Section 6. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Adams County
(i) Adams County Economic Development Corporation
(A) Infrastructure, construction, rehabilitation, equipment and other related costs for the EnergyWorks Biopower, LLC, energy and nutrient management facility
Project Allocation
1,250,000
(B) Infrastructure, construction, rehabilitation, equipment and other related costs for the Knouse Foods Cooperative, Inc., economic development project
Project Allocation
4,000,000
(C) Acquisition, construction, demolition, infrastructure, renovation and other related costs for the Lutheran Theological Seminary at Gettysburg
Project Allocation
10,000,000
(ii) Adams County Industrial Development Corporation
(A) Site preparation, acquisition, infrastructure, demolition, rehabilitation, expansion, construction and other related costs for an economic project
Project Allocation
4,000,000
(B) Site preparation, acquisition, infrastructure, demolition, renovation, expansion and construction of a manufacturing facility in Cumberland Township
Project Allocation
2,000,000
(C) Site preparation, acquisition, infrastructure, demolition, rehabilitation, expansion and/or construction of a technical preparation school and/or facility for work force development
Project Allocation
7,000,000
(iii) Susquehanna Area Regional Airport Authority
(A) Construction, infrastructure, redevelopment and other related costs for safety improvements and economic development at the Gettysburg Regional Airport
Project Allocation
1,000,000
(2) Allegheny County
(i) Allegheny County Department of Economic Development
(A) Infrastructure, rehabilitation, construction and other related costs for expansion of patient-related facilities at St. Clair Hospital
Project Allocation
15,000,000
(B) Manufacturing and environmental performance improvement projects for steel and coke production operations
Project Allocation
25,000,000
(i.1) Baldwin Borough
(A) Infrastructure improvements and construction for Academy/DBA Community Specialist Corp. facility
Project Allocation
4,000,000
(ii) Bellevue Borough
(A) Construction, infrastructure, acquisition, abatement, redevelopment and other related costs for the relocation of The Salvation Army's Northside facility
Project Allocation
4,000,000
(ii.1) Bethel Park Borough
(A) Construction, rehabilitation and other related costs for the implementation of the Master Park Plan for 14 parks
Project Allocation
1,500,000
(ii.2) Brackenridge Borough
(A) Redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing abandoned, blighted structures followed by environmental remediation and economic redevelopment projects
Project Allocation
500,000
(ii.3) Brentwood Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a municipal building
Project Allocation
2,550,000
(iii) City of McKeesport
(A) Acquisition, demolition and construction for new Police and Fire Station with office space
Project Allocation
10,000,000
(B) Infrastructure improvements, construction and other related costs for the redevelopment of RIDC McKeesport Industrial Park
Project Allocation
10,000,000
(C) Construction, infrastructure, abatement and other related costs for improvements to CP Industries
Project Allocation
5,000,000
(iv) City of Pittsburgh
(A) Construction, renovation, infrastructure and other related costs for the Wilford A. Payne Medical Center development project
Project Allocation
4,000,000
(B) Acquisition, construction, infrastructure and other related costs for Mansions on Fifth Avenue renovation project
Project Allocation
1,000,000
(C) Construction and other related costs for the Brew House redevelopment project
Project Allocation
3,000,000
(D) Construction, redevelopment and other related costs for the historic former National Guard facility project
Project Allocation
20,000,000
(E) Construction, infrastructure, environmental remediation and other related costs for the former St. Clair Village site
Project Allocation
20,000,000
(F) Acquisition, environmental remediation, construction, infrastructure, redevelopment and other related costs for the Hays Woods project
Project Allocation
20,000,000
(G) Construction, renovation, infrastructure, redevelopment and other related costs for parks improvements
Project Allocation
1,000,000
(H) Construction, renovation, infrastructure, redevelopment and other related costs for regional park improvements
Project Allocation
500,000
(I) Site preparation, construction, remediation, infrastructure and other related costs for the Nine Mile Run, Phase III, Summerset Development and expansion of Frick Park project
Project Allocation
20,000,000
(J) Construction, infrastructure and other related costs for regional bike trail improvements
Project Allocation
500,000
(K) Construction, infrastructure, redevelopment and other related costs for electric vehicle infrastructure
Project Allocation
500,000
(L) Construction, demolition, infrastructure, redevelopment, abatement, remediation and other related costs for the optimization of various city-owned facilities
Project Allocation
50,000,000
(M) Construction, infrastructure, storm water mitigation and other related costs for the 4 Mile Run, Watershed project
Project Allocation
20,000,000
(N) Acquisition, demo, renovation, expansion, remediation, construction, infrastructure and other related costs for citywide green infrastructure improvements
Project Allocation
500,000
(O) Renovation, expansion, remediation, construction, infrastructure and other related costs for an expansion of smart infrastructure for transportation throughout the city
Project Allocation
5,000,000
(P) Acquisition, infrastructure and other related costs for a mixed-use development with an emphasis on technology and research and development located in the Hazelwood and Oakland neighborhoods
Project Allocation
10,000,000
(Q) Construction, infrastructure, redevelopment and other related costs for Western Psychiatric Institute and Clinic of University of Pittsburgh Medical Center
Project Allocation
10,000,000
(R) Acquisition, construction, infrastructure, redevelopment and other related costs for the Center for Victims building project
Project Allocation
1,500,000
(S) Acquisition, remediation, construction and other related costs for a multimedia studio
Project Allocation
1,500,000
(T) Acquisition, construction, infrastructure, redevelopment and other related costs for The Schaeffer Intermediate School renovation project
Project Allocation
1,750,000
(U) Construction, renovation, infrastructure and other improvements to the Duquesne University Campus
Project Allocation
20,000,000
(V) Construction and other related costs for the Eighth Street Block in Downtown Pittsburgh's Cultural District
Project Allocation
15,000,000
(W) Construction, renovation, infrastructure and other related costs for the redevelopment of the Cultural District, including arts venues on Sixth Street
Project Allocation
5,000,000
(X) Construction, infrastructure, acquisition, abatement and other related costs for the redevelopment of the Allegheny Commons fountain
Project Allocation
2,500,000
(Y) Construction, infrastructure, acquisition, abatement and other related costs for the redevelopment of the Sarah Heinz House
Project Allocation
5,000,000
(Z) Construction, infrastructure improvements, renovation and other related costs for a movie/television studio project
Project Allocation
5,000,000
(AA) Construction, infrastructure improvements, renovation and other related costs for the Henderson Brothers' building redevelopment project
Project Allocation
1,000,000
(BB) Construction, infrastructure improvements, renovation and other related costs for the Astrobotic Technology redevelopment project
Project Allocation
2,000,000
(CC) Acquisition, construction, infrastructure, renovation and other related costs for the Milhaus Arsenal redevelopment project in Lawrenceville at Butler and 40th Streets
Project Allocation
10,000,000
(DD) Acquisition, construction, infrastructure, renovation and other related costs for the Milhaus Brewery redevelopment project in Lawrenceville
Project Allocation
10,000,000
(EE) Construction, renovation, environmental remediation, infrastructure improvements and other related costs for the mixed-use historic redevelopment of a former brewing bottling plant
Project Allocation
5,000,000
(FF) Construction, infrastructure improvements, renovation and other related costs for a public market place redevelopment project
Project Allocation
5,000,000
(GG) Construction and other related costs for redevelopment in the Route 51 Corridor
Project Allocation
5,000,000
(HH) Construction, infrastructure improvements, renovation and other related costs for the former Allegheny Commons site redevelopment project
Project Allocation
500,000
(II) Construction, demolition, infrastructure, redevelopment and other related costs for Grandview Avenue Corridor improvements
Project Allocation
1,000,000
(JJ) Construction, infrastructure, redevelopment and other related costs for a parks visitor center
Project Allocation
500,000
(KK) Acquisition, construction, infrastructure, redevelopment and other related costs for the Downtown-Oakland Transit Connection improvement project
Project Allocation
150,000,000
(LL) Acquisition, construction, infrastructure, redevelopment and other related costs for the Pittsburgh Abandoned Property Program
Project Allocation
25,000,000
(MM) Acquisition, construction, infrastructure, redevelopment and other costs associated with the Mattress Factory improvement and expansion project
Project Allocation
1,500,000
(NN) Construction, infrastructure improvements, renovations and other related costs for the Children's Museum of Pittsburgh
Project Allocation
10,000,000
(OO) Acquisition, construction, infrastructure improvements and other related costs for the Chatham University Shadyside Campus expansion and rehabilitation project
Project Allocation
15,000,000
(PP) Acquisition, construction, infrastructure improvements and other related costs for the Chatham University Homewood, Larimer and North Point Breeze Community redevelopment project
Project Allocation
15,000,000
(QQ) Acquisition, construction, infrastructure improvements and other related costs for the Chatham University Eastside Campus expansion and modernization project
Project Allocation
(RR) Infrastructure improvements, construction and other related costs for the Mill 19 property redevelopment project
Project Allocation
10,000,000
(SS) Acquisition, construction, renovations, infrastructure improvements and other related costs for the addition of a theater, galleries and classrooms to the Heinz History Center
Project Allocation
5,000,000
(TT) Site preparation, construction, environmental remediation, infrastructure, streets and bridge, utilities, storm water mitigation and other related costs for the Heth's Run watershed project
Project Allocation
2,500,000
(UU) Acquisition, clearing, demolition, renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities, storm water mitigation and other related costs for a consolidated public safety and municipal services facility
Project Allocation
15,000,000
(VV) Acquisition, infrastructure improvements and other costs associated with a mobile mammography unit for University of Pittsburgh Medical Center
Project Allocation
500,000
(WW) Acquisition, remediation, demolition, construction, infrastructure and other related costs for site redevelopment at the Fairywood Logistics Center at the Chartiers Valley Industrial Park
Project Allocation
3,000,000
(XX) Construction, infrastructure and other related costs for Pittsburgh Symphony Orchestra Heinz Hall renovation project
Project Allocation
10,000,000
(YY) Construction, infrastructure improvements and other related costs for the Pittsburgh Ballet Theatre Campus expansion project
Project Allocation
6,000,000
(ZZ) Acquisition, infrastructure improvements and other related costs for a mobile mammography unit for University of Pittsburgh Medical Center
Project Allocation
500,000
(AAA) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs to building a new neonatal intensive care nursery, labor/delivery and postpartum facility
Project Allocation
9,100,000
(BBB) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for AHAVA Memory Care Residence
Project Allocation
1,000,000
(CCC) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Jewish Association on Aging's independent living facility in the Fourteenth Ward
Project Allocation
1,800,000
(DDD) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for one or multiple environmental charter schools
Project Allocation
5,000,000
(EEE) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for an existing building on Washington's Landing, including significant updates to the docks
Project Allocation
500,000
(FFF) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Carlow University to rehabilitate existing laboratory space and include a new simulation space and new additional laboratory space
Project Allocation
1,306,000
(GGG) Construction, infrastructure, redevelopment and other related costs for business office development with an emphasis on technology and research and development
Project Allocation
10,000,000
(HHH) Acquisition, construction, infrastructure, redevelopment and other related costs for Renewal Incorporated's new treatment and reentry facility
Project Allocation
8,000,000
(v) Coraopolis Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Sports and Athletic Complex at Montour Junction, Phase III expansion project
Project Allocation
2,500,000
(v.1) Crafton Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects
Project Allocation
500,000
(vi) Duquesne Borough
(A) Infrastructure improvements, construction and other related costs for redevelopment of RIDC Duquesne Industrial Park
Project Allocation
10,000,000
(vi.1) City of Duquesne
(A) Site rehabilitation, construction and other related costs for business expansion and economic development projects in City Center in Duquesne
Project Allocation
5,000,000
(vii) Etna Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Etna Riverfront Park and Community Connection project, including conversion of a brownfield site into green space and park areas
Project Allocation
504,000
(vii.1) Findlay Township
(A) Construction, infrastructure, redevelopment and other related costs for the Westport II Development District for industrial, flex, office and ancillary commercial space
Project Allocation
25,000,000
(B) Construction, infrastructure and other related costs for a new public safety building
Project Allocation
1,000,000
(viii) Glassport and Lincoln Boroughs
(A) Infrastructure improvements and other related costs for the rehabilitation of the Glassport Terminal expansion project
Project Allocation
500,000
(viii.1) Green Tree Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape and other economic development projects
Project Allocation
500,000
(viii.2) Harrison Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Harrison Point mixed-use office and commercial project
Project Allocation
5,000,000
(B) Redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing abandoned, blighted structures followed by environmental remediation and economic redevelopment projects
Project Allocation
1,000,000
(viii.3) Homestead Borough
(A) Construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for mixed-use development for Voodoo Properties
Project Allocation
3,000,000
(ix) Jefferson Hills Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for expansion of the Jefferson Hospital emergency services facility
Project Allocation
10,000,000
(ix.1) Kennedy Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for Rosedale Technical College vehicle and industrial maintenance training program project
Project Allocation
600,000
(x) McKees Rocks Borough
(A) Construction, infrastructure, acquisition, abatement, redevelopment and other related costs for revitalization throughout McKees Rocks Borough
Project Allocation
15,000,000
(x.1) City of McKeesport
(A) Site rehabilitation, construction and related costs for new business and recreation development and relocation in the Industrial Center of McKeesport
Project Allocation
10,000,000
(x.2) Moon Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the Westpointe Corporate Center Five project
Project Allocation
7,500,000
(B) Construction, infrastructure and other related costs for a new community center
Project Allocation
5,000,000
(C) Construction, infrastructure, redevelopment and other related costs for expansion and improvements to the Seegrid RIDC facility
Project Allocation
2,000,000
(x.3) Monroeville Borough
(A) Construction, infrastructure improvements and other related costs for the Pittsburgh Supercomputing Center
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Monroeville Family Park
Project Allocation
1,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for upgrades at the emergency services dispatch center
Project Allocation
1,250,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Jamison Lane Expansion BPMI Project
Project Allocation
8,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for upgrades at the Monroeville Fire Company No. 6
Project Allocation
500,000
(x.4) Mt. Lebanon Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the upgrade of the Denis Theatre building
Project Allocation
1,500,000
(xi) Penn Hills Township
(A) Construction, renovation, infrastructure and other related costs for the Veterans Place Tiny Homes Community Project
Project Allocation
1,000,000
(xii) Pleasant Hills Borough
(A) Acquisition, demolition, rehabilitation, construction and other related costs for borough infrastructure improvements
Project Allocation
5,000,000
(xiii) Redevelopment Authority of Allegheny County
(A) Infrastructure, rehabilitation, construction and other related costs for facility upgrades and construction of new facilities on the campus of the Woodlands Foundation
Project Allocation
10,000,000
(B) Construction, infrastructure, abatement of hazardous materials and other related costs for the Eden Hall Campus expansion at Chatham University
Project Allocation
15,000,000
(C) Infrastructure, construction and other related costs for the expansion and renovations to the Natrona Bottling Company
Project Allocation
1,000,000
(D) Rehabilitation, construction and other related costs for the expansion of and leaseholder improvements to the RIDC facility in Moon Township
Project Allocation
1,000,000
(E) Rehabilitation, construction and other related costs for the Regional Learning Alliance expansion of a campus facility in addition to technology upgrades
Project Allocation
5,000,000
(F) Rehabilitation, redevelopment, renovation and expansion of The Bradley Center, including safety enhancements
Project Allocation
10,000,000
(G) Redevelopment, infrastructure, construction and other related costs for development of the Westport II Development District
Project Allocation
25,000,000
(H) Infrastructure and mass transit connection improvements, construction, acquisition, abatement of hazardous materials and other related costs for an economic development project in the Chateau and Manchester neighborhoods of Pittsburgh
Project Allocation
20,000,000
(I) Infrastructure and streetscape improvements, construction, acquisition, abatement of hazardous materials and other related costs for an economic development project in Troy Hill and adjacent neighborhoods in the City of Pittsburgh
Project Allocation
20,000,000
(J) Infrastructure and streetscape improvements, construction, acquisition, abatement of hazardous materials and other related costs for an economic development project in Strip District neighborhood in the City of Pittsburgh
Project Allocation
15,000,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the FQHC Multi-Service Medical Facility
Project Allocation
2,000,000
(L) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Western Pennsylvania School for the Deaf
Project Allocation
10,000,000
(M) Construction, renovation, infrastructure improvements and other related costs for the expansion of John Jay Center, home of Robert Morris University's School of Engineering, Mathematics and Sciences
Project Allocation
7,000,000
(N) Abatement, acquisition, construction, infrastructure and redevelopment assistance for an economic development project
Project Allocation
250,000,000
(xiii.1) Ross Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs to upgrade the Northway Mall commercial site
Project Allocation
2,250,000
(xiv) Shaler Township
(A) Infrastructure, redevelopment, construction and other related costs for rehabilitation of Fall Run Park
Project Allocation
550,000
(xiv.1) Sharpsburg Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a riverfront mixed-use development
Project Allocation
5,000,000
(xv) Urban Redevelopment Authority of Pittsburgh
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the renovation of cultural community center
Project Allocation
5,000,000
(B) Acquisition, infrastructure, construction and other related costs for rehabilitation adjacent to the former Nabisco plant, including transit-oriented development
Project Allocation
5,000,000
(C) Acquisition, infrastructure, construction and other related costs for transit-oriented development along Martin Luther King, Jr., East Busway, including, but not limited to, Homewood Station and Herron Station
Project Allocation
10,000,000
(D) Acquisition, infrastructure, construction and other related costs for the East Liberty Commercial District Project
Project Allocation
15,000,000
(E) Infrastructure, renovation, construction and expansion to a Phipps Conservatory and Botanical Gardens facility
Project Allocation
20,000,000
(F) Construction, infrastructure, acquisition, abatement of hazardous materials, redevelopment and other related costs for the redevelopment of the former Heinz administration and research buildings located in the North Side
Project Allocation
15,000,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Alan I.W. Frank House preservation project
Project Allocation
15,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Western Pennsylvania School for Blind Children
Project Allocation
10,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Arconic's Corporate Center expansion and improvement of facilities project
Project Allocation
10,000,000
(xvi) West Deer Township
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Bairdford Park and Nike Site Master Park Project
Project Allocation
1,550,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for a new municipal building and public works garage
Project Allocation
1,750,000
(xvii) West Mifflin Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs to the West Mifflin Sports Facility Complex Project
Project Allocation
5,000,000
(xviii) Wilmerding Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Westinghouse Castle project
Project Allocation
5,000,000
(xix) County Projects
(A) Construction, acquisition, infrastructure development and other costs related to a soccer stadium project
Project Allocation
22,500,000
(B) Acquisition, infrastructure, renovation, construction and other related costs for supportive services for individuals with intellectual disabilities, autism and traumatic brain injuries
Project Allocation
5,000,000
(3) Armstrong County
(i) Armstrong County Industrial Development Council
(A) Acquisition, construction, infrastructure and other related costs for an economic development project
Project Allocation
5,000,000
(ii) County Projects
(A) Acquisition, construction, infrastructure and other related costs for a community development project
Project Allocation
5,000,000
(4) Beaver County
(i) Beaver County Development Program
(A) Infrastructure improvements, redevelopment, construction and expansion of the Northern Lights Shopping Center
Project Allocation
10,000,000
(ii) Beaver County Economic Development Corporation
(A) Acquisition, infrastructure, redevelopment, construction and other related costs for Keystone FQHC Multiservice Medical Facility
Project Allocation
2,000,000
(5) Bedford County
(i) Bedford County Development Association
(A) Infrastructure, renovation, rehabilitation, construction and other related costs to restore the Anderson House and convert it to a fine art museum
Project Allocation
1,000,000
(B) Acquisition, infrastructure, construction and other related costs for a Bio-Tech Incubator at Everett Business Center
Project Allocation
2,500,000
(C) Acquisition, infrastructure and other related costs for construction of an open space building in a business park
Project Allocation
2,500,000
(D) Acquisition, site development, construction, redevelopment, rehabilitation, infrastructure, environmental remediation and other related costs for economic development projects in Bedford County
Project Allocation
7,500,000
(ii) County Projects
(A) Infrastructure, renovation, rehabilitation, construction and other related costs for development of a recreational trail on abandoned sections of the Pennsylvania Turnpike
Project Allocation
1,000,000
(6) Berks County
(i) Berks County Industrial Development Authority
(A) Infrastructure, redevelopment, construction and other related costs for development of a community center
Project Allocation
10,000,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for redevelopment and repurposing of abandoned commercial buildings
Project Allocation
10,000,000
(C) Acquisition, infrastructure, construction and other related costs for development of industrial park facilities
Project Allocation
10,000,000
(i.1) Kutztown Borough
(A) Acquisition, construction, infrastructure and other related costs for a public and safety facility
Project Allocation
500,000
(ii) City of Reading
(A) Construction, renovation, infrastructure and other related costs for the Albright College Gingrich Library renovation project
Project Allocation
6,000,000
(B) Acquisition, construction, infrastructure redevelopment and other related costs for the Albright College Track and Field Facility renovation project
Project Allocation
4,800,000
(C) Construction, renovation, infrastructure and other related costs for the Albright College Student Residence Hall renovation project
Project Allocation
2,000,000
(D) Acquisition, site preparation, construction, redevelopment, infrastructure improvements and other related costs for the Alvernia University Health, Wellness and Academic Complex development project
Project Allocation
12,000,000
(E) Land and building acquisition, infrastructure, demolition, building construction, rehabilitation and other related costs to support economic development projects
Project Allocation
30,000,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a support or academic facility for university and community use on the campus of Alvernia University
Project Allocation
20,000,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an academic facility for Centro Hispano use and community use
Project Allocation
1,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a support or academic facility for college and community use on the campus of Reading Area Community College
Project Allocation
10,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects in the area surrounding the Convention Center and Entertainment Square
Project Allocation
10,000,000
(iii) Greater Reading Economic Partnership
(A) Acquisition, infrastructure, construction and other related costs for redevelopment of Perry Township Industrial Park
Project Allocation
3,000,000
(iv) Redevelopment Authority of the County of Berks
(A) Acquisition, infrastructure, construction and other related costs for a centralized emergency medical services headquarters building
Project Allocation
1,500,000
(B) Construction, infrastructure and other related costs for West Run Business Park, to include four pad sites with necessary infrastructure improvements to the public water system, extending public roadways, widening and repaving of township roads, upgrading and extending electric service, creating a public bus transportation facility, extending public sewer lines and enhancing wetland areas
Project Allocation
5,000,000
(v) Sinking Spring Borough
(A) Acquisition, infrastructure, construction and other related costs for the New Town Center revitalization project
Project Allocation
7,000,000
(vi) Spring Township
(A) Infrastructure, rehabilitation, construction and other related costs for improvements to the municipal campus
Project Allocation
7,500,000
(vii) Wyomissing Borough
(A) Acquisition, site preparation, construction, redevelopment, infrastructure improvements and other related costs for the VF Outlet Complex development project
Project Allocation
10,000,000
(viii) Reading Regional Airport Authority
(A) Infrastructure, construction and other related costs for capital improvements, including new hangars, at the Reading Regional Airport
Project Allocation
10,000,000
(ix) The Pennsylvania State University
(A) Construction, infrastructure, redevelopment and other related costs, including equipment upgrades for catheterization lab rooms at St. Joseph's Medical Center
Project Allocation
20,000,000
(x) County Projects
(A) Acquisition, construction, infrastructure improvements and other related costs for the National Velodrome Events Center development project
Project Allocation
5,000,000
(B) Land acquisition, infrastructure, building construction, rehabilitation, demolition and other related costs for economic development and revitalization projects
Project Allocation
30,000,000
(7) Blair County
(i) Altoona-Blair County Development Corporation
(A) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for housing projects in the City of Altoona
Project Allocation
5,500,000
(ii) Blair County Airport Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for economic development of business and aviation facilities and infrastructure at the Altoona-Blair County Airport
Project Allocation
5,000,000
(ii.1) Roaring Spring Borough
(A) Construction, acquisition, redevelopment, infrastructure and other related costs for the renovation and expansion of the existing Nason Hospital Facility
Project Allocation
5,000,000
(B) Construction and other related costs to expand the surgical and catheterization areas at Nason Hospital
Project Allocation
500,000
(iii) Snyder Township
(A) Renovation, construction and other related costs to replace and upgrade facility infrastructure of Tyrone Hospital
Project Allocation
1,650,000
(8) Bradford County
(i) The Progress Authority
(A) Acquisition, infrastructure, construction and other related costs for rehabilitation of the former Ingersoll Rand Manufacturing Plant site
Project Allocation
2,000,000
(B) Infrastructure, construction and other related costs for development of an open-access fiber optic network
Project Allocation
5,000,000
(C) Infrastructure, construction and other related costs for renovation and rehabilitation of the Emergency Department and Cardiac Catheterization Lab at The Guthrie Clinic - Robert Packer Hospital
Project Allocation
7,700,000
(ii) Standing Stone Township
(A) Construction, infrastructure and other related costs for a reclamation facility to process flowback fluid associated with Marcellus Shale gas drilling
Project Allocation
5,000,000
(iii) County Projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a new Bradford County 911 Center
Project Allocation
4,500,000
(B) Construction, redevelopment, renovation, rehabilitation, infrastructure improvements and other related costs for the Animal Care Sanctuary in East Smithfield, Smithfield Township
Project Allocation
3,100,000
(9) Bucks County
(i) Bensalem Township
(A) Infrastructure, development, construction and other related costs for the redevelopment of Route 13, including streetscape, lighting and sidewalk enhancements
Project Allocation
5,000,000
(B) Acquisition, renovation, infrastructure, environmental remediation, construction and other related costs for redevelopment of the Armstrong Middle School and surrounding 25 acres, to include commercial, retail and recreational phases
Project Allocation
15,000,000
(C) Construction, infrastructure, redevelopment, renovation and other related costs for a capital improvement project for Livengrin Foundation, Inc.
