Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:
Project
Total Project Allocation
(1) Area Transportation Authority
(i) Provide for bus replacements, including 13 heavy duty mass transit vehicles and up to 27 Sprinter vehicles
Project Allocation
870,000
(Base Project Allocation - $783,000)
(Design and Contingencies - $87,000)
(ii) Purchase transit vehicles and upgrade facility
Project Allocation
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(2) Berks Area Reading Transportation Authority
(i) Provide for replacement of ten paratransit vehicles and purchase of an automatic vehicle locator system
Project Allocation
239,000
(Base Project Allocation - $215,000)
(Design and Contingencies - $24,000)
(2.1) Bucks County
(i) Reconstruction of Clymer Avenue Bridge, County Bridge No. 234, in West Rockhill Township
Project Allocation
2,000,000
(3) Centre Area Transportation Authority
(i) Additional funding to replace CNG compressors at the CNG fueling station and to replace ten CNG transit buses
Project Allocation
522,000
(Base Project Allocation - $470,000)
(Design and Contingencies - $52,000)
(ii) Provide for second phase of Advanced Public Transportation System, an automatic vehicle locator system and the purchase of 12 new vans, expansion of two additional vanpools and facility improvements, and replacement of roof membrane over maintenance and bus storage areas of the facility
Project Allocation
183,000
(Base Project Allocation - $165,000)
(Design and Contingencies - $18,000)
(iii) Purchase buses to add to current fleet for expanded service, replace diesel buses that have met their useful life and refurbish bus lanes in front of transit center to load wheelchairs
Project Allocation
1,000,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $100,000)
(3.1) City of Washington
(i) Replace two transit buses which have met their useful life
Project Allocation
142,000
(Base Project Allocation - $128,000)
(Design and Contingencies - $14,000)
(4) Crawford Area Transportation Authority
(i) Provide additional funding for the authority's intermodal/administrative facility
Project Allocation
266,000
(Base Project Allocation - $239,000)
(Design and Contingencies - $27,000)
(ii) Construct steel structure sheltered bus storage facility and wash bay for bus fleet
Project Allocation
194,000
(Base Project Allocation - $175,000)
(Design and Contingencies - $19,000)
(5) Dauphin County
(i) Construct a mass transit station, including infrastructure and other related costs
Project Allocation
10,600,000
(5.1) Erie Metropolitan Transit Authority
(i) Land acquisition, demolition, infrastructure improvements, renovations and rehabilitation and other related costs for the construction of a new joint operations facility
Project Allocation
5,000,000
(6) Fayette Area Coordinated Transportation
(i) Provide for replacement of a fixed-route vehicle, facility upgrades and transit equipment
Project Allocation
150,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $15,000)
(6.1) Lehigh County
(i) For costs related to the purchase of test engines, test vehicle and fuel equipment to conduct testing of lean burn LoNox compressed natural gas engines at Air Products and Chemicals, Inc.
Project Allocation
750,000
(6.2) Luzerne County
(i) Construction, infrastructure and other costs related to the Hazleton intermodal facility, Phase II
Project Allocation
14,300,000
(7) Mid Mon Valley Transit Authority
(i) Replace three buses, modernize bus maintenance facility for bus storage and refurbish bus lanes in front of the transit center to load wheelchair passengers more safely
Project Allocation
588,000
(Base Project Allocation - $529,000)
(Design and Contingencies - $59,000)
(7.1) Montgomery County
(i) Renovation, construction and expansion of station facilities and parking at the Ardmore Station Transit Center in Lower Marion Township
Project Allocation
10,000,000
(ii) Renovation, construction and expansion of station facilities at the Elkins Park East train station
Project Allocation
1,800,000
(8) Port Authority of Allegheny County
(i) Provide Alpine Village Park and Ride Facility for the complete design and construction of additional spaces at the park and ride located near the interchange of Routes 22 and 286 in Monroeville
Project Allocation
1,350,000
(Base Project Allocation - $1,215,000)
(Design and Contingencies - $135,000)
(ii) FY 2010-2011 Section 5307 Program, replace and/or rehabilitate major components of bus- and fixed guide- way system
Project Allocation
7,020,000
(Base Project Allocation - $6,318,000)
(Design and Contingencies - $702,000)
(iii) FY 2010-2011 Section 5309 Program, replace and/or rehabilitate major components within Authority's rail- and bus- way system
Project Allocation
5,349,000
(Base Project Allocation - $4,814,000)
(Design and Contingencies - $535,000)
