Act 53 of 1999, § 6, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000.

Act 53 of 1999, § 6

Section 6. Allegheny County.

(a) Local Bridges

(1) Plum Borough, Mary Street Bridge over Plum Creek, Bridge Replacement

630,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $180,000)

(2) City of Pittsburgh, Glenwood Bridge, Phase II over Monongahela River, Three Railroads and Carson Street, Bridge Rehabilitation

4,180,000

(Base Construction Allocation - $3,905,000)

(Design and Contingencies - $275,000)

(3) Elizabeth Township, Patterson Road, Boyd Hollow Bridge, Bridge Replacement

225,000

(Base Construction Allocation - $180,000)

(Land Allocation - $11,000)

(Design and Contingencies - $34,000)

(4) Elizabeth Township, Yates Street Bridge, Bridge Replacement

198,000

(Base Construction Allocation - $158,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(5) Shaler Township, South of Martha Avenue, Anderson Road over Wible Run, Bridge Replacement

500,000

(Base Construction Allocation - $400,000)

(Design and Contingencies - $100,000)

(6) Baldwin Borough, Old Clairton Road over CSX Railroad, Bridge Rehabilitation

80,000

(Base Construction Allocation - $65,000)

(Design and Contingencies - $15,000)

(7) Ben Avon Borough, Spruce Run Road over Spruce Run, Bridge Rehabilitation

265,000

(Base Construction Allocation - $200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(8) City of Pittsburgh, Swinburne Street, Bridge Painting

1,530,000

(Base Construction Allocation - $1,500,000)

(Design and Contingencies - $30,000)

(9) City of Pittsburgh, Railroad Bridge (Hot Metal Bridge) at Former LTV Steel Company over Monongahela River, Bridge Rehabilitation

25,000,000

(Base Construction Allocation - $22,500,000)

(Design and Contingencies - $2,500,000)

(10) Edgeworth Borough, Beaver Street over Little Sewickley Creek, Bridge Replacement

358,000

(Base Construction Allocation - $250,000)

(Land Allocation - $8,000)

(Design and Contingencies - $100,000)

(11) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(12) Hampton Township, Duncan Avenue over Pine Creek, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(13) Harrison Township, Natrona Road over Small Branch of Allegheny River, Bridge Rehabilitation

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(14) Jefferson Borough, Coal Valley Road Bridge No.2 over McRoberts Run, Bridge Rehabilitation

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(15) Jefferson Borough, Coal Valley Road Bridge No.4 over McRoberts Run, Bridge Rehabilitation

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(16) Leetsdale Borough, Beaver Road over Big Sewickley Creek, Bridge Replacement

420,000

(Base Construction Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $110,000)

(17) Municipality of Penn Hills, Mt. Carmel Road over Sandy Creek, Bridge Replacement

230,000

(Base Construction Allocation - $170,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(18) Municipality of Penn Hills, Lincoln Road Bridge No.6 over Sandy Creek, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(19) Municipality of Penn Hills, Lincoln Road Bridge No.12 over Sandy Creek, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(20) Sewickley Heights Borough, Blackburn Road over Kilbuck Run, Bridge Rehabilitation

145,000

(Base Construction Allocation - $110,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(21) South Park Township, Sleepy Hollow Road over Sleepy Hollow, Bridge Replacement

295,000

(Base Construction Allocation - $200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $90,000)

(22) South Park Township, Cochran's Mill Road over Licks Run, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(23) Hampton Township, T-357, Bridge over Gourdhead Run, Bridge Rehabilitation

320,000

(Base Construction Allocation - $280,000)

(Design and Contingencies - $40,000)

(24) Hampton Township, T-984, South Pioneer Road Bridge No.1 over Crouse Run, Bridge Rehabilitation

250,000

(Base Construction Allocation - $210,000)

(Design and Contingencies - $40,000)

(25) Hampton Township, T-984, South Pioneer Road Bridge No.2 over Crouse Run, Bridge Rehabilitation

250,000

(Base Construction Allocation - $210,000)

(Design and Contingencies - $40,000)

(26) Marshall Township, T-482, Northgate Drive Bridge over Brush Creek, Bridge Replacement

320,000

(Base Construction Allocation - $280,000)

(Land Allocation - $5,000)

(Design and Contingencies - $35,000)

(27) Town of McCandless, Blazier Drive Bridge No.1 over Pine Creek, Bridge Rehabilitation

17,000

(Base Construction Allocation - $15,000)

(Design and Contingencies - $2,000)

(28) Town of McCandless, Blazier Drive Bridge No.2 over Pine Creek, Bridge Rehabilitation

28,000

(Base Construction Allocation - $26,000)

(Design and Contingencies - $2,000)

(29) Town of McCandless, Blazier Drive Bridge No.3 over Pine Creek, Bridge Rehabilitation

3,000

(Base Construction Allocation - $2,000)

(Design and Contingencies - $1,000)

(30) Town of McCandless, Oakridge Drive over Pine Creek, Bridge Rehabilitation

10,000

(Base Construction Allocation - $8,000)

(Design and Contingencies - $2,000)

(31) Town of McCandless, Meinert Road over Pine Creek, Bridge Rehabilitation

3,000

(Base Construction Allocation - $2,000)

