Section 29. Erie County.
(a) Local Bridges
(1) Girard Township, Beckman Bridge over I-90, Bridge Painting
200,000
(Base Construction Allocation - $200,000)
(2) City of Erie, Norman Way, Bridge over Mill Creek, Bridge Replacement
360,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(3) City of Erie, McBride Viaduct-East Avenue, Bridge over Railroad Lines, Bridge Rehabilitation
1,360,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(4) City of Erie, Kahkwa Avenue Bridge over Ravine Drive, Bridge Rehabilitation
125,000
(Base Construction Allocation - $100,000)
(Land Allocation - $5,000)
(Design and Contingencies - $20,000)
(5) Greenfield Township, T-974, Old Route 89 Bridge over Tributary of French Creek, Bridge Replacement
360,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(6) Millcreek Township, T-707, Zimmerly Road Bridge over I-79, New Bridge Construction
4,550,000
(Base Construction Allocation - $3,500,000)
(Land Allocation - $400,000)
(Design and Contingencies - $650,000)
(7) Waterford Township, T-455, Sedgwick Road Bridge over Tributary of Lake Le Boeuf, Bridge Replacement
350,000
(Base Construction Allocation - $300,000)
(Land Allocation - $10,000)
(Design and Contingencies - $40,000)
(8) City of Erie, Pittsburgh Avenue over Conrail and NS Lines, New Bridge
11,000,000
(Base Construction Allocation - $10,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $750,000)
(9) City of Erie, Greengarden Boulevard over Conrail and NS Lines, New Construction
11,000,000
(Base Construction Allocation - $10,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $750,000)
(10) Franklin Township, Falls Road over Falk Run Bridge No.2, Bridge Rehabilitation
360,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(11) Franklin Township, Falls Road over Falk Run Bridge No.1, Bridge Replacement
360,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(12) McKean Township, Oliver Road over Tributary of Elk Creek, Bridge Replacement
150,000
(Base Construction Allocation - $125,000)
(Land Allocation - $5,000)
(Design and Contingencies - $20,000)
(13) Waterford Township, Sedgwick Road over Tributary of Lake Le Boeuf, Bridge Replacement
370,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $50,000)
(b) State Bridges
(1) SR 0005, SR 0005 over Scott Run, Harborcreek Township, Bridge Replacement
140,000
(Base Construction Allocation - $100,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(2) SR 0006, SR 0006 over French Creek, Le Boeuf Township, Bridge Replacement
700,000
(Base Construction Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(3) SR 0019, SR 0019 over Le Boeuf Creek, Waterford Township, Bridge Replacement
950,000
(Base Construction Allocation - $840,000)
(Land Allocation - $30,000)
(Design and Contingencies - $80,000)
(4) SR 0020, SR 0020 over I-79, City of Erie, Bridge Replacement
2,000,000
(Base Construction Allocation - $1,770,000)
(Land Allocation - $30,000)
(Design and Contingencies - $200,000)
(5) SR 0089, SR 0089 over Sixteen Mile Creek, North East Township, Bridge Replacement
490,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $70,000)
(6) SR 0090, SR 0090 over Crooked Creek, Girard Township, Bridge Replacement
1,420,000
(Base Construction Allocation - $1,330,000)
(Land Allocation - $30,000)
(Design and Contingencies - $60,000)
(7) SR 0090, SR 0090 under Cherry Street, Summit Township, Bridge Replacement
1,600,000
(Base Construction Allocation - $1,410,000)
(Land Allocation - $40,000)
(Design and Contingencies - $150,000)
(8) SR 0090, SR 0090 under Clark Road, Harborcreek Township, Bridge Replacement
2,100,000
(Base Construction Allocation - $1,880,000)
(Land Allocation - $40,000)
(Design and Contingencies - $180,000)
(9) SR 0098, SR 0098 over Cussewago Creek, Elk Creek Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(10) SR 0474, SR 0474 over Dean Run, Venango Township, Bridge Replacement
200,000
(Base Construction Allocation - $160,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(11) SR 1001, SR 1001 over Conrail, Millcreek Township, Bridge Replacement
720,000
(Base Construction Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(12) SR 1011, SR 1011 over Alder Brook, Venango Township, Bridge Replacement
470,000
(Base Construction Allocation - $400,000)
(Land Allocation - $10,000)
(Design and Contingencies - $60,000)
(13) SR 1013, SR 1013 over I-90, North East Township, Bridge Replacement
1,220,000
(Base Construction Allocation - $1,100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(14) SR 3001, SR 3001 over Conneaut Creek, Conneaut Township, Bridge Replacement
1,020,000
(Base Construction Allocation - $900,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(15) SR 3003, SR 3003 over West Branch Conneaut Creek, Conneaut Township, Bridge Replacement
630,000
(Base Construction Allocation - $550,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(16) SR 3014, SR 3014 over Trout Run, Waterford Borough, Bridge Replacement
370,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $50,000)
(17) SR 4007, SR 4007 over I-90, Fairview Township, Bridge Replacement
1,920,000
(Base Construction Allocation - $1,800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(18) SR 0020, Main Street Bridge over Elk Creek, Girard Township, Bridge Rehabilitation
