Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Adams County Transit Authority (ACTA)
(i) Design, construction and other related costs for multimodal transportation facility for Freedom Transit, ACTA Paratransit, intercity buses, automobiles and bicycles to provide off-street parking for both public and private users, as well as to accommodate overflow parking from the Gettysburg National Military Park, Borough of Gettysburg
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(1.1) Allegheny County
(i) High-density redevelopment at new and existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of Pittsburgh
Project Allocation
20,000,000
(Base Project Allocation - $20,000,000)
(ii) Acquisition, construction, infrastructure, redevelopment and other related costs for multimodal public transportation facility
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(2) Armstrong Area Transportation Authority
(i) Provide for facility and facility upgrades, including mobility management center, terminals, fuel storage, parking lots, fueling depots, roof replacement and miscellaneous equipment
Project Allocation
2,253,000
(Base Project Allocation - $2,028,000)
(Design & Contingencies - $225,000)
(ii) Upgrade and renovate DuBois facility to bring to state of good repair
Project Allocation
959,000
(Base Project Allocation - $863,000)
(Design & Contingencies - $96,000)
(iii) Construct terminals
Project Allocation
1,162,000
(Base Project Allocation - $1,162,000)
(iv) Mobility Management Center, to match discretionary Federal capital funding to rehabilitate infrastructure throughout system
Project Allocation
1,066,000
(Base Project Allocation - $959,000)
(Design & Contingencies - $107,000)
(v) Bus Purchase Program, provide for replacement of buses that have exceeded their useful life
Project Allocation
2,464,000
(Base Project Allocation - $2,218,000)
(Design & Contingencies - $246,000)
(2.1) Beaver County Transit Authority
(i) Construction, infrastructure and other related costs for natural gas fueling station in Center Township
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(3) Butler Transit Authority
(i) Expand Cranberry Area Park and Ride Facility on Route 528 near I-79, Butler County, including property acquisition and construction
Project Allocation
450,000
(Base Project Allocation - $405,000)
(Design & Contingencies - $45,000)
(ii) Provide for infrastructure improvements, facility upgrades for bus storage and maintenance areas, construction of public waiting area, training room, park and ride facility and compressed natural gas (CNG) refueling station and purchase of four 45-foot Coach CNG buses
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(4) Cambria County Transit Authority
(i) Replace transit facility in Johnstown to meet current standards and requirements
Project Allocation
2,419,000
(Base Project Allocation - $2,177,000)
(Design & Contingencies - $242,000)
(ii) Construct transit facility
Project Allocation
3,871,000
(Base Project Allocation - $3,871,000)
(iii) Construction and infrastructure improvements for new facility and bus replacement projects for Camtran
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(iv) Replace track ties and other improvements
Project Allocation
271,000
(Base Project Allocation - $244,000)
(Design & Contingencies - $27,000)
(v) Replace fare collection system
Project Allocation
78,000
(Base Project Allocation - $70,000)
(Design & Contingencies - $8,000)
(5) Capital Area Transit (CAT) Authority
(i) Replace CAT's transit facility to meet modern requirements
Project Allocation
47,742,000
(Base Project Allocation - $42,968,000)
(Design & Contingencies - $4,774,000)
(ii) Upgrade transportation technology for vehicle monitoring and real-time information for CAT's transit operations
Project Allocation
1,935,000
(Base Project Allocation - $1,742,000)
(Design & Contingencies - $193,000)
(6) Centre Area Transportation Authority (CATA)
(i) Expand CATA's maintenance and bus storage areas
Project Allocation
968,000
(Base Project Allocation - $871,000)
(Design & Contingencies - $97,000)
(ii) Acquisition of replacement buses
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
(iii) Rehabilitate or replace various facilities and infrastructure
Project Allocation
30,000,000
(Base Project Allocation - $24,000,000)
(Design & Contingencies - $6,000,000)
(iv) Acquisition of compressed natural gas (CNG) buses
Project Allocation
5,700,000
(Base Project Allocation - $5,700,000)
(6.1) Chester County
(i) Acquisition, construction and related costs of Darby Road extension and Paoli Transit Center projects in Tredyffrin Township
Project Allocation
30,000,000
(Base Project Allocation - $30,000,000)
(7) County of Lackawanna Transit System
(i) Acquisition, construction, infrastructure and other costs related to compressed natural gas fueling station and maintenance facility
Project Allocation
6,000,000
(Base Project Allocation - $6,000,000)
(ii) Acquisition, construction, infrastructure and other costs related to intermodal transportation center
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(8) Crawford Area Transportation Authority
(i) Construct steel structure sheltered bus storage facility and wash bay for bus fleet
Project Allocation
387,000
(Base Project Allocation - $348,000)
(Design & Contingencies - $39,000)
(9) Erie Metropolitan Transit Authority
(i) Construct new operations facility, including infrastructure
Project Allocation
1,796,000
(Base Project Allocation - $1,616,000)
(Design & Contingencies - $180,000)
(9.1) Lebanon Transit
(i) Rehabilitate building and grounds, including maintenance garage roof
Project Allocation
406,000
(Base Project Allocation - $365,000)
(Design & Contingencies - $41,000)
(10) Lehigh and Northampton Transportation Authority
(i) Construct new operations facility, including infrastructure at Allentown operating facility
Project Allocation
2,517,000
(Base Project Allocation - $2,265,000)
(Design & Contingencies - $252,000)
(ii) Transit vehicle purchase, provide funding for purchase of transit buses
Project Allocation
1,646,000
(Base Project Allocation - $1,481,000)
(Design & Contingencies - $165,000)
(10.1) Lycoming County