Project Allocation
3,000,000
(D) Acquisition, construction, infrastructure and other related costs for redevelopment of the Motherhouse of the Sisters of the Blessed Sacrament for economic development
Project Allocation
20,000,000
(E) Construction, acquisition, infrastructure, abatement of hazardous materials and other related costs for the expansion and redevelopment of the Advanced Lubrication Specialties facility
Project Allocation
7,500,000
(i.1) Bristol Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Adams Hollow Creek flood mitigation efforts
Project Allocation
1,750,000
(ii) Doylestown Borough
(A) Rehabilitation, construction and other related costs for renovation of The County Theater
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, rehabilitation and other related costs for the development of an integrated cluster of nonprofit and commercial discovery science centers
Project Allocation
10,000,000
(ii.1) Bucks County Industrial Development Authority
(A) Land acquisition, site preparation, demolition, construction, infrastructure, redevelopment, architectural design, engineering, relocation costs and other costs related to a corporate headquarters project
Project Allocation
10,000,000
(B) Construction, infrastructure, redevelopment and other related costs for the development of a class A industrial business park with offices, hotel, restaurant and infrastructure improvements
Project Allocation
6,000,000
(ii.2) Doylestown Hospital Authority
(A) Construction, infrastructure, acquisition, redevelopment, renovation, rehabilitation and other related costs for Doylestown Hospital
Project Allocation
20,000,000
(iii) Doylestown Township
(A) Acquisition, renovations, infrastructure improvements, construction and other related costs for restoration of the Oscar Hammerstein's Highland Farm
Project Allocation
5,000,000
(iii.1) Morrisville Borough and Falls Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Municipal Authority of the Borough of Morrisville regional facility
Project Allocation
75,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Municipal Authority of the Borough of Morrisville's new regional wastewater treatment plant
Project Allocation
75,300,000
(iii.2) Newtown Township
(A) Acquisition, infrastructure, environmental remediation, construction and other related costs for a hotel and conference facility
Project Allocation
15,000,000
(iii.3) Northampton Township
(A) Construction, infrastructure, site development and other related costs for an auditorium addition and classroom expansion at Villa Joseph Marie High School
Project Allocation
4,500,000
(iv) Redevelopment Authority of Bucks County
(A) Redevelopment, construction and other related costs for expansion and renovation of The Woods Enterprises Community Work Center
Project Allocation
1,000,000
(B) Redevelopment, renovation, construction and other related costs for expansion of the Woods Health Center to expand medical and behavioral health service capacity at Woods Health Center and the community
Project Allocation
1,500,000
(C) Construction, infrastructure, acquisition, redevelopment, renovation and other related costs for the relocation of a Pennsylvania-based company
Project Allocation
10,000,000
(v) Richland Township
(A) Infrastructure updates and improvements, environmental remediation, construction and other related costs for the Lehigh Valley Hospital - Cedar Crest and expansion of Lehigh Valley Health Network
Project Allocation
10,000,000
(vi) County Projects
(A) Acquisition, rehabilitation, construction and other related costs for development of a Valley Youth House Campus
Project Allocation
1,000,000
(B) Rehabilitation, construction and other related costs for expansion of the Central Bucks Family YMCA facility
Project Allocation
3,000,000
(C) Rehabilitation, construction and other related costs for a new Lower Bucks Family YMCA facility
Project Allocation
5,000,000
(10) Butler County
(i) Adams Township
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a fire district headquarters building
Project Allocation
3,000,000
(ii) Cranberry Township
(A) Site acquisition, development, infrastructure improvements, mitigation and removal of hazardous materials, construction and other related costs for an economic development project at the intersection of Route 228 and Franklin Road
Project Allocation
2,000,000
(B) Site acquisition, development, infrastructure improvements, mitigation and removal of hazardous materials, construction and other related costs for redevelopment of the Doyle Equipment site
Project Allocation
2,000,000
(C) Acquisition, redevelopment, infrastructure improvements, construction and other related costs for a business incubator and small business development center
Project Allocation
2,500,000
(D) Site acquisition, development, infrastructure improvements, mitigation and removal of hazardous materials, construction and other related costs for the Freedom Road redevelopment project
Project Allocation
2,500,000
(E) Site development, infrastructure improvements, construction and other related costs for an economic development project at the intersection of Rochester Road and Route 19
Project Allocation
3,000,000
(F) Infrastructure improvements, mitigation and removal of hazardous materials, construction and other related costs for redevelopment of two adjacent industrial sites along the Route 19 North corridor
Project Allocation
4,000,000
(iii) Butler County Community Development Corporation
(A) Construction, infrastructure, acquisition, redevelopment and other costs associated with economic development projects in southern Butler County
Project Allocation
5,000,000
(iv) Mars Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for downtown streetscape improvements, including sidewalk upgrades and street lighting
Project Allocation
3,000,000
(v) Redevelopment Authority of the County of Butler
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the Arden Wood development project
Project Allocation
5,000,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for an economic development project in Jackson Township, including, but not limited to, streetscape improvements
Project Allocation
10,000,000
(vi) Summit Township
(A) Infrastructure improvements, renovations, construction and other related costs for Summit Academy New Perspective Drug and Alcohol Inpatient Treatment Center project
Project Allocation
4,000,000
(B) Infrastructure improvements, renovations and construction of Summit Academy
Project Allocation
4,000,000
(vii) Butler County Tourism Foundation
(A) Acquisition, infrastructure, revitalization, construction and other related costs for community economic development for the City of Butler, including redevelopment and renovation of the historic Penn Theater and adjacent property
Project Allocation
750,000
(11) Cambria County
(i) Cambria County Redevelopment Authority
(A) Infrastructure, construction and other related costs for an Ebensburg Medical Office building
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the relocation and expansion of Diamond-MT
Project Allocation
7,500,000
(i.1) City of Johnstown
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Johnstown Center for Higher Education for developing a higher education facility
Project Allocation
3,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Pennsylvania Highlands Community College Downtown Johnstown Campus project
Project Allocation
3,000,000
(ii) Loretto Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an engineering facility associated with Saint Francis University
Project Allocation
5,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a health sciences facility associated with Saint Francis University
Project Allocation
10,000,000
(iii) County Projects
(A) Acquisition, infrastructure, construction and other related costs for redevelopment of Conemaugh Health System facilities
Project Allocation
1,750,000
(B) Infrastructure, construction and other related costs for the Laurel Highlands Civic Center to house the East Hills Recreation Commission
Project Allocation
3,500,000
(C) Acquisition, site development, rehabilitation, environmental remediation, infrastructure, construction and other related costs for an economic development project in Cambria County
Project Allocation
10,000,000
(12) (Reserved)
(13) Carbon County
(i) Jim Thorpe Borough
(A) Construction, infrastructure and other related costs for a new borough building
Project Allocation
500,000
(B) Renovations for the Carbon County Courthouse
Project Allocation
500,000
(C) Renovations for the Carbon County Courthouse Annex
Project Allocation
300,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for the Flagstaff Resort Gondola project
Project Allocation
2,500,000
(ii) Kidder Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for an economic development project associated with the I-476 and Route 80 corridor
Project Allocation
10,000,000
(B) Dredge and rehabilitate historic Lake Harmony to preserve the economic and recreational value of the lake and surrounding community
Project Allocation
1,000,000
(iii) Mahoning Township
(A) Construction, redevelopment and other related costs for a new fire department building
Project Allocation
750,000
(iv) Nesquehoning Township
(A) Construction, redevelopment and other related costs for the Ametek expansion project
Project Allocation
3,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for capital improvements to the Fire Training and Emergency Operations facility
Project Allocation
6,500,000
(v) Palmerton Borough
(A) Construction, infrastructure and other related costs for the regional Wall Street West Initiative
Project Allocation
25,000,000
(vi) Penn Forest Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for an economic development project associated with the I-476 and Route 903 corridor
Project Allocation
10,000,000
(vii) County Projects
(A) Construction, infrastructure improvements, renovations, rehabilitation, abatement of hazardous materials and other related costs for projects at Blue Mountain Hospital at the Palmerton campuses
Project Allocation
2,500,000
(B) Construction, infrastructure and other related costs for the renovation of a county office building
Project Allocation
1,000,000
(C) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants
Project Allocation
1,000,000
(14) Centre County
(i) Bellefonte Borough
(A) Design, infrastructure, construction and other related costs for the development of Bellefonte Borough's downtown and/or waterfront redevelopment, Phase II
Project Allocation
7,000,000
(i.1) Benner Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an aircraft rescue and firefighting facility at University Park Airport
Project Allocation
6,000,000
(i.2) Spring Township
(A) Construction of a Health Sciences Building and on-site training facility at the Central Pennsylvania Institute of Science and Technology, including facility construction, infrastructure, site preparation and other related costs
Project Allocation
8,000,000
(ii) The Pennsylvania State University
(A) Design, infrastructure, abatement of hazardous materials, construction and other related costs for a medical research and educational facility as part of the university's regional medical campus at University Park Campus
Project Allocation
22,500,000
(B) Design, infrastructure, abatement of hazardous materials and construction for the Arboretum Cultural District rehabilitation project, Phase 1a, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades at University Park Campus
Project Allocation
28,500,000
(ii.1) Centre County Recycling and Refuse Authority
(A) Acquisition, construction, infrastructure, redevelopment, renovation, materials, machinery and equipment and other related costs for the County Recycling and Refuse Authority converting to a CNG fleet
Project Allocation
1,293,000
(iii) County Projects
(A) Infrastructure, redevelopment, construction and other related costs for expansion of exhibit arenas, barns and associated facilities at the Centre County Grange Park Equine Center
Project Allocation
4,000,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project
Project Allocation
5,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for a skilled nursing care facility
Project Allocation
10,000,000
(D) Acquisition, infrastructure, construction and other related costs for Centre Care, Inc., including renovation and rehabilitation of existing facilities and construction of new nursing home facilities
Project Allocation
10,000,000
(E) Acquisition, infrastructure, construction, machinery, equipment and other related costs for a Health Sciences building at Central Pennsylvania Institute of Science and Technology
Project Allocation
8,000,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project
Project Allocation
20,000,000
(15) Chester County
(i) Chester County Economic Development Committee
(A) Construction, infrastructure, renovation and other related costs for a manufacturing facility for the National Guard Weapons of Mass Destruction/Civil Support Teams
Project Allocation
3,000,000
(i.1) Chester County Industrial Development Authority
(A) Infrastructure, redevelopment, construction and other related costs for renovations to the Chester County Historical Society facilities
Project Allocation
725,000
(B) Infrastructure, redevelopment, construction and other related costs for renovation and rehabilitation of the Moorhead Environmental complex
Project Allocation
2,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for the development of a wireless network technology facility
Project Allocation
3,000,000
(D) Infrastructure, construction and other related costs for a multiphased renovation project for student and faculty housing
Project Allocation
10,000,000
(E) Acquisition, infrastructure, rehabilitation, construction and other related costs for commercial, industrial and residential development for the Route 724 corridor
Project Allocation
10,000,000
(F) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project in Chester County
Project Allocation
10,000,000
(G) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for development and expansion of transportation centers
Project Allocation
15,000,000
(H) Infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the Great Valley Corporate Center mixed-use redevelopment project
Project Allocation
10,000,000
(I) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of medically necessary fixtures and other related costs for Paoli Hospital or other facilities of Main Line Health System
Project Allocation
20,000,000
(ii) City of Coatesville
(A) Construction, infrastructure, acquisition and other related costs for the development and expansion of Coatesville City Hall
Project Allocation
7,500,000
(B) Construction, infrastructure, acquisition and other related costs for the development of a municipal parking garage
Project Allocation
10,000,000
(C) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for transit-oriented development
Project Allocation
20,000,000
(iii) Downingtown Borough
(A) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for transit-oriented development
Project Allocation
20,000,000
(B) Construction, infrastructure, acquisition and other related costs for the development of a municipal parking garage
Project Allocation
10,000,000
(iii.1) Easttown and Tredyffrin Townships
(A) Construction, infrastructure, renovation and other related costs for the redevelopment of the Fritz Lumberyard property and adjoining Eadeh-owned commercial property
Project Allocation
3,500,000
(iv) East Whiteland Township
(A) Construction, infrastructure, acquisition, abatement of hazardous materials, redevelopment, renovation and other related costs for the Great Valley Corporate Center redevelopment
Project Allocation
10,000,000
(B) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for the redevelopment of property at the intersection of Route 29 and Route 202
Project Allocation
5,000,000
(C) Construction, infrastructure, acquisition and related costs associated with the development of the Immaculata University Student Engagement Center
Project Allocation
15,000,000
(v) Kennett Square Borough
(A) Infrastructure, construction and other related costs for the expansion of a parking garage
Project Allocation
1,600,000
(B) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for the East Linden Street parking garage expansion project
Project Allocation
1,623,000
(vi) London Grove Township
(A) Construction, infrastructure, acquisition and other related costs for the development of the London Grove Township maintenance facility
Project Allocation
3,000,000
(vii) London Grove and West Marlborough Townships
(A) Construction, infrastructure, acquisition, redevelopment, renovation and other related costs for Stroud Water Research Center improvement project
Project Allocation
2,000,000
(viii) Lower Oxford Township
(A) Construction, infrastructure, abatement of hazardous materials, acquisition, redevelopment, renovation and other related costs for the development of the Lincoln University Student and Faculty Housing project
Project Allocation
10,000,000
(ix) New Garden Township
(A) Construction, infrastructure, acquisition and other related costs for the development of the Southern Chester County Regional Police Department
Project Allocation
5,000,000
(x) Oxford Borough
(A) Acquisition, construction, infrastructure and other related costs for an economic development redevelopment project, including a multimodal transit center and parking garage in downtown Oxford
Project Allocation
5,000,000
(xi) Penn Township
(A) Construction, infrastructure, acquisition and other related costs for the development of the Penn Township Community Center
Project Allocation
5,000,000
(xii) Phoenixville Borough
(A) Construction, infrastructure, acquisition and other related costs for the development of a Community Multiservice Center
Project Allocation
3,000,000
(B) Construction, infrastructure, acquisition and other related costs for the development and expansion of a Fire Station
Project Allocation
10,000,000
(C) Construction, infrastructure, acquisition and other related costs for the development of a Community Recreation Center
Project Allocation
10,000,000
(D) Construction, infrastructure, acquisition, abatement and other related costs for the development of a municipal parking structure
Project Allocation
10,000,000
(xiii) Schuylkill Township
(A) Construction, infrastructure, acquisition and other related costs for the development and renovation of infrastructure at the Freedom Foundation at Valley Forge
Project Allocation
4,000,000
(xiv) Thornbury Township
(A) Infrastructure, construction and other related costs for a municipal building and community facility
Project Allocation
750,000
(B) Construction, infrastructure, redevelopment and other related costs for the Cheyney University revitalization project
Project Allocation
20,000,000
(xv) West Chester Borough
(A) Construction, infrastructure, acquisition and other related costs for building renovations at the Chester County Historical Society
Project Allocation
725,000
(B) Construction, infrastructure, acquisition, abatement and other related costs for the development and expansion of municipal facilities
Project Allocation
30,000,000
(xvi) West Grove Township
(A) Construction, infrastructure, acquisition and related costs associated with the development of the West Grove Fire Company building
Project Allocation
10,000,000
(xvii) West Whiteland Township
(A) Construction, infrastructure, acquisition and other related costs for the development and expansion of the Program Activity and Resource Campus
Project Allocation
3,000,000
(B) Construction, infrastructure, acquisition and other related costs for the development of the West Whiteland Township Public Works building
Project Allocation
10,000,000
(xviii) County Projects
(A) Construction, infrastructure, abatement of hazardous materials, acquisition, redevelopment, renovation and other related costs for transportation centers
Project Allocation
15,000,000
(B) Construction, infrastructure, abatement of hazardous materials, acquisition, redevelopment, renovation and other related costs for the development of innovation centers
Project Allocation
10,000,000
(C) Construction, infrastructure, acquisition, redevelopment, renovation and other related costs for an economic development project
Project Allocation
10,000,000
(D) Construction, infrastructure, abatement of hazardous materials, acquisition, redevelopment, renovation and other related costs for the development of a performing arts/multicultural facility
Project Allocation
5,000,000
(E) Construction, infrastructure, acquisition, abatement of hazardous materials and related costs associated with Brandywine Valley Railroad rehabilitation
Project Allocation
5,000,000
(F) Construction, infrastructure, acquisition, abatement of hazardous materials and related costs associated with ArcelorMittal rail rehabilitation
Project Allocation
2,500,000
(16) Clarion County
(i) Clarion Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs to make necessary improvements to the freight lanes connecting the Glassworks Business Park to major State routes
Project Allocation
3,040,000
(ii) County Projects
(A) Acquisition, construction, renovation, infrastructure and other related costs for a medical facility in Monroe Township
Project Allocation
10,000,000
(17) Clearfield County
(i) City of DuBois
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for demolition and redevelopment of abandoned properties
Project Allocation
500,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for rehabilitation of a commercial business building in the historic section of downtown
Project Allocation
750,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for a business development building in the downtown area
Project Allocation
1,125,000
(D) Acquisition, infrastructure, rehabilitation, construction and other related costs for streetscape improvements to Main Street and DuBois Street, including roadway reconstruction, landscaping, lighting, traffic control devices and other related improvements
Project Allocation
1,500,000
(E) Acquisition, infrastructure, rehabilitation, construction and other related costs for an elderly housing complex
Project Allocation
1,500,000
(F) Infrastructure, redevelopment, construction and other related costs for development of the DuBois Community Park, including an ice skating rink, playing fields and renovations to the community pool
Project Allocation
1,500,000
(G) Acquisition, infrastructure, rehabilitation, construction and other related costs for a new community theater and conference center
Project Allocation
2,000,000
(H) Acquisition, infrastructure, rehabilitation, construction and other related costs for a multistory housing unit
Project Allocation
2,500,000
(I) Infrastructure, construction and other related costs for the rehabilitation of a community football stadium
Project Allocation
2,500,000
(J) Acquisition, infrastructure, rehabilitation, construction and other related costs for a new municipal and emergency services building
Project Allocation
2,500,000
(K) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for an economic development project
Project Allocation
10,000,000
(ii) Clearly Ahead Development
(A) Infrastructure, redevelopment, construction and other related costs for the DuBois Area YMCA, including new roofing, HVAC units, gymnasium flooring, locker rooms, swimming pool upgrades and the addition of a therapy pool
Project Allocation
620,000
(B) Infrastructure, redevelopment, construction and other related costs for the Curwensville multitenant complex
Project Allocation
1,000,000
(C) Infrastructure, redevelopment, construction and other related costs for the Clearfield Alliance Park multitenant complex
Project Allocation
1,000,000
(D) Infrastructure, redevelopment, construction and other related costs for an outpatient facility, support services and parking area
Project Allocation
1,500,000
(E) Infrastructure, redevelopment, construction and other related costs for renovations and upgrades of the Penn Highlands Healthcare-Clearfield Hospital, including the emergency department, patient rooms, supportive services and parking facility
Project Allocation
1,500,000
(F) Acquisition, infrastructure, rehabilitation, construction and other related costs for an outpatient medical building, including outpatient diagnostic, radiologic services, therapeutic services, construction of a continuity clinic and support services for a Graduate Medical Education Program
Project Allocation
3,000,000
(G) Infrastructure, rehabilitation, construction and other related costs for expansion, renovations and upgrades to the East Campus of Penn Highlands Healthcare, including outpatient services, therapeutic services, behavioral health services, drug and alcohol services, parking and utility upgrades
Project Allocation
4,000,000
(H) Infrastructure, rehabilitation, construction and other related costs for expanding the outpatient facility, support services and parking area of Penn Highlands Healthcare
Project Allocation
5,000,000
(I) Acquisition, infrastructure, rehabilitation, environmental remediation, construction and other related costs for economic development projects in Clearfield County
Project Allocation
5,000,000
(J) Infrastructure, rehabilitation, construction and other related costs for renovations and upgrades of the Penn Highlands Healthcare Clearfield Hospital, including the behavioral health services, outpatient diagnostic, radiologic, therapeutic services, parking and utility upgrades
Project Allocation
6,000,000
(K) Infrastructure, rehabilitation, construction and other related costs for a new emergency department and patient rooms, including outpatient diagnostic, radiologic, therapeutic services, other outpatient services, parking and utility upgrades
Project Allocation
10,000,000
(iii) City of DuBois
(A) Infrastructure, rehabilitation, construction and other related costs for redevelopment of First Commonwealth Bank building in downtown DuBois
Project Allocation
3,000,000
(iv) County Projects
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for an economic development project
Project Allocation
15,000,000
(18) Clinton County
(i) Castanea Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a baseball field complex
Project Allocation
1,163,000
(i.1) Clinton County Economic Partnership
(A) Infrastructure, redevelopment, construction and other related costs for a gas transmission line extension into Lamar Business Park
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for implementing and installing a fish ladder along the West Branch of the Susquehanna River
Project Allocation
4,500,000
(i.2) Leidy Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for establishing elk viewing areas for Kettle Creek State Park
Project Allocation
500,000
(i.3) City of Lock Haven
(A) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the creation of a county cultural center
Project Allocation
1,600,000
(i.4) Lock Haven Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a manufacturing or business space project at the former Piper Aircraft manufacturing facility property
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a sports complex project at Lock Haven University
Project Allocation
5,000,000
(i.5) Lock Haven University
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the renovation and expansion of the Lock Haven University East Campus Wrestling Center
Project Allocation
4,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the renovation and expansion of the Lock Haven University East Campus Tiered Classroom project
Project Allocation
1,000,000
(i.6) Spring Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a Health Sciences Building at Central Pennsylvania Institute of Science and Technology
Project Allocation
8,000,000
(ii) Lycoming - Clinton Counties Commission for Community Action
(A) Infrastructure, construction and other related costs for the STEP Clinton County Community Center expansion project
Project Allocation
1,250,000
(iii) County Projects
(A) Infrastructure, construction and other related costs for the Mill Hall gas line extension project
Project Allocation
3,000,000
(B) Infrastructure, construction and other related costs for the Beech Creek Borough and Beech Creek Township gas line extension project
Project Allocation
4,500,000
(C) Infrastructure, construction and other related costs for a Rails to Trails connector trail to connect the City of Lock Haven and Castanea to the Pine Creek Rail Trail
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project
Project Allocation
20,000,000
(19) Columbia County
(i) Conyngham Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for development of Blaschak Coal Corporation's anthracite mine project
Project Allocation
4,500,000
(i.1) Columbia County Housing Corporation
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for development of the former Bloom Mills property
Project Allocation
2,000,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for redevelopment and reuse of land and buildings in Berwick Borough, including parking and common area improvements
Project Allocation
2,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for the development of the former Moose building and adjoining properties in the Town of Bloomsburg
Project Allocation
3,000,000
(D) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for an economic development project in Berwick Borough
Project Allocation
3,000,000
(ii) Columbia County Industrial Development Authority
(A) Acquisition, infrastructure, site preparation, rehabilitation, abatement of hazardous materials, construction and other related costs for a business park
Project Allocation
1,500,000
(iii) Columbia County Redevelopment Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Berwick YMCA
Project Allocation
750,000
(B) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of facilities to support growth in production volumes and jobs for Arconic, Inc.