5,450,000
(Base Construction Allocation - $5,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $400,000)
(19) SR 0090, I-90 Bridge, Eastbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation
6,350,000
(Base Construction Allocation - $6,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $300,000)
(20) SR 0090, I-90 Bridge Westbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation
7,350,000
(Base Construction Allocation - $7,000,000)
(Land Allocation - $50,000)
(Design and Contingencies - $300,000)
(21) SR 0090, Remington Road Bridge over I-90, North East Township, Bridge Replacement
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(22) SR 0505, Bridge over Mill Creek, City of Erie, Bridge Replacement
460,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $40,000)
(23) SR 0955, Bridge over Six Mile Creek, Harborcreek Township, Bridge Replacement
480,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(24) SR 1019, Gay Road Bridge over I-90 Eastbound and Westbound, North East Township, Bridge Replacement
2,630,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $110,000)
(25) SR 3002, Cherry Hill Road Bridge over Conneaut Creek, Conneaut Township, Bridge Replacement
620,000
(Base Construction Allocation - $540,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(26) SR 4014, Grandview Boulevard Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Replacement
2,640,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $40,000)
(Design and Contingencies - $100,000)
(27) SR 4016, West 38th Street Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Rehabilitation
1,730,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $30,000)
(Design and Contingencies - $200,000)
(28) SR 2008, West High Street Bridge over Horton Run, Union Township, Bridge Replacement
260,000
(Base Construction Allocation - $220,000)
(Land Allocation - $10,000)
(Design and Contingencies - $30,000)
(29) SR 0079, Bridges over Walnut Creek and West 32nd Street, Millcreek Township, Bridge Rehabilitation
2,800,000
(Base Construction Allocation - $2,000,000)
(Land Allocation - $10,000)
(Design and Contingencies - $790,000)
(30) SR 0090, Beckman Street Bridge over I-90, Girard Township, Bridge Rehabilitation
400,000
(Base Construction Allocation - $340,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(31) SR 0090, Crooked Creek Bridge over Crooked Creek, Girard Township, Bridge Replacement
700,000
(Base Construction Allocation - $640,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(32) SR 0090, Elk Creek Railroad Bridge over Elk Creek, Bridge Replacement
999,000
(Base Construction Allocation - $955,000)
(Land Allocation - $4,000)
(Design and Contingencies - $40,000)
(33) SR 0005, Bridge over East Lake Road, Harborcreek Township, Bridge Rehabilitation
800,000
(Base Construction Allocation - $680,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(34) SR 0006, Bridge over Tributary of French Creek, Le Boeuf Township, Bridge Replacement
300,000
(Base Construction Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(35) SR 0006, Bridge over Beaver Run, Wayne Township, Bridge Replacement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(36) SR 0008, Bridge over Hubbel Run, Amity Township, Bridge Replacement
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(37) SR 0018, Bridge over N&W Railroad, Girard Borough, Bridge Replacement
1,920,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(38) SR 0079, Bridge over SR 3006, Washington Township, Bridge Replacement
1,520,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(39) SR 0079, Bridge over SR 3008, Franklin Township, Bridge Replacement
920,000
(Base Construction Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(40) SR 0079, Bridge over T-481, Stancliff Road, Franklin Township, Bridge Replacement
920,000
(Base Construction Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(41) SR 0080, Bridge over Branch of French Creek, Greenfield Township, Bridge Replacement
300,000
(Base Construction Allocation - $200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(42) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement
1,420,000
(Base Construction Allocation - $1,200,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(43) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement
1,120,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(44) SR 0090, I-90 Eastbound Bridge over SR 0089, North East Township, Bridge Replacement
2,600,000
(Base Construction Allocation - $2,320,000)
(Land Allocation - $20,000)
(Design and Contingencies - $260,000)
(45) SR 0090, I-90 Westbound Bridge over SR 0089, North East Township, Bridge Replacement
2,400,000
(Base Construction Allocation - $2,140,000)
(Land Allocation - $20,000)
(Design and Contingencies - $240,000)
(46) SR 0090, Shadouck Road over I-90, North East Township, Bridge Rehabilitation
2,100,000
(Base Construction Allocation - $1,880,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(47) SR 0090, I-90 Bridge over Conrail, North East Township, Bridge Replacement
2,000,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design and Contingencies - $400,000)
(48) SR 0090, I-90 Eastbound Bridge over PA 20, North East Township, Bridge Rehabilitation
460,000
