Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:
Project
Total
Project
Allocation
(1) AMTRAN
(i) Capital upgrades related to technology
276,000
(ii) Replacement of vehicles, purchase of tools and equipment and upgrade of operations, maintenance and customer service facilities
600,000
(1.1) Area Transportation Authority
(i) Purchase replacement vehicles, including small heavy-duty vehicles and vans
340,000
(Base Project Allocation - $306,000)
(Design and Contingencies - $34,000)
(ii) Provide for intelligent transportation system
340,000
(Base Project Allocation - $306,000)
(Design and Contingencies - $34,000)
(iii) Purchase three new vehicles and intelligent transportation systems for Monroe Township, Clarion County
151,000
(Base Project Allocation - $136,000)
(Design and Contingencies - $15,000)
(1.2) Beaver County Transit Authority
(i) Replace 18 fixed-route vehicles and two demand response vehicles
817,000
(Base Project Allocation - $735,000)
(Design and Contingencies - $82,000)
(ii) Provide for design, land acquisition, demolition and construction of a park and ride lot
817,000
(Base Project Allocation - $735,000)
(Design and Contingencies - $82,000)
(ii) Provide for design, land acquisition, demolition and construction of a park and ride lot
817,000
(2) Berks and Reading Transit Authority
(i) Replace two fixed-route buses
100,000
(Base Project Allocation - $90,000)
(Design and Contingencies -$10,000)
(ii) Replace eight paratransit buses
147,000
(Base Project Allocation - $132,000)
(Design and Contingencies - $15,000)
(iii) Purchase auto vehicle locator system
167,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $17,000)
(iv) Renovations at the BARTA main facility at 1700 North 11th Street
600,000
(3) Blair County
(i) Altoona - Bellwood, construction of trolley line from Altoona to Bellwood
1,800,000
(4) Butler Township
(i) Pullman Center Multimodal Transfer Center
1,200,000
(Base Project Allocation - $1,080,000)
(Design and Contingencies - $120,000)
(4.1) Cambria County Transit Authority
(i) Provide for replacement of cable for the inclined cable replacement program
24,000
(Base Project Allocation - $22,000)
(Design and Contingencies - $2,000)
(ii) Purchase five replacement heavy-duty buses
213,000
(Base Project Allocation - $192,000)
(Design and Contingencies - $21,000)
(iii) Replace 53 bus shelters which have met their useful life
67,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $7,000)
(4.2) Capital Area Transit
(i) Purchase 14 replacement buses and spare parts
747,000
(Base Project Allocation - $672,000)
(Design and Contingencies - $75,000)
(ii) Purchase 16 new coaches to serve Corridor One Regional Commuter Rail System
833,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $83,000)
(iii) Purchase replacement electronic fare collection equipment
83,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $8,000)
(5) Centre Area Transit Authority
(i) Replace fueling station
167,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $17,000)
(ii) Purchase automatic vehicle locator system
156,000
(Base Project Allocation - $140,000)
(Design and Contingencies - $16,000)
(6) City of Philadelphia
(i) Streetscape improvements along Market Street
833,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $83,000)
(ii) Streetscape improvements adjacent to the intersection of 52nd Street and Lancaster Avenue
417,000
(Base Project Allocation - $375,000)
(Design and Contingencies - $42,000)
(iii) Streetscape improvements along Oxford Avenue and Huntingdon Pike in Fox Chase and Rockledge Borough in Montgomery County
207,000
(Base Project Allocation - $186,000)
(Design and Contingencies - $21,000)
(7) Clearfield County
(i) Purchase handicapped accessible transit bus for the Clearfield County Area Agency on Aging
100,000
(8) Clinton County
(i) Purchase five 14-passenger buses for Lock Haven University Shuttle Transportation
5,600,000
(9) Delaware River Port Authority
(i) Provide for additional smoke and fire system at Philadelphia Locust Street Subway
111,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $11,000)
(ii) Provide for interlocking project within City of Philadelphia, including rehabilitation/replacement of PATCO's three interlockings, railhead profile grinding, ballast remediation and rail replacement
581,000
(Base Project Allocation - $523,000)
(Design and Contingencies - $58,000)
(10) Elk County
(i) Construction of the St. Marys intermodal transportation center
2,750,000
(11) Erie Metropolitan Transportation Authority
(i) Construction of new transit operations and maintenance facility
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(ii) Purchase and construction/installation of passenger shelters
58,000
(Base Project Allocation - $52,000)
(Design and Contingencies - $6,000)
(iii) Real-time information system project
850,000
(iv) Construction of new transportation center within Glenwood Park in the City of Erie
2,500,000
(Base Project Allocation - $2,250,000)
(Design and Contingencies - $250,000)
(v) Purchase automatic vehicle locator and customer information system
100,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $10,000)
(vi) Purchase four replacement buses, two less-than-30-foot expansion trolleys and shop and miscellaneous equipment
774,000
(Base Project Allocation - $697,000)
(Design and Contingencies - $77,000)
(11.1) Fayette Area Coordinated Transportation
(i) Purchase maintenance and facility equipment
76,000
(Base Project Allocation - $68,000)
(Design and Contingencies - $8,000)
(ii) Purchase four replacement buses and spare parts
37,000
(Base Project Allocation - $33,000)
(Design and Contingencies - $4,000)
(12) Fayette County
(i) Provide for Fayette County's intermodal transit center and administrative maintenance building
223,000
