
Project Allocation
6,000,000
(iv.1) Redevelopment Authority of Allegheny County
(A) Acquisition, construction, infrastructure and other related costs for an economic development project in Oakmont Borough
Project Allocation
5,000,000
(B) Construction, infrastructure, rehabilitation and other costs related to the construction of housing for individuals with intellectual and physical disabilities in Ross Township
Project Allocation
800,000
(C) Demolition, environmental assessment, planning, remediation, rehabilitation, site preparation, infrastructure, construction and other related costs associated with the redevelopment of a former power generation facility
Project Allocation
10,000,000
(D) Construction, infrastructure and other related costs associated with the development of a teaching and research facility at Chatham University's Eden Hall campus
Project Allocation
2,000,000
(iv.2) Urban Redevelopment Authority of Pittsburgh
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for a redevelopment project on land owned or controlled by Bethel A.M.E. Church in the Hill District Neighborhood
Project Allocation
20,000,000
(v) Pittsburgh
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to the UPMC Children's Hospital of Pittsburgh
Project Allocation
30,000,000
(vi) City of Clairton
(A) Construction, acquisition, infrastructure, renovation and other related costs leading to economic development projects in the city
Project Allocation
5,000,000
(vi.1) City of McKeesport
(A) Construction, rehabilitation, infrastructure, renovation and other related costs for the redevelopment of the Carnegie Library of McKeesport
Project Allocation
500,000
(vii) City of Pittsburgh
(A) Construction, infrastructure, renovation, rehabilitation and abatement of hazardous materials associated with the development of a manufacturing facility with associated parking structure
Project Allocation
10,000,000
(B) Construction, acquisition, infrastructure, renovation and rehabilitation for a construction project that will expand the History Center
Project Allocation
5,000,000
(C) Construction, infrastructure, renovation and rehabilitation of structures and public open space assessments
Project Allocation
5,000,000
(D) Construction, acquisition, infrastructure improvements, abatement of hazardous materials, renovation and rehabilitation related to the development of Hazelwood Green in the Greater Hazelwood neighborhood
Project Allocation
50,000,000
(E) Construction, infrastructure improvement, renovation, rehabilitation and other related costs to create apartment-style living arrangements for individuals with disabilities
Project Allocation
5,000,000
(F) Acquisition, construction, infrastructure, redevelopment, and all other related costs for Carrick redevelopment projects
Project Allocation
20,000,000
(G) Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of a former brownfield site in Squirrel Hill and Swisshelm Park neighborhoods
Project Allocation
20,000,000
(H) Acquisition, construction, infrastructure, redevelopment and other costs related to the Homewood redevelopment projects
Project Allocation
20,000,000
(I) Acquisition, construction, infrastructure, redevelopment and other costs related to a mixed-use affordable housing development in the Homewood Business district
Project Allocation
20,000,000
(J) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Homewood Avenue
Project Allocation
25,000,000
(K) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Second Avenue
Project Allocation
25,000,000
(L) Construction and acquisition relating to the redevelopment of the Forest Hills - Chalfant Westinghouse Site
Project Allocation
1,500,000
(M) Renovation, rehabilitation and other costs related to Phase 2 of this project, including the renovation of the 23 units in the former three-story Highlander building
Project Allocation
1,300,000
(N) Renovation, rehabilitation and other costs related to the remediation and site infrastructure improvements to the former Westinghouse Atomy Smasher facility and site
Project Allocation
10,000,000
(O) Construction, acquisition, renovation, rehabilitation and other costs related to the redevelopment project of the Trade Institute of Pittsburgh to renovate a nearby property into short-term workforce housing
Project Allocation
500,000
(P) Construction, renovation and rehabilitation of an updated and expanded facility for the Jubilee Soup Kitchen
Project Allocation
1,000,000
(Q) Acquisition, construction, infrastructure, redevelopment and all other related costs for Garfield redevelopment projects
Project Allocation
20,000,000
(R) Acquisition, construction, infrastructure, redevelopment and all other related costs for Fairywood Industrial Park redevelopment projects
Project Allocation
20,000,000
(S) Acquisition, construction, infrastructure, redevelopment and other related costs for the redevelopment of the former J. Allen Steel site redevelopment projects
Project Allocation
60,000,000
(T) Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Greater Hill District neighborhoods of Pittsburgh
Project Allocation
20,000,000
(U) Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Uptown neighborhood of Pittsburgh
Project Allocation
20,000,000
(V) Acquisition, construction, infrastructure, redevelopment and other related costs for Beechview redevelopment projects
Project Allocation
20,000,000
(W) Acquisition, construction, infrastructure, redevelopment and other related costs for Sheraden redevelopment projects
Project Allocation
20,000,000
(X) Acquisition, construction, infrastructure, redevelopment and other related costs for Warrington Avenue redevelopment projects
Project Allocation
20,000,000
(Y) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Centre Avenue
Project Allocation
25,000,000
(Z) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Perrysville Avenue
Project Allocation
25,000,000
(AA) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Chartiers Avenue
Project Allocation
25,000,000
(BB) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - East Warrington Avenue
Project Allocation
25,000,000
(CC) Acquisition, construction, infrastructure and other related costs for the redevelopment of the Clack site in Lawrenceville
Project Allocation
20,000,000
(DD) Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Manchester neighborhood
Project Allocation
20,000,000
(EE) Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Perry South neighborhood
Project Allocation
20,000,000
(FF) Acquisition, construction, infrastructure, redevelopment and other related costs for Chartiers City redevelopment projects
Project Allocation
20,000,000
(GG) Acquisition, construction, infrastructure, redevelopment and other related costs for Elliot redevelopment projects
Project Allocation
20,000,000
(HH) Acquisition, construction, infrastructure and other related costs for public park expansion project
Project Allocation
20,000,000
(II) Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront redevelopment project
Project Allocation
20,000,000
(JJ) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Larimer Avenue
Project Allocation
25,000,000
(KK) Acquisition, construction, infrastructure, redevelopment and other costs related to East Liberty redevelopment projects
Project Allocation
20,000,000
(LL) Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of strategic brownfield sites
Project Allocation
50,000,000
(MM) Acquisition, construction, infrastructure, redevelopment and all other related costs for transit-oriented development projects
Project Allocation
50,000,000
(NN) Acquisition, construction, infrastructure, redevelopment and all other related costs for developing closed schools and historic churches for housing, office or commercial uses
Project Allocation
50,000,000
(OO) Acquisition, construction, infrastructure, redevelopment and all other related costs for Innovation and Entrepreneurship Center projects
Project Allocation
50,000,000
(PP) Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh-based advanced technology and incubator development projects
Project Allocation
50,000,000
(QQ) Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh riverfront redevelopment projects
Project Allocation
50,000,000
(RR) Acquisition, construction, infrastructure and other related costs for mixed-use development on Penn Avenue from Shady Avenue to Fifth Avenue in the Larimer and East Liberty sections of Pittsburgh
Project Allocation
250,000,000
(SS) Construction, renovation, rehabilitation and other costs related to the next phase of the museum's growth on Pittsburgh's North Side, including redevelopment and maintenance to buildings and grounds
Project Allocation
5,000,000
(TT) Acquisition, construction, infrastructure and other related costs for Pittsburgh riverfront redevelopment projects
Project Allocation
14,000,000
(UU) Renovation, rehabilitation and other costs relating to the renovation of a commercial building to house Work Hard Pittsburgh's expanded coworking, media production, meeting and maker spaces
Project Allocation
1,000,000
(VV) Construction, infrastructure, renovation, rehabilitation and other costs related to the rehabilitation and renovation of Saints Peter and Paul Church
Project Allocation
10,000,000
(WW) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, and other costs related to infrastructure improvements to libraries within the Allegheny County Library System
Project Allocation
10,000,000
(XX) Acquisition, construction, infrastructure and other related costs for mixed-use development, including residential, retail, parking and offices within the Boulevard of the Allies, Halket, Zulema and McKee Place in Oakland
Project Allocation
200,000,000
(YY) Construction, infrastructure, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment at and adjacent to 2400 East Carson Street in Pittsburgh's South Side
Project Allocation
2,500,000
(ZZ) Construction and other costs related to the development of a multiphased, mixed-use knowledge community in the Pittsburgh Innovation District
Project Allocation
10,000,000
(AAA) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to redevelopment located at the former Wholey building in the Strip District
Project Allocation
20,000,000
(BBB) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure construction and remediation projects throughout the region
Project Allocation
50,000,000
(CCC) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Sky Car project
Project Allocation
15,000,000
(DDD) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Downtown Commercial Office Conversion Program project
Project Allocation
50,000,000
(EEE) Infrastructure, improvements, redevelopment, construction and other related costs for the renovation of the Historic Crawford Grill facility
Project Allocation
3,000,000
(FFF) Infrastructure, renovation, rehabilitation and other related costs for an economic development project
Project Allocation
3,000,000
(GGG) Construction, infrastructure, renovation and other related costs for the redevelopment and expansion of the Pittsburgh Ballet Theatre
Project Allocation
5,000,000
(HHH) Construction, infrastructure, renovation, rehabilitation and other related costs for the development of the Marketplace of Ideas initiative
Project Allocation
3,000,000
(III) Construction, rehabilitation, infrastructure, renovation and other related costs for the development of a facility for the Humane Animal Rescue of Pittsburgh
Project Allocation
2,500,000
(JJJ) Construction, infrastructure, site preparation, rehabilitation and other related costs for the redevelopment of Beth Shalom Synagogue
Project Allocation
2,500,000
(KKK) Construction, site preparation, demolition, infrastructure, acquisition and other costs related to the expansion and renovation of a STEM laboratory
Project Allocation
2,000,000
(LLL) Construction, infrastructure and other costs related to the redevelopment of the National Aviary in Pittsburgh
Project Allocation
10,000,000
(MMM) Construction, redevelopment and other related costs for the development of an advanced biotechnology center at Carnegie Mellon University
Project Allocation
10,000,000
(NNN) Construction, redevelopment and other related costs for an economic development project at Carnegie Mellon University
Project Allocation
5,000,000
(OOO) Renovation, rehabilitation and other related costs for the redevelopment of the DePaul School for Hearing and Speech
Project Allocation
625,000
(PPP) Construction, renovation, infrastructure improvements and other related costs for the Kingsley Association in the neighborhood of Larimer
Project Allocation
6,000,000
(viii) Bethel Park Borough
(A) Construction, rehabilitation and other related costs for the improvement of the Irishtown, Patterson and Logan intersection with a roundabout
Project Allocation
1,300,000
(B) Construction, infrastructure, redevelopment, rehabilitation and other related costs for the expansion of the Montour Trail and construction of sidewalks for pedestrians
Project Allocation
600,000
(viii.1) Braddock Borough
(A) Acquisition, construction, infrastructure and other related costs for the development of a facility for Braddock Arts and Media
Project Allocation
2,000,000
(B) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of a building
Project Allocation
500,000
(viii.2) Bradford Woods Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation
1,000,000
(ix) Brentwood Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to facilities at AHN Brentwood Neighborhood Hospital
Project Allocation
10,000,000
(B) Construction, redevelopment and other related costs for Brentwood Municipal Public Safety Center
Project Allocation
3,000,000
(C) Construction, redevelopment and other related costs for Brentwood Municipal Stadium
Project Allocation
1,000,000
(ix.1) Crafton Borough
(A) Crafton Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including improvements and upgrades to borough facilities
Project Allocation
5,000,000
(x) Etna Borough
(A) Acquisition, construction, infrastructure and other related costs for residential, mixed-use and retail development
Project Allocation
10,000,000
(x.1) Franklin Park Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation
1,000,000
(x.2) Green Tree Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Parkway Center Mall project as well as improvements and renovations to borough facilities
Project Allocation
10,000,000
(x.3) Ingram Borough
(A) Ingram Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects in the borough, including improvements and upgrades to borough facilities
Project Allocation
5,000,000
(xi) Borough of Jefferson Hills
(A) Acquisition, construction, infrastructure and other related costs for consolidation of existing and outdated fire stations into a new facility
Project Allocation
1,000,000
(B) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for facility upgrades and renovations for the Steel Center
Project Allocation
14,636,150
(xi.1) McKees Rocks Borough
(A) Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including replacement or renovation of the Borough Building or other borough facilities
Project Allocation
10,000,000
(xi.2) Mt. Oliver Borough
(A) Acquisition, construction, infrastructure and other related costs for Brownsville Road Corridor development projects
Project Allocation
2,500,000
(xi.3) Oakmont Borough and Plum Borough
(A) Acquisition, construction, environmental remediation, infrastructure improvements, storm water management and other related costs for economic development initiatives at an outdoor facility and surrounding areas which host amateur and professional sporting events
Project Allocation
10,000,000
(xii) Sharpsburg Borough and O'Hara Township
(A) Construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs associated with the development of a site along the Allegheny River
Project Allocation
15,000,000
(xii.1) Swissvale Borough
(A) Acquisition, construction, infrastructure, site preparation, demolition and other related costs for the development of a municipal building
Project Allocation
1,000,000
(xii.2) Thornburg Borough
(A) Renovation, rehabilitation, general construction, infrastructure, acquisition and redevelopment within the borough, including, but not limited to, improvements and upgrades to borough facilities
Project Allocation
2,500,000
(xiii) Wilkinsburg Borough
(A) Renovation and rehabilitation of Community Forge to modernize key parts of the facility
Project Allocation
750,000
(B) Construction, acquisition and other costs relating to the redevelopment of the Ardmore Boulevard Texaco Station site
Project Allocation
1,750,000
(C) Construction and other costs related to the Wilkinsburg Townhome Development
Project Allocation
1,750,000
(xiv) Wilmerding Borough
(A) Acquisition, construction, infrastructure and other costs related to the expansion of Allegheny Petroleum Products
Project Allocation
20,000,000
(xiv.1) Elizabeth Township
(A) Construction, infrastructure and other related costs to convert a brownfield into a utility-scale solar field
Project Allocation
10,000,000
(xv) Harmar Township
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Harmar Neighborhood Hospital
Project Allocation
10,000,000
(xv.1) Marshall Township
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation
1,000,000
(xvi) McCandless Township
(A) Acquisition, construction, infrastructure, redevelopment, and other related costs for facilities at AHN McCandless Neighborhood Hospital
Project Allocation
10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to infrastructure and renovation of the A.W. Beattie Career Center
Project Allocation
5,000,000
(xvii) North Versailles Township
(A) Acquisition, construction, infrastructure, renovation, rehabilitation and other related costs for economic development projects and the construction of a new township building complex
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure and other related costs for historic, cultural or civic and economic development
Project Allocation
10,000,000
(xviii) Pine Township
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Wexford Hospital
Project Allocation
10,000,000
(B) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation
1,000,000
(xviii.1) Scott Township
(A) Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment project, including, but not limited to, renovation or replacement of the township building or other township facilities
Project Allocation
15,000,000
(xix) South Fayette Township
(A) Construction, infrastructure, redevelopment and other related costs for a municipal complex, police station and administration offices
Project Allocation
6,000,000
(xx) South Park Township
(A) Construction, infrastructure, redevelopment, rehabilitation and other related costs for an addition to existing building
Project Allocation
500,000
(B) Construction, redevelopment, rehabilitation and other related costs for the reconstruction of Route 88 and Brownsville Road intersection, including sidewalks
Project Allocation
800,000
(xxi) Town of McCandless
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation
1,000,000
(B) Construction and renovation of municipal facilities and park areas in the Town of McCandless
Project Allocation
1,000,000
(3) Armstrong County
(i) County projects
(A) Site development, construction and other related costs for relocation of the ARC Manor residential facility to property in the West Hills Industrial Park
Project Allocation
2,000,000
(B) Acquisition, infrastructure, construction and other related costs for an on-campus, assisted living/senior housing facility adjacent to the Armstrong Center for Medicine and Health (ACMH), including expansion, acquisition of properties and buildings, renovations and equipment upgrades at ACMH facilities
Project Allocation
10,000,000
(C) Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space at Butler County Community College
Project Allocation
1,750,000
(D) Acquisition, construction and other related costs for the improvement of the South Bend Quarry lightweight aggregate production facility
Project Allocation
5,000,000
(4) Beaver County
(i) County projects
(A) Construction, infrastructure and other related costs for public works building and fire station in Big Beaver Borough
Project Allocation
500,000
(B) Construction, infrastructure and other related costs for rehabilitation of the Legacy Dining Hall at Pine Valley Camp, including roofing, steel structure, enclosures, utilities and fire suppression services
Project Allocation
1,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for an emergency services garage, training and storage facility in the Borough of Ambridge
Project Allocation
2,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(F) Redevelopment, restoration and other related costs for the former Pittsburgh and Lake Erie Railroad passenger station to be used as a multipurpose meeting and event space
Project Allocation
1,000,000
(G) Construction, infrastructure and other related costs for a public works building and fire station in Big Beaver Borough
Project Allocation
500,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(K) Acquisition, infrastructure, construction and other related costs for expansion of multiuse community operational food facilities and headquarters for Crop and Kettle
Project Allocation
3,000,000
(ii) Beaver County Corporation for Economic Development
(A) Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility
Project Allocation
1,000,000
(B) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of industrial properties located within Ellwood City
Project Allocation
15,000,000
(C) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located within Potter Township
Project Allocation
15,000,000
(D) Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility
Project Allocation
1,000,000
(E) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located in Potter Township
Project Allocation
15,000,000
(iii) Redevelopment Authority of Beaver County
(A) Renovation and rehabilitation of patient rooms and corridors at Heritage Valley Beaver Hospital facility
Project Allocation
1,000,000
(B) Rehabilitation, construction and other related costs for renovations to radiology department at Heritage Valley Beaver Hospital facility
Project Allocation
1,000,000
(iii.1) City of Aliquippa
(A) Acquisition, construction, infrastructure and other related costs for a business or manufacturing facility associated with the petrochemical industry
Project Allocation
10,000,000
(B) Infrastructure, demolition, construction and other related costs for rehabilitation and renovation of the high school stadium
Project Allocation
2,000,000
(iii.2) Ambridge Borough
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a health, wellness and sports complex that will include exercise space and indoor athletic courts
Project Allocation
5,000,000
(iv) Baden Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project
Project Allocation
5,000,000
(iv.1) Conway Borough
(A) Acquisition, site preparation, renovation, remediation, demolition, construction, infrastructure and other related costs to be used for a municipal building project
Project Allocation
3,000,000
(v) Ellwood City Borough
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment projects
Project Allocation
15,000,000
(vi) Harmony Township
(A) Construction, infrastructure and other related costs for CNG conversion project
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park
Project Allocation
20,000,000
(C) Construction, infrastructure and other related costs for CNG conversion project
Project Allocation
1,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park
Project Allocation
20,000,000
(5) Bedford County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for the Mission Critical Solutions Expansion project
Project Allocation
750,000
(B) Design, engineering, demolition, renovation and construction for a community center and office space to house service providers and resources that promote self-sufficiency and community and economic development in Snake Spring Township
Project Allocation
606,000
(ii) Bedford County Development Association
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects in the county
Project Allocation
5,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of a community development project
Project Allocation
5,000,000
(iii) Bedford County Economic Development Corporation
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk
Project Allocation
5,000,000
(6) Berks County
(i) County projects
(A) Construction, infrastructure, redevelopment and other related costs for a St. Luke's Medical Office Building in Ontelaunee Township
Project Allocation
