28,889 sections across 2,256 South Dakota regulatory chapters.
20:44:22-ARSD 20:44:22:10 Service entrance disconnect location.
1.2K chars
Rule 20:44:22:10 Service entrance disconnect location. 20:44:22:10. Service entrance disconnect location. The raceway containing conductors to the service entrance disconnect enclosure may not extend more than five feet inside the structure except with the written permission of t…
20:44:22-ARSD 20:44:22:11 Repealed.
0.3K chars
Rule 20:44:22:11 Repealed. 20:44:22:11. Grounding methods.Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:05:12, August 12, 1994; repealed, 29 SDR 87, effective December 24, 2002.
20:44:22-ARSD 20:44:22:12 Electrical metallic tubing.
0.6K chars
Rule 20:44:22:12 Electrical metallic tubing. 20:44:22:12. Electrical metallic tubing. Electrical metallic tubing may not be used in concrete below grade or in concrete slab or masonry in direct contact with earth nor embedded in earth or fill. The use of a vapor barrier has no ef…
20:44:22-ARSD 20:44:22:13 Repealed.
0.3K chars
Rule 20:44:22:13 Repealed. 20:44:22:13. Lighting fixtures in clothes closets.Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; transferred from § 20:44:05:14, August 12, 1994; repealed, 29 SDR 87, effective December 24, 2002.
20:44:22-ARSD 20:44:22:14 Repealed.
0.4K chars
Rule 20:44:22:14 Repealed. 20:44:22:14. Overhead conductors to comply with installation requirements.Repealed. Source: SL 1975, ch 16, § 1; 2 SDR 89, effective July 2, 1976; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:…
20:44:22-ARSD 20:44:22:15 Repealed.
0.3K chars
Rule 20:44:22:15 Repealed. 20:44:22:15. Multiconductor cable ratings and requirements.Repealed. Source: SL 1975, ch 16, § 1; 10 SDR 131, effective June 3, 1984; 12 SDR 151, 12 SDR 155, effective July 1, 1986; transferred from § 20:44:05:16, August 12, 1994; repealed, 29 SDR 87, e…
20:44:22-ARSD 20:44:22:16 Underground conductors to comply with installation requirements.
0.9K chars
Rule 20:44:22:16 Underground conductors to comply with installation requirements. 20:44:22:16. Underground conductors to comply with installation requirements. All underground conductor installations, in addition to complying with the requirements of the National Electrical Code,…
20:44:22-ARSD 20:44:22:17 Repealed.
0.3K chars
Rule 20:44:22:17 Repealed. 20:44:22:17. Farmstead wiring to comply with installation requirements.Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; transferred from § 20:44:05:18, August 12, 1994; repealed, 29 SDR 87, effective December 24, 20…
20:44:22-ARSD 20:44:22:18 Repealed.
0.3K chars
Rule 20:44:22:18 Repealed. 20:44:22:18. Other farmstead outbuildings to comply with installation requirements.Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 92, effective January 1, 1986; 12 SDR 151, 12 SDR 155, effective July 1, 1986; transferred from § 20:44:05:21, August 12, 19…
20:44:22-ARSD 20:44:22:19 Repealed.
0.4K chars
Rule 20:44:22:19 Repealed. 20:44:22:19. Irrigation system control circuits.Repealed. Source: 10 SDR 131, effective June 3, 1984; 12 SDR 92, effective January 1, 1986; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:05:2…
20:44:22-ARSD 20:44:22:20 Repealed.
0.4K chars
Rule 20:44:22:20 Repealed. 20:44:22:20. Places of assembly.Repealed. Source: 10 SDR 131, effective June 3, 1984; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 16 SDR 153, effective March 29, 1990; 19 SDR 155, effective April 14, 1993; 20 SDR 222, effective July 6, 1994; transfe…
20:44:22-ARSD 20:44:22:21 Inspection for bonding of swimming pools.
0.7K chars
Rule 20:44:22:21 Inspection for bonding of swimming pools. 20:44:22:21. Inspection for bonding of swimming pools. All grid work and related apparatus of a swimming pool must be inspected prior to pouring the cement or other covering of the pool. The installer shall schedule the i…
20:44:22-ARSD 20:44:22:22 Repealed.
