Act 81 of 2022, § 325, under HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2022-2023 - ENACTMENT.

Act 81 of 2022, § 325

Section 325. Erie County.

Projects are as follows:

(1) SR 0005, Safety Improvements, PA 5 from East Side Access to Franklin Avenue, City of Erie, Project ID 109748

Project Allocation

505,800

(Base Project Allocation - $405,800)

(Design & Contingencies - $100,000)

(2) SR 0005, Highway Restoration, SR 0005 (West Lake Road/12th Street) from SR 0098 (Avonia Road) to SR 4009 (Asbury Road), Fairview and Millcreek Townships, Project ID 86499

Project Allocation

300,000

(Base Project Allocation - $300,000)

(3) SR 0005, ADA Ramp Improvements, SR 0005 (West 12th Street) from Asbury Road to Pittsburgh Avenue and SR 0020 (West 26th Street) at Caughy Road, Millcreek Township and City of Erie, Project ID 102740

Project Allocation

785,000

(Base Project Allocation - $785,000)

(4) SR 0005, Traffic Signal Improvements, 12th Street from Bayfront Parkway to Bayfront Connector, City of Erie, Project ID 111839

Project Allocation

2,900,000

(Base Project Allocation - $2,400,000)

(Design & Contingencies - $500,000)

(5) SR 0006, Highway Restoration, SR 0006 (Grand Army of the Republic Highway) from SR 0008 (Main Street) at Kwik Fill to PennDOT Shed, Union Township and Union City Borough, Project ID 90283

Project Allocation

300,000

(Base Project Allocation - $300,000)

(6) SR 0008, Intersection Improvements, Intersection of SR 0008 (Pine Avenue), SR 0097 (Old French Road) and East 28th Street, City of Erie, Project ID 106444

Project Allocation

1,300,000

(Base Project Allocation - $600,000)

(Land Allocation - $150,000)

(Design & Contingencies - $550,000)

(7) SR 0008, Highway Restoration, Various Structures on Various State Routes, Various Municipalities, Project ID 109893

Project Allocation

1,150,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $150,000)

(8) SR 0018, Traffic Signals, Intersection of US 6 (State Street) and PA 18 (Main Street), Albion Borough, Project ID 105608

Project Allocation

421,996

(Base Project Allocation - $276,250)

(Land Allocation - $96,459)

(Design & Contingencies - $49,287)

(9) SR 0018, Highway Restoration, SR 0018 (Rice Avenue/Lake Street) from SR 0020 (Ridge Road) to SR 0005 (West Lake Road), Conneaut and Elk Creek Townships and Albion Borough, Project ID 86951

Project Allocation

300,000

(Base Project Allocation - $300,000)

(10) SR 0019, Highway Restoration, SR 0019 (Peach Street) from Dorn Road to Robinson Road, Summit Township, Project ID 113880

Project Allocation

420,000

(Base Project Allocation - $320,000)

(Design & Contingencies - $100,000)

(11) SR 0019, Highway Restoration, US 19 from I-90 to Rotunda Drive, Summit Township, Project ID 114067

Project Allocation

300,000

(Base Project Allocation - $300,000)

(12) SR 0020, Highway Restoration, US 20 (Ridge Road/Main Street) from Chestnut Street to Imperial Parkway, Girard Township and Girard Borough, Project ID 87031

Project Allocation

815,000

(Base Project Allocation - $800,000)

(Land Allocation - $15,000)

(13) SR 0020, Highway Restoration, SR 0020 (Buffalo Road) from Mooreheadville Road to North East Township Line, Harborcreek and North East Townships, Project ID 90284

Project Allocation

4,000,000

(Base Project Allocation - $4,000,000)

(14) SR 0020, Highway Restoration, SR 0020 from Schiley Street to Harborcreek, Harborcreek Township, City of Erie and Wesleyville Borough, Project ID 113882

Project Allocation

850,000

(Base Project Allocation - $800,000)

(Design & Contingencies - $50,000)

