Section 303. Itemization of State projects.
Additional capital projects in the category of highway projects are hereby itemized, together with their respective estimated financial costs as follows:
Project
Base
Project
Allocation
Design and
Contingency
Allocation
Total
Project
Allocation
(1) Allegheny County
(i) Construction of
an Off-ramp on I-79
to Airport Parkway
West - Robinson Twp.
3,500,000
(ii) East Ohio River
Blvd., Aetna
Interchange,
Replace Decks on
7 Bridges.
11,000,000
1,500,000
12,500,000
(iii) Reconstruction
of the Ewing Mill
Road - Robinson
Twp.
275,000
(iv) Waterline
Extension -
Kilbuck Twp.
57,500
(2) Chester County
(i) L.R.15017,
New London Twp.,
Traffic Route
841, Bridge
over Hodgson
Run, Bridge
Replacement,
Length
0.1 Mile.
315,000
50,000
365,000
(3) Fayette County
(i) L.R.117 Spur A,
T.R.119, South
Connellsville,
Morrell to
Pittsburgh St.,
Dunbar Twp.,
2 Lane Relocation
Including new
Structure over
the Youghiogheny
River, Length
1.4 Miles.
11,400,000
1,540,000
12,940,000
(4) Huntingdon
County
(i) Hopewell Twp.,
L.R.721, T.R.913,
Replacement of
Structure over
Shoups Run and
Realignment of
Approaches.
825,000
125,000
950,000
(5) Montgomery
County
(i) L.R.46043,
Franconia Twp.,
Allentown Rd.,
Bridge over
Skippack Creek,
South of the Boro.
of Souderton,
Bridge Replacement,
Length 0.1 Mile.
225,000
30,000
255,000
(6) Westmoreland
County
(i) State Bridge,
L.R.64144, Par A,
T.R.981, Bridge
over Youghiogheny
River, Smithton
Boro., Bridge
Replacement,
Length 0.3 Mile.
4,200,000
400,000
4,600,000
(ii) Tunnel, L.R.
64111, Station 102
to 90, Tunnel Re-
moval, 14 Ft.
Clearance, Stone
Arch and Rebuild
of Road Surface.
500,000