Itemization of public improvement capital projects

Act 36 of 2020, § 3, under CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2019-2020 - ENACTMENT.

Act 36 of 2020, § 3

Section 3. Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Project

Total Project

Allocation

(1) Department of Agriculture

(i) Farm Show Complex

(A) Facility improvements, including site infrastructure, general building upgrades, electrical, HVAC, plumbing, technological improvements and new construction

Project Allocation

28,000,000

(ii) Animal Diagnostic Laboratory (ADL), State College

(A) Facility improvements, including renovations, alterations, new construction, technological improvements and site and infrastructure upgrades

Project Allocation

50,000,000

(iii) Health Diagnostic Laboratory

(A) Renovations, additions and new construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures

Project Allocation

20,000,000

(2) Department of Conservation and Natural Resources

(i) Bald Eagle State Forest

(A) Construct new woodshop, groomer storage and pole storage building

Project Allocation

4,200,000

(ii) Blue Knob State Park

(A) Additional design and construction funding for office buildings

Project Allocation

480,000

(iii) Buchanan State Forest

(A) Replace Sideling Hill maintenance headquarters and mechanics shop

Project Allocation

4,900,000

(iv) Caledonia State Park

(A) Additional design and construction funding for rehabilitation and modernization of campground facilities

Project Allocation

600,000

(B) Additional design and construction funding for restoration of water lines

Project Allocation

180,000

(v) Canoe Creek State Park

(A) Multi-use trail development of lower trail extension

Project Allocation

3,700,000

(vi) Cherry Springs State Park

(A) Additional design and construction funding for visitors and administrative center

Project Allocation

1,600,000

(vii) Codorus State Park

(A) Additional design and construction funding for rehabilitation of road and parking areas

Project Allocation

960,000

(viii) Cowans Gap State Park

(A) Additional design and construction funding for park office and attendance building

Project Allocation

240,000

(ix) Delaware Canal State Park

(A) Replacement of bridge at Bridge Street to provide trail grade separation and access, including site acquisition

Project Allocation

3,500,000

(B) Design and construction funding for stone wall replacement

Project Allocation

1,080,000

(C) Additional design and construction funding for repair and maintenance of the Delaware Canal

Project Allocation

2,000,000

(D) Additional design and construction funding for infrastructure redevelopment and rehabilitation of the Delaware Canal State Park from Reigelsville to Bristol

Project Allocation

1,000,000

(E) Provide additional funding for DGS 141-10 for construction, design and contingencies and land acquisition

Project Allocation

7,000,000

(ix.1) Delaware State Forest

(A) Additional funding to construct new resource center with storage building to meet current needs

Project Allocation

2,600,000

(x) Denton Hill State Park

(A) Additional design and construction funding for rehabilitation of park, including ski facilities

Project Allocation

2,400,000

(xi) Division of Forest Fire Protection

(A) Construct new Air Operations Facility

Project Allocation

5,400,000

(xii) Elk State Forest

(A) Additional funding to replace Hicks Run maintenance headquarters

Project Allocation

1,300,000

(xiii) Forest District 10

(A) Additional design and construction funding for replacement of failed acid mine drainage treatment system in Kettle Creek watershed

Project Allocation

400,000

(xiv) Forest District 11

(A) Additional design and construction funding for bridge over the Lehigh River

Project Allocation

700,000

(xv) Forest District 13

(A) Additional design and construction funding for remediation or reclamation of acid mine drainage pollution source into Little Dents Run watershed

Project Allocation

1,600,000

(xvi) Forest District 14

(A) Additional design and construction funding to locate, plug and retire abandoned wells on State Forest land

Project Allocation

400,000

(xvii) Fort Washington State Park

(A) Construct visitor center and park amenities

Project Allocation

13,200,000

(xviii) Gallitzin State Forest

(A) Additional funding for the new district office

Project Allocation

2,500,000

(B) Additional funding to replace Babcock Forest maintenance headquarters and storage building

Project Allocation

1,200,000

(xix) Gifford Pinchot State Park

(A) Additional design and construction funding to replace water lines

Project Allocation

312,000

(B) Additional design and construction funding to correct drainage and repave roads

Project Allocation

156,000

(xx) Hickory Run State Park

(A) Additional design and construction funding to develop and construct family cabin colony

Project Allocation

600,000

(xxi) Kinzua Bridge State Park

(A) Bridge repair and repainting

Project Allocation

15,500,000

(xxii) Laurel Mountain State Park

(A) Additional design and construction funding for development and construction of phase II ski area facilities

Project Allocation

600,000

(xxiii) Mira Lloyd Dock Conservation Center

(A) Repairs to Penn Nursery dam or breach dam and construct alternative water supply for irrigation system

Project Allocation

8,150,000

(B) Construct new seed extraction building

Project Allocation

3,700,000

(xxiv) Maurice K. Goddard State Park

(A) Redevelopment of park facilities

Project Allocation

13,200,000

(B) Additional design and construction funding to replace marina facilities with new structures

Project Allocation

2,100,000

(xxv) Moraine State Park

(A) Additional design and construction funding to upgrade sewage treatment facilities

Project Allocation

1,000,000

(xxvi) Moshannon State Forest

(A) Repairs to Shaggers Inn Dam

Project Allocation

4,900,000

(B) Additional funding to replace the Dauge Mechanics Shop and fire equipment storage