(Design and Contingencies - $1,000)

(32) Collier Township, Thom's Run Road-Oakdale Road No.4 over Thom's Run, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(33) Collier Township, Thom's Run Road-Oakdale Road No.5 over Thom's Run, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(34) Collier Township, Thom's Run Road-Oakdale Road No.9 over Thom's Run, Bridge Replacement

180,000

(Base Construction Allocation - $130,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(35) Etna Borough, Dewey Street over Little Pine Creek, Bridge Rehabilitation

23,000

(Base Construction Allocation - $20,000)

(Design and Contingencies - $3,000)

(36) Forward Township, Roberts Hollow Road over Fallen Timber Run, Bridge Replacement

200,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(37) Hampton Township, Duncan Avenue over Stillhouse Run, Bridge Replacement

230,000

(Base Construction Allocation - $170,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(38) Penn Hills Township, Lincoln Road over Ryans Run, Bridge Replacement

190,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(39) Penn Hills Township, Lincoln Road over Sandy Creek, Bridge Replacement

195,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $40,000)

(40) North Versailles Township, Crooked Run Road over Crooked Run, Bridge Replacement

170,000

(Base Construction Allocation - $130,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(41) O'Hara Township, Brownhill Road over Little Pine Creek, Bridge Replacement

275,000

(Base Construction Allocation - $231,000)

(Design and Contingencies - $44,000)

(42) Ross Township, Thompson Run Road over South Branch of Pine Creek, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $8,000)

(Design and Contingencies - $42,000)

(43) Moon Township, T-114, Becks Run Road over Flaugherty Run, Bridge Replacement

420,000

(Base Construction Allocation - $350,000)

(Land Allocation - $20,000)

(Design and Contingencies - $50,000)

(44) Homestead Borough, High Level Bridge, Bridge Rehabilitation and Upgrade

250,000

(45) North Braddock Borough, Hawkins Avenue Bridge, Bridge Rehabilitation

300,000

(46) Penn Hills Borough, Beechtree Road Box Culvert Bridge, Bridge Rehabilitation

100,000

(47) Whitaker Borough, Rankin Bridge, Bridge Rehabilitation

100,000

(48) Swissvale Borough, Kenmaur Bridge connecting Swissvale and Rankin, Bridge Replacement

320,000

(Base Construction Allocation - $270,000)

(Design and Contingencies - $50,000)

(49) Wilkins Township, Brown Avenue Bridge over Brown Run, Bridge Replacement

475,000

(Base Construction Allocation - $380,000)

(Design and Contingencies - $95,000)

(50) Wilkins Township, Ivy Street Bridge over Brown Run, Bridge Replacement

268,000

(Base Construction Allocation - $214,000)

(Design and Contingencies - $54,000)

(51) Wilkins Township, Baker Street Bridge over Chalfant Run, Bridge Replacement

205,000

(Base Construction Allocation - $164,000)

(Design and Contingencies - $41,000)

(52) Upper St. Clair Township, Walther Lane Bridge, Bridge Replacement

700,000

(Base Construction Allocation - $650,000)

(Design and Contingencies - $50,000)

(53) Green Tree Borough, Trumball Drive Bridge over Wheeling and Lake Erie Railroad, Bridge Rehabilitation

575,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $75,000)

(54) City of Pittsburgh, Fancourt Street Bridge, Bridge Replacement

625,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $125,000)

(55) City of Pittsburgh, Fort Wayne Bridge over Allegheny River, Bridge Rehabilitation

100,000,000

(Base Construction Allocation - $90,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $9,000,000)

(56) City of Pittsburgh, Wabash Bridge at Stanwix Street over Monongahela River, Bridge Construction

175,000,000

(Base Construction Allocation - $150,000,000)

(Land Allocation - $10,000,000)

(Design and Contingencies - $15,000,000)

(57) City of Pittsburgh, Northshore/Central Business District Bridge over Allegheny River, Bridge Construction

65,000,000

(Base Construction Allocation - $50,000,000)

(Land Allocation - $10,000,000)

(Design and Contingencies - $5,000,000)

(58) City of Pittsburgh, Airport Busway/HOV Bridge over Ohio River (Brunot Island), Bridge Construction

185,000,000

(Base Construction Allocation - $150,000,000)

(Land Allocation - $20,000,000)

(Design and Contingencies - $15,000,000)

(59) City of Pittsburgh, South Millvale Street Bridge over East Busway/Conrail, Bridge Rehabilitation

5,000,000

(Base Construction Allocation - $5,000,000)

(60) Carnegie Borough, Carnegie Pedestrian Mall Bridge, Conversion from Pedestrian Bridge to Vehicular Bridge

850,000

(Base Construction Allocation - $850,000)

(61) Jefferson Borough, State Street Bridge Reconstruction

100,000

(Base Construction Allocation - $100,000)

(62) City of Pittsburgh, Fort Wayne Bridge Rehabilitation and Conversion for L.R.T. Vehicles

20,000,000

(Base Construction Allocation - $18,000,000)

(Design and Contingencies - $2,000,000)

