Section 21. Clearfield County.
(a) Local Bridges
(1) City of DuBois, Washington Avenue over Pentz Run, Bridge Replacement
451,000
(Base Project Allocation - $371,000)
(Land Allocation - $10,000)
(Design and Contingencies - $70,000)
(2) City of DuBois, Weber Avenue over Pentz Run, Bridge Replacement
363,000
(Base Project Allocation - $287,000)
(Land Allocation - $10,000)
(Design and Contingencies - $66,000)
(3) Sandy Township, Sewage Treatment Plant Access Road over Sandy Lick Creek, Bridge Rehabilitation
115,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $15,000)
(4) City of DuBois, Park Avenue over Pentz Run, Bridge Rehabilitation
57,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $7,000)
(5) City of DuBois, Beaver Drive over McCracken Run, Bridge Rehabilitation
86,000
(Base Project Allocation - $80,000)
(Design and Contingencies - $6,000)
(6) City of DuBois, Spruce Alley over Pentz Run, Bridge Rehabilitation
92,000
(Base Project Allocation - $80,000)
(Design and Contingencies - $12,000)
(7) City of DuBois, Juniata Street over Clear Run, Bridge Replacement
475,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design and Contingencies - $55,000)
(8) City of DuBois, Franklin Street over Pentz Run, Bridge Restoration
125,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $15,000)
(9) Brady Township, TR-341 over Unnamed Tributary of East Branch of Sinnemahoning Creek, Bridge Replacement
12,000
(Base Project Allocation - $10,000)
(Design and Contingencies - $2,000)
(10) Bell Township, SR 0036 over SR 0036, Bridge Replacement
45,000
(Base Project Allocation - $25,000)
(Land Allocation - $20,000)
(11) Bradford Township, SR 0970 over SR 0970, Bridge Replacement
45,000
(Base Project Allocation - $25,000)
(Land Allocation - $20,000)
(12) Covington Township, T-637 over Deer Creek, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(13) Curwensville Borough, SR 0879, Bridge No.11550 over SR 0879, Bridge Replacement
45,000
(Base Project Allocation - $25,000)
(Land Allocation - $20,000)
(14) Curwensville Borough, SR 0879, Bridge No.11552 over SR 0879, Bridge Replacement
45,000
(Base Project Allocation - $25,000)
(Land Allocation - $20,000)
(15) City of DuBois, Weber Avenue, Bridge No.11959 over Pentz Run, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(16) City of DuBois, Weber Avenue, Bridge No.11962 over Pentz Run, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(17) City of DuBois, Weber Avenue, Bridge No.11965 over Pentz Run, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(18) Greenwood Township, T-420 over Curry Run, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(19) Knox Township, T-565 over Potts Run, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(20) Lawrence Township, RJ Corman over SR 1001, Bridge Replacement
45,000
(Base Project Allocation - $25,000)
(Land Allocation - $20,000)
(21) Sandy Township, T-372 over Sandy Lick Creek, Bridge Replacement
300,000
(Base Project Allocation - $200,000)
(Land Allocation - $50,000)
(Design and Contingencies - $50,000)
(b) State Bridges
(1) SR 0219 over Little Anderson Creek, Bloom Township, Bridge Replacement
1,725,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $125,000)
(Design and Contingencies - $500,000)
(2) SR 3014 over North Camp Run, Chest Township, Bridge Replacement
296,000
(Base Project Allocation - $196,000)
(Land Allocation - $30,000)
(Design and Contingencies - $70,000)
(3) SR 0080, Bridge No.11323 over SR 0053, PA 53, Cooper Township, Bridge Rehabilitation
215,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $15,000)
(4) SR 0080, Bridge No.11324 over SR 0053, PA 53, Cooper Township, Bridge Rehabilitation
215,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $15,000)