(i) Construction, infrastructure and other related costs for replacing existing cast in place culvert which carries Lawshee Run under several borough streets and sidewalks, including repairs to streets and replacement of sidewalks in Jersey Shore Borough
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
(11) Mid-County Transit Authority
(i) Construct bus storage facility
Project Allocation
215,000
(Base Project Allocation - $215,000)
(12) Mid Mon Valley Transit Authority
(i) Rehabilitate bus storage, Phase II, including construction to rehabilitate existing bus storage, administration and passenger areas at Donora transit facility
Project Allocation
1,160,000
(Base Project Allocation - $1,044,000)
(Design & Contingencies - $116,000)
(ii) Construct Donora Phase II project
Project Allocation
965,000
(Base Project Allocation - $965,000)
(iii) Replace revenue rolling stock that has outlived its useful life as part of Phase II of rehabilitation of Donora transit facility
Project Allocation
364,000
(Base Project Allocation - $328,000)
(Design & Contingencies - $36,000)
(13) Monroe County Transit Authority
(i) Construct new bus storage facility and staging area
Project Allocation
968,000
(Base Project Allocation - $871,000)
(Design & Contingencies - $97,000)
(14) Montgomery County
(i) Construction, infrastructure improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(14.1) Northampton County
(i) Installation of traffic light at intersection of Polk Valley Road and Route 412 in Lower Saucon Township
Project Allocation
450,000
(Base Project Allocation - $450,000)
(15) Philadelphia County
(i) Infrastructure improvements, including equipment upgrades for Phlash Trolley fleet
Project Allocation
235,000
(Base Project Allocation - $235,000)
(16) Port Authority of Allegheny County (PAAC)
(i) FY 2011-2012 Section 5307 Program, replacement and rehabilitation of major components of bus and fixed guideway system
Project Allocation
7,341,000
(Base Project Allocation - $6,607,000)
(Design & Contingencies - $734,000)
(ii) FY 2011-2012 Section 5309 Program, replacement and rehabilitation of major components within Port Authority's rail and busway system, including North Shore Connector project
Project Allocation
6,000,000
(Base Project Allocation - $5,400,000)
(Design & Contingencies - $600,000)
(iii) FY 2011-2012 Section 5307 Flex Program, to provide funding of replacement buses and standardize bus procurement program
Project Allocation
1,493,000
(Base Project Allocation - $1,344,000)
(Design & Contingencies - $149,000)
(iv) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements
Project Allocation
1,161,000
(Base Project Allocation - $1,045,000)
(Design & Contingencies - $116,000)
(v) Infrastructure Safety Renewal Program, to restore PAAC's transit and railroad infrastructure, including maintenance support facilities
Project Allocation
16,000,000
(Base Project Allocation - $14,400,000)
(Design & Contingencies - $1,600,000)
(vi) Vehicle Overhaul Program
Project Allocation
7,419,000
(Base Project Allocation - $6,678,000)
(Design & Contingencies - $741,000)
(vii) FY 2011-2012 Section 5307 Program, for replacement and rehabilitation of major components of bus and fixed guideway system
Project Allocation
13,706,000
(Base Project Allocation - $12,335,000)
(Design & Contingencies - $1,371,000)
(viii) FY 2011-2012 Section 5309 Program, for replacement and rehabilitation of major components within Port Authority's rail and busway system to ensure safety and reliability, including North Shore Connector project
Project Allocation
11,756,000
(Base Project Allocation - $10,580,000)
(Design & Contingencies - $1,176,000)
(ix) FY 2011-2012 Section 5307 Flex Program, to provide funding for match of Federal and local funding
Project Allocation
1,493,000
(Base Project Allocation - $1,344,000)
(Design & Contingencies - $149,000)
(x) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, to provide for utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements
Project Allocation
1,403,000
(Base Project Allocation - $1,263,000)
(Design & Contingencies - $140,000)
(xi) Infrastructure Safety Renewal Program, to provide funding to restore PAAC's transit and railroad infrastructure, including maintenance support facilities
Project Allocation
45,484,000
(Base Project Allocation - $41,000,000)
(Design & Contingencies - $4,484,000)
(xii) Vehicle Overhaul Program, to provide for PAAC's major overhaul of rolling stock
Project Allocation
5,000,000
(Base Project Allocation - $4,500,000)
(Design & Contingencies - $500,000)
(xiii) Section 5307 Program, to match discretionary Federal capital and local funding for replacement of major components of bus and fixed guideway systems
Project Allocation
4,723,000
(Base Project Allocation - $4,251,000)
(Design & Contingencies - $472,000)
(xiv) Section 5309 Program, to match Federal capital funds to replace buses and rehabilitate various facilities and infrastructure
Project Allocation
678,000
(Base Project Allocation - $610,000)
(Design & Contingencies - $68,000)
(xv) Section 5307 Program, to match discretionary Federal capital funding to purchase 70 replacement buses annually
Project Allocation
1,493,000
(Base Project Allocation - $1,344,000)
(Design & Contingencies - $149,000)
(xvi) Federal Grant Program, to match discretionary Federal capital and local funding to rehabilitate or replace existing facilities and infrastructure
Project Allocation
5,601,000
(Base Project Allocation - $5,041,000)
(Design & Contingencies - $560,000)
(16.1) Red Rose Transit Authority
(i) Purchase buses, to provide for replacement of buses
Project Allocation
1,887,000
(Base Project Allocation - $1,698,000)
(Design & Contingencies - $189,000)
(17) River Valley Transit
(i) Expand Trade and Transit Center and Church Street Transportation Intermodal Center
Project Allocation
1,161,000
(Base Project Allocation - $1,045,000)
(Design & Contingencies - $116,000)
(ii) Expand Trade and Transit Center
Project Allocation
1,459,000
(Base Project Allocation - $1,313,000)
(Design & Contingencies - $146,000)
(iii) Construct compressed natural gas fueling station and purchase four CNG transit vehicles
Project Allocation
1,042,000
(Base Project Allocation - $937,800)
