Section 6. Allegheny County.
(a) Local Bridges
Local
State
(1) Baldwin Borough, Brownsville Road (PV01 Brownsville Rd #1) over W&LE Railroad, Bridge Rehabilitation and Preservation, Bridge Key 2526, Project ID 93370
Project Allocation
114,000
(Base Project Allocation - $95,000)
(Design & Contingencies - $19,000)
(2) Carnegie Borough, Chestnut Street (CC04 Chartiers Creek No. 4) over Chartiers Creek, Bridge Rehabilitation, Bridge Key 2564, Project ID 93396
Project Allocation
41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(3) City of Pittsburgh, Forbes Avenue over Nine Mile Run and Fern Hollow, Bridge Replacement, Bridge Key 2410, Project ID 110319
Project Allocation
25,300,000
(Base Project Allocation - $25,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $100,000)
(4) Bellevue Borough, Jackman Avenue (DH03 Int Riverview Avenue) over West Bellevue Road and Dillworth Run, Bridge Rehabilitation, Bridge Key 2528, Project ID 93395
Project Allocation
38,000
(Base Project Allocation - $25,000)
(Design & Contingencies - $13,000)
(5) Penn Hills Township and Monroeville Borough, Old William Penn Highway over Thompson Run Road, Bridge Rehabilitation, Bridge Key 46768, Project ID 000
Project Allocation
797,100
(Base Project Allocation - $677,100)
(Design & Contingencies - $120,000)
(6) City of Pittsburgh, SR 0885 over Monongahela River, Three Rivers and Carson Street, Bridge Restoration, Bridge Key 1310, Project ID 93419
Project Allocation
303,000
(Base Project Allocation - $225,000)
(Design & Contingencies - $78,000)
(7) Elizabeth Township, SR 7105 over Youghiogheny River, Bridge Restoration, Bridge Key 2135, Project ID 93913
Project Allocation
660,000
(Base Project Allocation - $450,000)
(Land Allocation - $7,500)
(Design & Contingencies - $202,500)
(8) O'Hara Township, SR 7112 over Squaw Run, Bridge Restoration, Bridge Key 2172, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(9) Penn Hills Township, SR 7113 over Upper Branch of Plum Creek, Bridge Restoration, Bridge Key 2179, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(10) Penn Hills Township, SR 7113 over Thompson Run, Bridge Replacement, Bridge Key 46768, Project ID 109347
Project Allocation
300,000
(Base Project Allocation - $300,000)
(11) Ross Township, SR 7116 over South Branch of Pine Creek, Bridge Replacement, Bridge Key 2204, Project ID 107246
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(12) Scott Township, SR 7117 over Whiskey Run, Bridge Replacement, Bridge Key 55973, Project ID 112556
Project Allocation
750,000
(Base Project Allocation - $750,000)
(13) Shaler Township, SR 7118 over Wible Run Creek, Bridge Restoration, Bridge Key 2235, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(14) Shaler Township, SR 7118 over Pine Creek, Bridge Rehabilitation, Bridge Key 2230, Project ID 110316
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(15) Upper St. Clair Township, SR 7123 over Painters Run, Bridge Restoration, Bridge Key 2247, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(16) Hampton Township, SR 7207 over Pine Creek, Bridge Rehabilitation, Bridge Key 2310, Project ID 110317
Project Allocation
300,000
(Base Project Allocation - $300,000)
(17) City of Pittsburgh, SR 7301 over CSX Railroad and Bike Trail, Bridge Replacement, Bridge Key 2394, Project ID 91907
Project Allocation
3,932,550
(Base Project Allocation - $3,450,000)
(Land Allocation - $15,000)
(Design & Contingencies - $467,550)
(18) City of Pittsburgh, SR 7301 over Woods Run Avenue, Bridge Replacement, Bridge Key 2406, Project ID 67371
Project Allocation
1,177,500
(Base Project Allocation - $975,000)
(Land Allocation - $22,500)
(Design & Contingencies - $180,000)
(19) City of Pittsburgh, SR 7301 over Norfolk Southern Railroad and East Busway, Bridge Replacement, Bridge Key 2453, Project ID 83137
Project Allocation
880,950
(Base Project Allocation - $675,000)
(Land Allocation - $22,500)
(Design & Contingencies - $183,450)
(20) City of Pittsburgh, SR 7301 over CSX Railroad and Saline Street, Bridge Rehabilitation, Bridge Key 2457, Project ID 27747
Project Allocation
1,117,500
(Base Project Allocation - $900,000)
(Design & Contingencies - $217,500)
