Section 3. Itemization of public improvement projects.
Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
Total
Project
Project
Allocation
(1) Department of Agriculture
$12,397,000
(i) Department of Agriculture Headquarters
(A) Construction of a headhouse and greenhouse addition, including a covered walkway to connect all structures
392,000
(Base Project Allocation - $327,000)
(Design and Contingencies - $65,000)
(ii) Farm Show Complex
(A) Removal of piping and ducting which contain asbestos materials and/or encapsulation of asbestos-containing materials in Large Arena
785,000
(Base Project Allocation - $654,000)
(Design and Contingencies - $131,000)
(B) Reconstruction of roof system, including supporting joists, framing, decking, asbestos abatement and exterior materials involving 455,000 square feet over all main exhibition areas. Project must be fully evaluated regarding feasibility and costs of alternatives to reconstructing the existing design before implementation
9,000,000
(Base Project Allocation - $7,500,000)
(Design and Contingencies - $1,500,000)
(C) Conversion of one existing boiler to a gas/oil-fired unit to allow flexible operations at lower pressures
420,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $70,000)
(D) Exterior cleaning, sealing and reconstruction of masonry walls and decorative friezes of main building
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(2) Department of Community and Economic Development
$198,549,000
(i) Philadelphia area
(A) Conversion of the former Philadelphia Navy Yard
182,000,000
(ii) Port of Philadelphia
(A) Construction of a cruise ship facility
2,000,000
(iii) Port of Pittsburgh
(A) Construction of a passenger pier terminal on Pittsburgh's North Shore
1,000,000
(iv) Port of Erie
(A) State Street Pier construction and renovation
1,000,000
(v) Lackawanna County
(A) Borough of Throop, purchase and installation of traffic-control devices on Underwood Road
11,000
(Base Project Allocation - $9,000)
(Design and Contingencies - $2,000)
(vi) Greene County
(A) Nemacolin Industrial Park - Phase I site development, environmental assessment and cleanup and improvements to port facilities
10,000,000
(vii) Somerset County, Summit Township
(A) Relocation of approximately 46 houses out of the floodplain of the Casselman River across the river from the Borough of Meyersdale
2,500,000
(viii) Shawnee Park Field, City of Monessen, Westmoreland County
(A) Erection of lights
38,000
(Base Project Allocation - $30,000)
(Design and Contingencies - $8,000)
(3) Department of Conservation and Natural Resources
$81,175,000
(i) Chapman Dam State Park
(A) Flood damage repairs, renovations and provide increased handicapped accessibility
550,000
(ii) Cowans Gap State Park
(A) Day-use upgrade
300,000
(B) Repair dam control tower and gate valve
700,000
(C) Sewage treatment plant upgrade
200,000
(iii) Lackawanna State Park
(A) Construction of improvements and additional amenities
200,000
(iv) Lehigh Gorge State Park
(A) Park improvements
2,925,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $425,000)
(B) Interpretive facilities and trail construction
3,225,000
(Base Project Allocation - $2,750,000)
(Design and Contingencies - $475,000)
(C) Land acquisition
2,500,000
(v) Nescopeck State Park
(A) Park development, construction of comfort stations, pavilions, warming huts, roadways, parking lots and utilities in the main, middle and lower day-use areas
2,000,000
(B) Development of cabin area, construction of ten rustic cabins, including roads, utilities and site development
1,500,000
(C) Development of overnight camping area, construction of campground to include site development, bathhouses, living areas, roads, overflow parking and utilities
1,500,000
(vi) Oil Creek State Park
(A) Rehabilitation and enlargement of train station
100,000
(B) Design, production and installation of exhibits
201,000
(vii) Presque Isle State Park
(A) Waterworks reservoir area - Phase II
950,000
(B) Rehabilitation of park roadways
1,760,000
(C) Rehabilitation of water mains serving park
2,610,000
(D) State share of the cost of replenishing the sand on the lakeside shore
650,000
(Base Project Allocation - $650,000)
(E) Beach nourishment and breakwater maintenance
5,800,000
(F) Rehabilitation of comfort facilities and sewage system
1,800,000
(G) Rehabilitation of Presque Isle Marina
962,000
(viii) Prince Gallitzen State Park
(A) Additional funds for DGS 195-37, rehabilitate marina, Phase III, construct bulkhead to protect area from erosion
1,500,000
(Base Project Allocation - $1,250,000)
(Design and Contingencies - $250,000)
(ix) Pymatuning State Park
(A) Linesville Spillway improvements
2,407,000
(Base Project Allocation - $2,012,000)
(Design and Contingencies - $395,000)
(x) Raccoon Creek State Park
(A) Renovation of cabins, amphitheater and bathrooms
1,500,000
(Base Project Allocation - $1,250,000)
(Design and Contingencies - $250,000)
(B) Renovation of water and sewage systems
2,000,000
(Base Project Allocation - $1,666,000)
(Design and Contingencies - $334,000)
(C) Development of new picnic and launch area on Route 18
1,000,000
(D) Campground, main picnic area, pavilion buildings and other structures, electricity project
800,000
(xi) Shawnee State Park
(A) Additional funds for DGS 155-11, replacement of two bridges on main park road
900,000
(B) Replace lift station
80,000
(C) Construct rental cabins and support facilities
1,500,000
(D) Rehabilitate water plant roof and filters
140,000
(xii) Swatara State Park
(A) Rausch Creek Acid Mine Drainage Treatment Plant, additional treatment units and chemical feeding equipment to accommodate increased water flow due to the diversion of water from the Swatara Creek to the Rausch Creek
4,500,000
(Base Project Allocation - $3,800,000)
(Design and Contingencies - $700,000)
(xiii) Tyler State Park
(A) Rehabilitation of Schofield/Ford Covered Bridge
250,000
(xiv) Meadowcroft Rock Shelter, Avella
(A) Renovation of visitors' access and exhibit development
2,000,000
(Base Project Allocation - $1,750,000)
(Design and Contingencies - $250,000)
(xv) Allegheny, Westmoreland, Fayette and Somerset Counties
(A) Acquisition and development of the Pittsburgh to Washington, D.C., Trail
10,000,000
(xvi) Blair County
(A) Acquisition and development as a trail the New Portage Railroad and Hollidaysburg & Petersburg Branch of the former Pennsylvania Railroad from Williamsburg to Gallitzin, Cambria County
