Itemization of public improvement projects

Act 35 of 1999, § 3, under CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1999-2000.

Act 35 of 1999, § 3

Section 3. Itemization of public improvement projects.

Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project

Total

Project

Allocation

(1) Department of Agriculture

$120,140,000

(i) Equine Exposition Center

(A) Construction of an equine exposition center

13,500,000

(Base Project Allocation - $11,250,000)

(Design and Contingencies - $2,250,000)

(ii) Veterinary Diagnostic Laboratory

(A) Construction of a sample receiving room

600,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $100,000)

(iii) Meat Animal Evaluation Center

(A) Construction of a new meat animal evaluation facility

5,800,000

(Base Project Allocation - $4,834,000)

(Design and Contingencies - $966,000)

(iv) Farm Show Complex

(A) Coal silo replacement

240,000

(Base Project Allocation - $200,000)

(Design and Contingencies - $40,000)

(B) Construction and rehabilitation of the Pennsylvania Farm Show Complex

100,000,000

(Base Project Allocation - $90,000,000)

(Design and Contingencies - $10,000,000)

(2) Department of Community and Economic

Development

$149,998,000

(i) Allegheny County

(A) Pittsburgh International Complex, development of state-of-the-art maintenance and training complex for the new fleet of US Airways planes

100,000,000

(B) Purchase and installation of traffic control devices, Greentree Road

250,000

(C) Port of Pittsburgh Commission, Lower Monongahela Improvement Project, dredging and terminal improvements

45,000,000

(ii) Carbon County

(A) East Side Borough, reconstruction and rehabilitation of school building for use as borough offices, meeting hall and senior citizen community facility

60,000

(B) Mahoning Township, land acquisition for the construction of new township offices and police station

300,000

(C) Banks Township, design and construction of township office and community activity building

145,000

(D) County Project, design and construction of new building or acquisition and rehabilitation of existing building for county operations facility

1,500,000

(iii) Schuylkill County

(A) Foster Township, design and construction of municipal building

350,000

(B) Borough of St. Clair, design and construction of police station

350,000

(C) Borough of Tremont, interior and exterior repair and reconstruction of Tremont Area Community Center, including roof, windows, waterproofing, doors, painting and HVAC systems

385,000

(D) Hubley Township, design and construction of municipal building

250,000

(E) Borough of Ringtown, design and construction of municipal building

250,000

(F) Rush Township, construction of township building, including original furniture and equipment

600,000

(G) Borough of Mahanoy City, design and construction of Mahanoy Area Train Station Depot/Museum

200,000

(H) North Manheim Township, additions and modification to township building

258,000

(I) Borough of Cressona, renovation of salt storage building and construction of additional garage space

100,000

(3) Department of Conservation and Natural

Resources

$109,890,000

(i) Forest District 18

(A) Rehabilitation of White Oak Road

200,000

(Base Project Allocation - $200,000)

(ii) Lehigh Gorge State Park

(A) Additional funds for DGS 194-46, land acquisition for Lehigh Gorge State Park

2,500,000

(Land Allocation - $2,500,000)

(iii) Little Buffalo State Park

(A) Construction, at the permanent performance pavilion, of a state-of-the-art weather shield

150,000

(B) Construction of an arts building

100,000

(iv) Mt. Pisgah State Park

(A) Construction of overnight facilities, including infrastructure, sewage, roads and camping structures

2,000,000

(v) Ricketts Glen State Park

(A) Park improvements

3,499,000

(Base Project Allocation - $2,916,000)

(Design and Contingencies - $583,000)

(vi) Presque Isle State Park

(A) Beach nourishment

800,000

(Base Project Allocation - $800,000)

(B) Renovation of existing roadways, bridges and parking lots, Phase II

3,300,000

(C) Acquisition and development of Great Lake Visitation, Research and Education Center

25,000,000

(D) Renovation and expansion of administration building

850,000

(vii) Pymatuning State Park

(A) Additional funds for DGS 103-7, rehabilitate Espyville Boat Livery

701,000

(Base Project Allocation - $584,000)

(Design and Contingencies - $117,000)

(B) Pymatuning Trail development between Linesville and Jamestown Boroughs

700,000

(viii) Allegheny County

(A) Alle-Kiski Rails-to-Trails Project to expand existing rail trails along unused right-of-way on both sides of Allegheny and Kiskiminetas Rivers so that a continuous trail is established from Pittsburgh through the Alle-Kiski Region

15,000,000

(B) Alle-Kiski River Parks Expansion Project

50,000,000

(ix) Clinton County

(A) City of Lock Haven, development and construction of fish ladder at Grant Street Dam

1,000,000

(x) Erie County

(A) Headwaters Conservation Park located at Upper Mill Creek Basin, intersection of Route 8 and I-90

2,025,000

(xi) Greene County

(A) Monongahela Riverfront Development

600,000

(B) Franklin Township, Crawford Field Park and Route 188 site preparation

325,000

(C) Greene County Central Pool

300,000

(D) Richhill Township, community park construction and improvements

127,000

(xii) Mercer County

(A) Route 18 Bicycle and Pedestrian Transportation Enhancement Project, Rails-to-Trails, City of Hermitage

713,000

(4) Department of Corrections

$126,615,000

(i) State Correctional Institution at Camp Hill

(A) Construction of new coal handling system

1,260,000

(Base Project Allocation - $1,050,000)

(Design and Contingencies - $210,000)

(ii) State Correctional Institution at Cresson

(A) New kitchen and loading dock

2,160,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $360,000)