5,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials related to an affordable, accessible and inclusive apartment complex and community and education center in the county
Project Allocation
5,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials relating to economic projects in the county
Project Allocation
30,000,000
(D) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation
10,000,000
(E) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation
10,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(G) Acquisition, infrastructure, construction and other related costs for development of 104 acres for expansion of Reading Health System
Project Allocation
3,500,000
(H) Acquisition, construction, infrastructure, redevelopment and other related costs for projects for Berks County Community Health Center
Project Allocation
15,000,000
(I) Rehabilitation of railroad, including track improvements, siding extensions, visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties
Project Allocation
10,000,000
(ii) Berks County Redevelopment Authority
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for sewer-related services extension for the Blue Rock Bowman Business Center
Project Allocation
3,000,000
(B) Redevelopment, infrastructure, construction and other related costs for a business expansion project in the county
Project Allocation
10,000,000
(C) Rehabilitation, infrastructure, renovation, abatement of hazardous materials, construction and other related costs for redevelopment of Titus Station, a 200-acre industrial-zoned property in the county
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, rehabilitation and other related costs for expansion of Frecon Farms
Project Allocation
5,000,000
(ii.1) Reading Redevelopment Authority
(A) Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 212 S. 8th Street and surrounding properties
Project Allocation
10,000,000
(B) Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 7th Street and Franklin Street as well as surrounding properties
Project Allocation
10,000,000
(ii.2) Berks County Industrial Development Authority
(A) Acquisition, construction, infrastructure, renovation and other related costs for development projects in Berks County
Project Allocation
10,000,000
(iii) City of Reading
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment and rehabilitation of several buildings and properties in the area of 7th and Franklin Streets
Project Allocation
30,000,000
(B) Construction, infrastructure, acquisition, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Performing Arts Center
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Arena
Project Allocation
10,000,000
(D) Construction, acquisition, infrastructure, renovation and rehabilitation of a project involving the building of a new state-of-the-art early learning academy, with related academic training and support programs
Project Allocation
16,500,000
(E) Renovation, rehabilitation and infrastructure relating to upgrades and renovations to an existing structure for the Reading Area Community College Weitz Health Pavilion
Project Allocation
10,000,000
(F) Construction, acquisition, infrastructure, renovation and rehabilitation relating to a new support or academic facility for college and community use
Project Allocation
5,000,000
(G) Renovation, restoration, construction, infrastructure improvements and other related costs to enhance and modernize the Reading Public Museum
Project Allocation
5,000,000
(H) Construction, infrastructure and other related costs for an early learning center at Albright College
Project Allocation
1,500,000
(I) Construction, infrastructure and other related costs for Albright College Co-Generation Plant expansion project
Project Allocation
2,500,000
(J) Construction, infrastructure and other related costs for Albright College Track and Field Facility project
Project Allocation
1,500,000
(K) Construction, infrastructure and other related costs for Albright College Library Holocaust Resource Center project
Project Allocation
500,000
(L) Renovation, restoration, reconstruction, infrastructure improvements and related costs for Reading Public Museum
Project Allocation
1,112,000
(M) Construction, infrastructure improvements and other related costs for installation of a natural gas refueling station at Evergreen Community Power site
Project Allocation
5,000,000
(N) Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for redevelopment of existing building at Evergreen Community Power site
Project Allocation
5,000,000
(O) Construction, infrastructure improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation project
Project Allocation
600,000
(P) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement project
Project Allocation
1,178,000
(iii.1) Bernville Borough
(A) Acquisition, construction and other related costs for a new borough hall, library, police department, fire station and community center at the same location
Project Allocation
3,500,000
(iii.2) Mohnton Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for a Holocaust Museum
Project Allocation
1,750,000
(iii.3) West Reading Borough
(A) Acquisition, infrastructure, renovations and other related costs for Reading Health System surgical tower and related facilities
Project Allocation
3,500,000
(iv) Wyomissing Borough
(A) Acquisition, demolition, environmental remediation, infrastructure, site work, redevelopment, construction and related costs for blighted and underutilized sites intended for redevelopment
Project Allocation
10,000,000
(v) Bern Township
(A) Construction, acquisition, redevelopment and other costs to develop a portion of Reading Regional Airport Authority-owned land for an end-user, with the potential for a maintenance and overhaul (MRO) operator and amenities other than fuel
Project Allocation
8,400,000
(B) Construction, infrastructure, redevelopment, renovation and other related costs for Penn State Health St. Joseph Regional Medical Center
Project Allocation
6,000,000
(v.1) Maxatawny Township
(A) Acquisition, construction, infrastructure, renovation and other related costs for an expansion project at the Rodale Institute
Project Allocation
5,000,000
(vi) Muhlenberg Township
(A) Construction, facility improvements and renovations for the KidsPeace Berks campus
Project Allocation
1,000,000
(B) Acquisition, infrastructure, renovations and other related costs for NKG Metals facility redevelopment and reuse project
Project Allocation
5,000,000
(C) Acquisition, infrastructure, renovations and other related costs for Fifth Street Highway Corridor revitalization project
Project Allocation
10,000,000
(vii) Ontelaunee Township
(A) Design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a copper tubing manufacturing facility
Project Allocation
3,000,000
(7) Blair County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Nason Medical Center
Project Allocation
5,000,000
(B) Acquisition, construction, restoration, historic preservation and other related costs for a rail heritage development project with the Railroaders Memorial Museum
Project Allocation
40,000,000
(ii) Altoona-Blair County Development Corporation
(A) Construction, infrastructure, rehabilitation and other related costs for upgrades and improvements to the Peoples Natural Gas Field baseball stadium
Project Allocation
10,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a facility or facilities of the Southern Alleghenies Museum of Art
Project Allocation
1,000,000
(8) Bradford County
(i) (Reserved)
(9) Bucks County
(i) County projects
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network Facility 1
Project Allocation
10,000,000
(B) Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of bridges, trails, locks and other structures along Delaware Canal State Park
Project Allocation
3,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a life sciences advance manufacturing facility
Project Allocation
15,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction or renovation of buildings in order to utilize renewable energy or manufacture products to produce renewable energy
Project Allocation
5,000,000
(E) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects
Project Allocation
5,000,000
(F) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to a community mental health crisis center
Project Allocation
2,500,000
(G) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition, renovation and construction of facilities for workforce development
Project Allocation
5,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(ii) Bucks County Industrial Development Authority
(A) Construction, infrastructure, renovation and other related costs for water, sewer, commercial and industrial projects in Bensalem Township
Project Allocation
3,000,000
(B) Acquisition, construction, infrastructure and abatement of hazardous materials for a mixed-use development project in Quakertown Borough
Project Allocation
5,000,000
(C) Acquisition of land and other related costs for future construction and manufacturing expansion at the Klover III Panel Shop
Project Allocation
5,000,000
(D) Acquisition, construction and other related costs for future construction of a crane-served building for increased engineering-related and manufacturing-related job expansion at the Klover III Panel Shop
Project Allocation
11,000,000
(E) Construction, acquisition, infrastructure, redevelopment and other costs related to a mixed-use development project located at the corner of West Broad and Front Streets in Quakertown Borough
Project Allocation
2,500,000
(F) Acquisition, construction and other related costs to purchase a prepared storage yard and construct a crane-served building for Klover Contracting in Richland Township
Project Allocation
7,250,000
(iii) Redevelopment Authority of the County of Bucks
(A) Infrastructure, redevelopment, renovation, rehabilitation and other related costs to repurpose a former military site in Warminster Township
Project Allocation
5,000,000
(B) Infrastructure, redevelopment and other related costs for an economic development project along the Delaware River in Bensalem Township
Project Allocation
5,000,000
(C) Construction, redevelopment, renovation and other related costs for a historic building in Bristol Borough
Project Allocation
500,000
(D) Construction, redevelopment and infrastructure for the installation of curbs and sidewalks and storm water management in Bensalem Township
Project Allocation
5,000,000
(E) Construction, redevelopment, rehabilitation and other related costs for the Mill Race Inn site in Northampton Township
Project Allocation
3,000,000
(F) Acquisition, construction, infrastructure, hazardous material remediation and other related costs for the Neshaminy Mall site in Bensalem Township
Project Allocation
10,000,000
(G) Acquisition and construction for corporate headquarters development project in Bensalem Township
Project Allocation
10,000,000
(H) Acquisition, rehabilitation, infrastructure, flood mitigation and associated costs for a riverfront redevelopment project
Project Allocation
10,000,000
(iv) Bristol Borough
(A) Acquisition, construction and infrastructure for a new consolidated fire station in the borough
Project Allocation
1,500,000
(v) Doylestown Borough
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation of a former PennDOT building and construction of additional structures for a regional police facility and mixed-use complex
Project Allocation
2,500,000
(vi) Morrisville Borough
(A) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition and renovation of an existing building for affordable housing
Project Allocation
3,000,000
(vii) New Hope Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the land acquisition and construction of a parking garage
Project Allocation
4,000,000
(viii) Perkasie Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Pennridge Airport Business Park
Project Allocation
10,000,000
(B) Construction, infrastructure, redevelopment and other related costs for a retail/entertainment development project in downtown Perkasie Borough
Project Allocation
750,000
(ix) Bensalem Township
(A) Construction and other related costs for the installation of a new drainage infrastructure project for the Bensalem Township County Club
Project Allocation
1,000,000
(B) Construction and renovation of a recreational facility located in the township
Project Allocation
1,000,000
(x) Bristol Township
(A) Infrastructure, construction and other related costs for a new fire and rescue services building in the township
Project Allocation
2,500,000
(B) Infrastructure, construction and other related costs for a new fire and rescue services building
Project Allocation
2,500,000
(C) Construction, reconstruction, renovation, infrastructure, improvements related to energy, transportation, parking and common areas and all other related costs for expansion and renovation of an existing facility
Project Allocation
5,000,000
(D) Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the redevelopment of buildings and facilities at Lower Bucks Hospital
Project Allocation
525,000
(xi) Buckingham Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development of the PA Biotechnology Center Research Clusters
Project Allocation
10,000,000
(xii) Doylestown Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former county nursing home into a mixed-use facility
Project Allocation
5,000,000
(B) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the renovation and construction of a forensic diversion, treatment and rehabilitation center for mental health and substance abuse treatment and rehabilitation on land owned by Bucks County
Project Allocation
4,000,000
(xiii) Doylestown Township and New Britain Borough
(A) Construction, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the construction and renovation of three major capital projects at the Delaware Valley University relating to a mixed-use, multigenerational housing and health care development; the redevelopment of the campus gateway and main entrance to include a boutique hotel and conference center; and renovations to student housing buildings
Project Allocation
40,000,000
(xiv) Falls Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of a historic fire house to accommodate necessary fire equipment, firefighter accommodations and a community room
Project Allocation
200,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Keystone Trade Center Project
Project Allocation
10,000,000
(xv) Lower Makefield Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction and/or renovation of Municipal Complex and Police Department
Project Allocation
10,000,000
(xvi) Lower Southampton Township
(A) Construction, renovation and other related costs for projects at a swimming complex located in the township
Project Allocation
1,000,000
(xvii) Middletown Township
(A) Infrastructure, construction, demolition, abatement of hazardous materials and other related costs for redevelopment of the township's Department of Public Works yard and facilities
Project Allocation
5,000,000
(B) Construction, redevelopment and other related costs for a new education and training building and the renovation of an existing building for Woods Education and Training Center
Project Allocation
1,000,000
(xviii) Northampton Township
(A) Construction, infrastructure and other related costs for a new fire station
Project Allocation
2,000,000
(xviii.1) Plumstead Township
(A) Construction, renovation and other related costs for renovations to Plumsteadville Volunteer Fire Company Station 24
Project Allocation
800,000
(B) Demolition, construction and other related costs for the demolition of an old fire house and the construction of a replacement structure for Plumsteadville Volunteer Fire Company Station 20
Project Allocation
600,000
(xix) Richland Township
(A) Acquisition, construction, infrastructure and other related costs for the expansion of St. Luke's Upper Bucks Campus to meet the growing health care needs of the community
Project Allocation
10,000,000
(xx) Solebury Township
(A) Construction, infrastructure and other related costs to build a new facility and parking areas for the Bucks County Children's Museum
Project Allocation
500,000
(xxi) Warwick Township
(A) Construction of sidewalks and street frontages in the township
Project Allocation
1,500,000
(10) Butler County
(i) County projects
(A) Site preparation, environmental remediation, development and redevelopment, infrastructure, construction and other related costs for economic development in the county
Project Allocation
15,000,000
(B) Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the fields of automation, transportation and technology
Project Allocation
600,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(ii) Butler County Community Development Corporation
(A) Acquisition, infrastructure, abatement of hazardous materials, rehabilitation, construction and other related costs for a Bantam Jeep Events Center
Project Allocation
2,000,000
(iii) Cranberry Township
(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of the Kawneer facilities
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for parks, recreational and open space in the township
Project Allocation
2,000,000
(C) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for economic development projects in the township
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for the Cranberry Township Municipal Center
Project Allocation
2,500,000
(E) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for township-owned facilities
Project Allocation
5,000,000
(iv) Slippery Rock Township
(A) Acquisition, infrastructure, renovation, redevelopment, construction and other related costs for Slippery Rock University Foundation development
Project Allocation
1,500,000
(v) Zelienople Borough
(A) Construction, infrastructure, redevelopment and other related costs for development of Sensory House Museum on Glade Run's Zelienople campus for individuals with autism and other developmental disabilities
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a new fire station for Harmony Fire District
Project Allocation
2,500,000
(11) Cambria County
(i) County projects
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center
Project Allocation
2,500,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a cultural, civic and historical community development project
Project Allocation
5,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a regional economic development project
Project Allocation
5,000,000
(D) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Health System
Project Allocation
5,000,000
(E) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an economic development project at John Murtha Johnstown-Cambria County Airport
Project Allocation
5,000,000
(F) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an infrastructure and facility improvement project at Saint Francis University
Project Allocation
7,500,000
(G) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of any Conemaugh Health System new or existing facility located in the county
Project Allocation
5,000,000
(H) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of an economic development project located at the John Murtha Johnstown-Cambria County Airport in Richland Township
Project Allocation
5,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(J) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(K) Construction, acquisition, redevelopment and other related costs for the installation of communications infrastructure in the county
Project Allocation
9,000,000
(L) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of building and grounds, and all other related costs for the development of a Community Health Wellness and Recreation Facility in the county
Project Allocation
10,000,000
(i.1) Cambria County Redevelopment Authority
(A) Acquisition, renovation, redevelopment, construction, infrastructure and other related costs for the development of the Mid Atlantic Opportunity Park at Jack Murtha Cambria County Airport
Project Allocation
10,000,000
(ii) City of Johnstown
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvement, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of the Cambria County War Memorial
Project Allocation
5,000,000
(B) Construction and other related costs of a new firehouse and Public Safety Administration Building for the city
Project Allocation
3,000,000
(C) Economic development activities, including acquisition, construction, demolition, rehabilitation, infrastructure, installation of energy-efficient equipment and systems, for a pharmaceutical manufacturing facility
Project Allocation
10,000,000
(D) Construction, infrastructure, acquisition, renovation, rehabilitation and other related costs to upgrade a facility at the Cambria County War Memorial site
Project Allocation
1,000,000
(E) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs to develop a civic center in the city
Project Allocation
3,000,000
(F) Acquisition, construction, demolition, rehabilitation, infrastructure, energy systems and equipment and other related costs for a pharmaceutical manufacturing facility
Project Allocation
10,000,000
(iii) Cresson Township
(A) Acquisition, construction, demolition, renovation, rehabilitation, infrastructure and other related costs for the Mount Aloysius College campus
Project Allocation
10,000,000
(B) Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of Ihmsen Hall at Mount Aloysius College
Project Allocation
5,000,000
(12) Cameron County
(i) (Reserved)
(13) Carbon County
(i) County projects
(A) Construction, site development, infrastructure and other related costs for an educational facility located at Lehigh Carbon Community College
Project Allocation
4,000,000
(B) Acquisition, construction, renovation, infrastructure and other related costs for expansion of the Carbon County Correctional facility
Project Allocation
5,000,000
(C) Acquisition, demolition, construction, site development, infrastructure improvements and other related costs for economic development projects in the county
Project Allocation
7,500,000
(D) Acquisition, demolition, construction, infrastructure improvements and other related costs to repurpose sites within Nesquehoning Borough
Project Allocation
10,000,000
(E) Construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation, renovation, equipment and expansion of the county Human Services building
Project Allocation
2,500,000
(F) Infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the renovation and expansion of office space for the county, including equipment and furniture costs in Jim Thorpe Borough
Project Allocation
2,500,000
(ii) Reading Blue Mountain and Northern Railroad
(A) Acquisition, redevelopment, rehabilitation and other related costs for renovation of buildings and grounds of the Nesquehoning plant to support anthracite coal shipping domestically and internationally
Project Allocation
1,000,000
(ii.1) Carbon Chamber and Economic Development Corporation
(A) Construction, infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the redevelopment of a former industrial site in Nesquehoning Borough
Project Allocation
4,000,000
(iii) Bowmanstown Borough
(A) Construction, infrastructure and other related costs for a new fire station, borough hall and emergency shelter
Project Allocation
1,000,000
(iv) Nesquehoning Borough
(A) Acquisition, redevelopment and other related costs for the renovation of current buildings and grounds and for repair and maintenance of open-top and covered hoppers to support anthracite coal shipping domestically and internationally
Project Allocation
1,000,000
(v) Palmerton Borough
(A) Acquisition, site preparation, abatement, development, construction and infrastructure, including improvements related to energy and water utilities, on the former site of the New Jersey Zinc Company (West Plant)
Project Allocation
20,000,000
(14) Centre County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(C) Acquisition, infrastructure, construction and other related costs for rehabilitation and expansion of Memorial Field and Central Parklet in State College Borough
Project Allocation
8,000,000
(D) Acquisition, infrastructure, construction and other related costs for centralized, all-inclusive YMCA multisports facility
Project Allocation
10,000,000
(E) Construction, infrastructure, acquisition and other related costs for development of natural gas services
Project Allocation
5,000,000
(i.1) Geisinger Authority
(A) Construction, infrastructure, redevelopment, renovation and other related costs for expanded access to primary and specialty care project
Project Allocation
3,000,000
(ii) Moshannon Valley Economic Development Partnership, Inc.