(63) City of Pittsburgh, Fan Court Street Bridge, Bridge Reconstruction

650,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $150,000)

(64) City of Pittsburgh, South Millvale Avenue Bridge, Bridge Reconstruction

5,500,000

(Base Construction Allocation - $5,000,000)

(Design and Contingencies - $500,000)

(65) City of Pittsburgh, West Ohio Street Bridge, Bridge Reconstruction

3,575,000

(Base Construction Allocation - $3,250,000)

(Design and Contingencies - $325,000)

(66) City of Pittsburgh, McArdle Viaduct No.1, Bridge Reconstruction

3,850,000

(Base Construction Allocation - $3,500,000)

(Design and Contingencies - $350,000)

(67) City of Pittsburgh, McArdle Viaduct No.2, Bridge Reconstruction

3,850,000

(Base Construction Allocation - $3,500,000)

(Design and Contingencies - $350,000)

(68) City of Pittsburgh, Carnahan Road Bridge, Bridge Reconstruction

428,000

(Base Construction Allocation - $345,000)

(Design and Contingencies - $83,000)

(69) City of Pittsburgh, Second Avenue Bridge, Bridge Reconstruction

322,000

(Base Construction Allocation - $322,000)

(70) City of Pittsburgh, South Highland Avenue Bridge, Bridge Reconstruction

5,040,000

(Base Construction Allocation - $4,600,000)

(Design and Contingencies - $440,000)

(71) South Park Township, Catfish Run Bridge No.10, Bridge Replacement

210,000

(Base Construction Allocation - $175,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(72) Jefferson Borough, McRoberts Run Bridge No.6, Bridge Replacement

297,000

(Base Construction Allocation - $200,000)

(Land Allocation - $12,000)

(Design and Contingencies - $85,000)

(73) Indiana Township, Crawford Run Bridge No.2, Bridge Replacement

299,000

(Base Construction Allocation - $215,000)

(Land Allocation - $9,000)

(Design and Contingencies - $75,000)

(74) Monroeville Borough, Dirty Camp Run Bridge No.9, Bridge Replacement

315,000

(Base Construction Allocation - $225,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(75) City of McKeesport, Long Run Bridge No.8, Bridge Replacement

285,000

(Base Construction Allocation - $190,000)

(Land Allocation - $15,000)

(Design and Contingencies - $80,000)

(76) Ross Township, South Branch Pine Creek, Bridge No.10, Bridge Replacement

297,000

(Base Construction Allocation - $200,000)

(Land Allocation - $12,000)

(Design and Contingencies - $85,000)

(77) Sewickley Hills Borough, Kilbuck Run Bridge No.13, Bridge Replacement

405,000

(Base Construction Allocation - $300,000)

(Land Allocation - $15,000)

(Design and Contingencies - $90,000)

(78) Leetsdale Borough, Beaver Road Bridge No.1 over Big Sewickley Creek, Bridge Replacement

420,000

(Base Construction Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $110,000)

(79) Edgeworth Borough, Beaver Street Bridge No.1 over Little Sewickley Creek, Bridge Replacement

358,000

(Base Construction Allocation - $250,000)

(Land Allocation - $8,000)

(Design and Contingencies - $100,000)

(80) South Park Township, Sleepy Hollow Road Bridge No.1, Bridge Replacement

295,000

(Base Construction Allocation - $200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $90,000)

(81) Penn Hills, Lincoln Road Bridge No.6 over Sandy Creek, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(82) Penn Hills, Lincoln Road Bridge No.12 over Sandy Creek, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(83) South Park Township, Cochran's Mill Road Bridge No.9 over Licks Run, Bridge Replacement

215,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $60,000)

(84) Forward Township, Pangburn Hollow Road Bridge No.10 over Pangburn Run, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(85) Hampton Township, Duncan Avenue Bridge No.29 over Pine Creek, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(86) Ross Township, Thompson Run Road Bridge No.7 over Pine Creek, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $8,000)

(Design and Contingencies - $42,000)

(87) Penn Hills, Lincoln Road Bridge No.5 over Ryan's Run, Bridge Replacement

190,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(88) Penn Hills, Lincoln Road Bridge No.7 over Sandy Creek, Bridge Replacement

195,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $40,000)

(89) Hampton Township, Duncan Avenue Bridge No.1 over Stillhouse Run, Bridge Replacement

230,000

(Base Construction Allocation - $170,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(90) Collier Township, Thom's Run Bridge No.4, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(91) Collier Township, Thom's Run Bridge No.5, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(92) Collier Township, Thom's Run Bridge No.9, Bridge Replacement

180,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(93) North Versailles Township, Crooked Run Bridge No.3, Bridge Replacement

170,000

(Base Construction Allocation - $130,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(94) Forward Township, Roberts Hollow Road Bridge No.5 over Fallen Timber Run, Bridge Replacement

200,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $30,000)

(95) Sewickley Heights Borough, Blackburn Road Bridge No.16 over Kilbuck Run, Bridge Replacement

145,000

(Base Construction Allocation - $110,000)

(Land Allocation - $5,000)

(Design and Contingencies - $30,000)