(Design & Contingencies - $104,200)
(18) Southeastern Pennsylvania Transportation Authority (SEPTA)
(i) FFY 2012 Section 5307 Formula Program of Prospects, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, bus purchase and paratransit vehicle purchase programs
Project Allocation
23,831,000
(Base Project Allocation - $21,448,000)
(Design & Contingencies - $2,383,000)
(ii) FFY 2012 Section 5309 Rail Modernization Program, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, transit and regional rail station and station accessibility programs
Project Allocation
24,170,000
(Base Project Allocation - $21,753,000)
(Design & Contingencies - $2,417,000)
(iii) FFY 2012 Bus Purchase Program, including acquisition and replacement of buses
Project Allocation
4,133,000
(Base Project Allocation - $3,720,000)
(Design & Contingencies - $413,000)
(iv) FFY 2012 Federal Highway Flex Program, including funds for SEPTA's railroad/highway grade crossings and for CMAQ projects that help meet requirements of the Clean Air Act
Project Allocation
774,000
(Base Project Allocation - $697,000)
(Design & Contingencies - $77,000)
(v) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through competitive grant programs
Project Allocation
15,839,000
(Base Project Allocation - $14,255,000)
(Design & Contingencies - $1,584,000)
(vi) FY 2012-2013 State of Good Repair Program, to bring transit and railroad facilities to a state of good repair, including communications, track right-of-way, station facilities, environmental concerns and bridges
Project Allocation
24,174,000
(Base Project Allocation - $21,755,000)
(Design & Contingencies - $2,419,000)
(vii) Infrastructure Safety Renewal Program, to restore SEPTA's transit and railroad infrastructure, including maintenance support facilities
Project Allocation
31,936,000
(Base Project Allocation - $28,742,000)
(Design & Contingencies - $3,194,000)
(viii) FY 2011-2012 Vehicle Overhaul Program
Project Allocation
53,226,000
(Base Project Allocation - $47,903,000)
(Design & Contingencies - $5,323,000)
(ix) FFY 2013 Formula Program of Projects, to provide for SEPTA's State funds to match Federal capital funding to replace buses and rehabilitate various facilities and infrastructure to bring to state of good repair
Project Allocation
23,226,000
(Base Project Allocation - $20,903,000)
(Design & Contingencies - $2,323,000)
(x) FFY 2013 Rail Modernization Program, to provide for SEPTA's state of good repair program, vehicle overhaul program, regional rail signal mechanization, system improvements program, transit and regional rail station program and station accessibility program
Project Allocation
23,226,000
(Base Project Allocation - $20,903,000)
(Design & Contingencies - $2,323,000)
(xi) FFY 2013 Bus Purchase Program, to provide for acquisition and replacement of buses for SEPTA services
Project Allocation
4,133,000
(Base Project Allocation - $3,720,000)
(Design & Contingencies - $413,000)
(xii) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through competitive grant programs by improving air quality and removing congestion
Project Allocation
17,420,000
(Base Project Allocation - $15,678,000)
(Design & Contingencies - $1,742,000)
(xiii) Federal Competitive Clean Fuel Program, to provide for State funds to match discretionary Federal capital funding to replace existing vehicles with clean fuel vehicles to bring to state of good repair
Project Allocation
1,452,000
(Base Project Allocation - $1,307,000)
(Design & Contingencies - $145,000)
(xiv) FY 2013-2014 Safety Renewal Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair
Project Allocation
33,872,000
(Base Project Allocation - $30,485,000)
(Design & Contingencies - $3,387,000)
(xv) FY 2013-2014 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair
Project Allocation
19,356,000
(Base Project Allocation - $17,420,000)
(Design & Contingencies - $1,936,000)
(xvi) Vehicle Overhaul Program, to provide for SEPTA's 2013-2014 Vehicle Overhaul Program which provides for major overhaul of rolling stock
Project Allocation
53,227,000
(Base Project Allocation - $47,904,000)
(Design & Contingencies - $5,323,000)
(xvii) FY 2012-2013 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair
Project Allocation
24,194,000
(Base Project Allocation - $21,775,000)
(Design & Contingencies - $2,419,000)
(xviii) Infrastructure Safety Renewal Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities
Project Allocation
31,936,000
(Base Project Allocation - $28,742,000)
(Design & Contingencies - $3,194,000)
(xix) Vehicle Overhaul Program, to provide for SEPTA's 2012-2013 Vehicle Overhaul Program which provides for major overhaul of rolling stock
Project Allocation
53,227,000
(Base Project Allocation - $47,904,000)
(Design & Contingencies - $5,323,000)
(xx) FY 2012-2013 Infrastructure Safety Renewal Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities
Project Allocation
31,936,000
(Base Project Allocation - $28,742,000)
(Design & Contingencies - $3,194,000)
(xxi) Commuter rail expansion project, Phase 1 -- Elwyn to Wawa
Project Allocation
16,500,000
(Base Project Allocation - $15,000,000)
(Design & Contingencies - $1,500,000)
(xxii) Commuter rail expansion project, Phase 2 -- Wawa to West Chester
Project Allocation
16,500,000
(Base Project Allocation - $15,000,000)
(Design & Contingencies - $1,500,000)
(xxiii) Urbanized Area of Formula Program, to match Federal capital funding and to replace buses and rehabilitate various facilities and infrastructure
Project Allocation
47,614,000
(Base Project Allocation - $42,853,000)
(Design & Contingencies - $4,761,000)
(xxiv) State of Good Repair Program, to provide for the State of Good Repair Program and Facilities Overhaul Program and to rehabilitate or replace various facilities and infrastructure
Project Allocation
51,098,000
(Base Project Allocation - $45,988,000)
(Design & Contingencies - $5,110,000)
(xxv) Bus and Bus Facilities Program, to match Federal capital funding and replace buses and rehabilitate various facilities and infrastructure
Project Allocation
3,484,000
(Base Project Allocation - $3,136,000)
(Design & Contingencies - $348,000)
