Section 302. Allegheny County.
(a) North Shore Roadway
(1) Roadway and Pedestrian Improvements
4,001,000
(Base Project Allocation - $3,201,000)
(Land Allocation - $400,000)
(Design and Contingencies - $400,000)
(b) I-376
(1) PA 130 to I-76, Pavement Rehabilitation and Safety Improvements
500,000
(Base Project Allocation - $447,000)
(Land Allocation - $3,000)
(Design and Contingencies - $50,000)
(2) I-376 Access Ramp, Construction of an Off-Ramp from Parkway East to Pittsburgh Technology Center Site
12,000,000
(3) Grant Street to Greensburg Parkway, Restoration
2,300,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $300,000)
(4) Pennsylvania Turnpike to Squirrel Hill Tunnel, Intelligent Transportation Systems Improvements
5,100,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $100,000)
(c) PA 19
(1) Gilkeson Road to Cochran Road, Pavement Rehabilitation and Safety Improvements
450,000
(Base Project Allocation - $450,000)
(d) Fort Duquesne Boulevard
(1) Realignment of Fort Duquesne Boulevard
8,400,000
(e) Liberty Avenue
(1) Reconstruction of Liberty Avenue
6,600,000
(f) North Shore Drive
(1) Relocation of North Shore Drive to the North Side of Three Rivers Stadium Site in Order to Open Access to the Riverfront
8,100,000
(g) I-79
(1) Completion of the Interchange at I-79 and SR 0060 to Permit Easier Access to Airport
10,000,000
(2) Design and Construction of an Interchange at I-79 and Parkway West to Permit Easier Access to and from the Airport and I-79
43,400,000
(Base Project Allocation - $40,000,000)
(Design and Contingencies - $3,400,000)
(3) Construct Missing Link Between I-79 and Parkway West
16,000,000
(4) Groveton to Glenfield, Phase I Highway and Bridge Rehabilitation
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(5) Groveton to Glenfield, Phase II Highway and Bridge Rehabilitation
1,320,000
(Base Project Allocation - $1,120,000)
(Design and Contingencies - $200,000)
(6) I-79 Corridor from West Virginia State Line to Erie, Intelligent Transportation Systems Improvements
3,100,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $100,000)
(h) US 22/30
(1) Reconstruction of US 22/30 Between Imperial Exit and McDonald Exit
15,000,000
(2) Washington County Line to US 30, Pavement Restoration
13,000,000
(Base Project Allocation - $12,900,000)
(Design and Contingencies - $100,000)
(i) SR 0028
(1) Widen SR 0028 Between Downtown and 40th Street Bridge
30,000,000
(2) Blawnox to Powers Run Road, O'Hara Township, Pavement Rehabilitation, Resurface and Safety Improvement
621,000
(Base Project Allocation - $540,000)
(Design and Contingencies - $81,000)
(3) Ravine to Blawnox, O'Hara Township, Pavement Rehabilitation, Resurface and Safety Improvements
770,000
(Base Project Allocation - $670,000)
(Design and Contingencies - $100,000)
(j) SR 0051
(1) Reconstruction of Intersection of SR 0051 and SR 0088
14,518,000
(2) SR 0088 to SR 3104, 51 Signals, Signal Improvements
45,000
(Base Project Allocation - $37,000)
(Land Allocation - $1,000)
(Design and Contingencies - $7,000)
(3) Liberty Tunnels to Lebanon Church Road, Pavement Restoration and Safety Improvements
700,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $100,000)
(4) McKees Rocks Bridge Intersection, Widen and Signalization
44,000
(Base Project Allocation - $31,000)
(Land Allocation - $7,000)
(Design and Contingencies - $6,000)
(5) Southbound, Robert Hollow Road to Payday, Pavement Rehabilitation and Safety Improvements
320,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $20,000)
(6) SR 2040 to SR 0088, Construct 200-Space Park-and-Ride Lot
124,000
(Base Project Allocation - $120,000)
(Land Allocation - $2,000)
(Design and Contingencies - $2,000)
(7) Woodruff Connector, Miscellaneous Improvements
158,000
(Base Project Allocation - $28,000)
(Land Allocation - $127,000)
(Design and Contingencies - $3,000)
(8) Construct Park-and-Ride Lot, Brentwood
27,000
(Base Project Allocation - $20,000)
(Land Allocation - $4,000)
(Design and Contingencies - $3,000)
(k) Smithfield Street
(1) Reconstruction of the Smithfield Street Bridge to Support Retail Activity
18,000,000
(l) Wood Street
(1) Reconstruction of Wood Street to Support Retail Activities
27,000,000
(m) Fifth and Forbes Reconstruction
(1) Reconstruction to Fifth and Forbes Avenue Corridor to Promote Retail Development
12,000,000
(n) Golden Triangle Intermodal Facility/LRT Station
(1) Development of a New Intermodal Facility and Transit Stop to Serve the Retail Centers in Downtown
13,000,000
(o) North Side Intermodal Facility
(1) Development of a Major Commuter Interceptor Intermodal Facility and Transit Station on the North Side
34,420,000
(p) Findlay Connector
