Erie County

Act 53 of 1999, § 29, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000.

Act 53 of 1999, § 29

Section 29. Erie County.

(a) Local Bridges

(1) Girard Township, Beckman Bridge over I-90, Bridge Painting

200,000

(Base Construction Allocation - $200,000)

(2) City of Erie, Norman Way, Bridge over Mill Creek, Bridge Replacement

360,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(3) City of Erie, McBride Viaduct-East Avenue, Bridge over Railroad Lines, Bridge Rehabilitation

1,360,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(4) City of Erie, Kahkwa Avenue Bridge over Ravine Drive, Bridge Rehabilitation

125,000

(Base Construction Allocation - $100,000)

(Land Allocation - $5,000)

(Design and Contingencies - $20,000)

(5) Greenfield Township, T-974, Old Route 89 Bridge over Tributary of French Creek, Bridge Replacement

360,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(6) Millcreek Township, T-707, Zimmerly Road Bridge over I-79, New Bridge Construction

4,550,000

(Base Construction Allocation - $3,500,000)

(Land Allocation - $400,000)

(Design and Contingencies - $650,000)

(7) Waterford Township, T-455, Sedgwick Road Bridge over Tributary of Lake Le Boeuf, Bridge Replacement

350,000

(Base Construction Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(8) City of Erie, Pittsburgh Avenue over Conrail and NS Lines, New Bridge

11,000,000

(Base Construction Allocation - $10,000,000)

(Land Allocation - $250,000)

(Design and Contingencies - $750,000)

(9) City of Erie, Greengarden Boulevard over Conrail and NS Lines, New Construction

11,000,000

(Base Construction Allocation - $10,000,000)

(Land Allocation - $250,000)

(Design and Contingencies - $750,000)

(10) Franklin Township, Falls Road over Falk Run Bridge No.2, Bridge Rehabilitation

360,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(11) Franklin Township, Falls Road over Falk Run Bridge No.1, Bridge Replacement

360,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(12) McKean Township, Oliver Road over Tributary of Elk Creek, Bridge Replacement

150,000

(Base Construction Allocation - $125,000)

(Land Allocation - $5,000)

(Design and Contingencies - $20,000)

(13) Waterford Township, Sedgwick Road over Tributary of Lake Le Boeuf, Bridge Replacement

370,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(b) State Bridges

(1) SR 0005, SR 0005 over Scott Run, Harborcreek Township, Bridge Replacement

140,000

(Base Construction Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(2) SR 0006, SR 0006 over French Creek, Le Boeuf Township, Bridge Replacement

700,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(3) SR 0019, SR 0019 over Le Boeuf Creek, Waterford Township, Bridge Replacement

950,000

(Base Construction Allocation - $840,000)

(Land Allocation - $30,000)

(Design and Contingencies - $80,000)

(4) SR 0020, SR 0020 over I-79, City of Erie, Bridge Replacement

2,000,000

(Base Construction Allocation - $1,770,000)

(Land Allocation - $30,000)

(Design and Contingencies - $200,000)

(5) SR 0089, SR 0089 over Sixteen Mile Creek, North East Township, Bridge Replacement

490,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(6) SR 0090, SR 0090 over Crooked Creek, Girard Township, Bridge Replacement

1,420,000

(Base Construction Allocation - $1,330,000)

(Land Allocation - $30,000)

(Design and Contingencies - $60,000)

(7) SR 0090, SR 0090 under Cherry Street, Summit Township, Bridge Replacement

1,600,000

(Base Construction Allocation - $1,410,000)

(Land Allocation - $40,000)

(Design and Contingencies - $150,000)

(8) SR 0090, SR 0090 under Clark Road, Harborcreek Township, Bridge Replacement

2,100,000

(Base Construction Allocation - $1,880,000)

(Land Allocation - $40,000)

(Design and Contingencies - $180,000)

(9) SR 0098, SR 0098 over Cussewago Creek, Elk Creek Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(10) SR 0474, SR 0474 over Dean Run, Venango Township, Bridge Replacement

200,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(11) SR 1001, SR 1001 over Conrail, Millcreek Township, Bridge Replacement

