36 chapters · 230 sections in this title.
A well driller or well pump installer whose license has been revoked may not apply for a new license sooner than six months after the effective date of the revocation
0.1K chars
Source: SL 1983, ch 314 , § 99; SL 2001, ch 241 , § 7.
The license shall be issued pursuant to the procedures contained in chapter 46-2A
0.5K chars
No license may be issued unless the applicant is experienced and knowledgeable in good well construction methods. The Water Management Board shall promulgate rules pursuant to chapter 1-26 establishing qualifications for well drillers. Source: SL 1955, ch 431 , § 1; SDC Supp 1960…
SDCL § 46-6-1 Vested rights defined
0.6K chars
The term, vested rights, as used in this chapter, means: (1) Beneficial uses of groundwater under diversions and applications of water before February 28, 1955; (2) The right to take and use groundwater for beneficial purposes if an owner or lawful agent was engaged in the constr…
SDCL § 46-6-10 Wells to be constructed so as to prevent waste--Methods of construction, specification by board
0.5K chars
The Water Management Board shall require every well to be so constructed and finished as to prevent waste of its waters or underground leakage of these waters into other reservoirs. To this end it may specify methods of construction, kinds, size, and number of casings used, valve…
Records of well construction required
0.7K chars
On each well drilled the driller shall keep accurate records and complete a record of well construction on a form supplied by the chief engineer. If for any reason well construction is begun but not completed, the well driller shall complete the record of well construction to the…
SDCL § 46-6-12 Inspection of wells by chief engineer or state geologist
0.3K chars
The chief engineer or the state geologist may inspect wells for the purpose of making electric or radioactivity logs, caliper, leakage, and other surveys that pertain to the condition of the wells. Source: SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0406; SL 1983, ch 314 , § 101.
SDCL § 46-6-13 Measurement of flow and pressure of wells by chief engineer
0.3K chars
The chief engineer may measure the flow and pressure of any well, public or private, for the purpose of determining the increase or diminution of the flow or pressure of the well. Source: SDC 1939, § 61.0403; SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0408; SL 1983, ch 314 , § 10…
SDCL § 46-6-14 Waste of water from large capacity well prohibited
0.3K chars
No owner of property on which a large capacity artesian well is located may allow the water of the well to flow to waste if the board determines it is feasible to control the flow. Source: SDC 1939, § 61.0405; SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0410; SL 1983, ch 314 , § 1…
SDCL § 46-6-15 Uncontrolled artesian well--Definition--Owner to notify board of size and location
0.3K chars
The owner of an uncontrolled artesian well shall notify the Water Management Board in writing of the location and size of the well. An uncontrolled artesian well is one that cannot be controlled by mechanical means. Source: SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0411; SL 2011…
SDCL § 46-6-16 Uncontrolled artesian well from oil and gas exploration--Notice to chief engineer
0.3K chars
The Board of Minerals and Environment shall notify the chief engineer in writing of the location of any uncontrolled artesian well resulting from oil and gas exploration. Source: SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0412; SL 1983, ch 314 , § 104. 46-6-17. Repealed by SL 198…
SDCL § 46-6-18 Plugging abandoned or forfeited well by owner--"Owner" defined
0.4K chars
Any abandoned or forfeited well shall be plugged by its owner so that no leaking of its waters occurs underground or over the surface. The owner of property on which an abandoned or forfeited well is located is deemed to be the owner of the well. Source: SL 1955, ch 431 , § 1; SD…
SDCL § 46-6-2 Filing of vested right claim by claimant of vested right to groundwater--Hearing--Mandatory filing--Waiver of right
1.3K chars
Any person claiming to be the owner of a vested right to appropriate water from any underground source for beneficial use other than for domestic use as defined by subdivision § 46-1-6(7) may file a vested right claim with the chief engineer in a form and manner prescribed by the…
SDCL § 46-6-20 Rules and regulations of board relating to wells
0.4K chars
The Water Management Board shall promulgate rules pursuant to chapter 1-26 providing for or directing, as appropriate: (1) Rehabilitation of wells; (2) Construction of wells; (3) Prevention of underground leakage or other waste of water; and (4) Plugging or other control of aband…
SDCL § 46-6-21 Control of large capacity well required
0.6K chars
No owner or person in control of a large capacity artesian well may allow it to flow without a proper or sufficient casing or without a valve or contrivance for checking or preventing the flow of water if the Water Management Board determines that installation of a casing, valve,…
SDCL § 46-6-24 Liability for damages to domestic and municipal wells
0.6K chars
The failure of a well to meet standards established pursuant to § 46-6-6.1 is not a defense in any action or proceeding regarding damage, loss of water production or quality, replacement cost, or increased operating expenses incurred by a municipal or domestic use well located in…
SDCL § 46-6-25 Domestic and municipal well protection--Enforceability--Fees and costs
0.2K chars
Section 46-6-24 is enforceable in circuit court by the damaged owner or user of a domestic or municipal well. Attorney's fees, expert fees, and court costs may be awarded the plaintiff at the discretion of the court. Source: SL 1980, ch 304 , § 2.