(21) City of Pittsburgh, SR 7301 over Norfolk Southern Railroad, Transit Rail and Sassafras Street, Bridge Rehabilitation, Bridge Key 2461, Project ID 27144
Project Allocation
952,800
(Base Project Allocation - $762,750)
(Design & Contingencies - $190,050)
(22) City of Pittsburgh, SR 7301 over Allegheny Valley Railroad, Bridge Rehabilitation, Bridge Key 2468, Project ID 106386
Project Allocation
420,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $120,000)
(23) City of Pittsburgh, SR 7301 over Forbes Avenue and 2nd Avenue, Bridge Rehabilitation, Bridge Key 2502, Project ID 93922
Project Allocation
1,303,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $293,000)
(24) City of Pittsburgh, SR 7301 over Becks Run, Bridge Replacement, Bridge Key 2504, Project ID 103344
Project Allocation
837,500
(Base Project Allocation - $800,000)
(Design & Contingencies - $37,500)
(25) City of Pittsburgh, SR 7301 over Becks Run, Bridge Replacement, Bridge Key 2506, Project ID 103347
Project Allocation
837,500
(Base Project Allocation - $800,000)
(Design & Contingencies - $37,500)
(26) City of Pittsburgh, SR 7301 over Allegheny River, Bridge Preservation, Bridge Key 2417, Project ID 115822
Project Allocation
300,000
(Base Project Allocation - $300,000)
(27) City of Pittsburgh, SR 7301 over Three Rivers Heritage Trail, Bridge Preservation, Bridge Key 2437, Project ID 115822
Project Allocation
300,000
(Base Project Allocation - $300,000)
(28) Castle Shannon Borough, SR 7416 (Grove Road) over Saw Mill Run, Bridge Replacement, Bridge Key 2570, Project ID 83977
Project Allocation
150,000
(Base Project Allocation - $150,000)
(29) Coraopolis Borough, SR 7420 over Ohio River, CSX Railroad and Road, Bridge Restoration, Bridge Key 2574, Project ID 28426
Project Allocation
900,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $150,000)
(30) Monroeville Borough, SR 7446 over Abers Creek, Bridge Restoration, Bridge Key 2631, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(31) Monroeville Borough, SR 7446 over Abers Creek, Bridge Restoration, Bridge Key 2632, Project ID 27316
Project Allocation
309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(32) Monroeville Borough, SR 7446 over Thompson Run Creek, Bridge Replacement, Bridge Key 2629, Project ID 111788
Project Allocation
2,201,350
(Base Project Allocation - $1,581,350)
(Land Allocation - $20,000)
(Design & Contingencies - $600,000)
(33) Rankin Borough, SR 7456 over Fleet Street, Bridge Rehabilitation, Bridge Key 2663, Project ID 93917
Project Allocation
450,000
(Base Project Allocation - $270,000)
(Design & Contingencies - $180,000)
(34) Rankin Borough, SR 7456 over Union Railroad and West Braddock Avenue, Bridge Rehabilitation, Bridge Key 2665, Project ID 93917
Project Allocation
300,000
(Base Project Allocation - $180,000)
(Design & Contingencies - $120,000)
(35) Wilmerding Borough, SR 7479 over Norfolk Southern Railroad, Avenue U and Wall Avenue, Bridge Rehabilitation, Bridge Key 2723, Project ID 93371
Project Allocation
2,327,000
(Base Project Allocation - $2,250,000)
(Design & Contingencies - $77,000)
(36) Fawn Township, Grimm Road over Bull Creek, Bridge Replacement, Bridge Key 2256, Project ID 27-2020-0001-0010
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(b) State Bridges
(1) SR 0008 over West Branch of Deer Creek, Richland Township, Bridge Replacement, Bridge Key 505, Project ID 100600
Project Allocation
820,000
(Base Project Allocation - $600,000)
(Land Allocation - $30,000)
(Design & Contingencies - $190,000)
(2) SR 0008 over SR 0028 and Railroad, Etna Borough, Bridge Preservation, Bridge Key 491, Project ID 69055
Project Allocation
510,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $10,000)
(3) SR 0008 over SR 0028 and Railroad, Etna Borough, Bridge Preservation, Bridge Key 492, Project ID 113647
Project Allocation
300,000
(Base Project Allocation - $300,000)
(4) SR 0019 over Little Saw Mill Run, City of Pittsburgh, Bridge Restoration, Bridge Key 521, Project ID 97028
Project Allocation
590,000
(Base Project Allocation - $517,000)
(Land Allocation - $16,000)
(Design & Contingencies - $57,000)
(5) SR 0019 over Little Saw Mill Run, City of Pittsburgh, Bridge Restoration, Bridge Key 523, Project ID 97028
