Itemization of State projects

Act 38 of 1983, § 303, under GAME FUND CAPITAL BUDGET ACT FOR 1983-1984.

Act 38 of 1983, § 303

Section 303. Itemization of State projects.

Additional capital projects in the category of highway projects are hereby itemized, together with their respective estimated financial costs as follows:

Project

Base

Project

Allocation

Design and

Contingency

Allocation

Total

Project

Allocation

(1) Allegheny County

(i) Construction of

an Off-ramp on I-79

to Airport Parkway

West - Robinson Twp.

3,500,000

(ii) East Ohio River

Blvd., Aetna

Interchange,

Replace Decks on

7 Bridges.

11,000,000

1,500,000

12,500,000

(iii) Reconstruction

of the Ewing Mill

Road - Robinson

Twp.

275,000

(iv) Waterline

Extension -

Kilbuck Twp.

57,500

(2) Chester County

(i) L.R.15017,

New London Twp.,

Traffic Route

841, Bridge

over Hodgson

Run, Bridge

Replacement,

Length

0.1 Mile.

315,000

50,000

365,000

(3) Fayette County

(i) L.R.117 Spur A,

T.R.119, South

Connellsville,

Morrell to

Pittsburgh St.,

Dunbar Twp.,

2 Lane Relocation

Including new

Structure over

the Youghiogheny

River, Length

1.4 Miles.

11,400,000

1,540,000

12,940,000

(4) Huntingdon

County

(i) Hopewell Twp.,

L.R.721, T.R.913,

Replacement of

Structure over

Shoups Run and

Realignment of

Approaches.

825,000

125,000

950,000

(5) Montgomery

County

(i) L.R.46043,

Franconia Twp.,

Allentown Rd.,

Bridge over

Skippack Creek,

South of the Boro.

of Souderton,

Bridge Replacement,

Length 0.1 Mile.

225,000

30,000

255,000

(6) Westmoreland

County

(i) State Bridge,

L.R.64144, Par A,

T.R.981, Bridge

over Youghiogheny

River, Smithton

Boro., Bridge

Replacement,

Length 0.3 Mile.

4,200,000

400,000

4,600,000

(ii) Tunnel, L.R.

64111, Station 102

to 90, Tunnel Re-

moval, 14 Ft.

Clearance, Stone

Arch and Rebuild

of Road Surface.

500,000