Crawford County

Act 53 of 1999, § 24, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000.

Act 53 of 1999, § 24

Section 24. Crawford County.

(a) Local Bridges

(1) Fairfield Township, T-636 over Branch of French Creek, Bridge Replacement

108,000

(Base Construction Allocation - $100,000)

(Land Allocation - $1,000)

(Design and Contingencies - $7,000)

(2) Fairfield Township, T-321 Bridge No.1 over Branch of French Creek, Bridge Replacement

106,000

(Base Construction Allocation - $100,000)

(Land Allocation - $1,000)

(Design and Contingencies - $5,000)

(3) Fairfield Township, T-321 Bridge No.2 over Branch of French Creek, Bridge Replacement

106,000

(Base Construction Allocation - $100,000)

(Land Allocation - $1,000)

(Design and Contingencies - $5,000)

(4) Spring Township, T-747 over Branch of Conneaut Creek, Bridge Replacement

126,000

(Base Construction Allocation - $120,000)

(Land Allocation - $1,000)

(Design and Contingencies - $5,000)

(5) Wayne Township, T-347 over Branch of Powdermill Run, Bridge Replacement

106,000

(Base Construction Allocation - $100,000)

(Land Allocation - $1,000)

(Design and Contingencies - $5,000)

(6) Wayne Township, T-457 over Tributary of Lake Creek, Bridge Replacement

106,000

(Base Construction Allocation - $100,000)

(Land Allocation - $1,000)

(Design and Contingencies - $5,000)

(7) Vernon Township, T-487, Sportsman's Road Bridge over Watson Run, Bridge Replacement

460,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(8) Woodcock Township, T-653, Morris Road Bridge over Conrail, Bridge Replacement

360,000

(9) City of Titusville, Walnut Street Bridge over Church Run, Bridge Replacement

360,000

(10) Rockdale Township, T-878, Swamp Bridge, Bridge Replacement

360,000

(11) Vernon Township, T-487, Middle Road Bridge over Watson Run, Bridge Replacement

400,000

(Base Construction Allocation - $360,000)

(Design and Contingencies - $40,000)

(b) State Bridges

(1) SR 0006, SR 0006 over Padan Creek, Conneaut Township, Bridge Replacement

1,004,000

(Base Construction Allocation - $784,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(2) SR 0006, SR 0006 over French Creek, Woodcock Township, Bridge Replacement

2,325,000

(Base Construction Allocation - $1,840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $465,000)

(3) SR 0079, SR 0079 under Maple Drive, Hayfield Township, Bridge Replacement

2,401,000

(Base Construction Allocation - $1,901,000)

(Land Allocation - $20,000)

(Design and Contingencies - $480,000)

(4) SR 0089, SR 0089 over Shirley Run, Rome Township, Bridge Replacement

510,000

(Base Construction Allocation - $420,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(5) SR 0098, SR 0098 over Van Horne Run, Vernon Township, Bridge Replacement

320,000

(Base Construction Allocation - $260,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(6) SR 0099, SR 0099 over Little Conneauttee Creek, Cambridge Township, Bridge Replacement

950,000

(Base Construction Allocation - $700,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(7) SR 0099, SR 0099 over Conneaut Creek, Cambridge Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $70,000)

(8) SR 0198, SR 0198 over Carr Run, Woodcock Township, Bridge Replacement

260,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(9) SR 0285, SR 0285 over Bennett Run, North Shenango Township, Bridge Replacement

750,000

(Base Construction Allocation - $650,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(10) SR 1002, SR 1002 over Acker Run, Venango Township, Bridge Replacement

370,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(11) SR 1024, SR 1024 over Britton Run, Sparta Township, Bridge Replacement

340,000

(Base Construction Allocation - $250,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(12) SR 2005, SR 2005 over French Creek, East Fairfield Township, Bridge Replacement

1,300,000

(Base Construction Allocation - $1,130,000)

(Land Allocation - $20,000)

(Design and Contingencies - $150,000)

(13) SR 2010, SR 2010 over Little Sugar Creek, Wayne Township, Bridge Replacement

260,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(14) SR 3016, SR 3016 over B&LE Railroad, Summit Township, Bridge Replacement