Project Allocation
590,000
(Base Project Allocation - $517,000)
(Land Allocation - $16,000)
(Design & Contingencies - $57,000)
(6) SR 0019 over SR 0065 Northbound and Southbound and Ramps H and C, City of Pittsburgh, Bridge Restoration, Bridge Key 533, Project ID 100956
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
(7) SR 0019 over Ohio River and CSX Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 535, Project ID 100956
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
(8) SR 0030 over Turtle Creek and Norfolk Southern Railroad, East Pittsburgh Borough, Bridge Restoration, Bridge Key 674, Project ID 111624
Project Allocation
2,438,400
(Base Project Allocation - $2,438,400)
(9) SR 0048 over Branch of Jacks Run, White Oak Borough, Bridge Replacement, Bridge Key 686, Project ID 100606
Project Allocation
310,000
(Base Project Allocation - $160,000)
(Design & Contingencies - $150,000)
(10) SR 0051 over Lebanon Church Road, Pleasant Hills Borough, Bridge Restoration, Bridge Key 731, Project ID 28025
Project Allocation
670,000
(Land Allocation - $250,000)
(Design & Contingencies - $420,000)
(11) SR 0051 over Fallen Timber Run, Elizabeth Township, Bridge Replacement, Bridge Key 708, Project ID 62681
Project Allocation
360,000
(Base Project Allocation - $360,000)
(12) SR 0051 over Lewis Run, Pleasant Hills Borough, Bridge Preservation, Bridge Key 729, Project ID 100943
Project Allocation
600,000
(Base Project Allocation - $600,000)
(13) SR 0060 over Portland and Ogdensburg Railroad, Chartiers Creek and West Steuben Street, City of Pittsburgh, Bridge Restoration, Bridge Key 768, Project ID 109510
Project Allocation
7,200,000
(Base Project Allocation - $7,200,000)
(14) SR 0065 over SR 0065 Southbound and Various Streets and Alleyways, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 801, Project ID 109270
Project Allocation
1,495,000
(Base Project Allocation - $1,495,000)
(15) SR 0065 over Reedsdale and North Shore of Allegheny River, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 804, Project ID 109270
Project Allocation
1,265,000
(Base Project Allocation - $1,265,000)
(16) SR 0065 over Toms Run, Kilbuck Township, Bridge Restoration, Bridge Key 840, Project ID 109349
Project Allocation
360,000
(Base Project Allocation - $360,000)
(17) SR 0065 over Kilbuck Run, Glenfield Borough, Bridge Restoration, Bridge Key 844, Project ID 109349
Project Allocation
720,000
(Base Project Allocation - $720,000)
(18) SR 0088 over Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 927, Project ID 102961
Project Allocation
2,997,000
(Base Project Allocation - $2,160,000)
(Land Allocation - $324,000)
(Design & Contingencies - $513,000)
(19) SR 0088 over Branch of Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 928, Project ID 102961
Project Allocation
2,553,000
(Base Project Allocation - $1,840,000)
(Land Allocation - $276,000)
(Design & Contingencies - $437,000)
(20) SR 0136 over Beckets Run, Forward Township, Bridge Replacement, Bridge Key 957, Project ID 27407
Project Allocation
308,000
(Base Project Allocation - $260,000)
(Design & Contingencies - $48,000)
(21) SR 0136 over Beckets Run, Forward Township, Bridge Replacement, Bridge Key 959, Project ID 100618
Project Allocation
550,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $250,000)
(22) SR 0279 over Walkway of Point State Park, City of Pittsburgh, Bridge Restoration, Bridge Key 1018, Project ID 109270
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(23) SR 0279 over Point State Park and Monongahela River, City of Pittsburgh, Bridge Restoration, Bridge Key 1020, Project ID 109270
Project Allocation
300,000
(Base Project Allocation - $300,000)
(24) SR 0279 over SR 0279 Southbound, Ramp to SR 8041 and Ramp D, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1022, Project ID 109270
Project Allocation
575,000
(Base Project Allocation - $575,000)
(25) SR 0279 over Fort Duquesne Bridge Southbound and Allegheny River, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1023, Project ID 109270
Project Allocation
2,185,000
(Base Project Allocation - $2,185,000)
(26) SR 0279 over SR 0279 Southbound, City of Pittsburgh, Bridge Restoration, Bridge Key 1028, Project ID 109270
