Itemization of transportation assistance projects

Act 52 of 2017, § 5, under CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2017-2018 - ENACTMENT.

Act 52 of 2017, § 5

Section 5. Itemization of transportation assistance projects.

(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

Project

Total Project

Allocation

(1) Allegheny County

(A) Acquisition, demolition, renovation, expansion, remediation, construction, infrastructure and related costs associated with green infrastructure improvement citywide

Project Allocation

500,000

(B) Acquisition, construction, infrastructure, redevelopment and other costs associated with the Downtown-Oakland Transit Connection Improvement Project

Project Allocation

150,000,000

(C) Renovation, expansion, remediation, construction, infrastructure and related costs associated with an expansion of smart infrastructure for transportation throughout the city

Project Allocation

5,000,000

(D) Infrastructure and mass transit connection improvements, construction, acquisition, abatement of hazardous materials and other costs related to an economic development project in the Chateau and Manchester neighborhoods of Pittsburgh

Project Allocation

20,000,000

(2) Ardmore Multimodal Parking Facility

(A) Construction, infrastructure improvements and other costs related to the Ardmore Multimodal Parking Facility

Project Allocation

20,000,000

(3) Beaver County Transportation Authority

(A) Construct CNG fueling station and renovate maintenance facility

Project Allocation

574,000

(4) Berks Area Reading Transportation Authority

(A) Replace buses that have exceeded their useful life

Project Allocation

850,000

(5) Butler Transit Authority

(A) Provide funding for purchase of new or used buses

Project Allocation

779,000

(6) Cambria County Transit Authority

(A) Rehabilitate facilities and other miscellaneous improvements

Project Allocation

581,000

(7) Centre Area Transportation Authority

(A) Replace buses that have exceeded their useful life

Project Allocation

1,379,000

(8) Chester County - Transit-oriented Development

(A) Construction, infrastructure, acquisition, abatement of hazardous materials and related costs associated with transit-oriented development in the City of Coatesville

Project Allocation

20,000,000

(B) Construction, infrastructure, acquisition, abatement of hazardous materials and related costs associated with transit-oriented development in Downingtown Borough

Project Allocation

20,000,000

(C) Acquisition, construction, infrastructure and other related costs for a multimodal transit center and parking garage in downtown Oxford

Project Allocation

5,000,000

(8.1) Erie County

(A) Acquisition, rehabilitation, renovation, construction and other related costs for transit-related infrastructure improvements to promote business expansion and redevelopment within the Erie Bayfront in the City of Erie

Project Allocation

25,000,000

(8.2) City of Erie

(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for mass transit upgrades to revitalize and encourage economic development projects to improve the downtown core

Project Allocation

30,000,000

(8.3) Erie-Western Pennsylvania Port Authority

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements to Liberty Pier and the adjoining park and ride lot

Project Allocation

10,000,000

(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for repair and replacement of Presque Isle Bay dockwalls

Project Allocation

10,000,000

(8.4) Greene County

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for new, expansions and improvements to, transportation, rail, airport and multimodal infrastructure

Project Allocation

5,000,000

(9) Hazleton Public Transit

(A) Replace buses that have exceeded their useful life

Project Allocation

87,000

(10) County of Lackawanna Transit System

(A) Replace buses that have exceeded their useful life

Project Allocation

726,000

(11) Lehigh and Northampton Transportation Authority

(A) Acquisition and other related costs for the purchase of transit buses

Project Allocation

698,000

(B) Acquisition and other related costs for the purchase of minibuses

Project Allocation

281,000

(12) Lycoming County

(A) Purchase compressed natural gas vehicles

Project Allocation

3,500,000

(13) Mid Mon Valley

(A) Replace buses that have exceeded their useful life

Project Allocation

395,000

(13.1) McKean County

(A) Acquisition, construction, infrastructure and other related costs for site development, parking facilities and construction of a mass transit terminal facility

Project Allocation

7,500,000

(14) Monroe County Transit Authority

(A) Design and construct park and ride lot for MCTA customers

Project Allocation

387,000

(B) Construct new maintenance facility building

Project Allocation

581,000

(14.1) Philadelphia County

(A) Acquisition, construction, infrastructure and equipment related to the multiphase, mixed-use, urban transit-oriented North Station District project in North Philadelphia

Project Allocation

50,000,000

(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for bus facilities along Roosevelt Boulevard to increase mass transit service along the boulevard

Project Allocation

5,000,000

(15) Port Authority of Allegheny County

(A) Expand bus system, including construction, technology updates and vehicle acquisition for Bus Rapid Transit Program

Project Allocation

200,000,000

(B) Replace major components of bus and fixed guideway system as part of Section 5307 Program 2014-2015

Project Allocation

4,723,000

(C) Replace major components of bus and fixed guideway system as part of Section 5307/5339 Program 2016-2017, including site acquisition and development

Project Allocation

14,971,000

(D) Provide for the State funding match for Section 5307 Urbanized Area Apportionment Program 2016-2017

Project Allocation

8,516,000

(E) Replace buses and rehabilitate various facilities and infrastructure as part of Bus and Bus Facilities Program

