Section 3. Itemization of public improvement projects.
Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total
Project
Allocation
(1) Department of Agriculture
(i) Pennsylvania Animal Diagnostic Laboratory System
(A) Renovation and/or addition of existing facility in Harrisburg to provide for biosecurity level 3 capabilities
4,333,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $833,000)
(B) Renovation and/or addition of existing facility in New Bolton to provide for biosecurity level 3 capabilities
4,333,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $833,000)
(C) Renovation and/or addition of existing facility at The Pennsylvania State University to provide for biosecurity level 3 capabilities
4,333,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $833,000)
(ii) New Bolton Center
(A) Design and construction of new barns and clinical facilities, renovation and rehabilitation of existing clinic and consolidation of laboratory facilities
30,000,000
(B) Veterinary hospital improvements and renovations necessary for infection control and to prevent facility contamination
1,500,000
(iii) Department Headquarters
(A) Electrical and HVAC renovations
3,000,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $300,000)
(B) Upgrade to elevators
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(iv) Produce Distribution Center
(A) Construction of a Pennsylvania Produce Co-op Distribution Center
5,510,000
(Base Project Allocation - $4,283,000)
(Land Allocation - $125,000)
(Design and Contingencies - $1,102,000)
(v) Laboratory
(A) Construction of a new plant industry laboratory
10,000,000
(Base Project Allocation - $9,000,000)
(Design and Contingencies - $1,000,000)
(2) Department of Community and Economic Development
(i) Philadelphia County
(A) New sidewalks, benches and other pedestrian and landscape amenities for the entire length of the Benjamin Franklin Parkway between 16th Street and Eakins Oval
3,000,000
(B) Streetscape and landscape enhancements for outer park areas in Logan Square
1,000,000
(C) Streetscape improvements along the Benjamin Franklin Parkway from Logan Square to Eakins Oval to relocate curb lanes providing additional bicycle and pedestrian paths
2,000,000
(D) Reconstruct Eakins Oval to improve traffic flow, create safer pedestrian crossings to Art Museum and to the new Schuylkill River Park and provide new recreational and athletic facilities for adjacent communities
20,000,000
(E) Improvements to Pennsylvania Avenue that will reduce traffic accidents, provide safer pedestrian crossings to recreational and cultural facilities and add new roadway lighting
4,500,000
(F) Spring Garden District, for streetscaping and lighting
10,000,000
(3) Department of Conservation and Natural Resources
(i) Bald Eagle State Park
(A) Construct environmental interpretive complex
2,000,000
(Base Project Allocation - $1,660,000)
(Design and Contingencies - $340,000)
(B) Construct family campground
2,000,000
(ii) Benjamin Rush State Park
(A) Develop park
2,170,000
(Base Project Allocation - $1,953,000)
(Design and Contingencies - $217,000)
(B) Additional funds for DGS 160-1, Phase II, park development
2,000,000
(iii) Blue Knob State Park
(A) Rehabilitation of facilities
1,008,000
(Base Project Allocation - $907,000)
(Design and Contingencies - $101,000)
(iv) Cook Forest State Park
(A) Develop park
1,142,000
(Base Project Allocation - $1,028,000)
(Design and Contingencies - $114,000)
(v) Delaware Canal State Park
(A) Canal dredging
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(vi) Forest District 10
(A) Refurbish Hyner View Road, Phases 1 and 2
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(vii) Lackawanna State Park
(A) Lake dredging and removal of silt
1,250,000
(viii) Little Buffalo State Park
(A) Lake dredging and removal of silt
750,000
(ix) Lehigh Gorge State Park
(A) Construct trail and interpretive facilities
3,500,000
(Base Project Allocation - $3,150,000)
(Design and Contingencies - $350,000)
(x) Nockamixon State Park
(A) Construct campground
4,000,000
(xi) Norristown Farm Park
(A) Rehabilitate farm park building
1,000,000
(Base Project Allocation - $830,000)
(Design and Contingencies - $170,000)
(xii) Pine Grove Furnace State Park
(A) Lake dredging and removal of silt
750,000
(xiii) Poe Valley/Poe Paddy State Park
(A) Campground rehabilitation
922,000
(Base Project Allocation - $830,000)
(Design and Contingencies - $92,000)
(xiv) Point State Park
(A) Phase I of park capital development, including design, engineering and construction for trail and park improvements, riverfront connections to the Eliza Furnace Trail and to the David L. Lawrence Convention Center, which may include a visitors center and land acquisition for park expansion
35,000,000
(xv) Presque Isle State Park
(A) Beach nourishment and rehabilitation
8,000,000
(xvi) Ridley Creek State Park
(A) Restoration and rehabilitation of historically significant Environmental Living Demonstration Center and associated outbuildings, including, but not limited to, window and door replacement, HVAC and electrical system upgrades, installation of ADA facilities and reconstruction of pond and wetlands
504,000
(Base Project Allocation - $420,000)
(Design and Contingencies - $84,000)
(xvii) Ryerson Station State Park
(A) Lake dredging
1,000,000
(B) Repair and rehabilitation of dam and spillway
750,000
(C) Rehabilitation of park maintenance facility and equipment storage facility
650,000
(xviii) Sinnemahoning State Park
(A) Development of visitors facility
3,500,000
(xix) Whipple Dam State Park
(A) Lake dredging and removal of silt
2,250,000
(xx) Allegheny County
(A) Alle-Kiski Rails-to-Trails Project to expand existing rail trails along unused right-of-way on both sides of Allegheny and Kiskiminetas Rivers so that a continuous trail is established from Pittsburgh through the Alle-Kiski Region
15,000,000
(xxi) Bucks County
(A) Restoration of Delaware Canal in Tullytown Borough
500,000
(xxii) Cameron County
(A) Forest District 9, demolition of existing structures and site restoration at Quehanna Reactor Building Site
4,000,000
(Base Project Allocation - $3,200,000)
(Design and Contingencies - $800,000)
(xxiii) Clearfield County
(A) Acquisition and construction of Visitors Gateway Center proximate to Interstate 80
5,000,000
(xxiv) Elk and Clearfield Counties
(A) Construction of a regional visitor center as portal to the Lumber Heritage Region
4,000,000
(xxv) Elk County
(A) Acquisition, construction and rehabilitation of the Elk Viewing Center in Benezette Township
2,500,000
(xxvi) McKean County
(A) Kinzua Bridge State Park, construction of a new office/visitor center, maintenance center, roads, trails, parking lots, water and sewage systems, clearing and grubbing of debris field, fencing of debris field, rehabilitation of remaining bridge towers and related site work
7,000,000
(Base Project Allocation - $6,300,000)
(Design and Contingencies - $700,000)
(xxvii) Forest District 12
(A) Replacement of two bridges and relocation of two miles of forestry road located in McHenry Township, Lycoming County
1,000,000
(xxviii) Archbald Regional Park
(A) Site development, infrastructure improvements and new construction
1,470,000
(4) Department of Corrections
(i) State Correctional Institution at Cambridge Springs
(A) Construct new warehouse
4,430,000
(Base Project Allocation - $3,544,000)
(Design and Contingencies - $886,000)
(ii) State Correctional Institution at Camp Hill
(A) Replacement of water main
450,000
(Base Project Allocation - $375,000)
(Design and Contingencies - $75,000)
(B) Renovate kitchen and staff dining area
5,880,000
(Base Project Allocation - $5,292,000)
(Design and Contingencies - $588,000)
(iii) State Correctional Institution at Chester
(A) Renovate control center
1,210,000
(Base Project Allocation - $1,089,000)
(Design and Contingencies - $121,000)