(xxvi) Bus Purchase Flex Program, to match Federal funds to replace buses and rehabilitate various facilities and infrastructure
Project Allocation
8,267,000
(Base Project Allocation - $7,440,000)
(Design & Contingencies - $827,000)
(xxvii) Federal Grant Program, to match discretionary Federal capital funding to rehabilitate or replace existing facilities and infrastructure
Project Allocation
1,452,000
(Base Project Allocation - $1,307,000)
(Design & Contingencies - $145,000)
(xxviii) Infrastructure Safety Renewal Program, to provide for transit and railroad infrastructure, including maintenance support facilities
Project Allocation
67,744,000
(Base Project Allocation - $60,970,000)
(Design & Contingencies - $6,774,000)
(xxix) Fiscal year 2014-2015 State of Good Repair Program, to provide for the State of Good Repair Program and Facilities Overhaul Program and to rehabilitate or replace various facilities and infrastructure
Project Allocation
19,356,000
(Base Project Allocation - $17,420,000)
(Design & Contingencies - $1,936,000)
(xxx) Vehicle Overhaul Program, to provide for fiscal year 2013-2014 Vehicle Overhaul Program
Project Allocation
53,266,000
(Base Project Allocation - $47,903,000)
(Design & Contingencies - $5,323,000)
(xxxi) Federal Grant Program, provide State funds to match discretionary Federal capital funding to rehabilitate or replace existing assets
Project Allocation
4,839,000
(Base Project Allocation - $4,355,000)
(Design & Contingencies - $484,000)
(19) Department of Transportation
(i) Vehicle and Capital Equipment Program, to provide funding match for non-Federal projects for purchase of transit vehicles and other capital equipment and infrastructure
Project Allocation
50,000,000
(Base Project Allocation - $45,000,000)
(Design & Contingencies - $5,000,000)
(ii) Provide funding for capital improvements and capital maintenance to Keystone Corridor, including interlockings and stations
Project Allocation
15,000,000
(Base Project Allocation - $13,500,000)
(Design & Contingencies - $1,500,000)
(iii) Vehicle and Capital Equipment Program, to provide funding match for Federal projects for purchase of transit vehicles and other capital equipment and infrastructure
Project Allocation
50,000,000
(Base Project Allocation - $45,000,000)
(Design & Contingencies - $5,000,000)
(iv) Alternative Fuel Vehicles Program, provide for CNG, equipment and infrastructure to support alternate fuel vehicles for various transit authorities across this Commonwealth
Project Allocation
50,000,000
(Base Project Allocation - $50,000,000)
(19.1) Washington City Transit
(i) Improve transit facilities, to provide for purchase of passenger amenities
Project Allocation
58,000
(Base Project Allocation - $52,000)
(Design & Contingencies - $6,000)
(ii) Purchase equipment, to provide for purchase of new equipment for additional transit staff
Project Allocation
24,000
(Base Project Allocation - $22,000)
(Design & Contingencies - $2,000)
(20) York County Transportation Authority
(i) Renovate transit operations center/maintenance facility
Project Allocation
8,710,000
(Base Project Allocation - $7,839,000)
(Design & Contingencies - $871,000)
(ii) Purchase buses, to provide for replacement of fixed-route vehicles
Project Allocation
1,348,000
(Base Project Allocation - $1,213,000)
(Design & Contingencies - $135,000)
(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Allegheny County
(i) City of Pittsburgh
(A) High-density redevelopment at new and existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of Pittsburgh
Project Allocation
20,000,000
(Base Project Allocation - $20,000,000)
(ii) Three Rivers Marine & Rail Terminals
(A) Rail rehabilitation, including track infrastructure improvements, upgrade ballast, ties and surface and align tracks for Glassport Terminal rail expansion project
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(2) Allegheny, Fayette, Washington and Westmoreland Counties
(i) Wheeling & Lake Erie Railroad
(A) Upgrade existing infrastructure and construct new capacity for projected increases in car loadings and new customer development, including engineering, site preparation, grading, rail, ties, ballast, switches, signals, crossings, bridges, tunnels, slope stabilization and other related materials
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(3) Allegheny, Butler and Washington Counties
(i) Allegheny Valley Railroad
(A) Rehabilitate and build railroad infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, tunnels, crossings, freight yard modification and expansion
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
(3.1) Allegheny and Washington Counties
(i) Pittsburgh and Ohio Central Railroad
(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related work
Project Allocation
4,900,000
(Base Project Allocation - $4,900,000)
(B) Rail construction or rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related work
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(4) Beaver County
(i) Aliquippa and Ohio River Railroad
(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related work
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
(B) Rail construction or rail rehabilitation for support of new or existing customers in Beaver County
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(5) Berks County
(i) City of Reading
(A) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costs
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(ii) Colebrookdale Railroad
(A) Rehabilitation of railroad, including track improvements, siding extensions, visitor center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and enhance corridor for freight traffic in Berks and Montgomery Counties
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(iii) Richmond Township
(A) Construction of an approximately 3,000 feet, three-track rail spur from Norfolk Southern eastbound mainline between Reading and Allentown to East Penn Manufacturing facility, including track, ties, rail, switches, surface, bridges, road crossing, drainage, grading and other associated improvements and costs
Project Allocation
921,000
(Base Project Allocation - $921,000)
(6) Bucks County
(i) Fairless Hills
