Act 53 of 1999, § 36, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000.

Act 53 of 1999, § 36

Section 36. Indiana County.

(a) Local Bridges

(1) Banks Township, T-974, County Bridge No.13, Bear Run Bridge over Bear Run, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(2) Black Lick Township, T-574, Muddy Run Bridge over Muddy Run, Bridge Replacement

380,000

(Base Construction Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $70,000)

(3) Cherryhill Township, T-686, County Bridge No.65, Grace Church Bridge over Two Lick Creek, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(4) Cherryhill Township, T-978, Allen Bridge over Two Lick Reservoir, Bridge Rehabilitation

264,000

(Base Construction Allocation - $200,000)

(Land Allocation - $10,000)

(Design and Contingencies - $54,000)

(5) Rayne Township, T-760, County Bridge No.23-A, Chambersville Bridge over Crooked Creek, Bridge Rehabilitation

190,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(6) Grant Township, T-820 over Crooked Run, Bridge Replacement

245,000

(Base Construction Allocation - $200,000)

(Land Allocation - $10,000)

(Design and Contingencies - $35,000)

(b) State Bridges

(1) SR 0022, Chestnut Ridge Bridge over SR 0119, Burrell Township, Bridge Painting

90,000

(Base Construction Allocation - $75,000)

(Design and Contingencies - $15,000)

(2) SR 0022, Armagh Bridge over SR 0056, West Wheatfield Township, Bridge Painting

145,000

(Base Construction Allocation - $130,000)

(Design and Contingencies - $15,000)

(3) SR 0119, Black Lick Bridge over Black Lick Creek, Burrell Township, Bridge Painting

280,000

(Base Construction Allocation - $265,000)

(Design and Contingencies - $15,000)

(4) SR 0119, Bypass Steel Bridge No.1 over Wayne Avenue Ramps, White Township, Bridge Painting

170,000

(Base Construction Allocation - $155,000)

(Design and Contingencies - $15,000)

(5) SR 0119, Bypass Steel Bridge No.2 over Wayne Avenue Ramps, White Township, Bridge Painting

170,000

(Base Construction Allocation - $155,000)

(Design and Contingencies - $15,000)

(6) SR 0119, Bypass Steel Bridge No.3 over SR 0422, White Township, Bridge Painting

240,000

(Base Construction Allocation - $225,000)

(Design and Contingencies - $15,000)

(7) SR 0119, Bypass Steel Bridge No.4 over SR 0422, White Township, Bridge Painting

240,000

(Base Construction Allocation - $225,000)

(Design and Contingencies - $15,000)

(8) SR 0119, Bypass Steel Bridge No.5 over SR 0954, White Township, Bridge Painting

195,000

(Base Construction Allocation - $180,000)

(Design and Contingencies - $15,000)

(9) SR 0119, Bypass Steel Bridge No.6 over SR 0954, White Township, Bridge Painting

175,000

(Base Construction Allocation - $160,000)

(Design and Contingencies - $15,000)

(10) SR 0119, Bypass Steel Bridge No.7 over SR 0286, White Township, Bridge Painting

235,000

(Base Construction Allocation - $220,000)

(Design and Contingencies - $15,000)

(11) SR 0119, Bypass Steel Bridge No.8 over SR 0286, White Township, Bridge Painting

215,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $15,000)

(12) SR 0119, Bypass Steel Bridge No.9 over SR 1003, White Township, Bridge Painting

200,000

(Base Construction Allocation - $185,000)

(Design and Contingencies - $15,000)

(13) SR 0119, Bypass Steel Bridge No.10 over SR 1003, White Township, Bridge Painting

175,000

(Base Construction Allocation - $160,000)

(Design and Contingencies - $15,000)

(14) SR 0119, Bypass Steel Bridge No.11 over SR 0110, White Township, Bridge Painting

125,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $15,000)

(15) SR 0119, Bypass Steel Bridge No.12 over SR 0110, White Township, Bridge Painting

