Itemization of furniture and equipment projects

Act 36 of 2020, § 4, under CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2019-2020 - ENACTMENT.

Act 36 of 2020, § 4

Section 4. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial cost, as follows:

Project

Total Project

Allocation

(1) Department of Agriculture

(i) Animal Health Laboratory A

(A) Provide original furniture and equipment for new laboratory to serve the Pennsylvania Animal Diagnostic Laboratory System and Pennsylvania Racing Commission on the new Bolton Campus of the University of Pennsylvania

Project Allocation

6,250,000

(1.1) Department of Conservation and Natural Resources

(i) Cornplanter State Forest

(A) Provide original furniture and equipment for new Resource Management Center

Project Allocation

350,000

(ii) Division of Forest Fire Protection

(A) Provide original furniture and equipment for Air Operations Building

Project Allocation

150,000

(iii) Elk State Forest

(A) Provide original furniture and equipment for Brooks Run Headquarters

Project Allocation

150,000

(B) Provide original furniture and equipment for Hicks Run Headquarters

Project Allocation

150,000

(iv) Gallitzin State Forest

(A) Provide original furniture and equipment for Babcock Headquarters

Project Allocation

300,000

(v) Michaux State Forest

(A) Provide original furniture and equipment for new Resource Management Center

Project Allocation

350,000

(vi) Moshannon State Forest

(A) Provide original furniture and equipment for Dague Mechanics Shop and Fire Equipment Storage

Project Allocation

150,000

(vii) Pinchot State Forest

(A) Provide original furniture and equipment for Forestry and Fire Headquarters

Project Allocation

350,000

(viii) Sproul State Forest

(A) Provide original furniture and equipment for Snowshoe Headquarters

Project Allocation

150,000

(B) Provide original furniture and equipment for Hyner Wood Shop

Project Allocation

150,000

(ix) Tuscarora State Forest

(A) Provide original furniture and equipment for East Licking Creek Headquarters

Project Allocation

150,000

(x) Weiser State Forest

(A) Provide original furniture and equipment for Haldeman Maintenance Headquarters

Project Allocation

150,000

(2) Department of Education

(i) The Pennsylvania State University

(A) Provide original furniture and equipment for Physical Education Building at the Abington campus

Project Allocation

4,000,000

(B) Provide original furniture and equipment for Woodland Building at the Abington campus

Project Allocation

2,000,000

(C) Provide original furniture and equipment for Student Union Building at the Abington campus

Project Allocation

12,000,000

(D) Provide original furniture and equipment for Academic Building at the Altoona campus

Project Allocation

3,000,000

(E) Provide original furniture and equipment for the Transportation Training and Testing Facility at University Park campus

Project Allocation

3,000,000

(F) (Reserved)

(G) (Reserved)

(H) (Reserved)

(I) (Reserved)

(J) (Reserved)

(K) Provide original furniture and equipment for University Support Building I at the University Park campus

Project Allocation

4,200,000

(L) Provide original furniture and equipment for Thomas Building at the University Park campus

Project Allocation

1,440,000

(M) Provide original furniture and equipment for Physics Building at the University Park campus

Project Allocation

8,000,000

(N) Provide original furniture and equipment for College of Engineering Research and Teaching Space at the University Park campus

Project Allocation

24,000,000

(O) Provide original furniture and equipment for College of Engineering Building at the University Park campus

Project Allocation

30,000,000

(P) Provide original furniture and equipment for Academic and Research Building at the University Park campus

Project Allocation

12,000,000

(Q) Provide original furniture and equipment for Ritenour Building at the University Park campus

Project Allocation

3,840,000

(R) Provide original furniture and equipment for Global Programs Building at the University Park campus

Project Allocation

3,600,000

(S) Provide original furniture and equipment for Arboretum Cultural District infrastructure at the University Park campus

Project Allocation

2,000,000

(T) Provide original furniture and equipment for Arboretum Cultural District new facility at the University Park campus

Project Allocation

10,000,000

(U) Provide original furniture and equipment for Administrative Unit Building at the University Park campus

Project Allocation

17,000,000

(V) Provide original furniture and equipment for Capital Renewal, Phase VIII at the University Park campus

Project Allocation

8,000,000

(W) Provide original furniture and equipment for College of Engineering Building at the University Park campus

Project Allocation

36,000,000

(X) Provide original furniture and equipment for Sackett Building at the University Park campus

Project Allocation

16,000,000

(Y) Provide original furniture and equipment for College of Liberal Arts Research and Teaching Space at the University Park campus

Project Allocation

8,000,000

(Z) Provide original furniture and equipment for Hosler Building at the University Park campus