(5) SR 0080, Bridge No.11326 over SR 2037, Cooper Township, Bridge Rehabilitation
215,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $15,000)
(6) SR 0080, Bridge No.11327 over SR 2037, Cooper Township, Bridge Rehabilitation
215,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $15,000)
(7) SR 2035 over I-80, Cooper Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(8) SR 1009, Bridge No.11660 over I-80, Graham Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(9) SR 1009, Bridge No.11661 over I-80, Graham Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(10) SR 0153 over Bennett Branch, Huston Township, Bridge Replacement
1,400,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(11) SR 4021 over Negro Hollow, Huston Township, Bridge Replacement
180,000
(Base Project Allocation - $110,000)
(Land Allocation - $30,000)
(Design and Contingencies - $40,000)
(12) SR 3005 over South Witmer Run, Irvona Borough, Bridge Replacement
616,000
(Base Project Allocation - $464,000)
(Land Allocation - $30,000)
(Design and Contingencies - $122,000)
(13) SR 1015, TR T-519 over I-80, Lawrence Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(14) SR 0153, Bridge No.11361 over I-80, Pine Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(15) SR 0153, Bridge No.11362 over I-80, Pine Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(16) SR 0255 over Sandy Lick Creek, Sandy Township, Bridge Replacement
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $200,000)
(Design and Contingencies - $200,000)
(17) SR 4015 over I-80, Sandy Township, Bridge Rehabilitation
260,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $20,000)
(18) SR 0830, PA 830 over Slab Run, Sandy Township, Bridge Rehabilitation
1,200,000
(Base Project Allocation - $1,164,000)
(Land Allocation - $4,000)
(Design and Contingencies - $32,000)
(19) SR 0830, PA 830 over Wolf Run, Sandy Township, Bridge Replacement
5,396,000
(Base Project Allocation - $5,237,000)
(Land Allocation - $15,000)
(Design and Contingencies - $144,000)
(20) SR 2013 over Beaver Run, Woodward Township, Bridge Replacement
268,000
(Base Project Allocation - $180,000)
(Land Allocation - $30,000)
(Design and Contingencies - $58,000)
(21) SR 4019 over Juniata Run, City of DuBois, Bridge Replacement
1,000,000
(Base Project Allocation - $1,000,000)
(22) I-80 over SR 2037, Cooper Township, Bridge Rehabilitation
710,000
(Base Project Allocation - $460,000)
(Land Allocation - $20,000)
(Design and Contingencies - $230,000)
(23) SR 0036 over Tributary of Bear Run, Bell Township, Bridge Replacement
50,000
(Base Project Allocation - $20,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(24) SR 0036 over Snyder Run, Bell Township, Bridge Replacement
119,000
(Base Project Allocation - $66,000)
(Land Allocation - $20,000)
(Design and Contingencies - $33,000)
(25) SR 0036 over Wilson Run, Newburg Borough, Bridge Replacement
200,000
(Base Project Allocation - $120,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(26) SR 0036 over Moss Run, Westover Borough, Bridge Replacement
96,000
(Base Project Allocation - $51,000)
(Land Allocation - $20,000)
(Design and Contingencies - $26,000)
(27) SR 0036 over Branch of Chest Creek, Westover Borough, Bridge Replacement
86,000
(Base Project Allocation - $44,000)
(Land Allocation - $20,000)
(Design and Contingencies - $22,000)
(28) SR 0053 over Blue Run, Glen Hope Borough, Bridge Replacement
50,000
(Base Project Allocation - $20,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(29) SR 0053 over Hickory Run, Glen Hope Borough, Bridge Replacement
55,000
(Base Project Allocation - $23,000)
(Land Allocation - $20,000)
(Design and Contingencies - $12,000)
(30) SR 0053 over Clearfield Creek, Irvona Borough, Bridge Replacement
9,572,000
(Base Project Allocation - $8,972,000)