Project Allocation

3,000,000

(xxvii) Penn Nursery

(A) Additional funding to replace maintenance shop with new garage and sign shop

Project Allocation

2,500,000

(B) Additional design and construction funding to replace maintenance shop

Project Allocation

1,100,000

(xxviii) Pinchot State Forest

(A) Breach and remove Olyphant Dam No. 3

Project Allocation

4,300,000

(B) Breach and remove Pine Run Dam No. 1

Project Allocation

4,250,000

(C) Additional funding to breach and remove Edgerton Dam

Project Allocation

1,300,000

(D) Additional funding to breach and remove Olyphant Dam No. 2

Project Allocation

3,100,000

(E) Additional funding to construct county forestry and fire headquarters

Project Allocation

6,800,000

(xxix) Point State Park

(A) Additional design and construction funding to connect Great Allegheny Passage Trail to Point State Park, including rehabilitation of amenities, walkways and parking areas

Project Allocation

1,800,000

(xxx) Prince Gallitzin State Park

(A) Additional design and construction funding to replace toilet room facilities

Project Allocation

200,000

(B) Additional design and construction funding to replace water lines

Project Allocation

650,000

(C) Additional design and construction funding to regrade and repave roads

Project Allocation

480,000

(xxxi) Pymatuning State Park

(A) Additional funding for campground rehabilitation

Project Allocation

2,600,000

(B) Additional design and construction funding to rehabilitate campground facilities

Project Allocation

480,000

(xxxii) Rothrock State Forest

(A) Road paving

Project Allocation

3,000,000

(xxxiii) Samuel S. Lewis State Park

(A) Additional design and construction funding to replace toilet facilities, including septic system

Project Allocation

240,000

(xxxiv) Shawnee State Park

(A) Additional design and construction funding to replace regional office

Project Allocation

720,000

(xxxv) Shikellamy State Park

(A) Additional design and construction funding to replace dam bags

Project Allocation

800,000

(xxxvi) Sproul State Forest

(A) Additional funding to replace Snowshoe maintenance headquarters

Project Allocation

1,300,000

(xxxvii) Tiadaghton State Forest

(A) Construct new Waterville mechanics garage and storage

Project Allocation

3,400,000

(xxxviii) Tioga State Forest

(A) Additional funding to replace Armenia maintenance headquarters

Project Allocation

1,500,000

(xxxix) Warriors Path State Park

(A) Multiuse trail development of the rail trail extension into the main park use area

Project Allocation

1,000,000

(xl) Weiser State Forest

(A) Additional funding for New Haldeman maintenance headquarters

Project Allocation

3,700,000

(xli) Various State Parks - Statewide

(A) Development of full-service hookups at campsites

Project Allocation

12,200,000

(B) Paving projects

Project Allocation

16,200,000

(C) Camp rehabilitation

Project Allocation

21,600,000

(xlii) Various State Forest Land - Statewide

(A) Plug abandoned wells

Project Allocation

10,000,000

(xliii) Various State Forest Land - Sproul and Susquehannock

(A) Construct ATV connector trails

Project Allocation

44,000,000

(xliv) Various State Forest Land - Tiadaghton and Tioga

(A) Additional funding for Pine Creek maintenance offices

Project Allocation

3,000,000

(xlv) Various State Parks and Forest Land

(A) Park Region 1, Northcentral, Solar energy installations

Project Allocation

5,200,000

(B) Park Region 2, Western, Solar energy installations

Project Allocation

5,200,000

(C) Park Region 3, Southcentral, Solar energy installations

Project Allocation

5,200,000

(D) Park Region 4, Eastern, Solar energy installations

Project Allocation

5,200,000

(3) Department of Corrections

(i) Elizabethtown Training Academy

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

3,000,000

(ii) Quehanna Boot Camp

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

2,200,000

(iii) State Correctional Institution at Albion

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

3,800,000

(iii.1) State Correctional Institution at Benner

(A) Design and construction of transportation hub, including land development and site infrastructure improvements

Project Allocation

3,000,000

(iv) State Correctional Institution at Cambridge Springs

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

14,820,000

(v) State Correctional Institution at Camp Hill

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

35,600,000

(vi) State Correctional Institution at Chester

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

5,450,000

(vii) State Correctional Institution at Coal Township

(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

Project Allocation

10,401,000

(viii) State Correctional Institution at Dallas

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

950,000

(ix) State Correctional Institution at Fayette

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

15,675,000

(x) State Correctional Institution at Forest

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

12,583,000

(xi) State Correctional Institution at Frackville

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

4,750,000

(xii) State Correctional Institution at Graterford

(A) Design and construction for code, permit and site-related, utility-related and infrastructure-related issues

Project Allocation

575,000

(xiii) State Correctional Institution at Greene

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

5,800,000

(xiv) State Correctional Institution at Houtzdale

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

10,000,000

(xv) State Correctional Institution at Huntingdon

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

12,500,000

(xvi) State Correctional Institution at Laurel Highlands

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

4,375,000

(xvii) State Correctional Institution at Mahanoy

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

18,600,000

(xviii) State Correctional Institution at Mercer

(A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements

Project Allocation

4,250,000

(xix) State Correctional Institution at Muncy

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

13,025,000

(xx) State Correctional Institution at Pine Grove

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

5,875,000

(xxi) State Correctional Institution at Retreat

(A) Design and construction of building expansion, including land development, renovations and alterations and site infrastructure improvements, and new construction