Project Allocation

12,000,000

(ii) Lincoln University

(A) Provide original furniture and equipment for Cresson Hall

Project Allocation

5,000,000

(iii) The University of Pittsburgh

(A) Provide original furniture and equipment for the new engineering and computer information systems and technology building located at the University of Pittsburgh Bradford Campus

Project Allocation

2,500,000

(3) Department of General Services

(i) Department of General Services

(A) Provide original furniture and equipment for the Forum Building

Project Allocation

25,000,000

(3.1) Department of Health

(i) Chester County

(A) Construction, infrastructure and other related costs for the construction, furnishing and equipment of a Nemours Children's Health System pediatric facility in Chester County

Project Allocation

11,000,000

(3.2) Department of Human Services

(i) Norristown State Hospital

(A) Provide original furniture and equipment for Norristown State Hospital

Project Allocation

15,000,000

(4) Pennsylvania Historical and Museum Commission

(i) Pennsylvania State Archives Building

(A) Provide original furniture and equipment for facility

Project Allocation

3,000,000

(ii) Collections Storage Building

(A) Provide original furniture and equipment for Collections Storage Building

Project Allocation

6,000,000

(5) Department of Military and Veterans Affairs

(i) Hollidaysburg Veterans' Home

(A) Provide original furniture and equipment for CLC

Project Allocation

2,275,000

(B) Provide original furniture and equipment for MacArthur Hall

Project Allocation

500,000

(ii) Clearfield Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(iii) Erie Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(iv) Friedens Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(v) New Fire Station and Ancillary Facilities

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(vi) Fitzpatrick Hall Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(vii) Harrisburg Military Post Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(viii) Hermitage Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(ix) Hershey Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(x) Horsham Readiness Center

(A) Provide original furniture and equipment

Project Allocation

2,000,000

(xi) Jonestown Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xii) Philadelphia County Readiness Center

(A) Provide original furniture and equipment

Project Allocation

2,000,000

(xiii) Lehighton Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xiv) Lock Haven Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xv) Mount Pleasant Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xvi) Lawrence County or Mercer County Field Maintenance Shop

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xvii) Lawrence County or Mercer County Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xviii) New Milford Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xix) Phoenixville Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xx) Philadelphia Southampton Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xxi) Spring City Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xxii) East Stroudsburg Readiness Center

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xxiii) Washington Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xxiv) Wilkes-Barre Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xxv) Williamstown Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xxvi) Statewide physical fitness structures

(A) Provide original furniture and equipment

Project Allocation

1,000,000

(xxvii) Gettysburg Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(xxviii) Plymouth Meeting Readiness Center

(A) Provide original furniture and equipment

Project Allocation

500,000

(6) State System of Higher Education

(i) Bloomsburg University

(A) Provide original furniture and equipment for renovation or replacement of Bakeless Hall

Project Allocation

1,800,000

(B) Provide original furniture and equipment for renovation or replacement of Benjamin Franklin Hall

Project Allocation

1,900,000

(C) Provide original furniture and equipment for renovation or replacement of Simon Hall

Project Allocation

600,000

(D) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,500,000

(ii) California University

(A) Provide original furniture and equipment for facility space renovation, consolidation and demolition of academic buildings

Project Allocation

1,500,000

(B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,000,000

(iii) Cheyney University

(A) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,000,000

(B) Provide original furniture and equipment for renovation or replacement of King and Tubman Halls

Project Allocation

2,100,000

(iv) Clarion University

(A) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,500,000

(v) East Stroudsburg University

(A) Provide additional original furniture and equipment for renovation of Moore Biology

Project Allocation

1,000,000

(B) Provide additional original furniture and equipment for renovation of Stroud Hall

Project Allocation

1,500,000

(C) Provide additional original furniture and equipment for renovation of Gessner Science

Project Allocation

2,000,000

(D) Provide original furniture and equipment for facility space renovation, consolidation and demolition of academic buildings

Project Allocation

1,500,000

(E) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,000,000

(vi) Edinboro University

(A) Provide additional original furniture and equipment for renovation of Hendricks Hall

Project Allocation

1,500,000

(B) Provide original furniture and equipment for renovation of McComb Fieldhouse

Project Allocation

4,500,000

(C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,000,000

(vii) Indiana University of Pennsylvania

(A) Provide original furniture and equipment for academic building replacement

Project Allocation

5,000,000

(B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,000,000

(viii) Kutztown University

(A) Provide original furniture and equipment for renovation of Old Main

Project Allocation

3,000,000

(B) Provide original furniture and equipment for renovation or replacement of Rickenbach Education Building

Project Allocation

2,500,000

(C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

1,500,000

(ix) Lock Haven University

(A) Provide original furniture and equipment for renovation of Raub Hall

Project Allocation

2,000,000

(B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

1,200,000

(x) Mansfield University of Pennsylvania

(A) Provide original furniture and equipment for North Hall renovation

Project Allocation

5,000,000

(B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

1,900,000

(xi) Millersville University

(A) Provide original furniture and equipment for renovation or replacement of Argires Science Complex Buildings

