Itemization of Motor License Fund projects

Act 52 of 2017, § 15, under CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2017-2018 - ENACTMENT.

Act 52 of 2017, § 15

Section 15. Itemization of Motor License Fund projects.

Additional capital projects in the category of public improvement projects for which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt or from current revenues in the Motor License Fund are hereby itemized, together with their respective costs, as follows:

Project

Total Project

Allocation

(1) Adams County

(A) Construct a new facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(B) Construct a new facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(C) Construct a new general storage building

Project Allocation

500,000

(D) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

350,000

(E) Construct four new general storage buildings

Project Allocation

2,000,000

(F) Construct two new general storage buildings

Project Allocation

1,000,000

(G) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

500,000

(H) Construct, upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(2) Allegheny County

(A) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

1,000,000

(B) Retrofit the WEPTA facility with vehicle wash drains, including site work, utilities and equipment

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(E) Replace the roofing system at the county maintenance facility

Project Allocation

550,000

(F) Replace the roofing system at the Allegheny County 01 Office

Project Allocation

550,000

(G) Develop a new maintenance garage at the Liberty Tunnel site, including site acquisition and development

Project Allocation

3,000,000

(H) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(I) Construct two new general storage buildings

Project Allocation

2,000,000

(J) Construct two new general storage buildings

Project Allocation

1,000,000

(K) Construct two new general storage buildings

Project Allocation

1,000,000

(L) Construct a new general storage building

Project Allocation

500,000

(M) Renovate and expand District Office 11-0, including upgrading building systems and energy efficiencies

Project Allocation

4,000,000

(N) Renovate, expand or replace Roadside Rest Area #11

Project Allocation

3,500,000

(O) Renovate, expand or replace Roadside Rest Area #12

Project Allocation

3,500,000

(P) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(Q) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(R) Construct five-person personnel staging building

Project Allocation

2,000,000

(S) Upgrade or replace security camera system at Driver Licensing Center at Greensburg Road, including design, construction and installation

Project Allocation

350,000

(T) Upgrade or replace security camera system at Driver Licensing Center at Smithfield Street, including design, construction and installation

Project Allocation

350,000

(U) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(V) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(3) Armstrong County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Retrofit and separate floor drains at the County Maintenance Stockpile - Kiski Site

Project Allocation

1,000,000

(C) Retrofit and separate floor drains at the County Maintenance Stockpile - Wayne Site

Project Allocation

1,000,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(4) Beaver County

(A) Replace the backup electrical generator at the County Office

Project Allocation

600,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(C) Replace the backup electrical generator and electrical systems upgrades

Project Allocation

1,000,000

(D) Construct two new general storage buildings

Project Allocation

1,000,000

(E) Construct two new general storage buildings

Project Allocation

1,000,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(J) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(5) Bedford County

(A) Separate roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(B) Separate roof and floor drains and install an oil/water separator at the County Maintenance Garage

Project Allocation

500,000

(C) Construct three new general storage buildings

Project Allocation

1,500,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Construct three new salt storage buildings or renovate three existing salt storage buildings

Project Allocation

1,500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(J) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(6) Berks County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Staunton Site

Project Allocation

500,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Reading Site

Project Allocation

500,000

(D) Construct a new general storage building

Project Allocation

500,000

(E) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,300,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(7) Blair County

(A) Replace the backup generator at the County Office

Project Allocation

600,000

(B) Construct three new general storage buildings

Project Allocation

1,500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct three new salt storage buildings or renovate three existing salt storage buildings

Project Allocation

1,500,000

(E) Replace the backup electrical generator at the County Maintenance Facility

Project Allocation

600,000

(F) Renovate and expand District Office 9-0

Project Allocation

4,000,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(J) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(8) Bradford County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building and personnel staging building

Project Allocation

600,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(9) Bucks County

(A) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Renovate, expand or replace Roadside Rest Area Site P

Project Allocation

3,500,000

(D) Construct a salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(10) Butler County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(11) Cambria County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Replace or upgrade security camera system at Driver Licensing Center at Walters Avenue, including design, construction and installation

Project Allocation

350,000

(G) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(12) Cameron County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Renovate and expand the Bridge Beam Facility, including site acquisition and development

Project Allocation

3,000,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(13) Carbon County

(A) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(14) Centre County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Retrofit and separate floor drains at the County Maintenance Stockpile