(B) Construction of a level three medium security housing unit

6,476,000

(Base Construction Allocation - $5,397,000)

(Design and Contingencies - $1,079,000)

(iii) State Correctional Institution at Dallas

(A) Electrical system upgrades

7,680,000

(Base Project Allocation - $6,400,000)

(Design and Contingencies - $1,280,000)

(B) Additional funds for boiler plant renovations approved in Act 47 of 1997

1,140,000

(Base Project Allocation - $950,000)

(Design and Contingencies - $190,000)

(iv) State Correctional Institution at Graterford

(A) Plumbing and heating system renovations

6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(v) State Correctional Institution at Greensburg

(A) Additional funds for electric utility system upgrades approved in Act 47 of 1997

720,000

(Base Project Allocation - $600,000)

(Design and Contingencies - $120,000)

(B) Construction of a level three medium security housing unit

6,476,000

(Base Construction Allocation - $5,397,000)

(Design and Contingencies - $1,079,000)

(vi) State Correctional Institution at Huntingdon

(A) Security systems upgrade

9,540,000

(Base Project Allocation - $7,950,000)

(Design and Contingencies - $1,590,000)

(vii) State Correctional Institution at Laurel Highlands

(A) Additional funds for DGS 376-1, Phase II, conversion of Somerset State Hospital to a correctional institution

10,020,000

(Base Project Allocation - $8,350,000)

(Design and Contingencies - $1,670,000)

(viii) State Correctional Institution at Mercer

(A) Additional funds for the construction of a level two housing unit and renovation of support structures approved in Act 47 of 1997

5,650,000

(Base Project Allocation - $4,708,000)

(Design and Contingencies - $942,000)

(ix) State Correctional Institution at Muncy

(A) Construction of a youthful offender housing unit

2,100,000

(Base Project Allocation - $1,750,000)

(Design and Contingencies - $350,000)

(x) Quehanna Motivational Boot Camp

(A) Construction of a new sewage treatment plant

1,951,000

(Base Project Allocation - $1,626,000)

(Design and Contingencies - $325,000)

(xi) State Correctional Institution at Smithfield

(A) Reconstruction of underground water system

4,554,000

(Base Project Allocation - $3,795,000)

(Design and Contingencies - $759,000)

(xii) State Correctional Institution at Waynesburg

(A) Life safety code improvements

3,046,000

(Base Project Allocation - $2,538,000)

(Design and Contingencies - $508,000)

(B) Addition to dietary

2,580,000

(Base Project Allocation - $2,150,000)

(Design and Contingencies - $430,000)

(xiii) State Correctional Training Academy at Elizabethtown

(A) Electrical system renovations

2,400,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $400,000)

(xiv) State Correctional Institution - Forest County

(A) Additional funds for DGS 377-1, construction of a 1,000-cell facility, to change the security level from medium to close

31,962,000

(Base Project Allocation - $26,635,000)

(Design and Contingencies - $5,327,000)

(xv) Cumberland County

(A) Construction of a new headquarters/conference facility

20,900,000

(Base Project Allocation - $17,500,000)

(Design and Contingencies - $3,400,000)

(5) Department of Education

$363,448,000

(i) Temple University

(A) Additional funds for the design and construction of the Ambler Learning Center

2,800,000

(B) Design and construction of library building at Health Science Campus

10,000,000

(C) Design and construction of mini-arts campus primarily for the arts, including one new building and necessary improvements for conversion of 1101 Montgomery Avenue for academic and academic support uses at the Main Campus

25,000,000

(D) Improvements to Main Campus primary electrical system, Phase II

3,900,000

(E) Design and construction of facility for Hospitality School at Main Campus

10,000,000

(F) Design and construction of annex building for the Main Campus student activity center

4,600,000

(G) Design and construction of a diagnostic imaging and patient services building at Temple University Hospital

5,000,000

(ii) Scranton State School for the Deaf

(A) Steam line replacement

240,000

(Base Project Allocation - $200,000)

(Design and Contingencies - $40,000)

(iii) Thaddeus Stevens College of Technology

(A) Acquisition of existing building and conversion to dormitory, laboratory and classroom facilities

16,000,000

(Base Project Allocation - $10,000,000)

(Land Allocation - $4,000,000)

(Design and Contingencies - $2,000,000)

(B) Additional funds for project DGS 417-33, construction of a multipurpose activities center and rehabilitation and renovation of the existing gymnasium for a trade-technical laboratory

3,000,000

(C) Acquisition of community hospital building and conversion to dormitory and classroom facilities

6,400,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $4,000,000)

(Design and Contingencies - $400,000)

(iv) Lincoln University

(A) Boiler plant and steam distribution system

4,200,000

(Base Project Allocation - $3,500,000)

(Design and Contingencies - $700,000)

(B) Renovation of University Hall

2,530,000

(Base Project Allocation - $2,108,000)

(Design and Contingencies - $422,000)

(v) The Pennsylvania State University

(A) University Park Campus

(I) Construction of an Information Sciences and Technology Building

40,000,000

(II) Construction of a Biosciences Building

33,000,000

(III) Construction of a new Food Science Building

22,000,000

(IV) Beaver Stadium infrastructure and ADA improvements

15,000,000

(V) Additional funds to complete building to house the School of Forestry Resources

2,000,000

(B) Penn College of Technology

(I) Construction of new library

11,400,000

(C) Beaver Campus

(I) Construction of classroom/administration building

5,000,000

(D) Delaware Campus

(I) Construction of new classroom building

7,200,000

(Base Project Allocation - $6,000,000)