125,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $15,000)

(16) SR 0217, Torrance Bridge over Conemaugh River, Burrell Township, Bridge Painting

435,000

(Base Construction Allocation - $420,000)

(Design and Contingencies - $15,000)

(17) SR 0217, Black Lick Creek Bridge over Black Lick Creek, Burrell Township, Bridge Painting

400,000

(Base Construction Allocation - $385,000)

(Design and Contingencies - $15,000)

(18) SR 0259, Heshbon Bridge over Black Lick Creek, West Wheatfield Township, Bridge Painting

200,000

(Base Construction Allocation - $185,000)

(Design and Contingencies - $15,000)

(19) SR 0286, Clymer Bridge over Two Lick Creek, Clymer Borough, Bridge Painting

175,000

(Base Construction Allocation - $160,000)

(Design and Contingencies - $15,000)

(20) SR 0422, Two Lick Eastbound Bridge over Two Lick Creek, White Township, Bridge Painting

360,000

(Base Construction Allocation - $345,000)

(Design and Contingencies - $15,000)

(21) SR 0422, Two Lick Westbound Bridge over Two Lick Creek, White Township, Bridge Painting

360,000

(Base Construction Allocation - $345,000)

(Design and Contingencies - $15,000)

(22) SR 0422, Penn Run Exit Bridge Eastbound over TR 840, White Township, Bridge Painting

190,000

(Base Construction Allocation - $175,000)

(Design and Contingencies - $15,000)

(23) SR 0422, Penn Run Exit Bridge Westbound over TR 840, White Township, Bridge Painting

190,000

(Base Construction Allocation - $175,000)

(Design and Contingencies - $15,000)

(24) SR 0580, Cush Cushion Creek Bridge over Cush Cushion Creek, Green Township, Bridge Painting

85,000

(Base Construction Allocation - $70,000)

(Design and Contingencies - $15,000)

(25) SR 0954, Yellow Creek Bridge over Yellow Creek, White Township, Bridge Painting

125,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $15,000)

(26) SR 0954, Creekside Bridge over Crooked Creek, White Township, Bridge Painting

125,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $15,000)

(27) SR 0954, South Branch Bridge over South Branch of Plum Creek, Washington Township, Bridge Painting

75,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $15,000)

(28) SR 1004, Philadelphia Street Exit Bridge over SR 0119, White Township, Bridge Painting

235,000

(Base Construction Allocation - $220,000)

(Design and Contingencies - $15,000)

(29) SR 1006, Jimmy Stewart Airport Bridge over SR 0119, White Township, Bridge Painting

245,000

(Base Construction Allocation - $230,000)

(Design and Contingencies - $15,000)

(30) SR 1007, Tanoma Bridge over Crooked Creek, Rayne Township, Bridge Painting

75,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $15,000)

(31) SR 1014, Diamondville Bridge over North Branch of Two Lick Creek, Green Township, Bridge Painting

75,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $15,000)

(32) SR 1017, Pine Flats Bridge over South Branch of Two Lick Creek, Green Township, Bridge Painting

95,000

(Base Construction Allocation - $80,000)

(Design and Contingencies - $15,000)

(33) SR 1033, Gypsy Bridge over Cush Creek, Montgomery Township, Bridge Painting

85,000

(Base Construction Allocation - $70,000)

(Design and Contingencies - $15,000)

(34) SR 1034, Lower Wilgus Bridge over Branch of Cush Creek, Montgomery Township, Bridge Painting

55,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $15,000)

(35) SR 1038, Crooked Run Bridge over Crooked Run, East Mahoning Township, Bridge Painting

60,000

(Base Construction Allocation - $45,000)

(Design and Contingencies - $15,000)

(36) SR 1045, Broadhead Run Bridge over Broadhead Run, Canoe Township, Bridge Painting

70,000

(Base Construction Allocation - $55,000)

(Design and Contingencies - $15,000)