(Land Allocation - $100,000)
(Design and Contingencies - $500,000)
(31) SR 0153 over Goss Run, Brisbin Borough, Bridge Replacement
56,000
(Base Project Allocation - $24,000)
(Land Allocation - $20,000)
(Design and Contingencies - $12,000)
(32) SR 0153 over Wilson Run, Huston Township, Bridge Replacement
122,000
(Base Project Allocation - $68,000)
(Land Allocation - $20,000)
(Design and Contingencies - $34,000)
(33) SR 0153 over Wise Run, Huston Township, Bridge Replacement
68,000
(Base Project Allocation - $32,000)
(Land Allocation - $20,000)
(Design and Contingencies - $16,000)
(34) SR 0153 over Whiteside Run, Woodward Township, Bridge Replacement
200,000
(Base Project Allocation - $120,000)
(Land Allocation - $20,000)
(Design and Contingencies - $60,000)
(35) SR 0219 over Martin Run, Bell Township, Bridge Replacement
61,000
(Base Project Allocation - $27,000)
(Land Allocation - $20,000)
(Design and Contingencies - $14,000)
(36) SR 0219 over Tributary of Susquehanna River, Bell Township, Bridge Replacement
56,000
(Base Project Allocation - $24,000)
(Land Allocation - $20,000)
(Design and Contingencies - $12,000)
(37) SR 0219 over Curry Run, Greenwood Township, Bridge Replacement
272,000
(Base Project Allocation - $168,000)
(Land Allocation - $20,000)
(Design and Contingencies - $84,000)
(38) SR 0219 over Lee Run, Greenwood Township, Bridge Replacement
97,000
(Base Project Allocation - $51,000)
(Land Allocation - $20,000)
(Design and Contingencies - $26,000)
(39) SR 0219 over Poplar Run, Greenwood Township, Bridge Replacement
182,000
(Base Project Allocation - $108,000)
(Land Allocation - $20,000)
(Design and Contingencies - $54,000)
(40) SR 0219 over Pentz Run, Sandy Township, Bridge Replacement
122,000
(Base Project Allocation - $68,000)
(Land Allocation - $20,000)
(Design and Contingencies - $34,000)
(41) SR 0219 over Tributary of Wolf Run, Sandy Township, Bridge Replacement
164,000
(Base Project Allocation - $96,000)
(Land Allocation - $20,000)
(Design and Contingencies - $48,000)
(42) SR 0219, Bridge No.11428 over Slab Run, Sandy Township, Bridge Replacement
193,000
(Base Project Allocation - $115,000)
(Land Allocation - $20,000)
(Design and Contingencies - $58,000)
(43) SR 0219, Bridge No.11429 over Slab Run, Sandy Township, Bridge Replacement
265,000
(Base Project Allocation - $163,000)
(Land Allocation - $20,000)
(Design and Contingencies - $82,000)
(44) SR 0322 over West Branch of Susquehanna River, Clearfield Borough, Bridge Rehabilitation
786,000
(Base Project Allocation - $686,000)
(Land Allocation - $100,000)
(45) SR 0322 over Clearfield Creek, Lawrence Township, Bridge Rehabilitation
1,147,000
(Base Project Allocation - $1,047,000)
(Land Allocation - $100,000)
(46) SR 1006, Bridge No.11650 over I-80, Lawrence Township, Bridge Rehabilitation
719,000
(Base Project Allocation - $466,000)
(Land Allocation - $20,000)
(Design and Contingencies - $233,000)
(47) SR 1006, Bridge No.11651 over I-80, Lawrence Township, Bridge Rehabilitation
686,000
(Base Project Allocation - $444,000)
(Land Allocation - $20,000)
(Design and Contingencies - $222,000)
(48) SR 1012 over I-80, Bradford Township, Bridge Rehabilitation
774,000
(Base Project Allocation - $674,000)
(Land Allocation - $100,000)
(49) SR 0253 over Branch of Little Muddy Run, Gulich Township, Bridge Replacement
92,000
(Base Project Allocation - $48,000)
(Land Allocation - $20,000)
(Design and Contingencies - $24,000)
(50) SR 0255 over Branch of Heath Run, Huston Township, Bridge Replacement
50,000
(Base Project Allocation - $20,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(51) SR 0255 over Branch of Bennett Run, Huston Township, Bridge Replacement
73,000
(Base Project Allocation - $35,000)
(Land Allocation - $20,000)
(Design and Contingencies - $18,000)