(1) Construction of Highway Connection Between Pittsburgh International Airport and Route 22 West in Order to Assist the Development of the Airport Technology Center
135,000,000
(q) Cargo Interchange
(1) Development of State-of-the-Art Cargo Interchange Facility at the Cargo Terminal of the Greater Pittsburgh International Airport to Support Regional Business Growth in Global Markets
16,000,000
(r) Lawrenceville Industrial Access Road
(1) Construction of a Highway Bypass to Permit Truck and Passenger Cars Easier Access into and through the Lawrenceville Industrial and Commercial Areas
46,800,000
(s) Mon-Fayette Expressway
(1) Construction of the Mon-Fayette Expressway from Pittsburgh to Route 51
700,000,000
(2) Construction to Penn Hills
2,000,000
(t) Multi-Modal Corridor
(1) Transportation System Connecting Downtown Pittsburgh with the Greater Pittsburgh International Airport
363,750,000
(u) Tech World/Airport Transit Connection
(1) Creation of a Transit Connection Between the Airport Technology Center and the Greater Pittsburgh International Airport
135,000,000
(v) Settlers Cabin Interchange
(1) Construction of a New Interchange Along Parkway West in Robinson Township
10,750,000
(w) South Portal of Liberty Tubes
(1) Construction of a New Free-Flowing Intersection to Accommodate Traffic Flow
23,450,000
(x) Ewing Interchange
(1) Construction of a New Interchange Along Parkway West in Moon Township Adjacent to the Pittsburgh International Airport
16,350,000
(y) West End Circle
(1) Purchase of a Portion of West End Branch of Wheeling and Lake Erie Railway Right-of-Way to Accommodate West End Circle Project of PennDOT and Reconstruct Railroad Interchange with CSXT via the Pittsburgh Industrial Railroad South of Bridgeville between Milepost 57 and Milepost 61
12,800,000
(Land Allocation - $12,500,000)
(Design and Contingencies - $300,000)
(z) Pittsburgh Transportation Corridor
(1) Purchase Wheeling and Lake Erie Railway Main Right-of-Way from Rook Yard (Milepost 56 to Longview Milepost 46) to Create Two New Transportation Corridors to Downtown Pittsburgh
18,400,000
(Land Allocation - $18,000,000)
(Design and Contingencies - $400,000)
(aa) Pittsburgh Technology Center
(1) Construction of an Access Road between Pittsburgh Technology Center and South Side of LTV Site
5,000,000
(bb) SR 3009
(1) Improvement of Intersection of SR 3009, Baptist Road, and SR 2040, Broughton Road, Bethel Park
1,200,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(cc) SR 2040 to SR 88
(1) 200-Space Park'n Ride Lot
124,000
(Base Project Allocation - $120,000)
(Land Allocation - $2,000)
(Design and Contingencies - $2,000)
(dd) I-279
(1) Connector to I-376, City of Pittsburgh, New Construction
3,120,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $320,000)
(2) Banksville Interchange, Road Widening and Restoration
98,000
(Base Project Allocation - $65,000)
(Land Allocation - $4,000)
(Design and Contingencies - $29,000)
(3) City of Pittsburgh to Ross Township, Safety Improvements, Automate HOV Lane
610,000
(Base Project Allocation - $535,000)
(Design and Contingencies - $75,000)
(4) Slope Erosion in Franklin Park Borough, Ohio and Ross Townships, Miscellaneous, Slope Erosion and Movement
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(5) Milepost 6 North to I-79, Pavement Rehabilitation and Safety Improvements
1,300,000
(Base Project Allocation - $1,163,000)
(Land Allocation - $7,000)
(Design and Contingencies - $130,000)
(6) MSE Wall at Jacks Run, Wall Rehabilitation
95,000
(Base Project Allocation - $70,000)
(Design and Contingencies - $25,000)
(7) Mt. Nebo Road Slide in Ohio Township, Miscellaneous, Slide Remediation
222,000
(Base Project Allocation - $190,000)
(Design and Contingencies - $32,000)
(8) Service Road A, Ohio Township, Miscellaneous, Slope Movement Remediation
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(9) Macaleer Road Bridge to Bear Run, Slope Instability, Miscellaneous, Slope Stabilization
65,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $10,000)
(10) Construction of New Exit and Entrance Ramps for the North Shore Expressway, I-279 near Intersection with Federal Street, City of Pittsburgh
18,000,000
(ee) SR 2046
(1) Widen and Realign Intersection of Streets Run Road at Prospect Road in Baldwin Borough
300,000
(2) Streets Run Road Highway and Bridge Rehabilitation
125,000
(Base Project Allocation - $110,000)
(Land Allocation - $5,000)
(Design and Contingencies - $10,000)
(ff) SR 2120
(1) Widen Intersection of Brinton Road and Yost Boulevard in Braddock Hills Borough
75,000
(gg) SR 22
(1) Realign and Correct Slide of William Penn Highway in Churchill Borough
3,000,000
(hh) SR 837
(1) Add Additional Lanes to SR 837 in Homestead Borough
50,000
(ii) SR 2064
(1) Realign and Stabilize Lime Hollow Road in Penn Hills Borough
200,000