(Base Project Allocation - $201,000)
(Design and Contingencies - $22,000)
(ii) Construct Fayette County's Intermodal Transit Center Facility and provide maintenance equipment
41,000
(Base Project Allocation - $37,000)
(Design and Contingencies - $4,000)
(iii) Provide for Fayette County's Intermodal Transit Center, bus replacements and bus wash facility
182,000
(Base Project Allocation - $164,000)
(Design and Contingencies - $18,000)
(13) Lehigh and Northampton Transportation Authority
(i) Purchase of 12 heavy-duty buses
576,000
(Base Project Allocation - $518,000)
(Design and Contingencies - $58,000)
(ii) Expand Easton garage to increase capacity
167,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $17,000)
(iii) Purchase 20 minibuses to replace 15 minibuses which have met their useful life and expand five minibuses
360,000
(Base Project Allocation - $324,000)
(Design and Contingencies - $36,000)
(14) Luzerne County
(i) Acquisition, construction and infrastructure development of an intermodal transportation facility
2,500,000
(ii) Hazleton Public Transit, construction of intermodal facility, related equipment and bus replacements
1,042,000
(15) Mid-County Transit Authority
(i) Replace vehicle storage facility and upgrade radio equipment
85,000
(Base Project Allocation - $76,000)
(Design and Contingencies - $9,000)
(16) Mid Mon Valley Transit Authority
(i) Design and construct park and ride lot
67,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $7,000)
(16.1) Montgomery County
(i) Construction of Jenkintown Intermodal Facility
2,000,000
(17) New Castle Transit Center
(i) Acquisition, construction, infrastructure, abatement and other related costs for the New Castle Transit Center
1,000,000
(18) Port Authority of Allegheny County
(i) FY 2008-2009 Section 5307 Formula Program
7,275,000
(ii) FY 2007-2008 Vehicle Overhaul Program
4,000,000
(iii) FY 2007-2008 flex funds
2,000,000
(iv) FY 2008-2009 Vehicle Overhaul Program
4,000,000
(v) FY 2007-2008 Section 5309 fixed guideway modernization
5,850,000
(vi) FY 2008-2009 Infrastructure Safety Renewal Program (ISRP)
16,000,000
(vii) FY 2007-2008 Section 5307 Formula Program
7,275,000
(viii) FY 2008-2009 Section 5309 fixed guideway modernization
5,850,000
(ix) FY 2008-2009 flex funds
2,000,000
(x) FY 2007-2008 Infrastructure Safety Renewal Program (ISRP)
16,000,000
(xi) FFY 2007 Section 5307 Formula Program
7,275,000
(Base Project Allocation - $6,547,000)
(Design and Contingencies - $728,000)
(xii) FFY 2007 Section 5309 Formula Program
5,850,000
(Base Project Allocation - $5,265,000)
(Design and Contingencies - $585,000)
(xiii) FY 2007-2008 Vehicle Overhaul Program
3,500,000
(Base Project Allocation - $3,150,000)
(Design and Contingencies - $350,000)
(xiv) FY 2007-2008 Infrastructure Safety Renewal Program
17,000,000
(Base Project Allocation - $15,300,000)
(Design and Contingencies - $1,700,000)
(xv) FFY 2007 Federal Highway Flex Projects
2,000,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $200,000)
(18.1) Red Rose Transit Authority
(i) Design, engineering, construction and acquisition for a heritage streetcar system in Downtown Lancaster
10,000,000
(ii) Provide for design, land acquisition, demolition and construction of a park and ride lot at North Queen Street and McGovern Avenue
166,000
(Base Project Allocation - $149,000)
(Design and Contingencies - $17,000)
(19) Schuylkill Transportation System
(i) Purchase of four heavy-duty buses
233,000
(Base Project Allocation - $210,000)
(Design and Contingencies - $23,000)
(ii) Construction of Union Station Transit Center
417,000
(Base Project Allocation - $375,000)
(Design and Contingencies - $42,000)
(iii) Purchase of seven small transit buses and one trolley bus and repair and renovate maintenance facility
219,000
(Base Project Allocation - $197,000)
(Design and Contingencies - $22,000)
(19.1) Shenango Valley Shuttle Service
(i) Purchase two replacement buses
100,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $10,000)
(20) Southeastern Pennsylvania Transportation Authority
(i) FFY 2006 trackless trolley purchase program
3,559,000
(Base Project Allocation - $3,203,000)
(Design and Contingencies - $356,000)
(ii) FFY 2005 bus purchase program
3,559,000
(Base Project Allocation - $3,203,000)
(Design and Contingencies - $356,000)
(iii) FY 2005-2006 vehicle overhaul program
47,000,000
(Base Project Allocation - $42,300,000)
(Design and Contingencies - $4,700,000)
(iv) FY 2005-2006 infrastructure safety renewal program
33,000,000
(Base Project Allocation - $29,700,000)
(Design and Contingencies - $3,300,000)
(v) FFY 2001 additional funding for Section 5307 program
453,000
(Base Project Allocation - $408,000)
(Design and Contingencies - $45,000)
(vi) FFY 2006 Federal highway flex projects
834,000
(Base Project Allocation - $751,000)
(Design and Contingencies - $83,000)
(vii) FFY 2005 Federal highway flex projects
834,000
(Base Project Allocation - $751,000)
(Design and Contingencies - $83,000)
(viii) FFY 2001 additional funding for Section 5307 fixed guideway program
4,765,000
(Base Project Allocation - $4,288,000)
(Design and Contingencies - $477,000)
(ix) FFY 2006 Federal program
28,167,000
(Base Project Allocation - $25,350,000)
(Design and Contingencies - $2,817,000)
(x) FY 2006-2007 vehicle overhaul program
47,000,000
(xi) FY 2007-2008 vehicle overhaul program
47,000,000
(xii) FY 2006-2007 infrastructure safety renewal project
33,000,000
(xiii) FY 2007-2008 infrastructure safety renewal project
33,000,000
(xiv) FY 2006-2007 Section 5307 program
11,320,000
(xv) FY 2006-2007 Section 5309 program
16,980,000
(xvi) FY 2007-2008 Section 5307 program
11,600,000
(xvii) FY 2007-2008 Section 5309 program
17,400,000
(xviii) FY 2005-2006 bus purchase program
3,600,000