Project Allocation
10,000,000
(iv) Town of Bloomsburg
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a parking garage, hotel and conference center
Project Allocation
10,000,000
(v) County Projects
(A) Infrastructure, redevelopment, construction and other related costs for the development of a stage, track and grandstand in the Town of Bloomsburg
Project Allocation
1,250,000
(B) Acquisition, infrastructure and other related costs for an economic development project in the county
Project Allocation
2,500,000
(20) Crawford County
(i) Economic Progress Alliance of Crawford County
(A) Acquisition, site planning, remediation, renovation, rehabilitation, construction, infrastructure improvements and other related costs for the development of the Conneaut Lake Park Performing Arts Center
Project Allocation
2,000,000
(B) Acquisition, site planning, remediation, renovation, rehabilitation, construction, infrastructure improvements and other related costs for the development of the Conneaut Lake Park Dreamland Expo Center
Project Allocation
2,000,000
(C) Site planning, remediation, renovation, rehabilitation, construction, infrastructure improvements and other related costs for the continued development of the Broadway building at the Crawford Business Park
Project Allocation
3,000,000
(D) Acquisition, environmental assessment, planning, remediation, rehabilitation, infrastructure improvements, construction and other related costs for continued site remediation at the Bessemer Commerce Park
Project Allocation
3,000,000
(E) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Meadville Area Recreation Complex to develop and expand services within Crawford County
Project Allocation
5,000,000
(ii) Titusville Redevelopment Authority
(A) Infrastructure, redevelopment, construction and other related costs for the Brine Extraction Process TOP building renovations
Project Allocation
1,500,000
(B) Infrastructure, redevelopment, construction and other related costs for the renovation of the former YMCA building and development of housing units in downtown Titusville
Project Allocation
1,500,000
(C) Infrastructure, redevelopment, construction and other related costs for renovations to the Titusville YMCA, including construction of an indoor swimming pool, wellness center and parking lot
Project Allocation
2,130,000
(D) Infrastructure, redevelopment, construction and other related costs for a hotel and restaurant development project
Project Allocation
5,000,000
(E) Infrastructure, redevelopment, construction and other related costs for the Rail Siding Industrial Incubator project, including the construction of an industrial building
Project Allocation
10,000,000
(F) Infrastructure, rehabilitation, construction and other related costs for the JMA Industrial Complex access and rail siding project
Project Allocation
1,500,000
(iii) Redevelopment Authority of the City of Meadville
(A) Acquisition, renovation, infrastructure, construction and other related costs for the Allegheny College Campus
Project Allocation
10,000,000
(21) Cumberland County
(i) Cumberland Area Economic Development Corporation
(A) Demolition, renovation, construction, infrastructure and other related costs for expansion of the Carlisle Family YMCA facility
Project Allocation
3,000,000
(B) Acquisition, demolition, construction, infrastructure, site preparation, environmental remediation and other related costs for redevelopment of the former Lemoyne Middle School building
Project Allocation
3,000,000
(C) Renovation, construction, infrastructure and other related costs for rehabilitation and expansion of the Allenberry Resort and facilities
Project Allocation
3,000,000
(D) Acquisition, site preparation, construction and infrastructure of a multiuse sports complex
Project Allocation
5,000,000
(E) Construction, site improvement, infrastructure, environmental remediation, redevelopment and other related costs for an economic development project
Project Allocation
20,000,000
(ii) Cumberland County Housing and Redevelopment Authorities
(A) Site development, construction, infrastructure and other related costs for development of a mixed-use redevelopment project in Carlisle Borough
Project Allocation
5,000,000
(B) Infrastructure, construction and school modernization of the Central Pennsylvania Youth Ballet's Warehouse Studio location
Project Allocation
3,000,000
(ii.1) Cumberland County Industrial Development Authority
(A) Acquisition, renovation, redevelopment, demolition, construction, infrastructure and other related costs for the redevelopment of the Carlisle United Methodist Church complex
Project Allocation
3,000,000
(iii) Camp Hill Borough
(A) Acquisition, construction, renovation, infrastructure and other related costs for the Pennsylvania Ballet Academy studio, administrative offices and dormitories
Project Allocation
10,000,000
(iv) Carlisle Borough
(A) Acquisition, site development, construction, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs for redevelopment of downtown
Project Allocation
2,500,000
(iv.1) Lemoyne Borough
(A) Acquisition, infrastructure, construction and other related costs for the replacement of the West Shore Bureau of Fire Station
Project Allocation
1,500,000
(iv.2) Middlesex Township
(A) Construction, infrastructure and other related costs for the Army Heritage and Education Center expansion project
Project Allocation
15,000,000
(v) Monroe Township
(A) Site preparation, acquisition, infrastructure, demolition, construction and other related costs for expansion of the Speranza Animal Rescue and Rehabilitation facilities
Project Allocation
2,000,000
(vi) Shippensburg Borough
(A) Site preparation, acquisition, infrastructure, demolition, renovation, construction and other related costs for expansion of the Katie's Place facility
Project Allocation
2,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of the former Domestic Castings site with commercial and mixed-use development to support Cumberland County industrial development
Project Allocation
3,000,000
(22) Dauphin County
(i) Capital Region Economic Development Corporation
(A) Construction, infrastructure and other related costs for a multiuse soccer stadium
Project Allocation
5,000,000
(i.1) Dauphin County Redevelopment Authority
(A) Acquisition, construction, infrastructure, rehabilitation, renovation, abatement, storm water control and other related costs to build mixed-use building
Project Allocation
15,000,000
(i.2) Derry Township
(A) Acquisition, infrastructure, construction and other related costs for regional sports and recreational facilities
Project Allocation
55,000,000
(i.3) Derry Township Industrial and Commercial Development Authority
(A) Acquisition, construction, infrastructure and other related costs for the development of a community ice rink complex and related amenities
Project Allocation
5,000,000
(B) Construction, renovation and other related costs for the expansion of the upper level seating area, additional luxury suites and renovations to the existing suites and club seat section of the Giant Center
Project Allocation
4,000,000
(i.4) Lower Paxton Township
(A) Construction and other related costs to complete Heroes Grove Memorial Amphitheater
Project Allocation
750,000
(i.5) Lower Swatara Township
(A) Construction, infrastructure, renovation and other related costs for a central park, including walking trails, a dog park and athletic fields
Project Allocation
1,050,000
(B) Construction, infrastructure, renovation, abatement of hazardous materials and other related costs for an economic development project at Harrisburg International Airport
Project Allocation
10,000,000
(i.6) Lykens Borough
(A) Demolition, abatement of hazardous materials, redevelopment and other related costs for revitalization and economic development
Project Allocation
500,000
(i.7) Middle Paxton Township
(A) Acquisition, infrastructure, demolition, site preparation, construction, renovation, architectural/design and other related costs for the expansion of the Dauphin County Solar Farm
Project Allocation
4,000,000
(i.8) The Pennsylvania State University
(A) Design, infrastructure, abatement of hazardous materials and construction of a research and education building, including a parking garage, at the College of Medicine, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the Milton S. Hershey Medical Center
Project Allocation
80,000,000
(ii) Steelton Borough
(A) Infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for redevelopment of a six-acre parcel of land in the borough's Front Street corridor
Project Allocation
4,000,000
(iii) Susquehanna Area Regional Airport Authority
(A) Site preparation, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for an economic development project at the Harrisburg International Airport
Project Allocation
10,000,000
(iv) Dauphin County General Authority
(A) Acquisition, rehabilitation, infrastructure, construction and other related costs for an academic center within the City of Harrisburg
Project Allocation
47,250,000
(v) Capital Region Economic Development Corporation
(A) Acquisition, redevelopment and construction of a business incubator in the City of Harrisburg
Project Allocation
1,150,000
(vi) City of Harrisburg
(A) Acquisition, redevelopment, environmental remediation, infrastructure, construction and other related costs for the Salvation Army Harrisburg facility
Project Allocation
5,000,000
(B) Redevelopment, renovation, infrastructure, construction and other related costs for building systems, mission-critical technology, science center exhibits and theater seating at Whitaker Center for Science and Arts
Project Allocation
6,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Gamut Theatre Education Center project at the former First Church of God building
Project Allocation
1,300,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the dechannelization of Paxton Creek to allow for flood mitigation and additional redevelopment
Project Allocation
60,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment, flood control, land assembly and other related costs for a City Island development project
Project Allocation
10,000,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an existing or alternate site municipal building project
Project Allocation
15,000,000
(G) Acquisition, construction, infrastructure, utilities, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a transportation-oriented development project centered around the train station
Project Allocation
25,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects
Project Allocation
20,000,000
(vii) Derry Township
(A) Redevelopment, infrastructure, construction and other related costs for the downtown Hershey Master Plan, including streetscapes, economic development and public space
Project Allocation
5,000,000
(vii.1) Swatara Township
(A) Acquisition, site preparation, infrastructure, demolition, renovation, construction and/or related permitting and design costs for the Swatara Township Police Department building
Project Allocation
2,500,000
(23) Delaware County
(i) Aston Township
(A) Acquisition, infrastructure, construction and other related costs for a public works facility
Project Allocation
1,000,000
(B) Infrastructure, construction and other related costs for a police department and township administration building
Project Allocation
2,500,000
(C) Infrastructure, construction and other related costs for a fire station
Project Allocation
3,000,000
(i.1) City of Chester
(A) Acquisition, infrastructure, environmental remediation, construction and other related costs for an urban mixed-use development/redevelopment of 20 acres to include housing, commercial, retail and medical uses
Project Allocation
15,000,000
(ii) Chester Township
(A) Acquisition, demolition, infrastructure, rehabilitation, construction and other related costs for a police department facility
Project Allocation
3,000,000
(iii) Concord Township
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic project
Project Allocation
4,000,000
(iv) Delaware County Economic Development
(A) Acquisition, redevelopment, site preparation, construction and other related costs for redevelopment of the abandoned Foamex plant along the Delaware River
Project Allocation
12,000,000
(v) Delaware County Industrial Development Authority
(A) Acquisition, demolition, renovation, remediation, infrastructure and other related costs for an economic development project in Delaware County
Project Allocation
10,000,000
(B) Construction, infrastructure and related development costs for the completion of Phase II - Ridley Square mixed-use development project
Project Allocation
4,000,000
(vi) Delaware County Redevelopment Authority
(A) Infrastructure, redevelopment, construction and other related costs for capital improvements to a manufacturing facility along the Delaware River in the City of Chester
Project Allocation
10,000,000
(B) Acquisition, demolition, renovation, remediation, infrastructure and other related costs for an economic development project in Delaware County
Project Allocation
10,000,000
(C) Acquisition, infrastructure, construction and other related costs for a redevelopment project on or around the campus of an institution of higher education in a city of the third class in Delaware County
Project Allocation
10,000,000
(D) Acquisition, infrastructure, construction and other related costs for an energy equipment upgrade project
Project Allocation
20,000,000
(E) Acquisition, construction, renovation, rehabilitation and related costs for the Brandywine Conservancy and Museum of Art
Project Allocation
7,000,000
(F) Construction, redevelopment, renovation and related infrastructure of a capital improvement project at the Boeing facility
Project Allocation
30,000,000
(G) Site preparation, rehabilitation and construction of full-service, all-year, all-weather turf fields to accommodate collegiate/intramural competition and practices, educational camps, clinics and events for community groups and Neumann University
Project Allocation
2,000,000
(H) Site preparation, rehabilitation and construction of a multipurpose wellness field house adjacent to Neumann University's sports fields that will provide collegiate competition, recreation and wellness amenities in addition to coaches' training and community programming access for Aston Township and the surrounding region
Project Allocation
2,500,000
(I) Site preparation, rehabilitation and construction of a Community Health Clinic to provide health care services to the local community and medically underserved areas and to function as an educational hub and clinical space for Neumann University students
Project Allocation
3,000,000
(J) Site preparation, rehabilitation and construction of a multipurpose building to house a student center, centralized services, expanded space for activities and programs and meeting rooms for educational and community-sponsored activities for Neumann University
Project Allocation
4,500,000
(vii) Eddystone Borough
(A) Acquisition, infrastructure, redevelopment, construction and other related costs for the revitalization of Eddystone "Village" area
Project Allocation
1,300,000
(vii.1) Folcroft Borough
(A) Construction, redevelopment and other related costs for the Folcroft Borough Hall, police station and community center
Project Allocation
4,500,000
(viii) Marcus Hook Borough
(A) Infrastructure, construction and other related costs for structural improvements to the Delaware River fishing pier
Project Allocation
625,000
(ix) Nether Providence Township
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a cultural, civic or historical facility
Project Allocation
3,000,000
(x) Newtown Township
(A) Infrastructure, construction and other related costs for a new multistory, six-bay station house for fire and EMS equipment
Project Allocation
2,850,000
(xi) Radnor Township
(A) Construction, infrastructure, redevelopment and other related costs for Villanova University Performing Arts Center revitalization project
Project Allocation
10,000,000
(B) Construction, infrastructure, redevelopment and other related costs for Villanova University Pavilion renovation project
Project Allocation
10,000,000
(C) Construction, renovation and rehabilitation of capital facilities, including infrastructure, on the campus of Cabrini University
Project Allocation
20,000,000
(D) Infrastructure, construction and other related costs for the development of a STEM Education Center at the Academy of Notre Dame
Project Allocation
4,000,000
(xi.1) Tinicum Township
(A) Construction, infrastructure, redevelopment and other related costs for the renovation and restoration of the Lazaretto Building
Project Allocation
2,000,000
(xii) Trainer Borough
(A) Acquisition, infrastructure, redevelopment, construction and other related costs for a borough hall building, including offices, public meeting areas, police station, public works and a community center
Project Allocation
7,000,000
(xiii) Yeadon Borough
(A) Construction, infrastructure, renovation and other related costs for patient care facilities within the Trinity Health System
Project Allocation
25,000,000
(xiv) County Projects
(A) Infrastructure, rehabilitation, environmental remediation, construction and other related costs for a county economic development project
Project Allocation
20,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for phased development of a combined resource recovery and manufacturing facility in Delaware County
Project Allocation
10,000,000
(C) Construction, infrastructure, redevelopment, environmental improvements and other related costs for economic development projects
Project Allocation
20,000,000
(24) Elk County
(i) Northcentral Region Development and Planning Commission
(A) Acquisition, rehabilitation, renovations, construction and other related costs for redevelopment of a building located on Brusselles Street in St. Mary's
Project Allocation
500,000
(B) Infrastructure, construction and other related costs for renovations of an outpatient facility, support services and parking area of Penn Highlands Healthcare - Elk facility
Project Allocation
1,500,000
(C) Infrastructure, construction and other related costs for renovations, expansion and upgrades to Pinecrest Manor, including support services, parking and utilities
Project Allocation
2,100,000
(D) Upgrades and conversion of the Penn Highlands Healthcare - Elk electronic medical records system
Project Allocation
3,000,000
(E) Infrastructure, construction and other related costs for expansion, renovations and upgrades of an outpatient facility, support services, parking area and utilities for Penn Highlands Healthcare - Elk
Project Allocation
4,000,000
(25) Erie County
(i) Erie County General Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an industrial facility renovation project
Project Allocation
1,500,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for a commercial facility renovation project
Project Allocation
1,750,000
(C) Acquisition, demolition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a brownfield redevelopment project
Project Allocation
2,000,000
(D) Acquisition, infrastructure, redevelopment, construction and other related costs for a senior healthcare and living center
Project Allocation
14,000,000
(E) Acquisition, renovation and redevelopment of an industrial facility to provide space for new manufacturing companies
Project Allocation
1,500,000
(F) Acquisition, renovation and redevelopment of a commercial facility to provide space for new and expanding companies
Project Allocation
1,750,000
(G) Acquisition, demolition, renovation, environmental remediation, construction and other related costs for redevelopment of a brownfield property and vacant buildings on the property
Project Allocation
2,000,000
(H) Renovation, redevelopment, construction and other related costs for a Gannon University building enhancement project
Project Allocation
5,000,000
(I) Acquisition, infrastructure, construction and redevelopment of properties within the Our West Bayfront district to promote neighborhood business activities
Project Allocation
10,000,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the ExpERIEnce Children's Museum expansion project
Project Allocation
5,000,000
(ii) Redevelopment Authority in the City of Corry
(A) Infrastructure, redevelopment, construction and other related costs for an industrial facility in the Corry Industrial Park
Project Allocation
1,000,000
(iii) Redevelopment Authority of Erie
(A) Acquisition of a facility to house a new University of Pittsburgh Medical Center Call Center
Project Allocation
1,500,000
(B) Acquisition, demolition, environmental remediation, infrastructure, construction and other related costs for renovations to a nursing and personal care community serving primarily low-income seniors
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new pharmacy school at Lake Erie College of Osteopathic Medicine
Project Allocation
20,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for expansion of Lake Erie College of Osteopathic Medicine, including new buildings and facilities.