720,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(12) SR 1011, SR 1011 over Alder Brook, Venango Township, Bridge Replacement

470,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $60,000)

(13) SR 1013, SR 1013 over I-90, North East Township, Bridge Replacement

1,220,000

(Base Construction Allocation - $1,100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(14) SR 3001, SR 3001 over Conneaut Creek, Conneaut Township, Bridge Replacement

1,020,000

(Base Construction Allocation - $900,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(15) SR 3003, SR 3003 over West Branch Conneaut Creek, Conneaut Township, Bridge Replacement

630,000

(Base Construction Allocation - $550,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(16) SR 3014, SR 3014 over Trout Run, Waterford Borough, Bridge Replacement

370,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(17) SR 4007, SR 4007 over I-90, Fairview Township, Bridge Replacement

1,920,000

(Base Construction Allocation - $1,800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(18) SR 0020, Main Street Bridge over Elk Creek, Girard Township, Bridge Rehabilitation

5,450,000

(Base Construction Allocation - $5,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $400,000)

(19) SR 0090, I-90 Bridge, Eastbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation

6,350,000

(Base Construction Allocation - $6,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(20) SR 0090, I-90 Bridge Westbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation

7,350,000

(Base Construction Allocation - $7,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(21) SR 0090, Remington Road Bridge over I-90, North East Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(22) SR 0505, Bridge over Mill Creek, City of Erie, Bridge Replacement

460,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(23) SR 0955, Bridge over Six Mile Creek, Harborcreek Township, Bridge Replacement

480,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(24) SR 1019, Gay Road Bridge over I-90 Eastbound and Westbound, North East Township, Bridge Replacement

2,630,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $110,000)

(25) SR 3002, Cherry Hill Road Bridge over Conneaut Creek, Conneaut Township, Bridge Replacement

620,000

(Base Construction Allocation - $540,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(26) SR 4014, Grandview Boulevard Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Replacement

2,640,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(27) SR 4016, West 38th Street Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Rehabilitation

1,730,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $200,000)

(28) SR 2008, West High Street Bridge over Horton Run, Union Township, Bridge Replacement

260,000

(Base Construction Allocation - $220,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(29) SR 0079, Bridges over Walnut Creek and West 32nd Street, Millcreek Township, Bridge Rehabilitation

2,800,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $10,000)

(Design and Contingencies - $790,000)

(30) SR 0090, Beckman Street Bridge over I-90, Girard Township, Bridge Rehabilitation

400,000

(Base Construction Allocation - $340,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(31) SR 0090, Crooked Creek Bridge over Crooked Creek, Girard Township, Bridge Replacement

700,000

(Base Construction Allocation - $640,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(32) SR 0090, Elk Creek Railroad Bridge over Elk Creek, Bridge Replacement

999,000

(Base Construction Allocation - $955,000)

(Land Allocation - $4,000)

(Design and Contingencies - $40,000)

(33) SR 0005, Bridge over East Lake Road, Harborcreek Township, Bridge Rehabilitation

800,000

(Base Construction Allocation - $680,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(34) SR 0006, Bridge over Tributary of French Creek, Le Boeuf Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(35) SR 0006, Bridge over Beaver Run, Wayne Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(36) SR 0008, Bridge over Hubbel Run, Amity Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(37) SR 0018, Bridge over N&W Railroad, Girard Borough, Bridge Replacement

1,920,000

(Base Construction Allocation - $1,700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(38) SR 0079, Bridge over SR 3006, Washington Township, Bridge Replacement

1,520,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(39) SR 0079, Bridge over SR 3008, Franklin Township, Bridge Replacement

920,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(40) SR 0079, Bridge over T-481, Stancliff Road, Franklin Township, Bridge Replacement

920,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(41) SR 0080, Bridge over Branch of French Creek, Greenfield Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(42) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement

1,420,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(43) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement

1,120,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(44) SR 0090, I-90 Eastbound Bridge over SR 0089, North East Township, Bridge Replacement

2,600,000

(Base Construction Allocation - $2,320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $260,000)

(45) SR 0090, I-90 Westbound Bridge over SR 0089, North East Township, Bridge Replacement

2,400,000

(Base Construction Allocation - $2,140,000)