(96) Jefferson Borough, Coal Valley Road Bridge No.2 over McRoberts Run, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(97) Jefferson Borough, Coal Valley Road Bridge No.4 over McRoberts Run, Bridge Replacement

200,000

(Base Construction Allocation - $150,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(98) Penn Hills, Mt. Carmel Road Bridge No.14 over Sandy Creek, Bridge Replacement

230,000

(Base Construction Allocation - $170,000)

(Land Allocation - $10,000)

(Design and Contingencies - $50,000)

(99) Harrison Township, Natrona Road Bridge No.12 over Small Branch of Allegheny River, Bridge Replacement

210,000

(Base Construction Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(100) Borough of Rankin and Borough of Whitaker, Rankin Hot Metal Bridge over the Monongahela River, Bridge Rehabilitation

2,550,000

(Base Construction Allocation - $2,050,000)

(Design and Contingencies - $500,000)

(101) South Fayette Township, Millers Run, W&LE Railroad Overpass, Bridge Rehabilitation

350,000

(Base Construction Allocation - $330,000)

(Design and Contingencies - $20,000)

(102) Jefferson Township, W&LE Railroad Bridge over Peter Creek Road, Rehabilitate and Rebuild W&LE, Clairton Branch Bridge

380,000

(Base Construction Allocation - $345,000)

(Design and Contingencies - $35,000)

(103) Robinson Township, Steubenville Pike Bridge over Chartiers Creek, Bridge Replacement

85,000

(104) North Fayette Township, Noblestown Road, Bridge over Robinson Run, Superstructure Replacement

75,000

(105) Findlay Township, Santiago Road Bridge over Montour Run, Replace Super and Repair Sub

50,000

(106) Findlay Township, Potato Garden Road Bridge over Potato Garden Road, Replace Structure and Widen

75,000

(107) North Fayette Township, North Branch Road Bridge No.1 over Robinson Run, Structure Replacement

93,000

(108) North Fayette Township, North Branch Road Bridge No.2 over Robinson Run, Replace Super and Repair Sub

94,000

(109) Economy Borough, Big Sewickley Creek Road Bridge over Big Sewickley Creek, Bridge Rehabilitation

19,000

(110) Sewickley Borough, Bridge over Ohio River, Bridge Painting

701,000

(111) City of Pittsburgh, Bridge over Ohio River, Bridge Painting

1,101,000

(112) Moon Township, Beaver Grade Road Bridge over Montour Run, Deck Replacement Super/Sub Repairs

457,000

(113) City of Pittsburgh, South Hills Connector, Wabash Tunnel to Banksville Road and Parkway West over Saw Mill Run, Bridge Construction

90,000,000

(Base Construction Allocation - $50,000,000)

(Land Allocation - $30,000,000)

(Design and Contingencies - $10,000,000)

(114) Fox Chapel Borough, Rockwood Drive Bridge over Dry Stream Bed, Bridge Repainting

40,000

(Base Construction Allocation - $35,000)

(Design and Contingencies - $5,000)

(115) Shaler Township, Dravo Street Bridge over Girty's Run, Bridge Replacement

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(116) Hampton Township, South Pioneer's Road, Bridge No.1 over Crouse Creek, Bridge Replacement

85,000

(Base Construction Allocation - $75,000)

(Design and Contingencies - $10,000)

(117) Hampton Township, South Pioneer's Road, Bridge No.2 over Crouse Creek, Bridge Replacement

85,000

(Base Construction Allocation - $75,000)

(Design and Contingencies - $10,000)

(118) City of Pittsburgh, Ellsworth Avenue Bridge over Martin Luther King Busway and Rail, Bridge Replacement

3,300,000

(Base Construction Allocation - $3,000,000)

(Design and Contingencies - $300,000)

(b) State Bridges

(1) SR 0028, Etna Bridge, Northbound Bridge No.4 to Existing SR 0028, Etna Borough, Shaler Township, Sharpsburg Borough and O'Hara Township, Bridge Rehabilitation

7,415,000

(Base Construction Allocation - $7,115,000)

(Land Allocation - $300,000)

(2) SR 0028, Etna Bridge to 62nd Street Bridge, Etna Borough, Shaler Township, Sharpsburg Borough and O'Hara Township, Bridge Rehabilitation

17,222,000

(Base Construction Allocation - $17,022,000)

(Land Allocation - $200,000)

(3) SR 0030, Ardmore Westbound Electric over SR 2112, Chalfant Borough, Bridge Replacement

3,100,000

(Base Construction Allocation - $3,000,000)

(Design and Contingencies - $100,000)

(4) SR 0030, Ardmore Eastbound Electric over SR 2112, Chalfant Borough, Bridge Replacement

2,500,000

(Base Construction Allocation - $2,400,000)

(Design and Contingencies - $100,000)

(5) SR 0030, Ardmore Boulevard Bridge No.1 over Falls Run, North of SR 8012 Interchange, Forest Hills Borough, Bridge Replacement

550,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(6) SR 0048, Boston Hollow Road Bridge over Unnamed Stream, North of Lincoln Borough, Elizabeth Borough, Bridge Replacement

340,000

(Base Construction Allocation - $200,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(7) SR 0050, Bridge over Chartiers Creek, Northbound Lane, Heidelberg Borough, Scott Township, Bridge Rehabilitation