(A) Construction and other related costs for a new Moshannon Valley Emergency Medical Services ambulance headquarters building
Project Allocation
2,000,000
(iii) The Pennsylvania State University
(A) Critical infrastructure improvements to athletic facilities at University Park campus
Project Allocation
150,000,000
(iv) State College Borough
(A) Construction, infrastructure and other related costs for mixed-use development, including retail, hotel, residential and parking
Project Allocation
5,000,000
(15) Chester County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services
Project Allocation
10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources
Project Allocation
10,000,000
(D) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the adaptive reuse of historical assets (both land and buildings) throughout the county
Project Allocation
10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates
Project Allocation
20,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(I) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of the mushroom industry
Project Allocation
40,000,000
(ii) City of Coatesville
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a new public safety, fire, police and EMS station
Project Allocation
15,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of an economic development project to include retail, commercial, manufacturing, industrial and housing projects
Project Allocation
20,000,000
(iii) City of Coatesville and Valley Township
(A) Acquisition, infrastructure, remediation, construction and other related costs for the economic development of the National Sports Events Center
Project Allocation
10,000,000
(iv) Downingtown Borough
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the redevelopment of the former industrial maintenance yard
Project Allocation
10,000,000
(v) Kennett Square Borough
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for redeveloping a former industrial site
Project Allocation
5,000,000
(B) Site preparation, construction, acquisition, preparation, infrastructure and other related costs for the redevelopment of the Kennett Library
Project Allocation
3,000,000
(vi) Modena Borough
(A) Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation of historic buildings and new municipal construction
Project Allocation
2,000,000
(vi.1) Phoenixville Borough
(A) Construction, infrastructure improvements and other costs related to Colonial Theatre expansion project
Project Allocation
4,000,000
(B) Mixed-use development, including construction, infrastructure, acquisition and related costs at former Phoenix Steel site
Project Allocation
5,000,000
(C) Construction, acquisition, infrastructure, redevelopment and other related costs for parking garage and reconstruction of transit service trestle bridge
Project Allocation
2,000,000
(D) Construction, renovation and other related costs for upgrades to Reeves Park, including renovations to historic memorials and Civil War-era display
Project Allocation
750,000
(vii) West Chester Borough
(A) Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation, construction and other costs related to the development and expansion of a West Chester train line and transportation center
Project Allocation
20,000,000
(B) Site preparation, construction, infrastructure and other related costs for the renovation and redevelopment of a community cafe and culinary institute with expanded workforce development training facilities, a health and wellness clinic and a day-care facility at the Charles A. Melton Arts & Education Center
Project Allocation
3,000,000
(C) Site preparation, construction and other related costs for the revitalization and redevelopment of the Charles A. Melton Arts & Education Center
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure and other related costs for West Chester Borough redevelopment projects
Project Allocation
7,000,000
(E) Acquisition, construction, infrastructure and other related costs for former biopharma site redevelopment projects
Project Allocation
2,500,000
(viii) Berwyn Township
(A) Acquisition, construction, demolition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure improvements at Berwyn Fire Company
Project Allocation
4,500,000
(viii.1) Birmingham Township
(A) Site preparation, construction, adaptive reuse and other related costs for the development of a museum and education center on Linden Farm on Brandywine Battlefield
Project Allocation
1,200,000
(ix) East Fallowfield Township
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the development of a new municipal building
Project Allocation
1,500,000
(x) East Goshen Township
(A) Acquisition, construction, redevelopment, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to enhancements at the CTDI manufacturing facility, distribution center and headquarters
Project Allocation
10,000,000
(x.1) East Marlborough Township
(A) Infrastructure, construction, preparation and other related costs for a wastewater treatment facility at Longwood Gardens
Project Allocation
1,000,000
(x.2) East Whiteland Township
(A) Construction, site preparation, demolition, infrastructure, acquisition and other costs for an economic development project
Project Allocation
10,000,000
(xi) Elk Township
(A) Infrastructure, remediation, renovation, construction and other related costs for redevelopment and expansion projects at the South Mill Champs mushroom facility
Project Allocation
5,000,000
(xii) Kennett Township
(A) Construction, infrastructure and other related costs for a Kennett Area Community Service (KACS) facility
Project Allocation
5,000,000
(xiii) London Grove Township
(A) Demolition, infrastructure, environmental remediation, site work, construction and other related costs necessary to construct a materials recovery facility for rural, single-stream recycling at the Southeastern Chester County Refuse Authority landfill
Project Allocation
3,000,000
(xiv) New Garden Township
(A) Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation and renovation of a former 137-acre day camp into a regional park and amphitheater for public use
Project Allocation
5,000,000
(xv) Sadsbury Township
(A) Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other costs related to economic development projects at 110 Stewart Huston Drive
Project Allocation
5,000,000
(B) Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other related costs for the enhancements at an International Paper manufacturing or distribution site
Project Allocation
5,000,000
(xvi) Schuylkill Township
(A) Construction and other related costs for renovations to municipal complex, including police indoor shooting range, installation of geothermal and solar and new outbuilding
Project Allocation
1,250,000
(B) Construction, renovation, demolition, abatement of hazardous chemicals and other related costs for fire company apparatus
Project Allocation
4,500,000
(xvii) West Goshen Township
(A) Acquisition, construction, infrastructure and other related costs for the expansion and redevelopment of Carlino's Market food manufacturing facility
Project Allocation
2,500,000
(xviii) Westtown Township
(A) Acquisition, infrastructure, site preparation and other related costs associated with the redevelopment of Crebilly Farm
Project Allocation
14,500,000
(16) Clarion County
(i) County projects
(A) Acquisition, infrastructure, equipment, abatement of hazardous materials, construction and other related costs for upgrades and improvements to the Modern Living Solutions site
Project Allocation
2,500,000
(B) Construction, infrastructure and other related costs for renovations of the Foxburg Country Club and golf course
Project Allocation
2,000,000
(C) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for county facility projects
Project Allocation
10,000,000
(D) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for open space, trail, tourism and outdoor recreation projects
Project Allocation
10,000,000
(E) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for economic development and community revitalization projects
Project Allocation
10,000,000
(ii) Knox Borough
(A) Acquisition, construction, infrastructure, equipment, redevelopment and other related costs for an economic development project
Project Allocation
5,000,000
(17) Clearfield County
(i) (Reserved)
(ii) Clearly Ahead - Clearfield County Economic Development Corporation
(A) Infrastructure, redevelopment and other related costs for design and construction of a shell building in Curwensville Borough
Project Allocation
2,000,000
(B) Infrastructure, redevelopment and other related costs for design and construction of a shell building in Lawrence Township
Project Allocation
2,250,000
(iii) Sandy Township
(A) Construction, infrastructure and other related costs for an indoor sports complex, parking area, storm water management, associated utility extensions and a traffic control device
Project Allocation
2,050,000
(18) Clinton County
(i) (Reserved)
(19) Columbia County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation
5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation
10,000,000
(ii) Columbia County Housing and Redevelopment Authorities
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for expansion of the Berwick YMCA, including space for a basketball court and additional parking
Project Allocation
2,000,000
(B) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure, redevelopment and other related costs for the expansion of the Bloomsburg YMCA for a new child-care facility
Project Allocation
3,000,000
(20) Crawford County
(i) County projects
(A) Construction, infrastructure and other related costs for Bethesda Lutheran Services
Project Allocation
1,500,000
(ii) Economic Progress Alliance of Crawford County
(A) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Cochranton Community Services Complex
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Linesville Business Park
Project Allocation
2,000,000
(C) Land and right-of-way acquisition, planning, permitting, rehabilitation, construction and other related costs for economic development projects in and around the Keystone Regional Industrial Park and surrounding regional areas
Project Allocation
20,000,000
(D) Acquisition, construction, infrastructure and other related costs for redevelopment and expansion of Meadville Medical Center
Project Allocation
25,000,000
(iii) Borough of Conneaut Lake
(A) Construction, infrastructure, redevelopment and other related costs for revitalization of the downtown business district
Project Allocation
4,000,000
(21) Cumberland County
(i) County projects
(A) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for redevelopment and/or expansion of Williams Grove Historical Steam Engine site
Project Allocation
2,500,000
(B) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction
Project Allocation
10,000,000
(ii) Cumberland Area Economic Development Corporation
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Central Penn College campus
Project Allocation
5,000,000
(B) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a redevelopment and renovation project in Silver Spring Township
Project Allocation
5,000,000
(C) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a freestanding rehabilitation hospital located in Hampden Township
Project Allocation
10,000,000
(D) Acquisition, construction, redevelopment, renovation, infrastructure, abatement of hazardous materials and other related costs for improvements to a Safe Harbour facility
Project Allocation
1,250,000
(E) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for renovation of farm land buildings in Monroe Township
Project Allocation
4,000,000
(iii) Cumberland County Industrial Development Authority
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the historic Penn Harris Hotel located in East Pennsboro Township
Project Allocation
5,000,000
(B) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for the redevelopment and renovation of the historic Penn Harris Hotel
Project Allocation
5,000,000
(iv) Susquehanna Area Regional Airport Authority
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for safety improvements and economic development at Capital City Airport
Project Allocation
1,500,000
(iv.1) East Pennsboro Township
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of an existing structure and property for the creation of a health care workforce training center at Central Penn College
Project Allocation
2,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of community sports and recreational facilities at Central Penn College
Project Allocation
5,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of existing structures and property for affordable student housing at Central Penn College
Project Allocation
2,000,000
(v) Hampden Township
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hampden Township Municipal Pool
Project Allocation
2,000,000
(vi) Mechanicsburg Borough
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment of the Mechanicsburg Borough Downtown Partnership project
Project Allocation
2,500,000
(vii) Silver Spring Township
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hempt Farms
Project Allocation
10,000,000
(viii) South Middletown Township
(A) Acquisition, renovation, construction, infrastructure and other related costs for a community revitalization and economic development project in the township
Project Allocation
5,000,000
(B) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for a community revitalization and economic development project
Project Allocation
5,000,000
(C) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the improvement, expansion, redevelopment and revitalization of the Carlisle Airport facilities
Project Allocation
20,000,000
(22) Dauphin County
(i) County projects
(A) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other related costs for development of a PA Agriculture Discovery Center attraction
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for a mixed-use commercial development project in Derry Township
Project Allocation
5,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(ii) Redevelopment Authority of Harrisburg
(A) Acquisition, rehabilitation, construction, infrastructure and other related costs for economic development and growth of Harrisburg businesses
Project Allocation
10,000,000
(B) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects in the City of Harrisburg
Project Allocation
10,000,000
(ii.1) Capital Region Economic Development Corporation
(A) Modernization, construction, storm water management, electrical, exterior work and other related costs for the redevelopment and renovation of an old building in downtown Hershey
Project Allocation
2,000,000
(iii) Harrisburg Land Bank
(A) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation and development along Paxton Creek
Project Allocation
5,000,000
(iii.1) City of Harrisburg
(A) Acquisition and redevelopment costs for a commercial site at the corner of Green and Maclay Streets for the adaptive reuse of a new commercial and retail facility
Project Allocation
2,000,000
(iii.2) Hummelstown Borough
(A) Acquisition, site preparation, renovation, construction, infrastructure, parking and other related costs associated with a redevelopment project
Project Allocation
2,500,000
(iv) Lower Paxton Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a beverage production/processing facility and venue
Project Allocation
2,500,000
(v) Lower Swatara Township
(A) Renovation and other related costs to revitalize six of Lower Swatara Township's playgrounds by updating current play equipment, adding ADA-compliant playground equipment and updating walkways to facilitate the use of wheelchairs
Project Allocation
500,000
(vi) Swatara Township
(A) Acquisition, construction, redevelopment, renovation and other related costs associated with infrastructure investments, connectivity improvements, blight mitigation, business relocation and site remediation and redevelopment
Project Allocation
2,000,000
(vii) West Hanover Township
(A) Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs for construction of a municipal complex facility
Project Allocation
5,000,000
(23) Delaware County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Delaware County Hub Facility project
Project Allocation
1,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(ii) Delaware County Redevelopment Authority
(A) Construction, infrastructure, rehabilitation and other costs for Riddle Hospital in Middletown Township
Project Allocation
10,000,000
(iii) City of Chester
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the creation of integrated, community-based housing for people with disabilities
Project Allocation
3,000,000
(iii.1) Aldan Borough
(A) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the expansion and redevelopment of police and municipal buildings
Project Allocation
1,250,000
(iv) Glenolden Borough
(A) Acquisition, construction and other related costs for recreational fields, maintenance facility and walking trails
Project Allocation
500,000
(v) Morton Borough
(A) Construction, renovation and other related costs for improvements to municipal building, including police station, borough offices and community facilities
Project Allocation
500,000
(vi) Norwood Borough
(A) Construction and other related costs for new firehouse
Project Allocation
500,000
(vii) Prospect Park Borough
(A) Construction, redevelopment, rehabilitation and other related costs to revitalize a blighted business and civic district
Project Allocation
800,000
(B) Construction, rehabilitation, site preparation, infrastructure, upgrades, renovation and other related costs for the improvement and redevelopment of Interboro School District
Project Allocation
20,000,000
(viii) Ridley Park Borough
(A) Infrastructure improvements, construction, relocation, renovation and other related costs for Taylor Hospital
Project Allocation
4,000,000
(ix) Yeadon Borough
(A) Construction, renovation and rehabilitation of the property to expand, update and add new updates to the Nile Swim Club
Project Allocation
1,000,000
(ix.1) Aston Township
(A) Renovations, rehabilitation, site preparation, construction and other related costs for the development of a hockey rink at Neumann University
Project Allocation
10,000,000
(x) Concord Township
(A) Construction and other related costs for Phase 1B and Phase 2 of the Octoraro Trail
Project Allocation
1,000,000
(B) Acquisition of various parcels within the historic Ivy Mills District and potential Octoraro Trail connections
Project Allocation
500,000
(C) Acquisition, construction, infrastructure and other related costs for the completion of the Garnet Valley Greenway Trail that transects the north and south of the township and connects important public resources
Project Allocation
1,500,000
(xi) Marple Township
(A) Construction, infrastructure and other related costs for new municipal police station and magisterial district court
Project Allocation
4,100,000
(B) Construction, infrastructure, rehabilitation, renovation and other related costs for Marple Township municipal and library building
Project Allocation
654,000
(xi.1) Newtown Township
(A) Design, construction and all associated costs of a new Early Childhood Education Center and Recreational Facility for Garrett Williamson
Project Allocation
5,000,000
(xii) Radnor Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to construction, redevelopment and rehabilitation projects to the Villanova University Campus
Project Allocation
10,000,000
(B) Construction, renovation and rehabilitation of capital facilities, including infrastructure on campus of Cabrini College
Project Allocation
10,000,000
(C) Construction, redevelopment and other related costs for projects relating to Creutzburg Center
Project Allocation
1,050,000
(D) Construction, infrastructure and other related costs for project in Fenimore Woods Park
Project Allocation
700,000
(E) Construction, infrastructure, redevelopment and other related costs for projects relating to Radnor Township Building
Project Allocation
500,000
(F) Upgrades and deferred maintenance, Phase VII, for north Wayne flood mitigation
Project Allocation
550,000
(G) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the expansion and renovation of Radnor Fire Company's facilities
Project Allocation
1,750,000
(H) Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water management system
Project Allocation
5,000,000
(xiii) Springfield Township
(A) Rehabilitation, renovation, infrastructure and other related costs for improvements to two business districts
Project Allocation
1,000,000
(B) Renovations and other related costs for ADA accessibility requirements and upgrade facilities used for township public safety and emergency operation activities
Project Allocation
500,000
(C) Renovation, infrastructure and other related costs for township parks and recreation projects
Project Allocation
1,000,000
(D) Construction, infrastructure and other related costs for development of full-service hotel facility
Project Allocation
3,000,000
(E) Renovation, infrastructure and other related costs for township building and police station
Project Allocation
2,500,000
(xiv) Tinicum Township
(A) Construction, redevelopment, rehabilitation and other related costs for renovation of Lazaretto Quarantine Station for reuse as Tinicum Township Municipal Building
Project Allocation
3,000,000
(xv) Tinicum Township and City of Philadelphia
(A) Planning, development, construction and other costs associated with cargo expansion at the Philadelphia International Airport and/or the infrastructure improvement projects at the Philadelphia International Airport or the Philadelphia Northeast Airport
Project Allocation
30,000,000
(xvi) Upper Chichester Township
(A) Construction, infrastructure and other related costs for a library and resource center
Project Allocation
1,000,000
(xvii) Upper Darby Township
(A) Construction, renovation, rehabilitation and abatement of hazardous materials relating to a major facility redevelopment project at Delaware County Community College to create a new Southeast campus
Project Allocation
33,250,000
(B) Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project
Project Allocation
6,000,000
(C) Redevelopment, construction, demolition, infrastructure and other related costs for the development of the Upper Darby Community Center
Project Allocation
5,000,000
(xviii) Upper Darby Township and Clifton Heights and Millbourne Boroughs
(A) Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to Upper Darby School District
Project Allocation
80,000,000
(xix) Aldan, Colwyn, Darby, East Lansdowne, Lansdowne and Yeadon Boroughs
(A) Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to William Penn School District
Project Allocation
60,000,000
(24) Elk County
(i) (Reserved)
(ii) Bradford Office of Economic and Community Development
(A) Construction, infrastructure and other related costs for a new three-story building in downtown St. Marys, relocation of offices, meeting spaces and treatment program areas
Project Allocation
2,100,000
(25) Erie County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(C) Acquisition, construction, infrastructure improvements and other costs related to the L2S-NMI-ERIE Medical Device Assembly Plant project
Project Allocation
500,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for Erie Metropolitan Transit Authority projects
Project Allocation
2,500,000
(E) Acquisition, construction, infrastructure, redevelopment and other related costs for CNG fueling station projects of Erie Metropolitan Transit Authority
Project Allocation
2,500,000
(F) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(ii) Corry Area Industrial Development Corporation
(A) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for projects on vacant industrial facilities for one or more manufacturing units
Project Allocation
5,000,000
(ii.1) Economic Development Corporation of Erie County
(A) Infrastructure, construction, redevelopment and other related costs for improvement of former potato chip factory
Project Allocation
1,000,000
(ii.2) The Erie County General Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a commercial facility renovation project
Project Allocation
20,000,000
(B) Acquisition, infrastructure, rehabilitation, environmental remediation, construction and other related costs for a brownfield redevelopment project
Project Allocation
10,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for a business and industrial park project
Project Allocation
20,000,000
(iii) Erie-Western Pennsylvania Port Authority
(A) Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for existing and proposed waterfront development
Project Allocation
30,000,000
(iv) Erie County Redevelopment Authority
(A) Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for properties to promote development
Project Allocation
5,000,000
(B) Acquisition, infrastructure, construction, abatement of hazardous materials, renovation, rehabilitation and other related costs for redevelopment of properties within the City of Corry to promote development
Project Allocation
5,000,000
(C) Site acquisition for development, infrastructure and other related costs to create new business parks and space
Project Allocation
25,000,000
(D) Construction, renovations and other related costs for expansion of the physician assistant program at Mercyhurst University in the City of Erie
Project Allocation
5,000,000
(v) Erie Redevelopment Authority
(A) Construction, renovation, rehabilitation and other related costs for upgrades at senior care community
Project Allocation
1,500,000
(vi) Redevelopment Authority in the City of Corry
(A) Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for upgrades to multitenant manufacturing facilities
Project Allocation
7,500,000
(vi.1) The Pennsylvania State University
(A) Construction, infrastructure, equipment and other related costs for education and research facilities at Knowledge Park at Penn State Behrend
Project Allocation
15,000,000
(vii) Borough of Union City
(A) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for improvements and restoration to previous industrial sites
Project Allocation
500,000
(B) Acquisition, infrastructure, construction and other related costs for the development of a trail system
Project Allocation
500,000
(viii) City of Erie
(A) Infrastructure, construction and other related costs for public space improvements
Project Allocation
5,000,000
(B) Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for improvements to firehouses and police stations and creation of a joint public safety facility
Project Allocation
15,000,000
(C) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for development of sports complexes
Project Allocation
10,000,000
(D) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for the development of sports complexes
Project Allocation
15,000,000
(E) Acquisition, infrastructure, rehabilitation, construction and other related property improvement costs for building projects
Project Allocation
25,000,000
(F) Acquisition, renovation, remediation and redevelopment of brownfield sites for new and expanding companies
Project Allocation
10,000,000
(G) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of commercial and industrial corridors
Project Allocation
20,000,000
(H) Construction, renovation and other costs related to the redevelopment of exhibits, buildings, pathways, parking areas and other facilities and projects at Erie Zoo
Project Allocation
5,000,000
(I) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of a business or industrial park
Project Allocation
5,000,000
(J) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for historic preservation and cultural asset improvements
Project Allocation
5,000,000
(K) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for an economic development project
Project Allocation
5,000,000
(L) Site preparation, abatement, acquisition, construction, expansion, demolition, rehabilitation, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
25,000,000
(M) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for an expansion project at Mercyhurst University
Project Allocation
5,000,000
(26) Fayette County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(ii) Fay-Penn Economic Development Council
(A) Acquisition, infrastructure, construction and other related costs for countywide economic development
Project Allocation
25,000,000
(iii) Dunbar Borough
(A) Acquisition, infrastructure, construction and other related costs for the expansion of a facility to accommodate growing trucking fleet operations
Project Allocation
2,000,000
(iv) South Union Township
(A) Engineering, construction, renovation and other related costs for the Uniontown Area YMCA
Project Allocation
7,500,000
(27) Forest County
(i) (Reserved)
(28) Franklin County
(i) County projects
(A) Construction, infrastructure, redevelopment and other improvements to the Wilson College campus
Project Allocation
20,000,000
(ii) Franklin County Redevelopment Authority
(A) Acquisition, site preparation, renovation, rehabilitation, infrastructure, construction and other related costs for development of Phase II of Herbruck's Poultry Ranch and Blue Springs Egg Farm expansion
Project Allocation
5,000,000
(B) Acquisition, site preparation, renovation, rehabilitation, construction, infrastructure and other related costs for development of a pullet site to support Herbruck's Poultry Ranch and Blue Springs Egg Farm
Project Allocation
5,000,000
(C) Acquisition, site preparation, remediation, infrastructure, renovation, construction and other related costs associated with a new facility to house the Cumberland Valley School of Music
Project Allocation
750,000
(29) Fulton County
(i) (Reserved)
(30) Greene County
(i) County projects
(A) Acquisition, redevelopment, infrastructure, construction and other related costs for a Center for Economic Development facility and resources to build research, workforce readiness, social wellness, vocational and career development, and support educational initiatives, including early childhood education
Project Allocation
5,000,000
(B) Acquisition, construction, site preparation, infrastructure and other related costs for community and economic development projects in the county
Project Allocation
30,000,000
(C) Acquisition, construction, redevelopment, infrastructure and other related costs for a center for economic development at Waynesburg University
Project Allocation
5,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(E) Construction, infrastructure, land acquisition and other related costs to upgrade East Dunkard Water Authority's water treatment plant and distribution system
Project Allocation
8,000,000
(F) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation
7,500,000
(i.1) Franklin Township
(A) Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings economic development project
Project Allocation
2,000,000
(B) Acquisition, construction, infrastructure and other related costs for Franklin Township Business Park project
Project Allocation
5,000,000
(ii) Perry Township
(A) Renovation and construction of the township building
Project Allocation
1,000,000
(31) Huntingdon County
(i) County projects
(A) Acquisition, renovation, redevelopment, infrastructure, abatement of hazardous materials, construction and other related costs for expansion of Health and Wellness facilities of the Broad Top Area Medical Center, Inc.