(iv) State Correctional Institution at Coal Township
(A) Replacement of hot/chilled water loop system
8,836,000
(Base Project Allocation - $7,072,000)
(Design and Contingencies - $1,764,000)
(v) State Correctional Institution at Cresson
(A) Install new and upgrade existing fire alarms
4,200,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $700,000)
(vi) State Correctional Institution at Dallas
(A) Life safety code
4,104,000
(Base Project Allocation - $3,420,000)
(Design and Contingencies - $684,000)
(vii) State Correctional Institution at Laurel Highlands
(A) Construction of a medium/close security housing unit
988,000
(Base Project Allocation - $823,000)
(Design and Contingencies - $165,000)
(B) Construction of new restricted housing unit
702,000
(Base Project Allocation - $632,000)
(Design and Contingencies - $70,000)
(C) Boiler plant renovations and upgrades
3,500,000
(viii) State Correctional Institution at Smithfield
(A) Construction of a new restricted housing unit
660,000
(B) Renovation of boiler plant
1,925,000
(Base Project Allocation - $1,540,000)
(Design and Contingencies - $385,000)
(ix) State Correctional Institution at Somerset
(A) Construction of a security tower
1,214,000
(Base Project Allocation - $971,000)
(Design and Contingencies - $243,000)
(x) State Correctional Institution at Rockview
(A) Institution electrical upgrade including replacing existing service with new generators, new cables, switch gear and transformers
7,540,000
(B) Upgrade reservoir to meet dam safety regulations
482,000
(Base Project Allocation - $434,000)
(Design and Contingencies - $48,000)
(5) Department of Education
(i) Clearfield County
(A) Design and construction of a new health sciences building to include laboratories, classrooms, clinical facilities and multipurpose rooms
15,000,000
(B) Design and construction of classrooms and laboratories for programs in engineering technologies and computers and for multipurpose rooms
15,000,000
(C) Acquisition and improvements of existing building or buildings for classrooms and small business incubator
3,000,000
(ii) Lincoln University
(A) Renovation of Wright Hall classroom and laboratories
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(B) Renovations, which include fire/life safety system installations, to the Lincoln University Center for Graduate and Continuing Education Building
6,000,000
(C) Renovations, which include ADA accessibility upgrades, to the Student Union and Services Building
8,000,000
(D) Major renovations to the Langston Hughes Memorial Library
6,000,000
(E) Repairs and renovations of Thurgood Marshall Living-Learning Center
8,000,000
(F) Repairs and renovations of John Miller Dickey Hall
2,500,000
(G) Repairs and renovations of Lincoln Hall
2,900,000
(H) Repairs and renovations of Vail Building
2,700,000
(I) Repairs and renovations of Amos Hall
2,500,000
(J) Repairs and renovations of President's House
1,200,000
(K) Repairs and renovations of Azikiwe-Nkrumah Hall
1,000,000
(L) Repairs and renovations of Lincoln House
600,000
(M) Repairs and renovations of Cresson Hall
2,500,000
(N) Repairs and renovations of maintenance storage facility
1,500,000
(O) Repairs and renovations of residence facility
1,000,000
(P) Repairs and renovations of Guest House Facility
100,000
(Q) Construction of new International Cultural Center
19,000,000
(R) Construction of new 125,000-square-foot Science and General Classroom High Technology Building
31,000,000
(S) Renovation of University Hall
3,000,000
(T) Construction of international cultural center
20,000,000
(Base Project Allocation - $16,667,000)
(Design and Contingencies - $3,333,000)
(iii) The Pennsylvania State University
(A) Renovation of Swift Hall at DuBois Campus
4,250,000
(Base Project Allocation - $3,542,000)
(Design and Contingencies - $708,000)
(B) Renovation of McAllister Building at University Park Campus
12,000,000
(C) Infrastructure improvements at University Park Campus
40,000,000
(D) Renovation of the Ferguson Building at University Park Campus
8,000,000
(E) Library Depository at University Park Campus
10,000,000
(F) Delaware Administration and Classroom Building at Delaware Campus
6,000,000
(G) Infrastructure improvements at Erie Campus
2,000,000
(H) Addition and renovation to Henderson Building at University Park Campus
25,000,000
(I) Renovation of Borland Laboratory at University Park
15,000,000
(J) Renovation of Chandlee Laboratory at University Park
21,000,000
(K) Land acquisition and reconstruction of 1912 Building at Schuylkill Campus
4,000,000
(L) Development and construction of a hydrogen fueling station
2,110,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $2,000,000)
(M) Upgrade telecommunications and data infrastructure
10,000,000
(Base Project Allocation - $10,000,000)
(iv) University of Pittsburgh
(A) Chevron Science Center ventilation upgrade
12,900,000
(B) Additional funds for DGS 1103-67, Hillman Library renovation
17,600,000
(C) Benedum Hall addition
30,000,000
(D) Construction of upper campus boiler plant
25,000,000
(E) Upgrade and deferred maintenance, Phase III (campuswide)
20,000,000
(F) Upgrade and deferred maintenance, Phase IV (campuswide)
20,000,000
(G) Campuswide programmatic renovations
9,000,000
(H) Construction of a Bio-Sciences Medical Tower at the University of Pittsburgh Medical Center
10,000,000
(I) Acquisition, design, planning, renovations and construction of a new Transplant Center of Excellence
20,000,000
(J) Additional funds for DGS 1103-69, ventilation fume hood upgrade, Chevron Science Center
2,500,000
(K) University of Pittsburgh Medical Center - Braddock, construction and renovations for hospital expansion project
2,975,000
(v) Scranton School for the Deaf
(A) Cabling infrastructure improvement
132,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $17,000)
(B) Campus safety improvements
121,000
(Base Project Allocation - $105,000)
(Design and Contingencies - $16,000)
(C) Campus paving project
302,000
(Base Project Allocation - $263,000)
(Design and Contingencies - $39,000)
(D) Cabling infrastructure improvement
137,000
(Base Project Allocation - $123,000)
(Design and Contingencies - $14,000)
(E) Campus safety improvements
5,100,000
(Base Project Allocation - $4,250,000)
(Design and Contingencies - $850,000)
(vi) Thaddeus Stevens College of Technology
(A) Renovate Mellor Building
7,000,000
(Base Project Allocation - $5,800,000)
(Design and Contingencies - $1,200,000)
(B) Asbestos removal
723,000
(Base Project Allocation - $651,000)
(Design and Contingencies - $72,000)
(C) Expand dining hall and kitchen
5,750,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $750,000)
(D) Construct second floor to the Hartzell Building
3,200,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $1,200,000)
(E) Expand Vocational Education Building
750,000
(Base Project Allocation - $675,000)
(Design and Contingencies - $75,000)
(vii) Temple University
(A) Fire safety project, Phase III sprinkler installation
5,048,000
(B) Paley Library renovation and expansion
60,000,000
(C) Renovation of existing facilities to consolidate instructional spaces for Tyler Main Campus programs
3,492,000
(D) Exterior improvements on Mini-Arts Campus to create an Arts Walk
6,600,000
(E) Construct state-of-art computer lab in Bell Building
16,200,000
(F) Liacouras Walk reconstruction, including underground water main replacement
3,960,000
(G) Various buildings at Main, HSC and Ambler, major and interior systems rehabilitation
65,000,000
(H) Addition to Presser Hall for School of Music
5,688,000
(I) Construction of welcome center/admissions office
6,300,000
(J) Design and construction of Mini-Arts Campus primarily for the arts at the Main Campus. This project shall be construed as a supplement to the project authorized in section 3(5)(vi)(B) of the act of October 30, 2002 (P.L.891, No.131), known as the Capital Budget Project Itemization Act of 2001-2002.
