Section 13. Bucks County.
(a) Local Bridges
Local
State
(1) Lower Makefield Township, Black Rock Road over Delaware Canal, Bridge Rehabilitation, Bridge Key 45314
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(2) Warwick Township, Brook Lane over Tributary of Fish Creek, Bridge Restoration, Bridge Key 40482, Project ID 09 7228 0040 0000
Project Allocation
325,000
(Base Project Allocation - $325,000)
(3) Doylestown Township, Burpee Road over Cooks Run, Bridge Rehabilitation, Bridge Key 47934
Project Allocation
300,000
(Base Project Allocation - $300,000)
(4) Doylestown Township, Chapman Road over Pine Run, Bridge Replacement, Bridge Key 7597, Project ID 111565
Project Allocation
1,525,000
(Base Project Allocation - $1,525,000)
(5) Doylestown Township, Edison Road over Branch of Neshaminy Creek, Bridge Rehabilitation, Bridge Key 7596
Project Allocation
350,000
(Base Project Allocation - $350,000)
(6) Doylestown Township, Iron Hill Road Bridge over Cooks Run, Bridge Rehabilitation, Bridge Key 48010
Project Allocation
300,000
(7) Warrington and Doylestown Townships, Kelly Road over Tributary of Neshaminy Creek, Bridge Rehabilitation, Bridge Key 48014, BMS 09-7205-0503-0011
Project Allocation
385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(8) Doylestown Township, Kelly Road Bridge over Tributary of Neshaminy Creek, Bridge Rehabilitation, Bridge Key 48014
Project Allocation
385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(9) Northampton Township, Lower Holland Road over Ironworks Creek, Bridge Replacement, Bridge Key 7631
Project Allocation
980,000
(Base Project Allocation - $750,000)
(Land Allocation - $30,000)
(Design & Contingencies - $200,000)
(10) Doylestown Township, New Britain Road over Tributary of Neshaminy Creek, Bridge Rehabilitation, Bridge Key 49132
Project Allocation
300,000
(Base Project Allocation - $300,000)
(11) Doylestown Township, Nicklaus Drive over Branch of Neshaminy Creek, Bridge Rehabilitation, Bridge Key 48015
Project Allocation
300,000
(Base Project Allocation - $300,000)
(12) Warwick Township, Old York Road over Little Neshaminy Creek, Bridge Restoration, Bridge Key 7649, BMS 09-7228-0010-0000
Project Allocation
410,000
(Base Project Allocation - $410,000)
(13) Doylestown Township, Shady Retreat Road over Cooks Run, Bridge Rehabilitation, Bridge Key 47935
Project Allocation
300,000
(Base Project Allocation - $300,000)
(14) Yardley Borough, SR 0295 over Taylorsville Road, Bridge Rehabilitation, Bridge Key 7699
Project Allocation
400,000
(Base Project Allocation - $400,000)
(15) Yardley Borough, SR 7009 over Pennsylvania Canal, Bridge Rehabilitation, Bridge Key 7483, Project ID 13311
Project Allocation
500,000
(Base Project Allocation - $500,000)
(16) Bristol Township, SR 7101 over Queen Anne Creek, Bridge Replacement, Bridge Key 7588
Project Allocation
1,045,000
(Base Project Allocation - $1,045,000)
(17) Northampton Township, Stony Ford Road over SEPTA, Bridge Replacement, Bridge Key 7628
Project Allocation
1,580,000
(Base Project Allocation - $1,250,000)
(Land Allocation - $30,000)
(Design & Contingencies - $300,000)
(18) Warwick Township, Sunrise Way over Tributary of Fish Creek, Bridge Restoration, Bridge Key 40483, BMS 09-7228-0050-0000
Project Allocation
325,000
(Base Project Allocation - $325,000)
(19) Warwick Township, Sycamore Drive over Tributary of Little Neshaminy Creek, Bridge Restoration, Bridge Key 7650, BMS 09-7228-0020-0000
Project Allocation
375,000
(Base Project Allocation - $375,000)
(20) Doylestown Township, Turk Road over Hailey's Run, Bridge Rehabilitation, Bridge Key 7598
Project Allocation
300,000
(Base Project Allocation - $300,000)
(21) Warwick Township, Valley Road over Tributary of Neshaminy Creek, Bridge Restoration, Bridge Key 59154
Project Allocation
425,000
(Base Project Allocation - $425,000)
(22) Milford Township, Weiss Road over Licking Creek, Bridge Replacement, Bridge Key 7618
Project Allocation
550,000
(Base Project Allocation - $550,000)
(23) Warwick Township, Wilkinson Road over Tributary of Little Neshaminy Creek, Bridge Restoration
Project Allocation
400,000
(Base Project Allocation - $400,000)
(b) State Bridges
(1) Creamery Road over Brock Run Creek, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 7011