(Land Allocation - $20,000)

(Design and Contingencies - $240,000)

(46) SR 0090, Shadouck Road over I-90, North East Township, Bridge Rehabilitation

2,100,000

(Base Construction Allocation - $1,880,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(47) SR 0090, I-90 Bridge over Conrail, North East Township, Bridge Replacement

2,000,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $400,000)

(48) SR 0090, I-90 Eastbound Bridge over PA 20, North East Township, Bridge Rehabilitation

460,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(49) SR 0090, I-90 Westbound Bridge over PA 20, North East Township, Bridge Rehabilitation

460,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(50) SR 0090, I-90 Eastbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation

1,620,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(51) SR 0090, I-90 Westbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation

1,620,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(52) SR 0097, Bridge over Branch of French Creek, Union City Borough, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(53) SR 0426, Bridge over SR 0089, North East Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(54) SR 1004, Bridge over West Branch of French Creek, Greenfield Township, Bridge Replacement

800,000

(Base Construction Allocation - $700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(55) SR 1006, Moorheadville Road Bridge over I-90, North East Township, Bridge Replacement

2,600,000

(Base Construction Allocation - $2,330,000)

(Land Allocation - $20,000)

(Design and Contingencies - $250,000)

(56) SR 1017, Bridge over Averill Run, North East Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(57) SR 2008, Bridge over French Creek, Union Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(58) SR 2008, Bridge over French Creek, Union City Borough, Bridge Replacement

1,150,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(59) SR 2010, Bridge over Pine Run, Union Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(60) SR 2025, Bridge No.2 over Sciota Road, Wayne Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(61) SR 3001, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(62) SR 0005, Bridge over Lincoln Avenue, City of Erie, Bridge Replacement

900,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(63) SR 0020, Westbound Bridge over I-79, City of Erie, Bridge Rehabilitation

4,330,000

(Base Construction Allocation - $4,000,000)

(Land Allocation - $30,000)

(Design and Contingencies - $300,000)

(64) SR 0079, Southbound Bridge over West 32nd Street, City of Erie, Bridge Replacement

720,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(65) SR 3002, Bridge No.2 over Cherry Hill Road, Conneaut Township, Bridge Replacement

700,000

(Base Construction Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(66) SR 3002, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(67) SR 0005, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $410,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(68) SR 0090, Eastbound Bridge over Franklin Road, T-404, Fairview Township, Bridge Replacement

1,200,000

(Base Construction Allocation - $1,080,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(69) SR 0020, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(70) SR 0098, Bridge over I-90, Fairview Township, Bridge Rehabilitation

860,000

(Base Construction Allocation - $800,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(71) SR 0090, Bridge over Platz Road, Fairview Township, Bridge Rehabilitation

350,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $30,000)

(72) SR 0090, Westbound Bridge over T-404, Fairview Township, Bridge Replacement

1,200,000

(Base Construction Allocation - $1,080,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(73) SR 0018, Bridge over Elk Creek, Girard Borough, Bridge Replacement

1,020,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(74) SR 3014, Bridge over Franklin Center Road Bridge, Girard Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(75) SR 0090, Eastbound Bridge over Elk Creek, Girard Township, Bridge Replacement

6,500,000

(Base Construction Allocation - $6,280,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(76) SR 0090, Westbound Bridge over Elk Creek and Railroad Tracks, Girard Township, Bridge Replacement

6,000,000

(Base Construction Allocation - $5,780,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(77) SR 0090, Westbound Bridge over Neiger Road, Girard Township, Bridge Replacement

1,200,000

(Base Construction Allocation - $1,080,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(78) SR 0020, Bridge over Elk Creek, Girard Township, Bridge Rehabilitation

8,500,000

(Base Construction Allocation - $7,600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $850,000)

(79) SR 0090, Eastbound Bridge over Neiger Road, Girard Township, Bridge Replacement

2,000,000

(Base Construction Allocation - $1,880,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(80) SR 0090, Eastbound Bridge over Elk Creek and Railroad, Girard Township, Bridge Replacement

6,000,000

(Base Construction Allocation - $5,780,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(81) SR 0090, Westbound Bridge over Elk Creek, Girard Township, Bridge Replacement