15,000,000
(K) Design and construction for restoration of the Historic Baptist Temple on Main Campus. This project shall be construed as a supplement to the project authorized in section 3(5)(vi)(N) of the act of October 30, 2002 (P.L.891, No.131), known as the Capital Budget Project Itemization Act of 2001-2002.
2,011,000
(viii) Community College of Allegheny County
(A) Science facility upgrades
15,700,000
(Base Project Allocation - $14,130,000)
(Design and Contingencies - $1,570,000)
(B) Acquisition and renovation of Siemens property
5,300,000
(Base Project Allocation - $4,770,000)
(Design and Contingencies - $530,000)
(C) North Campus, renovation and replacement of classrooms, including computer and technology upgrades, improvement of restroom facilities, repair of elevator controls, repair and renovation of the health center and repaving of main driveway
400,000
(D) North Campus, facility upgrades and improvements
581,000
(E) Science Building, Allegheny Campus, renovation and construction of new building
24,500,000
(F) Siemens Building, Airport West Corridor, renovation and rehabilitation of old Siemens Building for classroom and workforce purposes
8,000,000
(G) Information technology upgrades, all campuses
7,000,000
(H) Acquisition of building for the replacement of three leased facilities
4,000,000
(I) Construction of new building for the purpose of consolidating the allied health programs
8,250,000
(J) Life safety code improvements, all campuses
6,800,000
(K) Upgrade of telecommunications infrastructure, server clusters and high-speed fiber network
408,000
(L) Upgrade to campus cabling and wiring, electronics and associated hardware to deploy high-speed network to the desktop
3,144,000
(ix) Community College of Beaver County
(A) Campus improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(B) Replacement of radar lab simulator
153,000
(C) Replacement of radar tower simulator
425,000
(D) Upgrade classroom instructional hardware and software for the Jenzabar nontraditional module and the installation of a parking gate for the allied health facility
205,000
(x) Reading Area Community College
(A) Design and construction of advanced technology and police center
23,600,000
(Base Project Allocation - $21,240,000)
(Design and Contingencies - $2,360,000)
(B) Construction of a new training and technology center
11,800,000
(C) Acquisition, renovation and improvement of two buildings for use as a testing center, classroom and office space
1,500,000
(D) Building and site improvements associated with the 2004-2005 Capital Plan
215,000
(E) Technology and Oritzky projects
826,000
(xi) Bucks County Community College
(A) Acquisition, rehabilitation and construction of facilities at the Bristol Center
7,200,000
(Base Project Allocation - $6,480,000)
(Design and Contingencies - $720,000)
(B) Campuswide renovations for ADA compliance
533,000
(C) Parking improvements for 100 additional spaces, Upper County site
500,000
(D) Construction of an addition to Hicks Arts Center
525,000
(E) Relocation and centralization of student services
300,000
(F) Acquisition and construction of a new facility to replace leased facility in Lower Bucks County
7,052,000
(G) New construction and renovation of existing facilities based on facilities construction study
11,000,000
(xii) Butler County Community College
(A) Capital improvements, including a public safety training center
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(B) Capital improvements, including building renovation and restoration, roadway improvements and parking expansion
8,304,000
(C) Construction of a 25,500-square-foot comprehensive student services building and associated traffic and parking improvements
6,000,000
(D) Construction of a 145-space parking lot
253,000
(E) Renovation and renewal of library, including furnishings
175,000
(F) Campus improvements related to student and visitor circulation, accessibility and safety, including signage
2,000,000
(xiii) Cambria County Area Community College
(A) Acquisition and rehabilitation of facilities
6,000,000
(Base Project Allocation - $5,400,000)
(Design and Contingencies - $600,000)
(B) Acquisition and rehabilitation of structures related to the Cambria County Area Community College and Greater Johnstown Career and Technology Center Partnership
10,000,000
(C) Cambria County Area Community College North Side Campus renovation project
460,000
(D) Johnstown consolidation, consolidation of four leased sites into one centralized campus
14,000,000
(E) Consolidation of student services at centralized location, including improvement of telecommunications infrastructure
208,000
(xiv) Harrisburg Area Community College
(A) Renovation and upgrades of technology and telecommunications infrastructure and upgrades to mechanical systems
11,000,000
(Base Project Allocation - $9,900,000)
(Design and Contingencies - $1,100,000)
(B) Expansion of the Lancaster Campus
24,400,000
(Base Project Allocation - $21,960,000)
(Design and Contingencies - $2,440,000)
(C) Energy enhancement, Phase II, technology infrastructure upgrades and expansion of Gettysburg Campus
3,900,000
(D) Construction of a building for the allied health programs
4,900,000
(E) Construction of an early care/early childhood education center
1,100,000
(F) Lancaster Campus improvements, Phase II
1,750,000
(xv) Delaware County Community College
(A) Campus improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(B) Renovation and upgrade of science laboratories
875,000
(C) Renovation of board room, HVAC improvement and exterior improvements, including lighting and security improvements
357,000
(D) Upgrade and renovation of nursing simulation laboratory
175,000
(E) Construction of a 250-space structured parking facility
1,250,000
(F) Replacement of interior fluorescent lighting with T-8 technology
300,000
(G) Upgrade and renovation of the library/learning center
325,000
(xvi) Lehigh-Carbon County Community College
(A) Campus improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(B) Purchase of a classroom building located on the college's campus
7,150,000
(C) Acquisition and rehabilitation of classroom and administrative office building adjacent to main campus
7,150,000
(Base Project Allocation - $6,500,000)
(Design and Contingencies - $650,000)
(D) Design and construction of a new allied health sciences laboratory and classroom building on main campus
8,800,000
(Base Project Allocation - $8,000,000)
(Design and Contingencies - $800,000)
(E) Acquisition and rehabilitation of an existing building located in Tremont, Schuylkill County, for use as a regional education center
5,500,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $500,000)
(F) Renovation and expansion of the Carbon and Donley Center sites
2,750,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $250,000)
(G) Capital improvements related to the creation of the National Institute for Teaching Excellence
2,200,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $200,000)
(H) Capital improvements to the Learning Resource Center located on the main campus
3,300,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $300,000)
(I) Design and construction of a new classroom building, including an auditorium/conference center
8,800,000