9,000,000
(xvii) Somerset County
(A) Rehabilitation of the Big Savage Tunnel and related structures
6,000,000
(xviii) Borough of Ashley
(A) Chester area of Solomon's Creek and Bobby Strish Park Association, enhancement to the trout fishing and picnic areas along Solomon's Creek, rehabilitation and/or construction of a baseball and softball field, concession stands, restroom facilities and parking lot
165,000
(xix) Harborcreek Township, Erie County
(A) Shades Beach Park development
6,000,000
(xx) Gulich Township, Clearfield County
(A) Facilities improvements at Mounty Memorial Park
1,000,000
(4) Department of Corrections
251,850,000
(i) State Correctional Institution - Coal Township, Northumberland County
(A) Addition of three modular units for inmate housing
27,600,000
(Base Project Allocation - $23,000,000)
(Design and Contingencies - $4,600,000)
(ii) State Correctional Institution - Dallas
(A) Reconstruction of three boilers, installation of new controls, reconstruction of support structures and associated fuel-handling equipment
5,640,000
(Base Project Allocation - $4,700,000)
(Design and Contingencies - $940,000)
(iii) State Correctional Institution - Graterford
(A) Construction of a Level 2 housing unit, including dormitories, 50 double rooms, offices, sanitary facilities, multipurpose room, laundry and storage areas
5,340,000
(Base Project Allocation - $4,450,000)
(Design and Contingencies - $890,000)
(B) Upgrade perimeter security, including additional lighting for both sides of perimeter wall, electrified fence inside perimeter and electronic monitoring at three sally ports
5,456,000
(Base Project Allocation - $4,547,000)
(Design and Contingencies - $909,000)
(iv) State Correctional Institution - Greensburg
(A) Upgrade electric utility system
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(v) State Correctional Institution - Mercer
(A) Expansion of kitchen/dining, administration and program facilities along with utilities, including water, sewer and electric
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(B) Construction of a Level 2 housing unit, including dormitories, 50 double rooms, offices, sanitary facilities, multipurpose room, laundry and storage areas
5,340,000
(Base Project Allocation - $4,450,000)
(Design and Contingencies - $890,000)
(vi) State Correctional Institution - Muncy
(A) Addition of two new cell blocks for close security, expansion of infirmary, outside warehouse, electrical and boiler upgrades
26,364,000
(Base Project Allocation - $21,970,000)
(Design and Contingencies - $4,394,000)
(vii) State Correctional Institution - Pittsburgh
(A) Rehabilitation of boiler plant components, including combustion control system, stokers on boilers 4 and 5, emergency generator, ash removal system and building components
3,120,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $520,000)
(viii) State Correctional Institution - Rockview
(A) Construction of a Level 2 housing unit, including dormitories, 50 double rooms, offices, sanitary facilities, multipurpose room, and laundry and storage areas. Also renovations to the kitchen and dining rooms and improvements to the perimeter security and intrusion detection system
13,000,000
(Base Project Allocation - $10,800,000)
(Design and Contingencies - $2,200,000)
(ix) State Correctional Institution - Western Pennsylvania
(A) Additional funds for DGS 575-3 to provide for expansion to 750 beds
16,110,000
(Base Project Allocation - $13,425,000)
(Design and Contingencies - $2,685,000)
(x) New State Correctional Institution - Western Pennsylvania
(A) Construction of a new close-security institution within a 50-mile radius of the existing institution with capacity of approximately 1,236 cells. Includes construction of all other facilities as necessary to operate institution
135,480,000
(Base Project Allocation - $105,984,000)
(Land Allocation - $3,000,000)
(Design and Contingencies - $26,496,000)
(5) Department of Education
$446,472,000
(i) The Pennsylvania State University
(A) University Park Campus
(I) Classroom building - Phase II
12,100,000
(II) Renovation of Willard Building
10,300,000
(III) Renovation of Moore and Sparks Buildings
16,070,000
(IV) Library Depository Facility
11,000,000
(V) Renovation of Engineering Units and Sackett Building
8,600,000
(VI) Renovation of Chandlee Laboratory
10,200,000
(VII) Renovation of Whitmore and Davey Laboratories
10,200,000
(VIII) Borland Laboratory Addition, renovations
12,000,000
(IX) Construction of new forestry building
9,000,000
(X) Construction of a visitors center
2,000,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $500,000)
(XI) Capital renewal for buildings and building systems - University Park
20,000,000
(B) Altoona Campus
(I) Construct Multistory Classroom
Facility
8,000,000
(II) Construction of new multipurpose activity building
4,750,000
(C) Harrisburg Campus
(I) Construct academic activities building
3,750,000
(D) DuBois Campus
(I) Addition to and renovation of Smeal Building
1,700,000
(E) Great Valley Center
(I) Addition to building
8,000,000
(F) Mont Alto
(I) Renovation of General Studies Building
3,200,000
(G) McKeesport Campus
(I) Design and construct student union/multipurpose building
1,400,000
(H) York Campus
(I) Construct library addition and classroom building addition
11,900,000
(I) The Behrend College
(I) Construction of a research and development center
30,000,000
(II) Renovation of Otto Behrend Building
3,100,000
(III) Restoration of Erie Hall
1,800,000
(IV) Maintenance of Police and Safety Building
1,800,000
(ii) University of Pittsburgh
(A) Oakland Campus
(I) Upgrade and deferred maintenance for buildings and building systems Phase I
12,000,000
(II) Upgrade and deferred maintenance for buildings and building systems Phase II
12,000,000
(III) Additional funds for DGS 1103-48, Convocation/Events Center
25,000,000
(IV) Renovation of Trees Hall and Fitzgerald Field House Phase I
11,300,000
(V) Renovation of the Cathedral of Learning
20,000,000
(VI) Additional funds for Hillman Library Renovation Phase II
9,600,000
(VII) Acquisition of Bellefield Tower for WPIC Children and Family Programming
8,000,000
(VIII) Construction of Basic Sciences Complex
25,000,000
(B) Bradford Campus
(I) Communications, Art and Technology Building
15,800,000
(C) Johnstown Campus
(I) Additional funds for DGS 1103-53, classroom/administration building
