Section 19. Chester County.
(a) Local Bridges
Local
State
(1) London Grove Township, Avondale New London Road over Middle Branch of White Clay Creek, Bridge Replacement, Bridge Key 10638
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(2) London Grove Township, Baker Station Road over East Branch of White Clay Creek, Bridge Replacement, Bridge Key 10639
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(2.1) West Nantmeal Township, Bollinger Road over Perkins Run, Bridge Rehabilitation, Bridge Key 54213, BMS 15-7249-0396-0001
Project Allocation
300,000
(Base Project Allocation - $250,000)
(Design & Contingencies - $50,000)
(3) Elk Township, Camp Bonsal Road over Big Elk Creek, Bridge Replacement, Bridge Key 10643, Project ID 14351
Project Allocation
650,800
(Base Project Allocation - $510,000)
(Land Allocation - $15,800)
(Design & Contingencies - $125,000)
(4) Tredyffrin Township, Church Road over Valley Creek, Bridge Replacement, Bridge Key 52521
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(5) East Vincent and West Vincent Townships, Cooks Glen Road over French Creek, Bridge Replacement, Bridge Key 10710
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(6) Schuylkill Township, Creek Road over Pickering Creek, Bridge Rehabilitation, Bridge Key 10722, Project ID 98223
Project Allocation
2,608,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $48,000)
(Design & Contingencies - $560,000)
(7) Honey Brook Township, Cupola Road (T-376) over East Branch of Brandywine Creek, Bridge Replacement, Bridge Key 10671
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(8) Uwchlan Township, Dowlin Forge Road over Shamona Creek, Bridge Replacement, Bridge Key 10830
Project Allocation
5,700,000
(Base Project Allocation - $5,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $500,000)
(9) Tredyffrin Township, Drummers Lane over Branch of Trout Creek, Bridge Replacement, Bridge Key 54182
Project Allocation
1,050,000
(Base Project Allocation - $800,000)
(Land Allocation - $25,000)
(Design & Contingencies - $225,000)
(10) Lower Oxford Township, Fairview Road over Tweed Creek, Bridge Replacement, Bridge Key 46458
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(11) Valley Township, Glencrest East Road over West Branch of Brandywine Creek, Bridge Replacement, Bridge Key 10637
Project Allocation
2,600,000
(Base Project Allocation - $1,850,000)
(Land Allocation - $50,000)
(Design & Contingencies - $700,000)
(12) East Brandywine Township, Hadfield Road over Beaver Creek, Bridge Replacement, Bridge Key 10684
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(13) East Brandywine Township, Hadfield Road over Beaver Creek, Bridge Replacement, Bridge Key 10683, Project ID 86064
Project Allocation
522,400
(Base Project Allocation - $400,000)
(Land Allocation - $15,600)
(Design & Contingencies - $106,800)
(14) East Bradford and West Bradford Townships, Harmony Hill Road over East Branch of Brandywine Creek, Bridge Rehabilitation, Bridge Key 10676
Project Allocation
2,600,000
(Base Project Allocation - $1,850,000)
(Land Allocation - $50,000)
(Design & Contingencies - $700,000)
(15) East Coventry Township, Halteman Road over Pigeon Creek, Bridge Replacement or Rehabilitation, Bridge Key 10715
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(16) Franklin Township, Hess Mill Road over West Branch of White Clay Creek, Bridge Replacement, Bridge Key 45932
Project Allocation
350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(17) East Bradford Township, Highland Road (T-440) over Taylors Run, Bridge Replacement, Bridge Key 10695
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(18) Kennett Township, Hillendale Road over East Branch of Red Clay Creek, Bridge Replacement, Bridge Key 10657
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(19) London Grove Township, Hilton Road over Middle Branch of White Clay Creek, Bridge Replacement, Bridge Key 54248
Project Allocation
830,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(20) New London and Elk Townships, Kings Row Road over Big Elk Creek, Bridge Rehabilitation, Bridge Key 10663
