Section 7. Itemization of flood control projects.
Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:
Project
Total Project
Allocation
(1) Department of Environmental Protection
(i) Allegheny County
(A) Construction, infrastructure and other related costs for a storm water line replacement, including storm sewer, manhole and replacement of a failing inlet, to reduce excessive runoff and flooding in Ben Avon Heights Borough
Project Allocation
50,000
(B) Construction, infrastructure and other related costs for drainage improvement and flood control on Harmony Road in Ohio Township, including installation of inlet boxes, cast iron frames, safety grates, culvert piping, outlets, earth work and wall erosion and sediment control
Project Allocation
158,000
(C) Construction, redevelopment and other related costs for a detention pond retrofit at Northridge, including earth work, maintenance and protection of traffic, culvert pipe installation, outlet removal and removal and replacement, erosion and sediment control, fencing and landscape restoration in Ohio Township
Project Allocation
169,000
(D) Construction, infrastructure and other related costs for a pollutant reduction plan project, including storm water detention pond improvements and sediment reduction in South Fayette Township
Project Allocation
250,000
(E) Construction, rehabilitation and other related costs for the Werner Avenue Slope Stabilization project, including a new retaining wall, roadway improvements and installation of storm sewer and catch basins for erosion prevention in Bridgeville Borough
Project Allocation
700,000
(F) Construction, infrastructure and other related costs for detention pond construction to alleviate flooding in the Broughton area of South Park Township
Project Allocation
900,000
(G) Construction, infrastructure, rehabilitation and other related costs for a flood mitigation project in Oakdale Borough
Project Allocation
1,000,000
(H) Construction, infrastructure, rehabilitation and other related costs for Phase I of the McLaughlin Run Flood Control project, including construction of a levee with pumps along Carol Avenue and replacement of the Commercial Street culverts in Bridgeville Borough
Project Allocation
5,600,000
(ii) Bucks County
(A) Core Creek Dam flood control - rehabilitation
Project Allocation
1,700,000
(B) Acquisition, rehabilitation, infrastructure, flood mitigation and related costs for a riverfront redevelopment project
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects
Project Allocation
5,000,000
(iii) Crawford County
(A) Rainbow Dam flood control - rehabilitation
Project Allocation
3,800,000
(iii.1) Delaware County
(A) Construction and other costs relating to the South Wayne Avenue Flood Reduction Project in Radnor Township
Project Allocation
1,000,000
(iii.2) Lackawanna County
(A) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation
10,000,000
(iv) Luzerne County
(A) Construction, infrastructure, rehabilitation and other related costs for the West Pittston flood mitigation levee project
Project Allocation
15,000,000
(B) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation
5,000,000
(v) Lycoming County
(A) Construction, infrastructure and other related costs for the Lawshee Run culvert replacement project in Jersey Shore Borough
Project Allocation
15,000,000
(B) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for a flood control project
Project Allocation
20,000,000
(v.1) Monroe County
(A) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation
5,000,000
(vi) Montgomery County
(A) Construction, infrastructure and other related costs for a storm water arch rehabilitation project located under 1200 High Street in the Borough of Pottstown
Project Allocation
750,000
(B) Construction, infrastructure and other related costs for a storm water arch rehabilitation project in the Borough of Pottstown
Project Allocation
3,750,000
(vii) Pike County
(A) Kintz Creek Dam flood control - rehabilitation
Project Allocation
2,300,000
(viii) Tioga County
(A) Hamilton Dam flood control - rehabilitation
Project Allocation
1,800,000
(ix) Washington County
(A) Construction, infrastructure and other related costs for a storm water management and backflow prevention project in West Brownsville Borough
Project Allocation
500,000
(B) Construction, infrastructure, rehabilitation and other related costs for a two-stage flood plain restoration project located along Tributary 1 of Catfish Creek upstream of SR 18 in the City of Washington, including realignment of the stream, recreation of historical floodplain, stabilization of existing incised banks and natural plan stabilization
Project Allocation
700,000
(x) York County
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for rehabilitation of Silver Lake
Project Allocation
2,000,000