74:36:07-ARSD 74:36:07:134 Additional collection system recordkeeping for existing municipal solid waste landfill.
2.2K chars
74:36:07:134. Additional collection system recordkeeping for existing municipal solid waste landfill. Except as provided in subdivision 74:36:07:126(2), each owner or operator that meets the requirements of § 74:36:07:105 must keep for at least five years up-to-date, readily acce…
74:36:07-ARSD 74:36:07:135 Recordkeeping for existing municipal solid waste landfill -- Converting design capacity.
0.7K chars
74:36:07:135. Recordkeeping for existing municipal solid waste landfill -- Converting design capacity. The owner or operator who converts design capacity from volume to mass or mass to volume to demonstrate landfill design capacity is less than 2.5 million megagrams or 2.5 millio…
74:36:07-ARSD 74:36:07:136 Recordkeeping for existing municipal solid waste landfill -- Surface methane.
2.7K chars
74:36:07:136. Recordkeeping for existing municipal solid waste landfill -- Surface methane. The owner or operator seeking to demonstrate that site-specific surface methane emissions are below five hundred parts per million, by conducting surface emission monitoring under the Tier…
74:36:07-ARSD 74:36:07:137 Recordkeeping for existing municipal solid waste landfill -- Control system monitor.
1.0K chars
74:36:07:137. Recordkeeping for existing municipal solid waste landfill -- Control system monitor. Except as provided in subdivision 74:36:07:126(2), the owner or operator must keep for at least five years up-to-date, readily accessible records of all collection and control syste…
74:36:07-ARSD 74:36:07:138 Existing municipal solid waste landfill submit reports electronically.
3.6K chars
74:36:07:138. Existing municipal solid waste landfill submit reports electronically. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 shall submit reports electronically according to the following: (1) For data coll…
74:36:07-ARSD 74:36:07:139 Report for existing municipal solid waste landfill -- Initial performance test.
2.5K chars
74:36:07:139. Report for existing municipal solid waste landfill -- Initial performance test. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 and seeking to comply with § 74:36:07:109, must submit the initial perfo…
74:36:07-ARSD 74:36:07:14 Standards of performance for volatile organic liquid storage vessels, including petroleum liquid storage vessels, for which construction, reconstruction, or modification commenced after July 23, 1984, and on or before October 4, 2023.
2.8K chars
74:36:07:14. Standards of performance for volatile organic liquid storage vessels, including petroleum liquid storage vessels, for which construction, reconstruction, or modification commenced after July 23, 1984, and on or before October 4, 2023. The standards of performance for…
74:36:07-ARSD 74:36:07:14.01 Standards of performance for volatile organic liquid storage vessels (including petroleum liquid storage vessels) for which construction, reconstruction, or modification commenced after October 4, 2023.
1.2K chars
74:36:07:14.01. Standards of performance for volatile organic liquid storage vessels (including petroleum liquid storage vessels) for which construction, reconstruction, or modification commenced after October 4, 2023. The standards of performance for volatile organic liquid stor…
74:36:07-ARSD 74:36:07:140 Existing municipal solid waste landfill annual report.
3.4K chars
74:36:07:140. Existing municipal solid waste landfill annual report. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 and is using an active collection system must submit an annual report to the secretary. The initi…
74:36:07-ARSD 74:36:07:141 Existing municipal solid waste landfill annual liquids report.
3.2K chars
74:36:07:141. Existing municipal solid waste landfill annual liquids report. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 and has employed leachate recirculation or added liquids within the last ten years must s…
74:36:07-ARSD 74:36:07:142 Existing municipal solid waste landfill closure report.
0.8K chars
74:36:07:142. Existing municipal solid waste landfill closure report. The owner or operator must submit a closure report for an existing municipal solid waste landfill to the secretary within thirty days of ceasing waste acceptance. The secretary may request additional informatio…
74:36:07-ARSD 74:36:07:143 Cap, remove, or decommission collection and control system for existing municipal solid waste landfills.
2.2K chars
74:36:07:143. Cap, remove, or decommission collection and control system for existing municipal solid waste landfills. The owner or operator must calculate the nonmethane organic compound emission rate for purposes of determining when the collection and control system can be capp…
74:36:07-ARSD 74:36:07:144 Removal criteria for existing municipal solid waste landfills.
1.4K chars
74:36:07:144. Removal criteria for existing municipal solid waste landfills. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 may cap, remove, or decommission the collection and control system if the following crite…
74:36:07-ARSD 74:36:07:145 Report for existing municipal solid waste landfill -- equipment removal.