(Base Construction Allocation - $400,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(49) SR 0090, I-90 Westbound Bridge over PA 20, North East Township, Bridge Rehabilitation
460,000
(Base Construction Allocation - $400,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(50) SR 0090, I-90 Eastbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation
1,620,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(51) SR 0090, I-90 Westbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation
1,620,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(52) SR 0097, Bridge over Branch of French Creek, Union City Borough, Bridge Replacement
500,000
(Base Construction Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(53) SR 0426, Bridge over SR 0089, North East Borough, Bridge Replacement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(54) SR 1004, Bridge over West Branch of French Creek, Greenfield Township, Bridge Replacement
800,000
(Base Construction Allocation - $700,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(55) SR 1006, Moorheadville Road Bridge over I-90, North East Township, Bridge Replacement
2,600,000
(Base Construction Allocation - $2,330,000)
(Land Allocation - $20,000)
(Design and Contingencies - $250,000)
(56) SR 1017, Bridge over Averill Run, North East Township, Bridge Replacement
200,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(57) SR 2008, Bridge over French Creek, Union Township, Bridge Replacement
200,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(58) SR 2008, Bridge over French Creek, Union City Borough, Bridge Replacement
1,150,000
(Base Construction Allocation - $1,000,000)
(Land Allocation - $20,000)
(Design and Contingencies - $130,000)
(59) SR 2010, Bridge over Pine Run, Union Township, Bridge Replacement
200,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(60) SR 2025, Bridge No.2 over Sciota Road, Wayne Township, Bridge Replacement
200,000
(Base Construction Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(61) SR 3001, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(62) SR 0005, Bridge over Lincoln Avenue, City of Erie, Bridge Replacement
900,000
(Base Construction Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(63) SR 0020, Westbound Bridge over I-79, City of Erie, Bridge Rehabilitation
4,330,000
(Base Construction Allocation - $4,000,000)
(Land Allocation - $30,000)
(Design and Contingencies - $300,000)
(64) SR 0079, Southbound Bridge over West 32nd Street, City of Erie, Bridge Replacement
720,000
(Base Construction Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(65) SR 3002, Bridge No.2 over Cherry Hill Road, Conneaut Township, Bridge Replacement
700,000
(Base Construction Allocation - $600,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(66) SR 3002, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(67) SR 0005, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation
500,000
(Base Construction Allocation - $410,000)
(Land Allocation - $40,000)
(Design and Contingencies - $50,000)
(68) SR 0090, Eastbound Bridge over Franklin Road, T-404, Fairview Township, Bridge Replacement
1,200,000
(Base Construction Allocation - $1,080,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(69) SR 0020, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(70) SR 0098, Bridge over I-90, Fairview Township, Bridge Rehabilitation
860,000
(Base Construction Allocation - $800,000)
(Land Allocation - $10,000)
(Design and Contingencies - $50,000)
(71) SR 0090, Bridge over Platz Road, Fairview Township, Bridge Rehabilitation
350,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $30,000)
(72) SR 0090, Westbound Bridge over T-404, Fairview Township, Bridge Replacement
1,200,000
(Base Construction Allocation - $1,080,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(73) SR 0018, Bridge over Elk Creek, Girard Borough, Bridge Replacement
1,020,000
(Base Construction Allocation - $800,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(74) SR 3014, Bridge over Franklin Center Road Bridge, Girard Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(75) SR 0090, Eastbound Bridge over Elk Creek, Girard Township, Bridge Replacement
6,500,000
(Base Construction Allocation - $6,280,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(76) SR 0090, Westbound Bridge over Elk Creek and Railroad Tracks, Girard Township, Bridge Replacement
6,000,000
(Base Construction Allocation - $5,780,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(77) SR 0090, Westbound Bridge over Neiger Road, Girard Township, Bridge Replacement
1,200,000
(Base Construction Allocation - $1,080,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(78) SR 0020, Bridge over Elk Creek, Girard Township, Bridge Rehabilitation
8,500,000
(Base Construction Allocation - $7,600,000)
(Land Allocation - $50,000)
(Design and Contingencies - $850,000)
(79) SR 0090, Eastbound Bridge over Neiger Road, Girard Township, Bridge Replacement
2,000,000
(Base Construction Allocation - $1,880,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(80) SR 0090, Eastbound Bridge over Elk Creek and Railroad, Girard Township, Bridge Replacement
6,000,000
(Base Construction Allocation - $5,780,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(81) SR 0090, Westbound Bridge over Elk Creek, Girard Township, Bridge Replacement