Project Allocation
7,000,000
(32) Indiana County
(i) County projects
(A) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for Phase II rehabilitation of the Indiana County Education and Technology Center
Project Allocation
5,000,000
(B) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational facilities and county fairground buildings at Mack Park
Project Allocation
5,000,000
(C) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational and aquatic facilities at the YMCA of Indiana County
Project Allocation
5,000,000
(D) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or redevelopment and blight remediation
Project Allocation
8,000,000
(E) Acquisition, rehabilitation, infrastructure, construction and other related costs for business park site improvements and multitenant building development at Windy Ridge Business & Technology Park - Phases 3 through 5
Project Allocation
10,000,000
(F) Acquisition, rehabilitation, infrastructure improvements, construction and other related costs for expansion of community health care services and educational and training partnerships through the Indiana Regional Medical Center
Project Allocation
15,000,000
(G) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development in the county
Project Allocation
75,000,000
(H) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs associated with development of clean coal technology
Project Allocation
10,000,000
(I) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects
Project Allocation
10,000,000
(J) Construction, infrastructure and other related costs for an Innovation and Entrepreneurship Center
Project Allocation
5,000,000
(K) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and preservation of historic, cultural and civic facilities and sites
Project Allocation
8,000,000
(L) Construction, infrastructure and other related costs for countywide broadband fiber and wireless communications projects
Project Allocation
9,000,000
(M) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in Burrell Township
Project Allocation
15,000,000
(N) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in West Wheatfield Township and East Wheatfield Township
Project Allocation
50,000,000
(O) Acquisition, rehabilitation, infrastructure, construction and related development costs for improvements at the Indiana County - Jimmy Stewart Airport
Project Allocation
7,000,000
(P) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and development of the Allegheny Arboretum at Indiana University of Pennsylvania's Confluence Discovery Park
Project Allocation
10,000,000
(Q) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(R) Construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development and all other related costs for the development of a facility or facilities for the Indiana Regional Medical Center
Project Allocation
10,000,000
(ii) Homer City Borough
(A) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects, including development of a connecting trail between proposed economic development site and existing county-owned regional trail network to new rail trail spur
Project Allocation
1,500,000
(33) Jefferson County
(i) (Reserved)
(34) Juniata County
(i) County projects
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project in Fayette Township
Project Allocation
2,000,000
(ii) Juniata County Industrial Development Authority
(A) Development of natural gas infrastructure in the Juniata County Industrial Park, including construction, remediation, landscaping and other related costs for future expansion in the park
Project Allocation
1,000,000
(B) Development of Phase V of the Juniata County Industrial Park, including grading, landscaping, construction of an access road, utilities, storm water management and all ancillary construction for pad-ready lots
Project Allocation
5,000,000
(C) Construction, infrastructure, redevelopment and other related costs for the development of natural gas infrastructure, including pipeline construction, LNG storage and ancillary construction work
Project Allocation
1,000,000
(35) Lackawanna County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to a residential care facility specializing in brain injury care
Project Allocation
6,000,000
(B) Acquisition, construction, renovation, rehabilitation and other costs related to Lackawanna County Park redevelopment and improvement projects
Project Allocation
5,000,000
(C) Acquisition, construction, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs related to an economic project
Project Allocation
20,000,000
(D) Infrastructure, improvements and acquisition for a sustainable energy project
Project Allocation
10,000,000
(E) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the reconstruction and/or restoration of Valley View School District pool
Project Allocation
1,500,000
(F) Construction, infrastructure and other costs relating to an indoor athletic field and training facility
Project Allocation
10,000,000
(G) Construction, infrastructure and other costs related to the Valley View Business Park new building project
Project Allocation
2,000,000
(H) Construction, infrastructure and other costs related to the Valley View Business Park Industrial Facility
Project Allocation
5,000,000
(I) Acquisition, construction, infrastructure and other costs related to recreational facilities and housing projects for Keystone College
Project Allocation
3,500,000
(J) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility in or around Dickson City
Project Allocation
10,000,000
(K) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(L) Acquisition, construction, redevelopment, infrastructure and other related costs for new fields and facilities and improvements to existing fields and facilities at Hillside Park
Project Allocation
10,000,000
(M) Acquisition, construction, redevelopment, infrastructure and other related costs for new facilities and expansion of existing facilities of Abington Heights School District
Project Allocation
10,000,000
(N) Acquisition, construction, redevelopment, infrastructure and other related costs for expansion of a sports facility within the Abington Heights School District
Project Allocation
5,000,000
(O) Acquisition, construction, redevelopment, infrastructure and other related costs for consolidation, modernization and facility upgrades within the Abington Heights School District
Project Allocation
10,000,000
(P) Acquisition, construction, infrastructure and other related costs for Valley View Business Park Industrial Facility
Project Allocation
5,000,000
(Q) Acquisition, construction, renovations, infrastructure and other related costs for dental, medical, health sciences and patient care facilities project
Project Allocation
20,000,000
(ii) City of Scranton
(A) Acquisition, construction, infrastructure, renovation, rehabilitation and other costs related to the relocation, renovation and/or expansion of buildings in the downtown business district
Project Allocation
4,000,000
(B) Design, construction, infrastructure improvements, renovation and other costs related to a health-related clinical and academic community outreach facility at the University of Scranton
Project Allocation
10,000,000
(C) Design, construction, infrastructure improvements, renovation and other costs related to a University of Scranton housing project
Project Allocation
15,000,000
(D) Construction, infrastructure, acquisition, renovation, rehabilitation and other costs related to the site, replacement of specialized canopy and parking expansion of the Pavilion at Montage Mountain
Project Allocation
5,000,000
(E) Construction, infrastructure, renovation, demolition and other costs related to the Scranton Enterprise Center renovation project
Project Allocation
1,000,000
(F) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of the Green Ridge neighborhood
Project Allocation
2,000,000
(G) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the economic development project revitalizing riverfront property along the Lackawanna River
Project Allocation
10,000,000
(H) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to renovations associated with the passenger rail station and modifications to the multimodal center
Project Allocation
10,000,000
(I) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of West Linden Street
Project Allocation
5,000,000
(J) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a redevelopment project in the West Side
Project Allocation
2,500,000
(K) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project along North South Road
Project Allocation
5,000,000
(L) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in the central business district
Project Allocation
2,500,000
(M) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to economic development associated with the Neighborhood Commercial District revitalization project
Project Allocation
5,000,000
(N) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in South Scranton
Project Allocation
2,500,000
(O) Acquisition, construction, infrastructure, renovation and other related costs for a health care facility
Project Allocation
10,000,000
(P) Acquisition, construction, infrastructure, renovation and other related costs for a school of dentistry
Project Allocation
10,000,000
(Q) Acquisition, construction, infrastructure, renovation and other related costs for a school of osteopathic medicine
Project Allocation
10,000,000
(R) Acquisition, construction, infrastructure, renovation and other related costs for business and residential development in West Scranton
Project Allocation
3,000,000
(S) Acquisition, construction, infrastructure, renovation and other related costs for business development in the downtown area
Project Allocation
4,000,000
(T) Acquisition, construction, infrastructure, renovation and other related costs for business development project
Project Allocation
4,000,000
(U) Acquisition, remediation and other related costs for a former, underutilized manufacturing facility
Project Allocation
5,000,000
(V) Improvements, construction and other related costs for Downtown Scranton infrastructure improvements
Project Allocation
3,000,000
(W) Construction, infrastructure and other related costs for streetscape project
Project Allocation
3,000,000
(X) Acquisition, remediation and other related costs for vacant properties within the city to expand an existing business park
Project Allocation
5,000,000
(Y) Construction, rehabilitation, infrastructure, site preparation and other related costs for improvements to parks, trails and recreation facilities
Project Allocation
5,000,000
(Z) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the development of a community center
Project Allocation
5,000,000
(iii) Archbald Borough
(A) Construction, infrastructure and other costs relating to the Archbald Business Park Phase II Redevelopment Project
Project Allocation
3,000,000
(B) Construction, infrastructure and other costs relating to the Archbald Route 6 Facility Redevelopment Project
Project Allocation
4,000,000
(C) Construction, infrastructure and other costs related to the Valley View Business Park redevelopment project
Project Allocation
2,500,000
(D) Acquisition, construction, infrastructure and other related costs for an economic development project in the borough
Project Allocation
5,000,000
(iii.1) Dunmore Borough
(A) Acquisition, construction, infrastructure and other related costs for an economic development project in the borough
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovations and other related costs for the redevelopment of land along the highway system
Project Allocation
5,000,000
(iii.2) Jermyn Borough
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation
5,000,000
(iv) Jessup Borough
(A) Construction, infrastructure, renovations and other costs related to a new building at the Jessup Small Business Center
Project Allocation
2,000,000
(B) Acquisition, construction, infrastructure, renovation and other costs related to the Valley View Business Park Interchange Project
Project Allocation
10,000,000
(v) Moosic Borough
(A) Acquisition, construction, infrastructure, renovations and other costs related to a new building at the Glenmaura Corporate Center
Project Allocation
2,000,000
(B) Construction, infrastructure improvements and other costs related to a redevelopment project at the Office Park at Montage Mountain
Project Allocation
4,000,000
(v.1) Moscow Borough
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for senior housing development
Project Allocation
4,000,000
(v.2) Vandling Borough
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation
5,000,000
(vi) Carbondale Township
(A) Construction, infrastructure and other costs relating to the Carbondale Technology Transfer Center Multitenant Flex Project
Project Allocation
1,000,000
(vii) Covington Township
(A) Construction, infrastructure improvements and other costs for the Moffat Estate redevelopment project
Project Allocation
500,000
(viii) Fell Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation
5,000,000
(viii.1) Greenfield Township
(A) Construction, infrastructure, acquisition, renovation and other related costs for a facility advancing pet therapy in the township
Project Allocation
2,000,000
(ix) Glenburn Township
(A) Acquisition, construction, redevelopment, infrastructure and other related costs for municipal buildings
Project Allocation
2,000,000
(x) Jefferson Township
(A) Construction, infrastructure and other costs related to the development of a commercial site and to provide sanitary sewer infrastructure for projects
Project Allocation
1,000,000
(B) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historic or civic projects
Project Allocation
5,000,000
(xi) Newton Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation
5,000,000
(xii) Ransom Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation
5,000,000
(xiii) Scott Township
(A) Construction, infrastructure improvements, renovations and other costs related to the Scott Township Technology and Industrial Facility redevelopment project
Project Allocation
3,000,000
(36) Lancaster County
(i) County projects
(A) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for the development of the PA Agriculture Discovery Center
Project Allocation
10,000,000
(B) Construction, infrastructure, site preparation and other related costs for a state-of-the-art Lancaster Environmental Center of Excellence facility
Project Allocation
10,000,000
(C) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
20,000,000
(D) Construction and other related costs for DiaVac R&D Center and Manufacturing Facility for Diagnostic Biotechnology
Project Allocation
10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for a medical education building
Project Allocation
20,000,000
(ii) Lancaster County Redevelopment Authority
(A) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development projects in the county
Project Allocation
15,000,000
(B) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development of an agriculture education facility that supports manufacturing and demonstration projects
Project Allocation
12,500,000
(C) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for Lancaster Life Sciences Incubator
Project Allocation
10,000,000
(D) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for emergency medical services program
Project Allocation
5,000,000
(E) Acquisition, redevelopment, renovation, construction, infrastructure, equipment and other related costs for modernization and expansion of the Schreiber Center for Pediatric Development
Project Allocation
4,000,000
(F) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for the development of the Brookside Medical Campus
Project Allocation
4,000,000
(G) Construction, infrastructure and other related costs for the Centro Hispano Community Center
Project Allocation
500,000
(H) Acquisition, construction, redevelopment and other related costs for the establishment of an aluminum extrusion facility in the county
Project Allocation
3,500,000
(I) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
10,000,000
(J) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for community and economic development projects for an entity to provide a fitness-based mentoring program that focuses on long-term support for at-risk teens that have experienced childhood trauma, have behavioral challenges and are struggling academically
Project Allocation
500,000
(ii.1) Redevelopment Authority of the County of Lancaster
(A) Acquisition, construction, infrastructure, site preparation, architectural and design and other related costs for development of Landis Place on Doe Run in Penn Township
Project Allocation
5,000,000
(iii) City of Lancaster
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for Lancaster Stockyards Surgical Center
Project Allocation
10,000,000
(B) Construction and other related costs for improvements to the Centro Hispano Community Center
Project Allocation
500,000
(C) Acquisition, construction, infrastructure, redevelopment and other related costs for North Prince Street redevelopment project
Project Allocation
8,000,000
(D) Construction, infrastructure, redevelopment and other related costs for green infrastructure initiative
Project Allocation
12,000,000
(E) Acquisition, design, infrastructure, construction and other related costs for a medical education building for Lancaster General College of Nursing and Applied Sciences
Project Allocation
22,000,000
(F) Construction, infrastructure, acquisition, redevelopment and other related costs for multimodal safety improvements
Project Allocation
2,000,000
(G) Acquisition, demolition, construction, infrastructure, site development and other related costs for public parks, recreation and open space
Project Allocation
5,000,000
(H) Construction, infrastructure, acquisition, redevelopment, site development and other related costs to upgrade and improve facilities
Project Allocation
5,000,000
(I) Acquisition, demolition, construction, infrastructure, development and other related costs for public works operations
Project Allocation
4,000,000
(J) Construction, infrastructure, site preparation and other related costs for the development of a facility for environmental organizations in Lancaster County
Project Allocation
10,000,000
(K) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northeastern area of Lancaster
Project Allocation
5,000,000
(L) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northwestern area of Lancaster
Project Allocation
5,000,000
(M) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southwestern area of Lancaster
Project Allocation
5,000,000
(N) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southeastern area of Lancaster
Project Allocation
5,000,000
(iv) Columbia Borough
(A) Construction, infrastructure, redevelopment and other related costs for a parking facility in the downtown to support existing businesses and attract new businesses
Project Allocation
1,500,000
(B) Construction, infrastructure, abatement of hazardous materials and other related costs for the development of an innovation and technology campus on the property of the former McGinness Airport
Project Allocation
3,000,000
(C) Acquisition, renovation, construction and associated costs for improvements at the National Watch and Clock Museum
Project Allocation
2,500,000
(D) Construction, infrastructure and other related costs for the development of a regional recreation facility
Project Allocation
2,750,000
(v) Bart Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(vi) East Cocalico Township
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements
Project Allocation
15,000,000
(vii) Lititz Regional Community Development Corporation
(A) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for Live Event Museum
Project Allocation
20,000,000
(B) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Warwick Township
Project Allocation
15,000,000
(C) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Warwick Township
Project Allocation
15,000,000
(D) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project for Elizabeth Township
Project Allocation
15,000,000
(E) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Elizabeth Township
Project Allocation
15,000,000
(F) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Lititz Borough
Project Allocation
15,000,000
(G) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Lititz Borough
Project Allocation
15,000,000
(viii) Elizabethtown Borough
(A) Construction, infrastructure, renovation, rehabilitation and other related costs for the demolition of an existing building and the construction of a new fire station that will also house the Regional Emergency Management Agency
Project Allocation
4,000,000
(B) Construction, renovation and other related costs to build new or renovate space designed to support health-related majors
Project Allocation
2,500,000
(C) Construction, renovation and other related costs to renovate or create space to house a Health Services Center designed to support the physical and mental health needs of Elizabethtown College students and the community
Project Allocation
750,000
(D) Acquisition, construction, redevelopment, renovation and other related costs to create new and extend existing walking, living and learning pathways and fitness trail designed to tie Elizabethtown Borough and Mt. Joy Township paths to campus pathways
Project Allocation
1,500,000
(E) Construction, redevelopment, renovation and other related costs to expand connection to downtown Elizabethtown by renovating space for college-sponsored or small business locations as part of a mixed-use space on College Avenue and/or Market Street
Project Allocation
500,000
(F) Acquisition, construction, redevelopment, renovation and other related costs to create living and learning space for graduate students
Project Allocation
1,500,000
(G) Site development, infrastructure improvements, construction and renovation of space related to academic programs and/or residence halls at Elizabethtown College
Project Allocation
2,500,000
(H) Renovation of Elizabethtown College's Thompson Gymnasium or creation, renovation, construction of other health and fitness facilities on campus designed to enhance student intramural opportunities and expand community programs
Project Allocation
3,000,000
(I) Acquisition, construction, redevelopment, renovation and other related costs to renovate existing space into a boutique hotel or space that will provide short-term housing for business leaders in downtown Elizabethtown
Project Allocation
2,500,000
(J) Construction, infrastructure, redevelopment, renovation and other related costs to transform a historically significant building into a Downtown Cultural and Welcome Center and improvements to public parking facilities
Project Allocation
1,500,000
(K) Partial demolition, construction, infrastructure, redevelopment and other related costs for the renovation of the former Borough Public Works facility to develop operations and training space for the Elizabethtown Police Department and emergency management operations as well as meeting space for community organizations
Project Allocation
743,000
(L) Construction, infrastructure, redevelopment and other related costs for the renovation of the existing police and government facility on Hanover Street to allow for reconfiguration of operational space for the Elizabethtown Police Department as well as safety and accessibility improvements for borough administration offices
Project Allocation
633,000
(viii.1) Ephrata Borough
(A) Construction, renovation, infrastructure and other related costs for renovating and rehabilitating a retired Pennsylvania State Police barracks, located in Ephrata Township and owned by Ephrata Borough, into a multiuse training facility and construction of an exterior training yard
Project Allocation
1,000,000
(viii.2) Manheim Borough
(A) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project
Project Allocation
15,000,000
(B) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for a community asset project
Project Allocation
15,000,000
(ix) Millersville Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(x) Mount Joy Borough
(A) Acquisition, redevelopment, construction, infrastructure, renovation and other related costs for expansion project at the Janus School
Project Allocation
3,000,000
(B) Construction, redevelopment and other related costs for sidewalk connections and handicapped accessible ramps adjacent to three borough-owned public parks, completing public trail connections within these parks, creating a public parking lot and associated storm water, grading and restoration, raised pedestrian crosswalks and installation of pedestrian-activated Rectangular Rapid Flashing Beacons
Project Allocation
500,000
(C) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xi) New Holland Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xii) Quarryville Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xiii) Colerain Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xiv) Drumore Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xv) Earl Township
(A) Construction, infrastructure, renovation and other related costs for a new multipurpose municipal building
Project Allocation
1,250,000
(B) Construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for a combined heat and power facility for Garden Spot Village
Project Allocation
2,000,000
(xvi) East Drumore Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xvii) East Lampeter Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(B) Permitting, construction, infrastructure, site preparation, various site fixed amenities and other related costs to support economic growth and redevelopment at Greenfield
Project Allocation
15,000,000
(xviii) Eden Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xix) Fulton Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xx) Lancaster Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxi) Leacock Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxii) Little Britain Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxii.1) Manheim Township
(A) Construction, abatement of hazardous materials, redevelopment, renovation and other related costs for the expansion of a commercial building, parking lot renovation, green space, sidewalk and storm water management
Project Allocation
3,000,000
(B) Acquisition of land to an existing commercial property, construction, infrastructure, redevelopment and other related costs for a building expansion, parking lot extension and storm water management facilities
Project Allocation
2,500,000
(C) Acquisition and other related costs to purchase a building that will accommodate the growth of Aaron's Acres
Project Allocation
1,500,000
(xxiii) Martic Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure and other related costs for a recreational pedestrian bridge across Route 324 to enable safe passage between the eastern and western portions of the Enola Low Grade Trail
Project Allocation
2,000,000
(xxiv) Mount Joy Township
(A) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project
Project Allocation
15,000,000
(xxv) Paradise Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxvi) Penn Township
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for expansion of Pleasant View Communities
Project Allocation
5,000,000
(B) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for Fenner Precision's plant expansion project
Project Allocation
30,000,000
(xxvii) Pequea Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxviii) Providence Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation
1,000,000
(xxviii.1) Rapho Township
(A) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project
Project Allocation
15,000,000
(xxix) Salisbury Township
(A) Construction, reconstruction, infrastructure, improvements, rehabilitation and other related costs to renovate and expand a facility
Project Allocation
5,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment, remediation, infrastructure, improvements and other related costs for an economic development project
Project Allocation
5,000,000
(xxx) Strasburg Borough
(A) Renovation, rehabilitation and construction protecting a National Registered Historic District providing for economic development
Project Allocation
1,000,000
(37) Lawrence County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(B) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(ii) Lawrence County Economic Development Corporation
(A) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an Incubator/Makerspace
Project Allocation
7,500,000
(B) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for county agribusinesses