Project Allocation

697,000

(F) Rehabilitate or replace existing facilities and infrastructure as part of Federal grant program

Project Allocation

6,484,000

(G) Purchase 70 replacement buses as part of Section 5307 Flex Funds Program

Project Allocation

1,836,000

(H) Replace buses as part of the Section 5307 Flex Funds Program 2016-2017

Project Allocation

4,766,000

(I) Provide for capital improvements to stations, signals, track and buildings as part of Infrastructure Safety Renewal Program 2014-2015

Project Allocation

14,516,000

(J) Provide for capital improvements to stations, signals, track and buildings as part of Infrastructure Safety Renewal Program 2016-2017

Project Allocation

52,259,000

(K) Provide for overhaul of rolling stock as part of Vehicle Overhaul program

Project Allocation

3,387,000

(L) Provides for capital improvements to stations, signals, tracks and buildings as part of the Safety Renewal Program 2016-2017

Project Allocation

14,516,000

(M) Construction, infrastructure, redevelopment and other related costs for East Busway extension - Phase 1

Project Allocation

3,867,000

(N) Replace or rehabilitate major components within the Port Authority's rail and busway system as part of the bus and bus facilities program

Project Allocation

1,394,000

(O) Construction, infrastructure, redevelopment and other related costs for East Busway Extension - Phase 2

Project Allocation

5,807,000

(P) Expand current bus operation facilities

Project Allocation

72,581,000

(Q) Expand bus system, including construction, technology updates and vehicle acquisition for Bus Rapid Transit Program

Project Allocation

200,000,000

(16) River Valley Transit

(A) Expand River Transit Center to accommodate needs

Project Allocation

968,000

(B) Construct CNG fueling station and renovate the maintenance facility to accommodate CNG vehicles

Project Allocation

731,000

(C) Replace rolling stock that has met its useful life

Project Allocation

484,000

(17) Schuylkill Transportation System

(A) Expand existing facility to accommodate current and future needs

Project Allocation

581,000

(18) Southeastern Pennsylvania Transportation Authority

(A) Replace buses and rehabilitate various facilities as part of Urbanized Area Formula Program

Project Allocation

47,613,000

(B) Rehabilitate or replace various facilities and infrastructure as part of State of Good Repair Program

Project Allocation

51,097,000

(C) Replace buses and rehabilitate various facilities and infrastructure as part of Bus and Bus Facilities Program

Project Allocation

3,484,000

(D) Replace buses and rehabilitate various facilities and infrastructure as part of the Bus and Bus Facilities Program 2016-2017

Project Allocation

2,000,000

(E) Repair or rehabilitate various facilities and infrastructure as part of Bus Purchase Flex Program

Project Allocation

8,266,000

(F) Repair or rehabilitate various facilities and infrastructure as part of the Bus Purchase Flex Program 2016-2017

Project Allocation

5,000,000

(G) Rehabilitate or replace existing facilities and infrastructure as part of Federal grant program

Project Allocation

5,807,000

(H) Rehabilitate or replace existing facilities and infrastructure as part of the Federal Grant Program 2016-2017

Project Allocation

5,000,000

(I) Provide for the State funds to match Federal capital funding to rehabilitate or replace existing facilities, vehicles and infrastructure

Project Allocation

107,000,000

(J) Restore transit and railroad infrastructure, including maintenance support facilities, as part of Infrastructure Safety Renewal Program

Project Allocation

69,678,000

(K) Restore transit and railroad infrastructure, including maintenance to supporting facilities, as part of Infrastructure Safety Renewal Program 2016-2017

Project Allocation

42,500,000

(L) Rehabilitate or replace various facilities and infrastructure as part of State of Good Repair Program

Project Allocation

19,356,000

(M) Rehabilitate or replace various facilities and infrastructure as part of the State of Good Repair Program

Project Allocation

25,500,000

(N) Replace existing assets as part of the Vehicle Overhaul Program

Project Allocation

55,162,000

(O) Provide State funds to replace or rehabilitate various facilities, vehicles and infrastructure

Project Allocation

110,000,000

(P) Provide for State matching funds to replace existing assets as part of the Formula Projects Program 2016-2017

Project Allocation

25,000,000

(Q) Improve transit services as part of the System Improvement Program

Project Allocation

25,000,000

(19) Urban Redevelopment Authority of Pittsburgh

(A) Acquisition, infrastructure, construction and other related costs for transit-oriented redevelopment adjacent to the former Nabisco plant rehabilitation project

Project Allocation

5,000,000

(B) Infrastructure, construction and other related costs for transit-oriented redevelopment along the Martin Luther King, Jr., East Busway, including, but not limited to, Homewood Station and Herron Station

Project Allocation

10,000,000

(20) Westmoreland County Transportation Authority

(A) Purchase property and construct park and ride lot for MCTA customers

Project Allocation

581,000

(21) York Adams Transportation Authority

(A) Replacement of rolling stock

Project Allocation

892,000

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project

Total Project

Allocation

(1) Allegheny County

(i) City of Pittsburgh

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improvements to the rail line near Bakery Square