Project Allocation
25,000,000
(iv) City of Erie
(A) Acquisition, rehabilitation, redevelopment and construction of a new state-of-the-art otter exhibit, including an underwater viewing area and replacement of visitor walkways
Project Allocation
1,000,000
(B) Acquisition, rehabilitation, redevelopment and expansion of the inner-city BLOOM Campus
Project Allocation
2,500,000
(C) Acquisition, rehabilitation, redevelopment and construction for the revitalization of strategic neighborhood commercial and mixed-use areas within the city, as related to the city's comprehensive plan, Erie Refocused
Project Allocation
20,000,000
(D) Rehabilitation, redevelopment, infrastructure and construction for educational campus-related improvements
Project Allocation
25,000,000
(E) Acquisition, rehabilitation, infrastructure and construction for improvements to promote business expansion and redevelopment efforts within the Erie Bayfront
Project Allocation
25,000,000
(F) Acquisition, rehabilitation and construction for revitalization projects and infrastructure upgrade initiatives to promote investment in the downtown core
Project Allocation
30,000,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for building four residential community homes for Erie Homes for Children and Youth
Project Allocation
1,500,000
(v) Millcreek Township
(A) Acquisition, rehabilitation, redevelopment and construction of the Gateway to Presque Isle to promote business development along the Gateway to Presque Isle State Park
Project Allocation
15,000,000
(B) Acquisition, rehabilitation, redevelopment and construction to enhance the economic viability of key commercial corridors within Millcreek Township as related to the strategic corridor redevelopment initiative
Project Allocation
15,000,000
(vi) Erie-Western Pennsylvania Port Authority
(A) Redevelopment, construction and other related costs for the renovation and rehabilitation of the historic McAllister Place and improvements to the adjacent Dobbins Landing public dock
Project Allocation
7,000,000
(B) Redevelopment, renovation and construction and other related costs for improvements to Liberty Pier, including infrastructure improvements to the boat storage yard and improvements to the park
Project Allocation
10,000,000
(C) Renovation, rehabilitation, construction and other related costs for repairs and replacement of the dock walls along Presque Isle Bay
Project Allocation
20,000,000
(vii) County Projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new community college in Erie County
Project Allocation
10,000,000
(26) Fayette County
(i) Bullskin Township
(A) Infrastructure, redevelopment, construction and other related costs for expansion of Bullskin Quarry
Project Allocation
2,000,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for additional development of youth sports and recreational facilities
Project Allocation
2,000,000
(ii) Brownsville Borough
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a Brownsville revitalization project, including rehabilitation of the downtown area and construction of a municipal complex
Project Allocation
10,000,000
(iii) City of Connellsville
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a Connellsville revitalization project, including rehabilitation of the downtown area and construction of a municipal complex
Project Allocation
10,000,000
(B) Acquisition, infrastructure, construction and other related costs for community economic development in the City of Connellsville
Project Allocation
2,000,000
(iv) City of Uniontown
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for reconstruction, expansion and other improvements to the Uniontown Hospital Campus
Project Allocation
15,000,000
(v) Fayette County Redevelopment Authority
(A) Acquisition, site development, infrastructure, rehabilitation, construction and other related costs for an aquatics facility at the Uniontown Area YMCA
Project Allocation
7,500,000
(B) Acquisition, infrastructure, construction and other related costs for community economic development in Fayette County
Project Allocation
25,000,000
(vi) Redevelopment Authority of the City of Connellsville
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for redevelopment of commercial mixed-use buildings
Project Allocation
5,000,000
(vii) Redstone Township
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for Republic Main Street revitalization, including streetscape improvements
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure and other related costs for an economic development project to advance agricultural production, food manufacturing and technology at Fayette County Community Action Agency's Republic Food Enterprise Center
Project Allocation
2,500,000
(27) (Reserved)
(28) Franklin County
(i) Antrim Township
(A) Acquisition, construction, development, infrastructure and other related costs for an athletic complex
Project Allocation
13,000,000
(ii) Chambersburg Borough
(A) Site preparation, acquisition, infrastructure, demolition, expansion and/or renovation of the former Chambersburg Borough Hall to be used by the Chambersburg Police Department and related uses
Project Allocation
2,000,000
(B) Site preparation, acquisition, infrastructure, demolition, rehabilitation, expansion and/or construction of a health care campus
Project Allocation
10,000,000
(ii.1) Greene Township
(A) Construction, infrastructure and other related costs for safety improvements and economic development at the Franklin County Regional Airport
Project Allocation
500,000
(iii) Franklin County Redevelopment Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for development of the Herbruck Poultry Ranch
Project Allocation
2,500,000
(iv) County Projects
(A) Site preparation, acquisition, infrastructure, demolition, renovation, expansion and/or construction of a downtown revitalization project in Waynesboro Borough
Project Allocation
2,500,000
(B) Site preparation, acquisition, infrastructure, demolition, renovation, expansion and/or construction of a downtown revitalization project in Franklin County
Project Allocation
4,000,000
(C) Site preparation, acquisition, infrastructure, demolition, renovation, expansion and/or construction of a countywide emergency services communications system
Project Allocation
10,000,000
(29) Fulton County
(i) Fulton Industrial Development Association
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for construction of a multitenant building in the Fulton County Business Park
Project Allocation
1,000,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for renovation and development of the former Fulton County Medical Center
Project Allocation
1,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project in Fulton County
Project Allocation
1,000,000
(ii) County Projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a County Public Safety Radio System project
Project Allocation
1,630,000
(30) Greene County
(i) Greene County Industrial Development Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for development of a new business park
Project Allocation
3,000,000
(B) Infrastructure, rehabilitation, construction and other related costs to renovate and repurpose a mining technology and training center
Project Allocation
5,200,000
(ii) Waynesburg Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for streetscape improvements
Project Allocation
750,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Waynesburg University's new Center for Innovation Building
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Waynesburg University Paul R. Stewart Science Hall project
Project Allocation
2,800,000
(iii) County Projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for industrial equipment installation for a redevelopment project
Project Allocation
2,500,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for a multiuse development project at the Wisecarver Dam area
Project Allocation
3,500,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project
Project Allocation
5,000,000
(D) Acquisition, infrastructure, rehabilitation, construction and other related costs for new telecommunications facilities and expansions and improvements to existing telecommunications facilities in the county
Project Allocation
15,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for new, expansions and improvements to transportation, rail, airport and multimodal infrastructure in Greene County
Project Allocation
5,000,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the development of a renewable self-generation facility to support reliable and sustainable power for coal mine operations
Project Allocation
5,000,000
(31) Huntingdon County
(i) Huntingdon County General Authority
(A) Infrastructure, construction and other related costs for expansion of the von Liebig Center for Science at Juniata College
Project Allocation
7,000,000
(B) Infrastructure, construction and other related costs for expansion of the Beeghly Library at Juniata College
Project Allocation
5,000,000
(C) Renovation of Brumbaugh Academic Center at Juniata College, including related costs
Project Allocation
7,000,000
(D) Construction of an athletic field house on the campus of Juniata College, including related costs
Project Allocation
10,000,000
(ii) County Projects
(A) Acquisition, infrastructure, construction and other related costs for a Huntingdon County public safety radio upgrade project to bring the county into compliance with Federal interoperability requirements
Project Allocation
3,100,000
(32) Indiana County
(i) Indiana Borough
(A) Acquisition, demolition, construction, redevelopment and other related costs for anchor building improvements
Project Allocation
5,000,000
(ii) Indiana County Development Corporation
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the development of a multitenant business facility
Project Allocation
4,000,000
(iii) County Projects
(A) Acquisition, engineering, infrastructure, rehabilitation, construction and other related costs for development of a countywide fiber optic network
Project Allocation
2,000,000
(B) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for a domestic abuse facility
Project Allocation
2,000,000
(C) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of a multipurpose building
Project Allocation
3,000,000
(D) Acquisition, infrastructure, rehabilitation, construction and other related costs for downtown redevelopment, including building and streetscape improvements
Project Allocation
8,000,000
(E) Acquisition, infrastructure, construction and other related costs for renovations and equipment upgrades at the Indiana Regional Medical Center facilities
Project Allocation
10,000,000
(F) Development and construction of a learning facility for Westmoreland County Community College
Project Allocation
2,000,000
(G) Acquisition, demolition, construction and other related costs for development of storm water management and flood mitigation infrastructure
Project Allocation
5,000,000
(33) Jefferson County
(i) Brockway Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project
Project Allocation
10,000,000
(B) Infrastructure, construction and other related costs for a recreation project in the borough
Project Allocation
10,000,000
(ii) Clearfield-Jefferson Counties Regional Airport Authority
(A) Acquisition, site development, infrastructure, rehabilitation, utilities extensions, construction and other related costs for the development of the Air Commerce Park, Phase III, and other related airport and commerce park projects
Project Allocation
2,000,000
(iii) Jefferson County Department of Development
(A) Infrastructure, construction and renovation of the Pantall Hotel complex
Project Allocation
5,000,000
(iv) Jefferson County Development Council
(A) Infrastructure, construction and other related costs for Penn Highlands Healthcare - Brookville Medical Building, support services, parking areas and utilities
Project Allocation
1,500,000
(B) Infrastructure, construction and other related costs for restoration of the 1886 Marlin's Opera House
Project Allocation
4,000,000
(C) Infrastructure, construction and other related costs for Penn Highlands Healthcare - Brookville renovations and upgrades of the hospital and emergency department, including outpatient diagnostic, radiologic, therapeutic services, behavioral health department, parking and utility upgrades
Project Allocation
6,000,000
(iv.1) Ringgold Township
(A) Construction, infrastructure and other related costs for an energy-focused industrial, business and agricultural park
Project Allocation
4,500,000
(v) County Projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project
Project Allocation
15,000,000
(B) Infrastructure, construction and other related costs for Sunnyside Energy Park
Project Allocation
4,500,000
(C) Renovation, rehabilitation and other related costs for the Punxsutawney Area Hospital
Project Allocation
5,700,000
(34) (Reserved)
(35) Lackawanna County
(i) Archbald Borough
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the Casey Casa/Silverbrook site development project
Project Allocation
3,000,000
(ii) City of Carbondale
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project
Project Allocation
3,500,000
(B) Construction, infrastructure improvements, acquisition, renovations, abatement and other related costs for a health care-related economic development project in the City of Carbondale
Project Allocation
1,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects governed by the Redevelopment Authority of the City of Carbondale
Project Allocation
3,500,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for energy efficiency facility improvements for Carbondale Area High School
Project Allocation
1,000,000
(iii) City of Scranton
(A) Construction, infrastructure improvements, abatement and other related costs for the rehabilitation of the Scranton Cultural Center
Project Allocation
5,000,000
(B) Acquisition, design, construction, infrastructure improvements, renovation and other related costs for University of Scranton Academic Facilities Improvement Project
Project Allocation
12,500,000
(C) Construction and other related costs for renovation of University of Scranton athletic facilities
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project on Jefferson Avenue
Project Allocation
4,000,000
(E) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the preservation of City Hall
Project Allocation
8,000,000
(F) Construction, infrastructure improvements, renovation and other related costs for the expansion of the Scranton Primary Care project
Project Allocation
3,000,000
(G) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project in the 300 Block of Adams Avenue
Project Allocation
3,500,000
(H) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project on Wyoming Avenue
Project Allocation
5,000,000
(I) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project on Linden Street
Project Allocation
5,000,000
(J) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the revitalization of gateways into the downtown corridor
Project Allocation
2,500,000
(K) Acquisition, construction, infrastructure improvements, abatement and other related costs for the Montage Dam restoration project
Project Allocation
1,500,000
(L) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project
Project Allocation
3,500,000
(M) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project
Project Allocation
7,000,000
(iv) City of Scranton/Dunmore Borough
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the former Scranton State School for the Deaf Complex project
Project Allocation
5,000,000
(v) Dickson City Borough
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects
Project Allocation
3,500,000
(vi) Dunmore Borough
(A) Construction, infrastructure, renovation, abatement and other related costs for The Pennsylvania State University Scranton Campus engineering building redevelopment project
Project Allocation
2,500,000
(vii) Fell Township
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for Gentex Corporation Industrial Facility project in Simpson
Project Allocation
5,000,000
(viii) Jessup Borough
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the Valley View Business Park Professional Plaza development project
Project Allocation
3,000,000
(B) Construction, infrastructure improvements and other related costs for Jessup Small Business Center industrial facility
Project Allocation
3,000,000
(ix) Moosic Borough
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the Goex Site development project
Project Allocation
3,000,000
(B) Construction, infrastructure improvements, acquisition, abatement and other related costs for a hotel project in Moosic
Project Allocation
5,000,000
(x) Old Forge Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects
Project Allocation
3,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for energy efficiency facility improvements for Old Forge High School
Project Allocation
1,000,000
(xi) South Abington Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Scranton School for the Deaf and Hard of Hearing
Project Allocation
10,000,000
(xii) Taylor Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects
Project Allocation
3,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for energy efficiency facility improvements for Riverside High School
Project Allocation
1,000,000
(xiii) County Projects
(A) Construction, infrastructure improvements, renovation and other related costs for upgrading the Lackawanna County parks system
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project
Project Allocation
10,000,000
(C) Construction, infrastructure improvements, acquisition, renovations, abatement and other related costs for an economic development project on Davis Street
Project Allocation
5,000,000
(36) Lancaster County
(i) Columbia Borough
(A) Acquisition, construction, infrastructure and other related costs for public facilities
Project Allocation
3,500,000
(i.1) City of Lancaster
(A) Acquisition, design, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a medical specialty facility
Project Allocation
20,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a building for literary services
Project Allocation
2,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for redevelopment of Lancaster Square bounded by East Orange, North Queen, East Chestnut and North Christian Streets
Project Allocation
15,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation
4,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the capital improvements and expansion of the Boys & Girls Club of Lancaster
Project Allocation
7,500,000
(F) Acquisition, construction, infrastructure, redevelopment and other related costs for urban greenhouse projects
Project Allocation
10,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in southeastern area
Project Allocation
5,000,000
(H) Construction, infrastructure and other related costs for the renovation of the Crispus Attucks Community Center
Project Allocation
5,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new Lancaster General Medical Services Center
Project Allocation
18,500,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for green infrastructure projects
Project Allocation
2,000,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Thaddeus Stevens and Lydia Hamilton Smith Historic Site Project
Project Allocation
10,000,000
(L) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development surrounding the Lancaster County Convention Center area
Project Allocation
50,000,000
(i.2) East Hempfield Township
(A) Site preparation, acquisition, infrastructure, demolition and other related costs for expansion and/or construction of an economic development project on the Outin Tract and Lime Spring sites
Project Allocation
2,000,000
(ii) Ephrata Borough
(A) Infrastructure, redevelopment, construction and other related costs for expansion and renovation of the Ephrata Community Hospital Cancer Center
Project Allocation
3,000,000
(iii) Ephrata Township
(A) Acquisition, infrastructure, demolition, site preparation, construction, architectural and design and/or other related costs for the Ephrata Crossings redevelopment project on Route 322
Project Allocation
5,000,000
(B) Acquisition, construction, infrastructure, demolition, site preparation and other related costs for the Ephrata Crossings Redevelopment site on Route 322
Project Allocation
5,000,000
(iii.1) Lancaster County Housing and Redevelopment Authority
(A) Acquisition, construction, infrastructure and other related costs, including machinery and equipment, for a hospital facilities project
Project Allocation
15,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for a parking garage
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for community homes by Excentia to support individuals with intellectual disabilities
Project Allocation
2,000,000
(iii.2) Lititz Regional Community Development
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for the redevelopment of an existing building or structure in Lititz Borough
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for the renovation of the Lititz Springs Pool
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for a community asset project in Warwick Township
Project Allocation
15,000,000
(D) Acquisition, construction, infrastructure and other related costs, including machinery and equipment, for an economic development project in Warwick Township
Project Allocation
5,000,000
(E) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for an economic development project in Warwick Township
Project Allocation
15,000,000
(iii.3) Manheim Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for an economic development project
Project Allocation
10,000,000
(B) Construction, renovation, infrastructure and other related costs for an academic and arts building at Lancaster Day School
Project Allocation
4,000,000
(C) Acquisition, construction, infrastructure and other related costs, including machinery and equipment, for an economic development project
Project Allocation
5,000,000
(iii.4) Marietta Borough
(A) Construction, infrastructure and other related costs for the redevelopment and renovation of a historic movie theater
Project Allocation
1,000,000
(iv) New Holland Borough
(A) Acquisition, infrastructure, construction, renovations and upgrades to a YMCA facility
Project Allocation
2,000,000
(v) Redevelopment Authority of the County of Lancaster
(A) Acquisition, infrastructure, construction and other related costs for Strasburg Rail Road redevelopment and rehabilitation projects
Project Allocation
10,500,000
(B) Construction, infrastructure and other related costs for the development of the Eurofins Lancaster Laboratories Campus
Project Allocation
15,000,000
(C) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of facilities to support growth in production volumes and jobs for Arconic, Inc.
Project Allocation
10,000,000
(vi) Salisbury Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a distribution warehouse facility
Project Allocation
5,000,000
(vii) County Projects
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for a medical specialty building
Project Allocation
20,000,000
(B) Construction, acquisition, infrastructure, redevelopment and other related costs for the Lancaster Behavioral Health Hospital
Project Allocation
30,000,000
(37) Lawrence County
(i) Ellwood City Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic project, including streetscape improvements, sidewalks, facade upgrades, pedestrian safety components, street lighting and other improvements
Project Allocation
4,000,000
(ii) Lawrence County Economic Development Corporation
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Ellport Borough
Project Allocation
1,000,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Ellwood City Borough
Project Allocation
5,000,000
(C) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Bessemer Borough
Project Allocation
1,000,000
(D) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Hickory Township
Project Allocation
1,000,000
(E) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in New Wilmington Borough
Project Allocation
1,000,000
(F) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Plain Grove Township
Project Allocation
1,000,000
(G) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Pulaski Township
Project Allocation
2,500,000
(H) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Wayne Township
Project Allocation
2,500,000
(I) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Wilmington Township
Project Allocation
2,500,000
(J) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in the City of New Castle
Project Allocation
5,000,000
(K) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Mahoning Township
Project Allocation
5,000,000
(L) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Neshannock Township
Project Allocation
5,000,000
(M) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Shenango Township
Project Allocation
5,000,000
(N) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Taylor Township
Project Allocation
5,000,000
(O) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Union Township
Project Allocation
5,000,000
(P) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Wampum Borough
Project Allocation
5,000,000
(Q) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in North Beaver Township
Project Allocation
10,000,000
(R) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of industrial and commercial sites in Volant Borough
Project Allocation
2,000,000
(S) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for revitalization and development of a Midtowne Industrial Center in the City of New Castle
Project Allocation
5,000,000
(T) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for redevelopment of properties along the Route 208 industrial/commercial corridor
Project Allocation
12,500,000
(U) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for development of the Millennium Technology Park in Neshannock Township
Project Allocation
15,000,000
(V) Acquisition, rehabilitation, infrastructure, construction and other related costs for redevelopment of industrial and commercial sites
Project Allocation
10,000,000
(W) Acquisition, infrastructure, environmental remediation, construction and other related costs for demolition of the University of Pittsburgh Medical Center Jameson Hospital - South Campus
Project Allocation
2,800,000
(X) Acquisition, infrastructure, environmental remediation, construction and other related costs for the University of Pittsburgh Medical Center Jameson Hospital - Heart and Vascular Institute
Project Allocation
6,900,000
(iii) New Wilmington Borough
(A) Infrastructure, rehabilitation and construction of a building to house classrooms, lab space, offices and innovation space for the School of Business and Entrepreneurial Technology at Westminster College
Project Allocation
8,500,000
(iv) County Projects
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for park improvements, including swimming pool, bath house and other park facilities
Project Allocation
2,500,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the West Pittsburgh Train Station
Project Allocation
1,000,000
(C) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for library renovations
Project Allocation
1,250,000
(D) Acquisition, site development, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a mixed-use facility
Project Allocation
3,000,000
(E) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, rail line installations, construction and other related costs for redevelopment of the former ESSROC cement plant site
Project Allocation
5,000,000
(F) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, rail line installations, construction and other related costs for redevelopment of the Route 65 industrial/commercial corridor
Project Allocation
5,000,000
(G) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the Ellwood City Hospital
Project Allocation
7,500,000
(H) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation
7,500,000
(I) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for University of Pittsburgh Medical Center Jameson Hospital renovations and construction of hospital facilities
Project Allocation
7,500,000
(J) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for business development of the downtown New Castle commercial complex
Project Allocation
10,000,000
(K) Acquisition, site development, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for railroad corridor development
Project Allocation
10,000,000
(L) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the redevelopment of the Route 422 industrial/commercial corridor
Project Allocation
12,500,000
(M) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the redevelopment of the Route 18 industrial/commercial corridor
Project Allocation
12,500,000
(N) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the redevelopment of the Interstate 376 industrial/commercial corridor
Project Allocation
12,500,000
(38) Lebanon County
(i) Annville Township
(A) Infrastructure, construction and other related costs for a new Health Professions Building at Lebanon Valley College
Project Allocation
10,000,000
(ii) City of Lebanon
(A) Acquisition, infrastructure, environmental remediation, construction and other related costs for downtown urban revitalization
Project Allocation
10,000,000
(iii) County Projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for development of an Integrated Population Health and Wellness Center for Vulnerable Populations
Project Allocation
3,000,000
(39) Lehigh County
(i) City of Allentown
(A) Renovation, rehabilitation and other related costs for Episcopal House Facility
Project Allocation
4,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a mixed commercial and residential use project at the Allentown State Hospital
Project Allocation
7,500,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for interior and exterior improvements to the Allentown Public Library
Project Allocation
2,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape development and other economic development projects to revitalize the 19th Street Theatre District
Project Allocation
750,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape development and other economic development projects that will revitalize Hanover Avenue
Project Allocation
1,250,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape development and other economic development projects to revitalize the Midway Manor neighborhood
Project Allocation
1,250,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for park and recreation improvements, including trail development facilities
Project Allocation
2,500,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape development and other economic development projects to revitalize the West End
Project Allocation
1,250,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape development and other economic development projects for Center City North revitalization
Project Allocation
1,250,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the former Lucent Semiconductor office building
Project Allocation
5,000,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for expanding and rehabilitating downtown art education facilities
Project Allocation
2,500,000
(L) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a mixed-use economic development and residential project at the historic Silk Mill
Project Allocation
4,000,000
(M) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for remediating the 26-acre former incinerator site adjacent to Basin Street and Little Lehigh Creek
Project Allocation
3,000,000
(N) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for remediating the 19-acre brownfield site in the South 10th Street industrial area
Project Allocation
5,000,000
(O) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the former Montex Manufacturing brownfield site
Project Allocation
3,000,000
(P) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Patriot Park Youth Association Stadium renovations
Project Allocation
1,000,000
(Q) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a mixed-use economic and community development project at the Neuweiler Brewery property
Project Allocation
10,000,000
(R) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for downtown arts district safety code compliances and infrastructure redevelopment
Project Allocation
2,500,000
(S) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for redevelopment and mixed-use industrial and commercial use project at the Queen City Airport
Project Allocation
5,000,000
(T) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for interior and exterior improvements of the downtown Allentown Symphony Hall
Project Allocation
3,000,000
(U) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements of Dubbs Memorial Community Center
Project Allocation
1,000,000
(V) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for rehabilitation of the America on Wheels Museum
Project Allocation