(15) SR 0020, Traffic Signal Improvements, SR 0020 (Ridge Road) from Millfair to Zuck Road, Millcreek Township, Project ID 110339

Project Allocation

1,680,000

(Base Project Allocation - $1,400,000)

(Land Allocation - $180,000)

(Design & Contingencies - $100,000)

(16) SR 0020, Highway Restoration, SR 0020 from Ridge Road to 26th Street, Millcreek Township and City of Erie, Project ID 1103

Project Allocation

400,000

(Base Project Allocation - $320,000)

(Land Allocation - $40,000)

(Design & Contingencies - $40,000)

(17) SR 0020, Interchange Improvements, SR 0020, West 26th Street and I-79, Millcreek Township and City of Erie, Project ID 109625

Project Allocation

3,450,000

(Base Project Allocation - $3,000,000)

(Land Allocation - $150,000)

(Design & Contingencies - $300,000)

(18) SR 0020, Traffic Signals, throughout SR 0020 Corridor, North East Borough, Project ID 104502

Project Allocation

450,000

(Base Project Allocation - $363,800)

(Design & Contingencies - $86,200)

(19) SR 0020, Highway Restoration, SR 0020 (Buffalo Road/Main Street) from North East Township Line to Orchard Beach Road, North East Township and North East Borough, Project ID 90285

Project Allocation

3,840,000

(Base Project Allocation - $3,840,000)

(20) SR 0020, Highway Restoration, SR 0020 (Ridge Road) from Zuck Road to Chestnut Street, City of Erie and Millcreek Township, Project ID 87032

Project Allocation

861,134

(Base Project Allocation - $861,134)

(21) SR 0020, Highway Restoration, SR 0020 (Main Street/Ridge Road) from SR 0098 (Avonia Road) to SR 4016 (Millfair Road), Fairview Township, Project ID 87030

Project Allocation

5,548,000

(Base Project Allocation - $5,448,000)

(Design & Contingencies - $100,000)

(22) SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), City of Erie, Project ID 75931

Project Allocation

3,675,000

(Base Project Allocation - $3,600,000)

(Design & Contingencies - $75,000)

(23) SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), Mile Markers 172 to 178, McKean and Summit Townships, Project ID 76852

Project Allocation

64,450,000

(Base Project Allocation - $63,600,000)

(Design & Contingencies - $850,000)

(24) SR 0079, Highway Restoration, Mile Markers 178 to 182.5, Millcreek and Summit Townships and City of Erie, Project ID 106298

Project Allocation

300,000

(Base Project Allocation - $300,000)

(25) SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), Millcreek and Summit Townships and City of Erie, Project ID 81283

Project Allocation

72,035,000

(Base Project Allocation - $71,000,000)

(Land Allocation - $35,000)

(Design & Contingencies - $1,000,000)

(26) SR 0086, Highway Restoration, SR 0086, Mile Markers 1 to 7, Greenfield Township, Project ID 112302

Project Allocation

300,000

(Base Project Allocation - $300,000)

(27) SR 0086, Highway Restoration, I-86 (Hopkins-Bowser Highway), Mile Markers 1 to 7, Eastbound Lanes Only, Greenfield Township, Project ID 81441

Project Allocation

7,651,653

(Base Project Allocation - $7,501,653)

(Design & Contingencies - $150,000)

(28) SR 0086, Highway Restoration, I-86 (Hopkins-Bowser Highway), Greenfield Township, Project ID 97886

Project Allocation

400,000

(Base Project Allocation - $400,000)

(29) SR 0086, Highway Restoration, throughout I-86 Corridor, Greenfield Township, Project ID 106300

Project Allocation

49,000,000

(Base Project Allocation - $49,000,000)

(30) SR 0086, Highway Restoration, I-86, Mile Markers 1 to 7, Greenfield Township, Project ID 109801

Project Allocation

300,000

(Base Project Allocation - $300,000)

(31) SR 0089, Intersection Improvements, Intersection of SR 0089 (Beaver Dam Road) and SR 0430 (Station Road), Greenfield Township, Project ID 106446