Project Allocation

20,000,000

(ii) Dormont Borough

(A) Construction, infrastructure, redevelopment and other related costs for improvements along the Port Authority's Light Rail Transit Line

Project Allocation

12,000,000

(iii) Wilmerding Borough

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improving a rail line along Allegheny Petroleum facility

Project Allocation

20,000,000

(2) Beaver County

(i) Ambridge Borough

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improving a rail line along Allegheny Petroleum facility

Project Allocation

10,000,000

(ii) Aliquippa and Ohio River Railroad Incorporated

(A) Track rehabilitation of main line, sidings and branches and construction of new sidings, including ties, rail, ballast, surface, bridge, switches, rail grinding, culverts, ditching, undercutting, brush cutting, road crossings, signal and communication and other track-related work

Project Allocation

4,500,000

(2.1) Berks County

(i) Redevelopment Authority of Berks County

(A) Rehabilitation of railroad, including, but not limited to, property and equipment acquisition; bridge, crossing, culvert, track and embankment/grading improvement, replacement and construction; stations and visitor centers; rolling stock and locomotive acquisition and repair; equipment maintenance facilities and passenger and freight infrastructure

Project Allocation

11,565,000

(3) Blair County

(i) Everett Railroad Company

(A) Rehabilitate rail infrastructure, including engineering, project management, rail, ties, ballast and other related materials

Project Allocation

1,500,000

(ii) D. Holdings

(A) Expand transload facility at the DeGol Industrial Center, including property acquisition, engineering, site preparation, rail-related materials, loading and unloading equipment, truck scales, asphalt and paving

Project Allocation

3,000,000

(B) Improve, replace and construct rail infrastructure at the DeGol Industrial Center to handle existing and prospective customer shipping needs, including engineering, site preparation, rail, ties, ballast, turnouts, switches, other track materials, drainage and surfacing

Project Allocation

5,000,000

(iii) UTLX (Union Tank Car Company)

(A) Construction, infrastructure, rehabilitation and other related costs for the rehabilitation and reinforcement of transfer table walls for an existing 100-year-old pit

Project Allocation

1,000,000

(4) Bradford County

(i) Appalachian Realty Holdings

(A) Construct a rail transload and material storage facility, including land acquisition, site preparation, engineering, permitting, rail, ties, ballast, storage tracks, switches, transload equipment, install truck scale and construct a loading/unloading area

Project Allocation

1,800,000

(4.1) Cambria County

(i) County Projects

(A) Construction, reconstruction, abatement of hazardous materials, rehabilitation and other improvements to rail freight facilities

Project Allocation

7,000,000

(5) Chester County

(i) Brandywine Valley Railroad

(A) Repair bridges, rehabilitate rail infrastructure and improve freight yards in Chester County, including engineering, drainage, rail, ties, ballast, turnouts, switches and all rail-related materials necessary for project completion

Project Allocation

5,000,000

(ii) ArcelorMittal Plate

(A) Rehabilitate ArcelorMittal Plate's in-plant railroad infrastructure in Chester County, including rail, ties, ballast, turnouts, switches, bridges and all rail-related materials necessary for project completion

Project Allocation

2,500,000

(6) Clinton County

(i) City of Lock Haven

(A) Construction, renovation and other related costs to reconstruct a rail line, including a new access road, sidings and facility improvements

Project Allocation

1,540,000

(6.1) Columbia County

(i) SEDA-COG Joint Rail Authority

(A) Track and roadbed reconstruction and improvements to mitigate flood flow damage to the North Shore Railroad, including rip-rap, new and/or upgraded drainage facilities and other site and track work

Project Allocation

2,000,000

(B) Construction, rehabilitation and other related costs for railroad facilities, including tracks, turnouts, grading, site improvements and environmental restorations for industrial sites along the North Shore Railroad

Project Allocation

3,000,000

(6.2) Crawford County

(i) Economic Progress Alliance of Crawford County

(A) Infrastructure, construction and other related costs for development of Keystone Regional Industrial Park rail line, including improvements to existing rail line, construction of new track, turnouts, industrial sidetrack and loading and unloading facilities

Project Allocation

12,500,000

(B) Infrastructure, construction and other related costs for development of the Ainsworth railroad line and associated rail facilities, including improvements to the existing track, construction of new track, turnouts and loading and unloading facilities

Project Allocation

5,000,000

(ii) Oil Creek and Titusville Lines

(A) Construction and other related costs for a railroad engine house and associated tracks and switches to facilitate the storage, maintenance and repair of locomotives and passenger cars used to provide freight switching and tourist rail excursions in Titusville

Project Allocation

375,000

(iii) Titusville Redevelopment Authority

(A) Construction and other related costs for a railroad engine house and associated tracks and switches to facilitate the storage, maintenance and repair of locomotives and passenger cars used to provide freight switching and tourist rail excursions in Titusville

Project Allocation

375,000

(B) Engineering, site preparation, demolition, infrastructure, construction and other related costs for the JMA Industrial Complex Access and Rail Siding Project

Project Allocation

1,500,000

(iv) Western New York and Pennsylvania Railroad Company, LLC

(A) Renovation, rehabilitation and other related costs for track improvements in the Meadville Freight Yard