(52) SR 0255 over Heath Run, Huston Township, Bridge Replacement
80,000
(Base Project Allocation - $40,000)
(Land Allocation - $20,000)
(Design and Contingencies - $20,000)
(53) SR 0255 over Narrows Creek, Sandy Township, Bridge Replacement
215,000
(Base Project Allocation - $130,600)
(Land Allocation - $20,000)
(Design and Contingencies - $65,000)
(54) SR 0322 over Laurel Run, Decatur Township, Bridge Replacement
356,000
(Base Project Allocation - $224,000)
(Land Allocation - $20,000)
(Design and Contingencies - $112,000)
(55) SR 0410 over Stump Creek, Brady Township, Bridge Replacement
68,000
(Base Project Allocation - $32,000)
(Land Allocation - $20,000)
(Design and Contingencies - $16,000)
(56) SR 0453 over Lost Run, Bigler Township, Bridge Replacement
85,000
(Base Project Allocation - $43,000)
(Land Allocation - $20,000)
(Design and Contingencies - $22,000)
(57) SR 0453 over West Branch of Susquehanna River, Curwensville Borough, Bridge Rehabilitation
1,897,000
(Base Project Allocation - $1,797,000)
(Land Allocation - $100,000)
(58) SR 0729 over Campbell Run, Ferguson Township, Bridge Replacement
77,000
(Base Project Allocation - $38,000)
(Land Allocation - $20,000)
(Design and Contingencies - $19,000)
(59) SR 0729 over Clearfield Creek, Glen Hope Borough, Bridge Replacement
487,000
(Base Project Allocation - $311,000)
(Land Allocation - $20,000)
(Design and Contingencies - $156,000)
(60) SR 0729 over Comfort Run, Jordan Township, Bridge Replacement
52,000
(Base Project Allocation - $21,000)
(Land Allocation - $20,000)
(Design and Contingencies - $11,000)
(61) SR 0879 over Deer Creek, Girard Township, Bridge Replacement
184,000
(Base Project Allocation - $109,000)
(Land Allocation - $20,000)
(Design and Contingencies - $55,000)
(62) SR 0879 over Lick Run, Goshen Township, Bridge Replacement
229,000
(Base Project Allocation - $139,000)
(Land Allocation - $20,000)
(Design and Contingencies - $70,000)
(63) SR 0969 over Bell Run, Greenwood Township, Bridge Replacement
647,000
(Base Project Allocation - $418,000)
(Land Allocation - $20,000)
(Design and Contingencies - $209,000)
(64) SR 1001 over West Branch of Susquehanna River, Lawrence Township, Bridge Replacement
1,724,000
(Base Project Allocation - $1,136,000)
(Land Allocation - $20,000)
(Design and Contingencies - $568,000)
(65) SR 1004 over Montgomery Run, Lawrence Township, Bridge Replacement
164,000
(Base Project Allocation - $96,000)
(Land Allocation - $20,000)
(Design and Contingencies - $48,000)
(66) SR 1008 over Trout Run, Goshen Township, Bridge Replacement
127,000
(Base Project Allocation - $71,000)
(Land Allocation - $20,000)
(Design and Contingencies - $36,000)
(67) SR 1011 over West Branch of Susquehanna River, Cooper Township, Bridge Rehabilitation
2,909,000
(Base Project Allocation - $1,926,000)
(Land Allocation - $20,000)
(Design and Contingencies - $963,000)
(68) SR 1011 over Mosquito Creek, Karthaus Township, Bridge Rehabilitation
991,000
(Base Project Allocation - $741,000)
(Land Allocation - $100,000)
(Design and Contingencies - $150,000)
(69) SR 2009 over Alexander Run, Bigler Township, Bridge Replacement
76,000
(Base Project Allocation - $37,000)
(Land Allocation - $20,000)
(Design and Contingencies - $19,000)
(70) SR 2013 over Beaver Run, Woodward Township, Bridge Replacement
104,000
(Base Project Allocation - $56,000)
(Land Allocation - $20,000)
(Design and Contingencies - $28,000)
(71) SR 2015 over Porter Run, Bigler Township, Bridge Replacement
86,000
(Base Project Allocation - $44,000)
(Land Allocation - $20,000)
(Design and Contingencies - $22,000)
(72) SR 2023 over Little Clearfield Creek, Knox Township, Bridge Replacement
254,000
(Base Project Allocation - $156,000)
(Land Allocation - $20,000)