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(21) West Brandywine Township, Lafayette Road (T-437) over West Branch of Brandywine Creek, Bridge Replacement and Rehabilitation, Bridge Key 10691
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(22) East Nottingham Township, Little Elk Creek Road over Big Elk Creek, Bridge Replacement, Bridge Key 10644
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(23) Phoenixville Borough, Main Street over French Creek, Bridge Replacement, Bridge Key 10636
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(24) London Grove Township, McCue Road (T-308) over East Branch of White Clay Creek, Bridge Replacement, Bridge Key 54159
Project Allocation
1,295,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $75,000)
(25) London Britain Township, Mercer Hill Road over Middle Branch of White Clay Creek, Bridge Replacement, Bridge Key 10648
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(26) South Coventry Township, Mount Pleasant Road over French Creek, Bridge Replacement, Bridge Key 10716
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(27) London Grove Township, New Garden Station Road over East Branch of White Clay Creek, Bridge Replacement, Bridge Key 10652
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(28) Wallace Township, Park Road (T-496) over East Branch of Brandywine Creek, Bridge Replacement, Bridge Key 10709
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(29) Uwchlan Township, Peck Road over Tributary of Shamona Creek, Bridge Replacement
Project Allocation
1,650,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $150,000)
(30) East Pikeland Township, Pickering Creek Road over Pickering Creek, Bridge Replacement, Bridge Key 46899
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(31) Charlestown Township, Pickering Road over Pickering Creek, Bridge Replacement, Bridge Key 10713
Project Allocation
325,000
(Base Project Allocation - $325,000)
(32) Penn Township, Pusey Mill Road over Big Elk Creek, Bridge Replacement, Bridge Key 48643
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(33) East Bradford Township, Ravine Road over Branch of Valley Creek, Bridge Replacement, Bridge Key 10770
Project Allocation
1,500,000
(Base Project Allocation - $1,200,000)
(Design & Contingencies - $300,000)
(34) West Caln and West Brandywine Townships, Reid Road (T-427) over West Branch of Brandywine Creek, Bridge Replacement, Bridge Key 45136
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(35) Tredyffrin Township, Richards Road over Trout Creek, Bridge Replacement, Bridge Key 45772
Project Allocation
1,130,000
(Base Project Allocation - $850,000)
(Land Allocation - $30,000)
(Design & Contingencies - $250,000)
(36) East Vincent Township, Seven Stars Road over French Creek, Bridge Rehabilitation, Bridge Key 10718, Project ID 113098
Project Allocation
2,100,000
(Base Project Allocation - $1,750,000)
(Land Allocation - $25,000)
(Design & Contingencies - $325,000)
(37) East Vincent and West Vincent Townships, Sheeder Mill Road over French Creek, Bridge Rehabilitation, Bridge Key 10707
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(37.1) West Chester Borough, South Franklin Street over Branch of Chester Creek, Bridge Rehabilitation or Replacement, Bridge Key 54191, BMS 15-7414-0200-0001
Project Allocation
1,515,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $30,000)
(Design & Contingencies - $285,000)
(38) London Grove Township, South Guernsey Road over Middle Branch of White Clay Creek, Bridge Replacement, Bridge Key 10669
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(39) North Coventry Township, South Keim Street over Small Run, Bridge Replacement, Bridge Key 44987
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(40) East Pikeland Township, Spring Hollow Road over Stony Run, Bridge Replacement, Bridge Key 10699
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(41) Avondale Borough, State Street over Indian Creek, Bridge Replacement, Bridge Key 55739