(Base Project Allocation - $8,000,000)
(Design and Contingencies - $800,000)
(J) Acquisition and renovation of the Carbon Lehigh Intermediate Unit for offices, conference and student services facilities
3,500,000
(K) Renovation of the Donley Center
250,000
(L) Renovation and retrofitting of classrooms in Science Hall and improvements to the Technology Center
475,000
(M) Renovation of Science Hall, including parking improvements
275,000
(N) Upgrade radio station and multimedia production studio
225,000
(xvii) Luzerne County Community College
(A) Campus improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(B) Construction and renovations to day care center
250,000
(C) Construction of regional athletic facility
10,000,000
(D) Replacement of HVAC equipment and roof replacements for various buildings and improvement of deteriorating parking lot
450,000
(E) Construction or acquisition of a public safety building
250,000
(xviii) Montgomery County Community College
(A) Renovation of the advanced technology and science center
14,200,000
(Base Project Allocation - $12,780,000)
(Design and Contingencies - $1,420,000)
(B) Pottstown-West Campus improvements
20,700,000
(Base Project Allocation - $18,630,000)
(Design and Contingencies - $2,070,000)
(C) Design of a multiuse facility
292,000
(D) Renovation and expansion of Art Barn Complex and both Central and West Campuses for development of art compound
1,738,000
(E) Development of a facilities master plan
618,000
(xix) Northampton County Area Community College
(A) Acquisition and rehabilitation of the East Annex Building, Bethlehem Works
10,000,000
(Base Project Allocation - $9,000,000)
(Design and Contingencies - $1,000,000)
(B) Construction of student activity center
11,900,000
(Base Project Allocation - $10,710,000)
(Design and Contingencies - $1,190,000)
(C) Acquisition and rehabilitation of the East Annex Building in the Bethlehem Works site for classrooms, laboratories and studios
5,000,000
(D) Construction of a 43,000-square-foot student activity center and renovation/conversion of existing student activity facilities for classroom and office spaces
7,500,000
(E) Acquisition and renovation of former Bethlehem Steel Corporate office in South Bethlehem for classroom and office space
5,000,000
(xx) Community College of Philadelphia
(A) Parking expansion
2,200,000
(Base Project Allocation - $1,980,000)
(Design and Contingencies - $220,000)
(B) Laboratory upgrades at main campus
2,200,000
(Base Project Allocation - $1,980,000)
(Design and Contingencies - $220,000)
(C) Renovations to Winnet/Gymnasium Complex, main campus
1,000,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $100,000)
(D) Renovations to Mint Building, main campus
1,400,000
(Base Project Allocation - $1,260,000)
(Design and Contingencies - $140,000)
(E) Infrastructure upgrades
1,700,000
(Base Project Allocation - $1,530,000)
(Design and Contingencies - $170,000)
(F) Construction of new building at 1809 Spring Garden Street
2,400,000
(Base Project Allocation - $2,160,000)
(Design and Contingencies - $240,000)
(G) Renovations to Bonnell Building
4,800,000
(Base Project Allocation - $4,320,000)
(Design and Contingencies - $480,000)
(H) Construction and renovation to develop the third floor of Building B at the Northwest Regional Center
2,500,000
(Base Project Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(I) Expansion of the Winnet Building
9,100,000
(Base Project Allocation - $8,190,000)
(Design and Contingencies - $910,000)
(J) Construction of new student dining facility
6,300,000
(Base Project Allocation - $5,670,000)
(Design and Contingencies - $630,000)
(K) Construction of new building at Northeast Regional Center
13,200,000
(Base Project Allocation - $11,880,000)
(Design and Contingencies - $1,320,000)
(L) Renovation and reconstruction of 600-car parking garage
1,200,000
(Base Project Allocation - $1,080,000)
(Design and Contingencies - $120,000)
(M) Technology system upgrades
7,200,000
(Base Project Allocation - $6,480,000)
(Design and Contingencies - $720,000)
(N) Acquisition and installation of new administrative system
3,600,000
(O) Roofing repairs, Bonnell, Winnet and gymnasium
210,000
(P) Upgrade of science and allied health laboratories
500,000
(Q) Replacement or renewal of key building systems as part of building life cycle program of repairs, all campuses
1,000,000
(xxi) Westmoreland County Community College
(A) Design and construction of various physical fitness facilities, including a fitness trail and a combination auditorium and gymnasium
3,250,000
(B) Design and construction of a railroad hazards training facility
1,750,000
(C) Design and construction of an equipment maintenance and storage building
1,750,000
(D) Design and construction of an indoor firing range
1,750,000
(E) Design and construction of a trucking transportation hazards training facility
1,250,000
(F) Design and construction of a public safety response station
2,250,000
(G) Public safety training center expansion, including additional classrooms, lab facilities and administrative offices
5,850,000
(H) Design and construction of the Hogan's Alley Outdoor Firing Range
2,200,000
(I) Design and construction of a structural collapse training facility
2,250,000
(J) Design and construction of an Emergency Vehicle Operator Course
5,335,000
(K) Campus improvements
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(L) Construction of a new 12,000-square-foot education center and parking lot, including demolition of an existing structure
1,000,000
(M) Renovation of an existing structure for the Indiana Education Center
180,000
(N) Conversion of a portion of Founders Hall for a student center
300,000
(O) Founders Hall roof replacement and installation of rooftop HVAC units
500,000
(6) Pennsylvania Emergency Management Agency
(i) Building security at PEMA headquarters
(A) Install and construct new interior/exterior security system for headquarters building
2,174,000
(ii) Commonwealth Emergency Operating Center Colocation
(A) Construct alternate site for core operations in the event of a disaster
7,000,000
(iii) Eastern Regional Office
(A) Construction of office and operations center space
935,000
(iv) Western Regional Office
(A) Demolition of western regional office
375,000
(v) Dauphin County
(A) Purchase and renovation of currently leased headquarters building
10,500,000
(Base Project Allocation - $10,500,000)
(vi) National Emergency Alert System
(A) Acquisition and installation of power equipment for the Pennsylvania Public Television Network to support the National Emergency Alert System and PEMA's delivery of data to secondary and tertiary emergency services
4,000,000
(7) Department of Environmental Protection
(i) Allegheny County
(A) Additional funds for DGS project 183-15, McKeesport flood protection
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) Logan Run Creek flood mitigation, storm water retention and flood control measures associated with the tributary of Piney Fork adjacent to Logan Road in Bethel Park Borough
1,700,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $200,000)
(C) Harmony Road tributary, flood control project including stream bank stabilization and storm water management measures in association with the Ohio River tributary in Ohio and Killbuck Townships