(Design and Contingencies - $1,200,000)

(E) Dubois Campus

(I) Acquisition and renovation of IDEAL property for future educational use

4,000,000

(vi) University of Pittsburgh

(A) All Campuses

(I) Deferred Maintenance, Phase III

18,000,000

(II) Programmatic Renovations

9,000,000

(III) Classroom Instructional Technology

5,500,000

(B) Greensburg Campus

(I) Additions to Common Facilities Building

3,500,000

(C) Oakland Campus

(I) Renovation and addition to central chilled water system

7,800,000

(II) Renovation, Phase II of Fitzgerald Fieldhouse and Trees Hall

14,450,000

(III) Ventilation and fume hood upgrade for Chevron Science Center

6,000,000

(D) Main Campus

(I) Construction and development of the UPMC Pittsburgh Cancer Research Clinic

1,500,000

(E) Johnstown Campus

(I) Expansion of the Pasquerilla Performing Arts Center

2,000,000

(II) Expansion and renovation of the Sports Center

1,750,000

(vii) Penn State Erie, Behrend College

(A) Renovation to the Otto Behrend Building

3,100,000

(B) Construction of a research and economic development center

30,000,000

(C) Erie Hall restoration

1,800,000

(D) Improvements at the Maintenance, Police and Safety Building

1,800,000

(viii) Allegheny County

(A) Renovation and expansion of Main Campus Building of Auberle School

1,050,000

(ix) Butler County

(A) Restoration and improvements to Butler Community College

508,000

(x) Greene County

(A) Waynesburg College

(I) Two additional locker rooms at College Gym

500,000

(II) Install new windows in Miller Hall

1,000,000

(III) Install central air conditioning, 4th floor, Miller Hall

300,000

(IV) Construction of locker room and service facility at soccer field and softball field area

200,000

(xi) Lawrence County

(A) Construction of new high school in New Castle School District

10,000,000

(xii) Lackawanna County

(A) Scranton School District, construction of high school and/or rehabilitation and/or additions to the existing school buildings and properties within the City of Scranton

7,700,000

(Base Project Allocation - $7,000,000)

(Design and Contingencies - $700,000)

(xiii) Luzerne County

(A) Nanticoke/Luzerne County Community College Athletic Facility

1,000,000

(xiv) Montgomery County

(A) Jenkintown School District, renovations to bring school buildings into ADA compliance

220,000

(xv) University of Pittsburgh Medical Center

(A) Construction and development of the UPMC Pittsburgh Cancer Research Clinic

1,500,000

(6) Pennsylvania Emergency Management Agency

$2,259,000

(i) State Fire Academy

(A) Reconstruction and upgrade of fire training facilities

1,500,000

(Base Project Allocation - $1,250,000)

(Design and Contingencies - $250,000)

(ii) Western Area Emergency Operations Center in Indiana County

(A) Construction of a new facility

759,000

(Base Project Allocation - $633,000)

(Design and Contingencies - $126,000)

(7) Department of Environmental Protection

$179,554,000

(i) Allegheny County

(A) Additional funds for DGS 184-20, flood protection along McLaughlin Run Extension, Bethel Park Borough

600,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $100,000)

(B) Etna Borough, construction of a retaining wall on Greismore Street

200,000

(C) Greenwald flood control project

2,450,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $450,000)

(D) Logan Creek flood control project

3,500,000

(E) Millvale Borough, replace a retaining wall at Girty's Run Creek located on the property at 510 East Ohio Street

162,000

(F) Sharpsburg Borough, construction of a retaining wall on Noble Street

55,000

(G) Borough of Springdale, Tawney Run Creek flood protection project

400,000

(H) Recut the channel in the Long Run Watershed

2,000,000

(I) Turtle Creek flood wall project

950,000

(ii) Armstrong County

(A) Kiskiminetas Township, sewer line extensions

2,000,000

(B) Kiskiminetas Township, water line extensions

3,000,000

(C) North Buffalo Township and Sugarcreek Township, water line extensions

2,000,000

(ii.1) Beaver County

(A) Dredging of Beaver River

2,500,000

(iii) Berks County

(A) Stream Banks Fencing Program

1,000,000

(B) Berks County Conservation Organization, Warm Seasons Grasses Program

1,000,000

(C) Flood Control Project, Heidelburg Township

100,000

(iv) Blair County

(A) Reconstruction of interceptor drainage system, Burgoon Road to 58th Street, City of Altoona

1,500,000

(v) Bucks County

(A) Rehabilitation of the Morrisville flood protection project

1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)

(vi) Butler County

(A) West Sunbury Borough sewage upgrade

1,000,000

(B) Improvements to Butler CDC water systems

2,000,000

(C) Chicora Borough, improvements to water lines

1,000,000

(D) Penn Township, improvements to township water system

4,000,000

(E) Middlesex Township, improvements to township water system

10,000,000

(F) Adams Township, improvements to township water system

600,000

(G) Butler City, renovation of Pillow Street storm sewer

150,000

(vii) Cambria County

(A) Cresson Township and Washington Township, Lilly Level water project

1,000,000

(B) Elton Heights, sewage project

1,000,000

(C) Cassandra Borough, water project

1,000,000

(D) Barnesboro Borough, water project

1,000,000

(E) Patton Borough, water and sewer project

3,344,000

(vii.1) Carbon County

(A) Reconstruction of flood-damaged retaining wall to support street, City of Jim Thorpe