3,750,000

(Base Construction Allocation - $3,300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $400,000)

(8) SR 0060, South Main Street Bridge over Saw Mill Run, South of West End Circle, City of Pittsburgh, Bridge Painting

178,000

(Base Construction Allocation - $173,000)

(Design and Contingencies - $5,000)

(9) SR 0130, Tri-Borough Extended Bridge over Patton Street at SR 8076 Interchange, Wilmerding Borough, Bridge Rehabilitation

505,000

(Base Construction Allocation - $400,000)

(Land Allocation - $30,000)

(Design and Contingencies - $75,000)

(10) SR 0148, Bridge over Crooked Run Creek near SR 2037, White Oak Borough, Bridge Replacement

350,000

(Base Construction Allocation - $200,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(11) SR 0791, Bridge over Chalfant Run at SR 2048, Wilkins Township, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(12) SR 0837, Northbound Ramp A to SR 0885 Southbound, City of Pittsburgh, Bridge Rehabilitation

1,350,000

(Base Construction Allocation - $1,250,000)

(Design and Contingencies - $100,000)

(13) SR 0978, Miller's Run Road Bridge over Dolphin Run, South Fayette Township, Bridge Replacement

300,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $100,000)

(14) SR 1001, West 7th Avenue Bridge over Bull Creek, Tarentum Borough, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $100,000)

(15) SR 1011, Guys Run Road Bridge over Guys Run, North of SR 0028, Harmar Township, Bridge Replacement

350,000

(Base Construction Allocation - $200,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(16) SR 2001, Glassport-Elizabeth Road Bridge over Burns Run, North of Elizabeth Township, Lincoln Borough, Bridge Replacement

350,000

(Base Construction Allocation - $200,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(17) SR 2081, Turtle Creek-Monroeville Road over US 22 Business, Monroeville Borough, Bridge Replacement

1,060,000

(Base Construction Allocation - $960,000)

(Design and Contingencies - $100,000)

(18) SR 2094, Jerome Street Bridge over SR 2027, Youghiogheny River, McKeesport Borough, Bridge Rehabilitation

4,600,000

(Base Construction Allocation - $4,500,000)

(Design and Contingencies - $100,000)

(19) SR 3066, Steubenville Pike Bridge over US 22, North Fayette Township, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $25,000)

(Design and Contingencies - $75,000)

(20) SR 3069, Liberty Tunnel Airshaft between SR 0051 and Liberty Bridge, City of Pittsburgh, Airshaft Restoration

1,570,000

(Base Construction Allocation - $1,370,000)

(Design and Contingencies - $200,000)

(21) SR 3104, McKees Rocks Sidewalk over Harriet Street, McKees Rocks Borough, Bridge Rehabilitation

6,800,000

(Base Construction Allocation - $6,700,000)

(Design and Contingencies - $100,000)

(22) SR 4036, Big Sewickley Creek Road over Big Sewickley Creek at SR 2003, Bell Acres Borough, Bridge Rehabilitation

500,000

(Base Construction Allocation - $400,000)

(Land Allocation - $25,000)

(Design and Contingencies - $75,000)

(23) SR 8043, Southbound Ramp Bridge over SR 0019 and SR 0065, City of Pittsburgh, Bridge Rehabilitation

2,400,000

(Base Construction Allocation - $2,100,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(24) SR 8045, Ramp at Stadium over SR 0065 and Stadium Drive, City of Pittsburgh, Bridge Rehabilitation

600,000

(Base Construction Allocation - $600,000)

(25) SR 8049, SR 0019 Bridge Ramp, Chateau Street to SR 0019, City of Pittsburgh, Bridge Rehabilitation

2,350,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(26) SR 8049, Bridge Ramp from SR 0065 Northbound to SR 0019, City of Pittsburgh, Bridge Rehabilitation

2,850,000

(Base Construction Allocation - $2,500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $300,000)

(27) SR 8049, I-279 Bridge Ramp to SR 0065 Northbound, City of Pittsburgh, Bridge Rehabilitation

1,730,000

(Base Construction Allocation - $1,500,000)

(Land Allocation - $30,000)

(Design and Contingencies - $200,000)

(28) SR 0030, Ardmore Boulevard Bridge No.2 over Falls Run, North of SR 8012 Interchange, Forest Hills Borough, Bridge Replacement

550,000

(Base Construction Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(29) SR 3004, McLaughlin Road Bridge over McLaughlin Run, Bridgeville Borough, Bridge Replacement

227,000

(Base Construction Allocation - $177,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(30) SR 0028, Northbound Bridge over Pennsylvania Turnpike, Harmar Township, Bridge Rehabilitation

344,000

(Base Construction Allocation - $314,000)

(Design and Contingencies - $30,000)

(31) SR 0028, Southbound Bridge over Pennsylvania Turnpike, Harmar Township, Bridge Rehabilitation

356,000

(Base Construction Allocation - $325,000)

(Design and Contingencies - $31,000)

(32) SR 0028, Northbound Bridge over SR 1028, Harrison Township, Bridge Rehabilitation