(xix) FY 2006-2007 trackless trolley purchase
3,600,000
(xx) FY 2007-2008 bus purchase program
3,600,000
(xxi) FY 2005-2006 Federal highway flex projects
834,000
(xxii) FY 2006-2007 Federal highway flex projects
834,000
(xxiii) FY 2007-2008 Federal highway flex projects
834,000
(xxiv) FY 2004-2005 transit enhancement program
500,000
(xxv) FY 2006-2007 transit enhancement program
500,000
(xxvi) FY 2001-2002 Section 3 program (additional)
4,765,000
(xxvii) FY 2001-2002 Section 9 program (additional)
453,000
(xxviii) Construction of the SEPTA R5 Rail extension to Coatesville, Parkesburg and Atglen
27,000,000
(xxix) Additional funding for FFY 2001 Section 5309 Fixed Guideway Program
3,559,000
(Base Project Allocation - $3,203,000)
(Design and Contingencies - $356,000)
(xxx) FFY 2006 Trackless Trolley Purchase Program
3,559,000
(Base Project Allocation - $3,203,000)
(Design and Contingencies - $356,000)
(xxxi) FFY 2004 Transit Enhancement Program
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(xxxii) FFY 2006 Transit Enhancement Program
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(xxxiii) FFY 2007 Section 5307 Program
11,600,000
(Base Project Allocation - $10,440,000)
(Design and Contingencies - $1,160,000)
(xxxiv) FFY 2007 Section 5309 Program
17,400,000
(Base Project Allocation - $15,660,00)
(Design and Contingencies - $1,740,00)
(xxxv) FFY 2007 Bus Purchase Program
3,600,000
(Base Project Allocation - $3,240,000)
(Design and Contingencies - $360,000)
(xxxvi) FFY 2007 Federal Highway Flex Projects
834,000
(Base Project Allocation - $751,000)
(Design and Contingencies - $83,000)
(20.1) Westmoreland County Transit Authority
(i) Purchase accessible vans, replacement and expansion buses. This project shall be construed to be a replacement of the project itemized in section 5(23)(ii) of the act of July 2, 1993 (P.L.265, No.47), known as the Capital Budget Project Itemization Act for 1993-1994.
23,000
(ii) Park and ride facilities, general improvements, maintenance garage, replacement and expansion buses. This project shall be construed to be a replacement of the project itemized in section 5(13)(i) of the act of June 25, 1999 (P.L.237, No.35), known as the Capital Budget Project Itemization Act for 1999- 2000.
2,000,000
(21) Williamsport Bureau of Transit
(i) Improve rail hub at Lycoming Mall and retrofit bus fleet to provide for automatic vehicle location system
150,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $15,000)
(ii) Purchase three replacement vehicles
162,000
(Base Project Allocation - $146,000)
(Design and Contingencies - $16,000)
(iii) Improve garage and office to provide additional maintenance and fleet storage space
167,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $17,000)
(22) York County Transportation Authority
(i) Acquisition, construction, infrastructure and related costs for expanding the current Transfer Center
131,000
(23) Other Class 3 and Class 4 rural and public transportation systems
(i) For Class 3 and Class 4 rural and public transportation systems, other than SEPTA and the Port Authority of Allegheny County, to fund projects, including, but not limited to, purchase of vehicles, vehicle overhaul, purchase of facilities, facility renovations and other capital equipment and associated capital items
4,000,000
(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total
Project
Allocation
(1) Adams County
(i) Growmark FS, LLC, construction of a 5,000- foot rail siding from main line, including a new switch from main track and four additional switches and bulk loading and unloading equipment
2,500,000
(1.1) Allegheny County
(i) Leetsdale Industrial Park, rehabilitation of rail infrastructure, including the rebuilding of track, installation of new crossties, repair of existing switches, resurfacing of track, repair of grade crossings and rebuilding of drainage systems
800,000
(ii) Leetsdale Industrial Park, construction of additional rail spur tracks, including grade crossings with crossing protection equipment, installation of switches and drainage improvements
400,000
(1.2) Aliquippa & Ohio River Railroad
(i) Rehabilitation of main line in Beaver County, including ties, rail, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(ii) Rehabilitation and the construction of new sidings to serve new and existing customers in Beaver County, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(2) Allegheny & Eastern Railroad
(i) Rehabilitation of main line from St. Marys to Erie in Warren, Elk and Erie Counties (MP 131 to MP 3, including Johnsonburg Yard, Warren Yard and all sidings), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(ii) Rehabilitation and the construction of new sidings to serve new and existing customers from St. Marys to Erie in Elk, Warren and Erie Counties (MP 3 to MP 131, including all yards, sidings and subdivisions), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
1,650,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $150,000)
(iii) Provide for rail rehabilitation from Erie to St. Marys, including rail, ties, bridge deck repairs, surfacing and road crossing improvements
3,300,000
(Base Project Allocation - $3,300,000)
(3) Allegheny Valley Railroad
(i) Allegheny Subdivision rail infrastructure rehabilitation, including track, roadbed, bridges and grade crossings from MP 0 to MP 20 in Allegheny and Westmoreland Counties
2,530,000
(Base Project Allocation - $2,300,000)
(Design and Contingencies - $230,000)
(ii) P&W Subdivision rail infrastructure rehabilitation, including track, roadbed, bridges and grade crossings from MP 1 to MP 17 and from MP 322 to MP 326 in Allegheny County
1,980,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $180,000)