150,000

(viii) Centre County

(A) Patton Township, revitalization of Ridgemont area water distribution system

1,000,000

(B) Construction of new water acquisition system

800,000

(C) Milesburg Borough Water Authority water system project

1,600,000

(ix) Chester County

(A) Stream bank wrapping for Sucker Run and Brandywine Creek, Valley Township

500,000

(x) Clarion County

(A) Reconstruction of Beaver Creek Dam

3,000,000

(xi) Clearfield County

(A) Additional funds for DGS 182-14, construction of levees and flood walls, Coalport Borough

2,760,000

(Base Project Allocation - $2,300,000)

(Design and Contingencies - $460,000)

(B) Construction of levee along Anderson Creek, Curwensville Borough

2,160,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $360,000)

(C) Morris Township, revitalization of West Decatur S.E. water project

1,000,000

(D) Boggs Township, revitalization of Salem area water distribution system

1,000,000

(E) Boggs Township, revitalization of West Decatur S.E. area water distribution system

1,000,000

(F) Bradford Township, revitalization of Bigler N.E. area water distribution system

1,000,000

(G) Bradford Township, revitalization of Millstone N.E. area water distribution system

1,000,000

(H) Decatur Township, revitalization of improvements to Pleasant Hill area water distribution system

1,000,000

(I) Decatur Township, revitalization of Drane Hill area water distribution system

1,000,000

(J) Decatur Township, revitalization of Mock Hill area water distribution system

1,000,000

(K) Woodward Township, revitalization of Sanbourn area water distribution system

1,000,000

(L) Graham Township, revitalization of various area water distribution systems

1,000,000

(M) Pike Township, revitalization of rehabilitation of sewage treatment facilities

1,000,000

(N) Lawrence Township, revitalization of water distribution system

1,000,000

(O) Borough of Irvona, water systems improvements

400,000

(P) County Projects

(I) Sandy Township, Three Phase sanitary sewer and potable water extension projects:

5,506,000

Phase I - Sanitary Sewers ($1,548,000)

Phase II - Residential Sewer ($1,651,500) and

Phase III - Water Main Extension ($2,306,700)

(Q) Coalport Borough and Beccaria Township, land acquisition for flood control project

500,000

(xii) Columbia County

(A) Bloomsburg flood control project, construction of dike/levee

12,000,000

(xiii) Elk County

(A) City of St. Marys, construct Elk Creek sewer interceptor

2,500,000

(B) City of St. Marys, construction of water detention ponds at various locations in the community

1,500,000

(xiv) Erie County

(A) Construction of breakwall on Elk Creek

500,000

(B) Construction of breakwall at Walnut Creek Access Area

160,000

(xv) Greene County

(A) Franklin Township, water, sewer and storm water extensions along SR 2026

450,000

(B) Point Marion Borough

(I) Restoration of severely eroded riverbank

350,000

(xvi) Indiana County

(A) Conemaugh Township, water and sewer line extension

2,000,000

(xvii) Lackawanna County

(A) Flood control and storm water projects in Boroughs of Throop, Dunmore and Taylor

1,650,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $150,000)

(B) City of Scranton, including, but not limited to, storm sewers, road reconstruction, pumping stations, curbing and levees

2,200,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $200,000)

(C) City of Scranton, storm water-sewer runoff main from Birch to Maple Street along Meadow Avenue

100,000

(D) City of Scranton non-Federal financial obligation for flood control projects on Lackawanna River

5,000,000

(E) Archbald Borough, rehabilitation of sewer systems

400,000

(F) Moosic Borough, flood control project

1,500,000

(G) Old Forge Borough, storm water management project for area near Milwaukee Road and Keyser Avenue intersection

2,000,000

(H) South Abington Township

(I) Storm water management improvements to unnamed tributary which connects to Legget's Creek

300,000

(II) Ford's Pond, rehabilitate dam

400,000

(I) Thornhurst Township, stream improvements

1,200,000

(xviii) Lehigh County

(A) North Whitehall Township, correct storm water problems

250,000

(B) Study and survey of the lower reaches of the Little Lehigh River

100,000

(C) Phoenix Square waterway obstruction removal project, City of Allentown

145,000

(D) Storm sewer extension into Alton Park

185,000

(E) Lehigh Street/33rd Street drainage improvement project, Salisbury Township

1,200,000

(xix) Luzerne County

(A) Stream improvement project in City of Wilkes-Barre

1,000,000

(B) Rehabilitation of the wall along Solomon's Creek stretching from Waller Street to South Franklin Street

3,000,000

(C) Hughestown Borough, construction of sewer line

3,200,000

(xix.1) Lycoming County

(A) Integrated Flood Forecasting System, urban area topography study, including hydrologic studies, stream and rain gauging and flood inundation mapping

1,500,000

(B) Lower Lycoming Creek flood mitigation

1,800,000

(C) Countywide Flood Hazard Mitigation Program

500,000

(D) McClure's Run stream restoration project, including culvert replacement, Loyalsock Township

117,000

(E) Muncy Creek stream restoration project, Muncy Creek Township

740,000

(F) Hagerman's Run flood control project, including the rehabilitation and upgrade of conduit, South Williamsport Borough

1,000,000

(xix.2) Monroe County

(A) East Stroudsburg Borough, reconstruction of dam spillway and development of Well No.4

1,000,000

(xx) Montgomery County

(A) Additional funds for DGS 179-1, construction of a fishway, Flat Rock Dam

1,440,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $240,000)

(B) Removal of Plymouth Dam, Schuylkill River

1,020,000

(Base Project Allocation - $850,000)