532,000
(II) Additional funds for Library renovations
1,580,000
(iii) Temple University
(A) Main Campus
(I) Installation of an electronic access/intrusion detection system at main campus
8,411,000
(Base Project Allocation - $7,009,000)
(Design and Contingencies - $1,402,000)
(II) Rehabilitation of lecture halls: Barton, Beury, Speakman, Ritter
4,900,000
(III) Roofing replacement and repairs: Presser, Gladfelter, Anderson Classroom, Anderson Engineering and Architecture, Paley, Bio-Life, Physical Plant, Computer, Tomlinson, Weiss, Sullivan, Conwell, Thomas, Student Activities Center, Tyler Hall, Mitten, Speakman, 1900 Block Park Mall, Bright Hall, Dixon and Widener
4,410,000
(IV) Tomlinson Theater rehabilitation and addition
5,049,000
(V) Mitten Hall renovation for performance hall
8,820,000
(VI) Rehabilitation of building system components: Curtis, Barton, Beury, Biolife Sciences
15,000,000
(VII) College Hall Renovations - Phase II
850,000
(VIII) Additional funds for DGS 1104-57, emergency fire and safety renovations, Phase II, to address complexities revealed by initial surveys within buildings on main campus to enable university to comply with fire codes
2,900,000
(Base Project Allocation - $2,417,000)
(Design and Contingencies - $483,000)
(IX) Additional funds for DGS 1104-53, Classroom and Laboratory Building
3,000,000
(B) Ambler Campus
(I) Education/learning technology center
7,200,000
(C) Various Campuses
(I) Masonry, sidewalk and walkway repairs: Paley, Thomas, Ritter, Ritter Annex, Computer, Sullivan, Klein, Curtis Speakman, Bio-Life, Barton, Beury, Pearson/McGonigle, Mitten, Johnson/Hardwick, Peabody, FSUB, Old Dental, Engineering and Architecture, Student Activities Center, Kresge, Tyler, Dixon, Widener, Park Mall, Berks Mall
7,812,000
(II) Telecommunications infrastructure improvements
8,100,000
(III) Deferred maintenance and energy conservation: Bio-Life, Beury, Tomlinson, Medical Research, Medical School
4,474,000
(IV) Computing and data communications
6,907,000
(D) All Campuses
(I) Fluorescent lighting retrofit
3,749,000
(iv) Lincoln University
(A) Construction of storm water drainage system, including piping and a detention basin to prevent hydraulic overload of the sewer system
1,084,000
(Base Project Allocation - $903,000)
(Design and Contingencies - $181,000)
(v) Thaddeus Stevens State School of Technology
(A) Construction of a multipurpose activities center and rehabilitation and renovation of the existing gymnasium for a trade-technical laboratory
5,000,000
(B) Repair and rebuild underground utility tunnel system and repair masonry retaining wall adjacent to Stevens Avenue
350,000
(C) Upgrade of high voltage electrical distribution system
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(D) Reconstruct and separate storm water and sewer conduit systems
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(vi) Scranton State School for the Deaf
(A) Reconstruction of roof system on O'Donnell Building
214,000
(Base Project Allocation - $178,000)
(Design and Contingencies - $36,000)
(B) Campus safety and grounds improvements
2,300,000
(Base Project Allocation - $1,920,000)
(Design and Contingencies - $380,000)
(vii) Reading Area Community College
(A) New computers for the history and political science department
1,000,000
(viii) Allegheny University of the Health Sciences
(A) Construction of a facility to house a baccalaureate program in emergency medical services and supportive training facilities
2,000,000
(6) Department of Environmental Protection
$98,066,000
(i) Allegheny County
(A) Greenwald Road Flood Control Project DGS 184-20
2,000,000
(B) Additional funds for DGS 184-20, culverts and debris basin along tributary to Grassers Run, Bethel Park
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(C) Additional funds for DGS 184-18, construction of levee, floodplain excavation and concrete retaining wall along Pine Creek, Shaler Township
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(ii) Armstrong County
(A) Reconstruction of valves and seals at the Ernest deep mine complex, Rayne Township
654,000
(Base Project Allocation - $545,000)
(Design and Contingencies - $109,000)
(iii) Beaver County
(A) Beaver River silt control and prevention program
500,000
(iv) Bedford County
(A) Borough of Hyndman, flood protection project
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(v) Berks County
(A) Replacement of the Felix Dam - construction of a new reinforced concrete dam
3,900,000
(Base Construction Allocation - $3,300,000)
(Design and Contingencies - $600,000)
(vi) Blair County
(A) Mill Run Creek Flood Protection Project, City of Altoona, Logan and Allegheny Townships
11,224,000
(vii) Bradford County
(A) Rehabilitation of Sayre Flood Control Project by reconstructing interceptor drainage system beneath levee
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(viii) Bucks County
(A) Flood control and storm water management, Phase I, affecting Bristol Borough and Bristol, Falls and Middletown Townships
350,000
(ix) Butler County
(A) Continuation of Sullivan Run streambank stabilization project in City of Butler
500,000
(B) Storm water projects in Butler Township
750,000
(C) Acquisition of Butler CDC Water System and construction of storage tank, pumping station and installation of mains
3,975,000
(x) Cambria County
(A) Flood control - separation of combined sewers and interceptor capacity improvements in City of Johnstown
1,200,000
(B) West end flood improvements in the City of Johnstown
5,000,000
(xi) Clearfield County
(A) Morris Township, improvements to water distribution system near West Decatur
500,000
(B) Boggs Township, improvements to water distribution system near Salem area
500,000
(C) Boggs Township, improvements to water distribution system in Spring Valley-Bigler area
500,000
(D) Bradford Township, improvements to water distribution system near Bigler
500,000
(E) Bradford Township, improvements to water distribution system near Millstone area
500,000
(F) Decatur Township, improvements to water distribution system near Mock Hill
500,000
(G) Decatur Township, improvements to water distribution system near Pleasant Hill
500,000
(H) Decatur Township, improvements to water distribution system near Drane Hill
500,000
(I) Woodward Township, improvements to water distribution system near Sanbourn area
500,000