1,150,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $30,000)

(Design and Contingencies - $120,000)

(15) SR 0018, SR 0018 Bridge over Tributary of Conneaut Creek, Summit Township, Bridge Rehabilitation

115,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $15,000)

(16) SR 0098, SR 0098 Bridge over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(17) SR 2003, Mercer Pike Bridge over Conneaut Creek Outlet, Union Township, Bridge Replacement

600,000

(Base Construction Allocation - $520,000)

(Land Allocation - $30,000)

(Design and Contingencies - $50,000)

(18) SR 0006, Bridge over French Creek, Woodcock Township, Bridge Painting

590,000

(Base Construction Allocation - $500,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(19) SR 0408, Mohawk Run Bridge over Mohawk Run, Rockdale Township, Bridge Replacement

262,000

(Base Construction Allocation - $189,000)

(Land Allocation - $20,000)

(Design and Contingencies - $53,000)

(20) SR 1020, Tryonville Road Bridge over Oil Creek, Steuben Township, Bridge Replacement

960,000

(Base Construction Allocation - $840,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(21) SR 1035, Brown Hill Road Bridge over Muddy Creek Tributary, Rockdale Township, Bridge Rehabilitation

194,000

(Base Construction Allocation - $135,000)

(Land Allocation - $20,000)

(Design and Contingencies - $39,000)

(22) SR 4010, West Road Bridge over Cussewago Creek, Cussewago Township, Bridge Painting

480,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(23) SR 0198, Bridge over Dickson Street, Randolph Township, Bridge Rehabilitation

300,000

(Base Construction Allocation - $220,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(24) SR 1008, Bridge over Brush Creek, Cussewago Township, Bridge Rehabilitation

340,000

(Base Construction Allocation - $260,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(25) SR 1008, Bridge over Boles Run, Cussewago Township, Bridge Rehabilitation

340,000

(Base Construction Allocation - $260,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(26) SR 3008, Bridge over Johnson Run, South Shenango Township, Bridge Rehabilitation

440,000

(Base Construction Allocation - $360,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(27) SR 0008, Bridge over Franklin Street Mill Race, Titusville, Bridge Replacement

360,000

(Base Construction Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(28) SR 0027, Bridge No.2 over Oil Creek, Oil Creek Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(29) SR 0077, Bridge over Main Street, Spartansburg Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(30) SR 0079, Bridge over T-528, Mercer Pike, Greenwood Township, Bridge Replacement

1,520,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(31) SR 0079, Bridge over Rock Creek, Greenwood Township, Bridge Replacement

570,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(32) SR 0079, Northbound Bridge over Conneaut Swamp, Greenwood Township, Bridge Replacement

4,050,000

(Base Construction Allocation - $3,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $500,000)

(33) SR 0079, Southbound Bridge over Conneaut Swamp, Greenwood Township, Bridge Replacement

4,050,000

(Base Construction Allocation - $3,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $500,000)

(34) SR 0079, Bridge over T-391 Rung Road, Union Township, Bridge Replacement

1,120,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(35) SR 0079, Bridge over T-433 and Conrail, Union Township, Bridge Replacement

2,120,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(36) SR 0079, Bridge over B&LE Railroad and Stream, Union Township, Bridge Replacement

3,220,000

(Base Construction Allocation - $3,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(37) SR 0079, Bridge over Van Horne Run, Vernon Township, Bridge Replacement

370,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(38) SR 0079, Bridge over US 6 and 322, Vernon Township, Bridge Replacement

3,630,000

(Base Construction Allocation - $3,400,000)

(Land Allocation - $30,000)

(Design and Contingencies - $200,000)

(39) SR 0079, Bridge over US 6 and 322, Vernon Township, Bridge Replacement

3,230,000

(Base Construction Allocation - $3,000,000)

(Land Allocation - $30,000)

(Design and Contingencies - $200,000)

(40) SR 0079, Bridge over Van Horne Run, Vernon Township, Bridge Rehabilitation

1,000,000

(Base Construction Allocation - $880,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(41) SR 0079, Bridge over SR 0102, Vernon Township, Bridge Replacement