(Design and Contingencies - $170,000)

(C) ((C) repealed June 22, 2000, P.L.136, No.27)

(xxi) Northampton County

(A) Route 512 flood relief project, Hanover Township

1,540,000

(B) Storm water management, Borough of Wind Gap

2,400,000

(C) Storm water management, Plainfield Township

600,000

(D) Renovation of city watershed

1,000,000

(E) City of Bethlehem, renovation of storm water system

1,500,000

(F) Williams Township, bridge replacement, storm water management/maintenance renovation

1,058,000

(xxii) Northumberland County

(A) Mount Carmel Borough, Shamokin Creek Drainage Facility

4,000,000

(B) Mount Carmel Borough, Butternut Creek Drainage Facility

1,000,000

(C) Plum Creek Flood Protection Project, Upper Augusta Township

360,000

(D) Streambank stabilization, Delaware Township

185,000

(xxiii) Schuylkill County

(A) Repairs to Owl Creek Dam, Tamaqua

3,000,000

(B) Reconstruction of Sweet Arrow Lake Dam, Pine Grove

1,200,000

(C) Cumbola Village flood protection project, Blythe Township

1,800,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $300,000)

(D) Construction of storm water system at Vernon Miller and Crest Street to reduce flooding along State Routes 1017 and 1477, Rush Township

230,000

(E) Dredging of Shenandoah Creek and reconstruction of creek walls and Kohinoor Creek culvert, Borough of Shenandoah

425,000

(F) Construction of storm drains for runoff on West Oak Street, Borough of Frackville

467,000

(G) Storm water management improvements, including construction of inlets and installation of piping and construction of bituminous swales and roll curb on Coal Street, Village of Upper Brownsville, West Mahanoy Township

110,000

(xxiv) Somerset County

(A) Rehabilitation of the Windber Borough flood protection project

1,440,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $240,000)

(xxv) Union County

(A) Buffalo Creek Watershed, reduction of erosion, wetland creation and improvement of channel stability

550,000

(xxvi) Warren County

(A) Rehabilitation of the Warren Borough flood protection project

900,000

(Base Project Allocation - $750,000)

(Design and Contingencies - $150,000)

(xxvii) Washington County

(A) California Borough/Long Branch water line extension

250,000

(B) Carroll Township water line extension

45,000

(C) Washington County Redevelopment Authority, acquisition, demolition and improvements to asbestos facilities, including the Old Monongahela Hospital Building

500,000

(xxviii) Westmoreland County

(A) Additional funds for DGS 182-7, construction of a levee and concrete floodwall, City of Jeannette

2,520,000

(Base Project Allocation - $2,100,000)

(Design and Contingencies - $420,000)

(xxix) Southwestern Pennsylvania Water Authority

(A) Water line extension, Route 21 - Khedive Area

4,000,000

(B) Water line extension, Wind Ridge

1,700,000

(C) Water line extension, Kirby to Mount Morris

2,000,000

(D) Water line extension, Route 221 - Washington Township

2,100,000

(E) Water line extension, tollgate to Washington Township

2,050,000

(F) Water line extension, Spraggs

1,000,000

(G) Water line extension, Adamik Road, Jefferson Township

350,000

(H) Water line extension, Sugar Run Road, Franklin Township

400,000

(I) Water line extension to Graysville

2,200,000

(xxx) Carmichaels - Cumberland Joint Sewer Authority

(A) Sewer extension to Paisley Industrial Park

1,000,000

(B) Lower Ten Mile - sewer extension to Wilson Company

1,000,000

(C) Crucible - sewer extension to riverfront communities and marinas

250,000

(D) East View - sewer extension to homes and businesses with malfunctioning systems

750,000

(8) Department of General Services

$194,703,000

(i) Capitol Area Buildings

(A) Fire safety upgrades to Agriculture, Forster St., State Records Center and Publication Buildings

125,000

(Base Project Allocation - $104,000)

(Design and Contingencies - $21,000)

(ii) Capitol Complex

(A) Additional funds for DGS 948-37, central air conditioning expansion to Main Capitol to upgrade the central chiller plant and connections to capitol buildings

5,000,000

(Base Project Allocation - $5,000,000)

(B) Heating, ventilating and air conditioning system upgrades for the Labor and Industry Building

1,858,000

(Base Project Allocation - $1,486,000)

(Design and Contingencies - $372,000)

(C) Upgrade restroom facilities at the Finance and Forum Buildings

6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(D) Restoration of bronze doors and enclosures at all Capitol Complex locations

1,980,000

(Base Project Allocation - $1,650,000)

(Design and Contingencies - $330,000)

(E) Additional funds for DGS 522-2, Diagnostic and Rehabilitation Center, Philadelphia

4,000,000

(iii) Allegheny County

(A) David L. Lawrence Convention Center, Phase II expansion

125,000,000

(B) Development of major hotel in conjunction with expansion of Lawrence Convention Center

27,000,000

(iv) Erie County

(A) Erie Civic Center Authority, renovations to Louis J. Tullio Convention Center

1,700,000

(B) Construction of the Warner Theater located on 8th and State Street in the City of Erie

2,000,000

(C) Repair of brick facade and upgrade of capital equipment, Erie Civic Center

2,040,000

(Base Project Allocation - $1,700,000)

(Design and Contingencies - $340,000)

(D) Erie Art Museum, acquisition, design and construction of the Erie Art Museum Annex and shared facilities connector building

18,000,000

(Base Project Allocation - $14,400,000)