Project Allocation
4,719,750
(Base Project Allocation - $4,719,750)
(27) SR 0279 Ramp C (Fort Pitt) over Ramps B, D, G, F and Q, City of Pittsburgh, Bridge Restoration, Bridge Key 1014, Project ID 109270
Project Allocation
300,000
(Base Project Allocation - $300,000)
(28) SR 0366 over Abandoned Norfolk Southern Railroad, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1108, Project ID 100624
Project Allocation
8,068,250
(Base Project Allocation - $6,000,000)
(Land Allocation - $568,250)
(Design & Contingencies - $1,500,000)
(29) SR 0366 over 4th Avenue, Ramp D and Norfolk Southern Railroad, Tarentum Borough, Bridge Restoration, Bridge Key 1111, Project ID 63306
Project Allocation
1,600,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(30) SR 0376 over Ramp A and Monongahela River, City of Pittsburgh, Bridge Preservation, Bridge Key 1120, Project ID 87754
Project Allocation
2,066,500
(Base Project Allocation - $2,060,500)
(Design & Contingencies - $6,000)
(31) SR 0376 over Abandoned Railroad, 2nd Avenue and 10th Street, City of Pittsburgh, Bridge Preservation, Bridge Key 1133, Project ID 87754
Project Allocation
1,569,920
(Base Project Allocation - $1,534,720)
(Design & Contingencies - $35,200)
(32) SR 0376 over Second Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1137, Project ID 87754
Project Allocation
900,920
(Base Project Allocation - $880,720)
(Design & Contingencies - $20,200)
(33) SR 0376 over Brady Street and Pedestrian Trail, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1143, Project ID 87754
Project Allocation
909,840
(Base Project Allocation - $889,440)
(Design & Contingencies - $20,400)
(34) SR 0376 over Brady Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1145, Project ID 87754
Project Allocation
501,400
(Base Project Allocation - $500,000)
(Design & Contingencies - $1,400)
(35) SR 0376 over Pedestrian Underpass, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1148, Project ID 87754
Project Allocation
501,400
(Base Project Allocation - $500,000)
(Design & Contingencies - $1,400)
(36) SR 0376 over CSX Railroad, Swineburn Street and Frazier Street, City of Pittsburgh, Bridge Preservation, Bridge Key 1157, Project ID 87754
Project Allocation
2,845,480
(Base Project Allocation - $2,781,680)
(Design & Contingencies - $63,800)
(37) SR 0376 over Saline Street, City of Pittsburgh, Bridge Preservation, Bridge Key 1159, Project ID 87754
Project Allocation
1,106,080
(Base Project Allocation - $1,081,280)
(Design & Contingencies - $24,800)
(38) SR 0376 over Forward Avenue and Ramp H, City of Pittsburgh, Bridge Preservation, Bridge Key 1163, Project ID 87754
Project Allocation
1,653,200
(Base Project Allocation - $1,648,400)
(Design & Contingencies - $4,800)
(39) SR 0376 over Banksville Road Southbound, City of Pittsburgh, Bridge Replacement, Bridge Key 999, Project ID 97028
Project Allocation
4,692,000
(Base Project Allocation - $4,121,000)
(Land Allocation - $122,000)
(Design & Contingencies - $449,000)
(40) SR 0376 over Branch of Saw Mill Run, City of Pittsburgh, Bridge Restoration, Bridge Key 1004, Project ID 97028
Project Allocation
1,875,000
(Base Project Allocation - $1,646,000)
(Land Allocation - $49,000)
(Design & Contingencies - $180,000)
(41) SR 0376 over Monongahela River and Norfolk Southern Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1011, Project ID 111632
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
(42) SR 0376 over Monongahela River and Norfolk Southern Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1019, Project ID 111632
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
(43) SR 0376 over Bates Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1152, Project ID 104228
Project Allocation
5,372,000
(Base Project Allocation - $3,239,000)
(Land Allocation - $948,000)
(Design & Contingencies - $1,185,000)
(44) SR 0376 over Commercial Street and Nine Mile Run, City of Pittsburgh, Bridge Replacement, Bridge Key 1167, Project ID 105438
Project Allocation
315,000
(Base Project Allocation - $315,000)
(45) SR 0376 over SR 8010 Ramp B, City of Pittsburgh, Bridge Replacement, Bridge Key 1170, Project ID 105438
Project Allocation
300,000