800,000
(Base Project Allocation - $650,000)
(Design and Contingencies - $150,000)
(D) Flood control and storm water management project associated with the tributary of Painters Run along Cedar Road at intersection of Greenhurst Road in Mt. Lebanon Township
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $65,000)
(Design and Contingencies - $35,000)
(E) Flood control, stream bank stabilization and storm water management project associated with the tributary of Bear Run along Crawford Road in Ohio Township
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(F) Flood control and storm water retention project associated with tributary of Brush Run adjacent to Hays and Underwood in Upper St. Clair Township
200,000
(Base Project Allocation - $150,000)
(Land Allocation - $25,000)
(Design and Contingencies - $25,000)
(G) Flood control and storm water management project associated with Weyman Run adjacent to Route 51 in Whitehall Borough
460,000
(Base Project Allocation - $400,000)
(Land Allocation - $40,000)
(Design and Contingencies - $20,000)
(ii) Bedford County
(A) Additional funds for DGS project 183-8, Hyndman flood protection
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(iii) Berks County
(A) Furnace Creek rehabilitation and storm water management project
1,000,000
(B) Installation of an inflatable dam and fish ladders at the Felix Dam site
3,900,000
(C) City of Reading, rehabilitation of the Antietam Lake Dam
2,000,000
(D) Heidelberg Township flood protection project
1,560,000
(Base Project Allocation - $1,404,000)
(Design and Contingencies - $156,000)
(iv) Bradford County
(A) Borough of Monroe flood protection project
4,800,000
(Base Project Allocation - $4,320,000)
(Design and Contingencies - $480,000)
(v) Butler County
(A) Sullivan Run stream improvements
500,000
(B) Evans City Borough, improvements to the sanitary sewer collection system to address inflow of storm water
4,000,000
(vi) Cambria County
(A) Borough of Northern Cambria flood protection project
3,000,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $300,000)
(B) Rehabilitation of Borough of Patton flood protection project
5,040,000
(Base Project Allocation - $4,536,000)
(Design and Contingencies - $504,000)
(C) Borough of Wilmore flood protection project
840,000
(Base Project Allocation - $756,000)
(Design and Contingencies - $84,000)
(D) Dalton Run Dam Spillway Project
875,000
(Base Project Allocation - $745,000)
(Design and Contingencies - $130,000)
(E) North Fork Dam Spillway Project
4,200,000
(Base Project Allocation - $3,530,000)
(Design and Contingencies - $670,000)
(F) Conemaugh/Stoneycreek River collapsible dam project
5,000,000
(vii) Carbon County
(A) Borough of Weissport flood protection project
840,000
(Base Project Allocation - $756,000)
(Design and Contingencies - $84,000)
(viii) Chester County
(A) Borough of Downingtown and East Caln Township flood protection project
4,800,000
(Base Project Allocation - $4,320,000)
(Design and Contingencies - $480,000)
(B) Borough of Downingtown and East Caln Township flood protection diversion project
5,400,000
(Base Project Allocation - $4,860,000)
(Design and Contingencies - $540,000)
(ix) Clearfield County
(A) Additional funds for DGS project 182-14, Coalport flood protection
820,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $120,000)
(B) Stinky Run flood protection
1,560,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $260,000)
(C) Construction of flood protection along Orrs Run
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(D) River and stream rehabilitation project in Clearfield, Centre and Cambria Counties
15,000,000
(x) Crawford County
(A) City of Meadville, storm sewer infrastructure improvements
3,000,000
(xi) Dauphin County
(A) Renovation of laboratory, including design and construction of a PEM fuel cell demonstration unit
16,500,000
(Base Project Allocation - $14,000,000)
(Design and Contingencies - $2,500,000)
(xii) Delaware County
(A) Flood abatement along Chester Creek in the City of Chester and Upland Borough
800,000
(xiii) Elk County
(A) Borough of Ridgway flood protection project
10,200,000
(Base Project Allocation - $9,180,000)
(Design and Contingencies - $1,020,000)
(xiv) Erie County
(A) Union City, property acquisition and construction for the Union City Dam Project
15,000,000
(xv) Lackawanna County
(A) Rehabilitation of City of Scranton flood protection project
4,800,000
(Base Project Allocation - $4,320,000)
(Design and Contingencies - $480,000)
(xvi) Lehigh County
(A) Sewer infrastructure improvements in municipalities of Slatington, Emerald, Coopersburg, Upper Saucon, Ormond and North Whitehall
7,000,000
(xvii) Luzerne County
(A) Borough of West Pittston, flood control project from North and Fifth Streets to the Susquehanna River, including Tunkhannock Avenue
2,476,000
(B) Borough of West Pittston, flood control project from North and Fifth Streets to the Susquehanna River and route pipe along North Street
2,152,000
(xviii) (Reserved)
(xix) Montgomery County
(A) Upper Merion Township and Bridgeport Borough, flood control project from Crooked Lane to the intersection of DeKalb and Ford Streets
2,000,000
(B) Additional funds for DGS 181-7, Plymouth Creek improvements, Conshohocken Borough
840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(xx) Northampton County
(A) Raubsville Creek, flood control improvements, Williams Township
250,000
(xxi) Northumberland County
(A) Delaware Township, stream bank stabilization flood control
250,000
(B) Construction, reconstruction and improvements to the Sunbury Flood Project
1,500,000
(C) Plum Creek Flood Protection Project
400,000
(xxii) Philadelphia County
(A) Flat Rock Dam canal wall stabilization/flood protection, stabilization and rehabilitation of concrete retention at Manayunk Canal
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Manayunk Canal Wall, rehabilitation of Flat Rock Dam along Schuylkill River
900,000
(Base Project Allocation - $810,000)
(Design and Contingencies - $90,000)
(xxiii) Potter County
(A) Rehabilitation of Borough of Coudersport flood protection project
1,200,000
(Base Project Allocation - $1,080,000)
(Design and Contingencies - $120,000)
(xxiv) Somerset County
(A) Borough of New Baltimore flood protection project
2,100,000
(Base Project Allocation - $1,890,000)
(Design and Contingencies - $210,000)
(xxv) Snyder County
(A) Stream bank stabilization along Weiser Run, including acquisition, design and construction, Selinsgrove Borough
481,000
(xxvi) Tioga County
(A) Borough of Elkland flood protection project
8,100,000
(Base Project Allocation - $7,290,000)
(Design and Contingencies - $810,000)
(B) Township of Middlebury flood protection project
750,000
(Base Project Allocation - $675,000)
(Design and Contingencies - $75,000)
(xxvii) Warren County
(A) Rehabilitation of Glad Run Flood Protection, including repairs to existing concrete structures, drainage improvements and improvements to existing levees
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(B) Borough of Sheffield flood protection project
6,480,000
(Base Project Allocation - $5,832,000)
(Design and Contingencies - $648,000)
(xxviii) Washington County
(A) East Bethlehem Township, Clyde Mine, refuse dump remediation and cleanup