(iii) W&P Subdivision rail infrastructure rehabilitation, including track, roadbed, bridges and grade crossings from MP 5 to MP 39 in Allegheny and Washington Counties
1,320,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $120,000)
(iv) Development of new yard track and intermodal transfer structures within New Kensington complex from MP 17 to MP 19.4 in Westmoreland County to support rail-truck and rail-barge transfer market development
4,620,000
(Base Project Allocation - $4,200,000)
(Design and Contingencies - $420,000)
(v) Provide for expanded rail-truck and rail-barge transfer market in connection with new Mon-Fayette Expressway Interchange
4,620,000
(Base Project Allocation - $4,200,000)
(Design and Contingencies - $420,000)
(4) Beech Creek Railroad
(i) Acquisition, rehabilitation and replacement of rail trackage on a 49-mile corridor, work to include the replacement of deteriorated and/or missing ballast, ties, rails and switches and the construction of bridges, culverts and road crossings in Blair, Clinton, Centre and Clearfield Counties
9,000,000
(4.1) Berks County
(i) Birdsboro materials, construction of a new track siding at the Birdsboro Yard at milepost GV 17
335,000
(5) Blair County
(i) ABCD Corporation, construction of a rail siding
570,000
(ii) ABCD Corporation, construction of a rail siding located in North Woodbury Township
2,000,000
(6) Bucks County
(i) Improvement of railroad clearances between Wilkes-Barre and the Port of Bucks County
3,500,000
(7) Buffalo & Pittsburgh Railroad
(i) Rehabilitation of main line from Brockway to New Castle in Jefferson, Allegheny, Indiana, Armstrong, Lawrence, Beaver, Clearfield and Butler Counties (MP 193 to MP 303.5, including DuBois Yard, Riker Yard, Butler Yard, Northern Subdivision, Indiana Branch and all sidings), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
10,450,000
(Base Project Allocation - $9,500,000)
(Design and Contingencies - $950,000)
(ii) Rehabilitation of main line from Brockway to State Line, NY, in Jefferson, Elk and McKean Counties (MP 193 to MP 116, including Johnsonburg Yard, Bradford Yard, subdivisions and all sidings), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(iii) Rehabilitation and the construction of new sidings to serve new and existing customers from New Castle to State Line, NY, in Jefferson, Elk, McKean, Butler, Lawrence, Armstrong, Allegheny, Cameron, Warren, Erie and Clearfield Counties (MP 52 to MP 10 and MP 303 to MP 116, including all yards, sidings and subdivisions), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
3,850,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $350,000)
(iv) Upgrade railroad infrastructure enabling increased coal shipments to Homer City electric generating station
2,200,000
(v) Upgrade railroad infrastructure to enable the expansion of Rosebud Mining coal preparation and railcar loading facility
1,500,000
(vi) Rehabilitation of track from Cloe to Creekside
4,200,000
(8) Cambria Rail Line
(i) Capital improvements to 8.3 miles of the Cambria Rail Line
800,000
(9) Delaware and Hudson Railroad
(i) Rehabilitation and construction of sidings to serve new and existing customers in Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties and other related improvements
1,100,000
(ii) Rehabilitation and construction of rail infrastructure from Taylor to Sunbury in Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties and other related improvements
7,700,000
(10) Central Columbia & Pennsylvania Railroad
(i) Rehabilitation of main line from Pennsylvania/Ohio state line to Darlington in Beaver County, including ties, rails, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(ii) Rehabilitation and the construction of new sidings to serve new and existing customers in Beaver County, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(11) Central New York Railroad
(i) Maintenance and rehabilitation of track from MP 186.6 to MP 201.9 in Susquehanna County
4,650,000
(ii) Maintenance and rehabilitation of track from MP 90.98 to MP 117.76 in Pike County
3,350,000
(12) Clearfield County
(i) Construction, infrastructure and other related costs for the new railroad track and the rehabilitation of existing railroad track in Curwensville Borough
3,000,000
(13) Clinton County
(i) Construction, infrastructure and other related costs to rehabilitate existing railroad tracks and related facilities in Renovo Borough
5,000,000
(14) CSX
(i) Philadelphia, establishment of an additional controlled siding on the Trenton Line extending south from CP Berry for approximately 10,000 feet
14,000,000
(ii) Chambersburg, establishment of double-stack vertical clearances from Connellsville to Chambersburg over the CSX Keystone, Cumberland, Metropolitan and Lurgan Subdivisions
85,000,000
(iii) Stoney Creek Branch, rehabilitation of Stoney Creek Branch to FRA Class II standards between Norristown to Lansdale, including a new side track to Lansdale Warehouse and increased capacity at Lansdale Yard
11,000,000
(iv) West Trenton Line, establishment of double-stack vertical clearances on the CSX Trenton subdivision between Park Junction at the City of Philadelphia and the County Line between Philadelphia and Bucks Counties
11,000,000
(v) Engleside Connection, complete wye connection in the City of Philadelphia to permit progressive train movements from CSX Philadelphia Subdivision to Conrail shared assets
4,000,000
(vi) Connellsville, establishment of double-stack vertical clearances from the Ohio state line to Connellsville over the CSX Pittsburgh and Keystone Subdivisions
11,000,000
(vii) Construction of railroad track and related infrastructure that improves efficient movement of freight trains through the City of Philadelphia
6,000,000
(15) CSX and Norfolk Southern
(i) Operated line at Stoney Creek Rail Branch, restore ten miles of track to Class II service in Montgomery County