(Design and Contingencies - $78,000)
(73) SR 2023 over Mitchell Run, Lawrence Township, Bridge Replacement
51,000
(Base Project Allocation - $21,000)
(Land Allocation - $20,000)
(Design and Contingencies - $10,000)
(74) SR 2024 over Tributary of Clearfield Creek, Boggs Township, Bridge Replacement
37,000
(Base Project Allocation - $11,000)
(Land Allocation - $20,000)
(Design and Contingencies - $6,000)
(75) SR 2024 over Dimeling Run, Boggs Township, Bridge Replacement
53,000
(Base Project Allocation - $22,000)
(Land Allocation - $20,000)
(Design and Contingencies - $11,000)
(76) SR 2024 over Rails to Trails, Pike Township, Bridge Rehabilitation
415,000
(Base Project Allocation - $263,000)
(Land Allocation - $20,000)
(Design and Contingencies - $132,000)
(77) SR 2029 over Laurel Run, Boggs Township, Bridge Replacement
83,000
(Base Project Allocation - $42,000)
(Land Allocation - $20,000)
(Design and Contingencies - $21,000)
(78) SR 2030 over Alder Run, Graham Township, Bridge Replacement
128,000
(Base Project Allocation - $72,000)
(Land Allocation - $20,000)
(Design and Contingencies - $36,000)
(79) SR 2032 over Moravian Run, Graham Township, Bridge Replacement
53,000
(Base Project Allocation - $22,000)
(Land Allocation - $20,000)
(Design and Contingencies - $11,000)
(80) SR 2034 over Laurel Run, Wallaceton Borough, Bridge Replacement
62,000
(Base Project Allocation - $28,000)
(Land Allocation - $20,000)
(Design and Contingencies - $14,000)
(81) SR 2039 over Browns Run, Cooper Township, Bridge Replacement
46,000
(Base Project Allocation - $17,000)
(Land Allocation - $20,000)
(Design and Contingencies - $9,000)
(82) SR 3003 over Barrett Run, Ferguson Township, Bridge Replacement
97,000
(Base Project Allocation - $51,000)
(Land Allocation - $20,000)
(Design and Contingencies - $26,000)
(83) SR 3003 over Woods Run, Ferguson Township, Bridge Replacement
56,000
(Base Project Allocation - $24,000)
(Land Allocation - $20,000)
(Design and Contingencies - $12,000)
(84) SR 3009 over East Branch of Mahoning Creek, Brady Township, Bridge Replacement
170,000
(Base Project Allocation - $100,000)
(Land Allocation - $20,000)
(Design and Contingencies - $50,000)
(85) SR 3014 over Patchin Run, Burnside Township, Bridge Replacement
91,000
(Base Project Allocation - $47,000)
(Land Allocation - $20,000)
(Design and Contingencies - $24,000)
(86) SR 3014 over Snyder Run, Chest Township, Bridge Replacement
56,000
(Base Project Allocation - $24,000)
(Land Allocation - $20,000)
(Design and Contingencies - $12,000)
(87) SR 3016 over Little Deer Run, New Washington Borough, Bridge Replacement
328,000
(Base Project Allocation - $140,000)
(Land Allocation - $100,000)
(Design and Contingencies - $88,000)
(88) SR 3017 over Branch of Beaver Run, Burnside Township, Bridge Replacement
133,000
(Base Project Allocation - $75,000)
(Land Allocation - $20,000)
(Design and Contingencies - $38,000)
(89) SR 4001 over Kuntz Run, Brady Township, Bridge Replacement
52,000
(Base Project Allocation - $21,000)
(Land Allocation - $20,000)
(Design and Contingencies - $11,000)
(90) SR 4003 over Stump Creek, Brady Township, Bridge Replacement
59,000
(Base Project Allocation - $26,000)
(Land Allocation - $20,000)
(Design and Contingencies - $13,000)
(91) SR 4013 over Dressler Run, Union Township, Bridge Replacement
88,000
(Base Project Allocation - $45,800)
(Land Allocation - $20,000)
(Design and Contingencies - $23,000)
(92) SR 4015 over I-80, Sandy Township, Bridge Replacement
1,658,000
(Base Project Allocation - $1,092,000)
(Land Allocation - $20,000)
(Design and Contingencies - $546,000)
(93) SR 4017 over Sandy Lick Creek, Sandy Township, Bridge Replacement
383,000
(Base Project Allocation - $242,000)
(Land Allocation - $20,000)
(Design and Contingencies - $121,000)