Apportionment of original cost to annexed area when project extended

SDCL § 46A-10A-79 — under COUNTY DRAINAGE.

SDCL § 46A-10A-79

If an existing drainage project is extended or enlarged, the board or boards shall apportion the benefits resulting to the annexed area from the existing construction in the original project as a cost to be absorbed by the lands of the annexed area on the basis of the original cost of the drain. Source: SL 1985, ch 362 , § 80.