Project Allocation

1,000,000

(D) Renovate, expand or replace Roadside Rest Area Site 29

Project Allocation

3,500,000

(E) Renovate, expand or replace Roadside Rest Area Site 30

Project Allocation

3,500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(I) Replace or upgrade security camera system at Driver Licensing Center at West College Avenue, including design, construction and installation

Project Allocation

350,000

(J) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(15) Chester County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(16) Clarion County

(A) Renovate and expand the vehicle weigh station at the County Maintenance Garage

Project Allocation

2,000,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Replace the roofing system at the County Maintenance Facility

Project Allocation

550,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(17) Clearfield County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Renovate and expand District Office 2-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building, including site acquisition and development

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(18) Clinton County

(A) Construct a new maintenance facility or renovate the existing maintenance facility, including site acquisition, design, construction and utility work

Project Allocation

2,500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Upgrade the existing sewage treatment plant at Roadside Rest Area Site 33

Project Allocation

1,000,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(19) Columbia County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Renovate, expand or replace Roadside Rest Area Site 37

Project Allocation

3,500,000

(C) Renovate, expand or replace Roadside Rest Area Site 38

Project Allocation

3,500,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(20) Crawford County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Renovate and expand the Bridge Beam Facility

Project Allocation

3,000,000

(E) Retrofit and separate the floor drains at the County Maintenance Stockpile

Project Allocation

1,000,000

(F) Renovate, expand or replace Roadside Rest Area Site 19

Project Allocation

3,500,000

(G) Renovate, expand or replace Roadside Rest Area Site 20

Project Allocation

3,500,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(K) Replace or upgrade security camera system at Driver Licensing Center at Patricia Drive, including design, construction and installation

Project Allocation

350,000

(L) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(21) Cumberland County

(A) Construct a new general storage building

Project Allocation

500,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

400,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(E) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(I) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(22) Dauphin County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Renovate the Dauphin County Sign Shop Facility by sandblasting, priming and painting Buildings 5, 6, 7 and 8

Project Allocation

500,000

(C) Renovate the Dauphin County Sign Shop Facility, including painting, siding, utility relocation, roof and gutter system upgrades and building system upgrades

Project Allocation

800,000

(D) Replace the roofing system at the Dauphin County Sign Shop

Project Allocation

400,000

(E) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment - Susquehanna Site

Project Allocation

350,000

(F) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment - Washington Site

Project Allocation

350,000

(G) Construct two new general storage buildings

Project Allocation

1,000,000

(H) Construct three new general storage buildings

Project Allocation

1,500,000

(I) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(J) Renovate and expand District Office 8-0, including system upgrades and energy efficiencies

Project Allocation

4,000,000

(K) Renovate, expand or replace Roadside Rest Area Site 47

Project Allocation

3,500,000

(L) Renovate, expand or replace Roadside Rest Area Site 48

Project Allocation

3,500,000

(M) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(N) Construct a new Server Farm or renovate the existing Server Farm facility

Project Allocation

3,500,000

(O) Reorganize and modify the PennDOT offices located in the Keystone Building

Project Allocation

1,750,000

(P) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(Q) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(R) Construct five-person personnel staging building

Project Allocation

2,000,000

(S) Replace or upgrade security camera system at Driver Licensing Center at Elmerton Avenue, including design, construction and installation

Project Allocation

350,000

(T) Replace or upgrade security camera system at Driver Licensing Center at ROC, including design, construction and installation

Project Allocation

350,000

(U) Renovate and expand Shop Sign Facility, including design and construction

Project Allocation

4,000,000

(V) Renovate and expand Material Testing Laboratory, including design and construction

Project Allocation

4,000,000

(W) Renovate and expand Server Farm facility, including design and construction

Project Allocation

4,000,000

(23) Delaware County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment - Media Site

Project Allocation

1,500,000

(B) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment - site to be determined

Project Allocation

1,400,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(E) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(F) Renovate, expand or replace the Welcome Center Site N

Project Allocation

3,500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(24) Elk County

(A) Construct a new maintenance facility or renovate an existing maintenance facility

Project Allocation

2,500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(25) Erie County

(A) Replace the backup electrical generator at the Erie County Welcome Center

Project Allocation

600,000

(B) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Retrofit and separate floor drains at the County Maintenance Stockpile - Albion Site

Project Allocation

1,000,000

(F) Retrofit and separate floor drains at the County Maintenance Stockpile - Union City Site