9,400,000
(16) CSXT S&C Branch Shortline Railroad
(i) Acquisition and rehabilitation
3,000,000
(16.1) DP Advisors, LLC
(i) Construct a 3,200-foot rail siding, including installation of switches, rail/highway grade crossing, and site preparation to serve warehousing facilities at the Logistic Center in Allentown
1,600,000
(Base Project Allocation - $1,600,000)
(17) Delaware & Hudson Railway
(i) Rehabilitation and construction of rail infrastructure from state line to Taylor in Susquehanna, Wyoming and Lackawanna Counties, including ties, rail, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
7,700,000
(Base Project Allocation - $7,000,000)
(Design and Contingencies - $700,000)
(ii) Rehabilitation and the construction of sidings to serve new and existing customers in Susquehanna, Wyoming and Lackawanna Counties, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(iii) Rehabilitation and construction of rail infrastructure from Taylor to Sunbury in Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties, including ties, rail, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
7,700,000
(Base Project Allocation - $7,000,000)
(Design and Contingencies - $700,000)
(iv) Rehabilitation and the construction of sidings to serve new and existing customers in Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(iv) Rehabilitation and the construction of sidings to serve new and existing customers in Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(v) Rehabilitation and the construction of sidings to serve new and existing customers in Philadelphia, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(18) Department of Transportation
(i) Construction of rail production facility and track, MAGLEV
3,000,000
(ii) Advanced Manufacturing and Precision Fabrication of Large Steel Structures and Curved Beam Technology Program, continued and expanded development of efforts in McKeesport to fabricate, test, integrate and certify high-speed guideway beams for commercial availability, MAGLEV
14,000,000
(19) Erie County
(i) Construction and reconstruction of a new rail spur, turnouts, roadbed, switching and ancillary improvements as well as bridge improvements, signalization and related engineering necessary to reactivate rail import and export at the former International Paper Company site in the City of Erie
3,000,000
(ii) Erie-Western Pennsylvania Port Authority, construction of a 2,000-foot rail spur connecting the shipyard to the nearby CSX rail network
1,000,000
(iii) IFP North America, construction of a rail spur to provide access to east-west CSX and Norfolk Southern rail lines for the import of raw materials and export of juice product
750,000
(19.1) ES3 LLC
(i) Provide for engineering, land acquisition, construction and reconstruction of a rail freight intermodal facility in York County
3,000,000
(Base Project Allocation - $870,000)
(Land Allocation - $2,100,000)
(Design and Contingencies - $30,000)
(20) Everett Railroad
(i) Construction of a rail siding as part of the Walter Business Park
470,000
(21) Freeport Terminals
(i) Construction of 1.5-mile railroad siding at Freeport Terminals to access Norfolk Southern and Pittsburgh & Shawmut Railroads, including switches, crossing rehabilitation and construction/reconstruction of underpass structure, including new retaining walls and reconstruction of slip to accommodate intermodal traffic
5,748,000
(Base Project Allocation - $5,225,000)
(Design and Contingencies - $523,000)
(21.1) Indiana County
(i) Design and construction of a rail siding and spur at the Homer City Generating Station
4,000,000
(21.2) Kiski Junction Railroad
(i) Armstrong County, revitalization of rail line
7,000,000
(ii) Acquisition, rehabilitation, construction and engineering for a railroad between Schenley and Ford City, including land acquisition, grading, bridges, crossings, signals, track and support facilities
8,000,000
(22) Knox-Kane Railroad
(i) Upgrades, including ties, ballast and drainage work to allow travel of heavy loads
14,000,000
(ii) Acquisition and/or upgrade of a railroad, construction and acquisition
28,000,000
(23) Lackawanna County Railroad Authority
(i) Construction, infrastructure and other related costs for the Nay Aug Tunnel railroad clearance project
975,000
(24) Lancaster County
(i) Renovation of the Lancaster City Amtrak
2,000,000
(25) Lawrence County
(i) Construction, infrastructure and other related costs for the rehabilitation of rail infrastructure in City of New Castle
3,000,000
(ii) Construction and rehabilitation of railroad trackage at Ellwood Quality Steel, including switches and other rail-related infrastructure
3,000,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $300,000)
(26) Lebanon County
(i) Pennsy Supply, rehabilitation and construction of a bulk transfer facility, including 22,000 feet of track, 14 switches, utility relocation, bulk loading and unloading equipment and a railroad scale at the intermodal facility located in North Annville and North Londonderry Townships
9,800,000
(ii) Pennsy Supply, construction of a 3,000-foot rail siding, including a new switch and the purchase of bulk loading and unloading equipment at a new intermodal facility in South Lebanon Township
900,000
(26.1) Lehigh Coal and Navigation Company
(i) Construct bulk transfer facility, including loading and unloading equipment, asphalt pad, unloading bridges, drainage, rail spur sidings, switches and track
2,500,000
(Base Project Allocation - $2,500,000)
(27) Luzerne County
(i) Construction, infrastructure and other related costs for the extension of rail spur to improve rail access in Newport Township
1,000,000
(ii) Construction, infrastructure and other related costs for bulk transfer facility located in the City of Hazleton