Project Allocation

4,000,000

(xxii) State Correctional Institution at Rockview

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

7,425,000

(xxiii) State Correctional Institution at Smithfield

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

5,730,000

(xxiv) State Correctional Institution at Somerset

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

5,107,000

(xxv) State Correctional Institution at Waymart

(A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction

Project Allocation

15,375,000

(4) Department of Education

(i) (Reserved)

(ii) Lincoln University

(A) Facility and infrastructure upgrades, including campus security utility, information technology and building systems and envelope

Project Allocation

16,000,000

(B) New building for student services, administrative offices and liberal arts classrooms

Project Allocation

25,000,000

(iii) The Pennsylvania State University

(A) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Physical Education Building renewal at the Abington campus

Project Allocation

20,000,000

(B) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Woodland Building renewal at the Abington campus

Project Allocation

10,000,000

(C) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Student Union Building at the Abington campus

Project Allocation

60,000,000

(D) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Academic Building renovation at the Altoona campus

Project Allocation

15,000,000

(E) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for University Support Building I renewal at the University Park campus

Project Allocation

21,000,000

(F) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Thomas Building renovation at the University Park campus

Project Allocation

7,200,000

(G) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Physics Building at the University Park campus

Project Allocation

40,000,000

(H) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Research and Teaching Space at the University Park campus

Project Allocation

120,000,000

(I) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Building at the University Park campus

Project Allocation

150,000,000

(J) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Academic and Research Building renewal at the University Park campus

Project Allocation

80,000,000

(K) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Ritenour Building renovation at the University Park campus

Project Allocation

19,200,000

(L) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Global Programs Building at the University Park campus

Project Allocation

18,000,000

(M) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Arboretum Cultural District Infrastructure at the University Park campus

Project Allocation

10,000,000

(N) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Arboretum Cultural District new facility at the University Park campus

Project Allocation

50,000,000

(O) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Administrative Unit Building at the University Park campus

Project Allocation

85,000,000

(P) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Capital Renewal, Phase VIII at the University Park campus

Project Allocation

40,000,000

(Q) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Building at the University Park campus

Project Allocation

180,000,000

(R) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Sackett Building at the University Park campus

Project Allocation

80,000,000

(S) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Liberal Arts Research and Teaching Space at the University Park campus

Project Allocation

40,000,000

(T) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Hosler Building at the University Park campus

Project Allocation

60,000,000

(U) Design, construction of new space and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrade of utilities and other infrastructure needs, and other related costs for capital renewal, Phase IX at the University Park campus

Project Allocation

40,000,000

(V) Acquisition, construction, abatement of hazardous materials and other related costs for a new academic building at the Pennsylvania College of Technology in the City of Williamsport

Project Allocation

7,000,000

(W) Construction, infrastructure, redevelopment and other related costs for a Penn State College of Medicine Research and Learning Facility to house research and academic space to include laboratories, vivarium and imaging labs in addition to instructional studios

Project Allocation

100,000,000

(X) Construction, infrastructure, redevelopment and other related costs associated with the design, demolition, grading and installation of water, sewer and streets to accommodate the planned redevelopment of the Meade Heights parcel on the Penn State Harrisburg campus as a public-private innovation park

Project Allocation

1,750,000

(Y) Construction, redevelopment and other related costs associated with the renovation of Wrisberg Hall on the Penn State Harrisburg campus as a laboratory building to support expanding externally sponsored research activity

Project Allocation

2,500,000

(Z) Acquisition, design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for the Transportation Training and Testing Facility at University Park Campus

Project Allocation

35,000,000

(iv) Temple University

(A) Multi-Purpose Academic/Administrative Building - New facility and infrastructure upgrades and associated design and construction expenses at the main campus

Project Allocation

170,000,000

(B) New Academic Facility - Main campus, renovations and infrastructure upgrades and associated design and construction expenses at the main campus

Project Allocation

140,000,000

(C) Annenberg/Tomlinson Hall - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the main campus

Project Allocation

40,000,000

(D) Anderson/Gladfelter Halls - CLA Lobby - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the main campus

Project Allocation

15,000,000

(E) Podiatry Building - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the School of Podiatric Medicine

Project Allocation

40,000,000

(F) Academic Center - Facility infrastructure improvements, including hazardous materials abatement, and utility upgrades and extensions and associated design and construction expenses at the Ambler campus

Project Allocation

50,000,000

(G) New Administrative Services Building - New Facility and infrastructure upgrades and associated design and construction expenses at the main campus

Project Allocation

30,000,000

(H) Classroom Building or Annex - Design, infrastructure, abatement of hazardous materials and construction of a classroom building/annex at the Anderson/Gladfelter academic complex

Project Allocation

41,000,000

(I) Design, infrastructure, abatement of hazardous materials, renovation, expansion, construction of academic, administrative and health care facilities, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the Health Sciences campus

Project Allocation

125,000,000

(J) Capital renewal, including existing academic and administrative spaces, as well as infrastructure which supports those spaces, at all domestic campuses

Project Allocation

150,000,000

(K) Design, infrastructure, abatement of hazardous materials and construction of a classroom building or annex facility, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus

Project Allocation

45,000,000

(L) Design, infrastructure, abatement of hazardous materials and construction of an academic learning center, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the Ambler campus