106,000

(Base Construction Allocation - $97,000)

(Design and Contingencies - $9,000)

(33) SR 0028, Southbound Bridge over SR 1028, Harrison Township, Bridge Rehabilitation

105,000

(Base Construction Allocation - $96,000)

(Design and Contingencies - $9,000)

(34) SR 0050, Washington Avenue Bridge over Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation

119,000

(Base Construction Allocation - $109,000)

(Design and Contingencies - $10,000)

(35) SR 0051, Clairton Boulevard Bridge over Lewis Run, Pleasant Hills Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(36) SR 0065, Ohio River Boulevard Bridge over Forest Avenue, Ben Avon Borough, Bridge Replacement

396,000

(Base Construction Allocation - $360,000)

(Design and Contingencies - $36,000)

(37) SR 0065, Bridge over Ramps, Railroad and Chateau Street, City of Pittsburgh, Bridge Rehabilitation

13,284,000

(Base Construction Allocation - $12,784,000)

(Design and Contingencies - $500,000)

(38) SR 0079, Neville Island Bridge over Ohio River, Neville Township, Bridge Rehabilitation

12,700,000

(Base Construction Allocation - $11,200,000)

(Design and Contingencies - $1,500,000)

(39) SR 0088, Library Road Bridge No.1 over Piney Fork Creek, Bethel Park Borough, Bridge Replacement

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(40) SR 0088, Library Road Bridge No.2 over Branch of Piney Fork Creek, Bethel Park Borough, Bridge Replacement

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(41) SR 0885, Mifflin Road Bridge over Branch of Streets Run, City of Pittsburgh, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(42) SR 0910, Gibsonia Road Bridge over Rawlins Run, Indiana Township, Bridge Deck Replacement

132,000

(Base Construction Allocation - $120,000)

(Design and Contingencies - $12,000)

(43) SR 1027, Pleasantville Road Bridge over Little Bull Creek, Harrison Township, Bridge Replacement

400,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $100,000)

(44) SR 1032, Burtner Road Bridge over Little Bull Creek, Harrison Township, Bridge Deck Replacement

198,000

(Base Construction Allocation - $180,000)

(Design and Contingencies - $18,000)

(45) SR 2008, Lovedale Road Bridge over Wylie Run Creek, Elizabeth Township, Bridge Replacement

430,000

(Base Construction Allocation - $300,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(46) SR 2017, Pineview Drive Bridge No.1 over Gillespie Run, Elizabeth Township, Bridge Deck Replacement

255,000

(Base Construction Allocation - $135,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(47) SR 2017, Pineview Drive Bridge No.2 over Gillespie Run, Elizabeth Township, Bridge Deck Replacement

243,000

(Base Construction Allocation - $123,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(48) SR 2018, West Smithfield Road Bridge over Unnamed Creek, Elizabeth Township, Bridge Deck Replacement

218,000

(Base Construction Allocation - $118,000)

(Design and Contingencies - $100,000)

(49) SR 2031, Lincoln Way Bridge over Long Run, White Oak Borough, Bridge Replacement

600,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $100,000)

(50) SR 2051, Brinton Road Bridge over I-376, Edgewood Borough, Bridge Rehabilitation

996,000

(Base Construction Allocation - $846,000)

(Design and Contingencies - $150,000)

(51) SR 4019, Mount Royal Boulevard Bridge over Pine Creek, Hampton Township, Bridge Rehabilitation

94,000

(Base Construction Allocation - $89,000)

(Design and Contingencies - $5,000)

(52) SR 4043, Big Sewickley Road Bridge over Branch of Big Sewickley Creek, Franklin Park Borough, Bridge Replacement

84,000

(Base Construction Allocation - $76,000)

(Design and Contingencies - $8,000)

(53) SR 8002, Crosstown Boulevard Bridge over Forbes and Diamond Street and Ramps, City of Pittsburgh, Bridge Painting

310,000

(Base Construction Allocation - $300,000)

(Design and Contingencies - $10,000)

(54) SR 8002, Ramp L Road Bridge over Forbes and Diamond Streets, City of Pittsburgh, Bridge Painting

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(55) SR 8015, Ramp D Road Bridge over Ohio River Back Channel, Neville Township, Bridge Rehabilitation

800,000

(Base Construction Allocation - $700,000)

(Design and Contingencies - $100,000)

(56) SR 8015, Ramp E Road Bridge over PC&Y Railroad, Neville Township, Bridge Rehabilitation

670,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $170,000)

(57) SR 8015, I-79 Ramp H Bridge over PC&Y Railroad, Neville Township, Bridge Rehabilitation

700,000

(Base Construction Allocation - $600,000)

(Design and Contingencies - $100,000)

(58) SR 8015, Ramp J Road Bridge over Neville Road, Neville Township, Bridge Rehabilitation

220,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $20,000)

(59) SR 8017, Ramp B2 Road Bridge over SR 4025 and SR 4033, Glenfield Borough, Bridge Rehabilitation

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(60) SR 8017, Ramp B Road Bridge over Ramp A and SR 4033, Glenfield Borough, Bridge Rehabilitation

120,000

(Base Construction Allocation - $110,000)