Project Allocation

1,000,000

(G) Replace the roofing system at the County Maintenance Facility

Project Allocation

600,000

(H) Renovate, expand or replace Roadside Rest Area Site L

Project Allocation

3,500,000

(I) Renovate, expand or replace Welcome Center Site M

Project Allocation

3,500,000

(J) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(K) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(L) Construct five-person personnel staging building

Project Allocation

2,000,000

(26) Fayette County

(A) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Garage and Stockpile

Project Allocation

500,000

(B) Replace the backup electrical generator at the District Office - Uniontown Site

Project Allocation

1,000,000

(C) Replace the backup electrical generator at the District Office - Fayette County Office

Project Allocation

1,000,000

(D) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Uniontown Site

Project Allocation

500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(G) Renovate, expand or replace District Office 12-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(H) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(I) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(J) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(K) Construct five-person personnel staging building

Project Allocation

2,000,000

(L) Replace or upgrade security camera system at Driver Licensing Center at North Gallatin Avenue, including design, construction and installation

Project Allocation

350,000

(M) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(N) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(27) Forest County

(A) Construct a new maintenance facility or renovate an existing maintenance facility

Project Allocation

2,500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(28) Franklin County

(A) Construct a new general storage building

Project Allocation

500,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct a new general storage building

Project Allocation

500,000

(D) Construct three new general storage buildings

Project Allocation

1,500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Renovate, expand or replace Welcome Center Site G

Project Allocation

3,500,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(29) Fulton County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - McConnellsburg Site

Project Allocation

500,000

(D) Construct three new general storage buildings

Project Allocation

1,500,000

(E) Construct a new general storage building

Project Allocation

550,000

(F) Design and construct a new bridge beam fabrication facility

Project Allocation

3,000,000

(G) Construct three new salt storage buildings or renovate three existing salt storage buildings

Project Allocation

1,500,000

(H) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Garage and Stockpile

Project Allocation

500,000

(I) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

1,000,000

(J) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(K) Replace the boiler and HVAC systems at the County Maintenance Facility

Project Allocation

650,000

(L) Construct a new general storage building

Project Allocation

500,000

(M) Construct a new salt brine operation facility, including equipment and materials

Project Allocation

750,000

(N) Renovate, expand or replace Roadside Rest Area Site 3

Project Allocation

3,500,000

(O) Renovate, expand or replace Welcome Center Site B

Project Allocation

$3,500,000

(P) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(Q) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(R) Construct five-person personnel staging building

Project Allocation

2,000,000

(30) Greene County

(A) Construct two new general storage buildings

Project Allocation

1,000,000

(B) Replace the HVAC system at the County Maintenance Facility

Project Allocation

900,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Waynesburg Site

Project Allocation

500,000

(D) Replace the backup electrical generator at the Greene County Welcome Center

Project Allocation

600,000

(E) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Garage and Stockpile

Project Allocation

500,000

(F) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

1,000,000

(G) Construct a new maintenance facility or renovate an existing maintenance facility, including site acquisition, design, construction and utility work

Project Allocation

3,000,000

(H) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(I) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(J) Renovate, expand or replace Welcome Center Site D

Project Allocation

3,500,000

(K) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(L) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(M) Construct five-person personnel staging building

Project Allocation

2,000,000

(N) Replace or upgrade security camera system at Driver Licensing Center at Willow Road, including design, construction and installation

Project Allocation

350,000

(O) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(P) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(31) Huntingdon County

(A) Construct a new general storage building

Project Allocation

550,000

(B) Construct a new general storage building

Project Allocation

550,000

(C) Replace the backup electrical generator at the County Maintenance Facility

Project Allocation

600,000

(D) Replace the backup electrical generator at the County Office

Project Allocation

600,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Replace the roofing system at the County Maintenance Facility

Project Allocation

600,000

(G) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(32) Indiana County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

750,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Renovate and expand District Office 10-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(E) Construct a regional salt storage building, including site acquisition and development

Project Allocation

1,500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(33) Jefferson County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,500,000

(D) Renovate, expand or replace Roadside Rest Area Site 25

Project Allocation

3,500,000

(E) Renovate, expand or replace Roadside Rest Area Site 26

Project Allocation

3,500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(34) Juniata County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(35) Lackawanna County