3.3K chars
74:36:07:145. Report for existing municipal solid waste landfill -- equipment removal. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 shall submit an equipment removal report to the secretary 30 days prior to remo…
74:36:07-ARSD 74:36:07:146 Standards of performance for new municipal solid waste landfills.
0.8K chars
74:36:07:146. Standards of performance for new municipal solid waste landfills. The standards of performance for municipal solid waste landfills that commenced construction, reconstruction, or modification after July 17, 2014, are those in 40 C.F.R. Part 60, Subpart XXX (July 1, …
74:36:07-ARSD 74:36:07:147 Standards of performance for crude oil and natural gas facilities for which construction, modification, or reconstruction commenced after September 18, 2015, and on or before December 6, 2022.
0.6K chars
74:36:07:147. Standards of performance for crude oil and natural gas facilities for which construction, modification, or reconstruction commenced after September 18, 2015, and on or before December 6, 2022. The standards of performance for crude oil and natural gas facilities for…
74:36:07-ARSD 74:36:07:15 Standards of performance for sewage treatment plants.
0.9K chars
74:36:07:15. Standards of performance for sewage treatment plants. The standards of performance for sewage treatment plants are those in 40 C.F.R. Part 60, Subpart O (July 1, 2024). Source: 14 SDR 72, effective November 24, 1987; 17 SDR 170, effective May 13, 1991; transferred fr…
74:36:07-ARSD 74:36:07:16 Standards of performance for coal preparation and processing plants.
0.9K chars
74:36:07:16. Standards of performance for coal preparation and processing plants. The standards of performance for coal preparation and processing plants are those in 40 C.F.R. Part 60, Subpart Y (July 1, 2024). Source: 14 SDR 72, effective November 24, 1987; 17 SDR 170, effectiv…
74:36:07-ARSD 74:36:07:17 Standards of performance for grain elevators.
1.2K chars
74:36:07:17. Standards of performance for grain elevators. The standards of performance for grain elevators are those in 40 C.F.R. Part 60, Subpart DD (July 1, 2024). A source subject to Subpart DD is exempt from the obligation to obtain a Part 70 operating permit if the source i…
74:36:07-ARSD 74:36:07:18 Standards of performance for stationary gas turbines.
0.9K chars
74:36:07:18. Standards of performance for stationary gas turbines. The standards of performance for stationary gas turbines are those in 40 C.F.R. Part 60, Subpart GG (July 1, 2024). Source: 14 SDR 72, effective November 24, 1987; 16 SDR 88, effective November 14, 1989; 17 SDR 17…
74:36:07-ARSD 74:36:07:19 Standards of performance for lime manufacturing plants.
0.9K chars
74:36:07:19. Standards of performance for lime manufacturing plants. The standards of performance for lime manufacturing plants are those in 40 C.F.R. Part 60, Subpart HH (July 1, 2024). Source: 14 SDR 72, effective November 24, 1987; 17 SDR 170, effective May 13, 1991; transferr…
74:36:07-ARSD 74:36:07:20 Standards of performance for metallic mineral processing plants.
1.0K chars
74:36:07:20. Standards of performance for metallic mineral processing plants. The standards of performance for metallic mineral processing plants are those in 40 C.F.R. Part 60, Subpart LL (July 1, 2024). Source: 11 SDR 151, effective May 12, 1985; 13 SDR 129, 13 SDR 141, effecti…
74:36:07-ARSD 74:36:07:21 Standards of performance for pressure-sensitive tape and label surface coating operations.
0.9K chars
74:36:07:21. Standards of performance for pressure-sensitive tape and label surface coating operations. The standards of performance for pressure-sensitive tape and label surface coating operations are those in 40 C.F.R. Part 60, Subpart RR (July 1, 2024). Source: 19 SDR 157, eff…
74:36:07-ARSD 74:36:07:22 Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after January 5, 1981, and on or before November 7, 2006.
2.7K chars
74:36:07:22. Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after January 5, 1981, and on or before November 7, 2006. The standards of performance for …
74:36:07-ARSD 74:36:07:22.01 Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after November 7, 2006., and on or before April 25, 2023
0.9K chars
74:36:07:22.01. Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after November 7, 2006, and on or before April 25, 2023. The standards of performance fo…
74:36:07-ARSD 74:36:07:22.02 Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after April 25, 2023.