Project Allocation
400,000
(Base Project Allocation - $400,000)
(2) SR 0032 over Dyers Creek, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 6786
Project Allocation
500,000
(Base Project Allocation - $500,000)
(3) SR 0032 over Tributary of Delaware River, Falls Township, Bridge Rehabilitation, Bridge Key 6780, Project ID 104746
Project Allocation
350,000
(Base Project Allocation - $350,000)
(4) SR 0032 over Cuttalossa Creek, Solebury Township, Bridge Replacement, Bridge Key 6800, Project ID 81220
Project Allocation
2,000,000
(Base Project Allocation - $1,419,000)
(Land Allocation - $35,000)
(Design & Contingencies - $546,000)
(5) SR 0113 over Branch of Mill Creek, Hilltown Township, Bridge Rehabilitation, Bridge Key 6883, Project ID 102320
Project Allocation
418,000
(Base Project Allocation - $400,000)
(Land Allocation - $18,000)
(6) SR 0136 over Woodhaven Road, Bensalem Township, Bridge Rehabilitation, Bridge Key 6757, Project ID 104747
Project Allocation
1,463,624
(Base Project Allocation - $1,463,624)
(7) SR 0295 over CSX Railroad and SEPTA Trenton Branch, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 6872, Project ID 84973
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(8) SR 0295 over CSX Railroad and SEPTA Trenton Branch, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 6873, Project ID 84973
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(9) SR 0295 over Langhorne-Yardley Road, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 6876, Project ID 84973
Project Allocation
300,000
(Base Project Allocation - $300,000)
(10) SR 0295 over Langhorne-Yardley Road, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 6877, Project ID 84973
Project Allocation
300,000
(Base Project Allocation - $300,000)
(11) SR 0309 over Beaver Run, Richland Township, Bridge Replacement, Bridge Key 6980, Project ID 102664
Project Allocation
820,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $120,000)
(12) SR 0313 over North Branch of Perkiomen Creek, New Britain Township, Bridge Replacement, Bridge Key 6985, Project ID 57619
Project Allocation
3,537,000
(Base Project Allocation - $3,012,000)
(Land Allocation - $219,000)
(Design & Contingencies - $306,000)
(13) SR 0313 over Branch of Neshaminy Creek, Plumstead Township, Bridge Replacement, Bridge Key 6986, Project ID 57619
Project Allocation
4,512,747
(Base Project Allocation - $3,000,000)
(Land Allocation - $298,600)
(Design & Contingencies - $1,214,147)
(14) SR 0313 over Deep Run, Hilltown Township, Bridge Replacement, Bridge Key 6987, Project ID 102318
Project Allocation
1,208,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(15) SR 0332 over Delaware Canal, Yardley Borough, Bridge Replacement, Bridge Key 7013, Project ID 13189
Project Allocation
2,000,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $250,000)
(Design & Contingencies - $250,000)
(16) SR 0563 over Saw Mill Road, Haycock Township, Bridge Rehabilitation, Bridge Key 7056, Project ID 110664
Project Allocation
917,448
(Base Project Allocation - $913,698)
(Land Allocation - $3,750)
(17) SR 0663 over Unami Creek, Milford Township, Bridge Replacement, Bridge Key 7092, Project ID 13440
Project Allocation
4,044,222
(Base Project Allocation - $1,260,000)
(Land Allocation - $1,216,530)
(Design & Contingencies - $1,567,692)
(18) SR 1002 over Cuttalossa Creek, Solebury Township, Bridge Rehabilitation, Bridge Key 7098, Project ID 104751
Project Allocation
1,684,500
(Base Project Allocation - $1,684,500)
(19) SR 1003 over Branch of Aquetong Creek, Solebury Township, Bridge Replacement, Bridge Key 7100, Project ID 110660
Project Allocation
4,718,000
(Base Project Allocation - $4,518,000)
(Land Allocation - $200,000)
(20) SR 1003 over Hickory Creek, West Rockhill Township, Bridge Rehabilitation, Bridge Key 7105, Project ID 102320
Project Allocation
416,000
(Base Project Allocation - $400,000)
(Land Allocation - $16,000)
(21) SR 1004 over Branch of Pine Run, Buckingham Township, Bridge Replacement, Bridge Key 7109, Project ID 110763
Project Allocation
1,850,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $250,000)
(22) SR 1007 over Tributary of Delaware River, Solebury Township, Bridge Rehabilitation, Bridge Key 7119, Project ID 104750