Project Allocation
7,500,000
(C) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Mahoning Township
Project Allocation
10,000,000
(D) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Neshannock Township
Project Allocation
10,000,000
(E) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Beaver Borough
Project Allocation
10,000,000
(F) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Wilmington Borough
Project Allocation
10,000,000
(G) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in North Beaver Township
Project Allocation
10,000,000
(H) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Pulaski Township
Project Allocation
10,000,000
(I) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Shenango Township
Project Allocation
10,000,000
(J) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Taylor Township
Project Allocation
10,000,000
(K) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Union Township
Project Allocation
10,000,000
(L) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Volant Borough
Project Allocation
10,000,000
(M) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wampum Borough
Project Allocation
10,000,000
(N) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wayne Township
Project Allocation
10,000,000
(O) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wilmington Township
Project Allocation
10,000,000
(P) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Bessemer Borough
Project Allocation
10,000,000
(Q) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Little Beaver Township
Project Allocation
10,000,000
(R) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Ellwood City Borough
Project Allocation
10,000,000
(S) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the City of New Castle
Project Allocation
10,000,000
(T) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the county
Project Allocation
12,500,000
(U) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for expansion of an historical facility in the City of New Castle
Project Allocation
13,000,000
(V) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for a cultural facility project in the county
Project Allocation
13,000,000
(W) Acquisition, construction, infrastructure and other related costs for the Baird Road business park economic development project in Mahoning Township
Project Allocation
20,000,000
(iii) City of New Castle
(A) Acquisition, demolition, infrastructure, rehabilitation and construction of properties in the business district of the city
Project Allocation
6,125,000
(38) Lebanon County
(i) County projects
(A) Site preparation, acquisition, renovation, construction, infrastructure and other related costs for development of the Annville Logistics Park
Project Allocation
5,000,000
(B) Acquisition, site preparation, renovation, redevelopment, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities
Project Allocation
5,000,000
(ii) City of Lebanon
(A) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for urban revitalization, including façade improvements in the commercial corridors of 9th and Lehman Streets
Project Allocation
10,000,000
(39) Lehigh County
(i) County projects
(A) Construction, infrastructure redevelopment and other related costs for restoration and repair of the Scottish Rite Cathedral in the City of Allentown
Project Allocation
1,000,000
(B) Construction, renovation, acquisition and other related costs for an early childhood education center in the City of Allentown
Project Allocation
12,000,000
(C) Acquisition, construction, infrastructure improvements and other related costs for the D&L Trail
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the county
Project Allocation
15,000,000
(E) Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the City of Allentown
Project Allocation
15,000,000
(F) Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties
Project Allocation
10,000,000
(G) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation
30,000,000
(H) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities
Project Allocation
10,000,000
(I) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility in the City of Allentown
Project Allocation
10,000,000
(J) Construction, infrastructure, redevelopment and other related costs for infrastructure improvements, additional space and renovations at St. Luke's West End Medical Center in South Whitehall Township
Project Allocation
5,000,000
(K) Acquisition, construction, renovation, abatement of hazardous materials and other related costs for a Lehigh Valley Health Network health center
Project Allocation
12,500,000
(L) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network
Project Allocation
12,500,000
(M) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(i.1) Allentown Housing Authority
(A) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the City of Allentown
Project Allocation
4,000,000
(i.2) Lehigh Northampton Airport Authority
(A) Construction, infrastructure development, redevelopment and other related costs for a new hotel and retail development at Lehigh Valley International Airport
Project Allocation
15,000,000
(i.3) Whitehall Township Industrial and Commercial Development Authority
(A) Site work, construction, preparation, infrastructure, renovation and other related costs for the redevelopment of the Whitehall Mall
Project Allocation
2,300,000
(ii) City of Allentown
(A) Construction infrastructure improvements and other related costs for renovation and rehabilitation of a former convent located on Hanover Avenue
Project Allocation
500,000
(B) Construction infrastructure improvements and other related costs for interior and exterior upgrades to the Agri-Plex building
Project Allocation
500,000
(C) Construction, acquisition and other costs related to the purchase and renovation of the Madison Hamilton building
Project Allocation
500,000
(D) Acquisition, construction, rehabilitation, infrastructure and other related costs for the Community Bike Works youth center facilities
Project Allocation
1,000,000
(E) Renovation, construction, building acquisition and equipment purchases for Lehigh Valley Hospital - 17th and Chew extended campus, including medical office buildings, the School of Nursing and legal office buildings
Project Allocation
10,000,000
(F) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for rehabilitation of a theater
Project Allocation
2,500,000
(G) Acquisition, construction, renovation, infrastructure and other related costs for Da Vinci Science Center
Project Allocation
2,500,000
(H) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties
Project Allocation
21,000,000
(I) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project
Project Allocation
35,000,000
(J) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for sports medicine, rehabilitation and health care facilities
Project Allocation
5,000,000
(K) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network
Project Allocation
7,500,000
(L) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a historic structure in the west end theater district
Project Allocation
2,000,000
(M) Construction, renovation, infrastructure and other related costs for civic, cultural or economic development projects for Phoebe Ministries
Project Allocation
5,000,000
(N) Acquisition, construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for a food manufacturing and distribution center
Project Allocation
1,500,000
(O) Construction, rehabilitation, infrastructure, utilities and infrastructure relocation and other related costs for a pharmaceutical and vaccine manufacturing and storage facility
Project Allocation
5,300,000
(P) Acquisition, construction, rehabilitation, infrastructure and other related costs for the development or redevelopment of affordable housing in the Franklin Park neighborhood
Project Allocation
2,000,000
(Q) Construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for an economic development project along Mack Boulevard
Project Allocation
1,500,000
(R) Construction, rehabilitation, infrastructure and other related costs for the rehabilitation of Miller Symphony Hall
Project Allocation
2,500,000
(S) Acquisition, construction, rehabilitation, infrastructure and other related costs for an early childhood facility and neighborhood resource center
Project Allocation
10,000,000
(T) Acquisition, construction, rehabilitation, infrastructure and other related costs for an early education center and a community center in Old Allentown
Project Allocation
2,500,000
(U) Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of athletic facilities at Cedar Crest College
Project Allocation
1,500,000
(V) Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of academic buildings at Cedar Crest College
Project Allocation
5,500,000
(W) Construction, renovation and other related costs for rehabilitation of Sacred Heart Hospital
Project Allocation
5,000,000
(X) Land acquisition, infrastructure improvements, construction and other costs related to Little Lehigh Creek Industrial Corridor redevelopment project
Project Allocation
2,000,000
(iii) City of Bethlehem
(A) Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties
Project Allocation
10,000,000
(iii.1) Catasauqua Borough
(A) Construction, infrastructure improvements and other costs related to the mixed-use Catasauqua redevelopment project
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a redevelopment project
Project Allocation
5,000,000
(iv) Fountain Hill Borough
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of current facilities and operations of St. Luke's Bethlehem
Project Allocation
10,000,000
(B) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Fountain Hill Elementary School
Project Allocation
11,000,000
(C) Construction, infrastructure, redevelopment and other related costs for Mill 2 projects
Project Allocation
2,000,000
(v) North Whitehall Township
(A) Construction, facility improvements, renovations and other related costs for KidsPeace Orchard Hills campus
Project Allocation
2,000,000
(B) Acquisition, construction, redevelopment, infrastructure and other related costs for a youth camp
Project Allocation
2,500,000
(vi) Salisbury Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the renovation and expansion of Lehigh Valley Hospital - Cedar Crest Campus, including, but not limited to, the hospital, MOBs and Lehigh Valley Reilley Children's Hospital
Project Allocation
10,000,000
(vi.1) South Whitehall Township
(A) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties
Project Allocation
3,000,000
(B) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project
Project Allocation
5,000,000
(C) Construction, renovations, abatement of hazardous materials, infrastructure and other related costs for improvements to and an expansion of a fire and rescue department facility
Project Allocation
1,000,000
(vii) Upper Macungie Township
(A) Construction, redevelopment, infrastructure and other related costs for a new community center, including indoor sports and recreation areas, meeting space, a walking track and rental space
Project Allocation
10,000,000
(40) Luzerne County
(i) County projects
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for an economic development project
Project Allocation
10,000,000
(B) Construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with improvements to Kirby Park
Project Allocation
5,000,000
(C) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the Hazleton Creek economic development project
Project Allocation
5,000,000
(D) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with the expansion of a commercial property located on Route 315 in Plains Township
Project Allocation
5,000,000
(E) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the construction of a new animal shelter
Project Allocation
3,000,000
(F) Renovation, rehabilitation and other related costs to repair and restore the Luzerne County Courthouse
Project Allocation
1,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for a sustainable energy project for production of renewable fuels
Project Allocation
10,000,000
(H) Acquisition, construction, renovation, infrastructure and other costs related to economic development projects
Project Allocation
15,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(J) Site preparation, acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the improvement of the Greater Wyoming Valley Area YMCA facilities
Project Allocation
5,000,000
(K) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of Upward Farms
Project Allocation
20,000,000
(L) Construction, infrastructure, redevelopment, renovation and other related costs for improvements to the Luzerne County Fairgrounds
Project Allocation
5,000,000
(i.1) Luzerne County Redevelopment Authority
(A) Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project in Forty Fort Borough
Project Allocation
10,000,000
(i.2) Luzerne County Industrial Development Authority
(A) Acquisition, infrastructure, site preparation, construction and other related costs associated with the development of Grimes Industrial Park Lot No. 5
Project Allocation
5,500,000
(ii) City of Hazleton
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation
10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project
Project Allocation
5,000,000
(iii) City of Nanticoke
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project
Project Allocation
10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with the redevelopment of the LS site project
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation
5,000,000
(iii.1) City of Pittston
(A) Acquisition, construction, infrastructure and other costs related to Main & Market Professional Center project
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation
5,000,000
(iv) City of Wilkes-Barre
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with Wilkes University facilities
Project Allocation
5,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with an economic development project
Project Allocation
5,000,000
(C) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs related to the improvement of facilities for the Wilkes-Barre YMCA
Project Allocation
2,500,000
(D) Acquisition, construction, infrastructure and other costs related to the redevelopment of Citizens Bank Center
Project Allocation
5,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation
5,000,000
(F) Acquisition, construction, infrastructure and other related costs for a project at King's College
Project Allocation
2,000,000
(iv.1) Dupont Borough
(A) Acquisition, construction, infrastructure and other costs related to Wilkes-Barre/Scranton International Airport economic development project
Project Allocation
2,000,000
(v) Edwardsville Borough
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with an energy sector economic development project
Project Allocation
20,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with a manufacturing or technology incubator project
Project Allocation
2,000,000
(vi) Exeter Borough
(A) Construction, infrastructure and other related costs for an economic development and job creation project
Project Allocation
15,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with the redevelopment of a commercial property on Wyoming Avenue
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Wyoming Avenue
Project Allocation
5,000,000
(vi.1) Dallas Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Lt. Michael Cleary Drive
Project Allocation
5,000,000
(vii) Greater Wilkes-Barre Industrial Fund
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Jewish Community Center of Northeastern Pennsylvania
Project Allocation
10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Wyoming Valley Art League
Project Allocation
3,000,000
(viii) Hanover Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project
Project Allocation
5,000,000
(viii.1) Jenkins Township
(A) Construction, infrastructure, acquisition, site preparation, environmental remediation and other related costs for the redevelopment, upgrade, relocation and expansion of a facility
Project Allocation
6,000,000
(viii.2) Kingston Borough
(A) Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the redevelopment of property along Wyoming Avenue
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the economic redevelopment of land along Market Street
Project Allocation
3,000,000
(ix) Luzerne Borough
(A) Construction, renovation, rehabilitation, infrastructure and other related costs associated with an infrastructure project that includes deploying sound barriers to address recent development
Project Allocation
1,500,000
(x) Newport Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with the development of an energy park
Project Allocation
20,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for repurposing SCI Retreat for economic development in the township
Project Allocation
10,000,000
(xi) Plains Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation
5,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with a multiuse sports complex project
Project Allocation
5,000,000
(xii) Pittston City
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation
5,000,000
(xiii) Rice Township
(A) Acquisition, infrastructure, construction and other related costs for a community center in the township
Project Allocation
2,000,000
(xiv) Wilkes-Barre Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation
5,000,000
(41) Lycoming County
(i) County projects
(A) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation
10,000,000
(B) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an open space, trail, tourism and outdoor recreation project in the county
Project Allocation
10,000,000
(42) McKean County
(i) County projects
(A) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation
5,000,000
(B) Acquisition, infrastructure, construction and other related costs for an energy project
Project Allocation
5,000,000
(C) Acquisition, infrastructure, construction, renovation and other related costs for projects at UPMC Kane
Project Allocation
10,000,000
(ii) City of Bradford
(A) Renovation, construction and other related costs to modernize, expand and improve facilities of a rehabilitation center for individuals with disabilities
Project Allocation
3,000,000
(B) Acquisition, infrastructure, construction, renovation, rehabilitation and other related costs for projects at Bradford Regional Medical Center
Project Allocation
10,000,000
(iii) Foster Township
(A) Construction, site work, infrastructure improvements, land acquisition and other related costs for an at-risk youth education and treatment facility on the main campus of Beacon Light
Project Allocation
7,000,000
(43) Mercer County
(i) County projects
(A) Acquisition, construction, infrastructure and abatement of hazardous materials at the former Damascus-Bishop Tube facility in the Reynolds Industrial Park
Project Allocation
1,500,000
(B) Acquisition, construction, infrastructure and other related costs for facilities development
Project Allocation
4,400,000
(C) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an industrial facility
Project Allocation
2,000,000
(D) Construction, infrastructure and other related costs for a work force development center to be built
Project Allocation
2,225,000
(E) Acquisition, construction, redevelopment and infrastructure for a new multitenant health care facility
Project Allocation
2,000,000
(F) Construction and/or renovation of a multitenant facility in the Reynolds Industrial Park
Project Allocation
1,000,000
(G) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(I) Acquisition, construction, infrastructure and related improvements for a recreational facilities project
Project Allocation
5,000,000
(ii) Greenville Area Economic Development Corporation
(A) Acquisition, construction, redevelopment, infrastructure and abatement of hazardous materials for the former Trinity Industries site in Hempfield Township
Project Allocation
3,000,000
(iii) Greenville-Reynolds Development Corporation
(A) Construction, infrastructure and other related costs to erect three versatile commercial buildings in industrial parks within the county
Project Allocation
2,000,000
(iv) Penn-Northwest Development Corporation
(A) Construction, renovation and infrastructure costs related to the conversion of the Sacred Heart Church and rectory into a community theater
Project Allocation
1,500,000
(B) Acquisition and renovation of an industrial manufacturing facility known as the Trinity South Plant
Project Allocation
1,000,000
(C) Construction, renovation, infrastructure and related costs for the expansion of the HopeCAT facility
Project Allocation
2,500,000
(D) Construction, renovation and infrastructure for modernization of fire prevention, chemical storage and overall facility upgrades to the Jamestown Coatings plant
Project Allocation
1,000,000
(E) Construction, redevelopment, infrastructure and abatement of hazardous materials for the expansion of NLMK's operation
Project Allocation
5,000,000
(F) Renovation of all or part of four buildings on East State Street and Chestnut Street in the City of Sharon as part of the redevelopment of Shenango Riverfront
Project Allocation
2,000,000
(G) Construction, infrastructure and other related costs for a community wellness center on the Thiel College Campus
Project Allocation
5,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Grove City
Project Allocation
10,000,000
(I) Construction, renovation and other related costs for the Grove City YMCA to renovate an unoccupied building
Project Allocation
1,000,000
(J) Construction, acquisition, redevelopment, renovation and infrastructure costs for the Town of Greenville central business district improvements
Project Allocation
2,000,000
(v) Borough of Grove City
(A) Acquisition, construction, infrastructure and other related costs for an industrial facility
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure and other related costs for commercial facilities
Project Allocation
1,000,000
(v.1) City of Farrell
(A) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation
2,000,000
(vi) City of Hermitage
(A) Acquisition, construction and infrastructure improvements for a business park project
Project Allocation
3,000,000
(B) Acquisition, construction, infrastructure and related improvements for a Hermitage community and economic development project
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure and related improvements for a Hermitage community recreational facilities project
Project Allocation
3,000,000
(D) Acquisition, construction, renovation and infrastructure improvements for an industrial facility
Project Allocation
3,500,000
(vii) City of Sharon
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the development of the commercial corridor of the city
Project Allocation
3,000,000
(B) Acquisition, construction and redevelopment of the banks of the Shenango River within the city
Project Allocation
5,000,000
(C) Infrastructure, construction and other related costs for the WaterFire Sharon riverbank development
Project Allocation
4,000,000
(44) Mifflin County
(i) County projects
(A) Acquisition, construction, site preparation, infrastructure and other related costs for a community and economic development project in the county
Project Allocation
25,000,000
(ii) Mifflin County Industrial Development Authority
(A) Abatement of hazardous materials, demolition and redevelopment of abandoned building number four located in the MCIDC Plaza
Project Allocation
1,000,000
(45) Monroe County
(i) County projects
(A) Acquisition, construction, renovation, infrastructure and other costs related to economic development projects
Project Allocation
10,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(ii) Monroe County Industrial Development Authority
(A) Construction, infrastructure and other related costs for redevelopment of the Chelsea property
Project Allocation
5,000,000
(B) Construction, infrastructure and other related costs for development of an industrial property on Airstrip Road
Project Allocation
5,000,000
(C) Construction, infrastructure and other related costs for development of a commercial site on Sullivan Trail
Project Allocation
3,000,000
(D) Construction, infrastructure and other related costs for redevelopment of the former Birchwood Resort property
Project Allocation
5,000,000
(E) Construction, infrastructure and other related costs for redevelopment of the site of the former Mount Pocono Golf Course
Project Allocation
5,000,000
(F) Construction, infrastructure and other related costs for redevelopment of an industrial property on North Road
Project Allocation
5,000,000
(G) Construction, infrastructure and other related costs for redevelopment of an industrial property located at 303 Possinger Drive
Project Allocation
5,000,000
(H) Construction, infrastructure and other related costs for redevelopment of property located at 142 Quarry Lane
Project Allocation
3,000,000
(I) Construction, infrastructure and other related costs for development of the Lynch Corporation property
Project Allocation
3,000,000
(J) Construction, infrastructure and other related costs for redevelopment of the former HJ Davis property
Project Allocation
3,000,000
(K) Construction, infrastructure and other related costs for the Monroe Career and Technical Institute (MCTI)
Project Allocation
2,000,000
(ii.1) Pocono Mountains Economic Development Corporation
(A) Construction, infrastructure, redevelopment, renovation and other related costs for repairs, upgrades and improvements to the existing facilities of the Salvation Army of East Stroudsburg
Project Allocation
4,000,000
(iii) Borough of East Stroudsburg
(A) Construction, infrastructure, renovation and other related costs for improvements to the East Stroudsburg University athletic and academic facilities
Project Allocation
10,000,000
(B) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(iii.1) Stroudsburg Borough
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(iii.2) Barrett Township
(A) Construction, infrastructure and other related costs to develop a parcel of township-owned land for an administrative and recreation complex
Project Allocation
600,000
(iii.3) Chestnuthill Township
(A) Acquisition, construction, infrastructure and other related costs for a shared emergency services facility
Project Allocation
2,500,000
(iii.4) Coolbaugh Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(iii.5) Paradise Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(iv) Pocono Township
(A) Construction, infrastructure, renovation and other related costs for the Center for Advanced Technology and Sustainability at the Northampton Community College Monroe campus
Project Allocation
2,500,000
(v) Price Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(vi) Stroud Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
10,000,000
(46) Montgomery County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing
Project Allocation
10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Montgomery County hub facility project
Project Allocation
1,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
30,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
30,000,000
(G) Acquisition, infrastructure, construction and other related costs for renovation and expansion of Rosemont College's Cardinal Hall
Project Allocation
2,500,000
(H) Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy training facility
Project Allocation
7,000,000
(I) Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy center
Project Allocation
7,000,000
(J) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates
Project Allocation
20,000,000
(K) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for the redevelopment of Elmwood Park Zoo
Project Allocation
10,000,000
(L) Demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improvements to Enfield Elementary School
Project Allocation
5,000,000
(M) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(i.1) Horsham Land Redevelopment Authority
(A) Construction, infrastructure, redevelopment, renovation and other related costs to redevelop Naval Air Station Joint Reserve Base Willow Grove in Horsham Township
Project Allocation
35,000,000
(i.2) Montgomery County Redevelopment Authority
(A) Acquisition, site preparation, infrastructure, renovations, construction and other related costs for the development of a railroad trestle plaza and riverfront development in Royersford Borough
Project Allocation
5,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment and other related costs for the expansion of Merion Hall on Saint Joseph's University campus
Project Allocation
7,400,000
(ii) Pottstown Area Industrial Development, Inc.