(A) Construct a vehicle wash facility or retrofit an existing facility

Project Allocation

1,500,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(C) Replace the roofing system at the County Maintenance Facility

Project Allocation

600,000

(D) Renovate, expand or replace Roadside Rest Area Site 55

Project Allocation

3,500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(F) Renovate and expand District Office 4-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(G) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(36) Lancaster County

(A) Construct a new general storage building

Project Allocation

500,000

(B) Replace the boiler and HVAC systems at the County Maintenance Facility

Project Allocation

600,000

(C) Construct two new general storage buildings

Project Allocation

1,000,000

(D) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

350,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Construct new, upgrade or replace salt storage building

Project Allocation

500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(37) Lawrence County

(A) Construct two new general storage buildings

Project Allocation

1,000,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Garage and Stockpile

Project Allocation

500,000

(D) Replace the backup electrical generator at the County Office

Project Allocation

600,000

(E) Renovate the sewage treatment system and water supply equipment at Roadside Rest Area Sites 15 and 16

Project Allocation

1,000,000

(F) Replace the backup electrical generator at the County Maintenance Facility

Project Allocation

600,000

(G) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

1,000,000

(H) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(I) Renovate, expand or replace Roadside Rest Area Site 15

Project Allocation

3,500,000

(J) Renovate, expand or replace Roadside Rest Area Site 16

Project Allocation

3,500,000

(K) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(L) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(M) Construct five-person personnel staging building

Project Allocation

2,000,000

(N) Replace or upgrade security camera system at Driver Licensing Center at Old Youngstown Road, including design, construction and installation

Project Allocation

350,000

(O) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(P) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(38) Lebanon County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

350,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Replace or upgrade security camera system at Driver Licensing Center at Old Cumberland Street, including design, construction and installation

Project Allocation

350,000

(I) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(39) Lehigh County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(C) Replace the HVAC system at the County Maintenance Facility

Project Allocation

500,000

(D) Construct a new general storage building

Project Allocation

500,000

(E) Construct two new general storage buildings

Project Allocation

1,000,000

(F) Construct two new general storage buildings

Project Allocation

1,000,000

(G) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(H) Renovate and expand District Office 5-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(I) Construct a regional salt storage building, including site acquisition and development

Project Allocation

1,500,000

(J) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(K) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(L) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(M) Construct five-person personnel staging building

Project Allocation

2,000,000

(40) Luzerne County

(A) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new salt brine operation facility, including equipment and materials

Project Allocation

750,000

(E) Renovate, expand or replace Roadside Rest Area Site 39

Project Allocation

3,500,000

(F) Renovate, expand or replace Roadside Rest Area Site 53

Project Allocation

3,500,000

(G) Renovate, expand or replace Roadside Rest Area Site 54

Project Allocation

3,500,000

(H) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(I) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(J) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(K) Construct five-person personnel staging building

Project Allocation

2,000,000

(L) Replace or upgrade security camera system at Driver Licensing Center at Hanover Street, including design, construction and installation

Project Allocation

350,000

(M) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(41) Lycoming County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Renovate and expand District Office 3-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(42) McKean County

(A) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(43) Mercer County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,500,000

(B) Replace equalization tanks and containment enclosures at Roadside Rest Area Sites 17 and 18

Project Allocation

2,000,000

(C) Renovate, expand or replace Welcome Center Site E

Project Allocation

3,500,000

(D) Renovate and expand the Bridge Beam Facility

Project Allocation

3,000,000

(E) Retrofit and separate floor drains at the County Maintenance Stockpile

Project Allocation

1,000,000

(F) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(G) Construct a new maintenance facility or renovate an existing maintenance facility

Project Allocation

2,500,000

(H) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(I) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(J) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(K) Construct five-person personnel staging building

Project Allocation

2,000,000

(L) Replace or upgrade security camera system at Driver Licensing Center at Greenville Road, including design, construction and installation

Project Allocation

350,000

(M) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(44) Mifflin County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Replace or upgrade security camera system at Driver Licensing Center at Ferguson Valley Road, including design, construction and installation

Project Allocation

350,000

(G) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(45) Monroe County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Tobyhanna Site

Project Allocation

500,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility - Stroudsburg Site

Project Allocation

500,000

(D) Construct a new general storage building

Project Allocation

500,000

(E) Replace the roofing system at the County Maintenance Facility

Project Allocation

500,000

(F) Resurface the garage floor at the County Maintenance Garage

Project Allocation

450,000

(G) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(H) Renovate, expand or replace Roadside Rest Area Site 41