SDCL § 46-6-26 Permits may be denied or conditioned to protect domestic or municipal wells or natural springs
0.3K chars
The Water Management Board or chief engineer pursuant to § 46-1-16 may deny or condition any permit in conformity with § 46-6-24 as is determined necessary to protect domestic wells, municipal wells, or natural springs of this state. Source: SL 1980, ch 304 , § 3; SL 1990, ch 355…
SDCL § 46-6-27 Plugging, sealing, or capping abandoned wells required--Rules
0.7K chars
If the owner of an existing well drills a replacement well and if the owner has no plan to use the existing well, the existing well is considered abandoned. The well owner shall plug the abandoned well within thirty days after the new well is ready for use. Any well that is being…
SDCL § 46-6-28 Geological survey to plug unused wells
0.2K chars
The state geological survey shall plug its test holes, observation wells, and any other of its borings or wells, pursuant to the provisions of § 46-6-27 , if they are no longer being used. Source: SL 1983, ch 319 , § 2.
SDCL § 46-6-29 Plugging or controlling large capacity well by chief engineer--Costs
0.6K chars
If an owner of property fails to plug or otherwise control a large capacity artesian well on his property after receiving an order to do so from the Water Management Board under the provisions of § 46-6-14 , the chief engineer may enter upon the property where the well is located…
SDCL § 46-6-3 Appropriation of groundwater authorized
0.3K chars
Subject to vested rights and prior appropriations, groundwaters of the state may be appropriated pursuant to the procedures contained in chapter 46-2A . Source: SL 1955, ch 431 , § 1; SDC Supp 1960, § 61.0404; SL 1971, ch 252 , § 1; SL 1972, ch 237 , § 5; SL 1973, ch 279 , § 2; S…
Annual withdrawal of groundwater not to exceed recharge--Exception for water distribution systems
0.7K chars
No application to appropriate groundwater may be approved if, according to the best information reasonably available, it is probable that the quantity of water withdrawn annually from a groundwater source will exceed the quantity of the average estimated annual recharge of water …
SDCL § 46-6-30 Order of chief engineer for proper construction or repair of well--Plugging or controlling well--Costs
0.8K chars
The chief engineer, during or immediately following construction of a well, may order the owner or driller of the well to properly construct or repair the well if the chief engineer determines that there is a serious and imminent threat to health or property. The chief engineer, …
SDCL § 46-6-31 Plugging or controlling well by chief engineer--Bidding provisions
0.4K chars
The chief engineer, if plugging or otherwise controlling a well pursuant to the provisions of §§ 46-6-29 and 46-6-30 , shall comply with the bidding provisions of chapters 5-18A and 5-18B unless the chief engineer determines that compliance with those provisions will result in ha…
SDCL § 46-6-6 Collection, preservation, and publication of data on underground water
0.6K chars
The collection, preservation, and publication of data with respect to the occurrence, quantity, quality, and hydraulic characteristics of underground water and the nature and identity of the subsurface geological formations in which it occurs are required by the public interest. …
SDCL § 46-6-6.1 Rules and regulations governing large capacity wells--Criteria and contents
1.5K chars
In addition to powers otherwise provided the Water Management Board shall promulgate rules pursuant to chapter 1-26 controlling the location and capacity of irrigation, industrial, municipal, and other large capacity wells for the purpose of ensuring or protecting water for reaso…
SDCL § 46-6-9 Well driller license--Fee--Issuance
0.9K chars
Any well driller, before doing any well drilling and before contracting for any such work, shall first secure and thereafter maintain a license. The words "South Dakota Licensed Well Driller No." shall be plainly displayed at a conspicuous place on the premises where the work is …
SDCL § 46-6-9.1 Well driller or well pump installer license--Revocation
0.5K chars
The chief engineer may initiate an action before the Water Management Board to revoke the license of any well driller or well pump installer upon refusal by the driller to properly complete any well or well pump installation in accordance with rules governing well construction or…
SDCL § 46-6-9.2 Well driller's license or well pump installer's license required for certain persons
0.3K chars
Any person who performs work for compensation in the repair of wells or as a well pump installer shall obtain a well driller's license issued pursuant to § 46-6-9 or a well pump installer's license issued pursuant to § 46-6-9.3 before conducting or contracting for such work. Sour…
SDCL § 46-6-9.3 Well pump installer license--Fee--Issuance
0.7K chars
The Water Management Board shall issue a well pump installer license to any applicant who meets the requirements specified in this section. The fee for the license is two hundred dollars for a resident, and three hundred dollars for a nonresident. The same amounts shall be paid e…
SDCL § 46-6-9.4 Certain persons exempt from well pump installer license requirements
0.2K chars
Any plumbing contractor licensed under chapter 36-25 , any electrical contractor licensed under chapter 36-16 , and any mechanical contractor licensed under municipal ordinances may be exempt from the well pump installer licensure requirements of §
SDCL § 46-6-9.5 Well pump installers and well drillers prohibited from performing certain acts without appropriate license
0.3K chars
No licensed well pump installer or well driller may perform any electrical, plumbing, or mechanical act regulated by state law unless licensed to do so. All applicable rules and regulations of state law and municipal ordinances shall apply regarding any permit and any installatio…