Mercer County

Act 53 of 1999, § 47, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000.

Act 53 of 1999, § 47

Section 47. Mercer County.

(a) Local Bridges

(1) City of Sharon, Service Avenue Bridge over Pine Run, Bridge Replacement

240,000

(Base Construction Allocation - $210,000)

(Land Allocation - $5,000)

(Design and Contingencies - $25,000)

(2) City of Sharon, Wengler Avenue Bridge over Pine Hollow Run, Bridge Replacement

218,000

(Base Construction Allocation - $193,000)

(Land Allocation - $5,000)

(Design and Contingencies - $20,000)

(3) Pine Township, T-355, Pinchlong Road Bridge over Swamp Run, Bridge Replacement

203,000

(Base Construction Allocation - $178,000)

(Land Allocation - $5,000)

(Design and Contingencies - $20,000)

(4) Pine Township, T-878, Diamond Road Bridge over Wolf Creek, Bridge Replacement

1,813,000

(Base Construction Allocation - $1,668,000)

(Land Allocation - $60,000)

(Design and Contingencies - $85,000)

(5) Pine Township, T-413, Daugherty Road Bridge over Wolf Run, Bridge Replacement

407,000

(Base Construction Allocation - $352,000)

(Land Allocation - $15,000)

(Design and Contingencies - $40,000)

(6) Shenango Township, T-955, Oak Hill Road Bridge over Turkey Run, Bridge Replacement

297,000

(Base Construction Allocation - $257,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(7) Shenango Township, Heasley Road Bridge over Tributary of Shenango River, Bridge Replacement

173,000

(Base Construction Allocation - $155,000)

(Land Allocation - $3,000)

(Design and Contingencies - $15,000)

(8) Springfield Township, T-722, Spring Road Bridge over Mill Run, Bridge Replacement

230,000

(Base Construction Allocation - $200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $25,000)

(9) Worth Township, T-912, Jack Atwell Road Bridge over Wolf Creek, Bridge Replacement

297,000

(Base Construction Allocation - $257,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(10) Springfield Township, North Spring Road Bridge, Bridge Replacement

245,000

(Base Construction Allocation - $210,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(11) Delaware Township, T-634, Redfoot Road Bridge over Otter Creek, Bridge Replacement

220,000

(Base Construction Allocation - $185,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(12) Fairview Township, T-623, Runkle Lane Bridge over Coolspring Creek, Bridge Replacement

220,000

(Base Construction Allocation - $185,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(13) City of Hermitage, T-307, Lynnwood Drive Bridge over Bobby Run, Bridge Replacement

308,000

(Base Construction Allocation - $270,000)

(Land Allocation - $3,000)

(Design and Contingencies - $35,000)

(14) Sharon City, Prindle Street Bridge over Pine Run, Bridge Replacement

485,000

(Base Construction Allocation - $405,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(b) State Bridges

(1) SR 0058, SR 0058 over Sugar Creek, Greene Township, Bridge Replacement

270,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(2) SR 0058, SR 0058 over Tributary of Shenango River, Greenville Borough, Bridge Replacement

250,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $30,000)

(3) SR 0058, SR 0058 over I-79, Findley Township, Bridge Replacement

1,630,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(4) SR 0062, SR 0062 over Shenango River/Riverside Drive, City of Sharon, Bridge Replacement

2,780,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $250,000)

(5) SR 0158, SR 0158 over Little Neshannock Creek, Wilmington Township, Bridge Replacement

770,000

(Base Construction Allocation - $650,000)

(Land Allocation - $40,000)

(Design and Contingencies - $80,000)

(6) SR 0173, SR 0173 over Mill Creek, New Lebanon Borough, Bridge Replacement

430,000

(Base Construction Allocation - $350,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(7) SR 0208, SR 0208 over Wolf Creek, Grove City Borough, Bridge Replacement