Project Allocation

50,000,000

(M) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion and modernization of the Temple Lung Center, including related clinical, patient, community and research and education facilities

Project Allocation

6,000,000

(N) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Episcopal Campus

Project Allocation

20,000,000

(O) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Boyer Pavilion Patient Care facilities

Project Allocation

10,000,000

(P) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital

Project Allocation

30,000,000

(Q) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion of the Emergency Department and related clinical, patient, community, research and education facilities for Temple University Hospital Emergency Department

Project Allocation

10,000,000

(R) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Fox Chase Cancer Center

Project Allocation

10,000,000

(S) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Jeanes Hospital

Project Allocation

10,000,000

(T) Construction and infrastructure improvement related to the development of a medical office building, including related clinical patient, community, parking, research and education facilities for Temple University Health System

Project Allocation

10,000,000

(U) Acquisition, construction, infrastructure improvements and other related development costs for a food service facility on the Ambler Campus

Project Allocation

10,000,000

(V) Design, infrastructure, abatement of hazardous materials and other related costs for renovation/rehabilitation and construction at the main campus

Project Allocation

300,000,000

(v) Thaddeus Stevens College of Technology

(A) Leonard Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

3,000,000

(B) Dormitories - Renovations, alterations, repairs, infrastructure upgrades and associated design and construction expenses, including HVAC improvements, at the main campus dormitories

Project Allocation

2,000,000

(C) Roof - Renovations, alterations, infrastructure upgrades and associated design and construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings

Project Allocation

2,500,000

(D) Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

2,500,000

(E) Parking Garage - New construction, renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

5,000,000

(F) Athletic Field - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses, including resodding of field

Project Allocation

1,500,000

(G) Campus Lighting - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

1,000,000

(H) Window Replacement - Renovations, alterations, additions, infrastructure upgrades and associated design and construction expenses at dormitories and other campus buildings

Project Allocation

2,000,000

(I) Campus Improvements - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses, including exterior painting

Project Allocation

500,000

(J) Student Center - Renovations, alterations, additions, new construction, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

5,000,000

(K) Dormitory Dining Hall - Renovations, alterations, additions, new construction, infrastructure upgrades, site improvements and associated design and construction expenses

Project Allocation

25,000,000

(vi) University of Pittsburgh

(A) Programmatic and infrastructure improvements, including design and construction for facilities at the Oakland campus

Project Allocation

50,000,000

(B) Programmatic and infrastructure improvements, including design and construction for the Cathedral of Learning at the Oakland campus

Project Allocation

100,000,000

(C) New Natatorium and Aquatics Building - New construction, alterations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus

Project Allocation

100,000,000

(D) New Student Recreation Center - New construction, additions, alterations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus

Project Allocation

80,000,000

(E) Athletic Performance Center - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus

Project Allocation

60,000,000

(F) New Parking Garage - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus

Project Allocation

20,000,000

(G) New Tennis Facility - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus

Project Allocation

15,000,000

(H) Acquisition, construction, infrastructure and other related costs for the University of Pittsburgh Bradford's Kessel Athletic Complex, including renovation and rehabilitation of existing facilities and construction of new facilities

Project Allocation

10,000,000

(I) Construction, infrastructure and other related costs for the University of Pittsburgh Bradford's Marilyn Horne Hall improvements, including renovation and rehabilitation of existing facilities, development of upper floor housing and construction of new facilities

Project Allocation

10,000,000

(5) Pennsylvania Emergency Management Agency

(i) State Fire Academy

(A) New Rescue Truck, Certification/Training Vehicle - Firefighter and Hazardous Material facility

Project Allocation

900,000

(ii) External Operations Facility

(A) Design and construction of a facility to house emergency response vehicles, trailers and equipment

Project Allocation

5,000,000

(6) Department of Environmental Protection

(i) Allegheny County

(A) Gladden Treatment Facility - Construct mine drainage treatment facility

Project Allocation

5,000,000

(i.1) Clearfield County

(A) DGS 182-22 Stinky Run, Clearfield Borough - Additional funding for design and construction of flood protection project

Project Allocation

1,000,000

(ii) Carbon County

(A) Quakake Treatment Facility - Construct acid mine drainage treatment facility

Project Allocation

6,000,000

(iii) Fayette County

(A) Ohiopyle Mine water treatment system design and construction upgrades to facility

Project Allocation

3,300,000

(iv) Lackawanna County

(A) Blakely - Design and construction of rehabilitation for flood protection at Hull Creek

Project Allocation

900,000

(iv.1) Luzerne County

(A) Construction of levee along the Susquehanna River, including consulting, engineering fees and other associated costs, including land acquisition and buildings, if necessary

Project Allocation

5,000,000

(B) Acquisition, construction and other related costs associated with a levee project to protect West Pittston Borough

Project Allocation

10,000,000

(v) Philadelphia County

(A) Schuylkill River Project - Additional funding for rehabilitation of existing facilities, including canal wall at Flat Rock Dam

Project Allocation

100,000

(vi) Schuylkill County

(A) Audenreid Treatment Facility - Land acquisition and construction of acid mine drainage treatment facility

Project Allocation

23,000,000

(B) Mill Creek Treatment Facility - Construction of mine drainage treatment facility