Project Allocation

582,000

(Base Project Allocation - $447,000)

(Design & Contingencies - $135,000)

(32) SR 0089, Highway Restoration, SR 0089 (Station Road) from Smith Road to SR 0426, North East Township and North East Borough, Project ID 109143

Project Allocation

1,870,000

(Base Project Allocation - $1,800,000)

(Design & Contingencies - $70,000)

(33) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 10.5 to 18, Conneaut, Fairview, Girard and McKean Townships, Project ID 106322

Project Allocation

1,200,000

(Base Project Allocation - $1,120,000)

(Design & Contingencies - $80,000)

(34) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 3.5 to 10.5, Girard and Springfield Townships and Platea Borough, Project ID 67893

Project Allocation

2,340,000

(Base Project Allocation - $1,890,000)

(Design & Contingencies - $450,000)

(35) SR 0090, Highway Resurfacing, I-90 (American Veterans Memorial Highway) from 1.3 Miles East of SR 0008 Interchange to 0.9 Miles West of I-86 Interchange, Mile Markers 30 to 35.1, Greene, Harborcreek and Millcreek Townships, Project ID 90308

Project Allocation

2,000,000

(Base Project Allocation - $2,000,000)

(36) SR 0090, Highway Resurfacing, I-90 (American Veterans Memorial Highway) from Maintenance Crossover in Millcreek Township to Ramp at Seven Mile Bridge Structure, Mile Markers 30 to 34.5, Greene, Harborcreek and Millcreek Townships, Project ID 91572

Project Allocation

10,000,000

(Base Project Allocation - $10,000,000)

(37) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Greene, Harborcreek, McKean, Millcreek and Summit Townships, Project ID 75932

Project Allocation

3,600,000

(Base Project Allocation - $3,600,000)

(38) SR 0090, Highway Restoration, I-90, Mile Markers 23 to 35, Greene, Harborcreek, Millcreek and Summit Townships, Project ID 109796

Project Allocation

14,650,000

(Base Project Allocation - $14,350,000)

(Design & Contingencies - $300,000)

(39) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 30 to 35, Harborcreek and Millcreek Townships, Project ID 76855

Project Allocation

12,000,000

(Base Project Allocation - $12,000,000)

(40) SR 0090, Highway Restoration, I-90 (American Veteran Memorial Highway) from 0.5 Miles East of SR 4017 Overpass to West of I-86 Interchange, Harborcreek Township, Project ID 94798

Project Allocation

2,795,000

(Base Project Allocation - $2,730,000)

(Design & Contingencies - $65,000)

(41) SR 0090, Highway Restoration, I-86 to New York State Line, Harborcreek, Greenfield and Northeast Townships, Project ID 106297

Project Allocation

300,000

(Base Project Allocation - $300,000)

(42) SR 0090, Highway Restoration, I-90, Mile Markers 18 to 23, McKean and Summit Townships, Project ID 109800

Project Allocation

4,610,000

(Base Project Allocation - $4,060,000)

(Design & Contingencies - $550,000)

(43) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 18 to 25, McKean and Summit Townships, Project ID 76854

Project Allocation

12,000,000

(Base Project Allocation - $12,000,000)

(44) SR 0090, Highway Restoration, I-90 (American Veteran Memorial Highway), Mile Markers 17.4 to 23.1, McKean and Summit Townships, Project ID 89232

Project Allocation

2,800,000

(Base Project Allocation - $2,800,000)

(45) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 18 to 23, McKean and Summit Townships, Project ID 109817

Project Allocation

5,000,000

(Base Project Allocation - $4,850,000)

(Design & Contingencies - $150,000)

(46) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 25 to 30, Greene, Harborcreek, Millcreek and Summit Townships, Project ID 81454

Project Allocation

8,000,000

(Base Project Allocation - $8,000,000)

(47) SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers 18 to 23, McKean and Summit Townships, Project ID 85756

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

(48) SR 0290, Intersection Improvements, Intersection of SR 0290 and Buffalo Road, City of Erie, Project ID 104463