(iv) FY 2010-2011 Section 5307 Flex Program, provide replacement buses, light rail vehicle mid-life overhaul, light rail extension and expand Authority's Alpine Village Park and Ride facility
Project Allocation
1,493,000
(Base Project Allocation - $1,344,000)
(Design and Contingencies - $149,000)
(v) FY 2010-2011 Infrastructure Safety Renewal Program, including improvements to stations, signals, track, power and buildings
Project Allocation
16,000,000
(Base Project Allocation - $14,400,000)
(Design and Contingencies - $1,600,000)
(vi) FY 2010-2011 Vehicle Overhaul Program, provide for major overhaul of rolling stock
Project Allocation
2,500,000
(Base Project Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(9) Red Rose Transit Authority
(i) Replace mass transit buses which have met their useful life
Project Allocation
400,000
(Base Project Allocation - $360,000)
(Design and Contingencies - $40,000)
(ii) Provide for communications improvements program and purchase of 12 shared-ride small transit vehicles
Project Allocation
202,000
(Base Project Allocation - $182,000)
(Design and Contingencies - $20,000)
(10) Southeastern Pennsylvania Transportation Authority
(i) Provide for purchase of 400 hybrid 40-foot low-floor transit buses to replace buses which have met their useful life
Project Allocation
521,000
(Base Project Allocation - $469,000)
(Design and Contingencies - $52,000)
(ii) Provide improvements at the Croydon and Levittown stations in Bucks County
Project Allocation
3,500,000
(Base Project Allocation - $3,150,000)
(Design and Contingencies - $350,000)
(iii) Provide improved intermodal connections between bus and rail at Glenside and Jenkintown stations, including parking
Project Allocation
6,700,000
(Base Project Allocation - $6,030,000)
(Design and Contingencies - $670,000)
(iv) FFY 2010 Transit Enhancement Program, provide for bus purchase program, paratransit vehicle purchase, utility fleet renewal, Smart stations, new payment technologies, station accessibility, subway stations rehabilitation, track and catenary improvements, rail line, state of good repair improvements and substation improvement
Project Allocation
13,416,000
(Base Project Allocation - $12,074,000)
(Design and Contingencies - $1,342,000)
(v) FFY 2010 Rail Modernization Program, provide for Smart stations, new payment technologies, station accessibility, subway station rehabilitation, rehabilitation of City Hall and 15th Street stations, track and catenary improvements, regional rail improvements, state of good repair improvements and substation improvements
Project Allocation
12,900,000
(Base Project Allocation - $11,610,000)
(Design and Contingencies - $1,290,000)
(vi) FFY 2010 Transit Enhancement Program, provide for historic preservation, rehabilitation and related activities; bus shelters, landscaping, signage and enhanced access to transit for persons with disabilities
Project Allocation
420,000
(Base Project Allocation - $378,000)
(Design and Contingencies - $42,000)
(vii) FFY 2010 Bus Purchase Program, provide for acquisition of 400 diesel/electric accessible 40-foot low-floor buses with a pricing option for an additional 80 buses which have met their useful life
Project Allocation
3,600,000
(Base Project Allocation - $3,240,000)
(Design and Contingencies - $360,000)
(viii) FFY 2010 Federal Highway Flex Projects, upgrade warning devices of various railroad/highway grade crossings and construct capital projects to improve air quality and reduce congestion
Project Allocation
834,000
(Base Project Allocation - $751,000)
(Design and Contingencies - $83,000)
(ix) FFY 2009-2010 Vehicle Overhaul Program, provide for major overhaul of rolling stock
Project Allocation
30,000,000
(Base Project Allocation - $27,000,000)
(Design and Contingencies - $3,000,000)
(x) FFY 2009-2010 Infrastructure Safety Renewal Program, improve stations, signals, track, power and buildings
Project Allocation
33,000,000
(Base Project Allocation - $29,700,000)
(Design and Contingencies - $3,300,000)
(xi) FFY 2008 Clean Fuels bus purchase, purchase 400 hybrid 40-foot low-floor transit buses with option to purchase 80 additional buses to replace buses which have met their useful life
Project Allocation
595,000
(Base Project Allocation - $535,000)
(Design and Contingencies - $60,000)
(xii) Renovate Bucks County Intermodal, improve Levittown station, including replacement of station building and infrastructure, improve pedestrian tunnels and intersection
Project Allocation
2,845,000
(Base Project Allocation - $2,560,000)
(Design and Contingencies - $285,000)
(xiii) Renovate Montgomery County stations, improve select SEPTA stations, including Jenkintown, Glenside and Noble
Project Allocation
4,742,000
(Base Project Allocation - $4,268,000)
(Design and Contingencies - $474,000)
(xiv) Renovate Paoli station, provide engineering and construction of transportation center in Paoli, located west of existing station
Project Allocation
290,000
(Base Project Allocation - $261,000)