0.3K chars
Rule 20:44:22:22 Repealed. 20:44:22:22. Outdoor ground-fault circuit interrupter protection for dwelling units.Repealed. Source: 14 SDR 76, effective November 30, 1987; transferred from § 20:44:05:26, August 12, 1994; repealed, 29 SDR 87, effective December 24, 2002.
20:44:22-ARSD 20:44:22:23 Dwelling unit receptacle outlets -- Countertops and peninsulas.
0.6K chars
Rule 20:44:22:23 Dwelling unit receptacle outlets -- Countertops and peninsulas. 20:44:22:23. Dwelling unit receptacle outlets -- Countertops and peninsulas. Island and peninsular countertops in dwelling units are exempt from the National Electrical Code requirements. Source: 18 …
20:44:22-ARSD 20:44:22:24 Working space about electrical equipment operating at 600 volts, nominal, or less.
0.9K chars
Rule 20:44:22:24 Working space about electrical equipment operating at 600 volts, nominal, or less. 20:44:22:24. Working space about electrical equipment operating at 600 volts, nominal, or less. In new structures, additional working spaces for switchboards, panelboards, and moto…
20:44:22-ARSD 20:44:22:25 Electrical receptacles in health care facilities.
0.7K chars
Rule 20:44:22:25 Electrical receptacles in health care facilities. 20:44:22:25. Electrical receptacles in health care facilities. Patient care space in health care facilities, as defined in Article 517 of the National Electrical Code, must have receptacles listed for hospital use…
20:44:22-ARSD 20:44:22:26 Repealed.
0.3K chars
Rule 20:44:22:26 Repealed. 20:44:22:26. Ground-fault circuit interrupter protection. Repealed. Source: 19 SDR 155, effective April 14, 1993; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:05:31, August 12, 1994; repealed, 37 SDR 236, effective June 29, 2011.
20:44:22-ARSD 20:44:22:27 Residential housing units moved to new locations.
1.3K chars
20:44:22:27. Residential housing units moved to new locations. Single, modular, or multifamily residential units moved from one location to another must have at least a 100-ampere service at the new location and must meet the ground fault circuit interrupter protection, tamper re…
20:44:22-ARSD 20:44:22:28 System grounding connections.
0.6K chars
Rule 20:44:22:28 System grounding connections. 20:44:22:28. System grounding connections. All grounding electrode conductors of the system grounding connections must terminate on the neutral bus inside the service equipment unless they are inspected before the service is energize…
20:44:23-ARSD 20:44:23:01 Modular homes and modular structures -- Compliance with requirements.
0.9K chars
Rule 20:44:23:01 Modular homes and modular structures -- Compliance with requirements. 20:44:23:01. Modular homes and modular structures -- Compliance with requirements. The installation of electrical wiring, materials, and equipment in modular homes and modular structures must c…
20:44:23-ARSD 20:44:23:02 Wiring permit required for modular homes and modular structures.
1.7K chars
Rule 20:44:23:02 Wiring permit required for modular homes and modular structures. 20:44:23:02. Wiring permit required for modular homes and modular structures. Wiring permits must be obtained from the commission office and provided with each individual modular home or modular str…
20:44:23-ARSD 20:44:23:03 Inspection of modular homes and modular structures.
1.1K chars
Rule 20:44:23:03 Inspection of modular homes and modular structures. 20:44:23:03. Inspection of modular homes and modular structures. Inspection of modular homes and modular structures located in or transported into this state must be by one of the following procedures: (1) Inspe…
20:44:23-ARSD 20:44:23:04 Inspection fees for modular homes and modular structures.
0.8K chars
20:44:23:04. Inspection fees for modular homes and modular structures. The fees for inspection of modular homes and modular structures conducted under subdivisions 20:44:23:03(1), (3), and (4) are as required by §§ 20:44:20:01, 20:44:20:02, 20:44:20:02.01, and 20:44:20:03. For in…
20:44:23-ARSD 20:44:23:05 Third-party inspection.
1.7K chars
20:44:23:05. Third-party inspection. The commission office may approve an individual or multiple individuals at a business entity as a third-party inspector to conduct inspections of modular homes and modular structures under subdivision 20:44:23:03(4). A third-party inspector sh…
20:44:24-ARSD 20:44:24:01 Carnivals, celebrations, and seasonal dwellings to have wiring permit.