Project Allocation

330,000

(B) Rehabilitation of the Oil City Branch, including track rehabilitation and culvert and drainage improvements

Project Allocation

1,160,000

(7) Dauphin County

(i) Middletown and Hummelstown Railroad

(A) Infrastructure, construction and other related costs for rehabilitation, including property acquisition, site preparation, engineering, rail, ties, ballast, turnouts, switches, other track materials, drainage improvements, surfacing, new rail siding and transload facilities

Project Allocation

5,000,000

(B) Infrastructure, construction and other related costs for rehabilitation of rail infrastructure, including site preparation, engineering, rail, ties, ballast, turnouts, switches, other track materials, drainage improvements, surfacing, crossings and bridges

Project Allocation

6,000,000

(ii) Halifax Township

(A) Study, design, permit, property acquisition, rail improvements, construction and other related costs for the Halifax Access rail crossing at the intersection of PA 147 to allow public access to a Fish and Boat Commission boat launch area

Project Allocation

450,000

(iii) Swatara Township

(A) Acquisition, construction, redevelopment, renovation and related costs for Norfolk Southern Railroad upgrades and improvements to infrastructure within proximity to Rutherford Rail Yard

Project Allocation

50,000,000

(7.1) Delaware County

(i) CSX Transportation

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for overhead clearances to facilitate doublestack railroad movements on CSX main line south of the Port of Philadelphia

Project Allocation

10,000,000

(ii) Delaware County Economic Development

(A) Acquisition, site planning, infrastructure, construction and other related costs for rehabilitation of the abandoned Foamex plant along the Delaware River, including rail freight infrastructure improvements, storage and support facilities, vessel berth dredging and improvements and expansion of the existing energy export facility

Project Allocation

12,000,000

(8) Fayette County

(i) Cudd Pumping Services Incorporated

(A) Rehabilitate, reconfigure existing infrastructure and construct additional track for car storage and unloading materials in Fayette County, including engineering, site preparation, rail, ties, ballast and other rail-related materials

Project Allocation

2,800,000

(9) Franklin County

(i) Proctor & Gamble Shippensburg Site

(A) Construct a rail siding from Norfolk Southern Railroad main line into the new Proctor & Gamble facility, including rail infrastructure

Project Allocation

12,000,000

(9.1) Greene County

(i) County Projects

(A) Acquisition, rehabilitation, infrastructure, construction and other related costs for new, expansions and improvements to transportation, rail, airport and multimodal infrastructure

Project Allocation

5,000,000

(9.2) Indiana County

(i) County Projects

(A) Construction, excavation, infrastructure and other related costs for new rail siding and intermodal facilities

Project Allocation

5,000,000

(10) Lackawanna County

(i) Pennsylvania Northeast Regional Railroad Authority

(A) Industrial development and economic development of rail served site on the Carbondale main line of the Pennsylvania Northeast Regional Railroad Authority for existing and potential new rail using industries

Project Allocation

1,100,000

(B) Industrial development and economic development of rail served site on the Carbondale main line of the Pennsylvania Northeast Regional Railroad Authority for existing and potential new rail using industries

Project Allocation

1,100,000

(C) Industrial development and economic development of rail served site on the Carbondale main line of the Pennsylvania Northeast Regional Railroad Authority for existing and potential new rail using industries

Project Allocation

1,200,000

(D) Purchase and install all material necessary to upgrade the Carbondale main line between Moosic (MP 0.0) and Carbondale (MP 20.5) for the purpose of handling increased traffic and other new rail traffic associated with new industries on this rail line, including, but not limited to, purchasing and installing new ties, rail, stone, anchors, surfacing and other rail track upgrades of the 20-mile rail line

Project Allocation

1,000,000

(E) Purchase and install all material for the installation of two #10 turnouts and split rail derail (MP 134 - MP 133.19) which will provide access by connecting two heavily traveled tracks for trains coming from Taylor to current industries and potential new industries on the Carbondale main line, which services Moosic to Carbondale. The project will also provide a safe and efficient route for trains that carry commodities and service industries from Taylor to Slateford via the Pocono main line

Project Allocation

272,000

(ii) Scranton Transload

(A) Property acquisition, engineering, site preparation and rail-related materials to develop and expand rail to truck transload facility in Lackawanna County, including repurposing, rehabilitating or constructing buildings onsite for needed storage, loading and unloading equipment, truck scales, loading dock modifications, asphalt, paving and fencing

Project Allocation

5,300,000

(11) Lawrence County

(i) Bessemer Borough and Mahoning Township

(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for the installation of rail lines

Project Allocation

10,000,000

(ii) Ellwood City Borough

(A) Construction, infrastructure, renovation, rehabilitation and other related costs for a railroad underpass

Project Allocation

500,000

(iii) Hill Railroad Car Company, Inc.