(jj) SR 0791
(1) Add Turning Lane on Rodi Road at Hoover Road in Penn Hills Borough
500,000
(2) Add Turning Lane on Rodi Road at Duff Road in Penn Hills Borough
500,000
(3) Add Turning Lane on Rodi Road at Stoneledge in Penn Hills Borough
500,000
(kk) Lawrenceville Industrial Access Road
(1) Construction of a 2-Lane, 38-Mile Access Highway along the Allegheny River Between 21st and 62nd Streets in the City of Pittsburgh's Lawrenceville Neighborhood
50,000,000
(ll) Liberty Way
(1) Reconstruction of Liberty Way in Liberty Borough
250,000
(Base Project Allocation - $175,000)
(Land Allocation - $25,000)
(Design and Contingencies - $50,000)
(mm) SR 1001
(1) Intersection with Corbet Street in Tarentum Borough, Installation of Traffic Signals
100,000
(Base Project Allocation - $80,000)
(Design and Contingencies - $20,000)
(nn) North Shore/Central Business District Transportation Improvement Project
(1) Regional Highway Access Improvements on Pittsburgh's North Shore, Including Ramp Connections with the Regional Highway System
7,756,000
(Base Project Allocation - $6,975,000)
(Design and Contingencies - $775,000)
(oo) SR 3160
(1) White Swan to Beaver County Line, Pavement Restoration
6,800,000
(Base Project Allocation - $6,700,000)
(Design and Contingencies - $100,000)
(2) Hangar Road to Southern Expressway, Pavement Rehabilitation and Safety Improvements
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(pp) PA 48
(1) Intersection with PA 130, Monroeville, Intersection Improvements
1,500,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $250,000)
(Design and Contingencies - $250,000)
(qq) PA 130
(1) Electric Avenue to Thomas Street, Pavement Rehabilitation and Safety Improvements
621,000
(Base Project Allocation - $540,000)
(Design and Contingencies - $81,000)
(rr) PA 837
(1) Duquesne-McKeesport Bridge to North 2nd Street, Pavement Rehabilitation and Safety Improvements
450,000
(Base Project Allocation - $410,000)
(Design and Contingencies - $40,000)
(ss) SR 1001
(1) Freeport Road, North Kensington Bridge to Tarentum Bridge, Pavement Restoration
1,852,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $152,000)
(tt) SR 4003
(1) McKnight Road from Nelson Run to Houston Road, Pavement Restoration
415,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $15,000)
(uu) SR 0000
(1) Campbells Run Road, Robinson Township, Construct Park-and-Ride Lot
66,000
(Base Project Allocation - $40,000)
(Land Allocation - $20,000)
(Design and Contingencies - $6,000)
(vv) Lorish Road
(1) Lorish Road, Kennedy Township, Construct Park-and-Ride Lot
44,000
(Base Project Allocation - $35,000)
(Land Allocation - $4,000)
(Design and Contingencies - $5,000)
(ww) PA 148
(1) McKeesport-Duquesne Bridge, Access Improvements
1,000,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design and Contingencies - $100,000)
(xx) US 30
(1) Widening and Installation of Median Barriers and Reconstruction from the Westinghouse Bridge to North Braddock Line
5,800,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $350,000)
(Design and Contingencies - $450,000)
(2) Five Points Intersection with SR 3066 and West Allegheny Road, North Fayette Township, Intersection Improvement
875,000
(Base Project Allocation - $760,000)
(Land Allocation - $35,000)
(Design and Contingencies - $80,000)
(yy) East Liberty/Penn Circle Rehabilitation, City of Pittsburgh
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(zz) CRTRCS Phase 2, City of Pittsburgh
800,000
(Base Project Allocation - $650,000)
(Design and Contingencies - $150,000)
(aaa) McArdle Roadway Reconstruction, City of Pittsburgh
10,200,000
(Base Project Allocation - $9,200,000)
(Design and Contingencies - $1,000,000)
(bbb) Oakland Improvements
(1) Fifth Avenue, City of Pittsburgh
2,350,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $350,000)
(ccc) Oakland Improvements
(1) Forbes Avenue, City of Pittsburgh
800,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $100,000)
(ddd) River Avenue
(1) Reconstruction, City of Pittsburgh
4,900,000
(Base Project Allocation - $4,300,000)
(Design and Contingencies - $600,000)
(eee) Strawberry Way
(1) Improvements, City of Pittsburgh
3,850,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $350,000)
(fff) Wenzel Avenue
(1) Improvements, City of Pittsburgh
2,900,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $400,000)
(ggg) Rodi
(1) At Duff Intersection, Penn Hills
400,000
(2) At Hoover Intersection, Penn Hills
250,000
(hhh) I-579
(1) Exit Ramp off Veteran's Memorial Bridge South to SR 28, City of Pittsburgh
9,000,000
(iii) Old Route 60
(1) Pittsburgh Airport, Construct Grade-Separated Interchange
5,000,000
(Base Project Allocation - $4,000,000)
(Land Allocation - $500,000)
(Design and Contingencies - $500,000)