(J) Graham Township, improvements and extensions to water distribution system
2,000,000
(K) Pike Township, improvements and rehabilitation of sewage treatment facilities
1,000,000
(L) Osceola Mills Borough, flood control project to include repair of the culvert box for the complete length of the canal
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(xii) Fayette County
(A) Additional funds for DGS 180-23, construction of retaining walls and culverts and excavation to widen or deepen Dunbar Creek and Gist Run channel in Dunbar
396,000
(Base Project Allocation - $330,000)
(Design and Contingencies - $66,000)
(xiii) Lackawanna County
(A) Funds for DGS 184-22, Phase II, flood control project on Meadowbrook Creek, City of Scranton and Borough of Dunmore
6,200,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,200,000)
(B) Funds for DGS 184-22, flood control project on Leggetts Creek, City of Scranton
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(C) Funds for DGS 184-22, flood control project on Keyser Creek, City of Scranton
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(D) Funds for DGS 184-22, flood control project on Lucky-Run Creek, City of Scranton
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(E) Funds for DGS 184-22, flood control project on Leach Creek, City of Scranton
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(F) Stream restoration of Scott Creek in Dickson City Borough
800,000
(G) Rushbrook Creek Project in Jermyn Borough
4,500,000
(xiv) Lebanon County
(A) Additional funds for Project DGS 182-12 located on Hazel Dyke Flood Control Project
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(xv) Luzerne County
(A) Construction of compact earth levee in area of Fox Hill in Plains Township, including grass-covered channel
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Flood wall improvement project, Newport Creek, Newport Township
240,000
(xvi) Montgomery County
(A) Additional funds for DGS 181-7, Plymouth Creek improvement, Borough of Conshohocken
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Sandy Run drainage shed flood control improvements
6,000,000
(xvii) Northumberland County
(A) Bank stabilization and reconstruction for Sunbury Flood Project
1,440,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $240,000)
(xviii) Tioga County
(A) Borough of Knoxville, flood protection project
5,100,000
(Base Project Allocation - $4,250,000)
(Design and Contingencies - $850,000)
(xix) Warren County
(A) Various flood protection projects
2,500,000
(xx) Westmoreland County
(A) Rehabilitation of the Greater Greensburg Area Flood Protection Project, South Greensburg Borough and Hempfield Township
1,620,000
(Base Project Allocation - $1,350,000)
(Design and Contingencies - $270,000)
(xxi) York County
(A) City of York, Spring Garden Township and York Township, Tyler Run Flood Control Project
2,500,000
(B) Spring Garden Township, Springettsbury Township and York Township, Mill Creek Flood Control Project
5,000,000
(C) Fairview Township, Flood Mitigation Project relating to Meadowbrook Pump Station
50,000
(D) Franklintown Borough, flood control project relating to storm water management
367,000
(E) Yoe Borough and York Township, construction of retention basins on Mill Creek between Locust Avenue in York Township and Boundary Avenue in Yoe Borough
400,000
(7) Department of General Services
$428,873,000
(i) Capitol Complex
(A) Upgrade chillers and humidification systems at the State Museum and Archives Buildings
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(B) Additional funds for DGS 948-37, expansion of central air conditioning system to Main Capitol, including funding to make the appropriate connections, remove the current chiller system and provide heating and cooling throughout
12,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $2,000,000)
(C) Additional funds for Project No. DGS 948-35, Fire Safety Code Improvements, Capitol Complex, to continue the fire safety improvements to the Capitol Building, North and South Office Buildings, Forum, Finance Building, Health and Welfare Building and Labor and Industry Building, including upgrading electrical system for code conformance, abatement of hazardous materials affecting construction, temporary relocation of occupants from construction areas (including new furniture and equipment needed for temporary arrangement) rerouting data, communication and other systems in alignment with fire safety power and lighting improvements and replacement/restoration of finishes in areas modified by fire safety improvements, for Phase I and subsequent phases
138,750,000
(Base Project Allocation - $111,000,000)
(Design and Contingencies - $27,750,000)
(D) Additional funding for Project No. DGS 946-2, renovation and conversion of Old Museum Building for legislative offices for the repair and restoration of the Old Museum Building to include the plaza on the west face of the building, security lighting at basement driveway, restoration and modern replication of historic light fixtures with UL labels and miscellaneous renovation and restoration consistent with the intended purpose
9,660,000
(Base Project Allocation - $8,050,000)
(Design and Contingencies - $1,610,000)
(E) Repair and renovation of the Capitol Complex to provide for the repair of exterior walks, railings and exterior site improvements, the renovation of the Capitol basement and fifth floor corridors, the repair and installation of new catwalks, the renovation of public restrooms, the repair and upgrading of the plumbing system, including the chilled drinking water system, the replacement of the East Wing parametric boards and upgraded HVAC direct digital control, including Central Plant and all associated buildings and the upgrade of power and lighting in Central Plant and service tunnels to the Capitol and associated buildings
14,000,000
(Base Project Allocation - $11,200,000)
(Design and Contingencies - $2,800,000)
(F) Additional funding for Project No. DGS 948-34, repair and restoration work for statuaries and north, south and center porticoes and plaza-level entries of the Capitol Building to continue the repair and restoration of the masonry to the porches and porticoes of the Capitol Building
1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)
(G) Additional funds for DGS 948-9, renovation of the Finance Building
5,203,000
(Base Project Allocation - $4,336,000)