(37) SR 1045, Juneau Bridge over Canoe Creek, Canoe Township, Bridge Painting

75,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $15,000)

(38) SR 1046, Straight Run Bridge over Straight Run, Banks Township, Bridge Painting

80,000

(Base Construction Allocation - $65,000)

(Design and Contingencies - $15,000)

(39) SR 2019, Tearing Run Bridge No.1 over Tearing Run, Center Township, Bridge Painting

55,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $15,000)

(40) SR 2019, Tearing Run Bridge No.2 over Tearing Run, Center Township, Bridge Painting

65,000

(Base Construction Allocation - $50,000)

(Design and Contingencies - $15,000)

(41) SR 3003, Tunnelton Bridge over Conemaugh River, Conemaugh Township, Bridge Painting

525,000

(Base Construction Allocation - $510,000)

(Design and Contingencies - $15,000)

(42) SR 3007, Clarksburg Bridge over Blacklegs Creek, Conemaugh Township, Bridge Painting

105,000

(Base Construction Allocation - $90,000)

(Design and Contingencies - $15,000)

(43) SR 3011, Black Lick Creek Bridge No.1 over Black Lick Creek, Brush Valley Township, Bridge Painting

405,000

(Base Construction Allocation - $390,000)

(Design and Contingencies - $15,000)

(44) SR 3011, Black Lick Creek Bridge No.2 over Black Lick Creek, Black Lick Township, Bridge Painting

405,000

(Base Construction Allocation - $390,000)

(Design and Contingencies - $15,000)

(45) SR 3013, Muddy Run Bridge over Muddy Run, Black Lick Township, Bridge Painting

65,000

(Base Construction Allocation - $50,000)

(Design and Contingencies - $15,000)

(46) SR 3016, Homer City Bridge over Two Lick Creek, Homer City Borough, Bridge Painting

125,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $15,000)

(47) SR 3031, Blacklegs Run Bridge over Blacklegs Run, Young Township, Bridge Painting

65,000

(Base Construction Allocation - $50,000)

(Design and Contingencies - $15,000)

(48) SR 3037, Walker Run Bridge over Walker Run, Armstrong Township, Bridge Painting

55,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $15,000)

(49) SR 3039, Anthony Run Bridge over Anthony Run, Armstrong Township, Bridge Painting

55,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $15,000)

(50) SR 4001, Fisher Siding Bridge over Crooked Creek, Armstrong Township, Bridge Painting

110,000

(Base Construction Allocation - $95,000)

(Design and Contingencies - $15,000)

(51) SR 4001, Five Points Bridge over South Branch of Plum Creek, Washington Township, Bridge Painting

100,000

(Base Construction Allocation - $85,000)

(Design and Contingencies - $15,000)

(52) SR 4006, Reddings Run Bridge over Reddings Run, Washington Township, Bridge Painting

55,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $15,000)

(53) SR 4008, Kimmel Station Bridge No.1 over Branch of Crooked Creek, Rayne Township, Bridge Painting

50,000

(Base Construction Allocation - $35,000)

(Design and Contingencies - $15,000)

(54) SR 4008, Kimmel Station Bridge No.2 over Branch of Crooked Creek, Rayne Township, Bridge Painting

50,000

(Base Construction Allocation - $35,000)

(Design and Contingencies - $15,000)

(55) SR 4035, Plumville Bridge over Plum Creek, Plumville Borough, Bridge Painting

75,000

(Base Construction Allocation - $60,000)

(Design and Contingencies - $15,000)

(56) SR 0056, Seward Conrail Overpass, East Wheatfield Township, Bridge Replacement

2,570,000

(Base Construction Allocation - $2,080,000)

(Land Allocation - $150,000)

(Design and Contingencies - $340,000)

