Act 78 of 2022, § 10, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2021-2022 - ENACTMENT.

Act 78 of 2022, § 10

Section 10. Berks County.

(a) Local Bridges

Local

State

(1) St. Lawrence Borough, Park View Road over Antietam Creek, Bridge Replacement, Bridge Key 5502, Project ID 10774

Project Allocation

442,500

(Base Project Allocation - $300,000)

(Land Allocation - $18,750)

(Design & Contingencies - $123,750)

(2) Exeter Township, SR 7214 over Antietam Creek, Bridge Replacement, Bridge Key 5358, Project ID 103884

Project Allocation

353,798

(Base Project Allocation - $247,500)

(Land Allocation - $10,500)

(Design & Contingencies - $95,798)

(3) Greenwich Township, SR 7215 over Tributary of Mill Creek, Bridge Replacement, Bridge Key 4978, Project ID 110011

Project Allocation

795,200

(Base Project Allocation - $490,000)

(Land Allocation - $25,200)

(Design & Contingencies - $280,000)

(4) Spring Township, SR 7237 over Lebanon Valley Branch of Norfolk Southern Railroad, Bridge Rehabilitation, Bridge Key 5456, Project ID 10727

Project Allocation

423,750

(Base Project Allocation - $300,000)

(Land Allocation - $18,750)

(Design & Contingencies - $105,000)

(5) Kutztown Borough, SR 7410 over Sacony Creek, Bridge Replacement, Bridge Key 5494, Project ID 102959

Project Allocation

566,700

(Base Project Allocation - $375,000)

(Land Allocation - $20,000)

(Design & Contingencies - $171,700)

(6) Shoemakersville Borough, SR 7419 over Pigeon Creek, Bridge Replacement, Bridge Key 5503, Project ID 56728

Project Allocation

427,500

(Base Project Allocation - $300,000)

(Land Allocation - $22,500)

(Design & Contingencies - $105,000)

(b) State Bridges

(1) SR 0010 over Tributary of Conestoga Creek, New Morgan Borough, Bridge Rehabilitation, Bridge Key 4566, Project ID 10943

Project Allocation

923,117

(Base Project Allocation - $234,000)

(Land Allocation - $35,000)

(Design & Contingencies - $654,117)

(2) SR 0061 over US 222, Muhlenberg Township, Bridge Rehabilitation, Bridge Key 4590, Project ID 110032

Project Allocation

2,750,000

(Base Project Allocation - $2,500,000)

(Design & Contingencies - $250,000)

(3) SR 0061 over Reading, Blue Mountain and Northern Railroad, Hamburg Borough, Bridge Rehabilitation, Bridge Key 4602, Project ID 10867

Project Allocation

1,296,400

(Base Project Allocation - $1,120,000)

(Land Allocation - $8,400)

(Design & Contingencies - $168,000)

(4) SR 0061 over Kaercher Creek, Hamburg Borough, Bridge Replacement, Bridge Key 4603, Project ID 10867

Project Allocation

2,592,800

(Base Project Allocation - $2,240,000)

(Land Allocation - $16,800)

(Design & Contingencies - $336,000)

(5) SR 0061 over Mill Creek, Hamburg Borough, Bridge Rehabilitation, Bridge Key 4604, Project ID 10867

Project Allocation

787,100

(Base Project Allocation - $680,000)

(Land Allocation - $5,100)

(Design & Contingencies - $102,000)

(6) SR 0061 over SR 4028, Schuylkill River and Reading, Blue Mountain and Northern Railroad, Hamburg Borough, Bridge Rehabilitation, Bridge Key 4605, Project ID 109894

Project Allocation

3,968,000

(Base Project Allocation - $3,498,000)

(Land Allocation - $150,000)

(Design & Contingencies - $320,000)

(7) SR 0061 over Bartram Section of Rail Trail, Tilden Township, Bridge Replacement, Bridge Key 4609, Project ID 96373

Project Allocation

9,041,841

(Base Project Allocation - $7,500,000)

(Land Allocation - $391,841)

(Design & Contingencies - $1,150,000)

