Section 2. The land to be transferred by the Supervisors of Indiana Township, Allegheny County, to the Department of Transportation for a right-of-way for construction of Project L.R.679, Section A07, to widen and reconstruct Traffic Route 910 is more particularly described as follows:
Description of Highway Project
Project L.R.679, Section A07, beginning at a point on existing L.R.679, T.R.910, in Harmar Township at the interchange of the Allegheny Valley Expressway with T.R.910. The project proceeds in a northwesterly direction on the present alignment of the road through the community of Indianola, crossing over the Pennsylvania Turnpike twice on existing structures and terminates at the intersection of T.R.910 with Saxonburg Boulevard in Indiana Township, a distance of approximately 4.4 miles.
Description of Required Project 70 Lands
The Project 70 land required for the above highway project comprises about 1.49 acres located approximately between Station 203 + 47 and Station 209 + 80. The highway right-of-way will have a maximum width of 250 feet, more or less.