(Design and Contingencies - $29,000)
(xv) Renovate Villanova Intermodal Station, design and construct high level platforms canopies for inbound and outbound service with new pedestrian tunnels and ADA compliant ramps and stairs
Project Allocation
4,471,000
(Base Project Allocation - $4,024,000)
(Design and Contingencies - $447,000)
(xvi) Design and construct 425 space parking garage at 69th Street terminal, including ADA accessibility and pedestrian connections between new garage and existing terminal
Project Allocation
4,258,000
(Base Project Allocation - $3,832,000)
(Design and Contingencies - $426,000)
(xvii) FFY 2011 Formula Program, acquire different size buses based upon needs and route characteristics in SEPTA's bus fleet management plan and state of good repair improvements
Project Allocation
16,955,000
(Base Project Allocation - $15,260,000)
(Design and Contingencies - $1,695,000)
(xviii) FFY 2011 Rail Modernization Program, provide for station accessibility, City Hall station and 15th Street station rehabilitation, Elwyn to Wawa Rail service, Paoli line improvements, regional rail substation improvements, parking expansion program, transit and regional rail program, new payment technologies, paratransit vehicle purchase program, state of good repair improvements and utility fleet renewal
Project Allocation
15,822,000
(Base Project Allocation - $14,240,000)
(Design and Contingencies - $1,582,000)
(xix) FFY 2011 Flex Program - Railroad/Highway Grade Crossing, support installation or upgrading of warning devices and renewal of highway grade crossing surfaces, improve air quality and reduce congestion
Project Allocation
705,000
(Base Project Allocation - $635,000)
(Design and Contingencies - $70,000)
(xx) FFY 2011 Transit Enhancements, including historic preservation, rehabilitation and related activities: bus shelters; landscaping and other scenic beautification including street lights, public art, pedestrian access and walkways; bicycle access including storage facilities and installation of equipment for transporting bicycles on transit vehicles; transit connections to parks; signage and enhanced access to transit for persons with disabilities
Project Allocation
238,000
(Base Project Allocation - $214,000)
(Design and Contingencies - $24,000)
(xxi) FFY 2010-2011 Vehicle Overhaul Program, provide for major overhaul of rolling stock
Project Allocation
30,000,000
(Base Project Allocation - $27,000,000)
(Design and Contingencies - $3,000,000)
(xxii) FFY 2010-2011 Infrastructure Safety Renewal Program, including improvements to stations, signals, track, power and buildings
Project Allocation
33,000,000
(Base Project Allocation - $29,700,000)
(Design and Contingencies - $3,300,000)
(xxiii) FFY 2008 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers
Project Allocation
550,000
(Base Project Allocation - $495,000)
(Design and Contingencies - $55,000)
(xxiv) FFY 2010 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, acquisition of buses, purchase of vehicles for use on SEPTA paratransit services, upgrade and replace SEPTA'S utility fleet and automotive service fleet, vehicle overhaul program, Smart stations, new payment technologies, radio communications project, the rehabilitation/renovation of the existing fire suppression system at Elmwood bus garage and Frankford bus garage, historic station renovations, regional rail car procurement, upgrade to the Customized Community Transportation Control Center
Project Allocation
10,175,600
(Base Project Allocation - $9,158,040)
(Design and Contingencies - $1,017,560)
(xxv) FFY 2010 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, vehicle overhaul program, rehabilitation of City Hall and 15th Street stations, improvements to the Jenkintown-Wyncote station, including ADA accessibility, passenger conveniences and parking, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements, new payment technologies, historic station renovations and the Market Street Elevated Reconstruction Program
Project Allocation
2,684,200
(Base Project Allocation - $2,415,780)
(Design and Contingencies - $268,420)
(xxvi) FFY 2010 additional funding for Bus Purchase Program
Project Allocation
533,100
(Base Project Allocation - $479,790)
(Design and Contingencies - $53,310)
(xxvii) FFY 2011 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers, modernization of the signal program on SEPTA's regional rail system, bus purchase program, new payment technologies, systems improvements program, purchase of vehicles for use on SEPTA paratransit services, upgrade and replace SEPTA's utility fleet and automotive service fleet, improve accessibility at railroad and transit stations, rehabilitation of City Hall and 15th Street stations, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements and design, construction, expansion and rehabilitation of parking facilities
Project Allocation
6,792,700
(Base Project Allocation - $6,113,430)