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(42) West Brandywine Township, Telegraph Road (T-435) over West Branch of Brandywine Creek, Bridge Replacement, Bridge Key 10690
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(43) London Grove Township, Valley Road over Middle Branch of White Clay Creek, Bridge Replacement, Bridge Key 56039
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(44) Tredyffrin Township, Walker Road (T-431) over Trout Creek, Bridge Replacement, Bridge Key 53362
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(45) Parkesburg Borough, West Bridge Street over Amtrak, Bridge Replacement, Bridge Key 10871, Project ID 14134
Project Allocation
1,403,761
(Base Project Allocation - $975,000)
(Land Allocation - $346,261)
(Design & Contingencies - $82,500)
(46) Lower Oxford Township, Wilson Mill Road over West Branch of Big Elk Creek, Bridge Replacement, Bridge Key 10650
Project Allocation
2,000,000
(Base Project Allocation - $1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(47) London Grove Township, Woodview Road over East Branch of White Clay Creek, Bridge Replacement, Bridge Key 54151
Project Allocation
945,000
(Base Project Allocation - $900,000)
(Land Allocation - $15,000)
(Design & Contingencies - $30,000)
(48) London Grove Township, Woodview Road (T-357) over West Branch of White Clay Creek, Bridge Replacement, Bridge Key 56688
Project Allocation
960,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(49) London Grove Township, Woodview Road (T-357) over West Branch of White Clay Creek, Bridge Replacement, Bridge Key 56689
Project Allocation
1,190,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $15,000)
(Design & Contingencies - $75,000)
(50) London Grove Township, Woodview Road (T-357) over East Branch of White Clay Creek, Bridge Replacement, Bridge Key 54151
Project Allocation
1,405,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $30,000)
(Design & Contingencies - $75,000)
(b) State Bridges
(1) SR 0001 over West Branch of Big Elk Creek, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 9890, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(2) SR 0001 over West Branch of Big Elk Creek, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 9892, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(3) SR 0001 over East Branch of Big Elk Creek, Upper Oxford Township, Bridge Rehabilitation, Bridge Key 9893, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(4) SR 0001 over East Branch of Big Elk Creek, Upper Oxford Township, Bridge Rehabilitation, Bridge Key 9894, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(5) SR 0001 over Middle Branch of White Clay Creek, London Grove Township, Bridge Rehabilitation, Bridge Key 9896, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(6) SR 0001 over Guernsey Road, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 9897, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(7) SR 0001 over Guernsey Road, London Grove Township, Bridge Rehabilitation, Bridge Key 9898, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(8) SR 0001 over East Branch of White Clay Creek, London Grove Township, Bridge Rehabilitation, Bridge Key 9899, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(9) SR 0001 over East Branch of White Clay Creek, London Grove Township, Bridge Rehabilitation, Bridge Key 9900, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(10) SR 0010 over SR 0001 Bypass, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 9929, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(11) SR 0030 over Beaver Creek, Caln Township, Bridge Replacement, Bridge Key 9971, Project ID 87781
Project Allocation
5,007,190
(Base Project Allocation - $4,596,500)
(Land Allocation - $47,490)
(Design & Contingencies - $363,200)
(12) SR 0030 over Bondsville Road, Caln Township, Bridge Replacement, Bridge Key 9972, Project ID 87781
Project Allocation
11,015,818
(Base Project Allocation - $10,112,300)
(Land Allocation - $104,478)
(Design & Contingencies - $799,040)
(13) SR 0030 over Tributary of Beaver Creek, Caln Township, Bridge Rehabilitation, Bridge Key 9973, Project ID 87781