Project Allocation

10,000,000

(C) Schuylkill River Project - Additional funding for rehabilitation of existing facilities at Auburn Dam

Project Allocation

50,000

(D) Schuylkill River Project - Additional funding for rehabilitation of existing facilities at Tamaqua Borough Dam

Project Allocation

50,000

(vii) Somerset County

(A) Dark Shade Creek Treatment Facility - Construction of mine drainage treatment facility

Project Allocation

13,000,000

(viii) Tioga County

(A) Morris Run Treatment Facility - Construction of mine drainage treatment facility

Project Allocation

10,000,000

(ix) Westmoreland County

(A) Design and construction of new treatment facility to eliminate need for Banning No. 4 and Euclid, including acquisition of land

Project Allocation

28,025,000

(B) Crabtree Discharge Treatment Facility - Construction of mine discharge treatment facility

Project Allocation

8,000,000

(C) DGS 180-43 Unnamed Tributary of Jack's Run, City of Greensburg - Additional funding for design and construction of flood protection near Northmont Street

Project Allocation

1,000,000

(D) DGS 182-07 Brush Creek, City of Jeannette - Additional funding for design and construction of flood protection project

Project Allocation

500,000

(E) Renovation and rehabilitation of Midway Cabin in Laurel Mountain State Park

Project Allocation

500,000

(x) Bureau of Laboratories

(A) Construction of new laboratory, including site and infrastructure improvements and land acquisition

Project Allocation

125,000,000

(7) Department of General Services

(i) Berks County

(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Reading

Project Allocation

15,000,000

(ii) Dauphin County

(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Harrisburg area

Project Allocation

200,000,000

(B) Renovations and alterations for upgrades and infrastructure improvements to the Finance Building

Project Allocation

120,000,000

(C) Renovations and alterations for upgrades and infrastructure improvements to the 18th and Herr Complex

Project Allocation

30,000,000

(D) Building controls, building automation system upgrades and installation, HVAC improvements and environmental abatement and restoration to DGS-owned buildings in the Harrisburg area

Project Allocation

80,000,000

(E) Facility infrastructure upgrades, including HVAC, electrical, code compliance, security and technology for Commonwealth Technology Center

Project Allocation

30,000,000

(iii) Lackawanna County

(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Scranton

Project Allocation

15,000,000

(iv) Statewide

(A) Improvements, infrastructure upgrades and land acquisition for ADA accessibility and code upgrades to DGS-owned buildings

Project Allocation

25,000,000

(B) Professional services for the development of facility master plans, facility assessments and agency capital planning

Project Allocation

25,000,000

(C) Demolition and site restoration, including utility and infrastructure modification for State-owned buildings

Project Allocation

100,000,000

(D) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for electric vehicle charging stations and battery storage systems at DGS-owned buildings

Project Allocation

30,000,000

(7.1) Department of Health

(i) Bureau of Laboratories

(A) Construct new laboratory, including site and infrastructure improvements and land acquisition

Project Allocation

50,000,000

(8) Pennsylvania Historical and Museum Commission

(i) State Archives

(A) Renovate existing building for reuse

Project Allocation

15,000,000

(ii) State Museum

(A) Building improvements and infrastructure upgrades

Project Allocation

20,000,000

(B) Exhibit upgrades

Project Allocation

30,000,000

(iii) Bushy Run Battlefield

(A) Building, site and infrastructure improvements

Project Allocation

1,500,000

(iv) Collections Storage Facility

(A) Land acquisition, building, site and infrastructure improvements

Project Allocation

15,000,000

(v) Cornwall Iron Furnace

(A) Building, site and infrastructure improvements

Project Allocation

1,500,000

(vi) Eckley Miner's Village

(A) Building, site and infrastructure improvements

Project Allocation

2,000,000

(B) Exhibit upgrades

Project Allocation

3,000,000

(vii) Ephrata Cloister

(A) Building, site and infrastructure improvements

Project Allocation

4,000,000

(vii.1) Erie Maritime Museum - U.S. Brig Niagara

(A) Building and exhibit improvements

Project Allocation

2,000,000

(B) U.S. Brig Niagara reconstruction

Project Allocation

10,000,000

(C) U.S. Brig Niagara restoration

Project Allocation

7,000,000

(D) Procurement of sailing school vessel

Project Allocation

2,000,000

(E) Building and infrastructure improvements

Project Allocation

2,000,000

(viii) Graeme Park

(A) Building, site and infrastructure improvements

Project Allocation

1,500,000

(ix) Joseph Priestley House

(A) Building, site and infrastructure improvements

Project Allocation

1,000,000

(x) Landis Valley Village and Farm Museum

(A) Building and site improvements

Project Allocation

3,000,000

(B) Exhibit upgrades

Project Allocation

4,100,000

(xi) Old Economy Village

(A) Building, site and infrastructure improvements

Project Allocation

2,000,000

(xii) Pennsbury Manor

(A) Building, site and infrastructure improvements

Project Allocation

2,000,000

(B) Exhibit upgrades

Project Allocation

750,000

(xiii) Pennsylvania Lumber Museum

(A) Building, site and infrastructure improvements

Project Allocation

2,000,000

(B) Exhibit upgrades

Project Allocation

750,000

(xiv) Pennsylvania Military Museum

(A) Building, site and infrastructure improvements

Project Allocation

2,000,000

(xv) Railroad Museum of Pennsylvania

(A) Building, site and infrastructure improvements

Project Allocation

3,000,000

(xvi) Somerset Historical Center

(A) Building, site and infrastructure improvements

Project Allocation

1,000,000

(9) Department of Human Services

(i) Clarks Summit State Hospital

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(ii) Danville State Hospital

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(iii) Ebensburg Center

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(iv) Loysville Youth Development Center

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

13,000,000

(v) Norristown State Hospital

(A) Design and construction of psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution. These funds shall supplement those funds previously appropriated for the same purpose in section 3(10)(v)(B) of the act of October 30, 2017 (P.L.831, No.52), known as the Capital Budget Project Itemization Act of 2017-2018.