500,000
(W) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a multiunit, accessible housing community at Good Shepherd
Project Allocation
3,000,000
(X) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the development of a postacute care hospital located within an assisted care community campus
Project Allocation
17,500,000
(Y) Acquisition, construction, infrastructure, redevelopment, renovation, demolition and other related costs for a property or parking facility in the Central Business District
Project Allocation
4,000,000
(Z) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for rehabilitation and expansion of an existing parking structure in center city
Project Allocation
2,000,000
(AA) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the development of a mixed-use facility, including parking and commercial uses, located within the Central Business District
Project Allocation
5,000,000
(BB) Infrastructure, redevelopment, renovation and other related costs for Bogert Covered Bridge restoration
Project Allocation
1,000,000
(CC) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for historic preservation and adaptive reuse of existing buildings and new facilities associated with 7th Street Main Street Program
Project Allocation
2,500,000
(DD) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the former Mack Truck Industrial Facility
Project Allocation
20,000,000
(EE) Renovation, rehabilitation, construction and other related costs to replace HVAC equipment with a high-efficiency, natural gas-powered system at the Allentown Public Library
Project Allocation
500,000
(FF) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improving the area of North Fifth Street between Hamilton Street and Chew Street
Project Allocation
2,500,000
(GG) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improving the area of North Sixth Street between Hamilton Street and Chew Street
Project Allocation
2,500,000
(HH) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improving the area of South Ninth Street between Hamilton Street and Chew Street
Project Allocation
2,500,000
(i.1) City of Bethlehem
(A) Construction, renovation and other related costs for the redevelopment of the Floyd Simons Bethlehem Armory
Project Allocation
1,000,000
(B) Acquisition, construction, renovation, infrastructure and other related costs for converting Bennett Toyota Land into mixed-use development
Project Allocation
2,500,000
(C) Acquisition, construction, renovation, infrastructure and other related costs for the redevelopment of the Wilson Kramer Building
Project Allocation
2,250,000
(i.2) Center Valley
(A) Acquisition, construction, renovation, redevelopment and other related costs for the construction of a new YMCA branch
Project Allocation
10,000,000
(ii) Coopersburg Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Coopersburg Streetscape redevelopment project
Project Allocation
2,000,000
(iii) Coplay Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Borough of Coplay Municipal Complex
Project Allocation
4,000,000
(iv) Emmaus Borough
(A) Construction, demolition, infrastructure improvements and other related costs for the rehabilitation of the Municipal Operations Complex
Project Allocation
1,500,000
(B) Construction, infrastructure, renovation and other related costs for the Borough of Emmaus Municipal Building, including meeting rooms, parking lots, fire and ambulance station and garages
Project Allocation
1,500,000
(v) Fountain Hill Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Borough of Fountain Hill Public Works Building Expansion Project
Project Allocation
750,000
(vi) Lehigh County Department of Community and Economic Development
(A) Infrastructure, redevelopment, construction and other related costs for renovation and rehabilitation of the Dubbs Memorial Community Center
Project Allocation
750,000
(B) Construction of a baseball and softball stadium complex at DeSales University
Project Allocation
2,500,000
(C) Construction of a new McShea Student Union student center at DeSales University
Project Allocation
9,000,000
(D) Construction of a medical services building, including classrooms, laboratory space and therapy rooms, at DeSales University
Project Allocation
10,000,000
(vii) Lehigh County General Purpose Authority
(A) Infrastructure, redevelopment, construction and other related costs for renovation and rehabilitation of the Dubbs Memorial Community Center
Project Allocation
750,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new Lehigh Jewish Community Center Campus and facilities
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for an existing YMCA facility in Allentown
Project Allocation
2,000,000
(vii.1) North Whitehall Township
(A) Acquisition, construction, infrastructure and other related costs to build an exhibit room/building for the Lehigh Valley Zoo
Project Allocation
500,000
(viii) Northern Lehigh Recreation Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Northern Lehigh Community Center in Slatington Borough
Project Allocation
1,000,000
(ix) Salisbury Township
(A) Construction, infrastructure, redevelopment and other related costs for the Lehigh Valley Hospital Cedar Crest Campus to expand the Children's Hospital
Project Allocation
20,000,000
(ix.1) South Whitehall Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for park and recreation improvements, including trail development facilities
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Parkland Community Library expansion project
Project Allocation
2,500,000
(C) Demolition, construction, infrastructure, redevelopment, renovation and other related costs for the Woodlawn Fire Company facilities to better meet accessibility needs and provide emergency disaster sheltering
Project Allocation
1,625,000
(D) Expansion of existing facilities and parking areas, including all renovations, rehabilitation and construction for Parkland Community Library
Project Allocation
2,000,000
(x) Upper Macungie Township
(A) Infrastructure, rehabilitation, construction and other related costs for the Upper Macungie Township Recreation Community Center
Project Allocation
1,750,000
(xi) Whitehall Township
(A) Infrastructure, redevelopment and other related costs for the Whitehall Township Municipal Complex Gas Line Extension Project
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for the Whitehall Township Emergency Services/Police Building project
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, redevelopment and other related costs for the Lehigh Valley Dairy and Duffy Real Estate Site development project
Project Allocation
6,500,000
(D) Infrastructure improvements and other related costs for the Route 145 MacArthur Road North Illumination and Streetscape Improvements Project
Project Allocation
1,100,000
(E) Infrastructure improvements and other related costs for the Route 145 MacArthur Road South Illumination and Streetscape Improvements Project
Project Allocation
2,500,000
(xii) Redevelopment Authority of the City of Allentown
(A) Infrastructure, rehabilitation, renovation, environmental remediation, construction and other related costs for the adaptive reuse of the former Mansion on 7th, including residential lofts, commercial space, community outreach offices and community art programming
Project Allocation
1,500,000
(xiii) County Projects
(A) Infrastructure, redevelopment, construction and other related costs for renovation and rehabilitation of the Trexler Library at Muhlenberg College
Project Allocation
2,000,000
(B) Construction and other related costs for a new YMCA branch to serve the southern region of Lehigh Valley
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for development of a Lehigh Carbon Community College Campus in Allentown
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for establishing a facility for teaching and training for jobs related to the electrical industry
Project Allocation
2,500,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Allentown Art Museum expansion and renovation project
Project Allocation
7,500,000
(40) Luzerne County
(i) Ashley Borough
(A) Restoration of Huber Breaker
Project Allocation
5,000,000
(B) Construction, infrastructure and other related costs for the Ashley Lane project
Project Allocation
500,000
(C) Acquisition, construction and other related costs for the Mill Street Mill project
Project Allocation
500,000
(ii) Butler Township
(A) Infrastructure, construction and other related costs for development of a public works garage
Project Allocation
550,000
(ii.1) Dallas Borough
(A) Construction, infrastructure, abatement of hazardous materials and other related costs for the renovation of a building for Misericordia University Physician Assistant Program Facilities Project
Project Allocation
1,250,000
(B) Construction, infrastructure and other related costs for an athletic and career center
Project Allocation
1,750,000
(ii.2) Exeter Borough
(A) Construction, infrastructure, renovation and other related costs for the redevelopment of Exeter's downtown economic and historic district
Project Allocation
2,000,000
(ii.3) Forty Fort Borough
(A) Acquisition, construction, infrastructure and other related costs for the redevelopment of land for the headquarters of Forty Fort Public Works and the West Side Council of Governments
Project Allocation
2,000,000
(iii) City of Hazleton
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for redevelopment of abandoned mine site with Act 2 approvals
Project Allocation
25,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for downtown redevelopment
Project Allocation
5,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for mixed-use housing and commercial development
Project Allocation
5,000,000
(D) Construction, acquisition, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for City of Hazleton and Hazleton Regional Airport development projects
Project Allocation
10,000,000
(iii.1) Kingston Borough
(A) Redevelopment, renovation and other related costs for redeveloping Riverbend Park area
Project Allocation
1,500,000
(B) Construction, renovation and other related costs for redeveloping Church Street and other Kingston Borough parks
Project Allocation
750,000
(C) Construction, infrastructure, renovation and other related costs for the redevelopment of blighted property
Project Allocation
1,500,000
(iii.2) Luzerne Borough
(A) Acquisition, infrastructure, redevelopment and other related costs for economic development projects in the historic and business districts
Project Allocation
2,000,000
(iv) City of Nanticoke
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for downtown redevelopment
Project Allocation
5,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for commercial and residential development near the South Valley Parkway and Kosciuszko Street
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for housing redevelopment projects
Project Allocation
5,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for repurposing of the Nanticoke Hospital building and campus
Project Allocation
10,000,000
(E) Construction, infrastructure, site improvement and other related costs for development of the Lower Broadway Recreation Complex
Project Allocation
5,000,000
(F) Downtown revitalization project
Project Allocation
5,000,000
(G) Acquisition, construction, infrastructure and other related costs for mixed-use development on East Main Street
Project Allocation
1,000,000
(H) Construction, infrastructure and other related costs for the Luzerne County Community College Public Safety Institute
Project Allocation
35,447,000
(I) Acquisition, construction, infrastructure and other related costs for Luzerne County Community College student housing
Project Allocation
5,000,000
(v) City of Pittston
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Housing and Commercial development
Project Allocation
2,500,000
(B) Acquisition, demolition, relocation assistance, public improvements and new parking facilities in the downtown area
Project Allocation
9,000,000
(C) WVIA - public television and radio equipment upgrade
Project Allocation
500,000
(D) Property acquisition, infrastructure improvements, construction and renovations to greater Pittston YMCA
Project Allocation
750,000
(E) Acquisition, demolition, infrastructure, construction and other related costs for the Downtown Pittston redevelopment project
Project Allocation
10,000,000
(F) Construction and infrastructure for security control center for Pittston Area District
Project Allocation
635,000
(vi) City of Wilkes-Barre
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for King's College Spring Brook Engineering Building project
Project Allocation
3,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Pharmacy facilities at Wilkes University
Project Allocation
10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for an economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
5,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for an economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
3,000,000
(E) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Industrial and Commercial Development
Project Allocation
10,000,000
(F) Selective demolition, renovation, construction, environmental remediation and infrastructure improvements of a blighted industrial site into a mixed-use facility, Murray complex, Pennsylvania Avenue
Project Allocation
10,000,000
(G) South Main Street mixed-use project
Project Allocation
5,000,000
(H) Construction and infrastructure improvements to downtown parking deck
Project Allocation
4,000,000
(I) Revitalization, reconstruction and construction of the river commons, riverfront and access to the Susquehanna River
Project Allocation
15,000,000
(J) Rehabilitation, expansion, infrastructure improvements and environmental remediation of historic Shriner's Hall
Project Allocation
20,000,000
(K) Acquisition, demolition, renovation, environmental remediation, infrastructure development and construction of blighted and abandoned industrial site along Courtwright Street
Project Allocation
5,000,000
(L) Construction, infrastructure development and environmental remediation of medical arts/office building, Coal Street Park
Project Allocation
7,000,000
(M) Construction and infrastructure improvements of downtown convention headquarters hotel
Project Allocation
15,000,000
(N) Renovation, construction and infrastructure improvements of regional Kirby Park along the Susquehanna River
Project Allocation
750,000
(O) Construction and infrastructure development for regional sports and nutrition complex
Project Allocation
8,000,000
(P) Acquisition, renovation, construction, environmental remediation and infrastructure improvements, including construction of a regional arts center and public green space, 100 Block South Main Street redevelopment project
Project Allocation
13,000,000
(Q) Acquisition, renovation, rehabilitation, construction, environmental remediation and infrastructure improvements, including construction of existing and vacant properties, first block South Main Street, Phase II
Project Allocation
10,000,000
(R) Renovation, construction and infrastructure improvements of Public Square
Project Allocation
5,000,000
(S) Acquisition, construction, infrastructure and other related costs for the revitalization of the 100 block of South Main Street
Project Allocation
13,000,000
(T) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for building the Irem Temple Mosque
Project Allocation
10,000,000
(U) Acquisition, construction, infrastructure and other related costs for a mixed-use facility at the Murray Complex
Project Allocation
10,000,000
(V) Construction and other related costs for the redevelopment of Murray Courtwright Complex
Project Allocation
5,000,000
(W) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the West Market Street Mixed-Use Revitalization Project
Project Allocation
5,000,000
(X) Acquisition, demolition, construction, infrastructure and other related costs for a mixed-use project at North Main and North Streets
Project Allocation
5,000,000
(Y) Acquisition, infrastructure improvements, construction and other related costs for the North Branch Library of the Osterhout Free Library project
Project Allocation
1,500,000
(Z) Acquisition, construction, infrastructure and other related costs for the Wilkes University Law School
Project Allocation
10,000,000
(AA) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for the Solomon Creek Flood Control and Economic Sustainability Project
Project Allocation
10,000,000
(BB) Construction, acquisition, infrastructure, renovation, redevelopment and other related costs for Wilkes University projects
Project Allocation
10,000,000
(CC) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the purchase, restoration and repurposing the Mary Stegmaier Mansion into a banquet facility and restaurant
Project Allocation
830,000
(vii) Edwardsville Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Main Street streetscape and commercial development
Project Allocation
2,500,000
(viii) Exeter Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Main Street streetscape and commercial development
Project Allocation
2,500,000
(viii.1) Greater Wilkes-Barre Industrial Fund
(A) Structural rehabilitation, infrastructure improvements, environmental remediation, construction and other related costs for a Physician Assistant Program facility at Misericordia University
Project Allocation
1,250,000
(B) Rehabilitation, infrastructure improvements, construction and other related costs for Misericordia University facilities
Project Allocation
17,500,000
(ix) Hanover Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for an Economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
3,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Industrial and Commercial Development
Project Allocation
5,000,000
(C) Construction, acquisition, infrastructure, redevelopment and other related costs for Hanover Crossings Phase III and Phase IV
Project Allocation
4,000,000
(x) Hazle Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for a new ambulatory health care campus for the Lehigh Valley Health Network
Project Allocation
10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for industrial and commercial development
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure and other related costs for the Route 424 extension project
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure and other related costs for the development of a cargo airport
Project Allocation
250,000,000
(xi) Jenkins Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for industrial and commercial development
Project Allocation
2,500,000
(xii) Larksville Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for housing and commercial development
Project Allocation
2,500,000
(xiii) Newport Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for mixed-use housing and commercial development
Project Allocation
5,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for industrial development
Project Allocation
5,000,000
(xiv) Plains Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for an economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
3,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for LIU complex
Project Allocation
2,500,000
(C) Birchwood Park improvement project
Project Allocation
319,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects in Plains Township
Project Allocation
3,000,000
(xv) Plymouth Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for Main Street streetscape and commercial redevelopment
Project Allocation
2,500,000
(xvi) Plymouth Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for housing and commercial development
Project Allocation
2,500,000
(xvii) Swoyersville Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for mixed-use housing and commercial development
Project Allocation
2,500,000
(B) Infrastructure, renovation, abatement of hazardous materials and other related costs for the removal of a waste coal bank and revitalizing the land for redevelopment
Project Allocation
7,500,000
(xviii) West Pittston Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for the conversion of the former PA National Guard Complex
Project Allocation
2,500,000
(B) Construction, infrastructure, redevelopment and other related costs for revitalizing West Pittston's historic and economic district
Project Allocation
2,000,000
(xix) Wilkes-Barre Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for an economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
3,000,000
(B) Construction and other related costs for renovation of the township municipal building
Project Allocation
500,000
(C) Construction and other related costs for the township police building
Project Allocation
800,000
(D) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for the Heinz Campus of Allied Services
Project Allocation
4,000,000
(xix.1) Wyoming Borough
(A) Construction, infrastructure, renovation and other related costs for redeveloping Wyoming Borough's economic and historic district
Project Allocation
2,000,000
(xx) Avoca, Dupont, Duryea and Pittston Townships
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project
Project Allocation
5,000,000
(xxi) County Projects
(A) Construction, acquisition, infrastructure, renovation, redevelopment and other related costs for an economic development project of the Greater Wilkes-Barre Industrial Fund
Project Allocation
3,000,000
(B) Construction, infrastructure and other related costs for improving the Whitney Point industrial park
Project Allocation
2,000,000
(C) Construction and other related costs for the redevelopment of downtown Edwardsville Borough
Project Allocation
1,000,000
(D) Renovations to the Darte Center for the theater at Wilkes University, including accessibility improvements for individuals with disabilities
Project Allocation
1,250,000
(E) Upgrade of athletic complex/stadium at Wilkes University
Project Allocation
2,500,000
(F) Infrastructure improvements and site preparation for Rails with Trails south project
Project Allocation
1,200,000
(G) Construction, infrastructure and other related costs for the Wilkes-Barre River commons project
Project Allocation
2,500,000
(H) Construction, infrastructure and other related costs for the redevelopment and expansion of an existing commercial area as part of an economic development project in Kingston and Edwardsville Boroughs
Project Allocation
500,000
(I) Infrastructure development of former Dyno Nobel lands and surrounding lands, approximately 1,100 acres, located in Jenkins and Pittston Townships
Project Allocation
20,000,000
(J) Infrastructure improvements and design for Avoca Borough industrial development
Project Allocation
1,500,000
(K) Demolition, infrastructure improvements and rehabilitation for Avoca Borough blight removal
Project Allocation
1,150,000
(L) Acquisition and rehabilitation of existing building for the Swoyersville Police Department
Project Allocation
1,100,000
(M) Infrastructure improvements for commercial, industrial or housing area in Swoyersville
Project Allocation
1,250,000
(N) Demolition and property acquisition for economic revitalization business expansion project in Plymouth
Project Allocation
1,500,000
(O) Infrastructure improvements to Ashley yard industrial expansion
Project Allocation
1,500,000
(P) Site preparation and infrastructure improvements to the Sather Building within the Grimes industrial park
Project Allocation
1,100,000
(Q) Construction, infrastructure and other related costs for the redevelopment of a former strip mine
Project Allocation
500,000
(R) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for affordable housing projects
Project Allocation
10,000,000
(41) Lycoming County
(i) City of Williamsport
(A) Acquisition, site preparation, infrastructure and construction for implementation of Lycoming College master plan
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the commercial development of a blighted property
Project Allocation
5,000,000
(C) Construction, infrastructure, rehabilitation and other related costs for the levee system
Project Allocation
5,000,000
(D) Construction and other related costs to build a new burn building for the training of firefighters
Project Allocation
1,000,000
(E) Construction, infrastructure and other related costs for a reclamation facility to process flowback fluid associated with Marcellus Shale gas drilling
Project Allocation
5,000,000
(ii) Jersey Shore Borough
(A) Acquisition, rehabilitation, infrastructure and construction for a regional public safety facility in western Lycoming County
Project Allocation
2,000,000
(B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for a regional public safety facility to house the Tiadaghton Valley Regional Police Department
Project Allocation
2,000,000
(iii) Limestone Township
(A) Infrastructure, construction and other related costs for an assisted living and urgent care facility in conjunction with the University of Pittsburgh Medical Center Susquehanna
Project Allocation
4,000,000
(B) Construction, infrastructure, redevelopment and other related costs for an assisted living and urgent care facility
Project Allocation
4,000,000
(iv) Pennsylvania College of Technology
(A) Acquisition, reclamation, infrastructure improvements and construction to land and facilities
Project Allocation
10,000,000
(v) County Projects
(A) Acquisition, demolition, site preparation, infrastructure and construction for economic initiatives
Project Allocation
10,000,000
(B) Acquisition, infrastructure, construction and other related costs for redevelopment initiatives in Muncy Borough
Project Allocation
10,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for the expansion of natural gas
Project Allocation
10,000,000
(D) Rehabilitation, construction and other related costs for expansion and renovation of the East Lycoming YMCA
Project Allocation
2,000,000
(42) McKean County
(i) City of Bradford
(A) Site clearance, demolition, infrastructure, construction, equipment and other related costs to American Refining Group for refinement of Pennsylvania grade crude oils
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape improvements, housing development and related infrastructure improvements, site development, parking facilities and construction of a mass transit terminal facility
Project Allocation
7,500,000
(C) Acquisition, demolition, construction, renovation, infrastructure and other related costs for a new multitenant center building and upgrades to multitenant buildings at the Habgood Business Development Center
Project Allocation
2,500,000
(D) Construction, renovation and other related costs for a soccer/lacrosse stadium on the Kessel Athletic Complex and the upgrade of Callahan Park recreational facilities
Project Allocation
5,000,000
(i.1) Lafayette Township
(A) Construction, infrastructure and other related costs for the development of an industrial/business park and a multitenant facility located on Bradford Regional Airport Authority property
Project Allocation
2,000,000
(ii) McKean County Economic Development
(A) Infrastructure, rehabilitation, construction and other related costs for the Journey Health System Corporation main campus in Bradford Township
Project Allocation
500,000
(iii) Redevelopment Authority of McKean County
(A) Infrastructure, construction and other related costs for the University of Pittsburgh Medical Center Kane Physician Office building
Project Allocation
3,500,000
(iv) County Projects
(A) Infrastructure, construction and other related costs for development of an industrial and business park located on Bradford Regional Airport Authority property
Project Allocation
2,000,000
(B) Infrastructure, rehabilitation, renovations and construction on the Journey Health System Corporation main campus
Project Allocation
500,000
(C) Acquisition, construction, demolition, infrastructure, redevelopment and other related costs for the Route 6 Corridor improvement project, including gateway improvements and other economic development and community impact projects
Project Allocation
5,000,000
(43) Mercer County
(i) City of Hermitage
(A) Construction, infrastructure and other related costs for the Buhl Farm Park Facilities Regional Recreation project
Project Allocation
1,500,000
(B) Acquisition, infrastructure, construction and other related costs for the redevelopment of the Hermitage Central Business District
Project Allocation
3,000,000
(C) Acquisition, infrastructure, construction and other related costs for the Regional Healthcare and Education Facilities project
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Shenango Valley YMCA recreational and public wellness facilities
Project Allocation
1,500,000
(ii) Greenville Borough
(A) Construction and redevelopment of track and field complex at Thiel College
Project Allocation
1,500,000
(B) Infrastructure, redevelopment, construction and other related costs for an academic center at Thiel College
Project Allocation
2,500,000
(iii) Greenville Area Economic Development Corporation
(A) Renovation and rehabilitation of historic building into a training facility for the Greenville Neuromodulation Clinic
Project Allocation
1,000,000
(B) Infrastructure, abatement of hazardous materials and other related costs for renovations and rehabilitation of buildings for an American Scholar Training Facility
Project Allocation
1,500,000
(C) Infrastructure, construction and other related costs for a multitenant building in the Greenville Reynolds Development Corporation Industrial Park to meet the manufacturing needs of the area
Project Allocation
1,500,000
(iv) Jamestown Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for redevelopment of the Liberty Street corridor
Project Allocation
2,000,000
(v) Mercer County Industrial Development Authority
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a commercial/office building and other mixed-use development
Project Allocation
5,000,000
(B) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a housing project in Cochranton Borough
Project Allocation
5,500,000
(vi) Mercer County Redevelopment Authority
(A) Infrastructure, construction, renovations and other related costs for an expansion of the University of Pittsburgh Medical Center Horizon Hospital Shenango Campus
Project Allocation
4,500,000
(vii) Penn-Northwest Development Corporation
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for an economic development project in the county
Project Allocation
3,000,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for facilities development at the Joy Cone site
Project Allocation
10,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for facilities development at the Sharon Regional Health System
Project Allocation
10,000,000
(D) Infrastructure, rehabilitation, construction and other related costs for an industrial facility
Project Allocation
12,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Buhl Community Recreation Center improvement and expansion project
Project Allocation
3,000,000
(vii.1) Pine Township
(A) Construction, infrastructure and other related costs for development of a site for a business park
Project Allocation
2,000,000
(viii) Sharpsville Borough
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Sharpsville Region Infrastructure and Economic development project
Project Allocation
2,400,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for development related to the DSF Unit Train Railroad Siding project
Project Allocation
12,500,000
(ix) County Projects
(A) Infrastructure, construction, renovations and other improvements to the former Chevron industrial facility
Project Allocation
1,500,000
(44) Mifflin County
(i) Mifflin County Industrial Development Authority
(A) Infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for improvements to the MCIDC Plaza
Project Allocation
1,500,000
(B) Infrastructure, construction and other related costs for development of a new business park with infrastructure and road extensions
Project Allocation
1,500,000
(C) Infrastructure and other related costs for construction of a natural gas pipeline and new access roads for industrial development
Project Allocation
2,500,000
(D) Infrastructure, construction and other related costs for a new natural gas pipeline for the Mifflin County Industrial Park
Project Allocation
3,000,000
(45) Monroe County
(i) Coolbaugh Township
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for an economic development project
Project Allocation
5,000,000
(ii) Monroe County Industrial Development Authority
(A) Acquisition, infrastructure upgrades and other related costs for a redevelopment project in the Village of Blakeslee
Project Allocation
2,500,000
(B) Acquisition, infrastructure, rehabilitation, construction and other related costs for the American Turner Historical Museum
Project Allocation
3,000,000
(C) Infrastructure, construction and other related costs for a snow tubing facility and lodge
Project Allocation
5,000,000
(D) Acquisition, demolition and redevelopment of a commercial site in Tobyhanna Township