(A) Infrastructure, construction and other related costs for rehabilitation of sidings and construction of new sidings, including rail imbedding, ties, rail, plates, bolts, tie bars, spikes, switches, ballast, surfacing, rail grinding, brush cutting, road crossings and other track-related rehabilitation

Project Allocation

450,000

(iv) City of New Castle

(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for the installation of rail lines

Project Allocation

5,000,000

(v) Neshannock Township

(A) Construction, acquisition, infrastructure and other related costs for the installation of rail lines at Millennium Technology Park

Project Allocation

15,000,000

(vi) New Beaver Borough

(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for the installation of rail lines at New Beaver Commercial Park

Project Allocation

3,000,000

(vii) Lawrence County Economic Development Corporation

(A) Acquisition, environmental remediation, infrastructure, construction and other related costs for redevelopment of industrial and commercial site and rail installation

Project Allocation

10,000,000

(11.1) Lehigh County

(i) City of Allentown

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements to a rail line and facilities at the former Mack Truck Industrial Facility

Project Allocation

20,000,000

(12) Luzerne County

(i) Medley Investments

(A) Extend rail service to recycling facility, expand transload operation in Luzerne County, including land acquisition, site preparation, engineering, permitting, rail, ties, ballast, storage tracks, switches, transload equipment and paving, and construct an enclosed storage area

Project Allocation

1,000,000

(ii) Wright Township

(A) Acquisition, construction, excavation, infrastructure, abatement of hazardous materials, demolition, redevelopment, extension of rail service and siding, development of transload operation, including rails, ties, ballast, storage tracks, switches, site preparation and other related costs for an economic development project in Wright Township

Project Allocation

4,000,000

(iii) County Projects

(A) Acquisition, construction, excavation, infrastructure, abatement of hazardous materials, demolition, redevelopment, extension of rail service and siding, development of transload operation, including rails, ties, ballast, storage tracks, switches, site preparation and other related costs for an economic development project in Luzerne County

Project Allocation

4,000,000

(12.1) McKean County

(i) American Refining Group

(A) Infrastructure, construction and other related costs for additional storage tracks and implementation of security measures, including fencing, lighting, monitoring and controlled access, to comply with railroad and Federal regulations

Project Allocation

3,000,000

(B) Infrastructure, rehabilitation, construction and other related costs to modernize American Refining Group's loading racks to maximize safety, product containment and operational efficiency

Project Allocation

5,000,000

(13) Mercer County

(i) City of Farrell

(A) Construction, infrastructure, renovation, rehabilitation and other related costs for a car thawing system and related facilities

Project Allocation

3,500,000

(ii) City of Sharon

(A) Construction, infrastructure, renovation, rehabilitation and other related costs for rail facility

Project Allocation

1,050,000

(iii) Sharpsville Borough

(A) Construction, infrastructure and other related costs for transload railroad siding facility

Project Allocation

7,000,000

(B) Acquisition, infrastructure, construction and other related costs for rehabilitation to support the DSF Unit Train Railroad siding project

Project Allocation

12,500,000

(13.1) Mifflin County

(i) SEDA-COG Joint Rail Authority - Juniata Valley Railroad

(A) Construction, rehabilitation and other capital upgrades to railroad facilities, including subgrade stabilization, drainage improvements, crossing rehabilitation and track construction at West Park in Lewistown

Project Allocation

3,150,000

(14) Monroe County

(i) East Stroudsburg Borough

(A) Construction and related costs for replacement of a railroad bridge

Project Allocation

1,200,000

(15) Montgomery County

(i) Lower Merion Township

(A) Construction, infrastructure improvements and other costs related to the Ardmore Multi-Modal parking facility

Project Allocation

20,000,000

(ii) Upper Merion and Plymouth Railroad

(A) Construct new storage tracks, rehabilitate bridges and rail infrastructure and upgrade tracks within Plymouth Yard, including land acquisition, site preparation, engineering, permitting, drainage, rail, ties, ballast, switches and all rail-related materials necessary for project completion

Project Allocation

2,500,000

(iii) Redevelopment Authority of Montgomery County

(A) Rehabilitation of railroad, including, but not limited to, property and equipment acquisition; bridge, crossing, culvert, track and embankment/grading improvement, replacement and construction; stations and visitor centers; rolling stock and locomotive acquisition and repair; equipment maintenance facilities and passenger and freight infrastructure

Project Allocation

11,565,000

(iv) Various municipalities

(A) Construct new storage tracks, rehabilitate bridges and rail infrastructure and upgrade tracks within Plymouth Yard, including land acquisition, site preparation, engineering, permitting, drainage, rail, ties, ballast, turnouts, switches and all related materials

Project Allocation

2,500,000

(15.1) Montour County

(i) Danville Borough

(A) Construction, infrastructure, renovation and other related costs for highway and railway improvements, track reconstruction, crossing relocation, drainage improvements and highway and railway signal systems to improve safety and accessibility through relocation of the entrance to the Danville Middle School

Project Allocation

2,450,000

(16) Northumberland County

(i) Boyd Station, LLC

(A) Expand existing infrastructure to increase capacity in transloading and processing of agricultural commodities in Northumberland County, including site preparation, engineering, permitting, grading, rail ties, ballast, switches and construction of transloading equipment and additional storage units

Project Allocation

4,000,000

(B) Site preparation, engineering, permits, grading, rail, ties, ballast, switches and construction of transloading equipment and additional storage units