(Design and Contingencies - $679,270)
(xxviii) FFY 2011 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers, modernization of the signal program on SEPTA's regional rail system, station accessibility program, rehabilitation of City Hall and 15th Street stations, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements and design, construction, expansion and rehabilitation of parking facilities
Project Allocation
7,416,800
(Base Project Allocation - $6,675,120)
(Design and Contingencies - $741,680)
(xxix) FFY 2011 Bus Purchase Program
Project Allocation
4,133,100
(Base Project Allocation - $3,719,790)
(Design and Contingencies - $413,310)
(xxx) FFY 2010-2011 State of Good Repair Program, rehabilitation of shops, maintenance/storage yards and associated maintenance and support facilities, rehabilitation of electric traction, power, signal and communications systems and associated components, renewal or replacement of track, switches and special work, including yard and shop areas, track surfacing, grade crossing improvements and acquisition of specialized track equipment, rehabilitation of station buildings and associated facilities, site assessments, remediation and testing activities associated with underground storage tanks, lead-based paint and asbestos abatement, contaminated soil and groundwater and air quality
Project Allocation
25,000,000
(Base Project Allocation - $22,500,000)
(Design and Contingencies - $2,500,000)
(xxxi) FFY 2011-2012 Infrastructure Safety Renewal Program, including improvements to stations, communications and signal systems, track, right-of-way, power, bridges and buildings
Project Allocation
66,000,000
(Base Project Allocation - $59,400,000)
(Design and Contingencies - $6,600,000)
(xxxii) FFY 2011-2012 State of Good Repair Program, rehabilitation of shops, maintenance/storage yards and associated maintenance and support facilities, rehabilitation of electric traction, power, signal and communications systems and associated components, renewal or replacement of track, switches and special work, including yard and shop areas, track surfacing, grade crossing improvements, acquisition of specialized track equipment, rehabilitation of station buildings and associated facilities, site assessments, remediation and testing activities associated with underground storage tanks, lead-based paint and asbestos abatement, contaminated soil and groundwater, air quality and rehabilitation/replacement of bridges
Project Allocation
25,000,000
(Base Project Allocation - $22,500,000)
(Design and Contingencies - $2,500,000)
(xxxiii) FFY 2009 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers
Project Allocation
15,000,000
(Base Project Allocation - $13,500,000)
(Design and Contingencies - $1,500,000)
(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total Project Allocation
(1) Allegheny County
(i) Allegheny Valley Railroad
(A) Rehabilitate and construct necessary Glenwood Yard infrastructure to improve existing capacity and safety issues, including rail, roadbed, bridges, grade crossings and other related materials
Project Allocation
3,000,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $300,000)
(B) Rehabilitate rail infrastructure and construct new sidings to support customer development in Allegheny and Washington Counties
Project Allocation
2,500,000
(Base Project Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(C) Rehabilitate main line infrastructure, including rails, ties, ballast, undercutting, bridges, crossings and other related materials, in Allegheny and Washington Counties
Project Allocation
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(ii) Leetsdale Borough
(A) Improvement and rehabilitation of the Hussey Copper Rail Spur Line and structures appurtenant thereto, including track construction, track reconstruction, grade construction and turnout installation
Project Allocation
2,000,000
(iii) Petroleum Products Corporation
(A) Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Allegheny County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts
Project Allocation
17,000,000
(2) Berks County
(i) Colebrookdale Railroad
(A) Engineering, permitting, property acquisition and construction of rails and loading facilities
Project Allocation
1,500,000
(ii) Muhlenberg Township
(A) Construction, renovation, infrastructure and other costs related to the Tuckerton Road Industrial Park, including rail facilities
Project Allocation
1,800,000
(iii) Petroleum Products Corporation
(A) Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Berks County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts
Project Allocation
10,000,000
(iv) Sinking Spring Borough
(A) Rehabilitation of railroad infrastructure, including track rebuild, installation of new crossties, repair of grade crossings, switch repair, track resurfacing and rebuild of drainage systems for F.M. Brown's and Sons, Inc.