Project Allocation
5,000,000
(E) Acquisition, infrastructure, construction and redevelopment of the Fernwood Hotel and Resort site
Project Allocation
5,000,000
(F) Acquisition, infrastructure, construction and other related costs for a natural gas pipeline extension to serve commercial and industrial areas of Barrett, Paradise and Coolbaugh Townships and Mount Pocono Borough
Project Allocation
5,000,000
(G) Acquisition, infrastructure, construction and other related costs for a natural gas pipeline extension to serve commercial and industrial areas of Smithfield and Middle Smithfield Townships
Project Allocation
5,000,000
(H) Acquisition, infrastructure and construction of a parking facility for a Monroe County multimodal project
Project Allocation
5,000,000
(I) Acquisition, infrastructure, construction and other related costs for a Combine Heat & Power (CHP) project in Shawnee and Delaware Water Gap
Project Allocation
5,000,000
(J) Acquisition, site preparation, infrastructure and construction at The Summit at Pocono Manor
Project Allocation
5,000,000
(K) Acquisition, infrastructure, renovation, construction and other related costs for the Sanofi Pasteur site
Project Allocation
20,000,000
(L) Infrastructure, rehabilitation, construction and other related costs for an economic development project in Monroe County
Project Allocation
20,000,000
(M) Land acquisition, infrastructure, construction and other related costs for St. Luke's University Health Network in Stroud Township
Project Allocation
2,000,000
(N) Acquisition, site preparation, infrastructure, construction and redevelopment of the former Mosier site
Project Allocation
5,000,000
(O) Acquisition, site preparation, infrastructure, construction and redevelopment of the former Summer Resort site in Tannersville
Project Allocation
5,000,000
(P) Acquisition, construction, infrastructure, redevelopment and other related costs for a combined heat and power project
Project Allocation
5,000,000
(Q) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a parking facility in Stroudsburg Borough
Project Allocation
3,000,000
(iii) Monroe County Transportation Authority
(A) Infrastructure, construction and other related costs to connect fueling station lines
Project Allocation
1,500,000
(iv) Pocono Mountain Industrial Development
(A) Acquisition, construction, infrastructure and other related costs for the redevelopment of the former Mosier site
Project Allocation
5,000,000
(v) Pocono Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Monroe Career and Technical Institute's roof replacement projects
Project Allocation
1,750,000
(vi) Stroud Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for St. Luke's Hospital's Monroe Campus Patient Room Project
Project Allocation
1,500,000
(vii) Stroudsburg Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Pocono Family YMCA's new building and relocation project
Project Allocation
11,000,000
(viii) Tobyhanna Township
(A) Infrastructure, rehabilitation, construction and other related costs for an economic development project in Tobyhanna Township
Project Allocation
20,000,000
(B) Construction, infrastructure, redevelopment and other related costs for a multipurpose public use facility
Project Allocation
7,500,000
(46) Montgomery County
(i) Abington Township
(A) Construction, infrastructure improvements and other related costs for the redevelopment of Manor College learning spaces
Project Allocation
1,500,000
(B) Construction, infrastructure improvements and other related costs for the redevelopment of Manor College outdoor spaces and access for persons with disabilities
Project Allocation
1,500,000
(C) Construction, infrastructure improvements and other related costs for the redevelopment of Manor College residence hall
Project Allocation
1,500,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape and economic development projects
Project Allocation
3,158,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a streetscape and economic development project in the Township Line Corridor
Project Allocation
625,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a streetscape and economic development project in the Roslyn business district
Project Allocation
1,289,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for improvement projects at Abington Hospital
Project Allocation
5,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the expansion and renovation of the Abington Public Library
Project Allocation
750,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the planning and development of bicycle facilities
Project Allocation
3,083,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for streetscape and other economic development projects
Project Allocation
500,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for developing affordable housing for low-income seniors, including a senior center for all seniors in the area
Project Allocation
9,000,000
(ii) Ambler Borough
(A) Infrastructure, construction, renovation and expansion of the Ambler Theater
Project Allocation
1,000,000
(iii) Bridgeport Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Bridgeport Commercial District enhancement project
Project Allocation
500,000
(iv) Cheltenham Township
(A) Construction, infrastructure improvements, renovation and other related costs for the Rowland Community Center redevelopment project
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, renovation and other related costs for the Lynnewood Hall redevelopment project
Project Allocation
10,000,000
(C) Construction, infrastructure improvements, renovation and other related costs for the Glenside Hall and Pool Event Center redevelopment project
Project Allocation
4,000,000
(D) Acquisition, construction, infrastructure, renovation and other related costs for the Elkins Estate redevelopment project
Project Allocation
5,000,000
(E) Construction, infrastructure improvements, renovation and other related costs for the Curtis Hall and Arboretum Event Center redevelopment project
Project Allocation
5,000,000
(F) Construction, infrastructure improvements, redevelopment and other related costs for the Salus University Elkins Park Campus Modernization Project
Project Allocation
8,300,000
(G) Construction, infrastructure improvements, development and other related costs for the MossSMART Center at Einstein Medical Center in Elkins Park
Project Allocation
5,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for building a new community pool on the site of the Charles D. Conklin, Jr., Community Pool
Project Allocation
4,000,000
(v) Conshohocken Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Mary H. Wood Property renovation project
Project Allocation
8,000,000
(vi) Franconia Township
(A) Acquisition, infrastructure, renovation, construction and other related costs for an economic development project
Project Allocation
25,000,000
(vii) Horsham Township
(A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project
Project Allocation
7,500,000
(viii) Jenkintown Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Jenkintown Borough's municipal offices and police station improvement or relocation project
Project Allocation
3,000,000
(ix) Lower Merion Township
(A) Construction, renovation and other related costs for The Barbara and Harvey Brodsky Enrichment Center of JFCS building project
Project Allocation
4,500,000
(B) Construction, infrastructure improvements and other related costs for the Ardmore Multimodal Parking Facility
Project Allocation
20,000,000
(C) Acquisition, renovation, infrastructure, construction, redevelopment and other costs associated with a corporate office facility in Lower Merion Township
Project Allocation
15,000,000
(D) Construction, infrastructure, renovation and other related costs for the Torah Academy of Greater Philadelphia
Project Allocation
2,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Merion Mercy Academy
Project Allocation
7,000,000
(F) Land acquisition, infrastructure, improvement, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of medical necessary fixtures and other related costs for Bryn Mawr Hospital or other facilities of the Main Line Health System
Project Allocation
20,000,000
(G) Construction, infrastructure and other related costs for the Harcum College Academic Center expansion project
Project Allocation
2,000,000
(x) Marlborough Township
(A) Construction, infrastructure, redevelopment, conservation and other related costs for renovation and expansion of the Musser Scout Reservation and outdoor education center
Project Allocation
3,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Camp Hart
Project Allocation
30,000,000
(xi) Montgomery County Industrial Development Authority
(A) Renovation, redevelopment, construction and other related costs for the Merck & Co., Inc., site in Upper Gwynedd Township
Project Allocation
20,000,000
(xii) Norristown Borough
(A) Construction, demolition, infrastructure improvement and other related costs for the Laborers Local 135 Union Hall
Project Allocation
2,250,000
(xiii) North Wales Borough
(A) Construction, renovation and other related costs for the North Penn fire house
Project Allocation
650,000
(xiv) Redevelopment Authority of Montgomery County
(A) Construction, infrastructure and renovation to the Lansdale Hospital
Project Allocation
5,000,000
(B) Infrastructure, environmental remediation and construction for the Ambler Lakeview project
Project Allocation
7,000,000
(C) Acquisition, infrastructure and construction of a new YMCA facility for the Philadelphia Freedom Valley YMCA
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Bryn Mawr Hospital Campus Modernization Project
Project Allocation
1,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Lankenau Hospital or other facilities of Main Line Health System
Project Allocation
20,000,000
(xv) Souderton Borough
(A) Construction, infrastructure and renovation to the historic Broad Theater
Project Allocation
2,000,000
(xvi) Montgomery County Industrial Development Authority
(A) Construction and other related costs for the redevelopment of fields for community use in Springfield Township
Project Allocation
2,000,000
(xvii) Upper Dublin Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the General Municipal Authority Area, including the Fort Washington Office Park
Project Allocation
10,000,000
(B) Construction, infrastructure, acquisition, renovation, site preparation and other related costs for redevelopment activities
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, renovation, rehabilitation, revitalization, site preparation and other related costs for the redevelopment of the General Municipal Authority Area, including the Fort Washington Office Park
Project Allocation
10,000,000
(D) Acquisition, construction and other related costs to purchase and repurpose property to be the new Upper Dublin Public Library
Project Allocation
1,000,000
(xviii) Upper Merion Township
(A) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Prince Frederick Extension redevelopment project
Project Allocation
8,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Upper Merion Area School District Athletic Complex Enhancement Project
Project Allocation
1,500,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Boathouse Park facility improvements
Project Allocation
2,500,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Heuser Park
Project Allocation
5,000,000
(xix) Upper Moreland Township
(A) Construction and development of a multipurpose lighted synthetic turf athletic field
Project Allocation
500,000
(xx) Upper Providence Township
(A) Construction, redevelopment, renovation and other related costs to provide an improved municipal complex for community services, such as citizen information, police and emergency services
Project Allocation
3,150,000
(xxi) Whitpain Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an educational and recreational facility
Project Allocation
4,000,000
(B) Construction, infrastructure, abatement of hazardous materials, environmental restoration, acquisition and other related costs for the redevelopment of the BoRit Asbestos Superfund Site
Project Allocation
6,000,000
(xxii) Worcester Township
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for the North Penn Memorial United States Army Reserve Center redevelopment project
Project Allocation
1,500,000
(xxiii) Ambler Borough and Lower Gwynedd, Upper Dublin and Whitpain Townships
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the Wissahickon Park Boys and Girls Club revitalization project
Project Allocation
6,000,000
(xxiv) West Norriton Township, Upper Merion Township, Norristown Borough and Bridgeport Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Schuylkill Riverfront property revitalization and economic development projects in and around West Norriton Township
Project Allocation
25,000,000
(xxv) County Projects
(A) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, construction and other related costs for Bryn Mawr Hospital or other facilities of Main Line Health System
Project Allocation
20,000,000
(47) Montour County
(i) Montour County Industrial Development Authority
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and site preparation for a business park
Project Allocation
1,500,000
(ii) County Projects
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials and construction at a building in the downtown business district in Danville Borough
Project Allocation
1,750,000
(B) Acquisition, infrastructure and other related costs for an economic development project in the county
Project Allocation
2,500,000
(48) Northampton County
(i) Bangor Borough
(A) Infrastructure, rehabilitation, construction and other related costs for Liberty Fire Company
Project Allocation
1,000,000
(ii) Bethlehem Township
(A) Construction, renovation and other related costs for expansion of St. Luke's Hospital Anderson Campus
Project Allocation
25,000,000
(B) Construction, infrastructure, redevelopment and other related costs for the Northampton Community College North Campus Conference Center
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure, redevelopment and other related costs for industrial park and retail development along the William Penn Corridor
Project Allocation
15,000,000
(D) Construction, infrastructure improvements, redevelopment and other related costs for the Hope Road commercial development project
Project Allocation
2,500,000
(E) Costs associated with the construction of a commercial or industrial development along Freemansburg Avenue
Project Allocation
5,000,000
(iii) City of Bethlehem
(A) Construction, infrastructure, redevelopment and other related costs for the Banana Factory Visual Arts Community Center
Project Allocation
5,000,000
(B) Construction, infrastructure and other related costs for a Science and Technology Academic Building at Lehigh University
Project Allocation
10,000,000
(C) Construction, infrastructure and other related costs for a Business and Economics Academic Building at Lehigh University
Project Allocation
5,000,000
(D) Construction, infrastructure and other related costs for a renovated Library and Technology Academic Building at Lehigh University
Project Allocation
10,000,000
(E) Renovation, construction, infrastructure and other related costs for the revitalization of Memorial Pool and Monacacy Park Complex
Project Allocation
4,500,000
(F) Acquisition, construction, renovation, infrastructure and other related costs for the Goodman Building project
Project Allocation
2,000,000
(G) Acquisition, construction, infrastructure and other related costs for the parking garage project
Project Allocation
6,250,000
(H) Renovation, construction, infrastructure and other related costs for the Walnut Street Garage project
Project Allocation
11,250,000
(I) Acquisition, construction, infrastructure and other related costs for the Southside Parking Garage
Project Allocation
8,000,000
(J) Acquisition, construction, infrastructure and other related costs for the Northside Parking Garage
Project Allocation
6,500,000
(K) Acquisition, construction, infrastructure and other related costs for converting former Bethlehem Steel land into mixed-use projects
Project Allocation
5,000,000
(L) Acquisition, construction, infrastructure and other related costs for converting the Miller Wholesale Building into a mixed-use project
Project Allocation
3,750,000
(M) Acquisition, construction, renovation, infrastructure and other related costs for the Wyandotte/378 Corridor redevelopment project
Project Allocation
1,000,000
(N) Acquisition, construction, infrastructure and other related costs for the Eastern Gateway Project
Project Allocation
8,500,000
(O) Acquisition, construction, infrastructure and other related costs for the Western Gateway Project
Project Allocation
10,000,000
(P) Acquisition, construction, renovation, infrastructure and other related costs for 315 Columbia
Project Allocation
1,800,000
(Q) Acquisition, construction, renovation, infrastructure and other related costs for the Straus Auto Project
Project Allocation
1,000,000
(R) Acquisition, construction, renovation, infrastructure and other related costs for the revitalization of the TOGS Building
Project Allocation
1,400,000
(S) Acquisition, construction, renovation, infrastructure and other related costs for the revitalization of the Wood Street Business Center
Project Allocation
6,700,000
(T) Construction, renovation, infrastructure and other related costs for the update of Bethlehem City Hall Complex and associated parking structure
Project Allocation
2,500,000
(U) Acquisition, construction, renovation, infrastructure and other related costs for the redevelopment of the Boyd Theater
Project Allocation
7,400,000
(V) Acquisition, construction, infrastructure and other related costs for the revitalization of Saucon Park
Project Allocation
1,000,000
(W) Acquisition, construction, renovation, infrastructure and other related costs for a Bethlehem Tech Center
Project Allocation
2,500,000
(X) Rehabilitation, construction and other related costs for the James Kunsman site for mixed-use commercial, retail and residential use
Project Allocation
1,500,000
(Y) Rehabilitation, construction and other related costs for the historic renovation of the former Turn and Grind Shop
Project Allocation
5,000,000
(Z) Construction and related capital costs to renovate the Hispanic Center Lehigh Valley's facilities
Project Allocation
1,300,000
(AA) Construction, infrastructure, acquisition, abatement, renovation and other related costs for development of a public market in the City of Bethlehem
Project Allocation
5,000,000
(iv) City of Easton
(A) Construction, infrastructure improvements and other related costs for a science building at Lafayette College
Project Allocation
10,000,000
(B) Construction, infrastructure improvements and other related costs for two Skyway projects at Lafayette College
Project Allocation
10,000,000
(C) Construction, infrastructure improvements and other related costs for an engineering building at Lafayette College
Project Allocation
5,000,000
(D) Construction, infrastructure improvements and other related costs for an economic development project at Lafayette College
Project Allocation
10,000,000
(E) Construction, infrastructure improvements and other related costs for campus housing and mixed-use facilities projects at Lafayette College
Project Allocation
10,000,000
(F) Construction, infrastructure improvements and other related costs for redevelopment of the existing Jacobs Produce Building for commercial use
Project Allocation
2,000,000
(G) Construction, infrastructure improvements and other related costs for redevelopment of the existing Armory Building for commercial use
Project Allocation
2,000,000
(H) Construction, infrastructure improvements and other related costs for redevelopment of the existing Cottingham Building for residential use
Project Allocation
2,000,000
(I) Construction, infrastructure improvements and other related costs for redevelopment of the existing American Veterans Building for residential and commercial use
Project Allocation
1,000,000
(J) Acquisition, rehabilitation and other related costs for renovations to the historic Hooper House and adjacent properties for commercial and residential use
Project Allocation
2,000,000
(K) Construction and other related costs for a new Southside Fire Station
Project Allocation
2,000,000
(L) Construction, infrastructure improvements and other related costs for redevelopment of the Black Diamond Site for commercial and residential use
Project Allocation
2,000,000
(M) Construction, infrastructure improvements and other related costs for the expansion of the Easton Area Community Center
Project Allocation
2,000,000
(N) Construction and other related costs for a new 4th Street parking garage
Project Allocation
3,000,000
(O) Demolition, construction, infrastructure improvements and other related costs for the Pine Street parking garage
Project Allocation
4,000,000
(P) Construction and other related costs for a West Ward Grocery Store
Project Allocation
5,000,000
(Q) Acquisition, construction, infrastructure and other related costs for the Da Vinci Science Center project
Project Allocation
30,000,000
(R) Construction, infrastructure improvement and other related costs for the adaptive reuse of the Heritage Lanes Building for mixed-use development
Project Allocation
3,000,000
(S) Acquisition, construction, infrastructure and other related costs for a new police station
Project Allocation
2,000,000
(T) Construction and other related costs for the High Line Trestle Project
Project Allocation
3,000,000
(U) Construction and other related costs for the Governor Wolf Parking Lot mixed-use development project
Project Allocation
3,000,000
(V) Construction, infrastructure improvement and other related costs for a new downtown hotel
Project Allocation
5,000,000
(W) Acquisition, construction, infrastructure, remediation and other related costs for the Bushkill Drive park development project
Project Allocation
5,000,000
(X) Acquisition, construction, infrastructure, remediation and other related costs for the Easton Made Incubator Project
Project Allocation
5,000,000
(Y) Acquisition, remediation, demolition, construction, infrastructure and other related costs to redevelop the former industrial properties in the south side of Easton at West Lincoln and Coal Streets
Project Allocation
7,500,000
(v) Freemansburg Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Freemansburg Municipal Police, Fire, Public Works and Administration Building
Project Allocation
1,800,000
(vi) Lehigh Township
(A) Infrastructure, site improvements and construction of a new public works building
Project Allocation
1,368,000
(vii) Nazareth Economic Development Commission
(A) Redevelopment of Nazareth National Building and abandoned industrial property
Project Allocation
3,000,000
(viii) Northampton County Department of Community and Economic Development
(A) Infrastructure improvements, construction and renovations to Moravian Historical Society facilities
Project Allocation
1,000,000
(viii.1) Pen Argyl Borough
(A) Construction, renovation and other related costs for the construction of a pool and gymnasium at the Slate Belt YMCA
Project Allocation
3,000,000
(B) Construction and other related costs for the replacement of Lookout Fire Station #32
Project Allocation
2,108,000
(viii.2) Upper Mount Bethel Township
(A) Infrastructure, construction and other related costs for an economic development project, including infrastructure improvements and upgrades, in Upper Mount Bethel Township
Project Allocation
15,000,000
(ix) West Easton Borough
(A) Acquisition, infrastructure improvements, abatements and other costs for the development of a drug treatment center in the Borough of West Easton
Project Allocation
3,000,000
(x) County Projects
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for a county facility building
Project Allocation
10,000,000
(B) Acquisition, construction, infrastructure and other related costs for a minor league soccer stadium
Project Allocation
15,000,000
(C) Infrastructure and construction of a new YMCA facility to serve the southern region of the Lehigh Valley
Project Allocation
10,000,000
(D) Infrastructure, rehabilitation, renovation, environmental remediation, construction and other related costs for the Northampton County Prison Facility
Project Allocation
15,000,000
(49) Northumberland County
(i) Lower Mahanoy Township
(A) Construction, infrastructure, redevelopment, renovation and other related costs to replace and update the municipal township building
Project Allocation
500,000
(i.1) Milton Borough
(A) Construction, infrastructure, abatement of hazardous materials and other related costs for the environmental cleanup and redevelopment of an old industrial site for future development
Project Allocation
600,000
(B) Acquisition, construction, infrastructure and other related costs for renovations and an addition to the existing Milton Fire Department building to allow fire, EMS and ambulatory services to be located in one location
Project Allocation
1,000,000
(i.2) Mount Carmel Borough
(A) Construction of a new municipal building
Project Allocation
500,000
(B) Construction and other related costs for a new Borough Hall to house the borough administration, police, municipal authority and Lower Anthracite Transit System in one building
Project Allocation
700,000
(i.3) Northumberland County Housing Authority
(A) Acquisition, demolition, renovation, abatement of hazardous materials, construction and other related costs for the removal and redevelopment of blighted and abandoned properties
Project Allocation
1,500,000
(ii) Northumberland County Industrial Development Authority
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure development, abatement of hazardous materials and site preparation for a business park
Project Allocation
1,500,000
(iii) Point Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure development and abatement of hazardous materials for a manufacturing site
Project Allocation
5,500,000
(B) Construction, infrastructure, redevelopment, renovation and other related costs for the expansion of Strong Industries buildings
Project Allocation
550,000
(C) Construction, infrastructure, rehabilitation and other related costs for the Point Township municipal building
Project Allocation
600,000
(iv) Ralpho Township
(A) Construction, infrastructure, renovation and other related costs to address recreation and civic projects, including All Home Days Park and township buildings
Project Allocation
500,000
(v) City of Shamokin
(A) Acquisition, renovation, abatement of hazardous materials and other related costs for the removal and redevelopment of an abandoned factory
Project Allocation
500,000
(B) Acquisition, construction, redevelopment and other related costs for a FQHC multiservice medical facility
Project Allocation
2,000,000
(C) Construction, acquisition and other related costs for downtown development, including building a replica of the former train station
Project Allocation
900,000
(vi) City of Sunbury
(A) Acquisition, construction, renovation and other related costs for a custody exchange and supervised visitation center
Project Allocation
500,000
(B) Construction, acquisition, infrastructure, redevelopment, renovation and other related costs for the development of the Family Success Center
Project Allocation
2,000,000
(vii) County Projects
(A) Acquisition, infrastructure and other related costs for an economic development project in the county
Project Allocation
2,500,000
(50) Perry County
(i) Perry County Economic Development Corporation
(A) Land acquisition, construction, infrastructure improvements and other related costs for an economic development project or for development of business-ready sites in Perry County
Project Allocation
5,000,000
(B) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project
Project Allocation
5,000,000
(ii) County Projects
(A) Acquisition, construction, infrastructure improvements and other related costs for the renovation, rehabilitation or preservation of historical sites
Project Allocation
2,000,000
(B) Construction, infrastructure and other related costs for a public safety radio tower to serve law enforcement, fire and EMS agencies
Project Allocation
2,100,000
(51) Philadelphia County
(i) City of Philadelphia
(A) Acquisition, construction, infrastructure, remediation and other related costs for economic development projects
Project Allocation
30,000,000
(B) Acquisition, construction, renovation, infrastructure improvements and other related costs for the food-related facilities for Philabundance
Project Allocation
15,000,000
(C) Construction, renovation, infrastructure improvements and other related costs for the PA Academy of Fine Arts Expansion and Modernization Project, Phase 2
Project Allocation
15,000,000
(D) Construction, renovation, infrastructure improvements and other related costs for the PA Academy of Fine Arts Expansion and Modernization Project, Phase 1
Project Allocation
12,000,000
(E) Acquisition, construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for the NexFab Advanced Manufacturing project
Project Allocation
10,000,000
(F) Acquisition, construction, infrastructure redevelopment and other related costs for the William Way LGBT Community Center project
Project Allocation
6,000,000
(G) Construction, infrastructure, renovation, abatement, redevelopment and other related costs for upgrade project for the Kimmel Center Merriam Theater improvement project
Project Allocation
20,000,000
(H) Renovation, infrastructure improvement and other related costs for the WHYY facilities upgrade project
Project Allocation
2,000,000
(I) Construction, infrastructure improvements, renovation and other related costs for the Salvation Army Emergency Disaster Services Facility expansion project
Project Allocation
1,500,000
(J) Construction, infrastructure improvements, renovation and other related costs for the Metropolitan Opera House redevelopment project
Project Allocation
5,000,000
(K) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at Hahnemann University Hospital
Project Allocation
20,000,000
(L) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Rock School for Dance Education redevelopment project
Project Allocation
7,000,000
(M) Acquisition, construction, infrastructure and other related costs for an economic development project at the Navy Yard for Rhoads Industries to create an industrial and manufacturing center
Project Allocation
10,000,000
(N) Construction, infrastructure, redevelopment and other related costs for the Walnut Theater Expansion project
Project Allocation
10,000,000
(O) Construction, acquisition and other related costs for the expansion and relocation of The Clay Studio
Project Allocation
6,000,000
(P) Construction, infrastructure improvements, renovations and other related costs for the Southwark Parking Garage project
Project Allocation
3,000,000
(Q) Construction, infrastructure improvements and other related costs for the Connelly Library and Learning Commons, the Special Troops Armory Building, student housing/residential facility and campus greening in the Main Quad
Project Allocation
5,000,000
(R) Land acquisition, site preparation, infrastructure improvements, construction and other related costs for Chestnut Hill College
Project Allocation
15,000,000
(S) Infrastructure, redevelopment and other related costs for the Chestnut Hill Commercial Corridor improvement project
Project Allocation
1,600,000
(T) Construction, renovation, infrastructure and other related costs for the Mann Center for the Performing Arts venue
Project Allocation
21,000,000
(U) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for the Ronald McDonald House expansion project
Project Allocation
7,000,000
(V) Construction, renovation, infrastructure improvements and other related costs for the Please Touch Museum Memorial Hall infrastructure project
Project Allocation
3,200,000
(W) Construction, demolition, infrastructure improvements, reclamation, remediation and other related costs for the Free Library of Philadelphia renovation project
Project Allocation
30,000,000
(X) Construction, infrastructure, redevelopment and other related costs for the Methodist Home for Children improvement project
Project Allocation
2,000,000
(Y) Construction, infrastructure, abatement, redevelopment and other related costs for the Chestnut Hall Apartments commercial and housing renovation project
Project Allocation
5,000,000
(Z) Construction, infrastructure and other related costs for the PAL Centers renovation and upgrade projects
Project Allocation
7,000,000
(AA) Construction, infrastructure and other related costs for the development of U City Square
Project Allocation
10,000,000
(BB) Acquisition, demolition, renovation, remediation, construction, infrastructure and other related costs for the development of campus assets and adjacent properties for Drexel University
Project Allocation
50,000,000