(A) Acquisition, infrastructure, redevelopment, construction and other related costs for Fairless Hills rail expansion project at the Keystone Industrial Port complex
Project Allocation
5,750,000
(Base Project Allocation - $5,750,000)
(ii) Falls Township
(A) Acquisition, infrastructure, rail improvements and other related costs for development of industrial facility located at Keystone Industrial Port Complex
Project Allocation
15,000,000
(Base Project Allocation - $15,000,000)
(iii) Bucks County Industrial Development Authority
(A) Acquisition, infrastructure, redevelopment, construction and other related costs to extend rail service to Riverside Industrial Park
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(iv) SMS Rail Lines
(A) Expand service to current and future customers and upgrade rail infrastructure, including land acquisition, engineering, site preparation, rail, ties, undercutting, ballast, sidings, crossings, equipment and other related materials
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
(7) Cambria County
(i) City of Johnstown
(A) Rehabilitation, construction and renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production located in the greater Johnstown area, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(ii) County projects
(A) Rehabilitation, construction and renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production, located in the greater Johnstown area, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(B) Rehabilitation, construction and renovation of rail infrastructure to serve economic development project
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(7.1) Carbon County
(i) Graymont, Inc., Pleasant Gap
(A) Rail construction and rehabilitation, including grading and filling, ballasts, switches, derailers and related work for a Graymont, Inc., Pleasant Gap plant rail expansion project
Project Allocation
2,100,000
(Base Project Allocation - $2,100,000)
(ii) Reading Blue Mountain and Northern Railroad
(A) Nesquehoning bridge project, Phase 2, construction of second span over Lehigh River adjacent to existing bridge
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(7.2) Centre County
(i) Titan Energy Park
(A) Rail construction, rail sidings, switches, bridge replacement, site upgrades, connector road, loading equipment, building upgrades, access systems and other related costs for development of centralized transloading site
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(7.3) Chester County
(i) City of Coatesville
(A) Rehabilitation of rail infrastructure pertaining to Modena Railroad Bridge to facilitate efficient and safe movement of raw materials and finished steel products, including, but not limited to, engineering, site preparation, drainage, grading, rails, ties, ballast, switches, crossings, sidings, bridge and paving
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
(7.4) Clearfield County
(i) Bloom Township
(A) Construction, infrastructure and other related costs for the development of a regional transloading facility at the Falls Creek location of Russell Stone Products
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(7.5) Clinton County
(i) Clinton County Solid Waste Authority
(A) Construction and related infrastructure for railroad siding and transloading facility in Wayne Township
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(ii) Clinton County Economic Partnership
(A) Construct siding and loading facilities for the Henry Street Rail project
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(7.6) Crawford County
(i) Economic Progress Alliance of Crawford County
(A) Infrastructure, construction and other related costs for development of Keystone Regional Industrial Park rail line, including improvements to existing rail line and construction of new track and turnouts
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(7.7) Dauphin County
(i) Steelton and Highspire Railroad
(A) Rehabilitation of rail infrastructure to facilitate the efficient and safe movement of raw materials and finished steel products in Dauphin County, including engineering, site preparation, drainage, grading, rails, ties, ballast, switches, crossings, sidings, bridge and paving
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
(7.8) Delaware County
(i) Delaware County Redevelopment Authority
(A) Construction, acquisition, railroad infrastructure, including support facilities, and related costs for economic development project in Delaware County
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(ii) SEPTA Media/Elwyn Regional Rail
(A) Construction, infrastructure, redevelopment and other related costs for modernization of Secane Regional Rail Station
Project Allocation
13,000,000
(Base Project Allocation - $13,000,000)
(8) Erie County
(i) City of Erie
(A) Construct rail improvements and ship loading infrastructure at the Port of Erie
Project Allocation
9,000,000
(Base Project Allocation - $9,000,000)
(B) Construct rail improvements and replace rail bridge at Erie Inland Port-Albion site
Project Allocation
12,000,000
(Base Project Allocation - $12,000,000)
(9) Fayette and Westmoreland Counties
(i) Southwest Pennsylvania Railroad Company
(A) Rehabilitate and build railroad infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansion
Project Allocation
11,500,000
(Base Project Allocation - $11,500,000)
(10) Lackawanna County
(i) Pocono Northeast Regional Railroad Authority
(A) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Laurel Line Mainline project
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(ii) Pennsylvania Northeast Regional Railroad Authority
(A) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Carbondale Mainline
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(B) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Pocono Mainline
Project Allocation
1,250,000
(Base Project Allocation - $1,250,000)
(iii) County of Lackawanna Transit System
(A) Acquisition, construction, infrastructure and other costs related to an intermodal transportation center
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(11) Lancaster County
(i) Columbia Economic Development Corporation