Project Allocation

4,000,000

(ii) North Shore Railroad Company

(A) Site development, construction of rail and loading and unloading facilities and other capital upgrades to facilities operated by North Shore Railroad Company

Project Allocation

3,500,000

(iii) SEDA-COG Joint Rail Authority

(A) Construction, renovation and other related costs for capital upgrades to tracks of the SEDA-COG Joint Rail Authority, including track reconfiguration, realignment and track upgrades at Reed Industrial Park, Paxinos, Shamrock and elsewhere on the Shamokin Valley Railroad

Project Allocation

1,750,000

(16.1) Philadelphia County

(i) City of Philadelphia

(A) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for redevelopment, reuse and rail improvements near 13 Pattison Avenue and the surrounding area

Project Allocation

5,000,000

(ii) CSX Transportation

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for overhead clearances to facilitate doublestack railroad movements on CSX main line south of the Port of Philadelphia

Project Allocation

10,000,000

(16.2) Schuylkill County

(i) Schuylkill Industrial Development Authority

(A) Infrastructure, construction and rehabilitation to upgrade and replace 240,000 linear feet of rail line throughout the Reading Blue Mountain and Northern Railroad service territory

Project Allocation

7,000,000

(16.3) Somerset County

(i) Shade Township

(A) Construction, land acquisition, infrastructure and other related costs to develop both a cleaning facility and rail transit loop to be operated by LCT Energy

Project Allocation

10,000,000

(16.4) Susquehanna County

(i) The Progress Authority

(A) Acquisition, construction, excavation, demolition, infrastructure, redevelopment, renovation and other related costs for economic development projects and transloading facility, including rail siding, in Great Bend and New Milford Townships

Project Allocation

5,000,000

(17) SEDA-COG Joint Rail Authority

(i) Blair County

(A) Capital upgrades to facilities of the SEDA-COG Joint Rail Authority, operated by Nittany & Bald Eagle Valley Railroad and the Borough of Tyrone, including drainage improvements, culvert and bridge replacements, bridge removal and flood mitigation

Project Allocation

2,800,000

(ii) Blair, Centre, Columbia and Lycoming Counties

(A) Upgrade 22 railroad bridges in central Pennsylvania to ensure safe and efficient rail freight service

Project Allocation

1,911,000

(iii) Blair, Centre, Clinton, Columbia, Lycoming, Mifflin and Northumberland Counties

(A) Capital upgrades to railroad facilities of the SEDA-COG Joint Rail Authority, operated by Juniata Valley, Lycoming Valley, Nittany & Bald Eagle and North Shore Railroads, including new or improved culverts and drainage facilities, stream bank stabilization, bridge replacements, raising and rehabilitation for improved regional flood mitigation

Project Allocation

5,000,000

(iv) Centre, Clinton and Lycoming Counties

(A) Capital upgrades to railroad facilities of the SEDA-COG Joint Rail Authority, operated by the Nittany & Bald Eagle and Lycoming Valley Railroads, including track construction, rail and turnout replacement to include near sidings at Port Matilda and rail upgrades in Centre, Clinton and Lycoming Counties

Project Allocation

3,500,000

(v) Columbia County

(A) Reconstruct railroad roadbed and related track and construct and improve drainage facilities to protect railroad from flood damage

Project Allocation

1,470,000

(vi) Lycoming County

(A) Purchase industrial property in Clinton Township and rehabilitate and construct yard track and related facilities

Project Allocation

1,750,000

(B) Construction, rehabilitation and other capital upgrades to tracks, including track construction, reconfiguration, relaying of rail and turnouts and crossing replacements at Newberry Yard Track of Lycoming Valley Railroad

Project Allocation

2,450,000

(C) Construction, rehabilitation and other capital upgrades to rail facilities, including replacement of rail, other track materials, crossties, grade crossing and other associated construction and rehabilitation at Avis Industrial Track of Lycoming Valley Railroad

Project Allocation

4,900,000

(vii) Mifflin County

(A) Rehabilitate and construct yard tracks and related site development in North Yards

Project Allocation

1,750,000

(B) Reconstruct railroad roadbed and track and improve subgrade and drainage on Mifflin County Industrial Park rail spur

Project Allocation

1,050,000

(17.1) Venango County

(i) Western New York and Pennsylvania Railroad Company, L.L.C.