6,500,000

(Base Construction Allocation - $6,280,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(82) SR 0090, Bridge over Four Mile Creek, Greene Township, Bridge Rehabilitation

800,000

(Base Construction Allocation - $700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(83) SR 0090, Bridge over Moore Road, Greene Township, Bridge Rehabilitation

1,700,000

(Base Construction Allocation - $1,380,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(84) SR 0090, Bridge over Clark Road, Harborcreek Township, Bridge Replacement

2,820,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(85) SR 0020, Bridge over Four Mile Creek, Harborcreek Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(86) SR 0090, Westbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement

1,520,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(87) SR 0090, Bridge over Jordan Road, Harborcreek Township, Bridge Rehabilitation

2,800,000

(Base Construction Allocation - $2,480,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(88) SR 0955, Bridge over Seven Mile Creek, Harborcreek Township, Bridge Replacement

830,000

(Base Construction Allocation - $700,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(89) SR 0090, Eastbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement

1,520,000

(Base Construction Allocation - $1,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(90) SR 0005, Bridge over Elk Creek, Lake City Borough, Bridge Replacement

3,220,000

(Base Construction Allocation - $2,900,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(91) SR 0006, Bridge over Mill Village Truss, Le Boeuf Township, Bridge Replacement

3,046,000

(Base Construction Allocation - $2,980,000)

(Land Allocation - $26,000)

(Design and Contingencies - $40,000)

(92) SR 0832, Bridge over I-90, McKean Township, Bridge Rehabilitation

3,000,000

(Base Construction Allocation - $2,670,000)

(Land Allocation - $30,000)

(Design and Contingencies - $300,000)

(93) SR 4013, Bridge over Elk Creek, McKean Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(94) SR 0099, Bridge over Stancliff Road, McKean Township, Bridge Replacement

1,620,000

(Base Construction Allocation - $1,400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(95) SR 0090, Bridge over Millfair Road, McKean Township, Bridge Rehabilitation

1,820,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $300,000)

(96) SR 0090, Bridge over SR 0008, Northbound and Southbound, Millcreek Township, Bridge Replacement

1,720,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(97) SR 4012, Bridge over I-79, Millcreek Township, Bridge Replacement

5,020,000

(Base Construction Allocation - $4,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $500,000)

(98) SR 0019, Bridge No.2 over Walnut Creek, Millcreek Township, Bridge Replacement

1,890,000

(Base Construction Allocation - $1,700,000)

(Land Allocation - $20,000)

(Design and Contingencies - $170,000)

(99) SR 0079, Southbound Bridge over Walnut Creek, Millcreek Township, Bridge Replacement

420,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(100) SR 0090, Bridge over Pond Road, Springfield Township, Bridge Replacement

1,600,000

(Base Construction Allocation - $1,400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(101) SR 0090, Bridge over McKees Road, Springfield Township, Bridge Replacement

1,550,000

(Base Construction Allocation - $1,380,000)

(Land Allocation - $20,000)

(Design and Contingencies - $150,000)

(102) SR 0090, Bridge over Huntley Road, Springfield Township, Bridge Replacement

1,700,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(103) SR 0020, Bridge over Crooked Creek, Springfield Township, Bridge Replacement

930,000

(Base Construction Allocation - $800,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(104) SR 0090, Bridge over Stanford Road, Springfield Township, Bridge Replacement

2,800,000

(Base Construction Allocation - $2,450,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(105) SR 0090, Bridge over Walnut Creek, Summit Township, Bridge Replacement

2,340,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $40,000)

(Design and Contingencies - $200,000)

(106) SR 0099, Bridge over I-90, Summit Township, Bridge Replacement

2,700,000

(Base Construction Allocation - $2,400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(107) SR 0097, Bridge over Le Boeuf Creek, Summit Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(108) SR 2018, Railroad Bridge over Lovell Road, Concord Township, Bridge Rehabilitation

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $25,000)

(Design and Contingencies - $75,000)

(109) I-90 Bridge over Sixteen Mile Creek, North East Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $90,000)

(Land Allocation - $10,000)

(Design and Contingencies - $400,000)