(Base Project Allocation - $300,000)
(46) SR 0376 over Braddock Avenue, Edgewood Borough, Bridge Replacement, Bridge Key 1171, Project ID 105438
Project Allocation
300,000
(Base Project Allocation - $300,000)
(47) SR 0376 over Parkway East, Edgewood Borough, Bridge Replacement, Bridge Key 1174, Project ID 105438
Project Allocation
300,000
(Base Project Allocation - $300,000)
(48) SR 0376 over Ardmore Boulevard, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1182, Project ID 110558
Project Allocation
472,500
(Base Project Allocation - $405,000)
(Design & Contingencies - $67,500)
(49) SR 0376 over SR 2110, Churchill Borough, Bridge Restoration, Bridge Key 1192, Project ID 110558
Project Allocation
402,500
(Base Project Allocation - $345,000)
(Design & Contingencies - $57,500)
(50) SR 0376 over Old William Penn Highway and Leak Run, Monroeville Borough, Bridge Restoration, Bridge Key 1206, Project ID 110558
Project Allocation
315,000
(Base Project Allocation - $270,000)
(Design & Contingencies - $45,000)
(51) SR 0376 over Old William Penn Highway, Monroeville Borough, Bridge Restoration, Bridge Key 1208, Project ID 110558
Project Allocation
315,000
(Base Project Allocation - $270,000)
(Design & Contingencies - $45,000)
(52) SR 0376 over US 22 Business, Monroeville Borough, Bridge Restoration, Bridge Key 46974, Project ID 110558
Project Allocation
335,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $35,000)
(53) SR 0376 over McMichael Road, Robinson Township, Bridge Replacement, Bridge Key 557, Project ID 113345
Project Allocation
822,500
(Base Project Allocation - $822,500)
(54) SR 0376 over CSX Railroad, Swineburn Road and Frazier Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1157, Project ID 113362
Project Allocation
133,500,000
(Base Project Allocation - $120,000,000)
(Land Allocation - $2,000,000)
(Design & Contingencies - $11,500,000)
(55) SR 0579 over Norfolk Southern Railroad, Pittsburgh Light Rail and East Busway, City of Pittsburgh, Bridge Restoration, Bridge Key 1241, Project ID 109295
Project Allocation
704,000
(Base Project Allocation - $704,000)
(56) SR 0579 over Norfolk Southern Railroad, Pittsburgh Light Rail and East Busway, City of Pittsburgh, Bridge Restoration, Bridge Key 1245, Project ID 109295
Project Allocation
704,000
(Base Project Allocation - $704,000)
(57) SR 0579 over SR 0028, SR 8108 and East Ohio Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1248, Project ID 109295
Project Allocation
836,000
(Base Project Allocation - $836,000)
(58) SR 0579 over I-279, SR 0028, HOV, Norfolk Southern Railroad and East Ohio Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1254, Project ID 109295
Project Allocation
836,000
(Base Project Allocation - $836,000)
(59) SR 0837 over Homestead Run, Munhall Borough, Bridge Replacement, Bridge Key 1280, Project ID 78441
Project Allocation
3,675,000
(Base Project Allocation - $3,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $525,000)
(60) SR 0910 over Deer Creek, West Deer Township, Bridge Rehabilitation, Bridge Key 1335, Project ID 109557
Project Allocation
1,210,000
(Base Project Allocation - $300,000)
(Land Allocation - $60,000)
(Design & Contingencies - $850,000)
(61) SR 0910 over Deer Creek, West Deer Township, Bridge Replacement, Bridge Key 1337, Project ID 109558
Project Allocation
605,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $180,000)
(62) SR 0910 over Rawlins Run, Indiana Township, Bridge Replacement, Bridge Key 1342, Project ID 100635
Project Allocation
2,100,000
(Base Project Allocation - $1,200,000)
(Land Allocation - $100,000)
(Design & Contingencies - $800,000)
(63) SR 0978 over Dolphin Run, South Fayette Township, Bridge Replacement, Bridge Key 1347, Project ID 100636
Project Allocation
2,475,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $125,000)
(Design & Contingencies - $850,000)
(64) SR 0978 over Bridge and North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1351, Project ID 100637
Project Allocation
720,000
(Base Project Allocation - $370,000)
(Design & Contingencies - $350,000)
(65) SR 0978 over North Branch of Robinson Run, North Fayette Township, Bridge Replacement, Bridge Key 1353, Project ID 63330
Project Allocation
494,000