(A) Infrastructure, construction and other related costs for various rail improvements and rehabilitation of the Oil City Branch, South Side Branch, Rouseville Industrial Track and the McClintock Yard, including rails, ties, surfacing, culvert replacements, drainage improvements and bridge replacements

Project Allocation

5,005,000

(17.2) Warren County

(i) Pitzer, L.C.C. - Warren Car Facility

(A) Infrastructure, construction and other related costs for various rail improvements and rehabilitation of the Warren Car Facility

Project Allocation

2,100,000

(17.3) Westmoreland County

(i) County Projects

(A) Acquisition, infrastructure, construction and other related costs for the development or redevelopment of the Westmoreland Rail Park, including the installation of infrastructure for a rail-oriented site industrial park to support manufacturing industries

Project Allocation

10,000,000

(ii) ArcelorMittal Monessen, LLC

(A) Rehabilitate ArcelorMittal's in-plant railroad infrastructure in Westmoreland County, including engineering, rail, ties, ballast, OTM, turnouts, switches, crossings, surfacing, drainage, loading/unloading equipment and all rail-related materials necessary for project completion

Project Allocation

5,000,000

(18) York County

(i) City of York

(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Continental Square renovation project

Project Allocation

3,500,000

(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for rail and other improvements at the former Metso Minerals and York County Prison sites

Project Allocation

10,000,000

(ii) County Projects

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Steam Into History rail line extension project

Project Allocation

5,000,000

(19) Multiple Counties

(i) Allegheny, Blair, Cambria, Indiana and Westmoreland Counties

(A) Study, design and other related costs for the development of commuter rail service along existing Norfolk Southern railroad lines between Altoona and Pittsburgh

Project Allocation

500,000

(i.1) American Rock Salt

(A) Infrastructure, construction and other related costs to upgrade and construct rail infrastructure needed to facilitate salt transload operations at Pennsylvania terminals, including property acquisition, engineering, site preparation, unloading and storage equipment, rail and related materials, surfacing and paving in Armstrong, Berks, Centre, Clearfield, Fayette, Lackawanna and York Counties

Project Allocation

7,000,000

(ii) Blair, Centre, Clinton, Columbia, Lycoming, Montour, Mifflin and Northumberland Counties

(A) Construction, renovation and other related costs to upgrade and construct 22 railroad bridges on short line railroads

Project Allocation

1,900,000

(iii) Clinton, Columbia, Lycoming and Montour Counties

(A) Construction, renovation and other related costs to construct, expand and rehabilitate railroad tracks and sidings

Project Allocation

2,340,000

(iii.1) Lackawanna, Monroe and Northampton Counties

(A) Construct new storage tracks, rehabilitate bridges and rail infrastructure and upgrade tracks within Plymouth Yard, including land acquisition, site preparation, engineering, permitting, drainage, rail, ties, ballast, turnouts, switches and all related materials

Project Allocation

987,000

(iii.2) Crawford and Erie Counties

(A) Infrastructure, construction and other related costs for rail and tie replacements and track surfacing on the Western New York and Pennsylvania Railroad main line

Project Allocation

4,500,000

(iii.3) Luzerne and Schuylkill Counties

(A) Infrastructure, construction and other related costs for the establishment of a new connection between the Reading Blue Mountain and Northern Railroad Hazleton Line to Humboldt Industrial Park to service industries contained within the park

Project Allocation

2,500,000

(iii.4) Pike and Susquehanna Counties

(A) Infrastructure, construction and other related costs for the rehabilitation or construction of the Central New York Railroad in Pike County or Susquehanna County, including track, bridges, culverts, sidings, crossings and signals

Project Allocation

29,400,000

(iv) Various Counties

(A) Rehabilitate and expand current rail infrastructure, including bridges, for transportation of hazardous materials

Project Allocation

24,000,000

(B) Rehabilitate and expand current rail infrastructure, including bridges, to accommodate current and future demands

Project Allocation

24,000,000

(C) Rehabilitate and expand current rail yards and intermodal facilities and the construction of new facilities and rail yards

Project Allocation

24,000,000

(D) Purchase and install components related to technology improvements, including positive train control, rolling stock upgrades and signalization

Project Allocation

18,000,000

(E) Construct and rehabilitate rail sidings and spurs

Project Allocation

18,000,000

(F) Provide State funding to promote economic development through freight or passenger rail service

Project Allocation

8,000,000

(G) Track rehabilitation of main line from New Castle to the New York State line for Buffalo and Pittsburgh Railroad, Inc., including all yards, sidings and subdivisions, ties, rail, ballast, surface, bridges, switches, rail grinding, culverts, ditching, undercutting, brush cutting, road crossings, signals, communications equipment and other track rehabilitation work

Project Allocation

9,750,000

(20) Statewide Projects

(i) Norfolk Southern Railway Company

(A) For facilitation of economic development and job creation by utilizing public-private partnerships with Norfolk Southern Railway Company to improve freight rail capacity throughout this Commonwealth through infrastructure projects, including rail yard construction, track and signal upgrades, bridge replacements and intermodal clearance work

Project Allocation

100,000,000

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project

Total Project

Allocation

(1) Adams County

(i) Cumberland Township

(A) Rehabilitation of existing aviation facilities and construction of new hangars, taxiways and airport-related buildings at Gettysburg Regional Airport

Project Allocation

700,000

(2) Bedford County

(i) Bedford County Airport Authority

(A) Infrastructure, construction and other related costs for a new hangar

Project Allocation

1,000,000

(B) Infrastructure, construction and other related costs for capital improvements on airport grounds

Project Allocation

5,000,000

(2.1) Berks County

(i) Reading Regional Airport Authority

(A) Infrastructure, construction and other related costs for capital improvements, including new hangars, at the Reading Regional Airport