Project Allocation

716,000

(Base Project Allocation - $520,000)

(Land Allocation - $96,000)

(Design & Contingencies - $100,000)

(49) SR 0430, Highway Restoration, SR 0430 (Station Road) from SR 0290 (Bayfront Connector) to Shannon Road, Harborcreek Township and Wesleyville Borough, Project ID 73242

Project Allocation

300,000

(Base Project Allocation - $300,000)

(50) SR 0531, Highway Reconstruction, SR 0531 from Davidson Road to McGill Road, Harborcreek Township, Project ID 102468

Project Allocation

300,000

(Base Project Allocation - $300,000)

(51) SR 0531, Highway Reconstruction, SR 0531 (Depot Road) from Franz Avenue to SR 0020 (Buffalo Road), Harborcreek Township, Project ID 106586

Project Allocation

1,640,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $190,000)

(Design & Contingencies - $250,000)

(52) SR 0699, Safety Improvements, SR 0699 (Erie Street), McKean Township, Project ID 713

Project Allocation

301,000

(Base Project Allocation - $300,000)

(Design & Contingencies - $1,000)

(53) SR 0699, Intersection Improvements, SR 0699 at Intersection of PA 99 (Edinboro Road) and SR 4010 (Hershey Road), Summit Township, Project ID 97952

Project Allocation

508,943

(Base Project Allocation - $302,543)

(Land Allocation - $166,400)

(Design & Contingencies - $40,000)

(54) SR 0832, Highway Restoration, SR 0832 from SR 0098 to I-90, Fairview and McKean Townships, Project ID 116814

Project Allocation

2,756,000

(Base Project Allocation - $2,656,000)

(Design & Contingencies - $100,000)

(55) SR 0832, Highway Reconstruction, SR 0832, Segments 0210/2344 to 0220/0600 and SR 0020, Segments 0500/0778 to 0510/0800 and Segments 0501/0798 to 0511/0800, Millcreek Township and City of Erie, Project ID 68273

Project Allocation

400,000

(Base Project Allocation - $400,000)

(56) SR 2025, Highway Restoration, SR 2025 from SR 0006 (Columbia Avenue) to New York State Line, Wayne Township and City of Corry, Project ID 107772

Project Allocation

1,757,000

(Base Project Allocation - $1,757,000)

(57) SR 3006, Intersection Improvements, Intersection of SR 3006 and US 6 (West Plumb Street and East Plumb Street) and Intersection of SR 3006 and PA 99 (Erie Street), Edinboro Borough, Project ID 109901

Project Allocation

300,000

(Base Project Allocation - $300,000)

(58) SR 3006, Highway Restoration, SR 3006 (Crossingville Road/Plum Street) from SR 0098 to SR 0699 (Erie Street), Elk Creek and Washington Townships and Edinboro Borough, Project ID 90282

Project Allocation

4,000,000

(Base Project Allocation - $4,000,000)

(59) SR 3006, Intersection Improvements, Intersection of US 6 (SR 3006) and SR 0198 (PA 98), Elk Creek Township, Project ID 109857

Project Allocation

370,000

(Base Project Allocation - $370,000)

(60) SR 3006, Highway Restoration, SR 3006 at US 6 Railroad Underpass, Springfield Township, Project ID 110343

Project Allocation

4,260,000

(Base Project Allocation - $3,500,000)

(Land Allocation - $380,000)

(Design & Contingencies - $380,000)

(61) SR 3018, Highway Resurfacing, SR 3018, Fairview and Girard Townships, Project ID 107750

Project Allocation

1,330,000

(Base Project Allocation - $1,330,000)

(62) SR 4009, Additional Lanes, SR 0020 (West 26th Street) and SR 4009 (Asbury Road), Millcreek Township, Project ID 68270

Project Allocation

1,250,000

(Base Project Allocation - $1,250,000)

(63) SR 4010, Highway Restoration, SR 4010 (Hershey Road), Millcreek, McKean and Summit Townships, Project ID 116813