(Design and Contingencies - $867,000)
(H) Acoustical improvements at The Forum
3,000,000
(Base Project Allocation - $2,600,000)
(Design and Contingencies - $400,000)
(I) Restoration of ceiling and wall murals at The Forum
1,490,000
(J) Upgrade fire alarm and security systems in the State Museum and Archives Buildings
700,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $100,000)
(K) Upgrade and installation of new fire suppression system in the State Museum and Archives Buildings
1,875,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $375,000)
(L) Upgrade electrical distribution system in the State Museum and Archives Buildings
4,750,000
(Base Project Allocation - $3,800,000)
(Design and Contingencies - $950,000)
(M) Repair compression joints and stabilize exterior cladding on Museum Building
1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)
(N) Upgrade HVAC systems, including installation of humidification and filtration equipment in the State Museum and Archives Buildings
5,000,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $1,000,000)
(O) Roof replacement, State Museum Building
1,500,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $300,000)
(P) Asbestos abatement in the State Museum and Archives Buildings
1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)
(Q) Upgrade elevator and escalator systems in the State Museum Building
1,250,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $250,000)
(R) Reconstruction of roof and clean, seal and resecure exterior stone panels and doors at the State Museum and Archives Buildings
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(S) Upgrade windows and clean, seal and caulk exterior of State Finance Building
6,600,000
(Base Project Allocation - $5,500,000)
(Design and Contingencies - $1,100,000)
(T) Upgrade windows and exterior door enclosures in Labor and Industry Building
5,280,000
(Base Project Allocation - $4,400,000)
(Design and Contingencies - $880,000)
(U) Upgrade windows and entrance doors and clean and seal exterior granite at Health and Welfare Building
4,600,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $600,000)
(V) Additional funding for Project No. DGS 948-36, waterproofing of Main Capitol, for construction on staging, hoists, cranes and scaffolding, additional parking, restoration of landscaping and grounds disrupted by construction at the Capitol restoration and cleaning of masonry and miscellaneous repairs consistent with the intended purpose
3,900,000
(Base Project Allocation - $3,300,000)
(Design and Contingencies - $600,000)
(ii) Farm Show Complex
(A) Upgrade exterior waterproof membrane, repoint and reset masonry and upgrade entrance doors at the Agriculture Building
518,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $68,000)
(iii) Public Works Complex
(A) Reconstruction of exterior masonry and resealing of the exterior of the Arsenal Building and reconstruction of roof on former ammunition bunker now used as an archive
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(iv) Governor's Residence
(A) Upgrade the heating, ventilating and air conditioning system
127,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $17,000)
(v) Philadelphia State Office Building
(A) Additional funding for Project No. DGS 943-6, improvements to the Philadelphia State Office Building, for the repair and replacement of the heating, ventilation and air conditioning equipment and system components to bring the building into compliance with occupancy codes, including hazardous material abatement and replacement of finishes and building elements necessary to achieve the HVAC improvements
19,200,000
(Base Project Allocation - $16,000,000)
(Design and Contingencies - $3,200,000)
(vi) Summerdale Laboratory Complex
(A) Basic infrastructure and site development for the Laboratory Complex in Summerdale, Cumberland County
5,000,000
(vii) Cogeneration - trash to steam and electrical energy recycling facility to be located on the grounds of the new correctional institution in Western Pennsylvania
22,000,000
(Base Project Allocation - $18,333,000)
(Design and Contingencies - $3,667,000)
(viii) Warner Theater, Erie County
(A) Conversion of the theater into a performing arts center, including additions to the stage area, improvements to mechanical systems and installation of elevators
7,000,000
(Base Project Allocation - $5,833,000)
(Design and Contingencies - $1,167,000)
(B) Erie Civic Center, Louis J. Tullio Convention Arena
500,000
(ix) Pennsylvania Public Law Center, Allegheny County
(A) Acquisition and construction
5,500,000
(x) David L. Lawrence Convention Center
(A) Expansion of convention center
145,000,000
(8) Historical and Museum Commission
$34,156,000
(i) Drake Well State Museum
(A) Boomtown and other exhibit development and construction
2,105,000
(ii) Niagara Maritime Museum
(A) Construction of fixed exhibits
1,750,000
(iii) Pithole State Museum
(A) Development and construction of exterior walkways, boardwalks and signage
100,000
(iv) Restoration of No. 9 Mine and Museum - Lansford
(A) Restoration
1,850,000
(Base Project Allocation - $1,550,000)
(Design and Contingencies - $300,000)
(B) Restoration of Switch-Back Railroad - Summit Hill
16,856,000
(Base Project Allocation - $14,388,000)
(Design and Contingencies - $2,468,000)
(v) Somerset Historical Center
(A) Additional funds for DGS 990-2 for construction of an addition to the center and improvements for parking and entrance area
145,000
(Base Project Allocation - $145,000)
(B) Additional funds for DGS 990-2 for construction of fixed exhibits
150,000
(Base Project Allocation - $150,000)
(vi) Fort Necessity
(A) Construction of the National Road Heritage Park educational interpretative center at Fort Necessity
3,000,000
(vii) Installation of fire protection systems at each of the listed museums or parks:
(A) Anthracite Heritage Museum
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(B) Brandywine Battlefield Historic Park
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(C) Conrad Weiser Historic Park
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(D) Cornwall Iron Furnace
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(E) Daniel Boone Homestead
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(F) Drake Well Museum
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(G) Eckley Miners' Village