(Base Project Allocation - $300,000)
(Land Allocation - $14,000)
(Design & Contingencies - $180,000)
(66) SR 1005 over Norfolk Southern Railroad, Allegheny River and Allegheny Valley Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 1380, Project ID 109549
Project Allocation
1,252,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $12,000)
(Design & Contingencies - $240,000)
(67) SR 1015 over Branch of Little Deer Creek, Indiana Township, Bridge Replacement, Bridge Key 1423, Project ID 100646
Project Allocation
1,190,000
(Base Project Allocation - $240,000)
(Land Allocation - $100,000)
(Design & Contingencies - $850,000)
(68) SR 1015 over Little Deer Creek, Indiana Township, Bridge Replacement, Bridge Key 1426, Project ID 63346
Project Allocation
1,105,000
(Base Project Allocation - $400,000)
(Land Allocation - $125,000)
(Design & Contingencies - $580,000)
(69) SR 1015 over Branch of Little Deer Creek, West Deer Township, Bridge Replacement, Bridge Key 1427, Project ID 110057
Project Allocation
1,190,000
(Base Project Allocation - $240,000)
(Land Allocation - $100,000)
(Design & Contingencies - $850,000)
(70) SR 1015 over Small Creek, West Deer Township, Bridge Replacement, Bridge Key 1428, Project ID 28606
Project Allocation
2,500,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $150,000)
(Design & Contingencies - $850,000)
(71) SR 1019 over Days Run, Frazer Township, Bridge Replacement, Bridge Key 1438, Project ID 100649
Project Allocation
2,940,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $900,000)
(72) SR 1027 over Little Bull Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 1448, Project ID 100650
Project Allocation
1,450,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $950,000)
(73) SR 1028 over Bessemer and Lake Erie Railroad, West Deer Township, Bridge Rehabilitation, Bridge Key 1453, Project ID 27452
Project Allocation
2,670,000
(Base Project Allocation - $1,900,000)
(Land Allocation - $110,000)
(Design & Contingencies - $660,000)
(74) SR 1033 over McDowell Run, Fawn Township, Bridge Replacement, Bridge Key 1466, Project ID 100654
Project Allocation
850,000
(Base Project Allocation - $850,000)
(75) SR 1038 over SR 9109, Pine Street and Allegheny River, East Deer Township, Bridge Restoration, Bridge Key 1475, Project ID 63515
Project Allocation
4,850,000
(Base Project Allocation - $4,000,000)
(Design & Contingencies - $850,000)
(76) SR 2005 over Kelly Run, Forward Township, Bridge Replacement, Bridge Key 1492, Project ID 28609
Project Allocation
307,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $7,000)
(77) SR 2010 over Wylie Run, Lincoln Borough, Bridge Replacement, Bridge Key 1504, Project ID 74319
Project Allocation
1,750,000
(Base Project Allocation - $400,000)
(Land Allocation - $250,000)
(Design & Contingencies - $1,100,000)
(78) SR 2013 over Branch of Beckets Run, Forward Township, Bridge Replacement, Bridge Key 1507, Project ID 100661
Project Allocation
750,000
(Base Project Allocation - $750,000)
(79) SR 2017 over Gillespie Run, Elizabeth Township, Bridge Replacement, Bridge Key 1515, Project ID 28440
Project Allocation
2,225,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $150,000)
(Design & Contingencies - $575,000)
(80) SR 2017 over Wildcat Run, Elizabeth Township, Bridge Replacement, Bridge Key 1521, Project ID 100664
Project Allocation
400,000
(Base Project Allocation - $400,000)
(81) SR 2031 over Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1535, Project ID 89129
Project Allocation
700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(82) SR 2048 over Union Railroad, Thompson Run and Thompson Run Road, Monroeville Borough, Bridge Preservation, Bridge Key 1575, Project ID 111630
Project Allocation
2,850,000
(Base Project Allocation - $2,100,000)
(Design & Contingencies - $750,000)
(83) SR 2058 over Sandy Creek, Penn Hills Township, Bridge Replacement, Bridge Key 1588, Project ID 89077
Project Allocation
2,500,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(84) SR 2075 over Branch of Little Plum Creek, Plum Borough, Bridge Replacement, Bridge Key 1621, Project ID 28615
Project Allocation
1,007,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $7,000)