Project Allocation
1,604,740
(Base Project Allocation - $1,604,740)
(23) SR 1012 over Tinicum Creek, Tinicum Township, Bridge Replacement, Bridge Key 7128, Project ID 13716
Project Allocation
3,480,800
(Base Project Allocation - $880,800)
(Land Allocation - $100,000)
(Design & Contingencies - $2,500,000)
(24) SR 1014 over Tohickon Creek, Bedminster Township, Bridge Replacement, Bridge Key 7137, Project ID 90550
Project Allocation
1,360,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $300,000)
(25) SR 1020 over Watson Creek, Buckingham Township, Bridge Rehabilitation, Bridge Key 7152, Project ID 104773
Project Allocation
1,534,000
(Base Project Allocation - $1,534,000)
(26) SR 2024 over Rock Run, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 7198
Project Allocation
300,000
(Base Project Allocation - $300,000)
(27) SR 2025 over Branch of Little Neshaminy Creek, Warwick Township, Bridge Replacement, Bridge Key 7210, Project ID 81170
Project Allocation
2,000,000
(Base Project Allocation - $1,510,000)
(Land Allocation - $30,000)
(Design & Contingencies - $460,000)
(28) SR 2025 over Branch of Little Neshaminy Creek, Warwick Township, Bridge Replacement, Bridge Key 7211, Project ID 81170
Project Allocation
2,000,000
(Base Project Allocation - $1,510,000)
(Land Allocation - $30,000)
(Design & Contingencies - $460,000)
(29) SR 2025 over Branch of Mill Creek, Doylestown Borough, Bridge Rehabilitation, Bridge Key 7215, Project ID 104772
Project Allocation
1,561,000
(Base Project Allocation - $1,561,000)
(30) SR 2027 over Chubb Run, Middletown Township, Bridge Rehabilitation, Bridge Key 7222, Project ID 107544
Project Allocation
1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(31) SR 2029 over Brock Creek, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 7232
Project Allocation
750,000
(Base Project Allocation - $750,000)
(32) SR 2032 over Van Horn Creek, Yardley Borough, Bridge Replacement, Bridge Key 7238, Project ID 13652
Project Allocation
2,000,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $250,000)
(Design & Contingencies - $250,000)
(33) SR 2043 over Neshaminy Creek, Lower Southampton Township, Bridge Replacement, Bridge Key 7278, Project ID 78516
Project Allocation
2,003,491
(Base Project Allocation - $1,300,000)
(Land Allocation - $149,000)
(Design & Contingencies - $554,491)
(34) SR 2043 over SEPTA, Bensalem Township, Bridge Replacement, Bridge Key 7591, Project ID 84256
Project Allocation
707,885
(Base Project Allocation - $400,000)
(Land Allocation - $90,000)
(Design & Contingencies - $217,885)
(35) SR 2048 over Branch of Newtown Creek, Middletown Township, Bridge Replacement, Bridge Key 7281
Project Allocation
1,275,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(36) SR 2048 over Newtown Creek, Newtown Borough, Bridge Rehabilitation, Bridge Key 7282, Project ID 12773
Project Allocation
1,050,000
(Base Project Allocation - $1,050,000)
(37) SR 2052 over Newtown Creek, Newtown Borough, Bridge Rehabilitation, Bridge Key 7289, Project ID 104771
Project Allocation
1,609,900
(Base Project Allocation - $1,609,900)
(38) SR 2060 over Branch of Delaware River, Morrisville Borough, Bridge Rehabilitation, Bridge Key 7297
Project Allocation
750,000
(Base Project Allocation - $750,000)
(39) SR 2069 over Branch of Core Creek, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 7308
Project Allocation
500,000
(Base Project Allocation - $500,000)
(40) SR 2069 over Brock Creek, Lower Makefield Township, Bridge Replacement, Bridge Key 7305, Project ID 110660
Project Allocation
4,718,000
(Base Project Allocation - $4,518,000)
(Land Allocation - $200,000)
(41) SR 2071 over Van Horn Creek, Yardley and Morrisville Boroughs, Bridge Replacement, Bridge Key 7312, Project ID 71708
Project Allocation
750,000
(Base Project Allocation - $750,000)
(42) SR 2071 over Dyers Creek, Yardley Borough, Bridge Rehabilitation, Bridge Key 7314, Project ID 76423
Project Allocation
500,000
(Base Project Allocation - $500,000)
(43) SR 2073 over Pennsylvania Canal, Morrisville Borough, Bridge Replacement, Bridge Key 7322, Project ID 84258
Project Allocation
1,980,000
(Base Project Allocation - $950,000)
(Land Allocation - $70,000)
(Design & Contingencies - $960,000)