(A) Construction, rehabilitation, renovation, rehabilitation and other related costs for the Hard Hat Cherry Street improvement project
Project Allocation
500,000
(B) Construction, infrastructure, equipment and other related costs for the American Keg Company deep draw press project
Project Allocation
1,000,000
(C) Construction, rehabilitation, abatement of hazardous materials and other related costs for renovation, remediation and redevelopment of the former Pottstown Plating Works property
Project Allocation
1,250,000
(D) Construction, redevelopment and other related costs for the Iron Globe Entertainment Complex project
Project Allocation
5,000,000
(E) Infrastructure, redevelopment and other related costs for Pottstown Sustainable Energy Plant
Project Allocation
2,000,000
(F) Acquisition, redevelopment, infrastructure and other related costs for the expansion of production and hiring in Pottstown Borough
Project Allocation
1,000,000
(G) Redevelopment, construction and other related costs for the renovation of an industrial site in Pottstown Borough
Project Allocation
5,000,000
(H) Redevelopment, construction, renovation, remediation and other related costs for the development of a vacant and blighted property in Pottstown Borough
Project Allocation
1,250,000
(I) Infrastructure, construction, renovation and other related costs for the redevelopment of an underutilized building in Pottstown Borough
Project Allocation
500,000
(ii.1) Ambler Borough
(A) Infrastructure, redevelopment, construction and other related costs for parking garage on Lindenwold Avenue
Project Allocation
2,000,000
(B) Infrastructure, redevelopment, construction and other related costs for parking lot, including street safety, mobility and parking improvements, and storm sewer enhancements on Poplar Street
Project Allocation
700,000
(C) Construction, rehabilitation and other related costs for Montco SAAC Senior Center Facility
Project Allocation
2,500,000
(ii.2) Collegeville Borough
(A) Construction, infrastructure, restoration, renovation and other related costs for redevelopment
Project Allocation
6,000,000
(ii.3) Conshohocken Borough
(A) Construction, infrastructure, redevelopment and other related costs for development at First and Fayette Streets
Project Allocation
10,000,000
(ii.4) Hatboro Borough
(A) Infrastructure, construction and other related costs for rehabilitation, expansion and modernization of borough facilities, including borough hall, police station and public works building
Project Allocation
1,500,000
(B) Acquisition, infrastructure, preservation and other related costs for reuse of existing historic facility
Project Allocation
2,500,000
(iii) Jenkintown Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery, equipment and other related costs for the municipal offices and police station improvement and/or relocation project
Project Allocation
3,000,000
(B) Construction, renovation, rehabilitation and other costs related to campus construction, renovations and miscellaneous improvement projects at Manor College
Project Allocation
5,000,000
(iii.1) Lansdale Borough
(A) Infrastructure and other related costs for facility improvements and renovation of Fairmount Volunteer Fire Company's fire house on Vine Street in Lansdale, including HVAC, fire doors and generator upgrades
Project Allocation
4,000,000
(B) Renovations, rehabilitation, construction and other related costs to restore a historic freight house building into a visitor and welcome center, community hub and venue
Project Allocation
5,000,000
(iv) Narberth Borough
(A) Construction, renovation and rehabilitation of 201 Sabine Avenue to provide economic and community benefits by improving the park and building facilities
Project Allocation
3,000,000
(B) Construction, infrastructure, renovation, site work and other related costs for the redevelopment of a property
Project Allocation
3,000,000
(v) Norristown Borough
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for primary care, outpatient, clinical and education facilities at the Nicholas and Athena Karabots Medical Building
Project Allocation
5,000,000
(B) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for public safety projects
Project Allocation
10,000,000
(C) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation
10,000,000
(D) Construction, infrastructure improvements and other costs related to new mixed-income development in downtown Norristown
Project Allocation
2,000,000
(E) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for medical office building
Project Allocation
5,000,000
(F) Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on Markley Street
Project Allocation
2,500,000
(G) Construction, infrastructure, redevelopment and other related costs for the George Washington Carver Community Center
Project Allocation
2,000,000
(H) Acquisition, construction, rehabilitation and other related costs for a new Montco SAAC Senior Center
Project Allocation
5,000,000
(v.1) North Wales Borough
(A) Construction, renovation and other related costs for the North Penn fire house
Project Allocation
650,000
(v.2) Pottstown Borough
(A) Infrastructure, improvements, redevelopment, construction and other related costs to update a storm water system
Project Allocation
3,750,000
(B) Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water system section on High Street
Project Allocation
750,000
(C) Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation
1,000,000
(D) Infrastructure, construction, rehabilitation, equipment and other related costs for STEM Pavilion main entrance, facade, addition and expansion for Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation
3,000,000
(E) Infrastructure, construction, rehabilitation, equipment and other related costs for renovation of South Hall Building, facade, exterior, second floor and parking lot on the Montgomery County Community College Pottstown Campus
Project Allocation
22,000,000
(F) Construction, infrastructure, redevelopment and other related costs to create a North Hall Gateway on the Montgomery County Community College Pottstown Campus
Project Allocation
4,000,000
(G) Acquisition, construction, renovation, equipment and other related costs for Hanover Building on the Montgomery County Community College Pottstown Campus
Project Allocation
3,000,000
(H) Infrastructure, construction and related costs to build multisport athletic fields on the Montgomery County Community College Pottstown Campus
Project Allocation
15,000,000
(I) Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation
1,000,000
(v.3) Souderton Borough
(A) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township
Project Allocation
2,500,000
(v.4) Telford Borough
(A) Infrastructure and other related costs for facility improvements and renovations of Telford Volunteer Fire Company's fire house
Project Allocation
4,000,000
(v.5) Trappe Borough
(A) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the development of a new fire station
Project Allocation
4,500,000
(vi) Abington Township
(A) Construction and infrastructure relating to storm water management projects as identified by the township's storm water management plan
Project Allocation
15,000,000
(B) Construction, renovation, rehabilitation and infrastructure relating to the building of a new municipal building to increase resident access to township services
Project Allocation
10,500,000
(C) Construction and infrastructure relating to the creation of an inclusive park in the township for use by disabled individuals and others
Project Allocation
550,000
(D) Acquisition, construction, renovation, remediation, site work, infrastructure and related improvements for a filtration project
Project Allocation
6,000,000
(vii) Cheltenham Township
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Elkins Park projects
Project Allocation
15,000,000
(B) Construction, renovation, rehabilitation, abatement of hazardous materials, infrastructure and replacement of aging property related to the repair of two heavily traveled bridges, rebuilding the entrance areas to Curtis Arboretum and rebuilding and consolidation of the township pool system
Project Allocation
7,500,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other expenses related to the consolidation of township facilities onto specified township sites
Project Allocation
27,000,000
(D) Construction, infrastructure improvements, including rehabilitation of sanitary sewer system, and other related costs for business development
Project Allocation
6,000,000
(E) Construction, infrastructure improvements and other costs related to pedestrian signals and crossings
Project Allocation
2,000,000
(F) Acquisition, construction, redevelopment and other related costs for public works facility relocation
Project Allocation
7,500,000
(G) Acquisition, construction, infrastructure and other costs related to Glenside area flood protection project
Project Allocation
10,000,000
(H) Construction, infrastructure, renovation and other related costs for the restoration of the Beth Sholom synagogue
Project Allocation
15,000,000
(vii.1) Douglass Township
(A) Construction, infrastructure and other related costs for a firehouse and emergency services building, including, but not limited to, site work, landscaping and curb and sidewalk changes
Project Allocation
1,510,000
(viii) East Norriton Township
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Montgomery projects
Project Allocation
15,000,000
(B) Construction, infrastructure improvements and other costs related to renovation of patient rooms
Project Allocation
2,000,000
(viii.1) Hatfield Township
(A) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for an updated location for the Hatfield Township Police Department
Project Allocation
4,000,000
(B) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township
Project Allocation
5,000,000
(C) Infrastructure and other related costs for facility improvements and renovations of Colmar Volunteer Fire Company fire house
Project Allocation
5,000,000
(viii.2) Horsham Township
(A) Construction, infrastructure, renovation and other related costs to convert the Horsham Soccer Association's home field complex from grass to turf
Project Allocation
600,000
(B) Construction, infrastructure, renovation and other related costs to construct a Miracle Field for visually impaired players and players in wheelchairs and construction of a new facility to house concessions, restrooms, storage and a meeting room at Deep Meadow Park
Project Allocation
1,250,000
(viii.3) Limerick Township
(A) Construction, renovation, infrastructure, redevelopment, realignment and other related costs for ramps, roadways, intersections and utilities for regional economic and cultural or civic development in Limerick Township
Project Allocation
14,000,000
(B) Site preparation, demolition, construction, infrastructure, rehabilitation and other related costs for the redevelopment of a pharmaceutical manufacturing facility
Project Allocation
1,900,000
(ix) Lower Gwynedd Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to a health care innovation project at Gwynedd Mercy University's campus
Project Allocation
10,000,000
(B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project
Project Allocation
10,000,000
(C) Construction, infrastructure and other related costs for a new fire substation to assist the North Penn Volunteer Fire Company
Project Allocation
5,000,000
(D) Land acquisition, construction, infrastructure and other related costs for a new public works facility
Project Allocation
6,250,000
(x) Lower Merion Township
(A) Construction, acquisition, infrastructure improvement, renovation, rehabilitation and associated costs for the expansion of Merion Hall on the Saint Joseph's University Campus to accommodate growth of the Kinney Center, which provides support for those on the autism spectrum
Project Allocation
7,400,000
(B) Construction, infrastructure, renovation, rehabilitation and other costs related to renovation and/or replacement of the Ardmore Avenue Community Center and the PALM Senior Center
Project Allocation
6,000,000
(C) Construction, infrastructure, improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project
Project Allocation
10,000,000
(xi) Lower Providence Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
5,000,000
(B) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a fire department facility and an emergency medical services facility
Project Allocation
2,500,000
(C) Infrastructure, construction and other related costs, including abatement of hazardous materials, for redevelopment of a superfund site at Lower Providence Business Park
Project Allocation
2,500,000
(xii) Lower Salford Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new public works complex with a detached salt storage building
Project Allocation
2,100,000
(xiii) Plymouth Township
(A) Acquisition, construction, renovation, redevelopment, site preparation, infrastructure and other related costs for a municipal administration building, police station, public works garage and other municipal buildings
Project Allocation
10,000,000
(B) Design, site preparation, demolition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the Plymouth Meeting Mall
Project Allocation
14,000,000
(C) Construction, infrastructure improvements and renovations for the East Plymouth Valley Park Little League facility
Project Allocation
500,000
(D) Construction, demolition, renovations, hazardous materials abatement, infrastructure and other related costs for improvements to and an expansion of Harmonville Fire Company
Project Allocation
4,500,000
(xiv) Skippack Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
5,000,000
(xv) Springfield Township
(A) Acquisition and construction of a new fire station on an existing vacant industrial property
Project Allocation
2,500,000
(xvi) Upper Dublin Township
(A) Acquisition, renovation, infrastructure development, site preparation and construction to support redevelopment and revitalization of Fort Washington Office Park
Project Allocation
10,000,000
(B) Reconstruction, repair, renovation, infrastructure, redevelopment and other related costs to upgrade the township building
Project Allocation
10,000,000
(C) Construction, infrastructure, renovation and other related costs for the reconstruction of the tornado-damaged Upper Dublin Township building
Project Allocation
10,000,000
(xvii) Upper Merion Township
(A) Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the expansion and redevelopment of land and buildings
Project Allocation
2,500,000
(B) Construction and other related costs for ambulance station project
Project Allocation
1,000,000
(C) Construction, infrastructure, redevelopment and other related costs for projects related to Triad commercial office facility in King of Prussia
Project Allocation
3,000,000
(D) Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the redevelopment of a Top Golf facility
Project Allocation
5,000,000
(E) Construction, rehabilitation, site preparation, infrastructure, renovation and other related costs for the redevelopment of the First Avenue Linear Park multimodal trail
Project Allocation
657,962
(F) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of the Maurice Stephens House in Valley Forge Park
Project Allocation
1,000,000
(xviii) Upper Moreland Township
(A) Construction, infrastructure improvements and other related costs for Willow Grove Industrial Commons, including construction of regional storm water management basin to improve economic development of the area
Project Allocation
500,000
(B) Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials, redevelopment and other related costs for improvements to PA 611 and I-276 Exit 343
Project Allocation
2,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of economic and community development projects in the township, including township buildings and facilities
Project Allocation
5,000,000
(xix) Upper Providence Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation
5,000,000
(xx) West Norriton Township
(A) Construction, infrastructure, restoration, renovation and other related costs for the redevelopment of Jeffersonville Golf Club
Project Allocation
3,444,100
(B) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a community center
Project Allocation
5,000,000
(xxi) Whitemarsh Township
(A) Construction, infrastructure improvements and other costs related to AIM Institute for Learning and Research redevelopment and expansion project
Project Allocation
3,500,000
(xxii) Whitpain Township
(A) Infrastructure, rehabilitation, equipment and related costs for the construction of the Hospitality Institute at Montgomery County Community College
Project Allocation
15,000,000
(B) Development, construction and related costs for the athletic fields, amphitheater and stadium complex at Montgomery County Community College
Project Allocation
20,000,000
(C) Construction, infrastructure and other related costs for renovation of Montgomery County Community College Science Center's west wing
Project Allocation
1,500,000
(D) Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project
Project Allocation
6,000,000
(E) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Mermaid Park
Project Allocation
2,000,000
(47) Montour County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation
5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation
10,000,000
(48) Northampton County
(i) County projects
(A) Construction, renovation infrastructure and redevelopment of the Nazareth YMCA
Project Allocation
3,500,000
(B) Construction, infrastructure and other related costs for a multipurpose indoor and outdoor sports complex in the Lehigh Valley
Project Allocation
9,500,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the Lehigh Valley Health Network facilities
Project Allocation
10,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for St. Luke's Hospital Easton campus
Project Allocation
10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
15,000,000
(G) Acquisition, construction, rehabilitation, infrastructure improvements and other related costs for historic rehabilitation and other improvements in the Historic Moravian Bethlehem national historic landmark district and contributing properties to the district
Project Allocation
3,000,000
(ii) Bangor Area Commercial and Industrial Development Authority
(A) Acquisition, construction, infrastructure and other related costs for redevelopment and site improvements to the former Portland Power Plant
Project Allocation
11,000,000
(iii) City of Bethlehem
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, demolition and other costs related to a mixed-use building on the Northside
Project Allocation
5,000,000
(B) (Reserved)
(C) Construction, infrastructure, renovation, rehabilitation and other costs related to the maintenance and preservation efforts related to the aging blast furnaces on the SteelStacks campus
Project Allocation
15,000,000
(D) Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of the National Museum of Industrial History
Project Allocation
3,000,000
(E) Construction, infrastructure, renovation, rehabilitation and other costs relating to the construction, facilities improvements, infrastructure upgrade and redevelopment of buildings on the ArtsQuest SteelStacks campus
Project Allocation
7,500,000
(F) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation
10,000,000
(G) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for a mixed-use development project
Project Allocation
1,000,000
(H) Construction, infrastructure, renovation and rehabilitation of the National Museum of Industrial History, including expansion of museum exhibit space
Project Allocation
4,000,000
(iv) City of Easton
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation
10,000,000
(B) Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the former Easton Iron & Metal site
Project Allocation
5,000,000
(C) Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the Pine Street Garage
Project Allocation
8,000,000
(D) Site preparation, renovation, construction, redevelopment, infrastructure and other related costs for the redevelopment of the former Stewart Silk Mill tract
Project Allocation
2,500,000
(E) Construction, infrastructure and other costs related to redevelopment of mixed-use commercial and office building with integrated parking and residential upper floor
Project Allocation
2,000,000
(F) Acquisition, construction and other related costs for redevelopment of Ferry Street
Project Allocation
3,000,000
(G) Acquisition, construction and other related costs for redevelopment of Centre Square
Project Allocation
10,000,000
(H) Construction, infrastructure, site preparation, site work, renovation and other related costs associated with the Watermark Easton residential development project
Project Allocation
3,000,000
(iv.1) Freemansburg Borough
(A) Construction, infrastructure and other related costs for fire, administration and public works department facilities
Project Allocation
2,000,000
(v) Hellertown Borough
(A) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Champion Spark Plug Factory
Project Allocation
15,000,000
(B) Acquisition, construction, infrastructure and other costs related to rehabilitation of former Champion Spark Plug facility
Project Allocation
2,500,000
(v.1) Pen Argyl Borough
(A) Construction, redevelopment and other related costs for an outdoor aquatic facility incorporating a splash pad, swimming pool and ice rink
Project Allocation
2,500,000
(vi) Tatamy Borough
(A) Construction, acquisition, renovation, rehabilitation and other costs related to an addition to the municipal building for the police department and police vehicle parking and the purchase of land and the construction of a community center and yard waste facility
Project Allocation
2,000,000
(vii) Wilson Borough
(A) Construction, acquisition, infrastructure and other costs relating to the construction of a new Wilson Borough Police Department station
Project Allocation
2,000,000
(B) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Dixie Cup site
Project Allocation
15,000,000
(viii) Bethlehem Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to an improvement for the Northampton Community College Multicultural Center
Project Allocation
1,000,000
(B) Construction, renovation, rehabilitation, infrastructure and other costs related to support the creation of the Student Veteran's Center at Northampton Community College
Project Allocation
1,000,000
(C) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at William Penn Elementary School
Project Allocation
7,000,000
(D) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Thomas Jefferson Elementary School
Project Allocation
7,000,000
(E) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Freedom High School
Project Allocation
12,000,000
(F) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at East Hills Middle School
Project Allocation
10,000,000
(G) Rehabilitation, infrastructure, site preparation, environmental remediation and other costs related to rehabilitation and improvement projects at the historic Archibald Johnston property
Project Allocation
1,000,000
(ix) Hanover Township
(A) Construction, infrastructure and other related costs for nonhighway roads and other infrastructure at the Majestic Business Park at the Lehigh Valley International Airport
Project Allocation
20,000,000
(B) Construction and other related costs for a community pool facility
Project Allocation
1,500,000
(ix.1) Lehigh Township
(A) Construction and other related costs for a new township maintenance facility
Project Allocation
1,500,000
(x) Moore Township
(A) Construction of a new, or renovation of the existing, municipal building housing administration, police department and a public meeting room
Project Allocation
3,000,000
(xi) Upper Mount Bethel Township
(A) Acquisition, construction, infrastructure and other related costs for development of River Pointe Commerce Center
Project Allocation
25,000,000
(49) Northumberland County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation
5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, renovation and other related costs for a new and independent community college
Project Allocation
5,000,000
(D) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the renovation of a former elementary school to become a multipurpose community center in Riverside Borough
Project Allocation
2,500,000
(ii) DRIVE - Economic Development Pennsylvania
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for construction of an industrial facility
Project Allocation
5,000,000
(iii) City of Sunbury
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Textile facility
Project Allocation
3,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Community Hospital site
Project Allocation
5,000,000
(C) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for consolidation of the fire companies within the city
Project Allocation
5,000,000
(D) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the renovation and expansion of an existing multipurpose community facility
Project Allocation
3,000,000
(50) Perry County
(i) County projects
(A) Construction, infrastructure, acquisition and other related development costs for an economic development project in the county
Project Allocation
10,000,000
(B) Construction, infrastructure, acquisition and other related development costs for a new Government Center
Project Allocation
10,000,000
(51) Philadelphia County
(i) County projects
(A) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation
250,000,000
(B) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation
185,000,000
(C) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation
30,000,000
(D) Construction, renovation, acquisition, infrastructure improvement, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, education and exterior facilities of Temple University Hospital and affiliated physician practices
Project Allocation
60,000,000
(E) Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Health System
Project Allocation
60,000,000
(F) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, education and exterior facilities of Temple University Health System
Project Allocation
30,000,000
(G) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital-Boyer Pavilion
Project Allocation
40,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
100,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation
100,000,000
(J) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for WES Health System facilities
Project Allocation
10,000,000
(K) Design, planning, acquisition, demolition, abatement of hazardous materials, extensions or upgrading of utilities, site grading, storm water management, construction of new space or addition to and renovation of existing space, infrastructure upgrades and other related costs within an area bounded by the Schuylkill River, the Schuylkill Expressway, 26th Street and Penrose Avenue, including adjacent lots
Project Allocation
100,000,000
(L) Construction, infrastructure, renovation, rehabilitation, historic preservation and related costs for Memorial Hall
Project Allocation
25,000,000