2,000,000
(xxix) Westmoreland County
(A) Additional funds for DGS project 182-7, Jeannette flood protection
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(8) Department of General Services
(i) Capitol Complex
(A) Restoration of the Finance Building, Forum Building, North Office Building and the Speaker K. Leroy Irvis Building, including the restoration of murals, bronze, sculptures and ornate spaces
8,000,000
(B) Restoration of the Main Capitol Building, including the restoration of artwork, historic spaces, statuary and historic furnishings
17,000,000
(C) Additional funds for DGS project 948-35.1, Phase 1, Part F - Basement Terazzo and Door Systems, Main Capitol Building, Capitol Complex - for finishes and systems for the Senate and House of Representatives
500,000
(D) Additional funds for DGS project 948-35, Phase 1, Part L, Capitol Complex Security Upgrades, Main Capitol Building, for additional security enhancements for the Senate and House of Representatives
3,600,000
(E) Renovation, restoration and rehabilitation of the Forum Building, including, but not limited to, life safety code, HVAC, security and telecommunication improvements and enhancements
58,200,000
(Base Project Allocation - $48,500,000)
(Design and Contingencies - $9,700,000)
(F) Renovation, restoration and rehabilitation of the North Office Building, including, but not limited to, life safety code, HVAC, security and telecommunication improvements and enhancements
35,368,000
(Base Project Allocation - $30,568,000)
(Design and Contingencies - $4,800,000)
(G) Renovation, restoration and rehabilitation of the Finance Building, including, but not limited to, life safety code, HVAC, security and telecommunication improvements and enhancements
61,812,000
(Base Project Allocation - $52,610,000)
(Design and Contingencies - $9,202,000)
(H) Renovation, restoration and rehabilitation of the Speaker K. Leroy Irvis Building, including, but not limited to, life safety code, HVAC, security and telecommunication improvements and enhancements
33,051,000
(Base Project Allocation - $28,642,000)
(Design and Contingencies - $4,409,000)
(ii) Philadelphia County
(A) DGS 522-2, Diagnostic and Rehabilitation Center, Philadelphia
4,000,000
(B) Land acquisition, site preparation, related infrastructure improvements, including transportation access and new construction of terminal facilities for the operation of a fresh food distribution center in Philadelphia
150,000,000
(C) Pennsylvania Convention Center expansion, including planning, land acquisition and construction
400,000,000
(iii) Erie County Convention Center Authority
(A) Development and construction of an entertainment and cultural district in the City of Erie
25,000,000
(iv) Allegheny County
(A) Completion of the David L. Lawrence Convention Center
8,000,000
(8.1) Department of Health
(i) Washington and Greene Counties
(A) Centerville Clinic, improvements to radiology services facility
1,000,000
(9) Pennsylvania Historical and Museum Commission
(i) Drake Well Museum
(A) Renovations to museum and collections storage
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(ii) Pennsylvania Military Museum
(A) Construction and installation of new permanent exhibits
4,200,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $700,000)
(iii) Washington Crossing Historic Park
(A) Additional funds for DGS project 996-15, rehabilitation of existing facility
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(B) Renovation of Bowman's Hill Wildflower Preserve
2,500,000
(iv) Northumberland County
(A) Joseph Priestley House, installation of fire protection systems
180,000
(v) Ephrata Cloister
(A) Design and construction of a new visitors center
6,000,000
(vi) Daniel Boone Homestead
(A) Design and construction of a new visitors center
3,000,000
(vii) Pennsylvania Lumber Museum
(A) Expansion of museum, including construction of a two-story addition
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(10) Pennsylvania Infrastructure Investment Authority (Reserved)
(11) Department of Military and Veterans Affairs
(i) Lebanon County
(A) Construction improvements to existing facility at Fort Indiantown Gap
650,000
(B) Land acquisition and construction of a Veterans Home
12,000,000
(Base Project Allocation - $10,000,000)
(Land Allocation - $2,000,000)
(ii) Hollidaysburg Veterans Home, Blair County
(A) Upgrades at Eisenhower Hall and dietary building
2,916,000
(Base Project Allocation - $2,442,000)
(Design and Contingencies - $474,000)
(B) Upgrades at MacArthur Hall
2,483,000
(Base Project Allocation - $2,075,000)
(Design and Contingencies - $408,000)
(C) Replace and upgrade sewer line
1,008,000
(Base Project Allocation - $907,000)
(Design and Contingencies - $101,000)
(D) Erect steel storage building
210,000
(Base Project Allocation - $189,000)
(Design and Contingencies - $21,000)
(E) Upgrades at old administration building
630,000
(Base Project Allocation - $567,000)
(Design and Contingencies - $63,000)
(F) Upgrades to maintenance building
189,000
(Base Project Allocation - $170,000)
(Design and Contingencies - $19,000)
(G) Paint water tank
105,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $10,000)
(H) Upgrades to groundskeeping building
150,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $15,000)
(I) Pharmacy design and relocation
240,000
(Base Project Allocation - $216,000)
(Design and Contingencies - $24,000)
(iii) Scotland School for Veterans' Children, Franklin County
(A) Repairs for the student center, Frey Gym, 13 cottages and maintenance buildings
4,100,000
(Base Project Allocation - $3,690,000)
(Design and Contingencies - $410,000)
(B) Package four, replacement of steam and hot water supply lines in cottage area
2,691,000
(Base Project Allocation - $2,422,000)
(Design and Contingencies - $269,000)
(iv) Southwestern Veterans Center, Allegheny County
(A) Modification to Alzheimer's unit and dining room
143,000
(Base Project Allocation - $129,000)
(Design and Contingencies - $14,000)
(B) Site work and perimeter fencing
154,000
(Base Project Allocation - $139,000)
(Design and Contingencies - $15,000)
(C) Driveway and parking lot repairs
153,000
(Base Project Allocation - $138,000)
(Design and Contingencies - $15,000)
(D) Replace flooring
288,000
(Base Project Allocation - $259,000)
(Design and Contingencies - $29,000)
(E) Finish storage area
124,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $12,000)
(v) Southeastern Veterans Center, Chester County
(A) Additional funds for DGS project 960-55
11,340,000
(B) Renovation and modernization of commandant's quarters
250,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $25,000)
(C) Decommission old power plants
200,000
(Base Project Allocation - $180,000)
(Design and Contingencies - $20,000)
(D) Construction of domiciliary/personal care unit building, Phase 2
2,975,000
(Base Project Allocation - $2,678,000)
(Design and Contingencies - $297,000)
(E) Installation of security camera system
262,000
(Base Project Allocation - $237,000)
(Design and Contingencies - $25,000)
(vi) Pennsylvania Soldiers and Sailors Home, Erie County
(A) Design and modernization of food production and storage area
250,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $25,000)