(44) SR 2075 over I-95, Lower Makefield Township, Bridge Rehabilitation, Bridge Key 7323, Project ID 86900
Project Allocation
500,000
(Base Project Allocation - $500,000)
(45) SR 2079 over Neshaminy Creek, Wrightstown Township, Bridge Rehabilitation, Bridge Key 7328, Project ID 104774
Project Allocation
368,980
(Base Project Allocation - $368,980)
(46) SR 2081 over Neshaminy Creek, Wrightstown Township, Bridge Replacement, Bridge Key 7330, Project ID 12931
Project Allocation
3,522,200
(Base Project Allocation - $1,674,400)
(Land Allocation - $112,800)
(Design & Contingencies - $1,735,000)
(47) SR 2083 over Jericho Creek, Upper Makefield Township, Bridge Rehabilitation, Bridge Key 7332, Project ID 110664
Project Allocation
401,250
(Base Project Allocation - $400,000)
(Land Allocation - $1,250)
(48) SR 2103 over Aquetong Creek, New Hope Borough, Bridge Rehabilitation, Bridge Key 7352, Project ID 110664
Project Allocation
401,000
(Base Project Allocation - $400,000)
(Land Allocation - $1,000)
(49) SR 2195 over SR 0095, Middletown Township, Bridge Rehabilitation, Bridge Key 6870, Project ID 110664
Project Allocation
795,122
(Base Project Allocation - $791,872)
(Land Allocation - $3,250)
(50) SR 4009 over Pine Run, Doylestown Township, Bridge Rehabilitation, Bridge Key 7375, Project ID 104770
Project Allocation
1,476,120
(Base Project Allocation - $1,476,120)
(51) SR 4027 over Ridge Valley Creek, West Rockhill Township, Bridge Replacement, Bridge Key 7401, Project ID 81169
Project Allocation
1,883,000
(Base Project Allocation - $1,249,000)
(Land Allocation - $30,000)
(Design & Contingencies - $604,000)
(52) SR 4027 over Branch of Unami Creek, Milford Township, Bridge Rehabilitation, Bridge Key 7403, Project ID 102320
Project Allocation
432,000
(Base Project Allocation - $400,000)
(Land Allocation - $32,000)
(53) SR 4027 over Licking Creek, Milford Township, Bridge Replacement, Bridge Key 7405, Project ID 13440
Project Allocation
2,375,178
(Base Project Allocation - $740,000)
(Land Allocation - $714,470)
(Design & Contingencies - $920,708)
(54) SR 4029 over East Branch of Perkiomen Creek, West Rockhill Township, Bridge Rehabilitation, Bridge Key 7408, Project ID 110664
Project Allocation
672,795
(Base Project Allocation - $670,045)
(Land Allocation - $2,750)
(55) SR 4033 over Unami Creek, Milford Township, Bridge Replacement, Bridge Key 7412, Project ID 13607
Project Allocation
2,902,000
(Base Project Allocation - $1,700,000)
(Land Allocation - $95,000)
(Design & Contingencies - $1,107,000)
(56) SR 4047 over Cooks Creek, Springfield Township, Bridge Replacement, Bridge Key 7419, Project ID 107544
Project Allocation
1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(57) SR 4059 over Branch of Unami Creek, Milford Township, Bridge Replacement, Bridge Key 7433, Project ID 69823
Project Allocation
750,000
(Base Project Allocation - $350,000)
(Land Allocation - $125,000)
(Design & Contingencies - $275,000)
(58) SR 4059 over Branch of Unami Creek, Milford Township, Bridge Replacement, Bridge Key 7434, Project ID 69823
Project Allocation
750,000
(Base Project Allocation - $350,000)
(Land Allocation - $125,000)
(Design & Contingencies - $275,000)
(59) SR 4059 over Branch of Tohickon Creek, Richland Township, Bridge Replacement, Bridge Key 7438, Project ID 110660
Project Allocation
4,718,000
(Base Project Allocation - $4,518,000)
(Land Allocation - $200,000)
(60) SR 4075 over Kimples Creek, Haycock Township, Bridge Replacement, Bridge Key 7449, Project ID 110660
Project Allocation
4,718,000
(Base Project Allocation - $4,518,000)
(Land Allocation - $200,000)
(61) SR 4101 over Kimples Creek, Haycock Township, Bridge Replacement, Bridge Key 7471, Project ID 13240
Project Allocation
1,172,425
(Base Project Allocation - $900,000)
(Land Allocation - $14,000)
(Design & Contingencies - $258,425)
(62) SR 4202 over West Branch of Neshaminy Creek, New Britain Township, Bridge Replacement, Bridge Key 6913, Project ID 102318
Project Allocation
1,208,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(63) SR 7009 over Herkaken Creek, New Britain Township, Bridge Rehabilitation, Bridge Key 7547, Project ID 110091
Project Allocation
300,000
(Base Project Allocation - $300,000)