Project Allocation
3,000,000
(3) Blair County
(i) Everett Railroad
(A) Engineering and design, as well as actual improvements and upgrades to the Bedford Secondary Branch Line from the Borough of Hollidaysburg to the Walter Business Park located in Greenfield Township, including construction, infrastructure and other related costs
Project Allocation
2,000,000
(3.1) Bradford County
(i) Borough of Sayre
(A) Construction of a rail transload facility, including loading and unloading equipment, a rail spur line, mainline turnout, additional sidings and switches, utility relocations, a railroad scale, a truck scale, asphalt lay-down and storage area and frac sand storage buildings
Project Allocation
4,000,000
(4) Bucks County
(i) Gamesa Wind US
(A) Construction and reactivation of approximately 5,000 feet of track in Langhorne
Project Allocation
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(ii) New Hope and Ivyland Railroad
(A) Rehabilitation of the New Hope and Ivyland Railroad, including infrastructure, installation of railroad ties, surfacing and resurfacing of track, trestle timbers replacement and other related costs
Project Allocation
1,828,000
(5) Centre County
(i) Boggs Township and Milesburg Borough
(A) Construction of the Nittany & Bald Eagle Railroad Baker Runaround Track
Project Allocation
1,120,000
(ii) Liberty and Howard Townships
(A) Replacement of jointed rails and related track improvements for Phase 4 of the Nittany & Bald Eagle Railroad Main Rail Welding Project
Project Allocation
3,500,000
(iii) SEDA-COG Joint Rail Authority - Nittany & Bald Eagle Railroad Bridge Replacement
(A) Span replacement and rehabilitation of bridge, including related track improvements, engineering and permitting for structure over Spring Creek in Bellefonte Borough (Tallyrand Bridge)
Project Allocation
2,000,000
(iv) SEDA-COG Joint Rail Authority - Nittany & Bald Eagle Railroad Track Rehabilitation
(A) Replace rail and make upgrades to track from Milesburg to Pleasant Gap on the Bellefonte Industrial and Pleasant Gap Industrial Tracks and related engineering costs
Project Allocation
2,000,000
(6) Chester County
(i) Tredyffrin and Willistown Townships
(A) Construction of the Paoli Transit Center, including infrastructure and other related costs
Project Allocation
20,000,000
(6.1) Crawford County
(i) Economic Progress Alliance of Crawford County
(A) For costs related to the improvements of the existing rail line that runs adjacent to the Keystone Regional Industrial Park as well as the construction of new track and turnouts to provide rail service to the industrial and manufacturing businesses in the Keystone Regional Industrial Park
Project Allocation
1,000,000
(ii) Greenwood Township
(A) Infrastructure, construction and other related costs for the development of the Keystone Regional Industrial Park rail line, including improvements to the existing rail line and the construction of new track and turnouts
Project Allocation
1,000,000
(7) Cumberland County
(i) Norfolk Southern Corporation
(A) Crescent Corridor Project: extend second main track in Mt. Holly Springs, from MP LG15.6 to MP LG15.0, in Cumberland County
Project Allocation
17,500,000
(Base Project Allocation - $16,100,000)
(Design and Contingencies - $1,400,000)
(8) Dauphin County
(i) Norfolk Southern Corporation
(A) Crescent Corridor Project: construct second main track in Harrisburg wye, from MP HP111.4 to MP LG0.5, in Dauphin County
Project Allocation
7,000,000
(Base Project Allocation - $6,440,000)
(Design and Contingencies - $560,000)
(B) Crescent Corridor Project: upgrades and rail reconstruction to the Intermodal Yard in Harrisburg, Dauphin County
Project Allocation
20,000,000
(Base Project Allocation - $18,000,000)
(Design and Contingencies - $2,000,000)
(C) Construction of a new higher-rated weight category railroad bridge over State Route 2019 (Milroy Road) in Swatara Township to replace a deficient- rated railroad bridge as part of the Crescent Corridor Project
Project Allocation
15,000,000
(ii) Petroleum Products Corporation
(A) Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Dauphin County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts
Project Allocation
15,000,000
(8.1) Elk County
(i) St. Marys Industrial Railroad Project
(A) For repair of existing trackage and switches, construction of new trackage and switches, acquisition of land, construction of transload facility and acquisition of related transload equipment
Project Allocation
5,000,000
(9) Erie County
(i) Erie Inland Port-Rail Terminal
(A) Acquisition, construction, infrastructure and other related costs for the Erie Inland Port-Rail Terminal and Logistics Park Phase I
Project Allocation
30,000,000
(10) Fayette County
(i) Fay-Penn Industrial Development Corporation
