Section 315. Chester County.
Projects are as follows:
(1) SR 29, Additional Right and Left Turning Lanes, PA 29 Phase III, East Whiteland and Charlestown Townships
2,950,000
(Base Project Allocation - $1,900,000)
(Land Allocation - $400,000)
(Design and Contingencies - $650,000)
(2) SR 202, Roadway and Bridge Reconstruction, US 202, Exton Bypass - Route 29, East Whiteland Township
14,200,000
(Base Project Allocation - $14,200,000)
(3) SR 1002, Improve Hazardous and Congested Intersection by Eliminating Offset and Adding Left Turn Lanes, Swedesford at Valley Road, Tredyffrin Township
160,000
(Base Project Allocation - $160,000)
(4) SR 1055, Construct Two-Lane or Three-Lane Highway on New Alignment, Eagle Loop Road, South Link, Upper Uwchlan Township
1,020,000
(Base Project Allocation - $1,020,000)
(5) SR 2020/SR 3053, Extension of SR 2020, Boot Road, to SR 3053, Viaduct Avenue, Borough of Downingtown
4,600,000
(Base Project Allocation - $3,700,000)
(Design and Contingencies - $900,000)
(6) US 30, Reconstruction, Including Travel Lanes and Shoulders, from PA 10 to US 30 Business
1,000,000
(Base Project Allocation - $1,000,000)
(7) US 202, Section 100 of US 202, Additional Lane in Each Direction, Construct Grade Separation Interchanges
180,000,000
(Base Project Allocation - $180,000,000)
(8) US 202, Paving Corridor from Delaware Border to High Street, West Chester
800,000
(Base Project Allocation - $800,000)
(9) PA 100, Provide Four Through Lanes on PA 100 by Constructing Two Through Lanes to the East of Ludwigs Corner
1,000,000
(Base Project Allocation - $1,000,000)
(10) French Creek Parkway, Design and Construct the French Creek Parkway and Connector Roads, Phoenixville
1,250,000
(Base Project Allocation - $1,250,000)
(11) PA-100, Corridor Improvements, Security Wall along the West Side of Route 100 Spur Between Kirkland Road and Greenhill Road, West Goshen Township
2,500,000
(Base Project Allocation - $2,500,000)
(12) SR-52, Roundabout Construction, Route 52
650,000
(Base Project Allocation - $650,000)