(M) Acquisition, demolition, renovation, remediation, construction, infrastructure and other related costs for the development of campus assets and adjacent properties for Drexel University
Project Allocation
30,000,000
(N) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at St. Christopher's Hospital for Children
Project Allocation
20,000,000
(O) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation
3,000,000
(P) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, including electrical wiring, vacant lot stabilization and other related costs for affordable housing developments owned, managed or supported by the Philadelphia Housing Authority
Project Allocation
250,000,000
(i.1) Philadelphia Industrial Development Corporation
(A) Construction, redevelopment and other related costs for the renovation of the International Union of Elevator Constructors (IUEC) Local 5 building
Project Allocation
1,000,000
(B) Construction and other related costs for a cold storage facility for a local community food bank
Project Allocation
2,000,000
(i.2) Philadelphia Authority for Industrial Development
(A) Site preparation, construction, acquisition, infrastructure and other related costs for the development of the Floating Water Workshop facility in Philadelphia
Project Allocation
3,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for the improvement and expansion of athletic facilities on Saint Joseph's University Campus
Project Allocation
7,000,000
(i.3) Philadelphia Industrial Redevelopment Authority
(A) Reconstruction of the Trocadero Theatre, including construction, infrastructure, redevelopment and other related costs
Project Allocation
5,000,000
(i.4) Schuylkill River Development Corporation
(A) Acquisition, construction, infrastructure and other costs related to Schuylkill Banks redevelopment and improvement projects
Project Allocation
20,000,000
(ii) City of Philadelphia
(A) Construction, renovation, rehabilitation and other related costs for improvements at Eastwick Park and Suffolk Park
Project Allocation
600,000
(B) Construction, infrastructure, redevelopment and other related costs for the uCity Square innovative district
Project Allocation
10,000,000
(C) Renovation and rehabilitation of church property to construct a permanent fence around the perimeter
Project Allocation
500,000
(D) Acquisition, site preparation, renovation, construction, redevelopment, infrastructure and associated costs for the improvement and expansion of athletic facilities on the Saint Joseph's University campus
Project Allocation
7,000,000
(E) Infrastructure, renovation and rehabilitation of Bethesda Manor and the Mt. Airy Administration Building
Project Allocation
2,000,000
(F) Construction, acquisition, infrastructure, renovation and rehabilitation of the Broad and Olney Business District
Project Allocation
500,000
(G) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs relating to a project to improve public recreation facilities, public amenities and commercial storefronts
Project Allocation
500,000
(H) Construction, infrastructure, renovation and rehabilitation along the Stenton Avenue Business District
Project Allocation
450,000
(I) Construction, acquisition, infrastructure, renovation and rehabilitation of St. Michael's Hall mansion
Project Allocation
5,000,000
(J) Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of an indoor go-cart track, classroom space and garage
Project Allocation
15,000,000
(K) Construction, infrastructure, renovation and other related costs for the Women Empowered 4 Life state-of-the-art center
Project Allocation
750,000
(L) Construction, infrastructure and other costs relating to a 14,000-square-foot addition to an existing charter school facility to alleviate student and staff overcrowding and space shortages
Project Allocation
2,600,000
(M) Construction, infrastructure, renovation and rehabilitation of additional square feet to the existing facility for the Ryeco LLC project
Project Allocation
6,000,000
(N) Construction, infrastructure, renovation and other related costs for the Salvation Army West Philadelphia Corps Development project
Project Allocation
6,000,000
(O) Construction and other costs related to the restoration of the church spire and replacement of the roof at Arch Street United Methodist Church
Project Allocation
10,000,000
(P) (Reserved)
(Q) Construction, infrastructure, renovation and rehabilitation of the Arch Street Presbyterian Church
Project Allocation
5,000,000
(R) Construction and infrastructure relating to the reconstruction of the Historic Tun Tavern
Project Allocation
5,000,000
(S) Construction, acquisition, infrastructure, renovation and rehabilitation relating to Peirce College projects
Project Allocation
5,000,000
(T) Construction, infrastructure, renovation, rehabilitation and other costs related to the demolition, expansion and construction of a new center for Dare to Imagine Church, Inc.
Project Allocation
2,000,000
(U) Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Water Tower Recreation Center
Project Allocation
10,000,000
(V) Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Waterview Recreation Center
Project Allocation
10,000,000
(W) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for capital improvements and development of an autism, early childhood and adult services center for SPIN, Inc.
Project Allocation
4,000,000
(X) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the Philadelphia State Hospital at Byberry, Self Help Movement Inc., facility
Project Allocation
5,000,000
(Y) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the IUEC5 building
Project Allocation
1,000,000
(Z) Construction, infrastructure, acquisition, abatement of hazardous materials and other costs related to projects at Jefferson-Torresdale Hospital in Northeast Philadelphia
Project Allocation
3,000,000
(AA) Construction, infrastructure, renovation, rehabilitation and other costs related to the facilities master plan of the Philadelphia Museum of Art
Project Allocation
15,000,000
(BB) Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the rehabilitation of the Charles Jacquin Et Cie, Inc. distillery
Project Allocation
7,500,000
(CC) Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of a dedicated building for vocational training and work force development
Project Allocation
4,000,000
(DD) Construction, acquisition, renovation, rehabilitation and other costs related to improvements to and the expansion of Liguori Academy
Project Allocation
2,000,000
(EE) Construction, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of Philadelphia's industrial real estate stock along the major inner-city trucking corridor of Castor Avenue and East Erie Avenue
Project Allocation
20,000,000
(FF) Acquisition, construction, renovations, infrastructure and other related costs for the Gaudenzia Foundation project
Project Allocation
10,000,000
(GG) (Reserved)
(HH) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to physical plant renovations and miscellaneous improvement projects at the Library Company of Philadelphia
Project Allocation
5,000,000
(II) Construction, acquisition, renovation, rehabilitation and other costs related to the South Street Art Gallery
Project Allocation
2,500,000
(JJ) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a child care facility project
Project Allocation
5,000,000
(KK) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a work force development project
Project Allocation
5,000,000
(LL) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs relating to an affordable housing project
Project Allocation
5,000,000
(MM) Acquisition, construction, infrastructure and equipment related to the development of a youth career and entrepreneurial innovation center in North Philadelphia
Project Allocation
5,000,000
(NN) Acquisition, construction and development of a complex of neighborhood multiseason, multipurpose indoor and outdoor sports facilities at Hartranft Community Center
Project Allocation
20,000,000
(OO) Acquisition, construction, infrastructure and equipment related to a Title IX sports complex in North Philadelphia
Project Allocation
10,000,000
(PP) Rehabilitation, construction, infrastructure and equipment related to the redevelopment of Youthbuild Charter School in North Philadelphia
Project Allocation
8,000,000
(QQ) Acquisition, construction, infrastructure and equipment related to the development of the Life Do Grow Farm
Project Allocation
1,000,000
(RR) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Cecil B. Moore corridor in North Philadelphia
Project Allocation
10,000,000
(SS) Acquisition, construction, infrastructure and equipment related to the development of a technical training institute in North Philadelphia
Project Allocation
10,000,000
(TT) Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center in North Philadelphia
Project Allocation
5,000,000
(UU) Construction and renovations for a Happy Hollow Recreation Center
Project Allocation
5,000,000
(VV) Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center for the formerly convicted in North Philadelphia
Project Allocation
2,000,000
(WW) Acquisition, construction, infrastructure and equipment related to an economic development project promoting the cultures of Africa
Project Allocation
2,000,000
(XX) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center in Hunting Park
Project Allocation
5,000,000
(YY) Construction and renovations for a One Day At A Time Recovery Center at 17th and Cambria Streets
Project Allocation
2,000,000
(ZZ) Acquisition and renovation to establish a permanent office space for the N. 5th Street Revitalization Project (Olney Community Collaborative), as well as tenant space for additional businesses/services providing social service resources (digital access, housing programs, food insecurity, etc.), work force development, job development training and experience and technical assistance for small business owners
Project Allocation
500,000
(AAA) Construction, acquisition, infrastructure improvements, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, green infrastructure, public amenities and commercial storefronts/façades on the Broad and Olney Business District and adjacent corridors
Project Allocation
500,000
(BBB) Construction, infrastructure improvements, redevelopment, equipment and other related costs for youth football fields across the City of Philadelphia
Project Allocation
30,000,000
(CCC) Acquisition, demolition, construction, renovation, infrastructure and other development costs for emergency, inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Philadelphia projects. Einstein intends to enhance and expand current medical center operations, including, but not limited to, expansion/renovation of the Emergency Department and enhancing educational experiences with expansion/renovation of Medical Library
Project Allocation
15,000,000
(DDD) Historic adaptive redevelopment of a nine-story, 600,000-square-foot building at 2700 North Broad Street. Current plans call for the first and second floors to be commercial/retail use, anchored by a grocery store. Third, fourth and fifth floors will contain medical office space to be used by a recognized, local educational institution. The remaining four floors will be comprised of 120 units of market rate and affordable apartments. Originally, the building was designed by renowned architect Albert Kahn and constructed in 1913-1914 as a manufacturing facility for the Ford Motor Company. 2700 North Broad was the largest building in the Automobile Row district and served as regional health quarters for Ford. Due to the building having sat vacant for several decades, the redevelopment costs are anticipated to be very high to save this historic structure
Project Allocation
15,000,000
(EEE) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to facility upgrades at the Kimmel Center, Inc.
Project Allocation
10,000,000
(FFF) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the Red Shield Family Residence
Project Allocation
1,000,000
(GGG) Acquisition, construction, infrastructure, redevelopment and other related costs for the Greenfield House Community Center project
Project Allocation
600,000
(HHH) Acquisition, demolition, construction, renovation, infrastructure and other related costs for Thomas Jefferson University projects
Project Allocation
25,000,000
(III) Construction, facility improvements, infrastructure and other related costs for the Special Smiles project
Project Allocation
1,500,000
(JJJ) Acquisition, construction, infrastructure, redevelopment and other related costs for a project to make improvements to an elementary school on Saint Joseph's University campus
Project Allocation
10,000,000
(KKK) Acquisition, construction, infrastructure, redevelopment and other related costs for the West Philadelphia Revitalization project
Project Allocation
10,000,000
(LLL) Acquisition, construction, infrastructure, redevelopment and other related costs for the North Philadelphia Revitalization project
Project Allocation
10,000,000
(MMM) Construction, renovation, rehabilitation and other costs associated with the redevelopment of the Huntingdon project to create work spaces, residential units, a food hall and a ghost kitchen
Project Allocation
4,000,000
(NNN) Construction, renovation, rehabilitation and other costs related to the construction of the 52nd Street Hub, including a building to contain commercial, business and communal office spaces, as well as community space for the business community to facilitate entrepreneurial growth in underserved neighborhoods
Project Allocation
5,000,000
(OOO) Construction, acquisition, infrastructure, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, improve public amenities, preserve and reuse historic property and improve commercial storefronts in the area around the Broad, Germantown and Erie intersection in North Philadelphia
Project Allocation
40,000,000
(PPP) Acquisition, construction, infrastructure, renovation and other related costs for the Consortium's Hope Counseling Center
Project Allocation
8,000,000
(QQQ) Acquisition, construction, infrastructure, renovation and other related costs for parks, recreation centers and libraries as part of the Philadelphia Rebuild Program
Project Allocation
50,000,000
(RRR) Acquisition, site preparation, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects within the Allegheny West neighborhood
Project Allocation
25,000,000
(SSS) Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of the outdoor campus and the interior building for the Woodmere Art Museum restoration and expansion project
Project Allocation
5,000,000
(TTT) Construction, infrastructure, renovation and other related costs for the Liberty 53: Estelle Richman Place project
Project Allocation
3,000,000
(UUU) Acquisition, construction, infrastructure, redevelopment and other related costs for the Neighborhood Engagement Initiative affordable housing project
Project Allocation
10,000,000
(VVV) Acquisition, construction, infrastructure, redevelopment and other related costs for the Enterprise Center Entrepreneurial campus development project
Project Allocation
10,000,000
(WWW) Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Hospital
Project Allocation
60,000,000
(XXX) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital
Project Allocation
60,000,000
(YYY) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Episcopal campus
Project Allocation
40,000,000
(ZZZ) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, education and exterior facilities for Fox Chase Cancer Center
Project Allocation
60,000,000
(AAAA) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Jeanes campus
Project Allocation
40,000,000
(BBBB) Acquisition, site improvements, construction and other related costs for a minority-owned, unionized modular manufacturing factory which will offer cross-training of construction trades
Project Allocation
5,000,000
(CCCC) Construction, infrastructure, restoration, redevelopment and other costs related to projects in The Woodlands' National Historic Landmark District
Project Allocation
5,000,000
(DDDD) Acquisition, construction, infrastructure, renovation and other costs related to the redevelopment of a recreation center and related facilities along Chester Avenue
Project Allocation
10,000,000
(EEEE) Infrastructure, improvements, redevelopment, construction, site development and other related costs for the expansion of a school building
Project Allocation
3,000,000
(FFFF) Construction, renovation, infrastructure, acquisition and other related costs associated with enhanced access to the AdvanSix facility for improved public safety, including upgraded pipeline and dock operations, in the Bridesburg neighborhood
Project Allocation
30,000,000
(GGGG) Construction, rehabilitation, infrastructure and other related costs for a sports complex and activity center
Project Allocation
8,000,000
(HHHH) Construction, infrastructure, renovation, preparation and other related costs for the redevelopment of buildings and facilities at the Philadelphia Urban Riding Academy
Project Allocation
500,000
(IIII) Construction, infrastructure, acquisition, site development, preparation and other related costs for the expansion and redevelopment of a homeless shelter in Center City
Project Allocation
5,000,000
(JJJJ) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the Walnut Street Theatre
Project Allocation
10,000,000
(KKKK) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Girard College
Project Allocation
10,000,000
(LLLL) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Philadelphia Technician Training Institute
Project Allocation
10,000,000
(MMMM) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Independence Seaport Museum at Penn's Landing
Project Allocation
8,000,000
(NNNN) Construction, infrastructure, renovations and other costs for Independence Visitor Center
Project Allocation
2,000,000
(OOOO) Construction, infrastructure, renovations and other costs for projects at Eastern State Penitentiary Historic Site
Project Allocation
10,000,000
(PPPP) Acquisition, construction, infrastructure improvements and other related costs for Strawberry Mansion housing development project
Project Allocation
10,000,000
(QQQQ) Construction, infrastructure, redevelopment and other related costs to support the Pennovation Works project in the Grays Ferry neighborhood of Philadelphia
Project Allocation
5,000,000
(RRRR) Construction, infrastructure, renovation, rehabilitation and other costs related to WHYY's facility at 150 North 6th Street
Project Allocation
10,000,000
(SSSS) Site preparation, renovation, construction and other related costs for the development of a floating art gallery on the Delaware River
Project Allocation
3,000,000
(TTTT) Construction, infrastructure, renovation, rehabilitation and other costs, including necessary upgrades for the Semiquincentennial Celebration, at the Museum of the American Revolution located at 3rd and Chestnut Streets
Project Allocation
10,000,000
(UUUU) Acquisition, site preparation, renovation, construction and other related costs for the development of an art facility on South Street in Philadelphia
Project Allocation
2,500,000
(VVVV) Site preparation, acquisition, construction, infrastructure and other related costs for the development of the Wharton Centre
Project Allocation
2,147,379
(WWWW) Acquisition, construction, redevelopment and other related costs for the project at the site of North Broad Salvation Army
Project Allocation
1,000,000
(XXXX) Construction, redevelopment, site preparation, infrastructure and other related costs to be used on Hunter Street
Project Allocation
500,000
(YYYY) Construction, redevelopment, site preparation, infrastructure and other related costs to renovate and improve the Haddington neighborhood
Project Allocation
5,000,000
(ZZZZ) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project in the Overbrook Farms neighborhood
Project Allocation
600,000
(A5) Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the development of outdoor space at Robert E. Lamberton Elementary School for educational and recreational purposes by students and community members
Project Allocation
639,500
(B5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building QO in the Philadelphia Navy Yard
Project Allocation
5,000,000
(C5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 543 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(D5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 500 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(E5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 139 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(F5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 41 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(G5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 25 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(H5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 22 in the Philadelphia Navy Yard
Project Allocation
10,000,000
(I5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 19 in the Philadelphia Navy Yard
Project Allocation
10,000,000
(J5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 18 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(K5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 17 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(L5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 16 in the Philadelphia Navy Yard
Project Allocation
10,000,000
(M5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 15 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(N5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 14 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(O5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 12 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(P5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 10 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(Q5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 7 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(R5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 3 in the Philadelphia Navy Yard
Project Allocation
5,000,000
(S5) Site preparation, construction, renovation and other related costs for the redevelopment of a community building at Granahan Playground
Project Allocation
1,200,000
(T5) Site preparation, acquisition, demolition, construction, fit out for mixed uses, including ground level retail, light industrial, community services spaces and residential end uses, and other related costs for the redevelopment of the Enterprise Center Campus Project
Project Allocation
7,000,000
(U5) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of an underutilized manufacturing facility on the western edge of Center City
Project Allocation
5,000,000
(V5) Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to the Christ the King Church and buildings
Project Allocation
2,000,000
(W5) Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to Our Lady of the Cavalry Catholic Church and buildings
Project Allocation
2,000,000
(X5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Academy Road Commercial Corridor
Project Allocation
2,000,000
(Y5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Castor Avenue within zip code 19152
Project Allocation
2,000,000
(Z5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Bustleton Avenue within zip code 19152
Project Allocation
2,000,000
(A6) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Grant Avenue Commercial Corridor
Project Allocation
2,000,000
(B6) Construction, renovation, infrastructure improvement and equipment related to the development of a neighborhood community facility in the northeast section of Philadelphia containing the zip codes 19114, 19136, 19152 and 19154
Project Allocation
5,000,000
(C6) Expansion and renovation of a training facility with a State-approved apprenticeship program in the northeast section of Philadelphia containing zip codes 19114, 19130 and 19154
Project Allocation
20,000,000
(D6) Construction, infrastructure, acquisition and other costs related to the expansion and renovation of a facility used for dance education and training located in the northeast section of Philadelphia containing zip code 19114
Project Allocation
15,000,000
(E6) Construction, infrastructure, acquisition and other costs for the creation of a new early childhood center and outdoor playground located in the northeast section of Philadelphia containing zip code 19114
Project Allocation
1,100,000
(F6) Construction, site preparation, expansion and renovation of sports complex to provide community access to indoor and outdoor family activities in the northeast section of Philadelphia containing zip codes 19114, 19136, 19152 and 19154
Project Allocation
5,000,000
(G6) Construction, site preparation, demolition, infrastructure, acquisition and other costs for field renovation for Mastery Charter Schools
Project Allocation
2,000,000
(H6) Construction, site renovation, demolition, infrastructure and other related costs for the redevelopment of the Christy Recreation Center
Project Allocation
5,000,000
(I6) Demolition, infrastructure improvements, construction and other related costs for a redevelopment project in the vicinity of 11th and Walnut Streets
Project Allocation
15,000,000
(J6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Vernon House
Project Allocation
4,000,000
(K6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Colonel Charles Young Post #682
Project Allocation
1,000,000
(L6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building on North Broad Street
Project Allocation
5,000,000
(M6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building
Project Allocation
20,000,000
(N6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the Weavers Way Germantown Expansion Project
Project Allocation
2,500,000
(O6) Construction, renovation, including major systems, plumbing, electrical, HVAC and roofing renovation, and other related costs to maintain and redevelop the Project Learn School
Project Allocation
1,000,000
(P6) Remediation, renovation and construction for ADA-compliant access and all major systems upgrades and other related costs for the water tower recreation center
Project Allocation
2,500,000
(Q6) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs to revitalize the Tioga Marine Terminal along with the rehabilitation of two container cranes
Project Allocation
25,000,000
(R6) Acquisition, demolition, construction, infrastructure, redevelopment, securitization, fencing and other related costs to revitalize, rehabilitate and enhance security on a portion of the Consolidated Rail Corporation (Conrail) line bounded by Aramingo Avenue and the Frankford Creek
Project Allocation
2,500,000
(S6) General improvements, including infrastructure enhancement, new construction and demolition, land and equipment acquisition and main capital maintenance projects at all Philadelphia Regional Port Authority facilities
Project Allocation
200,000,000
(T6) Rehabilitation, renovation, construction, infrastructure and other related costs for the redevelopment of the Philadelphia Orchestra and Kimmel Center, Inc.