1,000,000

(Base Construction Allocation - $870,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(8) SR 0258, SR 0258 over Daley Run, Jefferson Township, Bridge Replacement

430,000

(Base Construction Allocation - $350,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(9) SR 0318, SR 0318 over Shenango River/Street/Railroad, West Middlesex Borough, Bridge Replacement

4,400,000

(Base Construction Allocation - $3,700,000)

(Land Allocation - $100,000)

(Design and Contingencies - $600,000)

(10) SR 0518, SR 0518 over Pine Hollow Run, City of Hermitage, Bridge Replacement

410,000

(Base Construction Allocation - $300,000)

(Land Allocation - $30,000)

(Design and Contingencies - $80,000)

(11) SR 0846, SR 0846 over Shenango Reservoir, South Pymatuning Township, Bridge Replacement

1,500,000

(Base Construction Allocation - $1,340,000)

(Land Allocation - $10,000)

(Design and Contingencies - $150,000)

(12) SR 2006, SR 2006 over I-79, Springfield Township, Bridge Replacement

1,100,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $10,000)

(Design and Contingencies - $90,000)

(13) SR 2014, SR 2014 over Mill Creek, Findley Township, Bridge Replacement

330,000

(Base Construction Allocation - $240,000)

(Land Allocation - $20,000)

(Design and Contingencies - $70,000)

(14) SR 2025, SR 2025 over Lake Barmore Outlet, Pine Township, Bridge Replacement

300,000

(Base Construction Allocation - $230,000)

(Land Allocation - $10,000)

(Design and Contingencies - $60,000)

(15) SR 3011, SR 3011 over I-80, Shenango Township, Bridge Replacement

810,000

(Base Construction Allocation - $700,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(16) SR 4014, SR 4014 over Shenango River, Delaware Township, Bridge Replacement

920,000

(Base Construction Allocation - $800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(17) SR 0518, PA 518 (Walnut Street) Bridge over Pine Hollow Road, City of Hermitage, Bridge Replacement

550,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $50,000)

(18) SR 4003, Wasser Bridge Road Bridge over Shenango River, West Salem Township, Bridge Replacement

1,620,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $40,000)

(Design and Contingencies - $80,000)

(19) SR 0080, Bridges over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation

2,120,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(20) SR 0080, Bridges over T-998, Wolf Creek Township, Bridge Rehabilitation

2,120,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(21) SR 0208, Bridge over I-79, Springfield Township, Bridge Replacement

4,000,000

(Base Construction Allocation - $3,600,000)

(Land Allocation - $200,000)

(Design and Contingencies - $200,000)

(22) SR 2007, Bridge over Mill Creek, Findley Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(23) SR 2009, Bridge over Wolf Creek, Wolf Creek Township, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(24) SR 2009, Bridge over Centertown Run, Wolf Creek Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(25) SR 2013, Bridge over Munnel Run, Mercer Borough, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(26) SR 2016, Church Road Bridge, Findley Township, Bridge Replacement

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(27) SR 2024, Bridge over Wolf Creek, Worth Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(28) SR 2025, Bridge over Black Run, Liberty Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(29) SR 3008, Bridge over Small Stream, Hermitage Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(30) SR 3013, Bridge over Tributary of Little Neshannock Creek, Wilmington Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(31) SR 3018, Bridge over Shenango River, Sharpsville Borough, Bridge Replacement

4,920,000

(Base Construction Allocation - $4,400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $500,000)

(32) SR 3020, Bridge over Tributary of Shenango River, Jefferson Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(33) SR 3020, Bridge over Lackawannock Creek, Jefferson Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(34) SR 3030, Budd Street Bridge, Sharon Township, Bridge Rehabilitation

2,300,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(35) SR 4021, Bridge over Morrison Run, Perry Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(36) SR 0080, I-80 Bridge over Hog Back Run, Shenango Township, Bridge Rehabilitation

700,000

(Base Construction Allocation - $550,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(37) SR 0080, I-80 Eastbound Bridge over SR 0318, Shenango Township, Bridge Replacement