0.6K chars
74:36:07:22.02. Standards of performance for equipment leaks of VOC in the synthetic organic chemicals manufacturing industry for which construction, reconstruction, or modification commenced after April 25, 2023. The standards of performance for equipment leaks of VOC in the syn…
74:36:07-ARSD 74:36:07:23 Standards of performance for bulk gasoline terminals that commenced construction, modification, or reconstruction after December 17, 1980, and on or before June 10, 2022.
1.5K chars
74:36:07:23. Standards of performance for bulk gasoline terminals that commenced construction, modification, or reconstruction after December 17, 1980, and on or before June 10, 2022. The standards of performance for bulk gasoline terminals that commenced construction, modificati…
74:36:07-ARSD 74:36:07:23.01 Standards of performance for bulk gasoline terminals that construction, reconstruction, or modification commenced after June 10, 2022.
0.5K chars
74:36:07:23.01. Standards of performance for bulk gasoline terminals that construction, reconstruction, or modification commenced after June 10, 2022. The standards of performance for bulk gasoline terminals for which construction, reconstruction, or modification commenced after …
74:36:07-ARSD 74:36:07:24 Standards of performance for new residential wood heaters.
0.8K chars
74:36:07:24. Standards of performance for new residential wood heaters. The standards of performance for new residential wood heaters are those in 40 C.F.R. Part 60, Subpart AAA (July 1, 2024). Source: 19 SDR 157, effective April 22, 1993; 21 SDR 119, effective January 5, 1995; 2…
74:36:07-ARSD 74:36:07:25 Standards of performance for petroleum dry cleaners.
1.1K chars
74:36:07:25. Standards of performance for petroleum dry cleaners. The standards of performance for petroleum dry cleaners are those in 40 C.F.R. Part 60, Subpart JJJ (July 1, 2024). A source subject to Subpart JJJ is exempt from the obligation to obtain a Part 70 operating permit…
74:36:07-ARSD 74:36:07:26 Standards of performance for VOC emissions from synthetic organic chemical manufacturing industry, SOCMI, distillation operations. after December 30, 1983, and on or before April 25, 2023.
1.1K chars
74:36:07:26. Standards of performance for VOC emissions from synthetic organic chemical manufacturing industry, SOCMI, distillation operations after December 30, 1983, and on or before April 25, 2023. The standards of performance for VOC emissions from synthetic organic chemical …
74:36:07-ARSD 74:36:07:27 Standards of performance for nonmetallic mineral processing plants.
1.0K chars
74:36:07:27. Standards of performance for nonmetallic mineral processing plants. The standards of performance for nonmetallic mineral processing plants are those in 40 C.F.R. Part 60, Subpart OOO (July 1, 2024). Source: 12 SDR 183, effective May 21, 1986; 13 SDR 129, 13 SDR 141, …
74:36:07-ARSD 74:36:07:28 Standards of performance for magnetic tape coating facilities.
0.8K chars
74:36:07:28. Standards of performance for magnetic tape coating facilities. The standards of performance for magnetic tape coating facilities are those in 40 C.F.R. Part 60, Subpart SSS (July 1, 2024). Source: 19 SDR 157, effective April 22, 1993; 21 SDR 119, effective January 5,…
74:36:07-ARSD 74:36:07:29 Operating requirements for wire reclamation furnaces.
0.6K chars
74:36:07:29. Operating requirements for wire reclamation furnaces. New wire reclamation furnaces shall be equipped with a secondary chamber or afterburner which provides for turbulent mixing and a two-second residence time at 2200 degrees Fahrenheit or greater. New wire reclamati…
74:36:07-ARSD 74:36:07:30 Monitoring requirements for wire reclamation furnaces.
0.6K chars
74:36:07:30. Monitoring requirements for wire reclamation furnaces. An owner or operator of a new regulated wire reclamation furnace shall install, calibrate, operate, and maintain devices which continuously monitor and record the temperature of gases leaving the secondary or fin…
74:36:07-ARSD 74:36:07:31 Standards of performance for the graphic arts industry -- Publication rotogravure printing.
0.8K chars
74:36:07:31. Standards of performance for the graphic arts industry -- Publication rotogravure printing. The standards of performance for the graphic arts industry and publication rotogravure printing in the graphic arts industry are those in 40 C.F.R. Part 60, Subpart QQ (July 1…
74:36:07-ARSD 74:36:07:32 Standards of performance for volatile organic compound emissions from synthetic organic chemical manufacturing industry, SOCMI, reactor processes after June 29, 1990, and on or before April 25, 2023.