(8) SR 0061 over Tributary of Schuylkill River, Ontelaunee Township, Bridge Restoration, Bridge Key 44381, Project ID 110032

Project Allocation

2,750,000

(Base Project Allocation - $2,500,000)

(Design & Contingencies - $250,000)

(9) SR 0065 over Little Swatara Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 4902, Project ID 85670

Project Allocation

810,000

(Base Project Allocation - $620,000)

(Land Allocation - $20,000)

(Design & Contingencies - $170,000)

(10) SR 0100 over Tributary of Perkiomen Creek, Bally Borough, Bridge Replacement, Bridge Key 4706, Project ID 114392

Project Allocation

3,450,000

(Base Project Allocation - $1,800,000)

(Design & Contingencies - $1,650,000)

(11) SR 0143 over Tributary of Maiden Creek, Greenwich Township, Bridge Replacement, Bridge Key 4717, Project ID 85632

Project Allocation

1,482,000

(Base Project Allocation - $750,000)

(Land Allocation - $32,000)

(Design & Contingencies - $700,000)

(12) SR 0143 over Tributary of Maiden Creek, Albany Township, Bridge Rehabilitation, Bridge Key 4722, Project ID 94317

Project Allocation

335,000

(Base Project Allocation - $170,000)

(Land Allocation - $15,000)

(Design & Contingencies - $150,000)

(13) SR 0176 over SR 0422, Cumru Township, Bridge Replacement, Bridge Key 4740, Project ID 72814

Project Allocation

8,112,639

(Base Project Allocation - $7,680,000)

(Land Allocation - $173,700)

(Design & Contingencies - $258,939)

(14) SR 0183 over Norfolk Southern Railroad, City of Reading, Bridge Replacement, Bridge Key 4741, Project ID 91091

Project Allocation

2,443,345

(Base Project Allocation - $1,131,508)

(Land Allocation - $1,006,400)

(Design & Contingencies - $305,437)

(15) SR 0183 over Little Northkill Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 4759, Project ID 91976

Project Allocation

1,690,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $40,000)

(Design & Contingencies - $650,000)

(16) SR 0183 over Tributary of Little Northkill Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 4760, Project ID 91976

Project Allocation

1,690,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $40,000)

(Design & Contingencies - $650,000)

(17) SR 0222 over Tulpehocken Creek and TR 602, Bern Township, Bridge Rehabilitation, Bridge Key 5191, Project ID 110032

Project Allocation

550,000

(Base Project Allocation - $500,000)

(Design & Contingencies - $50,000)

(18) SR 0222 over Tributary of Moselem Creek, Richmond Township, Bridge Replacement, Bridge Key 4797, Project ID 61972

Project Allocation

11,701,261

(Base Project Allocation - $6,000,000)

(Land Allocation - $955,610)

(Design & Contingencies - $4,745,651)

(19) SR 0222 over SR 8015 Ramp G, Maxatawny Township, Bridge Rehabilitation, Bridge Key 4810, Project ID 10829

Project Allocation

3,080,750

(Base Project Allocation - $2,325,000)

(Land Allocation - $2,000)

(Design & Contingencies - $753,750)

(20) SR 0222 over SR 8015 Ramp G, Maxatawny Township, Bridge Rehabilitation, Bridge Key 4811, Project ID 96371

Project Allocation

3,416,000

(Base Project Allocation - $2,425,000)

(Land Allocation - $1,000)

(Design & Contingencies - $990,000)

(21) SR 0419 over Tributary of Mill Creek, Tulpehocken Township, Bridge Replacement, Bridge Key 4816, Project ID 114386

Project Allocation

300,000

(Base Project Allocation - $275,000)

(Land Allocation - $25,000)

(22) SR 0419 over Mill Creek, Tulpehocken Township, Bridge Replacement, Bridge Key 4818, Project ID 92079

Project Allocation

648,379

(Land Allocation - $75,000)

(Design & Contingencies - $573,379)

(23) SR 0419 over Tulpehocken Creek, Heidelberg Township, Bridge Replacement, Bridge Key 4814, Project ID 91908

Project Allocation

1,724,841

(Base Project Allocation - $1,300,000)