0.7K chars
Rule 20:44:24:01 Carnivals, celebrations, and seasonal dwellings to have wiring permit. 20:44:24:01. Carnivals, celebrations, and seasonal dwellings to have wiring permit. Prior to being connected for use all electrical installations and service connections for carnivals, celebra…
20:44:24-ARSD 20:44:24:02 Temporary installations for carnivals and celebrations.
1.6K chars
Rule 20:44:24:02 Temporary installations for carnivals and celebrations. 20:44:24:02. Temporary installations for carnivals and celebrations. All temporary installations of electrical wiring for carnivals or other celebrations consisting of surface or overhead installations for l…
20:44:24-ARSD 20:44:24:03 Additional requirements for temporary installations for carnivals and celebrations.
1.3K chars
Rule 20:44:24:03 Additional requirements for temporary installations for carnivals and celebrations. 20:44:24:03. Additional requirements for temporary installations for carnivals and celebrations. In addition to the requirements of § 20:44:24:02, temporary installations for carn…
20:44:24-ARSD 20:44:24:04 Notice of itinerary and application for inspection.
0.8K chars
Rule 20:44:24:04 Notice of itinerary and application for inspection. 20:44:24:04. Notice of itinerary and application for inspection. Each outdoor amusement enterprise entity, celebration sponsor, or carnival operating or intending to operate in South Dakota shall notify the comm…
20:44:24-ARSD 20:44:24:05 Inspection fee to be paid prior to inspection.
0.8K chars
20:44:24:05. Inspection fee to be paid prior to inspection. Inspection fees for carnivals or celebrations are charged to the owners and concessionaires in accordance with fees set forth in chapter 20:44:20. The inspection fees must be paid to the commission by the owners and conc…
20:44:24-ARSD 20:44:24:06 Fee to be paid to commission, Repealed.
0.4K chars
20:44:24:06. Fee to be paid to commission. Repealed. Source: SL 1975, ch 16, § 1; 10 SDR 131, effective June 3, 1984; 12 SDR 92, effective January 1, 1986; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:09:06, August 1…
20:44:24-ARSD 20:44:24:07 Repealed.
0.3K chars
Rule 20:44:24:07 Repealed. 20:44:24:07. Requirements for seasonal dwellings. Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:09:07, August 12, 1994; repealed, 40 SDR 198, effective…
20:44:25-ARSD 20:44:25:01 Definition of cogeneration systems.
0.5K chars
Rule 20:44:25:01 Definition of cogeneration systems. 20:44:25:01. Definition of cogeneration systems. Cogeneration systems are supplemental power generation systems that are connected in parallel with electrical service supplied by a power supplier. Source: 10 SDR 131, effective …
20:44:25-ARSD 20:44:25:02 Scope.
0.5K chars
Rule 20:44:25:02 Scope. 20:44:25:02. Scope. This chapter applies to cogeneration systems that are permanently installed in their entirety. All cogeneration systems shall be jointly approved by the power supplier and the commission according to the National Electrical Code, Articl…
20:44:25-ARSD 20:44:25:03 Application of other standards.
0.4K chars
Rule 20:44:25:03 Application of other standards. 20:44:25:03. Application of other standards. Except as modified by this chapter, all applicable articles of the National Electrical Code and all commission rules apply to cogeneration systems. Source: 10 SDR 131, effective June 3, …
20:44:25-ARSD 20:44:25:04 Equipment approval.
0.8K chars
Rule 20:44:25:04 Equipment approval. 20:44:25:04. Equipment approval. Prior to use, all equipment must be approved for supplemental power generation pursuant to § 20:44:22:03 and National Electrical Code, Section 110-3. If equipment is not listed by a qualified electrical laborat…
20:44:25-ARSD 20:44:25:05 Installation compatibility.
0.6K chars
Rule 20:44:25:05 Installation compatibility. 20:44:25:05. Installation compatibility. Since cogeneration systems parallel power supplier systems, all cogeneration equipment must satisfy requirements of existing systems with which it is to be interconnected. In cases of conflictin…
20:44:25-ARSD 20:44:25:06 Switch requirements.
0.6K chars
Rule 20:44:25:06 Switch requirements. 20:44:25:06. Switch requirements. The switch or switches installed in the cogeneration system as required by power supplier systems must be so arranged that only authorized persons have control of these switches. Authorized persons shall be d…
20:44:25-ARSD 20:44:25:07 System protection.