Project Allocation
3,004,314
(Base Project Allocation - $2,757,900)
(Land Allocation - $28,494)
(Design & Contingencies - $217,920)
(14) SR 0030 over SR 0322, Caln Township, Bridge Replacement, Bridge Key 9974, Project ID 87781
Project Allocation
19,027,322
(Base Project Allocation - $17,466,700)
(Land Allocation - $180,462)
(Design & Contingencies - $1,380,160)
(15) SR 0030 over Rock Raymond Road, Caln Township, Bridge Replacement, Bridge Key 9975, Project ID 87781
Project Allocation
4,005,752
(Base Project Allocation - $3,677,200)
(Land Allocation - $37,992)
(Design & Contingencies - $290,560)
(16) SR 0030 over Creek Road and Brandywine Creek, Caln Township, Bridge Replacement, Bridge Key 9976, Project ID 87781
Project Allocation
15,021,570
(Base Project Allocation - $13,789,500)
(Land Allocation - $142,470)
(Design & Contingencies - $1,089,600)
(17) SR 0030 over Hike and Bike Path, Downingtown Borough, Bridge Rehabilitation, Bridge Key 9977, Project ID 87781
Project Allocation
3,004,314
(Base Project Allocation - $2,757,900)
(Land Allocation - $28,494)
(Design & Contingencies - $217,920)
(18) SR 0030 over Norwood Road, Downingtown Borough, Bridge Replacement, Bridge Key 9978, Project ID 87781
Project Allocation
8,011,504
(Base Project Allocation - $7,354,400)
(Land Allocation - $75,984)
(Design & Contingencies - $581,120)
(19) SR 0030 over Bell Tavern Road, East Caln Township, Bridge Preservation, Bridge Key 9979, Project ID 87781
Project Allocation
4,005,752
(Base Project Allocation - $3,677,200)
(Land Allocation - $37,992)
(Design & Contingencies - $290,560)
(20) SR 0030 over East Branch of Brandywine Creek, Downingtown Borough, Bridge Rehabilitation, Bridge Key 40153, Project ID 87781
Project Allocation
1,001,438
(Base Project Allocation - $919,300)
(Land Allocation - $9,498)
(Design & Contingencies - $72,640)
(21) SR 0041 over SR 0001 Bypass, London Grove Township, Bridge Rehabilitation, Bridge Key 10013, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(22) SR 0052 over Brandywine Creek Flood Zone, Birmingham Township, Bridge Rehabilitation, Bridge Key 10033, Project ID 102853
Project Allocation
1,073,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $3,000)
(Design & Contingencies - $70,000)
(23) SR 0113 over SR 0030 Bypass, East Caln Township, Bridge Replacement, Bridge Key 10075, Project ID 87781
Project Allocation
6,008,628
(Base Project Allocation - $5,515,800)
(Land Allocation - $56,988)
(Design & Contingencies - $435,840)
(24) SR 0252 over Norfolk Southern Railroad, Tredyffrin Township, Bridge Rehabilitation, Bridge Key 10162, Project ID 110664
Project Allocation
1,651,406
(Base Project Allocation - $1,644,656)
(Land Allocation - $6,750)
(25) SR 0282 over East Branch of Brandywine Creek, East Caln Township, Bridge Replacement, Bridge Key 10172, Project ID 87781
Project Allocation
9,012,942
(Base Project Allocation - $8,273,700)
(Land Allocation - $85,482)
(Design & Contingencies - $653,760)
(26) SR 0282 over Branch of Brandywine Creek, East Brandywine Township, Bridge Replacement, Bridge Key 10173, Project ID 107544
Project Allocation
1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(27) SR 0322 over East Branch of Brandywine Creek, Downingtown Borough, Bridge Rehabilitation, Bridge Key 10190, Project ID 86301
Project Allocation
1,433,299
(Base Project Allocation - $1,300,000)
(Land Allocation - $12,000)
(Design & Contingencies - $121,299)
(28) SR 0340 over SR 0030 Bypass, Caln Township, Bridge Replacement, Bridge Key 10214, Project ID 87781
Project Allocation
7,010,066
(Base Project Allocation - $6,435,100)
(Land Allocation - $66,486)
(Design & Contingencies - $508,480)
(29) SR 0340 over Branch of Beaver Creek, Caln Township, Bridge Replacement, Bridge Key 10215, Project ID 87781
Project Allocation
400,000
(Base Project Allocation - $400,000)
(30) SR 0401 over Branch of Pickering Creek, West Pikeland Township, Bridge Replacement, Bridge Key 10230, Project ID 98042
Project Allocation
630,000
(Base Project Allocation - $300,000)
(Land Allocation - $125,000)
(Design & Contingencies - $205,000)