(Land Allocation - $95,000)

(Design & Contingencies - $329,841)

(24) SR 0419 over Tributary of Mill Creek, Tulpehocken Township, Bridge Replacement, Bridge Key 4815, Project ID 110014

Project Allocation

2,135,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $35,000)

(Design & Contingencies - $900,000)

(25) SR 0422 over Tulpehocken Creek, Womelsdorf Borough, Bridge Replacement, Bridge Key 4827, Project ID 10927

Project Allocation

6,300,000

(Base Project Allocation - $4,500,000)

(Land Allocation - $100,000)

(Design & Contingencies - $1,700,000)

(26) SR 0422 over Schuylkill River, Cumru Township, Bridge Replacement, Bridge Key 4857, Project ID 72814

Project Allocation

8,112,639

(Base Project Allocation - $7,680,000)

(Land Allocation - $173,700)

(Design & Contingencies - $258,939)

(27) SR 0422 over SR 2005, City of Reading, Bridge Replacement, Bridge Key 4770, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(28) SR 0422 over Tributary of Schuylkill River, City of Reading, Bridge Replacement, Bridge Key 4772, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(29) SR 0422 over SR 3222, City of Reading, Bridge Replacement, Bridge Key 4773, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(30) SR 0422 over Wyomissing Creek, City of Reading, Bridge Replacement, Bridge Key 4775, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(31) SR 0422 over Franklin Street, West Reading Borough, Bridge Replacement, Bridge Key 4777, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(32) SR 0422 over Schuylkill River, City of Reading, Bridge Replacement, Bridge Key 4852, Project ID 72814

Project Allocation

9,746,579

(Base Project Allocation - $8,960,000)

(Land Allocation - $509,250)

(Design & Contingencies - $277,329)

(33) SR 0422 over Brentwood Drive, City of Reading, Bridge Rehabilitation, Bridge Key 4851, Project ID 83965

Project Allocation

2,400,000

(Base Project Allocation - $1,600,000)

(Land Allocation - $100,000)

(Design & Contingencies - $700,000)

(34) SR 0422 over Thun Recreational Trail, West Reading Borough, Bridge Replacement, Bridge Key 4776, Project ID 10855

Project Allocation

35,300,000

(Base Project Allocation - $32,000,000)

(Land Allocation - $300,000)

(Design & Contingencies - $3,000,000)

(35) SR 0422 over Cacoosing Creek, Sinking Spring Borough, Bridge Replacement, Bridge Key 4834, Project ID 92070

Project Allocation

2,665,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $65,000)

(Design & Contingencies - $1,400,000)

(36) SR 0422 over PA 422 Business, West Reading Borough, Bridge Replacement, Bridge Key 5220, Project ID 72814

Project Allocation

8,112,639

(Base Project Allocation - $7,680,000)

(Land Allocation - $173,700)

(Design & Contingencies - $258,939)

(37) SR 0422 Business over Schuylkill River, Streets and Norfolk Southern Railroad, City of Reading, Bridge Rehabilitation, Bridge Key 5221, Project ID 72814

Project Allocation

8,112,639

(Base Project Allocation - $7,680,000)

(Land Allocation - $173,700)

(Design & Contingencies - $258,939)

(38) SR 0501 over Tributary of Swatara Creek, Bethel Township, Bridge Replacement, Bridge Key 4878, Project ID 110016

Project Allocation

1,835,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $35,000)

(Design & Contingencies - $800,000)

(39) SR 0562 over Tributary of Antietam Creek, Exeter Township, Bridge Rehabilitation, Bridge Key 4881, Project ID 110032

Project Allocation

550,000

(Base Project Allocation - $500,000)

(Design & Contingencies - $50,000)

(40) SR 0562 over Owatin Creek, Exeter Township, Bridge Rehabilitation, Bridge Key 4883, Project ID 110032

Project Allocation

550,000

(Base Project Allocation - $500,000)

(Design & Contingencies - $50,000)

(41) SR 0568 over Allegheny Creek, Robeson Township, Bridge Replacement, Bridge Key 4893, Project ID 79086

Project Allocation

1,314,240

(Base Project Allocation - $420,000)