Project Allocation

3,500,000

(I) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(J) Renovate, expand or replace Welcome Center Site F

Project Allocation

3,500,000

(K) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(L) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(M) Construct five-person personnel staging building

Project Allocation

2,000,000

(N) Replace or upgrade security camera system at Driver Licensing Center at Manor Drive, including design, construction and installation

Project Allocation

350,000

(46) Montgomery County

(A) Construct a new general storage building

Project Allocation

500,000

(B) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,400,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Construct a new general storage building

Project Allocation

500,000

(E) Renovate and expand District Office 6-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(47) Montour County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Renovate, expand or replace Roadside Rest Area Site 35

Project Allocation

3,500,000

(D) Renovate, expand or replace Roadside Rest Area Site 36

Project Allocation

3,500,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(H) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(48) Northampton County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,500,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

500,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(49) Northumberland County

(A) Renovate and expand the Bridge Beam Facility

Project Allocation

3,000,000

(B) Retrofit and separate the floor drains at the County Maintenance Stockpile

Project Allocation

1,000,000

(C) Replace the roofing system at the County Maintenance Facility

Project Allocation

600,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(I) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(50) Perry County

(A) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(51) Philadelphia County

(A) Construct a new general storage building

Project Allocation

500,000

(B) Construct a new vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,500,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(E) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(F) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(G) Construct five-person personnel staging building

Project Allocation

2,000,000

(52) Pike County

(A) Construct two new general storage buildings

Project Allocation

1,000,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(D) Renovate, expand or replace Roadside Rest Area Site 61

Project Allocation

3,500,000

(E) Renovate, expand or replace Roadside Rest Area Site 62

Project Allocation

3,500,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Renovate, expand or replace Welcome Center Site K

Project Allocation

3,500,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(53) Potter County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(54) Schuylkill County

(A) Construct a new vehicle wash facility or retrofit an existing facility

Project Allocation

1,000,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Replace or upgrade security camera system at Driver Licensing Center at East Main Street, including design, construction and installation

Project Allocation

350,000

(H) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(55) Snyder County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new maintenance facility or renovate an existing maintenance facility

Project Allocation

2,500,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Replace or upgrade security camera system at Driver Licensing Center at Route 522, including design, construction and installation

Project Allocation

350,000

(H) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(I) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(56) Somerset County

(A) Construct two new general storage buildings

Project Allocation

1,000,000

(B) Construct three new general storage buildings

Project Allocation

1,500,000

(C) Construct three new general storage buildings

Project Allocation

1,500,000

(D) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

1,000,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Construct a new maintenance facility or renovate an existing maintenance facility

Project Allocation

1,000,000

(G) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(H) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(I) Construct five-person personnel staging building

Project Allocation

2,000,000

(J) Replace or upgrade security camera system at Driver Licensing Center at Glades Pike, including design, construction and installation

Project Allocation

350,000

(K) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(L) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(57) Sullivan County

(A) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(58) Susquehanna County

(A) Construct a vehicle wash facility or retrofit an existing facility, including site work, utilities and equipment

Project Allocation

1,000,000

(B) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(C) Construct a new general storage building

Project Allocation

500,000

(D) Construct a new general storage building

Project Allocation

500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Renovate, expand or replace Roadside Rest Area Site 56

Project Allocation

3,500,000

(G) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(H) Renovate, expand or replace Welcome Center Site H

Project Allocation

3,500,000

(I) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(J) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(K) Construct five-person personnel staging building

Project Allocation

2,000,000

(59) Tioga County

(A) Renovate, expand or replace Welcome Center Site T

Project Allocation

3,500,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(60) Union County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(C) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(D) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(E) Construct five-person personnel staging building

Project Allocation

2,000,000

(F) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(61) Venango County

(A) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(B) Renovate and expand District Office 1-0, including building system upgrades and energy efficiencies

Project Allocation

4,000,000

(C) Renovate, expand or replace Roadside Rest Area Site 21

Project Allocation

3,500,000

(D) Renovate, expand or replace Roadside Rest Area Site 22

Project Allocation

3,500,000

(E) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000

(I) Replace or upgrade security camera system at Driver Licensing Center at Airport Road, including design, construction and installation