(85) SR 2096 over CSX Railroad and Youghiogheny River, Port Vue Borough, Bridge Restoration, Bridge Key 1652, Project ID 111629
Project Allocation
1,900,000
(Base Project Allocation - $1,400,000)
(Design & Contingencies - $500,000)
(86) SR 2107 over Ramps G and E and Cliff Street, City of McKeesport, Bridge Restoration, Bridge Key 1667, Project ID 63583
Project Allocation
444,000
(Base Project Allocation - $312,000)
(Land Allocation - $30,000)
(Design & Contingencies - $102,000)
(87) SR 2112 over Falls Run, East Pittsburgh Borough, Bridge Replacement, Bridge Key 40980, Project ID 78232
Project Allocation
20,950,000
(Base Project Allocation - $20,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $750,000)
(88) SR 2114 over PA 148 5th Avenue, City of McKeesport, Bridge Restoration, Bridge Key 1666, Project ID 63583
Project Allocation
366,000
(Base Project Allocation - $300,000)
(Land Allocation - $15,000)
(Design & Contingencies - $51,000)
(89) SR 2114 over SR 0736 Extension, Three Rivers and Monongahela River, City of Duquesne, Bridge Restoration, Bridge Key 1668, Project ID 63583
Project Allocation
4,292,000
(Base Project Allocation - $3,016,000)
(Land Allocation - $290,000)
(Design & Contingencies - $986,000)
(90) SR 3001 over Branch of Millers Run, South Fayette Township, Bridge Replacement, Bridge Key 1689, Project ID 78234
Project Allocation
2,500,000
(Base Project Allocation - $1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(91) SR 3004 over McLaughlin Run, Bridgeville Borough, Bridge Replacement, Bridge Key 1692, Project ID 63558
Project Allocation
600,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $180,000)
(92) SR 3015 over Lick Run Creek, Jefferson Hills Borough, Bridge Replacement, Bridge Key 1724, Project ID 105451
Project Allocation
486,000
(Base Project Allocation - $300,000)
(Land Allocation - $16,000)
(Design & Contingencies - $170,000)
(93) SR 3027 over Monongahela River and CSX Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 1742, Project ID 28525
Project Allocation
12,843,629
(Base Project Allocation - $12,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $743,629)
(94) SR 3028 over Branch of Millers Run, South Fayette Township, Bridge Replacement, Bridge Key 1745, Project ID 109548
Project Allocation
400,000
(Base Project Allocation - $400,000)
(95) SR 3041 over Campbells Run, Collier Township, Bridge Replacement, Bridge Key 1766, Project ID 27219
Project Allocation
2,682,000
(Base Project Allocation - $1,840,000)
(Land Allocation - $240,000)
(Design & Contingencies - $602,000)
(96) SR 3070 over Montour Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1823, Project ID 78272
Project Allocation
540,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $40,000)
(97) SR 3071 over Branch of Potato Garden Run, Findlay Township, Bridge Replacement, Bridge Key 1832, Project ID 78147
Project Allocation
300,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $20,000)
(98) SR 3104 over Harriet Street, McKees Rocks Borough, Bridge Restoration, Bridge Key 1867, Project ID 28344
Project Allocation
545,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $45,000)
(99) SR 3104 over CSX Railroad, McKees Rocks Borough, Bridge Rehabilitation, Bridge Key 1868, Project ID 28344
Project Allocation
1,435,000
(Base Project Allocation - $1,066,000)
(Design & Contingencies - $369,000)
(100) SR 3104 over Chambers Street, McKees Rocks Borough, Bridge Restoration, Bridge Key 1870, Project ID 28344
Project Allocation
545,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $45,000)
(101) SR 3104 over Munson Avenue, McKees Rocks Borough, Bridge Restoration, Bridge Key 1872, Project ID 28344
Project Allocation
327,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $27,000)
(102) SR 3104 over Helen Street, McKees Rocks Borough, Bridge Restoration, Bridge Key 1873, Project ID 28344
Project Allocation
309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(103) SR 3104 over Olivia Street Pedestrian Underpass, McKees Rocks Borough, Bridge Restoration, Bridge Key 1874, Project ID 28344
Project Allocation
309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(104) SR 3104 over Ohio River and Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1876, Project ID 100701