Project Allocation
20,000,000
(U6) Rehabilitation, renovation, construction, infrastructure and other related costs for redevelopment at 300 South Broad Street
Project Allocation
20,000,000
(V6) Infrastructure, development, construction and other related costs for facilities improvement to the Northeast Family YMCA
Project Allocation
2,000,000
(W6) Infrastructure, development, construction and other related costs for facilities renovation and improvement to the Penn Crisp Gym
Project Allocation
2,000,000
(X6) Construction, site preparation, expansion and other related costs for golf facilities and a youth golf learning center for the Union League Golf Club at Torresdale
Project Allocation
5,000,000
(Y6) Construction, infrastructure, development and other related costs for capital improvements and renovation of clubhouse facilities and a youth golf education center for the First Tee of Greater Philadelphia
Project Allocation
2,000,000
(Z6) Construction, site development, infrastructure, redevelopment and other costs and improvements to Al-Aqsa Islamic Academy
Project Allocation
7,500,000
(A7) Construction, site development, infrastructure, redevelopment and other costs and improvements for Al-Aqsa Islamic Academy and the surrounding campus
Project Allocation
7,500,000
(B7) Construction, infrastructure, redevelopment and other improvements to 1501 North Germantown Avenue in Philadelphia
Project Allocation
7,500,000
(C7) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's Health and Wellness Campus in Kensington
Project Allocation
7,500,000
(D7) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's North 5th Street location
Project Allocation
5,000,000
(E7) Construction, infrastructure and other related costs for the Children's Crisis Treatment Center - North Philadelphia
Project Allocation
6,000,000
(F7) Design, construction, redevelopment, renovation, rehabilitation and other related costs for the development of property located in the city related to an e-Sports facility located at 401 North Broad Street
Project Allocation
2,000,000
(G7) Construction, infrastructure, redevelopment, renovation and other related costs for an industrial warehouse
Project Allocation
3,000,000
(H7) Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities
Project Allocation
20,000,000
(I7) Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities for Bridge Point Philadelphia
Project Allocation
20,000,000
(iii) Philadelphia Independent School District
(A) Construction, site preparation, expansion and infrastructure-related costs and construction of a school campus academic facility located in the northeast section of Philadelphia containing zip code 19154
Project Allocation
10,000,000
(B) Construction, site preparation, expansion and infrastructure-related costs and construction of a grade school academic facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152
Project Allocation
10,000,000
(C) Construction, site preparation, expansion and infrastructure-related costs and construction of a state-of-the-art STEM education facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152
Project Allocation
10,000,000
(52) Pike County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation
10,000,000
(53) Potter County
(i) (Reserved)
(54) Schuylkill County
(i) County projects
(A) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation
10,000,000
(B) Physical infrastructure improvements at Penn State Schuylkill
Project Allocation
750,000
(C) Construction, infrastructure and other related costs for the Schuylkill County Emergency Management Offices and Training Facility in West Mahanoy Township
Project Allocation
1,500,000
(ii) City of Pottsville
(A) Acquisition, infrastructure, construction, renovation and other related costs for development of a farmers market
Project Allocation
500,000
(B) Acquisition, infrastructure, construction, renovation and other related costs for a streetscape project, including stormwater management, façade improvements, landscaping, lighting, parking lots, restrooms and streetscape improvements
Project Allocation
5,000,000
(C) Acquisition, infrastructure, construction, renovation and other related costs for development of downtown properties and streetscape improvements
Project Allocation
5,000,000
(D) Acquisition, infrastructure, construction, renovation and other related costs for historic housing revitalization
Project Allocation
5,000,000
(iii) Tamaqua Borough
(A) Infrastructure, rehabilitation and other related costs for development of a live-work space entrepreneurial center with high-speed fiber optic Internet service
Project Allocation
2,500,000
(iv) Schuylkill Economic Development Corporation
(A) Redevelopment and construction of an industrial shell building at Rush Township Industrial Park
Project Allocation
1,500,000
(B) Acquisition, infrastructure, construction, utility extensions and roadway improvements for development of a Schuylkill Airport Industrial Park
Project Allocation
2,000,000
(C) Redevelopment and construction of commercial and industrial buildings at Highridge Industrial Park
Project Allocation
2,000,000
(D) Acquisition, infrastructure, construction and other related costs for a rehabilitation of the former Ashland State Hospital complex to retrofit into a multipurpose facility
Project Allocation
2,000,000
(E) Rehabilitation, infrastructure and other related costs for construction of additional buildings and expansion at an industrial complex
Project Allocation
20,000,000
(55) Snyder County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for renovations of a county-owned facility
Project Allocation
2,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation
5,000,000
(C) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation
10,000,000
(ii) Selinsgrove Borough
(A) Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for creation of an intergenerational community life center
Project Allocation
2,500,000
(56) Somerset County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development of Conemaugh Health System facilities
Project Allocation
5,000,000
(57) Sullivan County
(i) (Reserved)
(58) Susquehanna County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation
10000000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for historic rehabilitation, new facilities and other improvements to the historic Dennis Farm property
Project Allocation
5,000,000
(59) Tioga County
(i) (Reserved)
(60) Union County
(i) County projects
(A) Acquisition, infrastructure, rehabilitation, redevelopment, construction and other related costs for the Evangelical Community Hospital
Project Allocation
10,000,000
(61) Venango County
(i) County projects
(A) Construction and other related costs for renovations to the dementia wing of a senior care facility
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center
Project Allocation
2,500,000
(C) Construction and other related costs to build residential homes for residents currently being served at the Polk Center in Polk Borough
Project Allocation
2,000,000
(62) Warren County
(i) (Reserved)
(ii) Northwest Pennsylvania Regional Planning and Development Commission
(A) Acquisition of a property within Warren County for the purpose of construction of a new building or renovation of an existing building to meet the needs of current employers or attract new employers to the county
Project Allocation
1,500,000
(iii) City of Warren
(A) Construction, infrastructure, redevelopment, renovation and other related costs for Warren General Hospital, including, but not limited to, updating elevators, bathrooms and sidewalks to meet ADA requirements
Project Allocation
5,000,000
(63) Washington County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for a community and economic development project in the county
Project Allocation
25,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of an alternative energy facility in Robinson Township
Project Allocation
10,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(ii) Redevelopment Authority of the County of Washington
(A) Construction, renovation, rehabilitation and infrastructure costs for capital improvements to the Washington Wild Things park
Project Allocation
10,000,000
(B) Acquisition, demolition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, construction and other related costs for a blight remediation project at the intersection of Main and Chestnut streets in the City of Washington
Project Allocation
5,000,000
(C) Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in Canonsburg Borough
Project Allocation
3,000,000
(D) Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in the City of Washington
Project Allocation
3,000,000
(E) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a capital construction project that will include a visitors' center at Meadowcroft Rockshelter and Historic Village
Project Allocation
2,000,000
(F) Construction, infrastructure, rehabilitation and other related costs for expansion and upgrades to the Donora Public Library, including new green heating and cooling
Project Allocation
350,000
(iii) City of Washington
(A) Construction, renovation, rehabilitation, redevelopment and other related costs for a community center renovation project at Transitional Paths to Independent Living (TRPIL)
Project Allocation
1,500,000
(iv) Midway Borough
(A) Acquisition, construction, renovation, rehabilitation, demolition, redevelopment and other related costs for a project to relocate the existing municipal building
Project Allocation
1,000,000
(v) North Strabane Township
(A) Acquisition, construction, renovation, rehabilitation and other related costs for a new public safety building
Project Allocation
4,100,000
(vi) Peters Township
(A) Redevelopment, infrastructure and other related costs for a spillway enhancement project for the dam at Peters Lake Park
Project Allocation
2,500,000
(B) Acquisition, construction, redevelopment, infrastructure and other related costs for the construction of a new fire substation and the purchase of a new fire engine
Project Allocation
2,500,000
(vii) South Strabane Township
(A) Acquisition, construction, infrastructure and other related costs for an indoor waterpark, hotel and convention center, including a solar array to power the complex and adjacent properties
Project Allocation
25,000,000
(64) Wayne County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation
10,000,000
(ii) Greater Honesdale Partnership
(A) Acquisition, site development, demolition, infrastructure, vertical construction, redevelopment and related costs for a community or economic development project
Project Allocation
5,000,000
(65) Westmoreland County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation and other related costs for an economic development project in the county as identified in the 2018 comprehensive plan "Reimagining Our Westmoreland"
Project Allocation
25,000,000
(B) Acquisition, construction, renovation, infrastructure improvements and other related costs for a community or economic development project or initiative
Project Allocation
25,000,000
(C) Construction, demolition, site and material abatement, site predevelopment activities, redevelopment, renovation, rehabilitation, infrastructure and other related costs to replace a roof; repair, replace or separate utilities; establish multitenant corridors; construct multitenant truck courts; and construct new buildings
Project Allocation
20,000,000
(D) Acquisition, construction, demolition, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the development of a convention center as a priority project for the comprehensive plan "Reimagining Our Westmoreland"
Project Allocation
10,000,000
(E) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure improvements and other related costs for a facility to house a medical school for the Lake Erie College of Osteopathic Medicine (LECOM)
Project Allocation
10,000,000
(F) Acquisition, construction, demolition, renovation, rehabilitation, abatement of hazardous materials, infrastructure and other related costs for the Seton Hill University campus
Project Allocation
10,000,000
(G) Acquisition, redevelopment, construction, renovation, rehabilitation, infrastructure extensions and improvements and other related costs for an economic development project along or near US Route 22
Project Allocation
5,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation
20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation
7,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities
Project Allocation
35,000,000
(ii) Redevelopment Authority of the County of Westmoreland
(A) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a three-story building in the City of Monessen
Project Allocation
7,500,000
(B) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a brownfield site in Trafford Borough
Project Allocation
3,500,000
(C) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former steel plant facility in the City of Latrobe
Project Allocation
1,500,000
(D) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former metal roll manufacturing facility in Avonmore Borough
Project Allocation
1,500,000
(E) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former glass plant in Hempfield Township
Project Allocation
1,500,000
(F) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs for the adaptive reuse of a former five-story bank building in the City of Jeannette
Project Allocation
1,500,000
(G) Construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in Mount Pleasant Borough
Project Allocation
500,000
(H) Acquisition, demolition, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in East Huntingdon Township
Project Allocation
500,000
(I) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former brewing facility in Smithton Borough
Project Allocation
500,000
(J) Construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a former trolley barn in Derry Borough
Project Allocation
500,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Hempfield Neighborhood Hospital
Project Allocation
10,000,000
(iii) Economic Growth Connection of Westmoreland
(A) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new aluminum manufacturing innovation and technical center and new laboratory infrastructure
Project Allocation
7,000,000
(iii.1) Export Borough
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation and other related costs for a downtown renovation project, including park development, renovation of a historic train station and development of the Westmoreland Heritage Bike Trail
Project Allocation
1,000,000
(B) Construction and other related costs for the development of a park and facilities, including a parking lot, picnic shelters, sidewalks and restrooms
Project Allocation
667,000
(iv) Hempfield Township
(A) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new regional public safety facility
Project Allocation
10,000,000
(v) Latrobe Industrial Development Authority
(A) Acquisition, construction, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the Saint Vincent College community outreach center in the City of Latrobe, other facilities in the City of Latrobe and facilities on the Saint Vincent College campus
Project Allocation
5,000,000
(v.1) Redevelopment Authority of Westmoreland County
(A) Construction, acquisition, infrastructure, redevelopment and other related costs for renovation and rehabilitation of the Laurel Highlands Workforce and Opportunity Center in Hempfield Township
Project Allocation
2,000,000
(vi) Southwest Greensburg Borough
(A) Construction and other related costs for a borough garage
Project Allocation
1,000,000
(vii) Westmoreland County Industrial Development Corporation
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with the improvement and expansion of the Adelphoi campus and associated facilities
Project Allocation
3,000,000
(B) Acquisition, construction and other related costs for Online Stores, Inc., to build a warehouse and manufacturing facility in Sewickley Township
Project Allocation
1,500,000
(66) Wyoming County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation
10,000,000
(B) Acquisition, redevelopment, renovation, rehabilitation and other related costs for Tyler Memorial Hospital
Project Allocation
1,000,000
(67) York County
(i) County projects
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities
Project Allocation
5,000,000
(B) Acquisition, site preparation, infrastructure, construction and other related costs associated with a large-scale, mixed-use development project north of Canal Road in Conewago Township
Project Allocation
5,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation
15,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic, or historical project
Project Allocation
15,000,000
(i.1) City of York Redevelopment Authority
(A) Construction, infrastructure, acquisition, site preparation, abatement of hazardous materials and other related costs for the redevelopment of the former Dentsply manufacturing facility and the creation of a mix-used urban redevelopment project
Project Allocation
15,000,000
(B) Construction, infrastructure, site preparation and other related costs for the redevelopment of new retail and housing spaces to eliminate and enhance surface parking areas
Project Allocation
10,000,000
(C) Construction, infrastructure, site preparation and other related costs for the development of structured parking and the development of new retail and housing spaces to eliminate and enhance surface parking areas
Project Allocation
9,000,000
(i.2) Red Lion Municipal Authority
(A) Demolition, construction, infrastructure and other related costs for the demolition of an aged and damaged steel water storage tank and the construction of a new concrete water storage tank in Red Lion Borough and Windsor Township
Project Allocation
1,150,000
(i.3) Redevelopment Authority of the County of York
(A) Site preparation, remediation, construction, infrastructure, renovation and other related costs for the development and site improvement for York College facility
Project Allocation
3,000,000
(ii) York County Economic Alliance
(A) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of an outdoor economy site for recreation
Project Allocation
4,000,000
(B) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for business expansion and development within York County's Historic Trail Towns communities
Project Allocation
4,000,000
(C) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the City of York
Project Allocation
5,000,000
(D) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for expansion and development of a manufacturing facility
Project Allocation
5,000,000
(E) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the Borough of Hanover
Project Allocation
5,000,000
(F) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use in a strategic corridor of the county
Project Allocation
5,000,000
(G) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for site redevelopment along the York County Heritage Rail Trail
Project Allocation
5,000,000
(H) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use along the Codorus Innovation Corridor in the City of York
Project Allocation
6,000,000
(I) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for nonprofit redevelopment, modernization and service enhancements throughout the county
Project Allocation
10,000,000
(J) Acquisition, construction and other related costs for safe workforce sustainable living units and commercial spaces
Project Allocation
5,000,000
(K) Acquisition, construction, infrastructure and redevelopment of a strategic site in Hanover Borough to enhance the property for productive use
Project Allocation
5,000,000
(ii.1) City of York
(A) Acquisition, demolition, construction, infrastructure and other related costs to redevelop and expand a facility
Project Allocation
10,000,000
(iii) Chanceford Township
(A) Construction, renovation and other related costs for the existing township community/municipal building
Project Allocation
1,000,000
(iv) Windsor Township
(A) Construction, infrastructure, design, administration, storm water management and other related costs for a community center building and other site improvement activities
Project Allocation
3,000,000
(68) Multiple Counties
(i) Crawford, Erie, Mercer, Venango and Warren Counties
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility
Project Allocation
25,000,000
(ii) Allegheny, Armstrong, Beaver, Butler, Cambria, Fayette, Washington and Westmoreland Counties
(A) Acquisition, construction, infrastructure redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility
Project Allocation
25,000,000
(iii) Columbia and Luzerne Counties
(A) Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for expansion of the Berwick Hospital behavioral health unit
Project Allocation
3,000,000
(iv) Lackawanna and Wyoming Counties
(A) Construction, infrastructure, redevelopment, acquisition and other related costs for Keystone College improvement projects
Project Allocation
5,000,000
(v) Chester County
(A) Construction of infrastructure to support track, station, ancillary features and safety improvements for operation of West Chester Railroad tourist trains, restoration of common carrier passenger rail service to West Chester, West Chester University, Westtown, Cheyney University and Center City via SEPTA connection, restoration of freight rail access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative battery technology
Project Allocation
3,962,500
(vi) Cumberland, Franklin, Lancaster and York Counties
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk
Project Allocation
25,000,000
(vii) Armstrong, Clarion, Forest and Venango Counties
(A) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for multicounty trail projects
Project Allocation
10,000,000