(Design and Contingencies - $10,000)

(61) SR 8017, Ramp B1 Road Bridge over SR 0065 Ramps A1 and R, Glenfield Borough, Bridge Rehabilitation

165,000

(Base Construction Allocation - $150,000)

(Design and Contingencies - $15,000)

(62) SR 8017, Ramp A Road Bridge over Ramp B3, Glenfield Borough, Bridge Rehabilitation

110,000

(Base Construction Allocation - $100,000)

(Design and Contingencies - $10,000)

(63) SR 0028, Etna Bridges, Phase III, Northbound Bridge No.4 to Existing SR 0028, Two Structures, Etna and Sharpsburg Boroughs, Bridge Rehabilitation

6,300,000

(Base Construction Allocation - $6,000,000)

(Land Allocation - $300,000)

(64) SR 0028, Etna Bridge, Phase II, Southbound Bridge No.3 and Northbound Bridge for SR 0008 Connection, Etna and Sharpsburg Boroughs and Shaler Township, Bridge Rehabilitation

13,200,000

(Base Construction Allocation - $12,200,000)

(Land Allocation - $1,000,000)

(65) SR 2013, Monessen-Elizabeth Road Bridge over Becketts Run, Forward Township, Bridge Replacement

450,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(66) SR 2016, Jefferson Heights Road Bridge over I-376, Wilkins Township, Bridge Reconstruction

1,600,000

(Base Construction Allocation - $1,200,000)

(Design and Contingencies - $400,000)

(67) SR 0008, Bridge over Allegheny River and Conrail, City of Pittsburgh, Bridge Painting

333,000

(Base Construction Allocation - $333,000)

(68) SR 0028, Allegheny Valley Expressway Bridge, Southbound over Burtner Road, Harrison Township, Bridge Rehabilitation

170,000

(Base Construction Allocation - $165,000)

(Design and Contingencies - $5,000)

(69) SR 0028, Allegheny Valley Expressway Bridge, Northbound over Burtner Road, Harrison Township, Bridge Rehabilitation

320,000

(Base Construction Allocation - $315,000)

(Design and Contingencies - $5,000)

(70) SR 0028, Allegheny Valley Expressway Bridge, Northbound over Bull Creek Road, Tarentum Borough, Bridge Rehabilitation

120,000

(Base Construction Allocation - $115,000)

(Design and Contingencies - $5,000)

(71) SR 0028, Allegheny Valley Expressway Bridge, Southbound over Bull Creek Road, Tarentum Borough, Bridge Rehabilitation

120,000

(Base Construction Allocation - $115,000)

(Design and Contingencies - $5,000)

(72) SR 0028, Allegheny Valley Expressway, Bridge over Scout Reservation Road, Sharpesburg Borough, Bridge Rehabilitation

1,000,000

(Base Construction Allocation - $850,000)

(Design and Contingencies - $150,000)

(73) SR 0079, Glenfield Bridge over Ramp A and SR 4033, Glenfield Borough, Bridge Rehabilitation

748,000

(Base Construction Allocation - $681,000)

(Design and Contingencies - $67,000)

(74) SR 0079, I-79 Bridge Northbound over Turnpike, Marshall Township, Bridge Painting

278,000

(Base Construction Allocation - $268,000)

(Design and Contingencies - $10,000)

(75) SR 0079, I-79 Bridge Southbound over Turnpike, Marshall Township, Bridge Painting

228,000

(Base Construction Allocation - $218,000)

(Design and Contingencies - $10,000)

(76) SR 0079, I-79 Neville Island Bridge over Ohio River, Neville Township, Bridge Rehabilitation

12,945,000

(Base Construction Allocation - $11,200,000)

(Land Allocation - $200,000)

(Design and Contingencies - $1,545,000)

(77) SR 0121, Green Tree Road Bridge over I-279, Parkway West, Green Tree Borough, Bridge Painting

192,000

(Base Construction Allocation - $165,000)

(Land Allocation - $10,000)

(Design and Contingencies - $17,000)

(78) SR 0376, I-376 Bridge Eastbound over Haymaker Road, Monroeville Borough, Bridge Painting

266,000

(Base Construction Allocation - $256,000)

(Design and Contingencies - $10,000)

(79) SR 0376, I-376 Bridge Westbound over Haymaker Road, Monroeville Borough, Bridge Painting

155,000

(Base Construction Allocation - $145,000)

(Design and Contingencies - $10,000)

(80) SR 0400, SR 0400, SR 4019 and SR 4042 Bridges, Structure Painting, Franklin Park Borough, Hampton Township and Pittsburgh, Bridge Painting

520,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $20,000)

(81) SR 0366, Tarentum Bridge over Allegheny River, Tarentum Borough, Bridge Rehabilitation

4,105,000

(Base Construction Allocation - $3,665,000)

(Design and Contingencies - $440,000)

(82) SR 0837, Eighth Avenue Bridge over Baldwin Road, West Homestead Borough, Bridge Replacement

2,529,000

(Base Construction Allocation - $2,258,000)

(Design and Contingencies - $271,000)

(83) SR 3078, Burgettstown Road Bridge over Potato Garden Road, Findlay Township, Bridge Replacement