(31) SR 0422 over Laurelwood Road, North Coventry Township, Bridge Replacement, Bridge Key 10235, Project ID 14698
Project Allocation
6,546,771
(Base Project Allocation - $5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
(32) SR 0422 over Pottstown Pike, North Coventry Township, Bridge Rehabilitation, Bridge Key 10236, Project ID 14698
Project Allocation
6,546,771
(Base Project Allocation - $5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
(33) SR 0422 over Hanover Street, North Coventry Township, Bridge Replacement, Bridge Key 10237, Project ID 14698
Project Allocation
6,546,771
(Base Project Allocation - $5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
(34) SR 0472 over SR 0001 Bypass, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 10241, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(35) SR 0796 over SR 0001, Penn Township, Bridge Rehabilitation, Bridge Key 10252, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(36) SR 0841 over SR 0001 Bypass, London Grove Township, Bridge Rehabilitation, Bridge Key 10258, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(37) SR 0842 over Branch of Blackhorse Run, East Bradford Township, Bridge Rehabilitation, Bridge Key 10267, Project ID 102320
Project Allocation
422,000
(Base Project Allocation - $400,000)
(Land Allocation - $22,000)
(38) SR 0896 over SR 0001 Bypass, Upper Oxford Township, Bridge Rehabilitation, Bridge Key 10270, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(39) SR 0926 over Radley Run, Thornbury Township, Bridge Replacement, Bridge Key 10284, Project ID 102318
Project Allocation
1,208,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(40) SR 0926 over Branch of Chester Creek, Thornbury Township, Bridge Rehabilitation, Bridge Key 10285, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(41) SR 1001 over Valley Creek, West Whiteland Township, Bridge Replacement, Bridge Key 10290, Project ID 98039
Project Allocation
1,506,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $93,000)
(Design & Contingencies - $213,000)
(42) SR 1005 over Amtrak, Tredyffrin Township, Bridge Replacement, Bridge Key 10309, Project ID 47979
Project Allocation
8,169,232
(Base Project Allocation - $3,650,000)
(Land Allocation - $3,001,700)
(Design & Contingencies - $1,517,532)
(43) SR 1017 over Branch of Pickering Creek, Charlestown Township, Bridge Replacement, Bridge Key 10328, Project ID 110765
Project Allocation
715,000
(Base Project Allocation - $360,000)
(Land Allocation - $105,000)
(Design & Contingencies - $250,000)
(44) SR 1024 over Branch of Pickering Creek, West Pikeland Township, Bridge Replacement, Bridge Key 10337, Project ID 107945
Project Allocation
1,487,500
(Base Project Allocation - $1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $137,500)
(45) SR 1024 over Branch of Pickering Creek, West Pikeland Township, Bridge Replacement, Bridge Key 10338, Project ID 107945
Project Allocation
1,487,500
(Base Project Allocation - $1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $137,500)
(46) SR 1024 over Branch of Pickering Creek, West Pikeland Township, Bridge Rehabilitation, Bridge Key 10339, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(47) SR 1024 over Branch of Pickering Creek, Charlestown Township, Bridge Rehabilitation, Bridge Key 10348, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(48) SR 1028 over Branch of French Creek, East Vincent Township, Bridge Rehabilitation, Bridge Key 10353, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(49) SR 1030 over Birch Run, West Vincent Township, Bridge Replacement, Bridge Key 10355, Project ID 98041
Project Allocation
1,288,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $93,000)
(Design & Contingencies - $195,000)
(50) SR 1036 over Anderson Brook, Schuylkill Township, Bridge Rehabilitation, Bridge Key 10362, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(51) SR 1101 over Pottstown Bypass, North Coventry Township, Bridge Replacement, Bridge Key 10238, Project ID 64220
Project Allocation
11,000,000
(Base Project Allocation - $9,820,000)