(CC) Construction, rehabilitation and other related costs for the Manayunk Canal Boardwalk redevelopment project
Project Allocation
2,400,000
(DD) Construction, infrastructure, redevelopment and other related costs for the Share Food Program renovation project
Project Allocation
3,000,000
(EE) Acquisition, construction, redevelopment and other related costs for the renovation of the Caring People Alliance Boys and Girls Clubs facilities
Project Allocation
5,000,000
(FF) Construction, infrastructure and other related costs for expansion of the West Philadelphia Regional Center of the Community College of Philadelphia
Project Allocation
12,000,000
(GG) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the expansion and modernization of the Medical Education and Research Building, including research, education, laboratory, student and community facilities
Project Allocation
40,000,000
(HH) Construction, infrastructure improvements and other related costs for the development of a medical office building, including related clinical, patient, community, parking, research and education facilities
Project Allocation
10,000,000
(II) Site preparation, acquisition, infrastructure, demolition, remediation, construction and related design activities for the redevelopment of the vacant Logan Triangle site
Project Allocation
40,000,000
(JJ) Construction, renovation, infrastructure improvements and equipment for the expansion and modernization of the multiuse athletic facility utilized by the 21st Ward Athletic Association
Project Allocation
10,000,000
(KK) Construction and other related costs for the 22nd Street commercial corridor redevelopment
Project Allocation
10,000,000
(LL) Acquisition, construction and infrastructure improvements for the building of a Cargolinc Factory to manufacture a building technology system that accelerates green and sustainable construction with high-quality standards
Project Allocation
5,000,000
(MM) Construction, renovation, infrastructure improvements and equipment for the creation of community schools and school-based health services
Project Allocation
5,000,000
(NN) Acquisition, construction, infrastructure improvements and equipment for the development of a crisis response center serving children and adults with both urgent and outpatient behavior health services in the Logan/Ogontz area of North Philadelphia
Project Allocation
15,000,000
(OO) Acquisition, construction, infrastructure and equipment for the development of low-income housing for senior citizens who are raising children in North Philadelphia
Project Allocation
5,000,000
(PP) Renovation and preservation of homes in the Hunting Park area by making them energy-efficient
Project Allocation
1,000,000
(QQ) Construction, infrastructure, redevelopment and equipment for the expansion and modernization of the Hunting Park Recreation Center
Project Allocation
5,000,000
(RR) Acquisition, construction, infrastructure and equipment for the development of an indoor agricultural hydroponics facility in North Philadelphia
Project Allocation
10,000,000
(SS) Construction, renovation, infrastructure improvements and other related costs for the development of a training facility for the Laborer's District Council of Philadelphia along the North Broad Street Corridor
Project Allocation
20,000,000
(TT) Acquisition, construction, infrastructure, redevelopment and other related costs for the purchase of land around the LGBTQ Home for Hope and the construction of a new shelter and community space for homeless LGBT people
Project Allocation
6,000,000
(UU) Construction, infrastructure improvements and equipment for the construction of a gymnasium for the Mathematics, Civics and Sciences Charter School
(VV) Construction, renovation, infrastructure improvements, equipment and other related costs for the restoration and redevelopment of the New Freedom Theatre
Project Allocation
5,000,000
(WW) Construction, acquisition, infrastructure improvements, equipment and other related costs for the redevelopment of the North 5th Street Commercial Corridor
Project Allocation
1,000,000
(XX) Acquisition, construction and development of a neighborhood multiseason, multipurpose indoor sports facility in North Philadelphia
Project Allocation
15,000,000
(YY) Rehabilitation, construction, infrastructure and equipment for the redevelopment of the iconic Oaklane Diner in the Oaklane neighborhood of North Philadelphia
Project Allocation
3,000,000
(ZZ) Acquisition, construction and rehabilitation of properties for use as transitional residential housing and for ancillary uses, targeted at providing services to individuals in recovery and long-term health care programs in the Greater Swampoodle/Lehigh Avenue areas of North Philadelphia west of Broad Street
Project Allocation
3,500,000
(AAA) Construction, renovation, infrastructure improvements and equipment for the development of a neighborhood/community facility as part of the nation's first African-American-owned shopping center
Project Allocation
1,000,000
(BBB) Acquisition, construction, infrastructure and equipment for the construction of a community recreation center in the Tioga section of North Philadelphia
Project Allocation
2,000,000
(CCC) Construction, acquisition, redevelopment and other related costs for the redevelopment of North Philadelphia's historic Uptown Theater
Project Allocation
5,000,000
(DDD) Acquisition, construction and infrastructure improvements for 40 newly constructed, affordable residential units within four two-story groups of buildings on one city block in North Philadelphia
Project Allocation
5,500,000
(EEE) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion and modernization of the Temple Lung Center, including related clinical, patient, community and research and education
Project Allocation
6,000,000
(FFF) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Episcopal Campus
Project Allocation
10,000,000
(GGG) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Boyer Pavilion Patient Care facilities
Project Allocation
10,000,000
(HHH) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital
Project Allocation
10,000,000
(III) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion of the Emergency Department and related clinical, patient, community, research and education facilities for Temple University Hospital Emergency Department
Project Allocation
5,000,000
(JJJ) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital
Project Allocation
30,000,000
(KKK) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Fox Chase Cancer Center
Project Allocation
10,000,000
(LLL) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Jeanes Hospital
Project Allocation
10,000,000
(MMM) Construction, infrastructure, redevelopment and other related costs for Nueva IV development project
Project Allocation
1,800,000
(NNN) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at St. Christopher's Hospital for Children
Project Allocation
20,000,000
(OOO) Construction, infrastructure and other related costs for the renovation of the Kensington & Allegheny Health and Wellness Campus of Esperanza Health Center
Project Allocation
15,000,000
(PPP) Construction, infrastructure, redevelopment and other related costs for the rehabilitation, enhancement and expansion of city-owned public spaces and property and surrounding infrastructure in Northeast Philadelphia
Project Allocation
25,000,000
(QQQ) Construction and other related costs for the FloatLab platform project in the Schuylkill River
Project Allocation
2,000,000
(RRR) Land acquisition, site preparation, demolition, construction, infrastructure, redevelopment and other related costs for Thomas Jefferson University
Project Allocation
30,000,000
(SSS) Acquisition, abatement, infrastructure, construction, renovation and other related costs for the expansion of Thomas Jefferson University Hospital postanesthesia care units
Project Allocation
4,000,000
(TTT) Acquisition, demolition, renovation, construction and other related costs for Thomas Jefferson University Hospital facilities
Project Allocation
50,000,000
(UUU) Construction, renovation, historic preservation and other related costs for the Eastern State Penitentiary site
Project Allocation
10,000,000
(VVV) Construction, demolition, renovation and other related costs for The William Way LGBT Community Center
Project Allocation
8,000,000
(WWW) Construction, renovation, infrastructure improvements and other costs for the Broad Street Ministry Building rehabilitation project
Project Allocation
4,000,000
(XXX) Acquisition, construction, demolition, infrastructure, renovation and other costs for the Lutheran Theological Seminary at 7301 Germantown Avenue
Project Allocation
10,000,000
(YYY) Restoration, rehabilitation and other costs for the 1797 First Bank of the United States Building in Independence Park
Project Allocation
10,000,000
(ZZZ) Construction, infrastructure improvements and other costs for the National Library Museum renovation project
Project Allocation
5,000,000
(AAAA) Construction, infrastructure improvements and other related costs for the Pennsylvania Ballet Phase II expansion project
Project Allocation
14,000,000
(BBBB) Acquisition, construction, infrastructure and equipment to redevelop 10 schoolyards in North Philadelphia
Project Allocation
2,500,000
(CCCC) Construction, renovation, infrastructure improvements and equipment related to the expansion and modernization of the Zitner's Candy Factory in North Philadelphia
Project Allocation
5,000,000
(DDDD) Acquisition, construction, infrastructure and equipment related to the multiphase, mixed-use, urban transit-oriented North Station District project in North Philadelphia
Project Allocation
50,000,000
(EEEE) Acquisition, construction, abatement and other related costs for the revitalization of Woodland Avenue
Project Allocation
4,700,000
(FFFF) Construction, infrastructure improvements, equipment and other related costs for the expansion of Cristo Rey High School
Project Allocation
4,000,000
(GGGG) Acquisition, construction, infrastructure improvements and other related costs for the renovation, rehabilitation or preservation of historical sites in North Central Pennsylvania
Project Allocation
500,000
(HHHH) Construction, renovation, infrastructure improvements and equipment related to the development of the WES Health System medical facility in the Logan/Olney section of Philadelphia
Project Allocation
5,200,000
(IIII) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a mixed-use high rise building as part of the revitalization of North Broad Street
Project Allocation
30,000,000
(JJJJ) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a new headquarters, kitchen and educational spaces for the Metropolitan Area Neighborhood Nutrition Alliance
Project Allocation
3,000,000
(KKKK) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs to facilities upgrades for the Monell Center
Project Allocation
12,500,000
(LLLL) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Nueva Esperanza community meeting space and classroom facilities
Project Allocation
1,800,000
(MMMM) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for high-quality affordable housing for seniors at Greater Bible Way Senior Apartments
Project Allocation
6,550,000
(NNNN) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Glen Foerd on the Delaware East Torresdale Community Revitalization Project
Project Allocation
1,500,000
(OOOO) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a community resource, social service and job training center in Tacony
Project Allocation
1,000,000
(PPPP) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the Tacony Neighborhood Parks and Pathways Improvements Project
Project Allocation
2,100,000
(QQQQ) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project in the Philadelphia Navy Yard
Project Allocation
10,000,000
(RRRR) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for redevelopment and reuse of 13 Pattison Avenue and the surrounding area
Project Allocation
5,000,000
(SSSS) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for economic development projects related to Liberty on the River mixed-use, master-planned community
Project Allocation
44,000,000
(TTTT) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the IATSE Local No. 8 Training and Education Center expansion and improvement project
Project Allocation
2,500,000
(UUUU) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a charter school expansion project located at 1329 E. Moyamensing Avenue
Project Allocation
3,000,000
(VVVV) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a charter school expansion project located at 1100 South Columbus Boulevard (Rear)
Project Allocation
3,000,000
(WWWW) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for economic development projects as part of the South Street Headhouse District Revitalization Initiative
Project Allocation
3,000,000
(XXXX) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a STEM educational center
Project Allocation
6,000,000
(YYYY) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for repairing, replacing, preserving and lighting Christ Church Tower and Steeple
Project Allocation
1,250,000
(ZZZZ) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Market East Lighting and Transit Enhancement Project
Project Allocation
3,000,000
(A5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for revitalization of property at and around 456 North 5th Street for mixed use, including retail, residential and municipal uses, including a grocery store
Project Allocation
3,000,000
(B5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Gallery at Market East revitalization project
Project Allocation
20,000,000
(C5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new grocery store project at Chew Avenue and Washington Lane in Mt. Airy
Project Allocation
1,500,000
(D5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Wilma Theater lobby cafe and facade refurbishing project
Project Allocation
500,000
(E5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new Philadelphia Police District #2 facility for the police and local police support services
Project Allocation
3,000,000
(F5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development or community project at the Old Fels School Building and property
Project Allocation
20,000,000
(G5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for bus facilities along Roosevelt Boulevard to increase mass transit service along Roosevelt Boulevard
Project Allocation
5,000,000
(H5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for multiple school yard redevelopments in Mt. Airy
Project Allocation
7,500,000
(I5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a community kitchen and culinary incubator space in Mt. Airy
Project Allocation
15,000,000
(J5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for converting the historic Sedgwick Theater into a performing arts center
Project Allocation
4,500,000
(K5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Temple University to expand the College of Public Health
Project Allocation
45,000,000
(L5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a teaching and research facility project for Temple University Main Campus
Project Allocation
102,500,000
(M5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Temple University Ritter Hall and Ritter Annex
Project Allocation
17,000,000
(N5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for an academic space at Temple University Main Campus
Project Allocation
50,000,000
(O5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a space on Temple University Health and Science Campus
Project Allocation
50,000,000
(P5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for an expansion project at Temple University's Fox School of Business
Project Allocation
34,500,000
(Q5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a project for Temple University's College of Engineering
Project Allocation
30,000,000
(R5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the restoration of the historic Pyramid Electric Building for the development of new commercial office and creative arts space
Project Allocation
3,000,000
(S5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Beeber Annex Community Multipurpose Facility improvement project
Project Allocation
2,500,000
(T5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a pet resource center and shelter
Project Allocation
3,500,000
(U5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project in the Philadelphia Navy Yard
Project Allocation
10,000,000
(V5) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new Lower Northeast Philadelphia Health Center
Project Allocation
5,000,000
(W5) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Park and Recreation Centers in Legislative District 202
Project Allocation
5,000,000
(X5) Site preparation, construction, infrastructure and other related costs for renovations to the Friends Hospital Campus
Project Allocation
15,000,000
(Y5) Rehabilitation, renovation, construction, abatement of hazardous materials and other related costs for the interior improvements for a cultural asset for First Troop Philadelphia City Calvary
Project Allocation
10,000,000
(Z5) Acquisition, rehabilitation, renovation, construction, abatement of hazardous materials and other related costs for mixed-use redevelopment for Cedar-South Philadelphia I, LLC
Project Allocation
15,000,000
(A6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the development of New Courtland Senior Community at Pennypack at 4401 Megargee Street, including adjacent areas
Project Allocation
20,000,000
(B6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Overbrook School for the Blind
Project Allocation
10,000,000
(C6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for upgrades to the Pennsylvania School for the Deaf
Project Allocation
10,000,000
(D6) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for various Nueva IV economic development projects for the 5th Street, Hunting Park and Wyoming Avenue Corridors as part of the Hunting Park Neighborhood Plan
Project Allocation
5,000,000
(E6) Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other related costs for improving and expanding housing and economic development projects
Project Allocation
10,000,000
(F6) Acquisition, design, construction, infrastructure improvements, renovation, rehabilitation and other related costs for new and existing buildings for Kleinlife Community Center
Project Allocation
5,000,000
(G6) Acquisition, construction, redevelopment and other related costs for the West Philadelphia Institute mixed-use project
Project Allocation
3,000,000
(H6) Acquisition, construction, redevelopment and other related costs for the SUPRA/EMSCO project at the West Parkside Industrial Park
Project Allocation
2,000,000
(I6) Acquisition, construction, redevelopment and other related costs for the West Philadelphia Revitalization Project and surrounding area
Project Allocation
10,000,000
(J6) Acquisition, construction, redevelopment and other related costs for the North Philadelphia Revitalization Project and surrounding area
Project Allocation
10,000,000
(K6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Frankford Transportation Center Transit-oriented Development
Project Allocation
3,500,000
(L6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Frankford Park improvement project and surrounding area
Project Allocation
600,000
(M6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Frankford Avenue Streetscape Project
Project Allocation
1,000,000
(N6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Paul Street improvement project and surrounding area
Project Allocation
500,000
(O6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Margaret Street Plaza improvement project
Project Allocation
500,000
(P6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the VFW Post 224 improvement project and surrounding area
Project Allocation
1,000,000
(Q6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Fifth Street corridor improvement project and surrounding area
Project Allocation
500,000
(R6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Carmella Recreation Center and Library play area improvement project and surrounding area
Project Allocation
1,000,000
(S6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Gambrell Recreation Center and Library play area improvement project and surrounding area
Project Allocation
1,000,000
(T6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Ziehler Recreation Center and Library play area improvement project and surrounding area
Project Allocation
1,000,000
(U6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the McIlvain Recreation Center and Library play area improvement project and surrounding area
Project Allocation
1,000,000
(V6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Hedge Street Park Recreation Center and Library play area improvement project and surrounding area
Project Allocation
1,000,000
(W6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Beeber Annex Community Multipurpose Facility improvement project and the surrounding area
Project Allocation
2,500,000
(X6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the store fronts of commercial businesses along the 5900-6200 blocks of North Market Street and the surrounding area
Project Allocation
5,000,000
(Y6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the store fronts of commercial businesses along the 6300-5400 blocks of North Lansdowne Avenue and the surrounding area
Project Allocation
2,500,000
(Z6) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the store fronts of commercial businesses along the 1700-2000 blocks of North 54th Street and the surrounding area
Project Allocation
2,500,000
(A7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Overbrook Park Ambulance improvement project and the surrounding area
Project Allocation
2,500,000
(B7) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Schuylkill Center for Environmental Education's visitor center building, core campus grounds, entrance road and trail system improvement project
Project Allocation
1,000,000
(C7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Roxborough Development Corporation's adaptive reuse of the Roxborough Trust Company Building and other adjacent parcels
Project Allocation
2,500,000
(D7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the Manayunk Canal Boardwalk
Project Allocation
2,400,000
(E7) Acquisition, construction, infrastructure, redevelopment and other related costs for the New Market West mixed-use project
Project Allocation
6,000,000
(F7) Acquisition, construction, infrastructure, redevelopment and other related costs for LGBT community development in Philadelphia
Project Allocation
6,000,000
(G7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Cliveden Hills Association streetscape project
Project Allocation
2,500,000
(H7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Ogontz Avenue Revitalization Corporation's Stenton Avenue streetscape and economic development projects
Project Allocation
1,600,000
(I7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Chew and Belfield Neighbors Club's Chew Avenue revitalization, streetscape and economic development projects
Project Allocation
2,500,000
(J7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Cedarbrook Civic Association's bus shelter and landscape project
Project Allocation
2,500,000
(K7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Friends of the Wissahickon's increasing and improving recreation trails of the historic Wissahickon Valley Park
Project Allocation
4,000,000
(L7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the New Covenant Church of Philadelphia's Children and Family Center project
Project Allocation
2,000,000
(M7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the Chestnut Hill Garden District's streetscape projects along the Chestnut Hill Commercial Corridor
Project Allocation
1,548,000
(N7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for projects related to Mt. Airy USA's mixed-use development project located at the former Kingdom Auto Care site
Project Allocation
4,580,000
(O7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for completing the remaining phases of connecting the Cresheim Trail to Montgomery County
Project Allocation
3,000,000
(P7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Families of Houston's playground renovation and work cooperative internship program project
Project Allocation
915,000
(Q7) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for proposed new Alliance for Progress Charter School building to accommodate additional students and provide additional educational support rooms
Project Allocation
3,000,000
(R7) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for improvement and expansion of one of Northern Children's Services historic buildings
Project Allocation
2,250,000
(S7) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for streetscape improvements and economic development projects in the East Falls Riverfront Business District
Project Allocation
2,500,000
(T7) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Paschalville Branch of the Free Library of Philadelphia and the surrounding area
Project Allocation
5,000,000
(U7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for KIPP West Philadelphia Charter School's development of a new campus
Project Allocation
3,500,000
(V7) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Trinity Church Oxford's redevelopment of buildings located at Rising Sun Avenue and Longshore Avenue for community use
Project Allocation
5,000,000
(W7) Construction, infrastructure, redevelopment and other related costs for the Overbrook Farmacy - Wellness Center
Project Allocation
4,500,000
(X7) Construction, infrastructure and other related costs for the 36th Street and Haverford Avenue development project
Project Allocation
2,000,000
(Y7) Design, development and construction of laboratories, coworking spaces and incubator facilities for biotech translational research, technology transfer and early-stage technology commercialization
Project Allocation
10,000,000
(Z7) Construction, infrastructure, rehabilitation and other related costs for the WURD Radio renovation project
Project Allocation
2,000,000
(i.1) Philadelphia Authority for Industrial Development
(A) Construction and other related costs for a multistory comprehensive community service, training and research center
Project Allocation
15,000,000
(B) Construction, renovation and other related costs for a multistory automotive community trade and apprenticeship training center
Project Allocation
6,000,000
(i.2) Philadelphia Industrial Development Corporation
(A) Construction, infrastructure, acquisition, redevelopment and other related costs for capital improvements and renovations to the St. Matthew Elementary School buildings and campus
Project Allocation
5,000,000
(B) Construction, infrastructure and other costs related to the Facilities Master Plan of the Philadelphia Museum of Art
Project Allocation
25,000,000
(C) Construction, infrastructure, redevelopment and other related costs for projects at the Philadelphia Zoo
Project Allocation
30,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for Delband Recreation Center's facilities and property upgrade project
Project Allocation
800,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for improvements to the Mitchell Playground facility and field improvements to the community center, including pool building and playground
Project Allocation
1,200,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for Thomas Holme Elementary School's site improvements for safety, community center upgrades and playground
Project Allocation
2,800,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for Rhawnhurst School grounds site improvements and safety, playground and community center
Project Allocation
1,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Bustleton 2 Gymnasium project D. Hayes playground and center
Project Allocation
2,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the CAA improvement to existing building and surrounding grounds for community use and upgrades
Project Allocation
1,500,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for Northeast Philadelphia Regional Infrastructure Improvements to improve community access to city facilities in 19154, 19114, 19152 and 19111
Project Allocation
10,000,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment, abatement of hazardous materials and other related costs for economic development projects and neighborhood improvement projects in northeast Philadelphia to fight blighted property
Project Allocation
5,000,000
(i.3) Philadelphia Redevelopment Authority
(A) Reconstruction, renovation, repair and other related costs for the National Constitution Center, including spaces and exhibits within the center
Project Allocation
50,000,000
(ii) County Projects
(A) Site development, construction and other costs associated with the build out of the University City Science Center
Project Allocation
25,000,000
(B) Construction, infrastructure, rehabilitation and other related costs for the Facilities Master Plan of the Philadelphia Museum of Art
Project Allocation
25,000,000
(C) Development and construction of a senior residential and supportive service facility in West Philadelphia
Project Allocation
3,000,000
(52) Pike County
(i) County Projects
(A) Construction, infrastructure and other related costs for a development project
Project Allocation
10,000,000
(53) Potter County
(i) Potter County Redevelopment Authority
(A) Construction, infrastructure and other related costs for regional recreation development, including reconstruction of the Galeton Dam
Project Allocation
1,500,000
(ii) County Projects
(A) Infrastructure, construction and other related costs for a Tri-County Rural Electric Cooperative fiber-to-home pilot project
Project Allocation
720,000
(54) Schuylkill County
(i) City of Pottsville
(A) Acquisition, construction, rehabilitation, infrastructure development and other related costs for a neighborhood community center
Project Allocation
10,000,000
(B) Acquisition, demolition, renovation, construction and further improvements to parking facilities in the City of Pottsville
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for renovation and expansion of community hospital campuses
Project Allocation
5,000,000
(ii) Coaldale Borough
(A) Construction, redevelopment and expansion of St. Luke's Miners Hospital Emergency Department
Project Allocation
650,000
(ii.1) Hegins Township
(A) Acquisition, construction, redevelopment and other related costs for a community arts and recreational center
Project Allocation
2,500,000
(iii) McAdoo Borough
(A) Acquisition, infrastructure and renovation of a facility for the development of a medical office building
Project Allocation
500,000
(iii.1) Orwigsburg Borough
(A) Construction, infrastructure and other related costs to construct a regional veterans community and recreation center
Project Allocation
1,000,000
(iv) The Pennsylvania State University
(A) Rehabilitation, renovation, infrastructure development and abatement of hazardous materials for a classroom building - science laboratory on the Schuylkill Campus
Project Allocation
2,000,000
(iv.1) Pine Grove Borough
(A) Construction, infrastructure, redevelopment and other related costs for a recreation park, walking trail and community center
Project Allocation
2,418,000
(iv.2) Pottsville Area Development Corporation
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for community revitalization, including downtown rehabilitation and renovation of historical community features
Project Allocation
10,000,000
(v) Schuylkill County Municipal Authority
(A) Construction, rehabilitation, infrastructure development and other related costs for utility system upgrades, including increasing water and sewer capacity, serving the Highridge Business Park and the Mahanoy Business Park
Project Allocation
1,375,000
(B) Construction, rehabilitation, infrastructure development and other related costs for improvements to the water system serving the Highridge Business Park and the Mahanoy Business Park, improving reliability and efficiency
Project Allocation
600,000
(C) Infrastructure improvements, rehabilitation and construction for the expansion of a wastewater treatment plant located in Gordon Borough that serves Highridge Business Park
Project Allocation
5,000,000
(vi) Schuylkill Economic Development Corporation
(A) Acquisition, construction and infrastructure development of industrial park facilities along the Interstate 81 corridor
Project Allocation
10,000,000
(vi.1) Schuylkill Haven Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the renovation of historic buildings for commercial applications
Project Allocation
1,000,000
(vii) Tamaqua Borough
(A) Infrastructure and construction of an early childhood and preschool facility for Child Development, Inc.