Project Allocation

10,000,000

(3) Blair County

(i) Blair County Airport Authority

(A) Acquisition, infrastructure, construction and other related costs for business and aviation facilities and infrastructure at the Altoona-Blair County Airport

Project Allocation

5,000,000

(4) Butler County

(i) Butler County Airport Authority

(A) Infrastructure, construction, rehabilitation and other related costs for a runway extension and other airport improvements

Project Allocation

5,000,000

(5) Cambria County

(i) Ebensburg Borough

(A) Rehabilitation, infrastructure, construction and other related costs for airfield improvements

Project Allocation

2,000,000

(B) Rehabilitation, infrastructure, construction and other related costs for construction and renovations of airport hangars

Project Allocation

2,000,000

(ii) Johnstown Cambria County Airport Authority

(A) Rehabilitation, infrastructure, construction and other related costs for airfield improvements

Project Allocation

2,000,000

(B) Infrastructure, construction and other related costs for renovations and rehabilitation of airport buildings

Project Allocation

2,000,000

(C) Rehabilitation, infrastructure, construction and other related costs for construction and renovations of airport hangars

Project Allocation

2,000,000

(5.1) Chester County

(i) Chester County Area Airport Authority

(A) Construction, infrastructure and other related costs for miscellaneous capital improvements at Chester County G. O. Carlson Airport

Project Allocation

10,000,000

(6) Clarion County

(i) Clarion County Airport Authority

(A) Acquisition, rehabilitation, infrastructure, construction and other related costs for corporate hangars, a maintenance facility and other airport improvements

Project Allocation

1,500,000

(7) Dauphin County

(i) Susquehanna Area Regional Airport Authority

(A) Rehabilitation of existing aviation facilities and construction, infrastructure and related costs of new hangars, taxiways and airport-related buildings at Harrisburg International Airport

Project Allocation

1,000,000

(B) Site preparation, infrastructure, rehabilitation, environmental remediation, construction and other related costs for a safety improvement and economic development project located at the Harrisburg International Airport

Project Allocation

3,750,000

(ii) Bureau of Aviation

(A) Provide for safety upgrades to the Bureau of Aviation's equipment

Project Allocation

1,500,000

(8) Franklin County

(i) Susquehanna Area Regional Airport Authority

(A) Rehabilitation of existing aviation facilities and construction of new hangars, taxiways and airport-related buildings at Franklin County Regional Airport in Greene Township

Project Allocation

700,000

(9) Greene County

(i) County Projects

(A) Acquisition, rehabilitation, infrastructure, construction and other related costs for new transportation, rail, airport and multimodal infrastructure and expansion and improvements to existing transportation, rail, airport and multimodal infrastructure

Project Allocation

5,000,000

(10) Jefferson County

(i) Clearfield-Jefferson Counties Regional Airport Authority

(A) Renovation, rehabilitation and construction of airport hangars and administration building and other airport improvement projects

Project Allocation

1,000,000

(11) Lancaster County

(i) Lancaster Airport Authority

(A) Site development, infrastructure, construction and other related costs for nonaviation business development at the Lancaster Airport to support aviation businesses on the airport grounds

Project Allocation

1,500,000

(B) Infrastructure, construction and other related costs for the renovation and expansion of aviation-related facilities to create a state-of-the-art customer service area

Project Allocation

2,000,000

(11.1) Lehigh County

(i) City of Allentown

(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for redevelopment and mixed-use industrial and commercial use project at the Queen City Airport

Project Allocation

5,000,000

(12) Luzerne County

(i) City of Hazleton

(A) Construction, acquisition, infrastructure, renovate or rehabilitate and other related costs for the Hazleton Regional Airport

Project Allocation

1,000,000

(13) Monroe County

(i) Pocono Mountain Municipal Airport Authority

(A) Construction, rehabilitation, abatement of hazardous materials and other related costs for replacement of the airport fuel farm, including removal of underground fuel storage tanks and installation of an aboveground fueling system

Project Allocation

567,000

(14) Montgomery County

(i) Limerick Township

(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for capital improvements at Heritage Field Airport

Project Allocation

10,125,000

(14.1) Snyder County

(i) Monroe Township

(A) Acquisition, construction, redevelopment and other related costs to construct a new energy efficient hangar, repair and renovate existing hangars, construct new waste oil heating system, security upgrades to comply with TSA requirements, construct additional t-hangars and additional upgrades in machinery and equipment

Project Allocation

6,000,000

(15) Venango County

(i) County Projects

(A) Construction, rehabilitation and other related costs for airport capital improvements, including, but not limited to, rehabilitation of aprons, taxiways and runways, construction of storage buildings and t-hangars and improvements to the airport terminal building and fuel farm

Project Allocation

500,000

(16) Westmoreland County

(i) Westmoreland County Airport Authority

(A) Infrastructure, construction and other related costs for expansion of the airport terminal at Arnold Palmer Regional Airport to accommodate additional commercial flights

Project Allocation

10,000,000

(17) York County

(i) Susquehanna Area Regional Airport Authority

(A) Rehabilitation of existing aviation facilities and construction of new hangars, taxiways and airport-related buildings at Capital City Airport

Project Allocation

700,000