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(H) Ephrata Cloister
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(I) Fort Pitt Museum
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(J) Graeme Park
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(K) Hope Lodge/Mather Mill
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(L) Joseph Priestley House
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(M) Landis Valley Museum
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(N) Old Economy Village
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(O) Pennsbury Manor
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(P) Pennsylvania Lumber Museum
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(Q) Pennsylvania Military Museum
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(R) Railroad Museum of Pennsylvania
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(S) Washington Crossing Historic Park
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(viii) Landis Valley Museum
(A) Storage building and Hands-On-House Museum
500,000
(ix) Fort Pitt Museum, Point State Park, Allegheny County. Additional funds for DGS 989-2. Replace and reconstruct roofing system and restore interior finishes to provide for removal of existing failed roofing with sod cover and cribbing, new roof structure that will prohibit trespass from Fort Pitt Bridge approach, with appurtenant structure and finishes, restore, repair or provide new exterior and interior finishes
2,000,000
(Base Project Allocation - $1,600,000)
(Design and Contingencies - $400,000)
(9) Department of Labor and Industry
$7,000,000
(i) Hiram G. Andrews Center
(A) Upgrade and repair of facility
7,000,000
(10) Department of Military and Veterans Affairs
$41,963,000
(i) Cambria County Armory at Johnstown
(A) Renovation and addition
1,380,000
(Base Project Allocation - $1,150,000)
(Design and Contingencies - $230,000)
(ii) Erie, Soldiers' and Sailors' Home
(A) New construction of two sunrooms and conversion of existing porch to a sunroom in the Patient Care Building
470,000
(Base Project Allocation - $392,000)
(Design and Contingencies - $78,000)
(iii) Franklin County Veterans Care Facility
(A) South Mountain Restoration Center
12,000,000
(Base Project Allocation - $10,400,000)
(Design and Contingencies - $1,600,000)
(iv) Hollidaysburg Veterans Home
(A) Improvements to facility roadways and parking lots
1,000,000
(v) Southeastern Veterans Home
(A) Expansion of parking facility
285,000
(vi) Scotland School
(A) Additional funds for project DGS 415-29, reconstruction of the main dining hall
500,000
(vii) Western maneuver training area
(A) To acquire three parcels of land, 5,300 acres more or less, to establish a tracked vehicle maneuver training area in Western Pennsylvania for the Pennsylvania National Guard
8,000,000
(viii) Easton Armory in Northampton County
(A) Construction of a new facility in Northampton County and supporting facilities to include military and off-street parking, access roads and sidewalks
1,370,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $70,000)
(Design and Contingencies - $300,000)
(ix) Armory at Latrobe
(A) Construction of a new armory at Latrobe, Westmoreland County, to replace existing armories at Blairsville and Latrobe
1,800,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $300,000)
(Design and Contingencies - $200,000)
(x) Armory at Tioga County
(A) Construction of a new armory in Tioga County to replace existing armories at Mansfield and Wellsboro
1,363,000
(Base Project Allocation - $1,163,000)
(Design and Contingencies - $200,000)
(xi) Maintenance Shop at Johnstown
(A) Land acquisition for the construction of an operations maintenance shop at Johnstown, Cambria County
300,000
(xii) Cambria County War Memorial Expansion
10,000,000
(xiii) Pennsylvania Veterans Memorial
(A) Construction of the Pennsylvania Veterans Memorial at Fort Indiantown Gap in Lebanon County. This project will be constructed entirely with private donations, therefore requiring no State funds
3,495,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $495,000)
(11) Department of Public Welfare
$24,844,000
(i) Norristown State Hospital
(A) Reconstruction or replacement of boilers to meet emissions requirements and upgrade the steam distribution system
3,924,000
(Base Project Allocation - $3,270,000)
(Design and Contingencies - $654,000)
(ii) Clarks Summit State Hospital
(A) Additional funds for project DGS 502-25, renovation of power plant boilers and distribution system
4,480,000
(Base Project Allocation - $3,480,000)
(Design and Contingencies - $1,000,000)
(iii) Danville State Hospital
(A) Installation of upgraded high voltage distribution cables throughout system
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(B) Install perimeter fence around the Reed Building for the Secure Juvenile Facility
200,000
(Base Project Allocation - $167,000)
(Design and Contingencies - $33,000)
(iv) South Mountain Restoration Center
(A) Installation of integrated and updated fire alarm system for entire facility
2,160,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $360,000)
(v) Ebensburg Center
(A) Additional funds for project DGS 583-11, replacement of steam lines
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(vi) Polk Center
(A) Installation of integrated and updated fire alarm system for entire facility
1,440,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $240,000)
(vii) White Haven Center
(A) Upgrade of electrical distribution system
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(viii) Loysville Youth Development Center
(A) Install upgraded locks for selected secure areas
100,000
(Base Project Allocation - $83,000)
(Design and Contingencies - $17,000)
(B) Install a perimeter intrusion detection and warning system
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(ix) New Castle Youth Development Center
(A) Install upgraded locks for selected secure areas
135,000
(Base Project Allocation - $113,000)
(Design and Contingencies - $22,000)
(x) Bensalem Youth Development Center
(A) Install Electronic Monitoring System and Visitor Center
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Replace underground high voltage primary electrical cabling
185,000
(Base Project Allocation - $154,000)
(Design and Contingencies - $31,000)
(xi) Eastern Pennsylvania Psychiatric Institute