(Land Allocation - $270,000)
(Design & Contingencies - $910,000)
(52) SR 2027 over Branch of Darby Creek, Easttown Township, Bridge Rehabilitation, Bridge Key 10412, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(53) SR 3001 over SR 0001 Bypass, East Nottingham Township, Bridge Rehabilitation, Bridge Key 10414, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(54) SR 3011 over Tributary of East Branch of White Clay Creek, Franklin Township, Bridge Replacement, Bridge Key 39994, Project ID 107544
Project Allocation
1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(55) SR 3018 over McDonald Run, East Nottingham Township, Bridge Rehabilitation, Bridge Key 10447, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(56) SR 3035 over East Branch of White Clay Creek, Avondale Borough, Bridge Rehabilitation, Bridge Key 10478, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(57) SR 3046 over Branch of Red Clay Creek, New Garden Township, Bridge Replacement, Bridge Key 10501, Project ID 107544
Project Allocation
1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(58) SR 3049 over Green Valley Creek, Newlin Township, Bridge Replacement, Bridge Key 10510, Project ID 102318
Project Allocation
1,208,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(59) SR 3049 over West Branch of Brandywine Creek, Newlin Township, Bridge Replacement, Bridge Key 10511, Project ID 102318
Project Allocation
1,208,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(60) SR 3049 over Buck Run and Doe Run, Newlin Township, Bridge Rehabilitation, Bridge Key 10514, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(61) SR 3069 over Broad Run Creek, West Whiteland Township, Bridge Rehabilitation, Bridge Key 10544, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(62) SR 3074 over Olive Street, Caln Township, Bridge Rehabilitation, Bridge Key 10564, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(63) SR 3083 over Officers Run, West Sadsbury Township, Bridge Rehabilitation, Bridge Key 10569, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(64) SR 3085 over SR 0001 Bypass, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 10571, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(65) SR 3089 over SR 0001 Bypass, Upper Oxford Township, Bridge Rehabilitation, Bridge Key 10575, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(66) SR 3195 over SR 0001 Bypass, West Nottingham Township, Bridge Rehabilitation, Bridge Key 9887, Project ID 110664
Project Allocation
733,958
(Base Project Allocation - $730,958)
(Land Allocation - $3,000)
(67) SR 3196 over SR 0001 Bypass, Lower Oxford Township, Bridge Rehabilitation, Bridge Key 9891, Project ID 14580
Project Allocation
2,150,500
(Base Project Allocation - $1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(68) SR 3198 over SR 0001 Bypass, Penn Township, Bridge Rehabilitation, Bridge Key 9895, Project ID 14581
Project Allocation
1,250,100
(Base Project Allocation - $1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(69) SR 4005 over SR 0030 Bypass, Caln Township, Bridge Replacement, Bridge Key 10591, Project ID 87781
Project Allocation
6,008,628
(Base Project Allocation - $5,515,800)
(Land Allocation - $56,988)
(Design & Contingencies - $435,840)
(70) SR 4008 over Indian Run, Wallace Township, Bridge Replacement, Bridge Key 10599, Project ID 81287
Project Allocation
1,500,000
(Base Project Allocation - $957,000)
(Land Allocation - $25,000)
(Design & Contingencies - $518,000)
(71) SR 4015 over Branch of Beaver Creek, Caln Township, Bridge Rehabilitation, Bridge Key 10607, Project ID 88419
Project Allocation
666,666
(Base Project Allocation - $666,666)
(72) SR 7101 over Beaver Creek, Caln Township, Bridge Replacement, Bridge Key 10767, Project ID 86698
Project Allocation
400,500
(Base Project Allocation - $315,000)
(Land Allocation - $15,000)
(Design & Contingencies - $70,500)
(73) Swan Road over Officers Run, West Sadsbury Township, Bridge Replacement, Bridge Key 10570
Project Allocation
3,000,000
(Base Project Allocation - $2,000,000)
(Design & Contingencies - $1,000,000)