2,500,000
(iii) Construct a bulk transfer facility, including 1,600 feet of track, two switches, site preparation, an asphalt pad with an access road, utilities relocation and loading/unloading equipment at an intermodal facility located in the City of Hazleton
2,500,000
(iv) Provide new rail siding for new rail service to the Sather Building within the Grimes Industrial Park in Avoca
1,100,000
(v) Rehabilitate and construct a bulk transfer facility, including 18,500 feet of track, three switches, utility relocation, a railroad bridge and bulk loading/unloading equipment at Pennsy Supply, Inc., in Jenkins Township
6,000,000
(28) Lycoming County
(i) Design and construction of a new and expanded transfer facility at the Newberry rail yard
3,900,000
(29) Middletown & Hummelstown Railroad
(i) Rehabilitation of interchange with Norfolk Southern and Amtrak, including switches, signals and rail infrastructure
880,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $80,000)
(30) Monroe County
(i) Upgrade railroad crossing at North Courtland and Route 209
500,000
(ii) Purchase from Norfolk Southern Railway Company and rehabilitation of 10 miles of main line trackage between MP 84.6 in Analomik and MP 74 in Slateford, Monroe County Railroad Authority
1,800,000
(30.1) Monroe County Rail Authority
(i) Provide for acquisition and rail rehabilitation of the 10-mile former Erie-Lackawanna main line track
1,800,000
(Base Project Allocation - $1,800,000)
(31) Montour County
(i) United States Gypsum, construction of rail line
6,900,000
(32) Norfolk Southern Railroad
(i) Port Berry Branch, construct two miles of additional main line track between CP Wing and Port Perry Tunnel, including traffic control signals
8,400,000
(ii) Saltsburg, construct a 130-car controlled passing siding in the vicinity of Saltsburg at MP LC 24
5,900,000
(iii) Provide for clearance improvement work on Keystone Corridor to accommodate double-stack requirements between Harrisburg and Philadelphia
14,000,000
(Base Project Allocation - $14,000,000)
iv) Stabilize embankment at MP 4.3 on Mon Line
7,000,000
(Base Project Allocation - $7,000,000)
(v) Construct five miles of additional track and maintain the track between CP Harris and CP Rockville on the main line
9,240,000
(Base Project Allocation - $9,240,000)
(vi) Construct an additional 6,500 feet of track to extend two passing sidings near Safe Harbor Dam
3,500,000
(Base Project Allocation - $3,500,000)
(vii) Replace bridge over Susquehanna Road in Montgomery County
13,000,000
(Base Project Allocation - $11,000,000)
(Land Allocation - $900,000)
(Design and Contingencies - $1,100,000)
(32.1) Northampton County
(i) Construct rail siding/spur to loading dock of a spec building occupied by C&S Wholesale Grocers, Inc., Lower Nazareth Township
800,000
(ii) Construct 3,200-foot rail siding, including a three switch rail/highway grade crossing and site preparation to serve warehousing facilities at the LogistiCenter in Allentown
1,600,000
(33) North Shore Railroad
(i) Randalls-McCray Alternative Fuels, LLC, construction of double-track rail siding and associated loading/unloading facility to former TRW facility
2,310,000
(Base Project Allocation - $2,100,000)
(Design and Contingencies - $210,000)
(34) Northumberland County
(i) Rehabilitation and rebuilding of railroad bridge serving F. P. Leopold and Moran Industries as well as connecting spur lines off of Buffalo Line of Norfolk Southern
1,980,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $180,000)
(ii) Moran Industries, installation of major lead siding of Buffalo Line of Norfolk Southern, including switches and other normal components for rail infrastructure as part of plant expansion
1,650,000
(iii) Norfolk Southern Railroad and Susquehanna Rail Works, construction of rail siding and switch from Norfolk Southern line to facility
495,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $45,000)
(35) Northwest Pennsylvania Regional Planning and Development Commission
(i) Acquisition and rehabilitation of Knox-Kane Railroad to serve industrial sites
2,000,000
(35.1) City of Philadelphia
(i) Rehabilitation and construction of the former Conrail Girard Point Yard
1,400,000
(36) Pittsburgh & Ohio Central Railroad
(i) Rehabilitation of main line from Neville Island to Bridgeville in Allegheny County, including ties, rail, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(ii) Rehabilitation of main line from Bridgeville to Arden in Allegheny and Washington Counties, including ties, rail, surface, bridges, switches, road crossings and signal and communication, grading, drainage and other associated improvements
3,300,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $300,000)
(iii) Rehabilitation and the construction of new sidings to serve new and existing customers in Allegheny and Washington Counties, including ties, rail, surface, switches, road crossings and signal and communication, grading, drainage and other associated work
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(iv) Rehabilitate railroad bridges in Mckees Rocks, Kirwan Heights, Bridgeville and Mayview, including masonry abutments, approach spans, main spans, deck replacement and related work
910,000
(Base Project Allocation - $910,000)
(37) Pittsburgh & Shawmut Railroad
(i) Rehabilitation of main line from Freeport to Brookville and Sligo to Driftwood in Cameron, Elk, Clearfield, Jefferson, Clarion and Armstrong Counties (MP 3 to MP 110 and MP 18 to MP 88, including DuBois Yard, Brookville Yard, Kittanning Yard and all sidings), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(ii) Rehabilitation and construction of new sidings to serve new and existing customers from Freeport to Driftwood to Sligo in Jefferson, Elk, Cameron and Armstrong Counties (MP 88 to MP 110, including all yards, sidings and subdivisions), including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings and signal and communication and any other related work