6,500,000
(Base Construction Allocation - $6,280,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(82) SR 0090, Bridge over Four Mile Creek, Greene Township, Bridge Rehabilitation
800,000
(Base Construction Allocation - $700,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(83) SR 0090, Bridge over Moore Road, Greene Township, Bridge Rehabilitation
1,700,000
(Base Construction Allocation - $1,380,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(84) SR 0090, Bridge over Clark Road, Harborcreek Township, Bridge Replacement
2,820,000
(Base Construction Allocation - $2,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(85) SR 0020, Bridge over Four Mile Creek, Harborcreek Township, Bridge Replacement
400,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(86) SR 0090, Westbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement
1,520,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(87) SR 0090, Bridge over Jordan Road, Harborcreek Township, Bridge Rehabilitation
2,800,000
(Base Construction Allocation - $2,480,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(88) SR 0955, Bridge over Seven Mile Creek, Harborcreek Township, Bridge Replacement
830,000
(Base Construction Allocation - $700,000)
(Land Allocation - $30,000)
(Design and Contingencies - $100,000)
(89) SR 0090, Eastbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement
1,520,000
(Base Construction Allocation - $1,300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(90) SR 0005, Bridge over Elk Creek, Lake City Borough, Bridge Replacement
3,220,000
(Base Construction Allocation - $2,900,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(91) SR 0006, Bridge over Mill Village Truss, Le Boeuf Township, Bridge Replacement
3,046,000
(Base Construction Allocation - $2,980,000)
(Land Allocation - $26,000)
(Design and Contingencies - $40,000)
(92) SR 0832, Bridge over I-90, McKean Township, Bridge Rehabilitation
3,000,000
(Base Construction Allocation - $2,670,000)
(Land Allocation - $30,000)
(Design and Contingencies - $300,000)
(93) SR 4013, Bridge over Elk Creek, McKean Township, Bridge Replacement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(94) SR 0099, Bridge over Stancliff Road, McKean Township, Bridge Replacement
1,620,000
(Base Construction Allocation - $1,400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(95) SR 0090, Bridge over Millfair Road, McKean Township, Bridge Rehabilitation
1,820,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(96) SR 0090, Bridge over SR 0008, Northbound and Southbound, Millcreek Township, Bridge Replacement
1,720,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $200,000)
(97) SR 4012, Bridge over I-79, Millcreek Township, Bridge Replacement
5,020,000
(Base Construction Allocation - $4,500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $500,000)
(98) SR 0019, Bridge No.2 over Walnut Creek, Millcreek Township, Bridge Replacement
1,890,000
(Base Construction Allocation - $1,700,000)
(Land Allocation - $20,000)
(Design and Contingencies - $170,000)
(99) SR 0079, Southbound Bridge over Walnut Creek, Millcreek Township, Bridge Replacement
420,000
(Base Construction Allocation - $300,000)
(Land Allocation - $20,000)
(Design and Contingencies - $100,000)
(100) SR 0090, Bridge over Pond Road, Springfield Township, Bridge Replacement
1,600,000
(Base Construction Allocation - $1,400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $150,000)
(101) SR 0090, Bridge over McKees Road, Springfield Township, Bridge Replacement
1,550,000
(Base Construction Allocation - $1,380,000)
(Land Allocation - $20,000)
(Design and Contingencies - $150,000)
(102) SR 0090, Bridge over Huntley Road, Springfield Township, Bridge Replacement
1,700,000
(Base Construction Allocation - $1,500,000)
(Land Allocation - $50,000)
(Design and Contingencies - $150,000)
(103) SR 0020, Bridge over Crooked Creek, Springfield Township, Bridge Replacement
930,000
(Base Construction Allocation - $800,000)
(Land Allocation - $30,000)
(Design and Contingencies - $100,000)
(104) SR 0090, Bridge over Stanford Road, Springfield Township, Bridge Replacement
2,800,000
(Base Construction Allocation - $2,450,000)
(Land Allocation - $50,000)
(Design and Contingencies - $300,000)
(105) SR 0090, Bridge over Walnut Creek, Summit Township, Bridge Replacement
2,340,000
(Base Construction Allocation - $2,100,000)
(Land Allocation - $40,000)
(Design and Contingencies - $200,000)
(106) SR 0099, Bridge over I-90, Summit Township, Bridge Replacement
2,700,000
(Base Construction Allocation - $2,400,000)
(Land Allocation - $50,000)
(Design and Contingencies - $250,000)
(107) SR 0097, Bridge over Le Boeuf Creek, Summit Township, Bridge Replacement
600,000
(Base Construction Allocation - $500,000)
(Land Allocation - $20,000)
(Design and Contingencies - $80,000)
(108) SR 2018, Railroad Bridge over Lovell Road, Concord Township, Bridge Rehabilitation
200,000
(Base Construction Allocation - $100,000)
(Land Allocation - $25,000)
(Design and Contingencies - $75,000)
(109) I-90 Bridge over Sixteen Mile Creek, North East Township, Bridge Rehabilitation
500,000
(Base Construction Allocation - $90,000)
(Land Allocation - $10,000)
(Design and Contingencies - $400,000)