Project Allocation

2,611,212

(Base Project Allocation - $2,511,212)

(Design & Contingencies - $100,000)

(64) SR 4010, Highway Reconstruction, SR 4010 (Hershey Road) to Hamot Road, Summit Township, Project ID 102074

Project Allocation

495,000

(Base Project Allocation - $350,000)

(Land Allocation - $145,000)

(65) SR 4015, Highway Restoration, SR 4015 (Zuck Road) from SR 4014 to SR 0020, Millcreek Township, Project ID 109147

Project Allocation

576,000

(Base Project Allocation - $476,000)

(Land Allocation - $40,000)

(Design & Contingencies - $60,000)

(66) SR 4016, Highway Restoration, SR 4016 from SR 0019 to SR 0197, City of Erie, Project ID 116815

Project Allocation

1,796,000

(Base Project Allocation - $1,696,000)

(Design & Contingencies - $100,000)

(67) SR 4017, Highway Restoration, SR 4017 (Pittsburgh Avenue) from SR 4016 (West 38th Street) to SR 4018 (8th Street) and SR 0098 (Avonia Road) from Hawthorne Ridge Road to SR 0832 (Sterrettania Road), City of Erie, Project ID 89218

Project Allocation

700,000

(Base Project Allocation - $600,000)

(Design & Contingencies - $100,000)

(68) SR 4028, Highway Restoration, SR 4028 (Gore Road), Millcreek Township, Project ID 116816

Project Allocation

1,876,000

(Base Project Allocation - $1,776,000)

(Design & Contingencies - $100,000)

(69) SR 4034, Intersection Improvements, Intersection of SR 4034 (Bayfront Parkway) and Sassafras Street, City of Erie, Project ID 77423

Project Allocation

300,000

(Base Project Allocation - $300,000)

(70) SR 4034, Roadway Reconstruction and Safety Improvements, SR 4034 from Greengarden to Sassafrass, City of Erie, Project ID 108952

Project Allocation

17,600,000

(Base Project Allocation - $10,500,000)

(Land Allocation - $2,500,000)

(Design & Contingencies - $4,600,000)

(71) SR 4034, Intersection Improvements, Intersection of SR 4034 (Bayfront Parkway) and PA 5 Alternate (6th Street), City of Erie, Project ID 110836

Project Allocation

300,000

(Base Project Allocation - $300,000)

(72) SR 4034, Highway Resurfacing, SR 4034 from Greengarden to Sassafrass, City of Erie, Project ID 110858

Project Allocation

2,278,900

(Base Project Allocation - $2,258,900)

(Design & Contingencies - $20,000)

(73) SR 4034, Railroad Relocation Project, SR 4034 along Bayfront Parkway, City of Erie, Project ID 115616

Project Allocation

6,356,001

(Base Project Allocation - $6,356,001)

(74) SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and Holland Street, City of Erie, Project ID 116143

Project Allocation

300,000

(Base Project Allocation - $300,000)

(75) SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and Sassafras Street Extension, City of Erie, Project ID 116144

Project Allocation

300,000

(Base Project Allocation - $300,000)

(76) SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and State Street, City of Erie, Project ID 116145

Project Allocation

300,000

(Base Project Allocation - $300,000)

(77) Various Routes, Highway Restoration, SR 0426 from Warren County Line to SR 0006 and SR 2029 from Airport Road to South Center Street, City of Corry, Project ID 109141

Project Allocation

5,700,000

(Base Project Allocation - $5,600,000)

(Design & Contingencies - $100,000)

(78) Various Routes, Highway Resurfacing, SR 0098 from Hawthorn Ridge Road to Crawford County Line and SR 4013 from Dunn Valley Road to Talley Road, Elk Creek, Franklin and McKean Townships, Project ID 107752

Project Allocation

3,333,000

(Base Project Allocation - $3,333,000)

(79) Various Routes, Highway Resurfacing, SR 4002, SR 3023 from Crane Road to SR 0006 and SR 2010, Fairview, Franklin, Girard, Union and Washington Townships and Edinboro, Lake City and Union City Boroughs, Project ID 107776