(Design and Contingencies - $3,600,000)

(9) Department of Health

$1,200,000

(i) Clearfield Area Hospital

(A) Purchase of van to transport patients and for construction of facility to house van

200,000

(ii) Philipsburg Area Hospital, Centre County

(A) Construction of transitional care unit

500,000

(B) Construction of pulmonary therapy unit

500,000

(10) Pennsylvania Historical and Museum

Commission

$66,920,000

(i) Old Economy Village

(A) Permanent Exhibits

1,200,000

(B) Exhibits in new visitors center

500,000

(ii) Conrad Weiser Homestead

(A) Historic Site Improvements

600,000

(iii) Daniel Boone Homestead

(A) New visitor center

2,760,000

(iv) Washington Crossing Historical Park

(A) Rehabilitation of existing facility, additional funds, DGS 996-15

2,000,000

(v) The State Museum of Pennsylvania

(A) Renovation to museum and archives buildings

12,000,000

(B) Upgrade HVAC System, Additional Funds

6,000,000

(C) Permanent Exhibits

6,000,000

(vi) Railroad Museum of Pennsylvania

(A) Permanent Exhibits

4,500,000

(vii) Eckley Miners Village

(A) Restoration

8,000,000

(viii) Pennsylvania Lumber Museum

(A) Permanent Exhibits

600,000

(ix) Allegheny County

(A) Fort Pitt Museum, construction of a gallery and permanent exhibits

2,400,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $400,000)

(x) Erie County

(A) Erie Maritime Museum, fire suppression system

360,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $60,000)

(B) Site development and improvements at Discovery Square, including the Erie Art Museum and Historical Society

20,000,000

(11) Department of Military and Veterans

Affairs

$21,962,000

(i) Armory at Connellsville

(A) Construction of new armory and land acquisition

1,620,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $300,000)

(Design and Contingencies - $120,000)

(ii) Armory at New Milford

(A) Construction of new armory and land acquisition

1,500,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $300,000)

(Design and Contingencies - $200,000)

(iii) Armory at Johnstown

(A) Construction of regional maintenance shop

0,000,000

(iv) Fort Indiantown Gap, Dauphin/Lebanon Counties

(A) Installation of natural gas feeder lines and conversion of furnace burners

460,000

(Base Project Allocation - $420,000)

(Design and Contingencies - $40,000)

(B) Replacement of underground water and sewage lines

0,000,000

(C) Upgrade of sewage treatment plant system

0,000,000

(D) Veterans Memorial at National Cemetery

2,500,000

(v) Hollidaysburg Veterans' Center, Blair County

(A) Reconstruct/replace roof on Eisenhower Hall

410,000

(Base Project Allocation - $372,000)

(Design and Contingencies - $38,000)

(B) Dietary Building floor replacement

156,000

(vi) Pennsylvania Soldiers' and Sailors' Home, Erie County

(A) Restoration of exterior masonry of Main Building

1,100,000

(Base Project Allocation - $917,000)

(Design and Contingencies - $183,000)

(vii) Scotland School for Veterans' Children

(A) Replacement of underground fuel oil storage tanks

360,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $60,000)

(B) Modernization of boiler plant

1,120,000

(Base Project Allocation - $930,000)

(Design and Contingencies - $190,000)

(C) Replacement of steam and hot water lines

618,000

(viii) Southeastern Veterans' Center, Chester County

(A) Renovation of water stand and tank

350,000

(Base Project Allocation - $350,000)

(B) Renovation of reservoir liner

125,000

(Base Project Allocation - $125,000)

(C) Exterior weatherization for Coates Hall

200,000

(Base Project Allocation - $200,000)

(D) Install automatic door locking system

135,000

(Base Project Allocation - $120,000)

(Design and Contingencies - $15,000)

(E) Additional funds for Dietary Building and parking lot

733,000

(F) Construction of domiciliary/PCU Building

9,000,000

(ix) Southwestern Veterans' Center

(A) Installation of second emergency generator

125,000

(x) Armory at Pottsville

(A) Capital improvements to armory for reuse as youth center

200,000

(xi) Greene County Armory, land and building acquisition, demolition, construction and improvements

750,000

(xii) Greene County Armory, rehabilitation of armory

500,000

(12) Department of Public Welfare

$32,148,000

(i) Danville State Hospital, Montour County

(A) Additional funding for installation of elevator to meet ADA requirements, DGS A503-109

275,000

(ii) Ebensburg State Hospital, Cambria County

(A) Renovate/replace heating system in Buildings No.1 through No.7

5,040,000

(Base Project Allocation - $4,200,000)

(Design and Contingencies - $840,000)

(B) ((B) repealed June 22, 2000 P.L.136, No.27)

(iii) Harrisburg State Hospital, Dauphin County

(A) Renovate Building No.17

4,320,000

(Base Project Allocation - $3,600,000)

(Design and Contingencies - $720,000)

(B) Petry Building, installation of central air conditioning

3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)

(iv) Mayview State Hospital, Allegheny County

(A) Life safety code upgrades

1,800,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $300,000)

(v) Norristown State Hospital, Montgomery County

(A) Replace electrical cables

1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)

(B) Life safety code upgrades

1,858,000

(Base Project Allocation - $1,548,000)

(Design and Contingencies - $310,000)

(vi) Polk Center

(A) Upgrade electrical service

600,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $100,000)

(vii) Selinsgrove Center, Snyder County

(A) Install particulate emissions collection system

1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)

(B) Replace electrical feeder cables

1,680,000

(Base Project Allocation - $1,400,000)