(Land Allocation - $275,000)

(Design & Contingencies - $619,240)

(42) SR 0662 over Branch Creek, Ruscombmanor Township, Bridge Replacement, Bridge Key 4910, Project ID 110011

Project Allocation

1,476,800

(Base Project Allocation - $910,000)

(Land Allocation - $46,800)

(Design & Contingencies - $520,000)

(43) SR 0724 over Allegheny Creek, Robeson Township, Bridge Rehabilitation, Bridge Key 4927, Project ID 10700

Project Allocation

2,272,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $102,000)

(Design & Contingencies - $170,000)

(44) SR 0737 over Stony Run, Albany Township, Bridge Restoration, Bridge Key 4941, Project ID 114485

Project Allocation

3,300,000

(Base Project Allocation - $3,000,000)

(Design & Contingencies - $300,000)

(45) SR 1003 over Lake Ontelaunee, Maiden Creek Township, Bridge Rehabilitation, Bridge Key 4944, Project ID 10826

Project Allocation

697,153

(Base Project Allocation - $426,153)

(Land Allocation - $8,000)

(Design & Contingencies - $263,000)

(46) SR 1015 over Stony Run, Albany Township, Bridge Replacement, Bridge Key 4981, Project ID 85643

Project Allocation

1,485,000

(Base Project Allocation - $800,000)

(Land Allocation - $35,000)

(Design & Contingencies - $650,000)

(47) SR 1018 over Maiden Creek, Albany Township, Bridge Rehabilitation, Bridge Key 4984, Project ID 85648

Project Allocation

495,000

(Base Project Allocation - $300,000)

(Land Allocation - $25,000)

(Design & Contingencies - $170,000)

(48) SR 1021 over Bieber Creek, Rockland Township, Bridge Replacement, Bridge Key 4988, Project ID 10746

Project Allocation

322,390

(Base Project Allocation - $170,000)

(Land Allocation - $12,100)

(Design & Contingencies - $140,290)

(49) SR 1022 over Branch of Perkiomen Creek, Hereford Township, Bridge Replacement, Bridge Key 5000, Project ID 114392

Project Allocation

1,138,500

(Base Project Allocation - $594,000)

(Design & Contingencies - $544,500)

(50) SR 1023 over Pine Creek, Pike Township, Bridge Preservation, Bridge Key 5004, Project ID 114391

Project Allocation

1,700,000

(Base Project Allocation - $1,500,000)

(Design & Contingencies - $200,000)

(51) SR 1025 over Glen Run, Longswamp Township, Bridge Replacement, Bridge Key 5009, Project ID 110011

Project Allocation

1,476,800

(Base Project Allocation - $910,000)

(Land Allocation - $46,800)

(Design & Contingencies - $520,000)

(52) SR 1025 over Tributary of Little Lehigh Creek, Longswamp Township, Bridge Replacement, Bridge Key 5011, Project ID 114392

Project Allocation

1,138,500

(Base Project Allocation - $594,000)

(Design & Contingencies - $544,500)

(53) SR 1026 over Pine Creek, Oley Township, Bridge Rehabilitation, Bridge Key 5014, Project ID 79008

Project Allocation

1,922,829

(Base Project Allocation - $1,500,000)

(Land Allocation - $36,740)

(Design & Contingencies - $386,089)

(54) SR 1026 over West Branch of Pine Creek, Pike Township, Bridge Replacement, Bridge Key 5016, Project ID 110011

Project Allocation

1,910,808

(Base Project Allocation - $1,095,210)

(Land Allocation - $25,800)

(Design & Contingencies - $789,798)

(55) SR 1029 over Little Sacony Creek, Rockland Township, Bridge Replacement, Bridge Key 5019, Project ID 116478

Project Allocation

3,100,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $110,000)

(Design & Contingencies - $990,000)

(56) SR 1029 over Little Sacony Creek, Rockland Township, Bridge Rehabilitation, Bridge Key 5020, Project ID 106467

Project Allocation

601,460

(Base Project Allocation - $601,459)

(Design & Contingencies - $1)