Project Allocation
500,000
(B) Acquisition, infrastructure and construction related to parking and ADA accessibility to Riverwalk and Tamaqua Community Art Center
Project Allocation
500,000
(C) Infrastructure, renovation and redevelopment of a medical office building for rural health and dental clinics
Project Allocation
750,000
(viii) County Projects
(A) Acquisition, infrastructure, construction and other related costs for an Innovation Center to provide space for emerging businesses
Project Allocation
7,500,000
(B) Acquisition, construction, infrastructure and related costs for a medical and health care related facility
Project Allocation
15,000,000
(55) Snyder County
(i) Selinsgrove Borough
(A) Acquisition, renovation and rehabilitation of a former church building in the Borough of Selinsgrove
Project Allocation
750,000
(ii) County Projects
(A) Acquisition, infrastructure and other related costs for an economic development project in the county
Project Allocation
2,500,000
(56) Somerset County
(i) Myersdale Borough
(A) Acquisition, construction, redevelopment, renovation and rehabilitation, infrastructure and abatement of hazardous materials associated with streetscape and community center projects
Project Allocation
3,000,000
(ii) Seven Springs Borough
(A) Site preparation, construction, renovation, rehabilitation, infrastructure and other costs related to an economic development project adding a new venue to the Laurel Highlands Visitors Bureau region
Project Allocation
10,000,000
(B) Construction, land acquisition, redevelopment, infrastructure and other related costs to support the construction of a large-scale tourism economic development project
Project Allocation
20,000,000
(iii) Somerset County General Authority
(A) Construction, infrastructure, land acquisition and other related costs for an energy-based economic development project
Project Allocation
6,000,000
(iv) County Projects
(A) Acquisition, construction, infrastructure improvements and other costs related to a renewable, alternative energy system
Project Allocation
2,000,000
(B) Acquisition, renovation, redevelopment, construction, infrastructure and other related costs for the consolidation of physician offices at a central location, providing greater efficiencies, easier patient access and expansion of specialty care
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure improvements and other costs related to community and economic projects and initiatives
Project Allocation
25,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for development of a health care or other medical facility by Conemaugh Health System
Project Allocation
5,000,000
(57) Sullivan County (Reserved)
(58) Susquehanna County
(i) The Progress Authority
(A) Acquisition, construction and infrastructure improvements for a new business park along the Route 81 transportation corridor
Project Allocation
3,000,000
(B) Construction of a new Susquehanna County Public Safety complex
Project Allocation
4,000,000
(C) Construction and other related costs for the development of a countywide Open Access Network to improve emergency services, public safety, rural telecommunications and economic development of the fiber optic highway
Project Allocation
5,000,000
(D) Acquisition, construction, excavation, demolition, infrastructure, redevelopment, renovation and other related costs for economic development projects and a transloading facility, including rail siding, in Great Bend and New Milford Townships
Project Allocation
5,000,000
(ii) County Projects
(A) Construction, infrastructure and other related costs for a reclamation facility to process flowback fluid associated with Marcellus Shale gas drilling
Project Allocation
5,000,000
(B) Construction, infrastructure, redevelopment and other related costs for the construction of a crystallizer and produced water treatment facility to treat water associated with the natural gas industry
Project Allocation
5,000,000
(59) Tioga County
(i) County Projects
(A) Development of the Mill Cove Environmental Education Center, including infrastructure improvements and construction of support facilities
Project Allocation
3,500,000
(B) Acquisition, construction, infrastructure and other costs related to opening a natural gas liquids waste reuse manufacturing and recycling facility
Project Allocation
10,000,000
(60) Union County
(i) Kelly Township
(A) Construction, renovation, redevelopment and other related costs for the Greater Susquehanna Valley YMCA
Project Allocation
3,000,000
(61) Venango County
(i) Oil City
(A) Construction, infrastructure, renovation, abatement of hazardous materials, redevelopment and other related costs to revitalize the Northside Business District
Project Allocation
7,500,000
(ii) Venango County Redevelopment Authority
(A) Infrastructure, rehabilitation, construction and other related costs for expansion of the University of Pittsburgh Medical Center Cancer Center at University of Pittsburgh Medical Center Northwest
Project Allocation
4,000,000
(iii) County Projects
(A) Acquisition, infrastructure and redevelopment of property surrounding the Venango Regional Airport for the development of a business park
Project Allocation
7,500,000
(B) Acquisition, infrastructure and construction for redevelopment of a Waste Coal Cogeneration Plant in Scrubgrass Township
Project Allocation
3,000,000
(62) Warren County
(i) Warren County Development Association
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure development and abatement of hazardous materials for an industry-specific business accelerator operation to provide sector-focused infrastructure and synergy for occupant businesses
Project Allocation
1,500,000
(ii) County Projects
(A) Acquisition, redevelopment and construction of a senior health care and living center in Warren County for the Erie County General Authority
Project Allocation
6,750,000
(63) Washington County
(i) Cecil Township
(A) Construction, infrastructure, redevelopment and other related costs for the development of a mixed-use site for Cool Valley
Project Allocation
25,000,000
(i.1) City of Washington
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for TRIPIL's new headquarters and community center at the former YWCA building
Project Allocation
4,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new municipal and public safety building
Project Allocation
5,000,000
(i.2) Mon Valley Alliance
(A) Infrastructure, construction and other related costs for right-of-way improvements, parking and other improvements for a riverfront park as part of the Charleroi Renaissance Phase 1 development
Project Allocation
2,000,000
(B) Redevelopment, renovation, abatement of hazardous materials and other infrastructure improvements to Charleroi's historic district for the Magic City Center as part of the Charleroi Redevelopment Zone Phase 2
Project Allocation
1,000,000
(C) Acquisition, infrastructure improvements, environmental remediation, construction and other related costs for Air Gas expansion of facilities to a former brownfield site
Project Allocation
1,500,000
(D) Acquisition, infrastructure, construction and other related costs for the World Kitchen Factory expansion
Project Allocation
1,500,000
(i.3) Peters Township
(A) Construction and other related costs for the development of a community park
Project Allocation
5,000,000
(ii) Redevelopment Authority of the County of Washington
(A) Acquisition, demolition, infrastructure improvements, abatement of hazardous materials, construction and other related costs for Jessop Place
Project Allocation
2,000,000
(B) Infrastructure improvements, construction and other related costs for Donora Industrial Park
Project Allocation
2,000,000
(C) Infrastructure, site preparation, construction, extension of public utilities and other related costs for development of an industrial park in the Fort Cherry Development District
Project Allocation
25,000,000
(D) Infrastructure improvements, construction and other related costs for expansion of the Pennsylvania Trolley Museum, including the addition of a Welcome and Educational Center
Project Allocation
5,000,000
(E) Rehabilitation, construction and other related costs for renovations to the Washington Health System facilities
Project Allocation
4,250,000
(F) Acquisition, rehabilitation, infrastructure, abatement of hazardous materials and construction of a residential Alzheimer's and Dementia Care facility
Project Allocation
5,000,000
(G) Infrastructure improvements, renovation, construction and other related costs for expansion of the Meadowcroft Visitor Center, including construction of adjacent picnic pavilion
Project Allocation
2,000,000
(H) Acquisition, construction, infrastructure and other related costs to redevelop the former Brockway Glass Plant brownfield site
Project Allocation
7,500,000
(I) Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for revitalization projects, including regional trail network design, installation and improvements, construction of an indoor fish hatchery, and regional blight and brownfield removal
Project Allocation
3,625,000
(iii) Washington County Council on Economic Development
(A) Infrastructure, site preparation, construction and other related costs for Phase III - 1-C of Starpointe Business Park
Project Allocation
3,660,000
(iv) Washington County Historical Society
(A) Rehabilitation, infrastructure improvements, construction and other related costs for development of the Washington County Research and Education Center
Project Allocation
1,250,000
(v) Peters Township
(A) Infrastructure, rehabilitation, construction and other related costs for design, development and construction of a community park
Project Allocation
5,000,000
(vi) County Projects
(A) Acquisition, rehabilitation, infrastructure improvements and construction for the advancement of the Washington County Fairgrounds Master Plan
Project Allocation
2,500,000
(B) Acquisition, rehabilitation, infrastructure improvements and construction for the advancement and preservation of historic, cultural, and civic facilities and sites in Washington County
Project Allocation
5,000,000
(C) Acquisition, rehabilitation, infrastructure improvements and construction for the advancement and preservation of historic, cultural, and civic facilities and sites in the Monongahela Valley region of Washington County
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a new recreational facility on Jefferson Avenue to replace the current Brownson House facility
Project Allocation
2,000,000
(64) Wayne County
(i) Wayne County Economic Development Corporation
(A) Infrastructure, rehabilitation, renovation, construction and other related costs for the Wayne Memorial Hospital
Project Allocation
20,100,000
(B) Construction, site development, infrastructure and other related costs for the development of Sterling Business & Technology Park
Project Allocation
1,000,000
(65) Westmoreland County
(i) City of Arnold
(A) Redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing abandoned, blighted structures followed by environmental remediation and economic redevelopment projects
Project Allocation
500,000
(i.1) City of Greensburg
(A) Construction, renovation, infrastructure improvements, facility upgrades and related costs for Excela Health System - Greensburg
Project Allocation
7,250,000
(B) Construction, renovation, infrastructure equipment improvements and costs related to the Westmoreland Museum of American Art
Project Allocation
5,000,000
(ii) City of Lower Burrell
(A) Acquisition, construction, infrastructure and other related costs for the Burrell Plaza redevelopment project
Project Allocation
10,000,000
(iii) City of Monessen
(A) Construction, acquisition, redevelopment, renovation, rehabilitation and infrastructure associated with the Monessen Municipal City Building
Project Allocation
3,000,000
(B) Construction, acquisition, redevelopment, renovation, rehabilitation, infrastructure and abatement of hazardous materials associated with streetscape and other economic development projects in the City of Monessen
Project Allocation
2,500,000
(iii.1) City of New Kensington
(A) Redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing abandoned, blighted structures followed by environmental remediation and economic redevelopment projects
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing dilapidated structures and redeveloping the Alcoa Manufacturing Facility site
Project Allocation
5,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the relocation of the Salvation Army-New Kensington Center
Project Allocation
2,500,000
(D) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of facilities to support growth in production volumes and jobs for Arconic, Inc.
Project Allocation
10,000,000
(iv) East Huntingdon Township
(A) Acquisition, site development, infrastructure, construction and other related costs for an aquatics facility at the YMCA of Laurel Highlands
Project Allocation
2,000,000
(v) Hempfield Township
(A) Construction, acquisition, infrastructure, abatement of hazardous materials and other costs associated with a mixed-use development in Hempfield Township
Project Allocation
15,000,000
(B) Expansion and renovation of facilities at the University of Pittsburgh at Greensburg, including construction, infrastructure and related costs to accommodate new and existing programs
Project Allocation
22,000,000
(vi) Ligonier Township
(A) Acquisition, rehabilitation, infrastructure, construction and other related costs for the expansion of Laurel Mountain Ski Resort
Project Allocation
3,000,000
(vii) Mt. Pleasant Borough
(A) Construction, renovation, rehabilitation and other related costs for expansion of Excela Health System facilities
Project Allocation
10,000,000
(viii) Scottdale Borough
(A) Acquisition, construction, infrastructure improvements and other costs related to community and economic development projects and initiatives in the Borough of Scottdale
Project Allocation
8,000,000
(ix) Rostraver Township
(A) Acquisition, infrastructure, construction and related costs for a natural gas purification and compression facility at the Westmoreland Sanitary Landfill
Project Allocation
2,500,000
(ix.1) South Huntingdon Township
(A) Acquisition, construction, redevelopment and other related costs for renovation of an industrial hemp facility, including machinery
Project Allocation
1,000,000
(x) Unity Township
(A) Construction, renovation, expansion and other related costs for Excela Health System, Excela Square at Latrobe
Project Allocation
19,500,000
(B) Construction, redevelopment and other related costs for the expansion and renovation of facilities to provide an academic hub to support the educational and cultural programs of Saint Vincent College
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a multipurpose athletic, educational and cultural student center at St. Vincent College
Project Allocation
12,000,000
(x.1) Upper Burrell Township
(A) Construction, infrastructure and other related costs to upgrade facilities, computing and networking infrastructure at a potential data center
Project Allocation
5,000,000
(xi) Westmoreland County Airport Authority
(A) Renovations, infrastructure improvements, construction and other related costs for expansion of the Arnold Palmer Regional Airport terminal
Project Allocation
10,000,000
(xii) County Projects
(A) Acquisition, redevelopment and infrastructure improvements for construction and development of an office park and mixed-use development in Westmoreland County, including transit-oriented development
Project Allocation
3,500,000
(B) Acquisition, redevelopment and infrastructure improvements for construction and development of an office park and mixed-use development in Hempfield Township
Project Allocation
3,500,000
(C) Acquisition, redevelopment, infrastructure improvements, construction and other related costs for development of modern sport and recreational facilities
Project Allocation
5,000,000
(D) Acquisition, redevelopment and infrastructure improvements for construction of a mixed-use and transit-oriented development in downtown Greensburg
Project Allocation
5,000,000
(E) Acquisition, redevelopment and infrastructure improvements for construction and development of an office park and mixed-use development in Murrysville, including transit-oriented development
Project Allocation
5,000,000
(F) Acquisition, redevelopment, infrastructure improvements, construction and other related costs for a rail-oriented site industrial park to support the manufacturing industry
Project Allocation
10,000,000
(G) Redevelopment, infrastructure extensions and improvements, roof replacement, construction and other related costs for the RIDC Westmoreland facility in Mt. Pleasant
Project Allocation
10,000,000
(H) Acquisition, infrastructure, construction, rehabilitation and costs relating to community and economic development projects and initiatives in Westmoreland County, in support of the Westmoreland County Comprehensive Plan
Project Allocation
25,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Conemaugh LifePoint Health System Health Center
Project Allocation
1,000,000
(66) Wyoming County
(i) Clinton Township
(A) Acquisition, construction, demolition, infrastructure, redevelopment, renovation and other related costs for economic development projects in Clinton Township
Project Allocation
2,500,000
(ii) Factoryville Borough
(A) Construction, infrastructure, redevelopment and other related costs for the development of a conference center, dormitory, wellness, business/hospitality center and campus anchor building
Project Allocation
10,000,000
(B) Acquisition, construction, demolition, infrastructure, redevelopment, renovation and other related costs for economic development projects
Project Allocation
2,000,000
(C) Acquisition, construction, demolition, infrastructure, redevelopment, renovation and other related costs for the Keystone Commons economic development project
Project Allocation
2,500,000
(D) Construction, infrastructure and other related costs for energy efficiency and facilities improvement for the Lackawanna Trail School District
Project Allocation
1,000,000
(iii) County Projects
(A) Acquisition, construction, demolition, infrastructure, redevelopment, renovation and other related costs for economic development projects in Wyoming County
Project Allocation
5,000,000
(67) York County
(i) City of York
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for properties bordering the Northern Gateway of the Downtown Business Improvement District
Project Allocation
2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for the 1895 Federal Building
Project Allocation
2,500,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for improvements at William Penn Senior High School Athletic Center
Project Allocation
5,000,000
(D) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the York Academy Upper School
Project Allocation
10,000,000
(i.1) Hanover Borough
(A) Site preparation, acquisition, infrastructure, demolition, renovation, expansion and/or construction of Hanover Hospital health care facilities
Project Allocation
10,000,000
(i.2) Red Lion Borough
(A) Acquisition, construction, infrastructure and other related costs to acquire land and build a municipal building with a gymnasium for recreation
Project Allocation
1,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development and park improvements and expansion
Project Allocation
1,500,000
(ii) Redevelopment Authority of the County of York
(A) Site preparation, redevelopment, infrastructure, construction and other related costs for the development of Fairview Crossroads at the intersection of Interstate 83 and the Pennsylvania Turnpike in Fairview Township
Project Allocation
5,000,000
(B) Infrastructure, renovation, construction, acquisition, redevelopment and other related costs for redevelopment and revitalization of downtown Hanover, including existing buildings and the Hanover State Theatre
Project Allocation
7,500,000
(C) Construction, infrastructure and other related costs for the redevelopment of an existing structure into a farmer's market and warehousing
Project Allocation
3,000,000
(iii) Spring Grove Borough
(A) Construction, infrastructure, redevelopment and other related costs for improvements and economic development projects for manufacturing facilities
Project Allocation
25,000,000
(B) Construction, infrastructure, environmental improvements and other related costs for manufacturing and economic development projects
Project Allocation
25,000,000
(iv) Windsor Township
(A) Construction, infrastructure, design and other related costs for a community center building
Project Allocation
3,081,000
(v) York County Economic Alliance
(A) Construction, infrastructure, redevelopment and other related costs for manufacturing and economic development projects for the Magnesita Refractories Company
Project Allocation
25,000,000
(B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a recreational or economic development project for Codorus Creek
Project Allocation
10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project at the former Metso Minerals and York County Prison sites
Project Allocation
10,000,000
(D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for projects related to blighted, abandoned and nuisance properties
Project Allocation
3,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for expansion and improvements to the York Fairgrounds
Project Allocation
5,000,000
(F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for economic development projects focused on historic properties
Project Allocation
5,000,000
(G) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the Voni Grimes Gym
Project Allocation
5,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for a youth education center located at the former York Armory
Project Allocation
5,000,000
(I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for economic development projects and capital improvements related to the York Professional Baseball Complex and surrounding area
Project Allocation
10,000,000
(J) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for York College of Pennsylvania expansion
Project Allocation
5,000,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for site assembly for a major industrial economic development project
Project Allocation
5,000,000
(L) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for Steam Into History rail line extension project
Project Allocation
5,000,000
(M) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for York County Library System projects
Project Allocation
10,000,000
(vi) York County Industrial Development Authority
(A) Construction, infrastructure, renovation and other related costs to expand, update and refurbish library space at the Martin Library in the City of York, the Kaltreider-Benfer Library in Red Lion Borough and the Kreutz Creek Valley Library in Hellam Township
Project Allocation
10,000,000
(vii) County Projects
(A) Construction, infrastructure, redevelopment and other related costs for the construction of a coroner's office, morgue and forensics autopsy lab
Project Allocation
1,000,000
(68) Multiple Counties
(i) Allegheny, Armstrong, Beaver, Butler, Washington and Westmoreland Counties
(A) Construction, infrastructure, redevelopment and other related costs for Children's Hospital of Pittsburgh of University of Pittsburgh Medical Center
Project Allocation
20,000,000
(ii) Beaver and Lawrence Counties
(A) Acquisition, rehabilitation, infrastructure and construction of the Ellwood City Borough Public Works and Electric Department Facilities
Project Allocation
3,127,000
(B) Acquisition, rehabilitation, infrastructure, construction and renovation of a Community Plaza and Borough Anchor Building in the Borough of Ellwood City
Project Allocation
500,000
(C) Rehabilitation, infrastructure, construction and other related costs for Ewing and Stiefel Park improvements in the Borough of Ellwood City
Project Allocation
1,000,000
(iii) Centre, Columbia, Cumberland, Dauphin, Lackawanna, Luzerne, Mifflin, Montour and Northumberland Counties
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Geisinger Health and its affiliates
Project Allocation
15,000,000
(iv) Lehigh and Northampton Counties
(A) Construction, infrastructure, rehabilitation and other costs to extend the Hoover Mason Trestle at the Sands Bethlehem Hotel
Project Allocation
2,000,000
(B) Acquisition, construction, renovation infrastructure and other related costs for blight remediation efforts in the City of Bethlehem
Project Allocation
1,000,000
(C) Acquisition, construction, renovation, infrastructure and other related costs for a building in the Moravian Historic District in the City of Bethlehem
Project Allocation
2,000,000
(D) Land acquisition, infrastructure improvements, construction and other related costs for the development of business-ready sites and redevelopment of existing businesses
Project Allocation
5,000,000
(v) Montgomery and Philadelphia Counties
(A) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for St. Joseph's University improvement project
Project Allocation
20,000,000
(B) Acquisition, renovation, infrastructure, construction, redevelopment and other costs associated with economic development projects near City Avenue and the City Avenue Special Services District
Project Allocation
20,000,000
(vi) Chester and Delaware Counties
(A) Acquisition, rehabilitation, infrastructure, renovation and construction of innovation center sites
Project Allocation
10,000,000
(vii) Bedford and Blair Counties
(A) Acquisition, rehabilitation, infrastructure, renovation and other related costs for upgrades and improvements to the Blue Knob All Seasons Ski Resort
Project Allocation
2,500,000
(viii) Bedford and Fulton Counties
(A) Acquisition, abatement of hazardous materials, infrastructure, construction and other related costs for rehabilitation of the abandoned Pennsylvania Turnpike tunnels located in Bedford and Fulton Counties
Project Allocation
4,000,000
(ix) Crawford, Erie, Mercer and Venango Counties
(A) Acquisition, construction and other related costs for CNG/LNG Electric filling stations in northwest Pennsylvania
Project Allocation
4,000,000
(x) Bucks and Montgomery Counties
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for medical services or health care-related facilities for Grand View Health
Project Allocation
10,000,000
(xi) Berks and Montgomery Counties
(A) Acquisition, environmental remediation, infrastructure, rehabilitation, construction and other related costs for the Colebrookdale Railroad and Eastern Berks Gateway Railroad economic development project
Project Allocation
6,000,000
(xii) Bedford, Blair, Fulton and Huntingdon Counties
(A) Acquisition, infrastructure, construction and other related costs for Southern Alleghenies 911 Public Safety systems upgrades
Project Allocation
12,500,000