1.0K chars
74:36:07:32. Standards of performance for volatile organic compound emissions from synthetic organic chemical manufacturing industry, SOCMI, reactor processes after June 29, 1990, and on or before April 25, 2023. The standards of performance for volatile organic compound emission…
74:36:07-ARSD 74:36:07:33 Standards of performance for calciners and dryers in mineral industries.
0.7K chars
74:36:07:33. Standards of performance for calciners and dryers in mineral industries. The standards of performance for calciners and dryers in mineral industries are those in 40 C.F.R. Part 60, Subpart UUU (July 1, 2024). Source: 23 SDR 106, effective December 29, 1996; 30 SDR 26…
74:36:07-ARSD 74:36:07:34 Existing municipal solid waste landfill.
1.8K chars
74:36:07:34. Existing municipal solid waste landfill. The owner or operator of an existing municipal solid waste landfill that meets the following conditions must comply with §§ 74:36:07:35 to 74:36:07:42, inclusive: (1) The landfill has accepted waste at any time since November …
74:36:07-ARSD 74:36:07:35 Plan submittal by existing municipal solid waste landfills.
1.0K chars
74:36:07:35. Plan submittal by existing municipal solid waste landfills. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 shall submit a plan within one year of the first annual report showing the nonmethane organic …
74:36:07-ARSD 74:36:07:36 Collection system.
1.1K chars
74:36:07:36. Collection system. The department must approve the collection and control system plan if it is equivalent to or meets the conditions provided in 40 C.F.R. § 60.752(b)(2)(ii) (July 1, 2024), and the control requirements in § 74:36:07:37. The EPA approved South Dakota’…
74:36:07-ARSD 74:36:07:37 Control system.
1.5K chars
74:36:07:37. Control system. The department must approve the control system if it is equivalent to or meets one of the following requirements: (1) An open flare designed and operated in accordance with the parameters established in 40 C.F.R. § 60.18 (July 1, 2024); (2) A control …
74:36:07-ARSD 74:36:07:38 Compliance schedule for existing municipal solid waste landfills.
1.3K chars
74:36:07:38. Compliance schedule for existing municipal solid waste landfills. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 must meet the following compliance dates: (1) Award contracts within 15 months of the fi…
74:36:07-ARSD 74:36:07:39 Existing municipal solid waste landfill operational standards for collection and control systems.
1.1K chars
74:36:07:39. Existing municipal solid waste landfill operational standards for collection and control systems. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 must meet the operational standards for collection and c…
74:36:07-ARSD 74:36:07:40 Existing municipal solid waste landfill compliance provisions.
1.1K chars
74:36:07:40. Existing municipal solid waste landfill compliance provisions. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 must meet the compliance provisions in 40 C.F.R. § 60.755 (July 1, 2024). The EPA approved …
74:36:07-ARSD 74:36:07:41 Existing municipal solid waste landfill monitoring provisions.
1.1K chars
74:36:07:41. Existing municipal solid waste landfill monitoring provisions. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 must meet the monitoring provisions in 40 C.F.R. § 60.756 (July 1, 2024). The EPA approved …
74:36:07-ARSD 74:36:07:42 Existing municipal solid waste landfill reporting and recordkeeping.
2.4K chars
74:36:07:42. Existing municipal solid waste landfill reporting and recordkeeping. The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:34 must meet the reporting and recordkeeping requirements specified in 40 C.F.R. §§ 60.7…
74:36:07-ARSD 74:36:07:42.01 Additional reporting for existing municipal solid waste landfills.
1.3K chars
74:36:07:42.01. Additional reporting for existing municipal solid waste landfills. The owner or operator of an existing municipal solid waste landfill that meets the requirements of subdivisions 74:36:07:34(1) and (2) must submit an initial nonmethane organic compound emission ra…
74:36:07-ARSD 74:36:07:43 Repealed.
0.6K chars
74:36:07:43. Standards of performance for new municipal solid waste landfills. Repealed. Source: 23 SDR 106, effective December 29, 1996; 25 SDR 123, effective April 4, 1999; 26 SDR 168, effective June 27, 2000; 30 SDR 26, effective September 1, 2003; 31 SDR 101, effective Januar…
74:36:07-ARSD 74:36:07:44 Standards of performance for nitric acid plants for which construction or modification commences after August 17, 1971, and on or before October 14, 2011.
0.8K chars
74:36:07:44. Standards of performance for nitric acid plants for which construction or modification commences after August 17, 1971, and on or before October 14, 2011. The standards of performance for nitric acid plants for which construction or modification commences after Augus…