1,120,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(42) SR 0079, Bridge over SR 4011, Cussewago Township, Bridge Replacement

920,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(43) SR 0089, Bridge over Hummer Creek, Oil Creek Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(44) SR 0173, Cochranton Truss Bridge, Fairfield Township, Bridge Replacement

3,100,000

(Base Construction Allocation - $2,750,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(45) SR 0198, Bridge over Wolf Run, Hayfield Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(46) SR 0285, Bridge over SR 0079 Northbound and Southbound, Greenwood Township, Bridge Replacement

7,920,000

(Base Construction Allocation - $7,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $800,000)

(47) SR 0285, Bridge over Town House Run, Fairfield Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(48) SR 1010, Bridge over Woodcock Creek, Richmond Township, Bridge Replacement

700,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(49) SR 1013, Bridge over McLaughlin Creek, Oil Creek Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(50) SR 1015, Bridge over Hotchkiss Run, Cussewago Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(51) SR 1033, Bridge over Muddy Creek, Richmond Township, Bridge Replacement

1,360,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $140,000)

(52) SR 1035, Mackey Hill Road, Bridge over Mud Creek, Rockdale Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $420,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(53) SR 1037, Bridge over Little Federal Run, Athens Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(54) SR 1037, Bridge over Federal Run, Bloomfield Township, Bridge Replacement

200,000

(Base Construction Allocation - $120,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(55) SR 1039, Bridge over Mosey Run, Bloomfield Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(56) SR 2017, Bridge over Sugar Creek, Troy Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(57) SR 2018, Deckards Run Bridge No.1, Wayne Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(58) SR 2018, Deckards Run Bridge No.2, Wayne Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(59) SR 2019, Bridge over Sugar Creek East Branch, Troy Township, Bridge Replacement

120,000

(Base Construction Allocation - $50,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(60) SR 2028, Bridge over Caldwell Creek, Oil Creek Township, Bridge Replacement

1,700,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $180,000)

(61) SR 3004, Bridge over Crooked Creek, East Fallowfield Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(62) SR 3005, Bridge over Bennett Run, North Shenango Township, Bridge Replacement

700,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(63) SR 3011, Bridge over Pymatuning Reservoir, Pine Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(64) SR 4001, Bridge over Padan Creek Tributary, Conneaut Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(65) SR 4001, Beaver Center Road Bridge No.1, Beaver Township, Bridge Replacement

600,000

(Base Construction Allocation - $520,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(66) SR 4003, Bridge over Tributary of Conneaut Creek, Conneautville Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(67) SR 4004, Center Road Bridge No.1, Conneaut Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(68) SR 4004, Center Road Bridge No.2, Conneaut Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(69) SR 4009, Bridge over I-79, Northbound and Southbound, Hayfield Township, Bridge Replacement

4,820,000

(Base Construction Allocation - $4,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $500,000)

(70) SR 4010, Bridge over East Branch of Conneaut Creek, Beaver Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(71) SR 4011, Bridge over Tributary of Wolf Run, Hayfield Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(72) SR 4016, Bridge over Bill Mack Run, Summerhill Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(73) SR 0006, Bridge over French Creek, Cambridge Springs Borough, Bridge Replacement

1,620,000

(Base Construction Allocation - $1,400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(74) SR 0006, Bridge over Cussewago Street, Cambridge Township, Bridge Replacement

590,000

(Base Construction Allocation - $500,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(75) SR 0008, Bridge over Franklin Street, Titusville City, Bridge Replacement

2,220,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(76) SR 0006, Bridge over Smock Street, West Mead Township, Bridge Replacement

33,600,000

(Base Construction Allocation - $30,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $3,500,000)

(77) SR 0006, French Creek Bridge No.3, Woodcock Township, Bridge Replacement

3,120,000

(Base Construction Allocation - $2,800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(78) SR 0006, French Creek Bridge No.2, Woodcock Township, Bridge Rehabilitation

9,320,000

(Base Construction Allocation - $8,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,300,000)

(79) SR 0006, French Creek Bridge No.1, Woodcock Township, Bridge Replacement

3,330,000

(Base Construction Allocation - $3,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $310,000)