Project Allocation

100,000,000

(B) Renovations to the institution, including new construction, alterations, additions, renovations, site improvements and infrastructure upgrades

Project Allocation

65,000,000

(vi) North Central Secure Treatment Unit

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

5,000,000

(vii) Polk Center

(A) Alterations, renovations, infrastructure and site modifications

Project Allocation

11,000,000

(viii) Selinsgrove Center

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(ix) South Mountain Secure Treatment Unit

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

3,000,000

(x) South Mountain Restoration Center

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

15,000,000

(xi) Torrance State Hospital

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(xii) Warren State Hospital

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(xiii) Wernersville State Hospital

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

11,000,000

(xiv) White Haven Center

(A) Alterations, renovations, infrastructure and site modifications

Project Allocation

11,000,000

(xv) Youth Forestry Camp No. 2

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

5,000,000

(xvi) Youth Forestry Camp No. 3

(A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition

Project Allocation

5,000,000

(10) Department of Military and Veterans Affairs

(i) Gino J. Merli Veterans' Center

(A) Additional funding for Project 969-16 Phase 2 0963-0204 Ph 2, Renovation and General Repairs

Project Allocation

690,000

(B) Dining Room expansion

Project Allocation

4,800,000

(C) Rehabilitate veterans' home

Project Allocation

8,750,000

(ii) Hollidaysburg Veterans' Home

(A) Additional funding for Renovation and General Repairs Project DGS 0969-0016 Ph 2

Project Allocation

825,000

(B) Infrastructure upgrades

Project Allocation

8,750,000

(C) Rehabilitate veterans' home, including demolition of vacant buildings

Project Allocation

5,000,000

(D) Expansion of MacArthur Hall

Project Allocation

6,000,000

(iii) Pennsylvania Soldiers' and Sailors' Home, Erie

(A) Rehabilitate State Veterans' Cemetery

Project Allocation

7,000,000

(B) Rehabilitate veterans' home

Project Allocation

6,250,000

(iv) Southeastern Veterans' Center, Spring City

(A) Construction of new replacement Community Living Center

Project Allocation

30,144,000

(B) Infrastructure upgrades

Project Allocation

6,250,000

(v) Southwestern Veterans' Center, Pittsburgh

(A) Infrastructure upgrades

Project Allocation

8,125,000

(v.1) Veterans Homes Statewide

(A) Land acquisition in and around existing veterans homes for green spaces and parking

Project Allocation

5,000,000

(v.2) Fort Indiantown Gap National Cemetery

(A) Alterations, repairs and deferred maintenance of the veterans' monument at Fort Indiantown Gap

Project Allocation

14,000,000

(vi) Bucks County

(A) Construct new facility and renovate existing facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

20,000,000

(vii) Cambridge Springs Maintenance Shop

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

1,000,000

(viii) Carbondale Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

5,000,000

(ix) Clearfield Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

9,000,000

(ix.1) Combined Support Maintenance Shop West, Pittsburgh, Allegheny County

(A) Design, construction, land acquisition and infrastructure improvements

Project Allocation

5,000,000

(ix.2) Dauphin County Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

20,000,000

(x) Erie Readiness Center

(A) Acquisition of land for expansion and new facility

Project Allocation

4,000,000

(B) Construct new Readiness Center

Project Allocation

20,000,000

(xi) Friedens Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

9,500,000

(xii) Fort Indiantown Gap

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

27,000,000

(B) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment

Project Allocation

7,500,000

(C) Construct new Fire Station and Ancillary Facilities

Project Allocation

20,000,000

(D) Additional funding to rehabilitate Fitzpatrick Hall, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

4,000,000

(xiii) Gettysburg Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

2,000,000

(xiv) Grove City Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

6,000,000

(xv) Hamburg Readiness Center

(A) Construct a new Readiness Center

Project Allocation

15,000,000

(xvi) (Reserved)

(xvii) Hermitage Readiness Center

(A) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment

Project Allocation

4,500,000

(xviii) (Reserved)

(xix) Horsham Readiness Center

(A) Renovate numerous facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

36,600,000

(xx) Jonestown Readiness Center

(A) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment

Project Allocation

10,000,000

(xxi) Lehighton Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

8,000,000

(xxii) Lock Haven Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

5,000,000

(xxiii) Mount Pleasant Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

5,000,000

(xxiv) Lawrence County or Mercer County Field Maintenance Shop

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

25,000,000

(xxv) Lawrence County or Mercer County Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

20,000,000

(xxvi) (Reserved)