(Design and Contingencies - $280,000)

(viii) Torrance State Hospital

(A) Upgrade water source and distribution

660,000

(Base Project Allocation - $550,000)

(Design and Contingencies - $110,000)

(ix) Wernersville State Hospital, Berks County

(A) New gas- or oil-fired boiler installation

720,000

(Base Project Allocation - $600,000)

(Design and Contingencies - $120,000)

(B) Building No.37, installation of central air conditioning

2,070,000

(x) Youth Development Center at Bensalem, Bucks County

(A) Life safety code upgrades

1,350,000

(Base Project Allocation - $1,125,000)

(Design and Contingencies - $225,000)

(xi) Youth Development Center at New Castle, Lawrence County

(A) Life safety code upgrades

1,155,000

(Base Project Allocation - $962,000)

(Design and Contingencies - $193,000)

(xii) Youth Forestry Camp No.2, Carbon County

(A) Construct new gym/activities building

3,720,000

(Base Project Allocation - $3,100,000)

(Design and Contingencies - $620,000)

(13) Office of Administration

$43,000,000

(i) Statewide mobile radio and microwave system

(A) Additional funds for DGS 950-10

43,000,000

(14) Pennsylvania State Police

$20,162,000

(i) State Police Academy, Dauphin County

(A) Additional funds for DGS 211-5, renovations and expansion of academy

3,950,000

(Base Project Allocation - $3,292,000)

(Design and Contingencies - $658,000)

(ii) Summerdale Laboratory Complex

(A) Additional funds for DGS 948-33, construction of a State Police Crime Laboratory

12,900,000

(Base Project Allocation - $10,750,000)

(Design and Contingencies - $2,150,000)

(iii) Trevose Station, Bucks County

(A) Additional construction funds

312,000

(iv) Firearms Training Center in Montgomery County

(A) Construction of an indoor firearms training center

3,000,000

(15) State System of Higher Education

$453,491,000

(i) Bloomsburg University

(A) Restoration of Carver Hall Tower

3,000,000

(B) Addition or renovation of Redman Stadium

2,200,000

(C) Renovation of Ben Franklin Building

5,220,000

(ii) California University

(A) Renovation of Old Industrial Arts Facility

6,773,000

(B) Construction of University Support Facility

4,181,000

(C) Replacement of selected high voltage cables and switches

542,000

(Base Project Allocation - $452,000)

(Design and Contingencies - $90,000)

(D) Burn Building

337,000

(iii) Cheyney University

(A) Additional funds for DGS 403-60, renovations to Burleigh Hall

2,140,000

(Base Project Allocation - $1,783,000)

(Design and Contingencies - $357,000)

(B) Additional funds for DGS 403-68, renovations to the Emlen Complex

4,953,000

(Base Project Allocation - $4,127,000)

(Design and Contingencies - $826,000)

(C) Renovation of Humphreys Hall

3,800,000

(Base Project Allocation - $3,167,000)

(Design and Contingencies - $633,000)

(D) Renovation of Carnegie Hall

4,478,000

(E) Renovation of the Hall Education Building

6,600,000

(F) Renovation of Browne Hall

2,058,000

(G) Renovation of Vaux/Logan Hall

6,385,000

(H) Renovation of Coppin Hall

2,015,000

(I) Renovation of Foster Union

4,896,000

(J) Construction of President's Residence

650,000

(iv) Clarion University

(A) Renovation of Becht Hall

5,506,000

(B) Construction of parking deck

5,700,000

(C) Addition/renovation of Marwick-Boyd Fine Arts Center

7,085,000

(D) Modify facilities for ADA compliance

3,624,000

(E) Renovate Moore Hall

1,107,000

(F) Renovate and expand Tippin Gymnasium

5,954,000

(G) Renovate Still Hall

6,012,000

(v) East Stroudsburg University

(A) Renovation and expansion of existing Eiler-Martin Stadium Complex

3,226,000

(Base Project Allocation - $2,688,000)

(Design and Contingencies - $538,000)

(B) Renovation and expansion of the Abeloff Convocation Center

4,900,000

(Base Project Allocation - $4,083,000)

(Design and Contingencies - $817,000)

(C) Environmental safety and mid-life renovations, Fine and Performing Arts Center

1,080,000

(Base Project Allocation - $900,000)

(Design and Contingencies - $180,000)

(D) New athletic complex

19,487,000

(Base Project Allocation - $16,239,000)

(Design and Contingencies - $3,248,000)

(I) New stadium complex - $9,677,000

(II) New baseball field - $1,445,000

(III) New softball field - $867,000

(IV) Parking (1,000 spaces) - $1,000,000

(V) Access road, sidewalks, etc. - $1,400,000

(VI) Land acquisition (37 acres) - $1,850,000

(E) Construction of parking garage

9,228,000

(F) Academic Science Building

21,234,000

(Base Project Allocation - $16,095,000)

(Land Allocation - $1,600,000)

(Design and Contingencies - $3,539,000)

(vi) Edinboro University

(A) Construction of Northwestern Pennsylvania National Resources and Environmental Center

4,520,000

(B) Tooling/Mold Design Technology Center

2,920,000

(C) Arts and Conference Center

2,000,000

(D) Renovation of Academy Hall

1,891,000

(E) Renovation of Cooper Science, Phase II

10,658,000

(vii) Indiana University

(A) Construction of new 150,000 square foot convocation center

38,271,000

(B) Renovation of Cogswell Hall, Phase II

13,000,000

(C) Construction of replacement facility for Wyant Hall/Doerr Library, Armstrong County Branch Campus