(B) Replacement of perimeter fence
350,000
(Base Project Allocation - $315,000)
(Design and Contingencies - $35,000)
(vii) Combined Readiness Center, State Area Command
(A) Construction of combined readiness center
14,950,000
(Base Project Allocation - $13,000,000)
(Design and Contingencies - $1,950,000)
(viii) Combined Readiness Center, Greene County
(A) Construction of combined readiness center
2,788,000
(Base Project Allocation - $1,772,000)
(Land Allocation - $750,000)
(Design and Contingencies - $266,000)
(ix) Combined Readiness Center, York County
(A) Construction of combined readiness center
2,902,000
(Base Project Allocation - $1,871,000)
(Land Allocation - $750,000)
(Design and Contingencies - $281,000)
(x) Joint Headquarters Readiness Center, Lebanon County
(A) Construction of joint headquarters readiness center
6,738,000
(Base Project Allocation - $6,064,000)
(Design and Contingencies - $674,000)
(xi) Readiness Center, Bedford County
(A) Construction of readiness center
2,314,000
(Base Project Allocation - $2,083,000)
(Design and Contingencies - $231,000)
(xii) Readiness Center, Bucks County
(A) Addition/alteration to readiness center
1,021,000
(Base Project Allocation - $919,000)
(Design and Contingencies - $102,000)
(xiii) Readiness Center, Chester County
(A) Construction of readiness center
2,663,000
(Base Project Allocation - $2,397,000)
(Design and Contingencies - $266,000)
(xiv) Readiness Center, Columbia County
(A) Construction of readiness center
2,105,000
(Base Project Allocation - $1,894,000)
(Design and Contingencies - $211,000)
(xv) Readiness Center, Lawrence County
(A) Construction of readiness center
3,169,000
(Base Project Allocation - $2,852,000)
(Design and Contingencies - $317,000)
(xvi) Readiness Center, Luzerne County
(A) Construction of readiness center
3,041,000
(Base Project Allocation - $2,737,000)
(Design and Contingencies - $304,000)
(xvii) Readiness Center, Lycoming County
(A) Construction of readiness center
2,599,000
(Base Project Allocation - $2,339,000)
(Design and Contingencies - $260,000)
(xviii) Readiness Center, McKean County
(A) Construction of readiness center
1,739,000
(Land Allocation - $1,739,000)
(xix) Readiness Center, Schuylkill County
(A) Construction of readiness center
3,378,000
(Base Project Allocation - $3,040,000)
(Design and Contingencies - $338,000)
(xx) Dauphin and Lebanon Counties
(A) Expansion of the range safety zones at Fort Indiantown Gap in Dauphin and/or Lebanon Counties to accommodate range upgrades for training of military personnel
5,000,000
(Land Allocation - $5,000,000)
(xxi) Combined Readiness Center/Operations Maintenance Shop, Crawford County
1,750,000
(Land Allocation - $1,750,000)
(12) Department of Public Welfare
(i) Clarks Summit State Hospital
(A) Install new heating and cooling systems
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(ii) Danville State Hospital
(A) Replace steam generation equipment
2,500,000
(Base Project Allocation - $2,083,000)
(Design and Contingencies - $417,000)
(iii) Hamburg Center
(A) Install new flooring and ceilings
840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(iv) Harrisburg State Hospital
(A) Upgrade HVAC systems in DPW Complex No.2
6,600,000
(Base Project Allocation - $5,500,000)
(Design and Contingencies - $1,100,000)
(B) Upgrade electrical distribution system, fire and security systems in Buildings 33, 41, 42 and 43
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(v) Loysville Complex
(A) Construction of a new 80-unit juvenile facility
12,900,000
(Base Project Allocation - $10,750,000)
(Design and Contingencies - $2,150,000)
(vi) Selinsgrove Center
(A) Upgrade fire alarm and suppression systems
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(vii) Torrance State Hospital
(A) Expansion and/or replacement of Building 7
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(13) Pennsylvania State Police
(i) Butler Headquarters, Butler County
(A) Construct new Butler Headquarters building
4,011,000
(Base Project Allocation - $3,610,000)
(Design and Contingencies - $401,000)
(ii) Department Headquarters, Dauphin County
(A) Construct new crime laboratory facility
10,000,000
(Base Project Allocation - $9,600,000)
(Design and Contingencies - $400,000)
(B) Construct new crime laboratory facility
38,160,000
(Base Project Allocation - $34,344,000)
(Design and Contingencies - $3,816,000)
(C) Construct new annex to department headquarters building
33,000,000
(Base Project Allocation - $29,700,000)
(Design and Contingencies - $3,300,000)
(D) Renovate department headquarters building
8,322,000
(Base Project Allocation - $7,490,000)
(Design and Contingencies - $832,000)
(iii) Police Academy, Dauphin County
(A) Renovations to academy, Phase 4
4,800,000
(Base Project Allocation - $4,320,000)
(Design and Contingencies - $480,000)
(iv) Lima Laboratory, Delaware County
(A) Construct new crime laboratory facility
6,760,000
(Base Project Allocation - $6,084,000)
(Design and Contingencies - $676,000)
(v) Wyoming Headquarters, Luzerne County
(A) Construct new headquarters building
5,787,000
(Base Project Allocation - $5,208,000)
(Design and Contingencies - $579,000)
(vi) Wyoming Laboratory, Luzerne County
(A) Construct new crime laboratory facility
876,000
(Base Project Allocation - $730,000)
(Design and Contingencies - $146,000)
(B) Construct new forensic crime laboratory facility
5,760,000
(Base Project Allocation - $5,184,000)
(Design and Contingencies - $576,000)
(vii) Philadelphia Headquarters, Philadelphia County
(A) Renovate headquarters building
8,209,000
(Base Project Allocation - $7,388,000)
(Design and Contingencies - $821,000)
(14) State System of Higher Education
(i) Bloomsburg University
(A) Renovation of Ben Franklin Building
5,700,000
(B) Renovation or addition to Haas Auditorium
12,700,000
(C) Renovation of Nelson Field House
14,900,000
(D) Construction of addition to Sutliff Hall
8,600,000
(E) Renovation of Waller Administration Building
6,500,000
(F) Construction of a classroom addition
6,000,000
(ii) California University
(A) Construction of a convocation center
38,400,000
(B) Construction of science building
20,093,000
(C) Renovation of old Industrial Arts building
6,859,000
(D) Construction of university support facility
4,703,000
(E) Pedestrian and vehicular enhancement, Phase II
8,700,000
(iii) Cheyney University
(A) Renovation of Humphreys Hall interior
4,000,000
(B) Renovation of Emlen Hall interior
5,343,000
(C) Renovation of potable water lines
5,640,000
(D) Renovation of lower campus steam lines
5,780,000
(E) Renovation of campus infrastructure, Phase III
5,340,000
(F) Renovation of tennis and athletic facilities
1,800,000
(G) Renovation of power plant and garage
480,000
(H) Athletic facilities addition/renovation
8,000,000
(iv) Clarion University
(A) Conversion and renovation of Becht Hall
7,914,000
(B) Renovation of Moore Hall
1,628,000
(C) Addition and renovation of Marwick Boyd Fine Arts Center
21,000,000
(D) Renovation of Still Hall
7,877,000
(E) Addition and renovation of Tippin Gymnasium
7,831,000
(F) Modification of facilities for ADA compliance
3,600,000
(v) East Stroudsburg University
(A) Renovation and replacement of Monroe Hall
8,000,000
(B) Replacement of Rosenkrans Hall
18,000,000