Project Allocation

350,000

(J) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(62) Warren County

(A) Renovate and expand the Bridge Beam Facility

Project Allocation

3,000,000

(B) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(E) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(F) Construct five-person personnel staging building

Project Allocation

2,000,000

(G) Replace or upgrade security camera system at Driver Licensing Center at Hatch Run Road, including design, construction and installation

Project Allocation

350,000

(H) Renovate and expand Driver Licensing Center, including design, construction, roof replacement, building system upgrades, site improvements and sewage plant upgrades

Project Allocation

2,500,000

(I) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(63) Washington County

(A) Construct two new salt storage buildings or renovate two existing salt storage buildings

Project Allocation

1,000,000

(B) Construct three new general storage buildings

Project Allocation

1,500,000

(C) Separate the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(D) Construct three new general storage buildings

Project Allocation

1,500,000

(E) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(F) Renovate, expand or replace Welcome Center Site A

Project Allocation

3,500,000

(G) Resurface garage floor at the County Maintenance Garage

Project Allocation

500,000

(H) Replace HVAC system at the County Maintenance Facility

Project Allocation

750,000

(I) Construct a new regional storage building

Project Allocation

1,500,000

(J) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(K) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(L) Construct five-person personnel staging building

Project Allocation

2,000,000

(M) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(64) Wayne County

(A) Construct a new vehicle wash facility or retrofit an existing facility

Project Allocation

1,000,000

(B) Separate the roof and floor drain and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(C) Renovate the garage and conference room at the County Maintenance Facility

Project Allocation

500,000

(D) Resurface the garage floor at the County Maintenance Garage

Project Allocation

500,000

(E) Replace the HVAC system at the County Maintenance Facility

Project Allocation

750,000

(F) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(G) Construct a new stockpile facility or renovate an existing stockpile facility, including site acquisition and development

Project Allocation

3,000,000

(H) Construct a new regional storage building

Project Allocation

1,500,000

(I) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(J) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(K) Construct five-person personnel staging building

Project Allocation

2,000,000

(65) Westmoreland County

(A) Construct two new general storage buildings

Project Allocation

1,000,000

(B) Construct a new maintenance facility and weld shop at the County Maintenance Facility

Project Allocation

3,500,000

(C) Construct three new general storage buildings

Project Allocation

1,500,000

(D) Construct a new general storage building

Project Allocation

600,000

(E) Construct new, upgrade or replace existing stockpile facility to meet code and program requirements

Project Allocation

3,000,000

(F) Construct the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(G) Construct three new general storage buildings

Project Allocation

1,500,000

(H) Construct the roof and floor drains and install oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(I) Construct a new stockpile facility or renovate an existing stockpile facility to meet code and program requirements

Project Allocation

3,000,000

(J) Construct a new or renovate existing stockpile facility to meet code and program requirements

Project Allocation

3,000,000

(K) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(L) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(M) Construct five-person personnel staging building

Project Allocation

2,000,000

(N) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(66) Wyoming County

(A) Construct the roof and floor drains and install an oil/water separator at the County Maintenance Facility

Project Allocation

500,000

(B) Construct a new general storage building

Project Allocation

500,000

(C) Construct two new general storage buildings

Project Allocation

1,000,000

(D) Construct two new general storage buildings

Project Allocation

1,000,000

(E) Construct a new general storage building

Project Allocation

500,000

(F) Construct new, upgrade or replace salt storage building

Project Allocation

500,000

(G) Develop a new or renovate existing stockpile facility to meet code and program requirements

Project Allocation

3,000,000

(H) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(I) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(J) Construct five-person personnel staging building

Project Allocation

2,000,000

(K) Design and construct new or retrofit existing vehicle wash facility

Project Allocation

1,500,000

(67) York County

(A) Construct a new vehicle wash facility or retrofit an existing facility

Project Allocation

1,000,000

(B) Construct two new general storage buildings

Project Allocation

1,000,000

(C) Construct a new salt storage building or renovate an existing salt storage building

Project Allocation

500,000

(D) Construct a new stockpile facility or renovate an existing stockpile facility

Project Allocation

3,000,000

(E) Construct three new general storage buildings

Project Allocation

1,500,000

(F) Upgrade or replace four salt storage buildings

Project Allocation

3,200,000

(G) Construct four high-capacity salt storage buildings

Project Allocation

5,600,000

(H) Construct five-person personnel staging building

Project Allocation

2,000,000