Project Allocation

3,661,000

(Base Project Allocation - $3,661,000)

(80) Various Routes, Highway Resurfacing, SR 1009 (Wales Road) from SR 0430 to SR 0008 and SR 1001 (Lake Pleasant Road) from SR 0008 to I-90, Greene, Greenfield, Harborcreek, Millcreek and Venango Townships and City of Erie, Project ID 107764

Project Allocation

2,310,000

(Base Project Allocation - $2,310,000)

(81) Various Routes, ADA Ramp Improvements, SR 0832 from SR 0020 to SR 0005, SR 0020 from Angle Road to Zuck Road, SR 0005 from Asbury Road to Pittsburgh Avenue, SR 0019 from Kuntz Road to Grandview Boulevard and SR 4009 from West Ridge Road to West 23rd Street, McKean and Millcreek Townships, Project ID 106766

Project Allocation

400,000

(Base Project Allocation - $300,000)

(Design & Contingencies - $100,000)

(82) Various Routes, Safety Improvements, SR 0019 (Peach Street) from SR 0699 (Edinboro Road) to Millcreek Square Road and SR 4026 (Kuntz Road) from Peach Street to Jodie Lane, Millcreek Township, Project ID 107348

Project Allocation

882,185

(Base Project Allocation - $780,000)

(Design & Contingencies - $102,185)

(83) Various Routes, Intelligent Transportation Systems, I-79 and 12th Street and SR 0290 and 12th Street, Millcreek Township and City of Erie, Project ID 113382

Project Allocation

300,000

(Base Project Allocation - $300,000)

(84) Various Routes, Traffic Signal Improvements, Various Locations on US 6 and SR 0008, Union City Borough, Project ID 110342

Project Allocation

1,533,000

(Base Project Allocation - $1,183,000)

(Design & Contingencies - $350,000)

(85) Various Routes, Slide Remediation, Various State Routes, Various Municipalities

Project Allocation

1,500,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $250,000)

(Design & Contingencies - $250,000)

(86) Various Routes, Highway Restoration, Welcome Centers and Rest Areas Districtwide, Various Municipalities, Project ID 112456

Project Allocation

25,000,000

(Base Project Allocation - $25,000,000)

(87) Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities, Project ID 106442

Project Allocation

300,000

(Base Project Allocation - $300,000)

(88) Various Routes, Safety Improvements - Pavement Markers, Various Locations, Various Municipalities, Project ID 109895

Project Allocation

300,000

(Base Project Allocation - $300,000)

(89) Various Routes, Safety Improvements - Pavement Markers, Various Locations, Various Municipalities, Project ID 109896

Project Allocation

300,000

(Base Project Allocation - $300,000)

(90) Various Routes, Safety Improvements - Lighting Replacement, Districtwide, Various Municipalities, Project ID 112367

Project Allocation

17,750,000

(Base Project Allocation - $17,500,000)

(Design & Contingencies - $250,000)

(91) Various Routes, Safety Improvements - Lighting Replacement, Districtwide, Various Municipalities, Project ID 112506

Project Allocation

645,000

(Base Project Allocation - $645,000)

(92) Various Routes, Safety Improvements, Districtwide, Various Municipalities, Project ID 115803

Project Allocation

756,064

(Base Project Allocation - $756,064)

(93) Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID 115823

Project Allocation

300,000

(Base Project Allocation - $300,000)

(94) Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID 115826

Project Allocation

300,000

(Base Project Allocation - $300,000)

(95) Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID 115829

Project Allocation

300,000

(Base Project Allocation - $300,000)

(96) Various Routes, Safety Improvements - Pavement Markers, Countywide, Various Municipalities, Project ID 116161

Project Allocation

300,000

(Base Project Allocation - $300,000)

(97) Various Routes, Safety Improvements - Pavement Markers, Countywide, Various Municipalities, Project ID 116162

Project Allocation

300,000

(Base Project Allocation - $300,000)