(A) Construction, infrastructure, redevelopment and other related costs for railroad tracks, turnouts to serve as a rail yard, a runaround track, track repair and rehabilitation in Columbia Borough
Project Allocation
733,000
(Base Project Allocation - $733,000)
(ii) Lancaster County Redevelopment Authority
(A) Acquisition, construction, infrastructure and other related costs for rail relocation, including removal of old tracks, construction of new switching track and redevelopment of old track site in Lititz Borough
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(iii) Strasburg Rail Road
(A) Land acquisition, engineering, rail, ties, ballast, crossings, transload equipment and other related costs for expansion of existing transload terminal and rail infrastructure
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
(iv) Urban Outfitters, Inc.
(A) Rehabilitation, construction and renovation of rail infrastructure to service a direct-to-consumer distribution center located in the Gap area of Lancaster County, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballasts, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs in Salisbury Township
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(11.1) Luzerne County
(i) County projects
(A) Rehabilitate existing rail infrastructure and construct transload facility, including site preparation, engineering, grading, rail, ties, ballast, switch relocation, paving, gravel, fabrication of concrete pad, acquiring and installing truck scale and other materials necessary in the operation of the new facility
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(B) Construction, site preparation, engineering, grading, rail ties, ballast, acquiring and installing rail scale and other related materials to extend siding to provide direct rail access to Northeast Recycling Solutions
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(12) Lycoming County
(i) Jersey Shore Railroad
(A) Rehabilitation of existing yard rail infrastructure and construction of additional track to increase capacity within the yard, including engineering, site preparation, rail, ties, ballast and grade crossings
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
(ii) City of Williamsport
(A) Track rehabilitation, new construction and other related costs to provide rail service to NuWeld Corporation facility
Project Allocation
350,000
(Base Project Allocation - $350,000)
(13) McKean County
(i) American Refining Group
(A) Reconstruct loading areas and rehabilitate existing infrastructure in McKean County to facilitate safe and efficient transfer of products critical to oil refining and petroleum distribution supply chain, including engineering, site preparation, rail, ties, ballast, switches, sidings, crossings, drainage, pipe and related loading equipment
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
(ii) McKean County Economic Development
(A) Acquisition, construction, rehabilitation, restoration, remediation, maintenance and infrastructure development and improvements for railroad development project
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(13.1) Mercer County
(i) Hempfield Township
(A) Design, infrastructure, construction and other related costs for installation of new rail spur and rail siding at Hodge Foundry
Project Allocation
700,000
(Base Project Allocation - $700,000)
(14) Mifflin County
(i) Mifflin County Industrial Development Authority
(A) Infrastructure, rehabilitation, abatement of hazardous materials and other related costs for remediation of abandoned brownfield site and construction of new railroad infrastructure
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(15) Monroe County
(i) Pennsylvania Northeast Regional Railroad Authority
(A) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Pocono Mainline
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
(16) Montgomery County
(i) Montgomery County
(A) Construction, infrastructure improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(ii) Colebrookdale Railroad
(A) Rehabilitation of railroad, including track improvements, siding extensions, visitors centers, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and enhance corridor for freight traffic in Berks and Montgomery Counties
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(iii) Pennsylvania Northeastern Railroad
(A) Rehabilitation of railroad, including track improvements, resurfacing road crossings and related remedial work to enhance economic development opportunities and enhance corridor for freight traffic in Lansdale, Hatfield and Souderton
Project Allocation
770,000
(Base Project Allocation - $770,000)
(16.1) Philadelphia County
(i) Philadelphia Regional Port Authority and PennDOT
(A) General access and on-terminal rail improvements for port facilities
Project Allocation
18,000,000
(Base Project Allocation - $18,000,000)
(ii) Philadelphia County
(A) Port of Philadelphia Pier 122 bulk cargo terminal facility, new rail line and rail turnout construction, pier crane, materials and equipment
Project Allocation
3,700,000
(Base Project Allocation - $3,700,000)
(17) Schuylkill County
(i) Greater Tamaqua Industrial Development Enterprises
(A) Infrastructure, rehabilitation and other related costs for Gordon Building rail spur project, including new rail and switches
Project Allocation
140,000
(Base Project Allocation - $140,000)
(17.1) Somerset County
(i) Somerset County
(A) Construction, infrastructure and other related costs for rail projects relating to economic development projects in Quemahoning Township
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(B) Acquisition, construction, infrastructure and other related costs for rail siding and transloading facility in Shade Township
Project Allocation
2,100,000
(Base Project Allocation - $2,100,000)
(18) Washington County
(i) Washington County
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to site improvement project at Mon River Industrial Park in Allenport Borough
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(B) Acquisition, construction, infrastructure, redevelopment and other costs related to Zediker Station Business Park improvement project in South Strabane Township