1,100,000

(Base Construction Allocation - $950,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(38) SR 0080, I-80 Westbound Bridge over SR 0318, Shenango Township, Bridge Replacement

1,100,000

(Base Construction Allocation - $950,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(39) SR 0173, Bridge over Black Run, Wolf Creek Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(40) SR 0173, Bridge over Sandy Creek, Sandy Lake Borough, Bridge Replacement

1,420,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(41) SR 0208, Bridge over I-79, Springfield Township, Bridge Replacement

2,920,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(42) SR 0258, Bridge over Tinkers Run, Liberty Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(43) SR 0318, Bridge over SR 0060, Shenango Township, Bridge Replacement

2,700,000

(Base Construction Allocation - $2,400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(44) SR 0358, Bridge over Tributary of Little Shenango River, Otter Creek Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(45) SR 0358, Bridge over Tributary of Shenango River, Otter Creek Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(46) SR 0846, Bridge over Chestnut Run, Pymatuning Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(47) SR 1004, Bridge over Coolspring Creek, Fairview Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(48) SR 1011, Carpenters Corner Road, Bridge No.1, New Vernon Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(49) SR 1011, Carpenters Corner Road, Bridge No.2, Perry Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(50) SR 1028, Bridge over North Deer Creek, Deer Creek Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(51) SR 2001, Bridge over Indian Run, Wilmington Township, Bridge Replacement

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(52) SR 2002, Bridge over Neshannock Creek, Springfield Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(53) SR 2006, Blacktown Road Bridge over SR 0080, Springfield Township, Bridge Rehabilitation

2,800,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(54) SR 0018, Thiel College Bridge over Little Shenango, Greenville Borough, Bridge Replacement

1,021,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $1,000)

(55) SR 0058, Bridge over Wolf Creek, Grove City Borough, Bridge Replacement

1,420,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(56) SR 0060, Bridge over Hewitt Road, Shenango Township, Bridge Replacement

1,120,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(57) SR 0060, Bridge over Hog Back Run, Shenango Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(58) SR 0060, Northbound Bridge over I-80 Eastbound and Westbound, Shenango Township, Bridge Replacement

3,850,000

(Base Construction Allocation - $3,600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(59) SR 0060, Southbound Bridge over I-80 Eastbound and Westbound, Shenango Township, Bridge Replacement

3,850,000

(Base Construction Allocation - $3,600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(60) SR 0060, Bridge over SR 0018, Shenango Township, Bridge Replacement

1,800,000

(Base Construction Allocation - $1,600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(61) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Rehabilitation

200,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(62) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(63) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(64) SR 0062, Bridge over Pine Run, Hermitage Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(65) SR 0062, Bridge over Pine Run, Hermitage Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(66) SR 0062, Bridge over Pine Hollow Creek, Hermitage Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(67) SR 0062, Bridge over I-79 Northbound and Southbound, Jackson Township, Bridge Replacement

6,720,000

(Base Construction Allocation - $6,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $700,000)

(68) SR 0079, I-79 Bridge over Pine Run, Findley Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(69) SR 0079, I-79 Northbound Bridge over Conrail and Yellow Creek, Jackson Township, Bridge Replacement

300,000

(Base Construction Allocation - $100,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(70) SR 0079, I-79 Southbound Bridge over Conrail and Yellow Creek, Jackson Township, Bridge Replacement

1,200,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(71) SR 0079, I-79 Bridge over Conrail, Lake Township, Bridge Replacement

3,720,000

(Base Construction Allocation - $3,300,000)

(Land Allocation - $20,000)

(Design and Contingencies - $400,000)

(72) SR 0079, I-79 Southbound Bridge over Sandy Creek, New Vernon Township, Bridge Replacement

5,320,000

(Base Construction Allocation - $4,800,000)

(Land Allocation - $20,000)

(Design and Contingencies - $500,000)