Project Allocation
14,000,000
(Base Project Allocation - $14,000,000)
(105) SR 3111 over Shouse Run, Crescent Township, Bridge Replacement, Bridge Key 1886, Project ID 78408
Project Allocation
1,020,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $20,000)
(106) SR 4019 over Pine Creek, Etna Borough, Bridge Preservation, Bridge Key 1953, Project ID 100716
Project Allocation
480,000
(Base Project Allocation - $480,000)
(107) SR 4039 over Little Sewickley Creek, Sewickley Hills Borough, Bridge Replacement, Bridge Key 1983, Project ID 78419
Project Allocation
440,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $40,000)
(108) SR 4050 over Branch of Brush Creek, Marshall Township, Bridge Replacement, Bridge Key 1995, Project ID 100722
Project Allocation
300,000
(Base Project Allocation - $300,000)
(109) SR 4068 over CSX Railroad, Richland Township, Bridge Restoration, Bridge Key 2013, Project ID 113631
Project Allocation
2,400,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $900,000)
(110) SR 4070 over CSX Railroad, Creek and Private Road, Hampton Township, Bridge Restoration, Bridge Key 2018, Project ID 78427
Project Allocation
1,000,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $400,000)
(111) SR 4165 over Norfolk Southern Railroad, Glenfield Borough, Bridge Preservation, Bridge Key 2027, Project ID 109570
Project Allocation
450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(112) SR 6279 over Four City Streets, City of Pittsburgh, Bridge Restoration, Bridge Key 2030, Project ID 109270
Project Allocation
805,000
(Base Project Allocation - $805,000)
(113) SR 6579 over State Roads, Railroad and City Streets, City of Pittsburgh, Bridge Restoration, Bridge Key 2043, Project ID 109295
Project Allocation
704,000
(Base Project Allocation - $704,000)
(114) SR 6579 over Norfolk Southern Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 2044, Project ID 109295
Project Allocation
616,000
(Base Project Allocation - $616,000)
(115) SR 8002 over Forbes, Diamond and 6th Avenues, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2730, Project ID 109562
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(116) SR 8006 over Hodge Street, City of Pittsburgh, Bridge Restoration, Bridge Key 2749, Project ID 104228
Project Allocation
1,428,000
(Base Project Allocation - $861,000)
(Land Allocation - $252,000)
(Design & Contingencies - $315,000)
(117) SR 8038 over Campbells Run, Collier Township, Bridge Replacement, Bridge Key 2810, Project ID 27219
Project Allocation
2,682,000
(Base Project Allocation - $1,840,000)
(Land Allocation - $240,000)
(Design & Contingencies - $602,000)
(118) SR 8055 over SR 0065 and Railroad, City of Pittsburgh, Bridge Preservation, Bridge Key 2855, Project ID 113632
Project Allocation
300,000
(Base Project Allocation - $300,000)
(119) SR 8057 over Railroad Property, City of Duquesne, Bridge Restoration, Bridge Key 2869, Project ID 63583
Project Allocation
438,000
(Base Project Allocation - $350,000)
(Land Allocation - $20,000)
(Design & Contingencies - $68,000)
(120) SR 8080 over US 22 Business, Monroeville Borough, Bridge Rehabilitation, Bridge Key 2896, Project ID 113638
Project Allocation
300,000
(Base Project Allocation - $300,000)
(121) SR 8086 over SR 1066, SR 0392 and Local Streets, City of McKeesport, Bridge Restoration, Bridge Key 2897, Project ID 63583
Project Allocation
1,480,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $100,000)
(Design & Contingencies - $340,000)
(122) SR 8086 over Cliff Street, City of McKeesport, Bridge Restoration, Bridge Key 2898, Project ID 63583
Project Allocation
322,000
(Base Project Allocation - $300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $17,000)
(123) SR 8086 over Ramp E, City of McKeesport, Bridge Restoration, Bridge Key 2899, Project ID 63583
Project Allocation
448,000
(Base Project Allocation - $360,000)
(Land Allocation - $20,000)
(Design & Contingencies - $68,000)
(124) SR 8086 over Ramp E, City of McKeesport, Bridge Restoration, Bridge Key 2900, Project ID 63583
Project Allocation
316,000
(Base Project Allocation - $250,000)
(Land Allocation - $15,000)
(Design & Contingencies - $51,000)