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(C) Acquisition, construction, infrastructure, redevelopment and other costs related to mixed-use business park
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(D) Acquisition, construction, infrastructure, redevelopment and other costs related to development of pad-ready sites along the I-79 and Route 19 corridor
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(E) Acquisition, construction, infrastructure, redevelopment and other costs related to locating sites for support companies for natural gas industry
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(F) Acquisition, construction, infrastructure, redevelopment and other costs related to redevelopment of former industrial sites for new and expanding businesses
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(G) Acquisition, construction, infrastructure, redevelopment and other costs related to Mon Valley receiving and loading facility development project
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(H) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business park
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(I) Acquisition, construction, infrastructure, redevelopment and other costs related to Skypointe business park
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(J) Acquisition, construction, infrastructure and other related costs for loadout facility in Carroll Township
Project Allocation
4,750,000
(Base Project Allocation - $4,750,000)
(19) Westmoreland County
(i) Three Rivers Marine and Rail Terminals LP
(A) Infrastructure, rehabilitation, construction and other related costs for rail track expansion, including addition of rail switches
Project Allocation
750,000
(Base Project Allocation - $750,000)
(ii) Westmoreland County Industrial Development Corporation
(A) Infrastructure, construction and other related costs for Southwest Pennsylvania Railroad rail rehabilitation project
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(B) Infrastructure, construction and other related costs for Derry Porcelain Park Redevelopment Project, including extension of rail spur service for industrial use
Project Allocation
350,000
(Base Project Allocation - $350,000)
(iii) Westmoreland County
(A) Construction, infrastructure and other related costs for rail expansion project in City of Monessen
Project Allocation
750,000
(Base Project Allocation - $750,000)
(20) Wyoming County
(i) Procter and Gamble Paper Products Co., Mehoopany Plant
(A) Rehabilitate rail and existing infrastructure, including switches, signals, ties, ballast, rail, timbers, surfacing and other related materials
Project Allocation
250,000
(Base Project Allocation - $250,000)
(21) Multiple Counties
(i) D & I Silica, LLC
(A) Improve and expand existing transload sites in Armstrong, Cameron, Elk, Fayette, Luzerne, McKean, Tioga and Warren Counties, including land acquisition, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, gaging, unloading pits, transload equipment, truck staging and road access
Project Allocation
5,500,000
(Base Project Allocation - $5,500,000)
(B) Establish new intermodal facilities to transload materials required by natural gas industry in Blair, Bradford, Butler, Centre, Clearfield, Clinton, Crawford, Erie, Indiana, Lawrence, Mercer, Venango, Westmoreland and Wyoming Counties, including land acquisition, site preparation, brush cutting, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, unloading pits, transload equipment, truck staging and road access
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(ii) SEDA-COG Joint Rail Authority
(A) Railroad bridge upgrades, including load capacity increases in Columbia, Montour, Northumberland, Union, Lycoming, Clinton, Centre, Blair and Mifflin Counties
Project Allocation
2,100,000
(Base Project Allocation - $2,100,000)
(B) Nittany & Bald Eagle Railroad yard upgrades and expansion, including construction of railroad tracks in Blair, Centre and Clinton Counties
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
(C) Shamokin City and yard rehabilitation, including roadbed, crossing surfaces, turnouts and related track work
Project Allocation
3,150,000
(Base Project Allocation - $3,150,000)
(D) Lycoming Valley Railroad track upgrades and expansion, including construction of new storage tracks between Williamsport, Lycoming County, and South Avis, Clinton County
Project Allocation
1,260,000
(Base Project Allocation - $1,260,000)
(E) Capital upgrades and other safety upgrades to eight railroad bridges in Blair, Centre, Columbia, Lycoming, Mifflin and Northumberland Counties for critical rail service on the Nittany & Bald Eagle, Juniata Valley, Lycoming Valley, North Shore and Shamokin Valley Railroads
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
(iii) North Shore Railroad
(A) Retrofitting of diesel locomotives and other equipment to operate on alternative fuel sources or natural gas, or both, in Lycoming and Northumberland Counties
Project Allocation
750,000
(Base Project Allocation - $750,000)
(B) Rehabilitation, infrastructure, construction and other related costs for equipment upgrades, installation of new technology and other upgrades to ensure Federal regulation compliance in Blair, Centre, Clinton, Columbia, Lycoming, Mifflin, Montour and Northumberland Counties
Project Allocation
1,250,000
(Base Project Allocation - $1,250,000)
(iv) R. J. Corman Railroad Company
(A) Rehabilitation of the rail line known as the Clearfield Cluster, located in Cambria, Centre, Clearfield, Clinton, Indiana and Jefferson Counties, including rail bed, ties, rail and other materials to support continued growth of business in these areas and reduction of truck traffic
Project Allocation
20,000,000
(Base Project Allocation - $20,000,000)
(v) Southwest Pennsylvania Railroad
(A) Rehabilitate and build railroad infrastructure to enhance operational capacity in Fayette and Westmoreland Counties, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansion
Project Allocation
11,500,000
(Base Project Allocation - $11,500,000)
(vi) Lycoming and Union Counties
(A) Construction, rehabilitation, development of rail infrastructure and other costs relating to extending service through Gregg Township, Union County, to Timber Run Industrial Park in Brady Township, Lycoming County