(57) SR 1035 over Toad Creek, Longswamp Township, Bridge Replacement, Bridge Key 5026, Project ID 110011

Project Allocation

1,022,060

(Base Project Allocation - $585,810)

(Land Allocation - $13,800)

(Design & Contingencies - $422,450)

(58) SR 2005 over PA 12, Muhlenberg Township, Bridge Replacement, Bridge Key 4787, Project ID 93626

Project Allocation

16,560,000

(Base Project Allocation - $15,900,000)

(Land Allocation - $10,000)

(Design & Contingencies - $650,000)

(59) SR 2005 over Norfolk Southern Railroad, City of Reading, Bridge Replacement, Bridge Key 5035, Project ID 10824

Project Allocation

27,018,500

(Base Project Allocation - $25,000,000)

(Land Allocation - $93,500)

(Design & Contingencies - $1,925,000)

(60) SR 2016 over Reading Branch Line of Reading, Blue Mountain and Northern Railroad, Muhlenberg Township, Bridge Replacement, Bridge Key 5052, Project ID 10527

Project Allocation

2,193,805

(Base Project Allocation - $820,000)

(Land Allocation - $155,000)

(Design & Contingencies - $1,218,805)

(61) SR 2023 over Antietam Creek, Lower Alsace Township, Bridge Replacement, Bridge Key 5062, Project ID 91932

Project Allocation

4,468,806

(Base Project Allocation - $3,200,000)

(Land Allocation - $175,000)

(Design & Contingencies - $1,093,806)

(62) SR 2032 over Swamp Creek, Washington Township, Bridge Replacement, Bridge Key 5092, Project ID 110011

Project Allocation

1,510,872

(Base Project Allocation - $865,980)

(Land Allocation - $20,400)

(Design & Contingencies - $624,492)

(63) SR 2032 over Branch of West Swamp Creek, Washington Township, Bridge Replacement, Bridge Key 5093, Project ID 10616

Project Allocation

411,000

(Base Project Allocation - $350,000)

(Land Allocation - $11,000)

(Design & Contingencies - $50,000)

(64) SR 2036 over Manatawny Creek, Douglass Township, Bridge Preservation, Bridge Key 5097, Project ID 114391

Project Allocation

1,700,000

(Base Project Allocation - $1,500,000)

(Design & Contingencies - $200,000)

(65) SR 2041 over Monocacy Creek, Amity Township, Bridge Replacement, Bridge Key 5105, Project ID 10753

Project Allocation

607,369

(Base Project Allocation - $408,000)

(Land Allocation - $25,000)

(Design & Contingencies - $174,369)

(66) SR 2057 over Leaf Creek, Amity Township, Bridge Replacement, Bridge Key 5122, Project ID 92043

Project Allocation

753,950

(Base Project Allocation - $195,500)

(Land Allocation - $32,880)

(Design & Contingencies - $525,570)

(67) SR 2082 over Hay Creek, Robeson Township, Bridge Removal, Bridge Key 4696, Project ID 89634

Project Allocation

300,000

(Base Project Allocation - $253,000)

(Land Allocation - $7,000)

(Design & Contingencies - $40,000)

(68) SR 2087 over Norfolk Southern Railroad, City of Reading, Bridge Replacement, Bridge Key 5137, Project ID 91995

Project Allocation

1,992,174

(Base Project Allocation - $1,100,000)

(Land Allocation - $213,909)

(Design & Contingencies - $678,265)

(69) SR 3003 over Angelica Creek, Cumru Township, Bridge Rehabilitation, Bridge Key 5139, Project ID 79079

Project Allocation

1,235,000

(Base Project Allocation - $600,000)

(Land Allocation - $35,000)

(Design & Contingencies - $600,000)

(70) SR 3019 over SR 0422, Wyomissing Borough, Bridge Replacement, Bridge Key 40023, Project ID 72814

Project Allocation

8,112,639

(Base Project Allocation - $7,680,000)

(Land Allocation - $173,700)

(Design & Contingencies - $258,939)

(71) SR 3024 over Tributary of Allegheny Creek, Brecknock Township, Bridge Replacement, Bridge Key 5170, Project ID 110017