(A) Construct transload facility to support new customer development in Fayette County
Project Allocation
2,500,000
(Base Project Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(11) Franklin County
(i) Norfolk Southern Corporation
(A) Crescent Corridor Project: extend second main track in Greencastle, from MP HW60 to MP HW68, in Franklin County
Project Allocation
15,500,000
(Base Project Allocation - $14,260,000)
(Design and Contingencies - $1,240,000)
(B) Crescent Corridor Project: construct new intermodal terminal yard in Greencastle, Franklin County
Project Allocation
98,000,000
(Base Project Allocation - $90,160,000)
(Design and Contingencies - $7,840,000)
(12) Huntingdon County
(i) East Broad Top Preservation Association
(A) Three-phase project to include the acquisition of the Mount Union East Broad Top trackage and land, improvements to track, addition of storage and repair of trackage, construction of loading station on the existing East Broad Top land, usage of old trackage and ROW in Mount Union to Orbisonia and other related costs
Project Allocation
5,000,000
(12.1) Lackawanna County
(i) Fell Township
(A) Construction, infrastructure and other costs related to the Carbondale Rail Yard Transload Facility
Project Allocation
5,456,000
(12.2) Lancaster County
(i) Strasburg Railroad
(A) Infrastructure, rehabilitation, construction and other related costs for the construction of a transload facility and customer sidings to handle biofuel, aggregate, construction materials and agriculture commodities in Lancaster County
Project Allocation
3,000,000
(B) Rehabilitate and construct infrastructure required for handling increasing freight demand in Lancaster County, including rails, ties, ballast, switches, undercutting, drainage, bridges, crossings, sidings, turning facilities and other related materials and costs
Project Allocation
5,000,000
(13) Lehigh County
(i) Allentown Commercial and Industrial Development Authority
(A) Rehabilitation, construction and other related costs to reintroduce freight rail service to the Barber's Quarry branch of the former Lehigh Valley Railroad
Project Allocation
1,500,000
(ii) Upper Macungie Township
(A) Extension of rail service in Upper Macungie Township from existing line to serve new buildings
Project Allocation
1,000,000
(14) Luzerne County
(i) Jenkins Township
(A) Track rehabilitation and new construction at the former Techneglas facility
Project Allocation
700,000
(ii) Petroleum Products Corporation
(A) Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Luzerne County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts
Project Allocation
10,000,000
(15) Lycoming County
(i) City of Williamsport
(A) Infrastructure improvements for the Newberry Rail Yard Intermodal Facility in the Reach Road Industrial Park
Project Allocation
1,000,000
(ii) SEDA-COG Joint Rail Authority
(A) Construction and infrastructure costs related to the Keystone Filler Rail Extension and unloading system. The project will include the extension of existing track, the addition of a second switch and the addition of a rail pit and unloading system which will include a public use rail side unloading ramp
Project Allocation
2,000,000
(15.1) McKean County
(i) American Refining Group
(A) Rehabilitate existing rail infrastructure and construct new sidings to facilitate the efficient and safe handling of petroleum and alternative fuel products, including engineering, site preparation, drainage, loading equipment, piping, rail, ties, ballast and other related materials
Project Allocation
3,300,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $300,000)
(15.2) Mercer County
(i) City of Sharon
(A) Track rehabilitation and new construction adjacent to Route 718 in Sharon
Project Allocation
700,000
(16) Montgomery County
(i) Ambler Borough
(A) Acquisition, construction and other related costs to redevelop the Ambler Main Street Rail Corridor
Project Allocation
5,000,000
(ii) Lower Marion Township
(A) Construction and infrastructure costs for the replacement and expansion of existing Norfolk Southern Railroad bridge
Project Allocation
5,000,000
(17) Montour County
(i) Danville Borough
(A) Construction and other related costs for the Irontown Commerce Center Rail Facilities
Project Allocation
3,500,000
(18) Northampton County
(i) Lehigh Valley Economic Development Corporation
(A) Infrastructure, construction and other related costs for the construction of four new rail spur lines next to the Ponderosa Fibers Plant for expansion of operations at the facility
Project Allocation
353,000
(ii) Scots Lubricants
(A) Construction of rail access to manufacturing facility in Northampton Borough
Project Allocation
700,000
(Base Project Allocation - $630,000)
(Design and Contingencies - $70,000)
(19) Northumberland County