0.5K chars
Rule 20:44:25:07 System protection. 20:44:25:07. System protection. Switching equipment and wiring associated with the cogeneration system shall be provided with suitably rated protection devices according to the National Electrical Code or approved by the commission according to…
20:44:25-ARSD 20:44:25:08 System isolation.
0.5K chars
Rule 20:44:25:08 System isolation. 20:44:25:08. System isolation. Cogeneration systems shall automatically disconnect from the power supplier system when the power supplier system is deenergized. The equipment to prevent backfeed shall be approved by the power supplier and commis…
20:44:25-ARSD 20:44:25:09 Permits -- Fees.
0.5K chars
Rule 20:44:25:09 Permits -- Fees. 20:44:25:09. Permits -- Fees. Cogeneration systems must have a wiring permit executed according to chapter 20:44:18. Inspection fees are determined by equivalent service size and category as described in chapter 20:44:20. Source: 10 SDR 131, effe…
20:44:26-ARSD 20:44:26:01 Definitions.
0.5K chars
Rule 20:44:26:01 Definitions. 20:44:26:01. Definitions. Terms used in this chapter mean: (1) "Contractor," an individual licensed with the commission as an electrical contractor or a Class B electrician; (2) "Installation," an electrical installation; (3) "Submitter," an individu…
20:44:26-ARSD 20:44:26:02 Claim eligibility requirements.
1.2K chars
Rule 20:44:26:02 Claim eligibility requirements. 20:44:26:02. Claim eligibility requirements. Each claim for recovery from the undertaking fund shall be made on a commission approved claim form. For a submitter's claim to be eligible for recovery from the undertaking fund, the cl…
20:44:26-ARSD 20:44:26:03 Resolution of claim for recovery from the undertaking fund.
1.4K chars
Rule 20:44:26:03 Resolution of claim for recovery from the undertaking fund. 20:44:26:03. Resolution of claim for recovery from the undertaking fund. The commission shall resolve all claims for recovery from the undertaking fund that meet the requirements of ARSD § 20:44:26:02. T…
20:44:26-ARSD 20:44:26:04 Contractor required to reimburse the undertaking fund -- Request for waiver possible.
1.0K chars
Rule 20:44:26:04 Contractor required to reimburse the undertaking fund -- Request for waiver possible. 20:44:26:04. Contractor required to reimburse the undertaking fund -- Request for waiver possible. If a claim for recovery from the undertaking fund is resolved in favor of the …
20:45:01-ARSD 20:45:01:01 State board meetings, Repealed.
0.2K chars
20:45:01:01. State board meetings. Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 19 SDR 35, effective August 27, 1992; 50 SDR 157, effective July 2, 2024.
20:45:01-ARSD 20:45:01:02 Hearings, Repealed.
0.2K chars
20:45:01:02. Hearings. Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 30 SDR 215, effective July 14, 2004; 50 SDR 157, effective July 2, 2024.
20:45:01-ARSD 20:45:01:03 Reviewing of contested cases, Repealed.
0.2K chars
20:45:01:03. Reviewing of contested cases. Repealed. Source: SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 30 SDR 215, effective July 14, 2004; 50 SDR 157, effective July 2, 2024.
20:45:02-ARSD 20:45:02:01 Inspection of premises.
1.4K chars
20:45:02:01. Inspection of premises. The board shall inspect each funeral establishment in accordance with SDCL 36-19-31 to determine compliance with SDCL chapter 36-19 and this article. The funeral establishment shall correct a violation found during the inspection within twenty…
20:45:02-ARSD 20:45:02:02 Preparation room--Requirements.
1.1K chars
20:45:02:02. Preparation room--Requirements. The funeral establishment preparation room must be equipped with: (1) An embalming table; (2) Instruments for embalming; (3) A sink connected to a public sewer or septic tank; (4) An electric aspirator or hydroaspirator equipped to pre…
20:45:02-ARSD 20:45:02:03 Preparation room--Maintenance.
0.7K chars
20:45:02:03. Preparation room--Maintenance. All refuse, bandages, cotton, and other waste materials must be disposed of at the conclusion of each embalming case. All preparation rooms must be maintained in a clean and sanitary condition. All embalming tables, sinks, floors, recep…