(A) Upgrade of patient units to come into code compliance and general improvements
5,500,000
(B) Renovations and improvements to heating, ventilation and air conditioning system
2,500,000
(C) Building envelope repairs and window replacement
2,000,000
(12) Pennsylvania State Police
$4,680,000
(i) Trevose Station, Bucks County
(A) Demolition of existing structure and construction of new building on site
2,000,000
(ii) Hollidaysburg Troop Headquarters
(A) Additional funds for DGS 201-3, renovation and expansion of headquarters
2,680,000
(Base Project Allocation - $2,233,000)
(Design and Contingencies - $447,000)
(13) State System of Higher Education
$572,538,000
(i) Bloomsburg State University
(A) Addition to Hartline Science
6,806,000
(B) ((B) June 22, 2000, P.L.136, No.27)
(C) Renovation of Andrus Building
7,280,000
(ii) California State University
(A) Demolition of Reed Hall
330,000
(B) Renovation of Old Main and South Hall
8,827,000
(C) Addition to and renovation of Steel Auditorium
5,718,000
(D) Renovation of Vulcan Hall
1,668,000
(E) Renovation of Noss Hall
3,366,000
(F) Installation of water backflow preventers, campuswide
497,000
(G) Pedestrian and vehicular enhancement, Phase I
4,592,000
(H) Construction of a new dormitory
10,000,000
(iii) Cheyney University of Pennsylvania
(A) Addition to and renovation of athletic facility
3,022,000
(B) Infrastructure renovations, Phase II
2,916,000
(C) Renovation of Bailey Hall
4,369,000
(iv) Clarion State University
(A) Renovate/upgrade communication and electrical system
4,944,000
(B) Replace steam lines, Phase III
5,476,000
(C) Addition to and renovation of Carlson Library
17,060,000
(D) Renovation of Pierce Science Center
19,762,000
(v) East Stroudsburg State University
(A) ((A) repealed June 22, 2000, P.L.136, No.27)
(B) Addition to and renovation of auditorium
4,900,000
(C) Renovation of LeRue Arts
861,000
(D) Upgrade infrastructure and storm water management system
4,920,000
(E) Addition to and renovation of stadium complex
3,226,000
(F) Renovation of Fine and Performing Arts Building
1,080,000
(G) Renovation of and addition to storeroom and garage
2,378,000
(vi) Edinboro State University
(A) Renovation of Butterfield Hall
4,936,000
(B) Rehabilitation of campus infrastructure
5,820,000
(C) Renovation of Memorial Auditorium
2,498,000
(D) Renovation of Heather Hall
2,267,000
(E) Renovation of Baron-Forness Library
5,772,000
(vii) Indiana State University
(A) Renovation of Stabley Library
4,632,000
(B) Construction of a replacement facility for Wyandt Hall, Armstrong Campus
5,250,000
(C) Construction of a replacement facility for Old Main, Punxsutawney Campus
4,632,000
(D) Addition to and renovation of Cogswell Hall
8,888,000
(E) Renovation of Keith Hall
7,057,000
(F) Renovation of John Sutton Hall, Phase I
7,382,000
(G) Renovation of Leonard Hall
5,252,000
(viii) Kutztown State University
(A) Renovation of Graduate Center
3,598,000
(B) Addition to and renovation of science buildings
18,662,000
(C) Construction of Kutztown University access road
2,760,000
(D) Renovation of Shaeffer Auditorium
5,206,000
(E) Addition to or renovation of maintenance building
4,198,000
(F) Renovation and upgrade of boiler plant
2,857,000
(G) Renovation of Reisley Hall
2,635,000
(ix) Lock Haven State University
(A) Renovation of New Ulmer Hall
6,720,000
(B) Renovation of Zimmerli Gym
7,306,000
(C) Addition to and renovation of Jack Stadium, Phase III
2,798,000
(D) Renovation of Lusk Run Conduit
1,560,000
(E) Construction of building to serve as branch campus in Clearfield County
5,000,000
(x) Mansfield State University
(A) Addition to and renovation of Grant Science
9,959,000
(B) Addition to and renovation of home economics center
6,672,000
(C) Renovation of South Hall
4,178,000
(xi) Millersville State University
(A) Addition to and renovation of McComsey Hall
7,657,000
(B) Renovation of Gerhart Hall
236,000
(C) Addition to and renovation of Stayer Hall
6,835,000
(D) Renovation of Roddy Science Center
5,870,000
(E) Renovation of Lyle Hall
2,681,000
(F) ((F) repealed June 22, 2000, P.L.136, No.27)
(G) Renovation of Ganser Building
5,914,000
(H) Renovation of Wickersham Hall
2,123,000
(I) Upgrade of electrical utility system
6,480,000
(xii) Shippensburg State University
(A) Renovation of Horton Hall
6,920,000
(B) Renovation of Gilbert and Stewart Halls
3,478,000
(C) Construction of instructional arts facility
19,853,000
(D) Addition to and renovation of Lehman Library
19,778,000
(E) Reconstruction of roadways, sidewalks and parking facilities
4,618,000
(F) Renovation of Franklin Science Center
14,514,000
(G) Renovation of Huber Arts Center and Counselor Education Building
2,798,000
(H) Addition to and renovation of Shippen Hall
15,814,000
(I) Upgrade Steam Plant Boiler No. 4
563,000
(J) ((J) repealed June 22, 2000, P.L.136, No.27)
(K) Renovation of Dauphin Humanities
4,124,000
(L) Construction of Central Services Building
1,529,000
(xiii) Slippery Rock State University
(A) ((A) repealed June 22, 2000, P.L.136, No.27)
(B) Renovation of West Hall
2,297,000
(C) Renovation of Morrow Field House
14,643,000
(D) Reconstruction of roadways, sidewalks and parking areas
1,530,000
(E) Construction of physical therapy building
6,540,000
(F) Renovation of steam distribution system, Phase II
7,680,000
(xiv) West Chester State University
(A) Renovation of Francis Harvey Green Building
4,154,000
(B) Construction of classroom facility
12,959,000
(C) Renovation of Schmucker Science, Phase III
15,842,000
(D) Renovation of Lawrence Hall
3,051,000
(E) Construction of computing/instructional technology center
10,931,000
(F) Construction of all-purpose outdoor physical education and athletic fields
3,314,000
(G) Infrastructure upgrade/code updates, Phase I
11,158,000
(H) Construction of Recital Hall
3,317,000
(I) Addition to and renovation of Eringer Gym and Special Education Building
3,883,000
(xv) Systemwide project
(A) Alteration of facilities for ADA compliance
34,569,000
(14) Department of Transportation
$175,782,000
(i) Road Signage
(A) Purchase and erection of highway signs in Fayette, Westmoreland and Somerset Counties to promote access to Laurel Highlands
400,000
(B) Purchase and erection of highway signs in the surrounding and adjacent counties to promote the Allegheny National Forest and Kinzua Reservoir
350,000
(ii) Erie County Welcome Center
(A) Additional funds to construct a new welcome center
3,423,000