(i) Coal Township
(A) Construction and other related costs for the SEEDCO North Rail Facilities
Project Allocation
2,695,000
(B) Construction and other related costs for the SEEDCO South Rail Facilities
Project Allocation
1,078,000
(i.1) Moran Industries
(A) Rehabilitation and construction of railroad crossing bridge serving F.P. Leopold and Moran Industries, as well as connecting spur lines off Buffalo Line of Norfolk Southern, including construction costs related to development of rail-served intermodal yard
Project Allocation
2,000,000
(ii) Norfolk Southern Corporation
(A) Rehabilitation and rebuilding of railroad crossing bridge serving F.P. Leopold and Moran Industries, connecting spur lines off Buffalo Line of Norfolk Southern and construction costs related to development of rail-served intermodal yard
Project Allocation
1,900,000
(iii) Power and Yard
(A) Construction and infrastructure costs to establish a rail facility to support the shipping of products related to the natural gas industry
Project Allocation
5,000,000
(20) Philadelphia County
(i) Norfolk Southern Corporation
(A) Crescent Corridor Project: construct addition to intermodal terminal at Navy Yard in Philadelphia County
Project Allocation
5,000,000
(Base Project Allocation - $4,600,000)
(Design and Contingencies - $400,000)
(ii) City of Philadelphia
(A) Construction, infrastructure and other related costs for a waste-to-rail transfer station
Project Allocation
6,424,000
(20.1) Potter County
(i) Western New York and Pennsylvania Railroad Company L.L.C.
(A) Renovations, rehabilitation, construction and other costs related to the repair or replacement of the Austin Road (T-516) bridge over the Western New York and Pennsylvania Railroad
Project Allocation
157,000
(20.2) Tioga County
(i) Wellsboro and Corning Railroad Company
(A) New construction of a second main line for high-volume points on existing railroad right-of-way, land acquisition and infrastructure necessary to support new and existing transloading operations, construction of turnouts and sidings to new and existing industry and rehabilitation of existing rail infrastructure
Project Allocation
15,200,000
(21) Union County
(i) Gregg and White Deer Townships
(A) Renovations, rehabilitation, construction and other costs related to the restoration of rail service to Great Stream Commons, including bridge restoration, washout repairs, public crossings, sidings and other related rehabilitation
Project Allocation
2,800,000
(i.1) Lewisburg and Buffalo Creek Railroad
(A) Replacement of timber ties, walkway and ground tie timbers for bridge number 166.54
Project Allocation
100,000
(ii) West Shore Railroad in Union and Northumberland Counties
(A) Capital improvements to bridges numbered 170.29 and 170.45, including removing and replacing the timber ties on the four east end spans of each bridge structure and replacement of walkway and timber guard. New ground tie timbers to be placed in the approach track at each end of the bridge
Project Allocation
430,000
(22) Westmoreland County
(i) City of Monessen
(A) Rehabilitation and reestablishment of rail spur, including installation of linear track and three switches for Alumisource Rail
Project Allocation
475,000
(23) York County
(i) Church & Dwight/Arm & Hammer
(A) Construction and related rail work of new rail spurs servicing the Davies Facility in Jackson Township
Project Allocation
2,300,000
(Base Project Allocation - $2,070,000)
(Design and Contingencies - $230,000)
(ii) York Railway Company
(A) Rehabilitation, infrastructure, construction and other related costs for new sidings and yard tracks for the York Railway Company
Project Allocation
20,000,000
(B) Rail infrastructure improvements, construction and other related costs for a manufacturing and distribution facility in Jackson Township
Project Allocation
1,500,000
(iii) Codorus Creek Railway
(A) Rehabilitation of Northern Central and Stewartstown Railroad, including ties, rail and ballast
Project Allocation
7,698,000
(24) Multiple Counties
(i) D & I Silica Transload Facilities
(A) Infrastructure, renovations, rehabilitation, construction and other costs related to the expansion of rail lines and storage facilities for D & I Silica in Armstrong, Bradford, Cameron, Fayette, Luzerne, McKean, Tioga and Warren counties
Project Allocation
3,000,000
(ii) Delaware and Hudson Railway
(A) Establish transload facilities from New York State line to Sunbury in Susquehanna, Wyoming, Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties to accommodate new commodities and developing markets, including land acquisition, site preparation, grading, rail, ties, ballast, signals, customer sidings, crossings and other related materials
Project Allocation
15,000,000
(Base Project Allocation - $14,000,000)