5,750,000

(D) Construction of replacement facility for Old Main, Punxsutawney Branch Campus

5,750,000

(E) Academic Sciences Building

21,234,000

(Base Project Allocation - $17,695,000)

(Design and Contingencies - $3,539,000)

(F) Parking garage

9,228,000

(Base Project Allocation - $7,690,000)

(Design and Contingencies - $1,538,000)

(viii) Kutztown University

(A) Construct College of Visual and Performing Arts Learning Center

19,550,000

(B) Renovation or replacement of boiler plant

5,900,000

(C) Renovation of Sharidan Arts Building

8,584,000

(D) Renovation of Lytle Building

503,000

(E) Life Cycle Renovation, Kemp Building

508,000

(ix) Lock Haven University

(A) Acquisition, construction and renovation of adjoining Keystone Central School District properties and structures

6,760,000

(Base Project Allocation - $6,465,000)

(Design and Contingencies - $295,000)

(B) Construction of new educational facility at the Clearfield Campus

5,000,000

(C) Renovation of Russell Hall

5,760,000

(x) Mansfield University

(A) Renovation of Butler Center and Steadman Theatre

10,848,000

(B) Upgrade campus infrastructure, Phase II

3,223,000

(C) Renovation and addition to President's Residence

275,000

(xi) Millersville University

(A) Renovation of Palmer Bishop

2,845,000

(B) Addition/renovation of Theatre Arts Education Building

12,200,000

(C) Upgrade campus infrastructure

4,120,000

(D) Construction of Sports Education Center

10,257,000

(xii) Shippensburg University

(A) Renovation of steam distribution system

6,660,000

(B) Renovation of the electrical distribution system

8,729,000

(xiii) Slippery Rock University

(A) Addition to North Lodge, McKeever Environmental Learning Center

697,000

(B) Expansion of dining hall, McKeever Environmental Learning Center

568,000

(C) Construction of McKeever Conference Center

3,343,000

(Base Project Allocation - $2,786,000)

(Design and Contingencies - $557,000)

(xiv) West Chester University

(A) Construction of School of Music

21,214,000

(Base Project Allocation - $16,922,000)

(Land Allocation - $907,000)

(Design and Contingencies - $3,385,000)

(B) Construction of conference center

20,338,000

(Base Project Allocation - $16,440,000)

(Land Allocation - $793,000)

(Design and Contingencies - $3,105,000)

(C) Construct vehicle parking garage

16,578,000

(D) Renovation of E. O. Bull Center

9,438,000

(16) Department of Transportation

$85,343,000

(i) Allegheny County

(A) Sharpsburg Borough, replacement of three traffic lights as part of the Y2K project

180,000

(B) Borough of Verona, traffic signal at the intersection of Allegheny River Boulevard and Wildwood Avenue

80,000

(C) Navigating Alle-Kiski - Wayfinder Sign System and map for the Alle-Kiski Region

375,000

(D) Environmental studies and engineering for a low-speed maglev downtown urban shuttle system in Pittsburgh

10,000,000

(ii) Bucks County Maintenance Facility

(A) Construct or acquire a replacement maintenance facility

2,500,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(iii) Dauphin County

(A) City of Harrisburg, extension of Third Street to Paxton Street Area

16,000,000

(B) City of Harrisburg, widening of North Seventh Street from Reily to Maclay Street

4,000,000

(iv) Elk County

(A) City of St. Marys, reconstruction of city streets, including sanitary sewers, storm water controls, curb and gutter and paving activities

3,000,000

(v) Erie County

(A) City of Corry, Corry to Erie Road corridor improvements

4,000,000

(vi) Indiana County

(A) Indiana County Wayfinder Sign System

100,000

(vii) Lackawanna County

(A) City of Scranton, traffic signal at intersection of River Street and Meadow Avenue

100,000

(B) City of Scranton, noise barriers on north side of I-81 from River Street exit to Brook Street in the vicinity of St. Mary's cemetery

2,000,000

(viii) Luzerne County Maintenance Facility

(A) Construct or acquire a replacement maintenance facility

3,000,000

(Base Project Allocation - $3,000,000)

(B) Construction of sound barriers between Exit 45 and Exit 46 along Route 81

15,000,000

(ix) Monroe County

(A) Delaware Water Gap Welcome Center, Interstate 80

7,000,000

(Base Project Allocation - $5,300,000)

(Land Allocation - $300,000)

(Design and Contingencies - $1,400,000)

(x) Northampton County

(A) Township of Williams, I-78 North Industrial Area drainage improvements

570,000

(B) Browns Drive bridge replacement

128,000

(xi) New Welcome Center, Tioga County

(A) Additional funds for construction of new Welcome Center

3,810,000

(Base Project Allocation - $2,966,000)

(Land Allocation - $250,000)

(Design and Contingencies - $594,000)

(xii) Washington County Maintenance Facility

(A) Construct or acquire a replacement maintenance facility

3,500,000

(Base Project Allocation - $3,500,000)

(xiii) High-speed Magnetic Levitation

(A) High-speed magnetic levitation transportation for the preconstruction engineering, environmental systems and other preliminary work for the installation of a trans-Pennsylvania high-speed maglev line between the Pittsburgh metropolitan area and the Philadelphia area based on the 310 mph operationally ready German Transrapid International TR-07 and TR-08 design. Funds will be utilized as match for Federal funding designated for maglev systems development.

10,000,000

Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.