Project Allocation

909,000

(Base Project Allocation - $700,000)

(Land Allocation - $9,000)

(Design & Contingencies - $200,000)

(72) SR 3024 over I-176, Robeson Township, Bridge Replacement, Bridge Key 5171, Project ID 110017

Project Allocation

935,306

(Base Project Allocation - $700,000)

(Land Allocation - $9,000)

(Design & Contingencies - $226,306)

(73) SR 3037 over Mill Race Creek, Marion Township, Bridge Replacement, Bridge Key 5184, Project ID 94290

Project Allocation

655,635

(Base Project Allocation - $150,000)

(Land Allocation - $26,240)

(Design & Contingencies - $479,395)

(74) SR 4015 over Mill Creek, Tilden Township, Bridge Rehabilitation, Bridge Key 5250, Project ID 110032

Project Allocation

550,000

(Base Project Allocation - $500,000)

(Design & Contingencies - $50,000)

(75) SR 4015 over Tributary of Irish Creek, Centre Township, Bridge Replacement, Bridge Key 5248, Project ID 10702

Project Allocation

1,490,000

(Base Project Allocation - $750,000)

(Land Allocation - $40,000)

(Design & Contingencies - $700,000)

(76) SR 4020 over Plum Creek, Centre Township, Bridge Restoration, Bridge Key 5259, Project ID 114485

Project Allocation

3,300,000

(Base Project Allocation - $3,000,000)

(Design & Contingencies - $300,000)

(77) SR 4040 over Birch Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 53243, Project ID 110013

Project Allocation

1,988,150

(Base Project Allocation - $1,462,000)

(Land Allocation - $17,000)

(Design & Contingencies - $509,150)

(78) SR 4040 over Little Northkill Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 53244, Project ID 110013

Project Allocation

1,988,150

(Base Project Allocation - $1,462,000)

(Land Allocation - $17,000)

(Design & Contingencies - $509,150)

(79) SR 4040 over Cabin Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 53245, Project ID 110013

Project Allocation

1,988,150

(Base Project Allocation - $1,462,000)

(Land Allocation - $17,000)

(Design & Contingencies - $509,150)

(80) SR 4040 over Mollhead Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 53246, Project ID 110013

Project Allocation

1,988,150

(Base Project Allocation - $1,462,000)

(Land Allocation - $17,000)

(Design & Contingencies - $509,150)

(81) SR 4040 over Tributary of Northkill Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 47409, Project ID 110078

Project Allocation

2,296,983

(Base Project Allocation - $1,950,000)

(Land Allocation - $165,000)

(Design & Contingencies - $181,983)

(82) SR 4040 over Northkill Creek, Upper Bern Township, Bridge Replacement, Bridge Key 53248, Project ID 110013

Project Allocation

1,438,083

(Base Project Allocation - $1,020,000)

(Land Allocation - $27,200)

(Design & Contingencies - $390,883)

(83) SR 4040 over Tributary of Mollhead Creek, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 53247, Project ID 110013

Project Allocation

1,988,150

(Base Project Allocation - $1,462,000)

(Land Allocation - $17,000)

(Design & Contingencies - $509,150)

(84) SR 7103 over Angelica Creek, Cumru Township, Bridge Rehabilitation, Bridge Key 5310, Project ID 110088

Project Allocation

394,500

(Base Project Allocation - $300,000)

(Land Allocation - $4,500)

(Design & Contingencies - $90,000)

(85) SR 7212 over Ironstone Creek, Douglass Township, Bridge Replacement, Bridge Key 5352, Project ID 110247

Project Allocation

300,000

(Base Project Allocation - $300,000)

(86) SR 7233 over Hay Creek, Robeson Township, Bridge Rehabilitation, Bridge Key 5445, Project ID 110089

Project Allocation

435,000

(Base Project Allocation - $300,000)

(Land Allocation - $22,500)

(Design & Contingencies - $112,500)

(87) SR 7412 over Maiden Creek, Lenhartsville Borough, Bridge Removal, Bridge Key 5496, Project ID 110079

Project Allocation

1,450,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $50,000)

(Design & Contingencies - $400,000)