(Base Project Allocation - $2,759,000)
(Land Allocation - $120,000)
(Design and Contingencies - $544,000)
(iii) Harrisburg International Airport
(A) Replacement of the concrete surface of Runway 13-31
11,268,000
(Base Project Allocation - $11,268,000)
(B) Construction of a centralized de-icing facility and the modification of the hold pad at Runway 13 for secondary de-icing
8,936,000
(Base Project Allocation - $8,936,000)
(iv) Allegheny County
(A) High-performance precision manufacturing technology development by the Institute for Precision Technologies for use in bridge structures, hermetically sealed box beams and other metal-fabricated infrastructure components for transportation systems
1,000,000
(B) ((B) repealed June 22, 2000, P.L.136, No.27)
(v) Blair County
(A) Construction of new maintenance building at District 9-0 headquarters
700,000
(Base Project Allocation - $645,000)
(Design and Contingencies - $55,000)
(vi) Lackawanna County
(A) Borough of Taylor, road construction, including storm sewers and curbing on Oak Street, from Keyser Avenue to Main Street
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(B) Borough of Taylor, road reconstruction, including storm sewers and curbing on Keyser Avenue, from the Taylor/Scranton line to the Taylor/Old Forge line
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(C) Borough of Taylor, road reconstruction, including storm sewers and curbing on Union Street, from Keyser Avenue to North Main Street
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(D) Borough of Taylor, road reconstruction, including storm sewers and curbing on Main Street, from the Taylor/Scranton line to the Taylor/Old Forge line
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(E) Borough of Dunmore, road reconstruction, including storm sewers and curbing on Blakely Street, from the Dunmore/Throop line to Dunmore/Scranton line
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(F) Borough of Dunmore, road reconstruction, including storm sewers and curbing on Green Ridge Street, from Dunmore/Scranton line to Blakely Street, Dunmore
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(G) Borough of Dunmore, road reconstruction, including storm sewers and curbing on Drinker Street, from Blakely Street to I-81
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(H) Borough of Throop, road reconstruction, including storm sewers and curbing on Cypress Street (northbound and southbound lanes), from Throop/Dunmore line to Throop/Olyphant line
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(I) City of Scranton, road reconstruction, including storm sewers and curbing on Green Ridge Street, from North Main Avenue to Scranton/Dunmore line
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(J) City of Scranton, road reconstruction, including storm sewers and curbing on Providence Road, from Olive Street to North Main Avenue
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(K) City of Scranton, road reconstruction, including storm sewers and curbing on Main Avenue, from Scranton/Taylor line to Scranton/Dickson City line
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(L) City of Scranton, road reconstruction, including storm sewers and curbing on Keyser Avenue, from Scranton/Taylor line to West Market Street
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(M) City of Scranton, road reconstruction, including storm sewers and curbing on Jackson Street, from Keyser Avenue to Newton Road
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(N) City of Scranton, road reconstruction, including storm sewers and curbing on Newton Road, from Jackson Street to Scranton/Ransom Township line
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(O) City of Scranton, road reconstruction, including storm sewers and curbing on Luzerne Street, from North Main Avenue to Keyser Avenue
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(P) Borough of Dunmore, flood control and storm water project, including, but not limited to, storm sewers and road reconstruction and pumping stations in the area of Clay Avenue, Quincy Avenue, Madison Avenue, Jefferson Avenue and Adams Avenue; Marion Street, Green Ridge Street and Electric Street
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(Q) Borough of Taylor, flood control and storm water project, including, but not limited to, storm sewers and road reconstruction and pumping stations in the area of Green View West, including Walnut Street, Oak Street, Williams Street and Prince Street; Mackie Lane, Vine Lane, Laurel Lane, Chester Lane and Bichler Lane; Rinaldi Drive, Barbara Drive; Donny Drive and Anthony Drive
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(vii) Montgomery County
(A) Reconstruction and rehabilitation of Main Street from Beaver Street to Prospect Avenue, Borough of North Wales
1,715,000
(viii) Montour County
(A) Additional funds for project DGS 251-35, construction of transportation maintenance shed
500,000
(B) Construction of a satellite maintenance building
1,200,000
(ix) Philadelphia, Delaware and Bucks Counties
(A) Dredging of the channel of the Delaware River from 40 to 45 feet
15,000,000
(x) City of Erie
(A) Improvements to city enterprise zone transportation infrastructure
530,000
(xi) Adams County Welcome Center
(A) Additional funds for project DGS 657-6, to construct a new welcome center
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(xii) Susquehanna County Welcome Center
(A) Additional funds for project DGS 657-13, to construct welcome center in Great Bend Township
1,320,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $220,000)
(xiii) Harrisburg area
(A) Additional funds for a new testing laboratory
14,400,000
(Base Project Allocation - $12,000,000)
(Design and Contingencies - $2,400,000)
(xiv) Venango County
(A) Acquisition of a new district office building in Oil City
1,000,000
(xv) Forest County
(A) Construction of new welcome center
350,000
(xvi) McKean County
(A) Construction of new welcome center
350,000
(xvii) Warren County
(A) Construction of new welcome center
350,000
(xviii) Port of Philadelphia
(A) Improvements to the Ameriport Intermodal connection facility
5,000,000
(B) Acquisition of two container cranes
15,000,000
(xix) Lawrence County
(A) Installation of traffic signals on SR 0168 in Taylor Township
250,000
Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.