(xxvii) New Milford Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

10,000,000

(xxviii) Philadelphia County Readiness Centers

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

55,000,000

(xxix) Phoenixville Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

2,000,000

(xxx) Plymouth Meeting Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

5,000,000

(xxxi) Spring City Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

4,000,000

(xxxii) Washington Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

9,760,000

(xxxiii) Wilkes-Barre Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

15,000,000

(xxxiv) Williamstown Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

3,000,000

(xxxv) Schuylkill County Readiness Center

(A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades

Project Allocation

20,000,000

(xxxvi) Statewide improvements

(A) Provide force protection and physical security upgrades to DMVA facilities statewide, including new construction, renovations, electronic security systems, site work and building hardening

Project Allocation

30,000,000

(B) Construct physical fitness structures at readiness centers statewide to meet readiness requirements for soldiers

Project Allocation

5,000,000

(C) Construct cold storage for readiness centers throughout this Commonwealth

Project Allocation

20,000,000

(11) State System of Higher Education

(i) Bloomsburg University

(A) Renovation or replacement of Bakeless Hall

Project Allocation

18,000,000

(B) Renovation or replacement of Benjamin Franklin Hall

Project Allocation

19,000,000

(C) Renovation or replacement of Simon Hall

Project Allocation

6,000,000

(ii) California University

(A) Construction, renovation and acquisition of student housing facilities

Project Allocation

66,000,000

(B) Construction, renovation and acquisition of parking garage

Project Allocation

12,000,000

(C) Facility space renovation, consolidation and demolition of academic buildings

Project Allocation

15,000,000

(D) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

22,000,000

(E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

20,000,000

(iii) Cheyney University

(A) Additional funding for Browne Hall renovation

Project Allocation

1,000,000

(B) Acquisition, redevelopment, renovation/rehabilitation, construction, infrastructure improvements and abatement of hazardous materials for the redevelopment of Cheyney University

Project Allocation

10,000,000

(C) Renovation and construction to address deferred maintenance and capital renewal

Project Allocation

19,000,000

(D) Renovation or replacement of King and Tubman Halls

Project Allocation

21,000,000

(iv) Clarion University

(A) Construction, renovation and acquisition of student housing facilities

Project Allocation

98,000,000

(B) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

18,000,000

(C) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

23,000,000

(v) East Stroudsburg University

(A) Additional funding for renovation of Gessner Science

Project Allocation

20,000,000

(B) Additional funding for renovation of Moore Biology

Project Allocation

10,000,000

(C) Additional funding for renovation of Stroud Hall

Project Allocation

15,000,000

(D) Additional funding for demolition of underutilized and obsolete buildings

Project Allocation

10,000,000

(E) Facility space renovation, consolidation and demolition of academic buildings

Project Allocation

15,000,000

(F) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

20,000,000

(G) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

20,000,000

(vi) Edinboro University

(A) Additional funding for renovation of Hendricks Hall

Project Allocation

10,000,000

(B) Additional funding for demolition of underutilized and obsolete buildings

Project Allocation

15,000,000

(C) Construction, renovation and acquisition of student housing facilities

Project Allocation

105,000,000

(D) Renovation or replacement of McComb Fieldhouse

Project Allocation

45,000,000

(E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

20,000,000

(vii) Indiana University of Pennsylvania

(A) New construction, land development and infrastructure upgrades for replacement of academic buildings

Project Allocation

50,000,000

(B) Facility space renovation, consolidation and demolition of academic buildings

Project Allocation

15,000,000

(C) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

25,000,000

(D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

19,000,000

(viii) Kutztown University

(A) Construction, renovation and acquisition of student housing facilities

Project Allocation

63,000,000

(B) Renovation of Old Main

Project Allocation

12,000,000

(C) Renovation or replacement of Rickenbach Education Building

Project Allocation

22,000,000

(D) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

15,000,000

(E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

15,000,000

(ix) Lock Haven University

(A) Construction, renovation and acquisition of student housing facilities

Project Allocation

36,000,000

(B) Renovation of Raub Hall

Project Allocation

20,000,000

(C) Renovation, replacement or upgrade of campus infrastructure

Project Allocation

10,000,000

(D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

12,000,000

(x) Mansfield University of Pennsylvania

(A) Renovation, alteration, new construction, land development, infrastructure upgrades and demolition for North Hall renovation and Elliot Hall demolition

Project Allocation

50,000,000

(B) Construction, renovation and acquisition of student housing facilities

Project Allocation

76,000,000

(C) Renovation, replacement or upgrade of campus utilities infrastructure

Project Allocation

10,000,000

(D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

19,000,000

(xi) Millersville University

(A) Renovation or replacement of Argires Science Complex Buildings

Project Allocation

60,000,000

(B) Renovation, replacement or upgrade of campus water treatment and distribution utilities infrastructure

Project Allocation

9,000,000

(C) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

14,000,000

(xii) Shippensburg University

(A) Additional funding for replacement of Henderson Hall

Project Allocation

5,000,000

(B) Additional funding for renovation of Lehman Library

Project Allocation

5,000,000

(C) Construction, renovation and acquisition of student housing facilities

Project Allocation

131,000,000

(D) Renovation and addition of Heiges Field House

Project Allocation

40,000,000

(E) Renovation of Old Main, Phase 2

Project Allocation

15,000,000

(F) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

15,000,000

(xiii) Slippery Rock University

(A) Additional funding for electrical infrastructure upgrades

Project Allocation

5,000,000

(B) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

17,000,000

(xiv) West Chester University

(A) Renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

19,000,000

(xv) Statewide campuses

(A) Demolition and site restoration of underutilized and obsolete buildings

Project Allocation

50,000,000

(12) Office of Administration

(i) Commonwealth Technology Center

(A) Renovations, alterations and mechanical, electrical, technology and other associated infrastructure upgrades