Project Allocation

6,000,000

(xii) Shippensburg University

(A) Provide additional original furniture and equipment for replacement of Henderson Hall

Project Allocation

2,000,000

(B) Provide additional original furniture and equipment for renovation of Lehman Library

Project Allocation

1,500,000

(C) Provide original furniture and equipment for renovation and addition of Heiges Field House

Project Allocation

4,500,000

(D) Provide original furniture and equipment for renovation of Old Main, Phase 2

Project Allocation

2,500,000

(E) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,200,000

(xiii) Slippery Rock University

(A) Provide original furniture and equipment for renovation of Eisenberg Classroom Building

Project Allocation

2,500,000

(B) Provide original furniture and equipment for renovation and addition of McKay Building

Project Allocation

3,000,000

(C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

2,500,000

(xiv) West Chester University

(A) Provide additional funding for original furniture and equipment for renovation of FH Green Library

Project Allocation

3,000,000

(B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings

Project Allocation

3,500,000

(6.1) Pennsylvania State Police

(i) Pennsylvania State Police Academy/Bureau of Emergency and Special Operations

(A) Provide original furniture and equipment for facility

Project Allocation

30,000,000

(7) Department of Transportation

(i) Adams County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(ii) Allegheny County

(A) Provide original furniture and equipment for District Office 11-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(C) Provide original furniture and equipment for maintenance facility at Fort Pitt Tunnel

Project Allocation

600,000

(iii) Armstrong County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(iv) Beaver County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(v) Bedford County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(vi) Berks County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(vii) Blair County

(A) Provide original furniture and equipment for District Office 9-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(viii) Bradford County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(ix) Bucks County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(x) Butler County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xi) Cambria County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xii) Cameron County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xiii) Carbon County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xiv) Centre County

(A) Provide original furniture and equipment for maintenance facility at Bellefonte

Project Allocation

600,000

(B) Provide original furniture and equipment for maintenance facility at Phillipsburg

Project Allocation

600,000

(xv) Chester County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xvi) Clarion County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xvii) Clearfield County

(A) Provide original furniture and equipment for District Office 2-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xviii) Clinton County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xix) Columbia County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xx) Crawford County

(A) Provide original furniture and equipment for maintenance facility at Centerville

Project Allocation

600,000

(B) Provide original furniture and equipment for maintenance facility at Meadville

Project Allocation

600,000

(xxi) Cumberland County

(A) Provide original furniture and equipment for maintenance facility at Carlisle

Project Allocation

600,000

(B) Provide original furniture and equipment for maintenance facility at Lemoyne

Project Allocation

600,000

(xxii) Dauphin County

(A) Provide original furniture and equipment for District Office 8-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility at Harrisburg

Project Allocation

600,000

(C) Provide original furniture and equipment for maintenance facility at Elizabethville

Project Allocation

600,000

(xxiii) Delaware County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxiv) Elk County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxv) Erie County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxvi) Fayette County

(A) Provide original furniture and equipment for District Office 12-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxvii) Forest County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxviii) Franklin County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxix) Fulton County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxx) Greene County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxi) Huntingdon County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxii) Indiana County

(A) Provide original furniture and equipment for District Office 10-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxiii) Jefferson County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxiv) Juniata County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxv) Lackawanna County

(A) Provide original furniture and equipment for District Office 4-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxvi) Lancaster County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxvii) Lawrence County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxviii) Lebanon County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xxxix) Lehigh County

(A) Provide original furniture and equipment for District Office 5-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xl) Luzerne County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xli) Lycoming County

(A) Provide original furniture and equipment for District Office 3-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlii) McKean County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xliii) Mercer County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xliv) Mifflin County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlv) Monroe County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlvi) Montgomery County

(A) Provide original furniture and equipment for District Office 6-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlvii) Montour County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlviii) Northampton County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(xlix) Northumberland County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(l) Perry County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(li) Philadelphia County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lii) Pike County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(liii) Potter County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(liv) Schuylkill County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lv) Snyder County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lvi) Somerset County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lvii) Sullivan County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lviii) Susquehanna County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lix) Tioga County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lx) Union County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxi) Venango County

(A) Provide original furniture and equipment for District Office 1-0

Project Allocation

2,000,000

(B) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxii) Warren County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxiii) Washington County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(B) Provide original furniture and equipment for maintenance facility at the Eighty Four Facility

Project Allocation

600,000

(lxiv) Wayne County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxv) Westmoreland County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxvi) Wyoming County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000

(lxvii) York County

(A) Provide original furniture and equipment for maintenance facility

Project Allocation

600,000