2,750,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $250,000)
(38) Reading, Blue Mountain and Northern Railroad
(i) Clearance project to accommodate double-stack cars on main line between Reading MP 600 and Nesquehoning Junction MP 124
2,700,000
(ii) Track rehabilitation on main line from Reading MP 60 to Mehoopany MP 213
3,000,000
(iii) Land acquisition, track and switch construction in and around Taylor Yard on Scranton Branch and Running Track in Luzerne County
1,375,000
(iv) Purchase and installation of a welded rail train on the main line from Reading MP 62 to Dupont MP 175
3,500,000
(v) Track rehabilitation and extension of tracks in North Reading Yard in Berks County to enhance the use of this facility as interchange location with Norfolk Southern for coal and other unit train business
1,400,000
(vi) Rebuild Tamaqua Yard in Schuylkill County to improve efficiency of service to customers in the coal region
1,000,000
(vii) Track rehabilitation to the Mahanoy & Shamokin Branch
1,200,000
(viii) Track rehabilitation on the Tremont Branch
840,000
(ix) Track rehabilitation of the Pottsville, Minersville and Middleport Branches from Port Clinton to the new Yuengling facility in Port Carbon
840,000
(38.1) Green Holdings
(i) Construction of rail siding at proposed Green Holding, LLC ethanol facility in Porter Township, Schuylkill County, and construction of rail spur from siding to existing Reading, Blue Mountain and Northern main line for transfer and unloading of corn and other commodities
4,950,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $450,000)
(ii) Construction of three miles of railroad line from Morea/New Boston to Frackville Industrial Park, including construction of three railroad bridges, property acquisition, grading and engineering
9,000,000
(39) Reading and Northern Railroad
(i) Clearance project to accommodate double-stack cars on main line between Reading MP 60 and Nesquehoning Junction MP 124, Berks, Schuylkill and Carbon Counties in conjunction with Nesquehoning Bridge Phase II
2,700,000
(ii) Track rehabilitation on main line from Reading MP 60 to Mehoopany MP 213, Berks, Schuylkill, Carbon and Luzerne Counties to permit safer and more efficient service to all RBMN customers
3,000,000
(iii) Land acquisition and rehabilitation, track and switch construction in and around Taylor Yard on Scranton Branch and Running Track in Luzerne County
1,375,000
(iv) Purchase and installation of a welded rail train on the main line from Reading MP 62 to Dupont MP 175 in Berks, Schuylkill, Carbon and Luzerne Counties
3,500,000
(v) Track rehabilitation and extension of tracks in North Reading Yard in Berks County
1,400,000
(vi) Rebuild Tamaqua Yard in Schuylkill County
1,000,000
(vii) Track rehabilitation to the Mahanoy & Shamokin Branch in Schuylkill, Columbia and Northumberland Counties
1,200,000
(viii) Track rehabilitation on Tremont Branch in Schuylkill County
840,000
(ix) Track rehabilitation of Pottsville, Minersville and Middleport Branches from Port Clinton to new Yuengling Facility in Port Carbon, Schuylkill County
840,000
(40) River Hill Coal
(i) Rehabilitation and expansion of track infrastructure for new Thompsontown tipple, including drainage, water control enclosures and other rail infrastructure related to the interchange and loading of rail cars
3,520,000
(Base Project Allocation - $3,200,000)
(Design and Contingencies - $320,000)
(ii) Construction and rehabilitation of railroad spur at River Hill Tipple, including switches and other related rail infrastructure
880,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $80,000)
(iii) Construction and rehabilitation of Bowman siding off R.J. Corman Railroad, including switches and other related rail infrastructure
1,650,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $150,000)
(41) R.J. Corman Railroad
(i) Rehabilitation of the rail line known as the Clearfield Cluster, located in Cambria, Clearfield, Centre, Indiana and Jefferson Counties
8,000,000
(ii) Engineering, acquisition and construction of a five-mile rail line connecting the R.J. Corman railroad to the site of the new facilities of PA Waste, LLC
3,000,000
(42) Schuylkill County
(i) Randalls McCray Alternative Fuels, LLC, construction of a bulk transfer facility, including 1,200 feet of track, switches, site preparation, utility relocation and loading/unloading equipment at an intermodal facility located in Jajic Industrial Park, Delano Township
2,000,000
(43) SEDA-COG Joint Rail Authority
(i) Lewistown Street running railroad track reconstruction
1,540,000
(ii) Construction of infrastructure to enhance safety in Spring Township, Centre County
2,300,000
(iii) Design and construction of a new and expanded transfer facility at the Newberry Rail Yard, including acquisition and related infrastructure
3,900,000
(iv) Rehabilitation of the King Street crossing in Northumberland County
100,000
(v) Mifflin County Industrial Park East Railroad and related facilities, new facilities to serve the proposed 316-acre Mifflin County Industrial Park East
1,400,000
(43.1) Susquehanna County Railroad Authority
(i) Acquire property and reconstruct track to establish new industrial park, including track construction, siding construction, switch installation, land acquisition and related work
2,000,000
(Base Project Allocation - $2,000,000)
(44) Union Railroad Company
(i) USS Mon Valley rail rehabilitation, including upgrades, rail installation, switches, road crossings at USS facility, track ties and switches on the Union Railroad main line in Penn Hills, Turtle Creek, East Pittsburgh, North Versailles, West Mifflin and Clairton