148,000

(Base Construction Allocation - $120,000)

(Land Allocation - $10,000)

(Design and Contingencies - $18,000)

(84) SR 1010, Hart's Run Road Bridge over Branch of Hart's Run, Hampton Township, Bridge Replacement

520,000

(Base Construction Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(85) SR 1040, Bakerstown Road Bridge over Route 28, Tarentum Borough, Bridge Rehabilitation

275,000

(Base Construction Allocation - $270,000)

(Design and Contingencies - $5,000)

(86) SR 2065, Thompson Run Road Bridge over Union Railroad, Monroeville Borough, Bridge Replacement

550,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $50,000)

(87) SR 2074, Hulton Road Bridge over Caldwell Run, Penn Hills, Bridge Replacement

117,000

(Base Construction Allocation - $84,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(88) SR 2080, Plum Avenue Bridge over Plum Creek, Oakmont Borough, Bridge Painting

109,000

(Base Construction Allocation - $99,000)

(Design and Contingencies - $10,000)

(89) SR 2082, Hulton Bridge over Conrail and Allegheny River, Oakmont Borough and Harmar Township, Bridge Rehabilitation

550,000

(Base Construction Allocation - $450,000)

(Design and Contingencies - $100,000)

(90) SR 2084, Milltown Road Bridge over Plum Creek, Penn Hills, Bridge Painting

31,000

(Base Construction Allocation - $26,000)

(Design and Contingencies - $5,000)

(91) SR 2085, Birmingham Bridge over Mon River, CSX Railroad, City of Pittsburgh, Bridge Rehabilitation

1,455,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $5,000)

(Design and Contingencies - $250,000)

(92) SR 2114, Bowman Avenue Bridge over SR 1066, RPS G & E, Cliff Street, City of McKeesport, Bridge Rehabilitation

300,000

(Base Construction Allocation - $260,000)

(Design and Contingencies - $40,000)

(93) SR 3005, Mayview Road Bridge over Branch Chartiers Creek, South Fayette Township, Bridge Replacement

400,000

(Base Construction Allocation - $320,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(94) SR 3007, Walton Road Bridge over Branch of Lobbs Run, Jefferson Borough, Bridge Replacement

93,000

(Base Construction Allocation - $63,000)

(Land Allocation - $20,000)

(Design and Contingencies - $10,000)

(95) SR 3069, Liberty Bridge and Approach Ramps, Six Structures, City of Pittsburgh, Bridge Painting

1,000,000

(Base Construction Allocation - $900,000)

(Design and Contingencies - $100,000)

(96) SR 3104, Bridge over Ohio River, City of Pittsburgh, Bridge Painting

960,000

(Base Construction Allocation - $950,000)

(Design and Contingencies - $10,000)

(97) SR 4003, McKnight Road Bridge over Branch Pine Creek, Culvert Repair, McCandless Township, Bridge Replacement

978,000

(Base Construction Allocation - $850,000)

(Design and Contingencies - $128,000)

(98) SR 4025, Bridge over Ohio River, Sewickley Borough, Bridge Painting

610,000

(Base Construction Allocation - $600,000)

(Design and Contingencies - $10,000)

(99) SR 8037, Bridge and Ramp over Saw Mill Run, City of Pittsburgh, Bridge Painting

584,000

(Base Construction Allocation - $564,000)

(Design and Contingencies - $20,000)

(100) SR 0279, Fort Pitt Bridge over Monongahela River, City of Pittsburgh, Bridge Rehabilitation

1,800,000

(Base Project Allocation - $1,800,000)

(101) SR 1015, Russellton Road Railroad Bridge, Indiana Township, Bridge Replacement

5,000,000

(Base Construction Allocation - $4,000,000)

(Land Allocation - $500,000)

(Design and Contingencies - $500,000)

(102) SR 2058, Hulton Road Bridge over Allegheny River, Oakmont Borough and Harmar Township, Expand to Four Lanes, Bridge Replacement

125,000,000

(103) SR 0048, Lincoln Way Bridge over Unknown Stream, White Oak Borough, Bridge Reconstruction

250,000

(104) SR 0048, McKee Road Bridge over Unknown Stream, White Oak Borough, Bridge Reconstruction

300,000

(105) Various Bridges, Allegheny and Beaver Counties, Bridge Rehabilitation

8,000,000

(Base Construction Allocation - $7,200,000)

(Design and Contingencies - $800,000)

(106) SR 0079, I-79 Northbound over TR 51, Robinson Township, New Deck and Paint

890,000

(107) Birmingham Bridge and Ramps, City of Pittsburgh, Bridge Rehabilitation

1,904,000

(108) Smithfield Street Bridge over Monongahela River and P&LE Railroad, City of Pittsburgh, Bridge Painting

140,000

(109) Fort Duquesne Bridge Ramp over Ramp D, City of Pittsburgh, Bridge Rehabilitation

185,000

(110) Fort Duquesne Bridge Ramp Southbound over Ramp D, Allegheny River, City of Pittsburgh, Bridge Rehabilitation

262,000

(111) SR 0022/0030, 22/30 Expressway, North Fayette Township, Bridge Preservation

1,000,000