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Allegheny County
(i) Allegheny County Airport Authority
(A) Acquisition, construction, infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding Allegheny County Airport
Project Allocation
20,000,000
(Base Project Allocation - $20,000,000)
(B) Construction, infrastructure improvements and other costs related to development of de-icing fluid treatment facility at Pittsburgh International Airport
Project Allocation
12,500,000
(Base Project Allocation - $12,500,000)
(C) Construction, infrastructure improvements and other costs related to development of Phase III of Clinton Commerce Center
Project Allocation
15,000,000
(Base Project Allocation - $15,000,000)
(D) Construction, infrastructure improvements and other costs related to development of business park on site 7 at Pittsburgh International Airport
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(E) Construction, infrastructure improvements and other costs related to development of Cherrington Commerce Center Phase II
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(F) Acquisition, construction, infrastructure and other related costs for development of industrial and commercial sites at or surrounding Pittsburgh International Airport
Project Allocation
50,000,000
(Base Project Allocation - $50,000,000)
(2) Armstrong County
(i) McVille Airport
(A) Acquisition, infrastructure, construction and other related costs for expansion of existing facilities and construction of access road, new hangars and helipad
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(2.1) Beaver County
(i) Beaver County Airport Authority
(A) Construction and other related costs for hangars and an extension of runway in Chippewa Township
Project Allocation
300,000
(Base Project Allocation - $300,000)
(2.2) Bedford County
(i) Bedford County Airport Authority
(A) Acquisition, construction and other related costs for airport expansion of hangars, required taxi lane, removal of landing approach obstructions, operation and maintenance buildings, required infrastructure, including roads and parking, for both aircraft and automobiles
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(2.3) Bradford County
(i) Bradford County Airport Authority
(A) Construction and other related costs to extend runway and parallel taxiway in Towanda
Project Allocation
4,227,000
(Base Project Allocation - $4,227,000)
(3) Bucks County
(i) Bucks County Airport Authority
(A) Infrastructure, construction and other related costs for airport improvements and upgrades at Quakertown Airport, including renovations to existing facilities and paving of parking lot and access roads
Project Allocation
150,000
(Base Project Allocation - $150,000)
(B) Infrastructure, construction and other related costs for airport improvements and upgrades at Doylestown Airport, including demolition, infrastructure development and construction of administration building, aircraft storage hangar and aircraft maintenance hangar
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(4) Carbon County
(i) Carbon County Airport Authority
(A) Construction of airport buildings, including general aviation terminal and snow removal equipment storage and aircraft storage hangars
Project Allocation
4,500,000
(Base Project Allocation - $4,500,000)
(5) Chester County
(i) Chester County Area Airport Authority
(A) Infrastructure, construction and other related costs for Phase I of a hangar development expansion project
Project Allocation
337,000
(Base Project Allocation - $337,000)
(6) Crawford County
(i) Crawford County Regional Airport Authority
(A) Design, engineer and other related costs for the construction of field hangar
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(B) Design, engineer and other related costs for construction of aircraft T-hangars
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(ii) Titusville Airport Authority
(A) Runway expansion
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(7) Lancaster County
(i) Lancaster Airport Authority
(A) Site development to include sewer pumping station and extended sewer lines
Project Allocation
750,000
(Base Project Allocation - $750,000)
(8) Luzerne County
(i) Hazleton Airport
(A) Acquisition, construction, rehabilitation and other related costs for hangars and expansion of runway at Hazleton Airport
Project Allocation
300,000
(Base Project Allocation - $300,000)
(9) Lycoming County
(i) Williamsport Regional Airport
(A) Design and construction of facility improvements, including directional signage, terminal building, renovations and parking
Project Allocation
3,676,000
(Base Project Allocation - $3,676,000)
(B) Demolition of existing terminal building and other associated buildings, construction of new terminal building and other airport improvements
Project Allocation
11,500,000
(Base Project Allocation - $11,500,000)
(10) Somerset County
(i) Somerset County Airport
(A) Replacement of existing underground aviation fuel storage tanks and dispensing units
Project Allocation
400,000
(Base Project Allocation - $400,000)
(B) Construction of permanent location for medical helicopter base
Project Allocation
400,000
(Base Project Allocation - $400,000)
(C) Construction of new hangars, improvements to existing hangars and acquisition of existing hangars
Project Allocation
500,000
(Base Project Allocation - $500,000)
(11) Snyder County
(i) Penn Valley Airport Authority
(A) Acquisition, infrastructure and other related costs for development of aviation industrial park
Project Allocation
750,000
(Base Project Allocation - $750,000)
(B) Infrastructure, construction and other related costs for construction of energy-efficient maintenance facility
Project Allocation
850,000
(Base Project Allocation - $850,000)
(12) Washington County
(i) Washington County Airport
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business park
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(ii) Skypointe Business Park
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to Skypointe Business Park
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)