5,020,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $20,000)
(ii) Upgrade rail infrastructure within the Curry Hollow "B" Yard, including track rebuilding, switch replacement and associated work
580,000
(Base Project Allocation - $580,000)
(44.1) Warren County
(i) Hyma-Devore Lumber Company, rehabilitation and replacement of rail siding to begin rail shipments, including replacement of deteriorating ballast, rail, ties, switches and turnouts and the construction of culverts and ditches
500,000
(44.2) West Chester Railroad
(i) Maintenance to passenger line, including construction
3,000,000
(45) Western New York and Pennsylvania Railroad
(i) Additions and betterments to former Conrail track in Crawford, Erie, Mercer, Venango, Warren and surrounding counties, to assure the ability to provide continued and enhanced rail freight service. Work may include, but is not limited to, grading, ballast, crossties, rail welding, rail replacement, rail renewal, bridge rehabilitation, highway grade crossing and grade crossing protection renewal and signal repair
3,900,000
(46) Westmoreland County Industrial Development Corporation
(i) Radebaugh Subdivision head worn and curve worn rail replacement from MP 0 to MP 23.8 in Westmoreland and Fayette Counties
1,100,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $100,000)
(ii) Rehabilitate Radebaugh Branch, including rail replacement and associated work
1,766,000
(Base Project Allocation - $1,766,000)
(47) Wheeling & Lake Erie Railway
(i) Construction of 3,000-foot-plus passing track and three switches at Bruceton to provide interchange capability with Allegheny Valley Railroad
556,000
(Base Project Allocation - $505,000)
(Design and Contingencies - $51,000)
(ii) Rehabilitation of rail infrastructure, including replacement of rail ties and upgrade of several crossings located in approximately 40 miles of Rook Subdivision of Wheeling & Lake Erie Railroad
990,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $90,000)
(iii) Rehabilitation of track infrastructure of the Mifflin Branch of Wheeling & Lake Erie Railroad, including replacement of ties, rail, ballast and other related materials
528,000
(Base Project Allocation - $480,000)
(Design and Contingencies - $48,000)
(iv) Construct new connection to the Allegheny Valley Railroad at Bruceton, including track, switch, site and related work
420,000
(Base Project Allocation - $420,000)
(48) Wyoming County
(i) Procter and Gamble Paper Products Co., Mehoopany Plant, rehabilitate and reconstruct rail spur and switching yard, including switches, signals, ties, ballast, rail and other related railroad construction materials
1,250,000
(49) York County
(i) Acquisition of land and construction and engineering of a rail freight intermodal facility
3,000,000
(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total
Project
Allocation
(1) Berks County
(i) Reading Regional Airport
(A) Construct hangars
250,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $50,000)
(B) Demolition and site restoration of hangar No. 501
1,020,000
(ii) Maxatawny Township
(A) Acquisition and development of the Kutztown Airport
5,500,000
(1.1) Bucks County
(i) Quakertown Airport
(A) Construction of airport hangars
600,000
(B) Acquisition and rehabilitation of former technical school property for operation of office and business
1,000,000
(C) Property acquisition
700,000
(2) Butler County
(i) Butler County Airport
(A) Construct hangars
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(3) Cambria County
(i) Cambria County Airport
(A) Construct hangars
400,000
(Base Project Allocation - $320,000)
(Design and Contingencies - $80,000)
(4) Carbon County
(i) Carbon County Airport
(A) Construct hangars
300,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $60,000)
(5) Chester County
(i) Chester County Airport
(A) Construct hangars
513,000
(Base Project Allocation - $410,000)
(Design and Contingencies - $103,000)
(5.1) Crawford County
(i) Port Meadville Airport
(A) Construction of six single-aircraft hangars
1,000,000
(B) Construction of 20 T-hangars and construction of hazmat/scuba regional emergency responders at Port Meadville Airport
1,500,000
(5.2) Indiana County
(i) Indiana County Airport Authority
(A) Runway extension and rehabilitation for Jimmy Stewart Airport
2,500,000
(5.3) Lancaster County
(i) Lancaster County Airport Authority
(A) Site development and construction of T-hangar complex
1,400,000
(B) Site development and construction of corporate hangar and offices
3,400,000
(6) Lawrence County
(i) New Castle Airport Authority
(A) Acquisition, construction, infrastructure and other related costs for the New Castle Airport Authority expansion
4,500,000
(7) Lehigh County
(i) Lehigh Valley International Airport
(A) Land acquisition
1,500,000
(Land Allocation - $1,500,000)
(ii) Airport improvements for economic development and safety enhancement
5,000,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $500,000)
(8) Luzerne County
(i) Wilkes-Barre/Wyoming Valley Airport
(A) Construct hangars
450,000
(Base Project Allocation - $360,000)
(Design and Contingencies - $90,000)
(9) Lycoming County
(i) Williamsport Regional Airport, Montoursville Borough
(A) Design and construction of facility improvements, including directional signage, terminal building, renovations, parking and Pennsylvania State Police hangar improvements
676,000
(10) Northumberland County
(i) Northumberland County Airport
(A) Construct hangars
104,000
(Base Project Allocation - $83,000)
(Design and Contingencies - $21,000)
(11) Philadelphia County
(i) Philadelphia International Airport
(A) Runway extension and other airfield improvements
10,000,000