(Design and Contingencies - $1,000,000)
(B) Reconstruct rail infrastructure from New York State line to Sunbury in Susquehanna, Wyoming, Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties, including grading, drainage, ties, rail, surface, bridges, switches, road crossings, signals, communications and other associated improvements
Project Allocation
16,500,000
(Base Project Allocation - $15,000,000)
(Design and Contingencies - $1,500,000)
(25) Westmoreland and Fayette Counties
(i) Westmoreland County Industrial Development Corporation
(A) Rehabilitate main line infrastructure, including rails, ties, ballast, undercutting, bridges, crossings and other related materials
Project Allocation
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(B) Rehabilitate rail infrastructure and construct new sidings to support customer development
Project Allocation
2,000,000
(Base Project Allocation - $1,700,000)
(Design and Contingencies - $300,000)
(ii) Wheeling and Lake Railroad
(A) Infrastructure, construction and improvements to handle increase in traffic volumes, including switches, signals, rail, ties, ballast, bridges, tunnels and other related materials in Allegheny, Washington, Fayette and Westmoreland Counties
Project Allocation
11,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(B) Infrastructure, construction and improvements to develop new and existing customers in Allegheny, Washington, Fayette and Westmoreland Counties, including rail, ties, ballast, switches, signals, bridges, tunnels and other related materials
Project Allocation
11,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total Project Allocation
(1) Allegheny County
(i) Allegheny Airport in West Mifflin
(A) Construction of office building and hangar, including related costs
Project Allocation
4,000,000
(ii) Allegheny County Airport Authority
(A) Infrastructure, redevelopment, construction and other related costs, including environmental mitigation, for expansion of the Pittsburgh International Airport Airside Business Park
Project Allocation
1,500,000
(B) Construction, environmental improvements and other costs related to Phase IV of a project at the Pittsburgh International Airport for construction of a Deicing Stormwater Treatment Plant
Project Allocation
12,000,000
(C) Infrastructure, redevelopment, construction, environmental mitigation and other costs related to Phase I of an economic development project at the Pittsburgh International Airport for development of the Westfield site, adjacent to the Clinton Road/U.S. Route 30 Interchange of I-376
Project Allocation
32,000,000
(2) Chester County
(i) New Garden Flying Field
(A) Construction of public use terminal building, including related costs
Project Allocation
2,235,000
(B) Construction of base hangar, including related costs
Project Allocation
2,278,000
(2.1) Columbia County
(i) Bloomsburg Municipal Airport
(A) Infrastructure, rehabilitation, construction and other costs related to renovations and restoration of main buildings on the airport grounds
Project Allocation
1,500,000
(3) Dauphin County
(i) Harrisburg International Airport
(A) Construction, infrastructure and associated costs for the demolition and redevelopment of the former Harrisburg International Airport terminal building
Project Allocation
3,000,000
(3.1) Erie County
(i) Erie International Airport, Tom Ridge Field
(A) Acquisition, installation and other related costs for equipment necessary for maintaining and operating the Erie International Airport
Project Allocation
1,000,000
(3.2) Fayette County
(i) Fayette County Airport Authority
(A) Expansion and renovation of the Joseph A. Hardy Connellsville Airport for expansion and renovation of airport facilities
Project Allocation
2,000,000
(4) Lehigh County
(i) Lehigh-Northampton Airport Authority
(A) Construction of hangar for Queen City Airport, including related costs
Project Allocation
1,100,000
(B) Construction of bulk aircraft storage hangar at Queen City Airport, including related costs
Project Allocation
2,000,000
(C) Construction of hangar at Lehigh Valley International Airport, including related costs
Project Allocation
3,400,000
(5) Philadelphia County
(i) Philadelphia International Airport
(A) Construction, renovation, infrastructure and other related costs for the Liberty USO section of Terminal A
Project Allocation
1,000,000
(6) Snyder County
(i) Penn Valley Airport
(A) Construction, acquisition and other related costs for a new, modern, energy-efficient hangar, renovation of existing hangars, construction of new waste oil heating system and construction of additional T-hangars
Project Allocation
1,500,000
(7) Washington County
(i) Redevelopment Authority of Washington County
(A) Construction of hangars at Washington Airport Northside
Project Allocation
3,000,000