(C) Addition and renovation of Eiler-Martin Stadium
9,000,000
(D) Addition and renovation of Abeloff Convocation Center
11,000,000
(vi) Edinboro University
(A) Construction of Tool & Mold Institute
3,420,000
(B) Addition and renovation of Cooper Science, Phase II
23,000,000
(vii) Indiana University
(A) Replacement of Old Main, Punxsutawney Campus
10,201,000
(B) Steam distribution/tunnel system renovation
1,800,000
(C) Electrical distribution system upgrade
2,100,000
(D) Boiler plant renovation
3,600,000
(viii) Kutztown University
(A) Upgrade Keystone Hall
5,034,000
(B) Upgrade Beeky Education Building
1,912,000
(C) Upgrade Stratton Administration Building
2,226,000
(D) Addition and renovation of Lytle Hall
3,974,000
(E) Addition and upgrade of Kemp Building
900,000
(F) Acquisition of 137-acre campus, design, development, construction and implementation of an e-campus
23,000,000
(G) Renovation and addition to Shaffer Auditorium
11,000,000
(ix) Lock Haven University
(A) Demolish E&G structures
1,620,000
(B) Clearfield Campus, design and construction of a new health services building to include laboratories, classrooms, clinical facilities and multipurpose rooms
15,000,000
(C) Clearfield Campus, design and construction of classrooms and laboratories for programs in engineering technologies and computers and multipurpose rooms
15,000,000
(D) Clearfield Campus, design and construction of new education building
10,600,000
(E) Old KCSD High School renovation
12,000,000
(x) Mansfield University
(A) Addition to and renovation of Grant Science Center
10,993,000
(Base Project Allocation - $9,161,000)
(Design and Contingencies - $1,832,000)
(B) Addition and renovation of Grant Science Center, Phase II
10,993,000
(C) Renovation/replace Allen Hall
6,500,000
(xi) Millersville University
(A) Addition of theater arts facility
14,210,000
(B) Addition of Sports Education Center
12,325,000
(C) Addition and renovation of Palmer/Bishop Buildings
3,552,000
(D) Upgrade campus infrastructure
4,532,000
(xii) Shippensburg University
(A) Renovation of steam distribution system
6,660,000
(B) Renovation of electrical distribution system
8,730,000
(C) Renovation of Memorial Auditorium
5,360,000
(D) Renovation of Dauphin Humanities Center
8,570,000
(E) Campus steam plant modernization
7,300,000
(xiii) Slippery Rock University
(A) Central heating plant renovation, Phase III
3,500,000
(xiv) West Chester University
(A) Construction of academic classroom and office complex
24,984,000
(B) Renovation of E.O. Bull Center
13,000,000
(C) Update infrastructure and chilled water plant
3,800,000
(D) Renovation of FHG Library
20,400,000
(E) Steam line replacement
6,000,000
(15) Department of Transportation
(i) Adams County
(A) Construction of new welcome center along Route 15
5,000,000
(ii) Allegheny County
(A) Construction of a new county maintenance garage
1,800,000
(iii) Bradford County
(A) Construction of a new county maintenance office and garage
10,000,000
(iv) Bucks County
(A) Relocation of maintenance shed located in Doylestown Borough
1,000,000
(B) Construction of a new county maintenance office
3,400,000
(C) Renovation of Safety Rest Area Site P, I-95 Southbound
518,000
(v) Clearfield County
(A) Construction of a new Engineering District 2-0 office
10,000,000
(vi) Clinton County
(A) Construction of a new county maintenance garage
10,000,000
(vii) Cumberland County
(A) Construction of a new county maintenance garage
10,000,000
(viii) Dauphin County
(A) Construction of a new materials testing laboratory
18,000,000
(B) Renovation of Safety Rest Area Site 48, I-81 Southbound
1,780,000
(C) Renovation of Safety Rest Area Site 47, I-81 Northbound
1,000,000
(ix) Lackawanna County
(A) Renovation of Safety Rest Area Site 55, I-81 Northbound
1,300,000
(x) Lawrence County
(A) Construction of a new regional salt distribution/storage facility
380,000
(xi) Lehigh County
(A) Construction of a new Engineering District 5-0 office
8,700,000
(xii) Luzerne County
(A) Construction of a new county maintenance garage
10,000,000
(B) Renovation of Safety Rest Area Site 54, I-81 Southbound
1,100,000
(C) Renovation of Safety Rest Area Site 53, I-81 Northbound
1,100,000
(xiii) Pike County
(A) Construction of a new county maintenance garage
10,000,000
(xiv) Schuylkill County
(A) Construction of a new regional salt distribution/storage facility
380,000
(xv) Sullivan County
(A) Construction of a new county maintenance garage
5,000,000
(xvi) Susquehanna County
(A) Construction of a new county maintenance garage
10,000,000
(xvii) Washington County
(A) Construction of a new county maintenance office
2,900,000
(xviii) York County
(A) Construction of a new county maintenance garage
10,000,000
(16) Philadelphia Regional Port Authority
(i) Piers 78, 80 and 80A
(A) Improvements to Pier 78, including roof replacement, floor replacement and lighting
4,000,000
(B) Floor replacement at Pier 80A
2,000,000
(C) Paving project in the area of Piers 78 and 80
1,500,000
(D) Improvements to Pier 80, including roof replacement, floor replacement and lighting
4,000,000
(E) Demolition and construction of a new terminal and warehouse at Pier 80A
52,000,000
(ii) Piers 38 and 40
(A) Improvements to Pier 38, including floor replacement and lighting
1,350,000
(B) Parking lot project in the Garden Area of Piers 38 and 40
2,000,000
(C) Improvements to Pier 40, including roof and floor replacement and lighting
4,000,000
(iii) Portwide improvements
(A) Blocking up of all doors not being used at all locations within the port
1,000,000
(B) Acquisition and installation of three container cranes, acquisition of two Kocks cranes and electrification of diesel crane
28,000,000
(C) Acquisition and development of property located beneath Walt Whitman Bridge
5,000,000
(D) Acquisition and development of property adjacent to Pier 98 Annex facility for expansion and development of off-port warehousing and light manufacturing
7,000,000
(E) Packer Avenue North expansion to include acquisition and development of Piers 92 through 104
70,000,000
(F) Land acquisition, site preparation, related infrastructure improvements, including transportation access and new construction of terminal facilities for the operation of a fresh food distribution center in Philadelphia
150,000,000
(G) Acquisition of a floating dry dock to be moored at a PRPA pier
2,500,000
(iv) Packer Avenue Marine Terminal
(A) Refrigeration and dry warehouse expansion
18,000,000
(B) Terminal automation and gate complex renovations
5,000,000
(C) General improvements to facilities, including paving and acquisition of 20-foot spreaders
7,500,000
(D) General port property expansion, including acquisition and development of refrigerated building located at Packer Avenue Marine Terminal
5,500,000
(E) Expansion south of Packer Avenue Marine Terminal from Berth 6 through Piers 122/124 to the Navy Yard, including development of 1,800-foot deepwater berth
85,000,000
(v) Pier 82
(A) Acquisition of cargo-handling equipment and infrastructure improvements to Pier 8
22,500,000
(17) Office of Administration
(i) Commonwealth Technology Center
(A) Alternate site, colocation with CTC
21,500,000
(ii) Statewide Mobile Radio and Microwave System
(A) Additional funds for DGS project 950-10, Statewide mobile radio and microwave system
5,000,000