Project Allocation

4,500,000

(13) Pennsylvania State Police

(i) Troop L Headquarters/Station, Berks County

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

30,000,000

(ii) Troop D Butler Headquarters, Butler County

(A) Renovate the institution, including roof and gutter replacement, alterations, renovations, site improvements and infrastructure upgrades

Project Allocation

4,800,000

(iii) BESO Headquarters, Dauphin, Cumberland or Lebanon Counties

(A) Facility and site improvements, including new construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

34,000,000

(iv) Troop H Headquarters, Dauphin or Cumberland Counties

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

42,000,000

(v) State Police Academy, Dauphin, Cumberland or Lebanon Counties

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

180,000,000

(vi) Erie Laboratory, Erie County

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

9,600,000

(vii) Troop E Headquarters, Erie County

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

6,000,000

(viii) Troop M Headquarters/Laboratory, Lehigh County

(A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades

Project Allocation

1,200,000

(ix) Regional Forensic Laboratory

(A) Renovate and/or construct new laboratory in central Pennsylvania, including site and infrastructure improvements and land acquisition

Project Allocation

50,000,000

(14) Department of Transportation

(i) Adams County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(ii) Allegheny County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing western training facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(D) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Fort Pitt Tunnel

Project Allocation

7,000,000

(E) New construction, renovations, expansion and alterations to existing roadside rest area at Site 11, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(F) New construction, renovations, expansion and alterations to existing roadside rest area at Site 12, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(G) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(iii) Armstrong County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(iv) Beaver County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(v) Bedford County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(vi) Berks County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(vii) Blair County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(viii) Bradford County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(ix) Bucks County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site P, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(x) Butler County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xi) Cambria County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xii) Cameron County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xiii) Carbon County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xiv) Centre County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Bellefonte

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Phillipsburg

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 29, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 30, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xv) Chester County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xvi) Clarion County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xvii) Clearfield County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xviii) Clinton County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 33, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 34, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xix) Columbia County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 37, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 38, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xx) Crawford County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Centerville

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Meadville

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 19, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 20, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(F) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxi) Cumberland County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Carlisle

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Lemoyne

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 45, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 46, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxii) Dauphin County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing materials testing laboratory, including site acquisition and development, design, construction and utility work

Project Allocation

8,000,000

(C) New construction, renovations, expansion and alterations to existing fleet management facility, including site acquisition and development, design, construction and utility work

Project Allocation

17,000,000

(D) New construction, renovations, expansion and alterations to existing sign shop facility, including site acquisition and development, design, construction and utility work

Project Allocation

15,000,000

(E) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Harrisburg

Project Allocation

7,000,000

(F) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Elizabethville

Project Allocation

7,000,000

(G) New construction, renovations, expansion and alterations to existing roadside rest area at Site 47, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(H) New construction, renovations, expansion and alterations to existing roadside rest area at Site 48, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(I) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxiii) Delaware County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site N, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxiv) Elk County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxv) Erie County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site L, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing welcome center at Site M, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxvi) Fayette County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxvii) Forest County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxviii) Franklin County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site G, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxix) Fulton County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site B, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 3, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction for bridge beam fabrications facility, including site acquisition and development, design, construction and utility work

Project Allocation

6,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxx) Greene County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site D, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxi) Huntingdon County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxii) Indiana County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxiii) Jefferson County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 25, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 26, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxiv) Juniata County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxv) Lackawanna County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 55, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxvi) Lancaster County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxvii) Lawrence County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 15, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 16, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxviii) Lebanon County

(A) New construction, renovations, expansion and alterations to existing eastern training facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xxxix) Lehigh County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xl) Luzerne County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 39, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 53, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 54, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xli) Lycoming County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlii) McKean County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xliii) Mercer County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site E, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 17, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 18, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(F) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xliv) Mifflin County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlv) Monroe County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site F, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 41, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlvi) Montgomery County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing district office parking garage, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(C) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlvii) Montour County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 35, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 36, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlviii) Northampton County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(xlix) Northumberland County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(l) Perry County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(li) Philadelphia County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lii) Pike County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site K, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 61, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 62, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(liii) Potter County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(liv) Schuylkill County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lv) Snyder County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lvi) Somerset County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lvii) Sullivan County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lviii) Susquehanna County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site H, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 56, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lix) Tioga County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site T, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lx) Union County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxi) Venango County

(A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work

Project Allocation

10,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 21, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 22, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxii) Warren County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work

Project Allocation

3,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxiii) Washington County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Eighty Four Facility

Project Allocation

7,000,000

(C) New construction, renovations, expansion and alterations to existing welcome center at Site T, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxiv) Wayne County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxv) Westmoreland County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxvi) Wyoming County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxvii) York County

(A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work

Project Allocation

7,000,000

(B) New construction, renovations, expansion and alterations to existing welcome center at Site J, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work

Project Allocation

5,000,000

(lxviii) Statewide

(A) New construction for bridge beam fabrications facilities, including site acquisition and development, design, construction and utility work at sites to be determined

Project Allocation

9,000,000