(57) SR 0119, Two Lick Creek Bridge over Big Two Lick Creek, Center Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(58) SR 0119, Bridge over PA 840, Center Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(59) SR 0119, Yellow Creek Bridge over Yellow Creek, Center Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(60) SR 0119, Pickering Creek Bridge over Pickering Creek, East Mahoning Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(61) SR 0119, Northbound Bridge over PA 110, Rayne Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(62) SR 0119, Southbound Bridge over PA 110, Rayne Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(63) SR 0119, Pine Run Bridge No.1 over Pine Run, Rayne Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(64) SR 0119, Pine Run Bridge No.2 over Pine Run, Rayne Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(65) SR 0119, Northbound Bridge over US 422, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(66) SR 0119, Southbound Bridge over US 422, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(67) SR 0119, Southbound Bridge over PA 268, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(68) SR 0119, Northbound Bridge over SR 0268, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(69) SR 0119, Northbound Bridge over SR 1002, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(70) SR 0119, Southbound Bridge over SR 1002, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(71) SR 0119, Northbound Bridge over SR 1113 Ramp, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(72) SR 0119, Southbound Bridge over SR 1113 Ramp, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(73) SR 0286, Westbound Bridge over SR 1004, White Township, Bridge Rehabilitation

1,050,000

(Base Construction Allocation - $750,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(74) SR 0422, Cheese Run Bridge over Cheese Run, Armstrong Township, Bridge Replacement

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(75) SR 0422, Crooked Creek Bridge over Crooked Creek, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(76) SR 0422, Crooked Creek Bridge No.2 over Branch Crooked Creek, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(77) SR 0422, Curry Run Bridge No.1 over Curry Run, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(78) SR 0422, Curry Run Bridge No.2 over Curry Run, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(79) SR 0422, Curry Run Bridge No.3 over Curry Run, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(80) SR 0422, Curry Run Bridge No.4 over Branch of Curry Run, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(81) SR 0422, Laurel Run Bridge over Laurel Run, Armstrong Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(82) SR 0422, Westbound Bridge over PA 840, Cherryhill Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(83) SR 0422, Eastbound Bridge over PA 840, Cherryhill Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(84) SR 0422, Little Yellow Creek Bridge over Little Yellow Creek, Pine Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(85) SR 0422, Bridge over Branch of Little Yellow Creek, Pine Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(86) SR 0422, Westbound Bridge over PA 954, White Township, Bridge Replacement

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(87) SR 0422, Eastbound Bridge over PA 954, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(88) SR 1012, Diamondville Bridge over Two Lick Creek, Cherryhill Township, Bridge Replacement

1,250,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(89) SR 6422, McCarthy Run Bridge over Branch of McCarthy Run, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(90) SR 6422, Bridge over Tributary of McCarthy Run, White Township, Bridge Rehabilitation

1,450,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $350,000)

(91) SR 0119, Steel Railroad Bridge No.15 over PA 954, White Township, Bridge Painting

51,000

(Base Construction Allocation - $45,000)

(Design and Contingencies - $6,000)

(92) SR 0422, Penn Run Exit Bridge Eastbound over TR 845, Cherryhill Township, Bridge Painting

61,000

(Base Construction Allocation - $55,000)

(Design and Contingencies - $6,000)

(93) SR 0422, Penn Run Exit Bridge Westbound over TR 845, Cherryhill Township, Bridge Painting

46,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $6,000)

(94) SR 1044, Bridge over Big Canoe Creek, Canoe Township, Bridge Replacement

195,000

(Base Construction Allocation - $110,000)

(Land Allocation - $10,000)

(Design and Contingencies - $75,000)

(95) SR 1047, Bridge over Big Canoe Creek, Canoe Township, Bridge Replacement

205,000

(Base Construction Allocation - $120,000)

(Land Allocation - $10,000)

(Design and Contingencies - $75,000)

(96) SR 4006, Bridge over Plum Creek, South Mahoning Township, Bridge Replacement

205,000

(Base Construction Allocation - $120,000)

(Land Allocation - $10,000)

(Design and Contingencies - $75,000)